detailed project report on nonoi integrated watershed management
Transcription
detailed project report on nonoi integrated watershed management
DETAILED PROJECT REPORT ON NONOI INTEGRATED WATERSHED MANAGEMENT PROJECT UDALGURI UNDER THE DEPARTMENT OF LAND RESOURCES MINISTRY OF RURAL DEVELOPMENT GOVERNMENT OF INDIA NEW DELHI PREPARED & SUBMITTED TO STATE LEVEL NODAL AGENCY INTEGRATED WATERSHED MANAGEMENT PROGRAMME GOVERNMENT OF ASSAM BY BS CONSULTANTS 128, RAJGARH ROAD, 2ND FLOOR GUWAHATI-7 1 PROJECT AT A GLANCE 1. Name of project : Nonoi Integrated Watershed Management Project Code No. 3A2C1 2. Name of the State : Assam (Code No. 18). 3. Name of the State Level Nodal Agency: Department of Soil Conservation, Government of Assam 4. Name of the District : Udalguri 5. Name of the Development Block : 1. Kaligaon Development Block (Part) 2. Khairabari Development Block (Part) 6. Name of VCDC : 1. Bhekelikanda, 2. Kacharital, 3. Bhuyan Khat, 4. Bholabari . 7. Numbers of villages covered : 19 Nos. 8. Name of Micro Watershed with Code: 1. Nonoi (3A2C1 i), 2. Kulsi (3A2C1 ii) 9. Total Geographical area of the project: 4586 ha. 10. Area proposed to be treated : 3000 ha. 11. Total project cost : Rs. 360.00 Lakhs. 12. Name & Address of Project Manager: Divisional Officer, Udalguri Soil Conservation Division, Udalguri 13. Name & Address of PIA: - Range Officer, Tongla Soil Conservation Range, Tongla. 2 CONTENTS Sl. No. 1 2 3 CHAPTER –I 4 CHAPTER –II 5 6 Chapter CHAPTER-III CHAPTER-IV Particulars INTRODUCTION METHODOLOGY DISTRICT PROFILE General description of the District Physiography Demographic profile Land use & Land Holdings Ground Water Level IWMP projects in the District Proposed IWMP in the District Table M(SP)-2 Prioritized list of Projects Table DPR-1 Vision and Strategy Page No. 1 2 4-10 4 5 6 6 7 7 8 8 9 GENERAL DESRIPTION OF THE NANOI IWM PROJECT AREA Location Climate Rainfall with Table: DPR 2 & 3 Soil Physiography, Relief & Drainage PRESENT STATUS OF THE PROJECT AREA Objectives Present Land Use Table: DPR 4 Details of Areas of Micro Watersheds Table: M (SP) 2 Details of Types of Areas Covered under IWMP, Table (SP) 3 Details of Physiography & Relief Table: M (SP) 4 Agro-Climatic Zone, Soil types, Average Rainfall & Major Crops., Table M (SP) 5 Details of Flood & Drought in Project Area., Table M (SP) 6 Details of Soil Erosion, Table M (SP) 7. Details of Infrastructure, Table M (SP)8 Details of Land Holdings pattern, Table M (SP) 9 Details of Common Property Resources Table M (SP) 10 Details of Kharif Crop Area, Table M(PO) C1 Details of Rabi Crops Area, Table M (PO) C2 Details of Zaid Crop Area, Table M (PO) C3 Details of Fund Flow of Watershed Committee Account, Table M(FM) 4 Details of Pending Ucs, Table M(FM) 5 11-14 PROPOSED MANAGEMENT PLAN Strategy Preparatory phase Entry Point Activities (EPA) Table M(PA) A1 Other Activities of Preparatory Phase table M (PA)-A2 Livelihood activities & Production system Table DPR-5 26-44 26 31 31 32 33 3 11 11 11-13 13 14 15-25 15 17 17 18 18 19 19 20 21 22 22 23 23 24 24 25 7 CHAPTER-V 8 CHAPTER-VI 9 10 Activities related to Surface water resources table M (PA)B1 Activities related to ground water resources Table M (PA)B2 Activities proposed for Users groups(UGs) Table M(PS)B3 Activities related to livelihood by Self Help Groups Table M(PA)B4 Other activities of watershed work phase Table M (PA)B5 Details of Engineering Structures in Watershed works Table M(PA)B6 Details of activities connected with vegetative cover Table M(PA)B7 Details of allied other activities Table M(PA)B8 Livelihood proposed to be created for Asset less people Table M(PA) B9 Livelihood proposed to be created for farmers Table M(PA)B10 PLANNING Proposed Entry Point Activities (EPA) Table M(PA)A1 Year wise phasing of project activities, Table DPR 6 Year wise Physical & Financial Target Table DPR 7 INSTUTIONAL STRUCTURES Details of Self Help groups (SHG) M(IS)9 Details of User Groups (UGs) in project area Table M(IS)10 CHAPTER-VII CAPACITY BUILDING Capacity building activities for the year 2010-11, Table M(CB)2 Information, Education & Communication (IEC) Table M(CB)3 Location Map of Nanoi IWM Project. MAPS Present Land Use Map of Nanoi Watershed Area. Watershed map of Nanoi IWM project showing Micro Watersheds, villages, drainage, relief etc. 4 34 36 37 38 40 41 42 42 43 44 45-50 45 46 47-50 51 51 51 52 52 52 INTRODUCTION Soil-Water-Plant resources are nature’s gift to mankind. These three resources are the most important and vital natural resources for the existence of man and animals. Soil, water and plant are so interdependent that one cannot be managed efficiently without the other two. But due to high rate of population growth in both human and livestock, there is indiscriminate exploitation of natural resources for meeting the everincreasing demand for food, fodder, fuel, fibers and fertilizers. Thus developed, continuous degradation of production base and imbalance in land-water-plant and human-animal system is creating ecological imbalance and economic insecurity. As a result there is threat to the quality of our life and cultivation. Therefore it is highly felt that the natural resources are to be managed efficiently, collectively and simultaneously. One has to look and find out the suitable “unit of management”. Of the three resources soil, water and vegetation or plants, soil and vegetation subjected themselves to an easier manipulation where as water is the climatic parameter that needs to be disciplined once it comes in contact with vegetation and the soil. However, water can be managed conveniently and efficiently only if watershed is taken as a unit. Since soil, plant and water are interdependent resources, “watershed” is considered to be the ideal unit for most effective and gainful management of these resources. Watershed is defined as an unit of an area which covers all land and water area that contribute runoff to a common point. It is a complete dynamic unit, which invariably responds to any change that may be brought about within its extent. The soil and water must therefore be considered planned and managed on watershed basics for effective results. Watershed approach has conventionally aimed at treating degraded land with the help of low cost and locally accessed technologies such as in-situ soil and moisture conservation measures, afforestation etc. through a participatory approach that seek to secure close involvement of the user communities. The broad objectives were the 5 promotion of the overall economic development and improvement of socio-economic conditions of the resource poor section of the people in-habiting in the programme areas. With this aim, the Govt. of India has launched the “Integrated Watershed Management Programme (IWMP). METHODOLOGY The general common guidelines for watershed development projects (2008) of the Department of Land Resources (DoLR) Government of India were followed in preparation of the Detailed Project Report (DPR). The methodology of planning envisages in the guidelines participatory planning approach involving directly the villagers (Beneficiaries) of the project area with active co-operation & participation from the gram panchayats/VCDC. The Participatory Rural Appraisal (PRA) was carried out in all the villages in the project areas. Participatory work sheet for assessment of needs and priorities including details of activities were prepared. The socio economic survey was conducted covering each and every house hold. The data collected house wise and village wise were generated and analyzed. The Comprehensive District Agricultural Plan (C-DAP) was also referred to and the prescriptions suggested in C-DAP were adhered to in finalizing the work phase. Basic information on watershed including rainfall, temperature, topography, hydrogeology, soil forests etc. were collected from various published and unpublished records and reports etc. of various Central and State Government Organization including remote sensing data/maps of NRSO, Topo-sheets, soil maps, Climatic maps, hydro-ecological maps prepared and published by the National Bureau of soil survey and Land use planning. Land use Land cover maps here supplied by the SLNA and the present land use Land cover was analyzed and interpreted from these maps with ground truth verification as well as data available with revenue authority. 6 The treatment measures taken up for compiling and preparing the work phase in the DPR as detailed in the common guidelines and as prescribed by the SLNA. The cost analysis design and drawing etc. of different activities were also designed and supplied by the SLNA and accordingly used in project Planning. The GPS points were taken for all village level proposed project sites and were transferred in GIS layers. The draft plan (both soft copy as well as hard copy) was prepared and placed for review, modification and approval to the SLNA. On scrutiny of the draft plan by the SLNA as well as by the concerned Project Manager Final Detailed Project Reports have been prepared. 7 CHAPTER- I GENERAL DESCRIPTION OF THE DISTRICT Location: This district is bounded by Bhutan and Arunachal Pradesh in the north, Sonitpur district in the east, Darrang district in the south and Baska district in the west. The district of Udalguri lies between 26046 / and 26077 / North Latitude and 92008/ and 95 015/ East Longitude. Total geographical area of the district is about 1,985.68 sq.km, while the population of the district is roughly about 75,671 meaning that the population density is 381 persons per sq.km. Distance of the District Headquarters from the state capital Guwahati is 140 km. Climate& Soil The district has a sub-tropical humid climate with semi-dry hot summer and cold winter. Agro-climatically, the district falls under the North Bank Plain Zone. During summer (May to Early September), heavy rainfall occurs due to south-west monsoon for which the district experiences flood. Taking the five years’ average, the monthly minimum temperature was observed 9.250 C in January. Similarly the average monthly maximum temperature observed 31.78.0 C in May. The last five years, average annual rainfall in the district is 2077 mm ranging from 1553.7 mm (lowest) in 2006 & 2888.2 (highest) in 2005. The rainfall pattern observed dry during November to March (winter) with an average annual rainfall of 119.2 mm only while April to October was observed as wet period that received the average rainfall of 1832 mm. Due to varied distribution of rainfall, the district suffers from heavy flood during wet period and moisture stress in the dry period. 8 The soil of the district is more or less heterogeneous in nature. The northern part of the district is composed of clay and clay-loam soils whereas the middle part is loamy and sandy. The soil of the southern part of the district is composed of deposited sand and clay. There is no available data based on soil sample analysis regarding organic Carbon, N, P, K, and other micronutrient content of the soil in the district. However in general, soil of the district is acidic in reaction. Soil of major areas are mildly acidic (5.5-6.5 PH), while soil in high land old alluvial is severely acidic. There is a problem of riverbank erosion in the riverine tracts, specially during flood season.. Mild micronutrient deficiency specially of Boron has been observed in same areas throughout the district. Soil erosion is a serious problem specially in flood prone area. Physiography The district is characterized by almost plain topography being flanked by foothills of Bhutan in the upper strip of north and high plain in the middle to lower strip towards the southern side with a gradation from north to south. The southern part however, has hills and hillocks also. The southern parts of the district are situated on the plains of the Brahmaputra Valley Zone. Major tributaries of the river Brahmaputra viz. Pachoni, Dhansiri, Noa, Nonoi, Gulandi, Joyphrung, Kulsi, Dipila and Bornoi, which originate from the foothills of the Himalayan Range flow through the district and they mainly contribute towards the sustenance of the agrarian economy of the district. Despite various efforts made in the past, the present status of irrigated agriculture in the district is not satisfactory (compared to the state and the national standard). More and more agricultural land is required to be brought under irrigation on priority basis (there being potentiality), both for increasing production and productivity through intensification of agriculture Demographic Profile: The total population of the district is7,56,671 (Census 2001) out of which 63.82% belongs to General Caste, 32.07% Schedule Tribe and a negligible percentage of 9 Schedule Caste population which is only 4.11%. Under 114 VCDC in total, there are 1136 revenue villages out of which 68 are uninhabited. The reason of un-inhabitation is mainly complete erosion of the villages by flood & river Brahmaputra and tributaries. The population density of the district is 381 per square K.M. Land use & Land Holdings: The total geographical area of the district is 185216 ha and out of which 36.16% is cultivable wasteland, 0.8% current fallow, 4.94% forest 6.08% Pastures, 8.1% under non-agricultural use, 3.70% under miscellaneous plantation. The net Sown Area of Udalguri district is 91,681 ha which is 20.33% of the total area of the district. There are 38,786 operational holdings. The average size of tilling is reported to be below 1.25 ha in most of the VCDCs, which is the result of excessive fragmentation of land holdings. The marginal farmers constitute 30.70% of farm families with 27.01% of land under their possession and the small farmer is 33.39% occupying 30.54% of land. 18.52% of farm families represent semi-medium farmers possessing 28.99% of land while medium farmers constitute 5.20% of farm families with 12.07% of land. The large farmer in the district is only less than 0.9% of total farm families. The district has been divided into three Agro Ecological situations (AES) based on physiography hydrology, soil, climate and cropping patterns viz. (i) Plain Zone, (ii) Hill and Hillock Zone and (iii) Foot Hill area. Plain zone is the largest zone covering an area of 69.15% of total area while Hill and Hillock zone is the smallest zone with 12% of area in the south. The Foot Hill zone enshrines 24.85% area in the district. Agriculture is the main occupation of the district. The District favoured by desirable soil and climatic condition grows a wide range of crops. Paddy is the main crop of the district, grown mainly as summer and winter paddy. The other major crops are Mustard, Jute, Potato, Wheat, Lentil, Black gram and different vegetables like Brinjal, Cabbage, Cauliflower, Lady’s finger, Radish, Tomato, Cucumber, Carrot and Guards. Onion, Garlic, Chilly, Zinger and Turmeric are also grown in small areas in all the Dev. Blocks. Some other minor crops are pea, sesamum Niger, Cucurbits, Tapioca etc. Important plantation crops are Banana, Coconut, arecanut, guava, mango, 10 lemon, bamboo etc.. In animal husbandry sector, different indigenous and cross breeds are reared by the farmers of Udalguri district. In case of fisheries, different indigenous and exotic breeds like Katla, Rahu, Mrigal, Bahu, Bato, Bhangan, Puthi, Borali, Chitol, Kandhuli, etc. are grown. Ground Water Level It is reported that the average ground water table in the district can be reached at depth of about 3 to 8 m from ground level/surface depending upon location. It is also reported that the ground water table in the district is depleting at the rate of about 1m. per year due to large-scale deforestation, this started about a decade ago. IWMP in the District: The district has proposed two numbers of IWMP projects that are indicated below along with the salient features 11 MIS TABLE M (SP)-2: PROPOSED INTEGRATED WATERSHED MANAGEMENT PROJECTS IN THE DISTRICT Sl. Name Total Micro No. of Watershed in the Department of Other Total District District Land Ministries/ Watershed Resources Department Covered No. Area Micro Watershed covered so far No. (Ha.) 1 1. 2 3 Udalguri 23 4 No. Area (Ha.) 5 1,17,175 Area 6 3 (Ha.) 7 20000 No. 8 Nil Net Watershed Area to be covered No. Area (Ha.) 9 Nil 10 3 20,000 (Ha.) 11 12 20 97,175 TABLE DPR-1 PRIORITIZED LIST OF PROJECTS PROPOSED FOR SANCTION DURING THE FINANCIAL YEAR 2009-10. No Name of the No of micro Proposed Type of area (Hilly/ Proposed Projects watersheds project area Desert/ Other) cost (Rupees proposed to be (Ha.) District Sl. Remarks in Lakh.) Udalguri 1 Nonoi IWMP covered 3 3000 Moderately slope 360 Area to be treated during XI 12 th Plan VISION AND STRATEGY The district of Udalguri needs major rejuvenation and reconstruction in all the sectors of development as it has been running through a stagnation Agriculture in the district is of subsistence type. The productivity of almost all major crops in the district as reflected in the Comprehensive District Agriculture Plan, has remained below the State’s average. The average yield of the most important food crop of rice (3600 kg/ha.) which is higher than that in the State and even then that of the neighboring district of Darrang. Similarly yields of pulses and spices are also higher. Yields of oil seeds, vegetables and tuber crops are higher than those of the States average. Under the circumstances critical issues relating to the development of agriculture and allied sectors vis-à-vis in-situ conservation of soil & moisture, that need to be eddies are as follows. 1. Stable productivity and income through in-situ conservation of soil & moisture, up-gradation and utilization of natural endowments like land, water, plant, and human resources in harmonious and integrated manner. This will aim at perpetual availability of food, fodder, fuel, fiber, timber and biomass for rural and cottage industry to meet the growing demands of human and livestock population through diversification and intensification in existing farming system Introducing land use technologies, which improve production and productivity and will enable the farmers to make use of land according to capability. 2. Farmers Organization: Formation, promotion and empowering Users Groups, Self Help Groups covering marginal and landless farmers providing facilities of integrated development of the watershed with effective participation of the people of the project area. 3. Sustainability of production and farm income: The high rainfall and light soil condition need attention for efficient natural resources management including judicious water management, rain water harvesting, proper drainage line 13 treatment, rejuvenation of degraded vegetative cover to tackle the problems of soil erosion, soil acidity, lose of vegetative cover and bio-diversity. 4. Generation of employment by optimum development of natural and human resources of villages through creating general awareness on scientific farming and market information as well as human resources through adequate time-totime training. 14 CHAPTER-II GENERAL DESCRIPTION OF THE NONOI IWM PROJECT AREA LOCATION The Nonoi IWMP area is located in the western side of the district HQ, Udalguri town. It lies between 910 53’ E to 91059’ E and 26034’ N to 26039’N CLIMATE The Climate is warm and humid with hot summer followed by monsoon of heavy rainfall and relatively cool and dry winter. Min Temperature 80 - 100 C and Max Temperature is 330 - 380C Relative Humidity is Min 72.75% and Max 75.50%. RAINFALL The last five years, average annual rainfall in the district is 3027 mm ranging from 1553.7 mm (lowest) in 2006 & 2888.2 (highest) in 2005. The rainfall pattern observed scanty during November to March (winter) with an average total rainfall of 119.2 mm only while April to October was observed as wet period that received the total rainfall of 1832 mm.. Due to varied distribution of rainfall, the district suffers from heavy flood during wet period and moisture stress in the dry period. The normal rainfall, actual rainfall and deviation in percentage for the period from January 2005 to October 2009are given in the table DPR-2 & 3: 15 Table: DPR 2: The Rainfall data for the period from 2005 to 2009 (September) 2005 Months 2006 2007 2008 2009 Normal Actual % Deviation Normal Actual % Deviation Normal Actual % Deviation Normal Actual % Deviation Normal Actual % Deviation 17 22.8 34 13.8 0 -100 13.8 0 -100 25 13.8 81 0 13.8 (-)100 February 28.2 26.2 -7 13 9 -31 20.6 92.6 349 14.5 20.6 -30 8.4 20.6 (-)59 March 81.3 130.4 60 45.9 2.5 -95 56.7 19.7 -65 69.6 56.7 23 40.3 56.7 (-)29 April 125.3 169.2 35 173 230.7 33 173 342.3 98 189.9 173 10 160.8 173 (-)7 May 193.6 207.9 7 312.7 156.9 -50 312.7 183.7 -61 122.2 312.7 -61 210.5 312.7 (-)33 June 293.8 193.2 -34 312.7 183.7 -61 407.6 398.1 -2 410.9 407.6 1 210.5 312.7 (-)33 July 247.4 209.7 -15 122.2 312.7 -61 350.1 494.4 41 398.6 350.1 14 208.9 407.6 (-)49 August 323.6 301.8 -7 273.5 268.2 -2 273.2 150.1 -45 197.4 273.2 -28 486.3 350.1 39 September 230.7 98 -58 195.9 209.7 7 223 153.5 -31 232 223.1 4 254.8 285.5 -10 October 99.9 160.4 61 114.7 71.3 -38 92.3 136.4 48 87.9 92.3 -5 155.3 213.8 -27 November 19.1 5.4 -72 16.7 26.4 58 17.2 3.7 -78 8.4 17.2 -51 10.1 12.8 27 10.9 0 -100 0 10.9 -100 January December 16 Table: DPR 3 - SEASONAL DISTRIBUTION OF RAIN FALL DURING 2008. Udalguri North Bank Plain Zone District and Agro-Climatic Zone Season Rainfall in mm. Normal Actual Deviation Winter (Jan, Feb) Summer (March, April & May) Monsoon (June to September) Post Monsoon (October to December) Total: 34.6 542.4 1178.0 120.40 39.5 381.7 1238.9 96.3 14.16 -42.10 5.16 -25.02 1875.4 1756.40 -6.77 (Source: Statistical Handbook, Assam, 2008) Now from the analysis of the tables given above it is seen that out of the total rainfall of 1756.40 mm during the year 2008 a total of 1238.90 mm i.e. 70.53% rainfall had occurred during the months from June to September. On the other hand there was 14.16 mm rainfall at all during the months of January and February and there was only 10.9 mm rainfall during the month of December; as such there was practically no rainfall at all during four months of the year. This is a clear indication that for four months of the year the land suffers moisture stress while during the rainy season i.e from June to October almost 3/4th of the total annual rainfall (70.19%) had occurred during the season; on account of which the area suffers periodic inundation as well as soil erosion due to high intensity of rainfall. SOIL The Soil is predominantly very deep, well drained, fine loamy soils occurring on very gently to gently sloping,having loamy surface with slight erosion (Fine- Loamy, Dystric Eutrochrepts) associated with deep, imperfectly drained, coarse loamy soil occurring on very gently sloping plain with slight erosion and slight flooding (Coarse - Loamy, Typic Haplaquents) and acidity to neutral in reaction, as per soil survey map prepared by National Bureau of Soils Survey and Land Use Planning (ICAR) (Regional Center, Jorhat). 17 PHYSIOGRAPHY RELIEF AND DRAINAGE The area is very gently sloping characterized by almost plain topography mostly less than 10 meters per km. gradient towards south, being flanked by foothills of Bhutan in the strip of North and high plain in the middle to lower strip towards the southern side with aggression from north to south. The southern part however has hills and hillocks also. The lowest elevation recorded in the project area is 45mtrs. and the highest elevation is 70 meters. The river Nonoi passes through the project area in the left side. River Kulsi also passes through the project area and meets the river Nonoi. The drainage pattern is almost parallel to sub-dendritic. 18 CHAPTER-III PRESENT STATUS OF THE PROJECT AREA Objectives: The specific objectives of the project are as follows: i. Conservation up-gradation and utilization of natural endowments like land, water plant, animal and human resources in harmonious and integrated manner. This will aim at perpetual availability of food, fodder, fuel, fiber, timber and biomass for rural and cottage industries to meet the growing demands of human and livestock population through diversification use pattern. ii. Introducing land use technologies, which improve production and productivity of crops in the project areas. iii. Introducing measures, which will enable the farmers to make use of land according to its capability. iv. Generation of employment during project period and regular employment after completion of the project. v. Securing stability and growth of agricultural production. vi. Optimization of available resources such as soil, water and land within the micro watershed. vii. Creating a general awareness among the local farmers about adopting scientific farming. viii. Providing facilities of integrated development and production of the watershed with effective participation of the people of the project area. ix. In addition to food, fodder and fuel, the project will endeavor to enhance cash flow to the farmers and landless agricultural labourer through increased casual employment, marketing of marketable surplus of various produce with the help of forming various self help groups (SHG). x. Generation of employment by optimum development of natural and human resources of villages in order to promote income generation activities and to encourage savings. 19 TABLE DPR 4: LAND USE PATTERN OF NONOI IWM PROJECT The present land use pattern of the project area as interpreted from the remote sensing map supplied by the SLNA and as per ground habitation is as follows: Name of project Builtup(ha) Kharif (ha) Rabi (ha) Zaid Double crop(ha) Nonoi Nil 1723 Nil Nil 1040 Agril. Plantati on (ha) 1272+ 76(TG) Deci .Forest (dense) Deci Forest (open) Scru b Grass (ha) Marshy (ha) Nil Nil Nil 58 24 River/ Waterbod y (ha) 231 River Sand Gully Nil Nil TABLE: M(SP) 2: DETAILS OF AREAS OF MICRO WATERSHEDS COVERED UNDER THE WATERSHED PROGRAMME. Sl. Name of Total Micro No. District Watershed in the Department of Other Ministries/ Total Watershed District Land Resources Department Covered No. Area Micro Watershed covered so far No. (Ha.) Area No. (Ha.) Area No. (Ha.) Net Watershed to be Area covered No. (Ha.) Area (Ha.) 1 2 3 4 5 6 7 8 9 10 11 12 1. Udalguri 23 117175 3 20000 - - 3 20000 20 97175 20 TABLE-M (SP) 3: DETAILS OF THE TYPES OF AREAS COVERED UNDER THE IWMP. 1 2 Sl. No. Name of State 1 3 4 5 Names Name of Year of of District sanction projects Assam Udalguri Nonoi 2009 6 Project duration (dd/mm/ yyyy) 2009 2014 7 8 9 Area of the projects Type of terrain Hilly (H)/ Desert (D)/ Others (O) 3000 ha. Others 10 Names of micro Project watersheds and cost (Rs. Code Nos.# (as per In lakh) DoLR’s unique codification) 360.00 3A2C1 11 12 Cultivated and wasteland area of the projects Area details (ha) (Falling within the projects) Uncultivated wasteland Cultivated Cultivated Rain fed irrigated a) Temporary Pvt. Agri. Land b) Permanent area area Fallow 82 231 2411 1040 Gen. SC ST OBC Total 453 794 1751 535 3533 Others Forest Community (River & Total Land Land river sand area (ha) etc.) Nil 822 231 4586 TABLE-M(SP)4: DETAILS OF PHYSIOGRAPHY AND RELIEF OF THE PROJECT AREAS 1 Sl. No. 1. 2 Name of State Assam 3 Name of District Udalguri 4 Names of project 5 6 7 Elevation (meters) Slope range (%) 50 - 100 m. 0–5% Order of Watershed Sub/micro-watershed 1. Nonoi 2. Kulsi Nonoi 21 8 9 Major streams Top sequence (Soil series) Nonoi & Kulsi Older Alluvial (Alfisols) TABLE-M (SP) 5: AGRO-CLIMATIC ZONE, SOIL TYPES, AVERAGE RAINFALL AND MAJOR CROPS IN THE PROJECT AREA 1 2 3 4 5 6 7 8 Major soil types Sl. No. Name of State 1. Assam Name of the Agro-climatic zone Lower Brahamaputra Valley Climatic Zone No.-4 Area in ha Names of the District 4586 Udalguri Names of the projects a) Type b) Area (ha) Older Alluvial (Alfisols) 3210 Terai (Mollisols ) 1376 Nonoi 9 Average rainfall in mm (preceding 5 years’ average) 2576 Major crops b) Area (ha) a) Name Paddy, 2411 TABLE-M (SP) 6: DETAILS OF FLOOD AND DROUGHT IN THE PROJECT AREA. 1 2 3 4 5 6 Sl. No. Name of State Name of District Name of projects Particulars Villages 1. Assam Udalguri Nonoi Flood Drought Nil Nil. 22 7 Periodicity Any other Annual (please specify) Nil Nil Nil. Nil 8 Not affected Not affected Nil. TABLE-M (SP) 7: DETAILS OF SOIL EROSION IN THE PROJECT AREAS 1 2 Sl. No. Name of State 3 Name of District 4 5 6 Name of project Cause Type of erosion 7 Area affected (ha) 8 Run off (mm/ year) 9 Average soil loss (Tones/ ha/ year) Water erosion 1. Assam Udalguri Nonoi a. Sheet b. Rill c. Gully Sub-Total: 1287 1052 972 176.18 65.73 99.84 100.00 Wind erosion Nil Total for project: 3411 (Source: Soil Conservation Deptt. Assam – Data as reflected in PPR) 23 TABLE-M (SP) 8: DETAILS OF INFRASTRUCTURE IN THE PROJECT AREA 1 Sl. No . 2 Name of State 3 Name of District 4 5 6 Name of project Parameters Status (i) 19 19 Nil (iv) No. of educational institutions : Primary (P)/ Secondary (S)/ Higher Secondary (HS)/ vocational institution (VI) (P) 19 (v) No. of villages with access to Primary Health Center (vi) No. of villages with access to Veterinary Dispensary (vii) (viii ) (ix) (x) (xi) (xii) No. of villages with access to Post Office No. of villages with access to Banks Adjacent to Kolaigaon town where there is hospital facility Adjacent to Kolaigaon town where there is hospital facility 19 Nearest bank at Kolaigaon Nonoi Udalguri Assam 1. (ii) (iii) No. of villages connected to the main road by an allweather road No. of villages provided with electricity No. of households without access to drinking water (xiii ) (xiv ) No. of villages with access to Markets / mandis No. of villages with access to Agro-industries Total quantity of surplus milk No. of milk collection centers (e.g. Union(U)/ Society(S)/ Pvt. agency(PA)/ others (O)) No. of villages with access to Anganwadi Center Any other facilities with no. of villages (Please specify) 24 (U) Nil. (S) 2 (HS) 0 Kalaigaon Nil Nil. (S) (PA) Nil. Nil 19 Nil (VI) 0 (O) Nil. TABLE-M (SP) 9: DETAILS OF LAND HOLDING PATTERN IN THE PROJECT AREA. Name of State Name of District 4 Names of the project Nonoi Sl. No. Udalguri 3 Assam 2 1 1 5 6 7 Type of Farmer No. of households No. of BPL households 0 1004 0 0 187 (i) Large farmer (ii) Small farmer (iii) Marginal farmer (iv) Landless person Total: 25 8 Land holding (ha) Irrigated Rainfed Total Nil Nil Nil 1520 985 1260 3784 1172 0 2309 0 2309 1976 1976 394 4679 394 4679 Nil Nil TABLE-M (SP) 10: DETAILS OF COMMON PROPERTY RESOURCES OF THE PROJECT AREA Name of State Name of District Name of Project Udalguri Nonoi 4 Assam 3 Sl. No. 2 1. 1 5 6 7 CPR Total Area (ha) Particulars Area owned / In possession of Area available for treatment (ha) Pvt. Govt. PRI Any Pvt. Govt. PRI Any other persons other (Pl. persons (Specify (Pl. Specify) Specify) deptt.) (i) Wasteland / degraded land 82 231 Nil Nil 82 Nil Nil Nil (ii) Pastures 58 Nil. Nil Nil Nil Nil Nil Nil (iii) Orchards 1272 Nil Nil Nil 800 Nil Nil Nil (iv) Village Woodlot Nil Nil. Nil Nil Nil Nil Nil Nil (v) Forest Nil Nil Nil Nil Nil Nil Nil Nil (vi) Village Ponds / Tanks 9 5 Nil Nil Nil Nil Nil Nil (vii) Community Buildings 8 9 Nil Nil Nil Nil Nil Nil (viii) Weekly Markets Nil. 3 Nil Nil Nil Nil Nil Nil (ix) Permanent markets Nil. Nil Nil Nil Nil Nil Nil Nil (x) Temples / Places of worship 5 Nil Nil Nil Nil Nil Nil Nil (xi) Others (Pl. specify) Nil. Nil. Nil Nil Nil Nil Nil Nil TABLE-M (PO) C1: DETAILS OF KHARIF CROP AREA AND YIELD IN THE PROJECT AREA 1 2 3 4 Sl. Name of Name of Name of Project No. State the District 1. Assam Udalguri Nonoi 5 Name of crops Paddy Oil seed Total for the project area: Area (ha) 6 Pre - project Average Yield (Qtl) per ha. Irri. Rf. Irri. Rf. 340 1081 25 340 990 2071 - 26 Total Production (Qtl) Irri. Rf. 12.8 8500 17702 6 - 8500 5940 23642 TABLE-M(PO)C2: DETAILS OF RABI CROP AREA AND YIELD IN THE PROJECT AREA 4 Name of Project 3 Name of the District 2 Name of State Sl. No. 1 5 6 7 8 Name of crop Pre-project Mid-term Post-project Nonoi Udalguri Assam 1. Lentil Area (ha) Irri Rf. - - Average Yield (Qtl) per ha. Irri Total Production (Qtl) Area (ha) Average Yield per ha (qtl) Total production (qtl) Area (ha) Average Yield per ha (qtl) Total production (qtl) - - - - - Irr i - 30 - 1200 25 70 50 45 1250 3150 50 100 60 50 3000 5000 30 - 1200 25 70 50 45 1250 3150 50 100 60 50 3000 5000 Rf. Irri Rf. Irri Rf. Rf. Irri Rf. Irri Rf. Irri Rf. Irri - - - - - - - - Rf. - Vegetables - 40 - Total for the Project: - 40 - * From column no.2 total number of States, from column no.3 total no. of Districts; from column no.4 total no. of projects; from column no.5, total no. of crops; from column no.6 to 8, the totals for the area, average yield per ha and total production, category-wise, for the entire country may be given at the end of the Table. Irri. – Irrigated Rf. – Rainfed 27 TABLE-M(PO)C3: DETAILS OF ZAID CROP AREA AND YIELD IN THE PROJECT AREA 4 6 Name of crops Pre-project Area (ha) Irri Winter rice Nonoi Udalguri 5 Name of Project 3 Name of State Name of the District 2 Assam 1 Sl. No. 1 Average Yield (Qtl) per ha. Rf. Irri Rf. Total Production (Qtl) Irri Rf. Area (ha) Irri 450 - 22 - 9900 - 500 - 50 - 5 - 250 - Banana Assam Lemon Total for the project: 5 - 150 659 750 377 15035 100 Rf. 7 8 Mid-term Post-project Average Total Yield per ha production (qtl) (qtl) Irri Rf. Irri Rf. 25 12500 Area (ha) Irri Rf. Average Total Yield per ha production (qtl) (qtl) Irri Rf. Irri Rf. 600 - 25 15000 - 60 - 6 - 360 - 80 - 7 - 560 10 - 300 - 3000 - 20 - 350 - 7000 2500 68800 150 1120 750 25 826 27 1079 4050 64350 * From column no. 2, total number of States, from column no. 3, total no. of Districts; from column no. 4, total no. of projects; from column no.5, total no. of crops; from column no. 6 to 8, the totals for the area, average yield per ha and total production, category-wise, for the entire country may be given at the end of the Table. Irri. – Irrigated Rf. – Rainfed TABLE-M(FM)4: DETAILS OF FUND FLOW OF WATERSHED COMMITTEE ACCOUNTS IN THE COUNTRY: STATE-WISE* (AMOUNT IN RS.) Name of watershe d committe Name of Project 5 Nonoi & Kulsi Udalguri 4 Nonoi 3 Name of State Name of District 2 Assam 1 Sl. No. 1 6 7 8 Opening Balance Deposit Withdrawal DRDA/ ZP Cheque No./date Amount / Date of deposit in WC Account Total amount available in WC Account Amount withdrawn Date of by Cash/ Cheque with-drawal 9 10 Interest Closing accrued balance Purpose of withdrawal To be maintained with the progress of execution. * From column no.2 total number of States, from column no.3 total number of Districts; from column no.4 total number of projects; from column no.5 total no. of watershed committees; from column no. 6 total amount of opening balance; from column no.7, total amount deposited in WC accounts and total amount available in WC accounts; from column no.8 total amount withdrawn, category-wise; from column no.9 total interest accrued and from column no.10 total closing balance for WCs, for the entire country may be mentioned at the end of the table. 28 TABLE-M(FM)5: DETAILS OF PENDING UCS. 4 5 Instal -ment no. Project 3 District 2 State Sl. No. 1 Udalguri 1 Assam Golandi hariyali (IWDP) Pachnoi Bhutiamari Hariyali (IWDP) Latasuti Kalsuti Hariyali IWDP 6 Financial year of release of fund 7 Amount released (Rs. in lakh) 8 Amount utilized (Rs.in lakhs) 9 10 Submission of UC@ Due date Amount (Rs. In lakhs) t (Rs. In lakhs) 11 Reasons for not submittin g/ delayed submissio n of UC 45.00 Date of Submission of UC Amoun Date 12 Pending UCs Perio d Amount (Rs. in lakhs) Nil Nil Nil 88.51 Nil Nil Nil - Nil Nil Nil 2nd 2004-05 45.00 45.00 3rd 2007-08 88.76 88.51 ND 2 2004-05 41.25 41.25 - 41.25 20/4/0 6 21/7/0 9 - 3RD 2007-08 80.56 80.56 - 80.56 - - Nil Nil Nil 2nd 2004-05 41.25 41.25 - 41.25 - - Nil Nil Nil 3rd 2008-09 79.46 79.46 - 79.46 - - 20/4/0 6 21/7/0 9 45.00 88.51 Total: 376.28 376.03 29 376.03 133.5 1 CHAPTER -IV PROPOSED MANAGEMENT PLAN RESOURCE POTENTIALS, PROBLEMS AND CONSTRAINTS Resource Potentials The favourable climate and altitude, the high rainfall and humidity and the ecology make the area a distinct and unique. The favourable climate for growth, the soil types, the water resources, the diversity of crops etc. make the area endowed with rich potentials. Crop diversity- The project area has good potentialities for growing a wide diversity of crops because of favourable climate, rainfall and other factors. Food crops such as cereals, pulses and oilseeds are grown in the project area although rice is by far the most important crop. Other cereals grown in the area are maize, wheat, millet etc. the pulses grown include black gram, green gram, lathyrus (khesari), peas, pegion pea (arahar) and lentil. Among the oilseeds are mustard, sesame and ground nut. Cash crops include jute, mesta cotton, potatoes and sugarcane. Horticultural crops include pineapple, banana, orange and other citrus fruits, guava coconut, mango, jackfruit, litchi, plums, papaya etc. The spice crops such as zinger, turmeric and tuber crops like tapioca, sweet potato etc. are grown. Plantation crops like tea, rubber, black pepper, betel nut and betelvine, etc. are common in the project area. All common vegetable are also grown in the project area. Medicinal and aromatic crops as well as timber trees, bamboo and cane are also grown. Grasses are more important in flush seasons, but tree leaves, shrubs and weeds have an important role to play in feeding domestic livestocks during lean season. Genetic diversity- The entire North Eastern Region of India is considered to be the home of origin of many crops such as rice, cucumber, brinjal, phaseolus beans, amaranth, mandarin orange and other citrus fruits including assam lemon, jambara etc. The wide variability in the germplasm of the region is a major sources for improving productivity 30 of crops, enhancing quality and for imparting resistance to pests, diseases as well as various other stress conditions. Agro industrial potentialities are rather vast in the entire region. However, these potentialities for agro based industries have not been utilized fully mainly because of infrastructural deficiencies, lack of awareness and other socio economic bottlenecks. Water resources- There is abundant resources of water in the area because of heavy rainfall. There are also large numbers of tributaries emanating from the hills and flowing through the project area in to the river Brahmaputra. With proper planning, harvesting and management water resources potentials can be effectively utilized for production purposes. Rain water from the major sources as well as natural lakes, ponds, springs; beels, marshy lands and ground water etc. form other sources of water. The ground water potentials of the area is also high. Institutional based- Institutions concerned with development, education, research and training in agriculture and allied sectors are vitally linked with improvement of agriculture. The development departments of the Govt. of Assam like Department of Agriculture, Soil Conservation, Animal Husbandry, Fishery, Sericulture, and Forestry are proposed to facilitate coordinating in proper implementation of the management plan. Technological and capacity building supports are proposed from the National Institute of Rural Development (NIRD) (NER), Assam Remote Sensing Application Centre (ARSAC), Assam Agriculture University (AAU) including Veterinary and Fishery Colleges and Krishi Vikash Kendras (KVK) as well as other Research Centers including ICAR research Complex at Borapani, Meghalaya etc. Constraints and Problems: Despite having so much of potentialities agriculture in the region has remained under developed. It is primarily because there are also a number of constraints and problems 31 which are responsible for the present state of agricultural production. These constraints can be grouped under five broad heads. These are (1) Climatic Constraints, (2) Infrastructural Constraints, (3) Bio-physical Constraints, (4) Constraints of Management and (5) Socio-economic Constraints. Constraints of Climate include heavy rainfall with high intensity and periodic distribution and humidity, low temperature during winter, low light intensity and radiation, recurrent floods as well as drought conditions. The high rainfall and the humidity not only create favourable environment for the prevalence of wide range of pests, diseases and weeds, the rainfall also create problems not only of floods but also in drying, storage and hay making etc. It needs to be mentioned however that there are also positive aspects of high rainfall and humidity resulting in adequacy of water as well as favourable climate for growth of crops. Infrastructural Constraints include geographic isolation, lack of road, transport and communication facilities, inadequacy of irrigated areas and lack of post harvest facilities and marketing etc. Transport and communication system is absolutely poor in the entire North Eastern Region. Similarly, the cost of transport to and fro out side the region is also very costly and time consuming. Such a situation hampers not only in transfer of technology, supply of input in time but also leads to higher cot in transportation; and thus creating disadvantage in competitive market outside. The scope for increased production utilizing modern technology, modern tools and higher rate of fertilizers is limited due to lack of assured irrigation. Similarly, facilities for post harvest operations such as drying, threshing, storage and processing have practically not been developed. The acidic soil, in accessible areas, the varied undulating topography, soil erosion and degradation, ecological imbalance, recurring floods, abundance of weeds, insects, pests, and diseases and low level technology are some of the important bio-physical constraints limiting agricultural production. 32 There are also a large number of problems connected with management of agricultural production. Some important ones are the gap in extension, poor motivation and awareness, inadequacy of training, lack of incentive for the farmers including non assurance of support price; non availability of improved inputs in time, lack of credit facilities and market, dearth of qualified manpower in many cases, weak linkage between research and development and above all in effective coordination of all concerned. STRATEGYThe new approach envisages a broader vision of hydrological units (watershed) comprising of clusters of micro watersheds. There would be a multi -tier ridge to valleysequenced approach, which is proposed to be adopted towards implementation of Watershed Development Project. Keeping in mind the guiding principles of watershed management the major thrust will be to immediately increase the vegetative cover in the project area and to restore the degraded ecosystem, which is at a critical stage. It is also equally stressed to conserve rainwater through increasing time of concentration by way of decreasing the velocity of runoff water, encouraging ground water recharge through surface water storage, harvesting and distribution of rainwater arriving to provide alternative and self sustaining occupation to the people with enhanced livelihood opportunities and improvements in productivity and income. An Integrated Watershed Management Project with due emphasis on protective afforestation pasture development, scientific agriculture through various soil conservation measures, harvesting of rainwater and runoff water, distribution of water to agriculture field, horticulture, pisiculture, sericulture, piggery development, poultry development, dairy development etc. Emphasis should also be given adequately at imparting training and environmental motivation programme to all users group and shelf help groups as such it is proposed to 33 make the people conscious and develop skill specially among womenfolk who are traditionally an important constituent of the society particularly in respect of economic activity and thereby improving access of the poor, specially women to the benefits and ensuring access to usufructs right from common property resources for the resource poor. The schemes proposed in the project area are basically on the basis on the participatory rural appraisal (PRA) exercises conducted in the project area. The needs of the villagers are taken into consideration and based on the availability of fund and magnitude of the requirement of the villagers the schemes have been proposed. Entry Point Activities: With a view to establish credibility of the project implementing agency as well as watershed development team and to create a rapport with the village community some important entry point activities have been proposed as envisaged in the guidelines of the Govt. of India. The schemes/projects are selected and proposed by the PIA/Project Manager in consultation with the beneficiaries, the gram panchayats, the watershed committee as well as the watershed development team. A. Agricultural Strategy proposed: Production of rice will have to be raised through improving productivity of winter and summer rice through use of quality seeds, high yielding varieties, hybrid inputs and irrigation potential. Area under rice with very poor productivity should be diverted to summer rice with creation of irrigation potential. However there is need to bridge the gap between research and extension for which the Watershed Committee, Project Implementing Agency, The District Agricultural Machinery as well as District Watershed Development Unit should Co-ordinate; not only to increase agricultural production but also on agri processing, input availability, and marketing as well as overall transfer of technology from lab to land. More over it is proposed that one no. of Central Nursery with different suitable horticultural species be raised under entry point activities so as to enable to distribute seedlings to the people to supplement in their home stead garden and orchards. 34 B. Protective Afforestation: Forest are important natural resources and they influence climate, soil conditions particularly soil and water balance, erosion, floods, maintenance of bio-sphere, ecology as well as wild flora and fauna etc. In this project it is proposed to create additional forest coverage of 50.6 ha. in Nonoi with suitable species. In areas with sandy soils in reverine environment Khair Sisso and Simul etc. should be planted while in other areas plantation of bamboo to be stressed as it is not only poor man’s timber but are also needed for paper industries. Moreover, it is proposed that one no. of central nursery with around 3.00 lakhs planting stock be raised with important forest species suitable for the locality under entry point activity so that seedlings can be given to the people within the project area as well as planting can be undertaken in road sides river bank and institutional campus. C. Development of Pasture and Animal Husbandry: The project area has good potential for development of animal husbandry, which needs special attention. The rural people rear livestock and poultry as important source of income. Grasess like Gunea, Napier, Para and other locally available grass species may be considered for raising in the proposed area. As many as 164 units of Self Help Groups (SHGs) are selected in the project area to take up schemes of rearing of milch cow, poultry, piggery and duckery, beekeeping etc. D. Pisciculture:Pisciculture is one of the important developmental schemes, which helps in improving life style of the people. In one hand creation of water bodies helps in recharging of ground water level and improve in soil moisture regime. On the other hand pisciculture in water bodies like Farm Pond, fisheries etc. gives additional income to the farmers. In 35 general this would meet the nutrient requirement of the people in the project area and others. E. Soil and Water Conservation Activities: In situ-conservation, utilization of soil and water within the Project is the prime criteria for sustaining agricultural and horticultural production in the cultivated land for which proper soil and water conservation activities are to be taken on priority basis. Therefore considering the necessity for comprehensive in situ soil and water conservation measures in the project area the following soil conservation engineering measures are recommended as detailed in the work plan. F. Water harvesting structures - To store run off water and to check gully erosion as well as sheet and rill erosion construction of 12 nos. R.C.C. check dams or drop spill ways, farm ponds, earthen embankments etc. are proposed in the project area which will give benefit to arrest soil loss, improve soil moisture regime and increase production of crops of kharif as well as rabi crops in the project area 11 nos. of water distribution canal are proposed to be constructed in the project area. Further by using water pumps kharif crops can also be cultivated in nearby areas. G. Land Development:To protect the land from erosion as well as to arrest the run off water in the project area 13 nos, of earthen bunds with core wall are proposed to be created in the project area to give benefit in 600 hectares of cultivated field. These earthen bunds will also protect the paddy fields from inundation by the floodwater of the adjoining Nonoi river and to give strength to the dykes boulder pitching is also proposed in areas where it is felt needed. 36 Surface Water Storage / Ground Water Recharge: To create facility for storage of run off water and to facilitate rearing of fish construction of RCC check dams, farm ponds, fishery ponds as well as reclamation of marshy lands are also proposed in the project area. The water from the farms dug out ponds and ring wells in agricultural fields and homestead garden will recharge the ground water level about 3 mts. And can be utilize by in paddy fields, orchards including vegetables gardens can be utilized by using water pumps. Moreover 12 nos. of open wells are also proposed in the project area to recharge ground water level as well as for meeting up requirement of drinking water of the people of the project area. For effective implementation of the project activities in the project area all concerned must share the overall responsibilities from the District Water Shed Development Unit (DWDU) level to the Users Groups (UG) and Self Help Group (SHG) Level. For proper and fruitful implementation of the Project the responsibility of the Project Implementing Agency and that of the Watershed committee is maximum. The watershed Development Team must co-ordinate with the watershed committee and Project Implementing Agency for effective implantation of the water shed works. Proper Training to the Users Groups (UG) and Self Help Groups (SHG) is most required for effective implementation of the project activities. 37 CHAPTER: IV- PROJECT ACTIVITIES TABLE-M(PA)A1: ENTRY POINT ACTIVITIES (EPA). IV. A. PREPARATORY PHASE: PROPOSED ACTION PLAN UNDER ENTRY POINT ACTIVITIES (EPA) Treatable Area: 3000 ha. Financial Outlay; Rs. 14.40 lakhs 1 Sl No 1 2 3 Name of the Village Entry Point Activities planned Tokankata Central Horticulture Nursery (1 ha.) Kacharitol Central Afforestation Nursery (0.5 ha.) Open wells (12 nos.) one in each village Tube wells (21 nos.) one in each village 1.50 - - 1.05 - - 2.10 - - Improvement & Repairing of Dolagrant L.P. School 0.80 - - Improvement & Repairing of Tokankata L.P. School Improvement & Repairing of Tokankata M.E. School Improvement & repairing of Kalaguru Bishnu Rabha Smiriti School 0.90 - - To protect & improve public property --do-- 0.93 - - --do-- 0.70 - - --do-- Makelikanda, Tolkenkata and Naharbari village Tamaru, Tokankata, Naharbari, Hirapara, Pub Jungalpara, Pachim Jungalpara, Ganakpara, Nanjalah, No. 1 Batabari, Maugaon, Dolagrant, Uttar Badulikanda, Makelikanda, No. 1 Amguri, Nizdola, Bhalabari and Bholabari Bagisa. Dolagrant Tokankata Tokankata Kacharitol 38 4 5 6 Estimated Expenditure Balance cost incurred 3.50 - 7 8 Expected outcome Remarks Seedlings to be distributed -do- Works and estimated cost as proposed by the Project Manager, Udalguri District. The detailed estimates are to be approved by the DWDU/SLNA. (Financial figures in lakh Rs.) For drinking purpose. For drinking purpose. Nizdola Improvement & repairing of Sitaram Sarma M.E. School Improvement & Repairing of Ganakpara Gandhi Smiriti M.E. School Improvement & repairing of Dakhin Bhokelikanda M.E. School Grand Total: Ganakpara Dakhin Bhokelikanda 1.00 - - --do-- 0.90 - - --do-- 1.02 - - --do-- 14.40 4 5 Initiation of village level institution 0.7596 Nonoi District 3 Udalguri State 2 Assam 1 Sl. No. 1 Name of project TABLE-M(PA)A2: OTHER ACTIVITIES OF PREPARATORY PHASE 6 7 8 Capacity IEC Baseline building activities survey 13.886 3.358 14 Any Identifying Hydroother technical Resource Preparation Evaluation geological (please support agreements of DPR of DPR survey specify) agencies Included in DPR 9 10 11 12 13 Included in DPR NIRD (NER), ARSCA, AAU, JRT. On progress 3.60 0.36 - * from column no. 2, no. of States; from column no. 3, no. of Districts; from column no. 4, total no. of Projects; from column no. 5 to 14 category wise totals, from column no. 15, total cost incurred, for the entire country may be indicated at the end of the table # One of the following may be entered in columns 5 to 14 , Completed (ii) in progress (iii) just started (iv) not started 39 TABLE DPR: 5- PHASING OF LIVELIHOOD ACTIVITIES AND PRODUCTION SYSTEM (FOR ASSET LESS PEOPLE) Name of District: Udalguri. Name of Project: Nonoi IWMP Treatable Area: 3000 ha Financial Target: 36.00Lakh Name of Scheme Physical Target Nos. Livelihood Activities (Asset less) Livestock Development Works by S.H.G. A. Piggery – Breaded 2 B. Duck Rearing 12 C. Milch Cow 10 Other Activities 0 A. Bicycle Repairing 7 B. Handloom 8 C.Pottary Making 2 D. Fruit Processing 4 E. Carpenter 5 F. Mobile Repairing 1 G. Bike Repairing 2 I. Vermi Compost 3 J. Fishery Dev./ Fish 5 Farming (25 x 30) m2 K. Bamboo Craft 2 L. Wood Craft 0 M. Blacksmith 2 N. Jaru Making 1 O. Tarja Making 3 P. Bee-Keeping 3 Total 72 Unit cost nd 2 year (4%) Nos Amonut Year wise Phasing 3 year (3%) 4th year (3%) Nos Amonut Nos Amonut rd (1 unit to each SHG Group) 1.20 1 1.20 0.12 1 0.12 1.20 4 4.80 1 6 3 1.20 0.72 3.60 0 5 3 0.00 0.60 3.60 0.40 0.50 0.44 0.50 0.24 0.30 0.50 0.225 0.60 4 3 0 2 2 1 1.60 1.50 0.40 1.00 0.44 0.50 0.48 2 3 1 1 1 0 0.80 1.50 0.44 0.50 0.24 0.00 2 1 0.45 0.60 1 2 1 1 2 0 2 1 0 0 4 0.00 2.40 0.55 0.55 0.40 0.30 0.50 0.20 1 0 2 1 1 1 27 0.55 0.00 0.80 0.30 0.50 0.20 14.40 1 0.55 1.00 0.48 0.30 1.00 0.225 0.00 0 0.00 0 0 2 1 23 1.00 0.20 10.77 1 22 0.20 10.83 Total 2.40 1.44 12.00 0.00 2.80 4.00 0.88 2.00 1.20 0.30 1.00 0.68 3.00 1.10 0.00 0.80 0.30 1.50 0.60 36.00 Contd.. 40 TABLE DPR: 5- PHASING OF LIVELIHOOD ACTIVITIES AND PRODUCTION SYSTEM (FOR PRODUCTION SYSTEM & MICRO ENTERPRISES) Name of District: Udalguri. Name of Project: Nonoi IWMP Treatable Area: 3000 ha Financial Target : 46.80.00Lakh Name of Scheme Physical Target Production System & Micro Enterprises A. Piggery – Breaded B. Duck Rearing C. Milch Cow D. Bicycle Repairing E. Handloom F.Pottary Making G. Fruit Processing H. Carpenter I. Mobile Repairing J. Bike Repairing K. Vermi Compost L. Fishery Dev./ Fish Farming (25 x 30) m2 O. Bamboo Craft P. Wood Craft R. Blacksmith S. Jaru Making T. Tarja Making U. Bee-Keeping Total Unit cost Nos. 2nd year (5%) Nos Amonut 3 8 10 7 14 3 8 8 2 2 4 7 1.20 0.12 1.20 0.40 0.50 0.44 0.50 0.24 0.30 0.50 0.225 0.60 1 2 5 3 6 1.20 0.24 6.00 1.20 3.00 4 3 2 2.00 0.72 0.60 0 2 0.00 1.20 2 2 2 0 5 5 0.55 0.55 0.40 0.30 0.50 0.20 1 0.55 2 0.80 1 0.50 32 18.01 92 41 Year wise Phasing 3rd year (4%) 4th year (4%) Nos Amonut Nos Amonut Total 1 3 3 1 4 2 2 3 0 2 1 2 1.20 0.36 3.60 0.40 2.00 0.88 1.00 0.72 0.00 1.00 0.225 1.20 1 3 2 3 4 1 2 2 0 1.20 0.36 2.40 1.20 2.00 0.44 1.00 0.48 0.00 3 3 0.675 1.80 3.60 0.96 12.00 2.80 7.00 1.32 4.00 1.92 0.60 1.00 0.90 4.20 0 0 0 0 2 4 0.00 0.00 0.00 0.00 1.00 0.80 1 2 0 0 2 1 0.55 1.10 0.00 0.00 1.00 0.20 1.10 1.10 0.80 0.00 2.50 1.00 30 14.39 30 14.41 46.80 IV. B. Watershed Works phase TABLE-M(PA)B1: ACTIVITIES RELATED TO SURFACE WATER RESOURCES IN THE PROJECT AREAS ( Rs. in lakh ) 1 2 3 4 5 7 6 Construction of new structures - - - - - 4nos/ 15000 m3 - - - - - - - - - - - - - - - - - - - - 5nos/ 97 m2 7 nos/ 11395 rm 5 nos/ 10698 rm 1 no/ 1000 rm Storage capacity Estimated cost Area to be irrigated (ha) Storage capacity No. (i) Excavated Pond (In 19 For drinking purpose M3) (ii) RCC Check dam (In M2) (iii) Earthen embankment without core wall (In RM) (Iv) Distribution canal Earthen (In RM) (v) Boulder spur (In RM) - Proposed target Augmentation/ repair of existing structures No. Nonoi No. Sub Total Kulsi MWS Udalguri 1 Assam Nonoi MWS Type of structures Area irrigated (ha) Names of project/MWS Names of District Name of State Sl. No Pre-project (i) Excavated pond (In M3) (ii) RCC Check dam (In M2) (iii) Earthen embankment without core wall (In RM) (iv) Distribution canal earthen (In RM) Total target Area to be irrigated (ha) Storage capacity ( M3 ) Estimated cost Area to be irrigated (ha) Storage capacity ( M3 ) Estimate d cost 50 12000 8.55 50 12000 8.55 500 34.43 500 34.43 480 22.79 480 22.79 360 10.27 360 10.27 - 2.90 - 2.90 1390 78.94 1390 78.94 - - - - - - - 2 nos / 9000 m3 25 5.13 25 5.13 - - - - - - - 7 nos/ 136.25 m2 700 48.37 700 48.37 - - - - - - - 370 15.76 370 15.76 - - - - - - - 6 nos / 7840 rm 6 nos/ 10047.50 rm 460 9.64 460 9.64 Sub Total 1555 78.90 1555 78.90 Grand Total 2945 157.84 2945 157.84 42 TABLE- M(PA)B2: ACTIVITIES RELATED TO RECHARGING GROUND WATER RESOURCES IN THE PROJECT AREA 5 Type of structures Name of project 4 Nonoi Name of District 3 Udalguri 1 Name of State S. No. 2 Assam 1 6 Pre-project Area No. Irrigate d (ha) Augmentation/ repair of existing recharging structures 9 8 Achievement due to project Construction of new recharging structures Total target Augmentation/ repair of existing recharging structures Chang e in irrigat ed area (Col. Area to Exp. Exp. To 8-6) be incurre be (ha) irrigated d incurred (ha) Construction of new recharging structures Area to be Estima Area to be Area to be Area Estimat Estimate Exp. No. irrigated ted No. irrigated irrigated No. irrigated No. ed cost d cost incurred (ha) cost (ha) (ha) (ha) Area irrigated (ha) Total achievement - - - 12 120 From EPA 120 From EPA - - - 12 120 From EPA 120 From EPA 120 - For drinking purpose - - - - - - - - - - - - -` - +- - - - - - - - - - - - - - - - - - - - - - - 13 For drinkin g purpose - - - 12 120 From EPA 120 From EPA - - - 12 120 From EPA 120 From EPA 120 (i)Open wells 13 (ii) Tube wells (iii)Any others Total for the project: 7 Proposed target 43 TABLE M(PS)B3: ACTIVITIES PROPOSED FOR USERS GROUPS (UGS) IN THE PROJECT AREA (Rs. in lakhs) 5 Name Of MWS 4 Name of project 3 Name of District 2 Name of State Sl. No. 1 6 Major Activities of the UGs-targets Sl. No. 1. 2. 3. Nonoi 5. 6. 7. 8. 9. 10. 11. 12. Kulsi MWS Udalguri 1. Assam Nonoi MWS 4. 1. 2. 3. 4. 5. 6. 7. 8. Structure /Activity proposed Type No. Treatment (ha.) Excavated Pond (In M3) RCC Check dam (In M2) E/ embankment without core wall (In RM) Dist. canal Earthen (In RM) Boulder spur (In RM) Aff. Regeneration (In Ha) Crop Demo (Paddy) (In Ha) Rubber Plantation (In Ha) Bench Terracing (In RM) Protective afforestation (In Ha) Plantation Nursery (In Ha) Crop Demo (Veg) (In Ha) Sub Total Excavated Pond (In M3) RCC Check dam (In M2) E/ embankment without core wall (In RM) Distri. canal earthen (In RM) Rubber Plantation (In Ha) Protective Aff. (In Ha) Aff. Regeneration (In Ha) Crop Demo (Paddy) Sub Total Total Nos. of UGs proposed Estimated Cost Amount of WDF to be collected 4 5 50 500 4 5 8.55 34.43 0.43 1.72 7 480 7 22.79 1.14 5 360 5 1 7 25.48 1 7 2.90 4.71 0.15 0.24 2 2.73 2 0.41 0.02 1 1 1.75 1 1 1.27 0.69 0.06 0.03 1 2.50 1 0.68 0.03 1 1 36 2 7 1 1 1424.46 25 700 1 1 36 2 7 3.00 0.24 89.94 5.13 48.37 0.15 0.01 4.50 0.26 2.42 6 370 6 15.76 0.79 6 460 6 9.64 0.48 2 3 6 2 34 70 5 13.38 19.70 2 1595.05 3019.54 2 3 6 2 34 70 3.64 3.66 3.64 0.30 90.14 180.08 0.18 0.18 0.18 0.02 4.51 9.01 44 10.27 0.51 TABLE- M(PA)B4: ACTIVITIES RELATED TO LIVELIHOODS BY SELF HELP GROUP (SHGS) FOR ASSET LESS PEOPLE IN THE PROJECT AREA (Rs. in lakhs) Sl No Name of the State Name of the District Name of Project Name of Scheme Livelihood Activities (Asset less) 1 Assam Udalguri Nonoi Livestock Development Works by S.H.G. (1 unit to each SHG Group) A. Piggery – Breaded B. Duck Rearing C. Milch Cow Other Activities A. Bicycle Repairing B. Handloom C.Pottary Making D. Fruit Processing E. Carpenter F. Mobile Repairing G. Bike Repairing I. Vermi Compost J. Fishery Dev./ Fish Farming (25 x 30) m2 K. Bamboo Craft L. Wood Craft M. Blacksmith N. Jaru Making O. Tarja Making P. Bee-Keeping Total Physical Target Average annual income from per SHG Nos. of SHGs involve 2 12 10 0.80 0.50 0.80 7 8 2 4 5 1 2 3 5 2 0 2 1 3 3 72 0.50 0.80 0.50 0.80 0.50 0.50 0.50 0.50 0.80 0.50 0.50 0.50 0.50 0.50 0.50 0.50 Contd……… 45 Nos. of SHGs to be given training 2 12 10 7 8 2 4 5 1 2 3 5 2 0 2 1 3 3 72 Total assistance received by the SHG Materi al Total Total annual income Total annual savings Nos of SHG greaded as Total amount of loan sanction by the Bank Nos of SHG federate d Loan from revolvin g fund 0.20 1.20 1.00 Traini ng 0.20 1.20 1.00 1.00 2.40 5.00 1.40 4.80 7.00 1.60 6.00 8.00 0.20 1.20 1.00 2 12 10 0.70 0.80 0.20 0.40 0.50 0.10 0.20 0.30 0.50 0.20 0.70 1.60 0.20 0.40 0.50 0.10 0.20 0.30 0.50 0.20 1.40 2.40 0.40 1.60 1.00 0.20 0.40 0.30 1.50 0.30 2.80 4.80 0.80 2.40 2.00 0.40 0.80 0.90 2.50 0.70 3.50 6.40 1.00 3.20 2.50 0.50 1.00 1.50 4.00 1.00 0.70 1.60 0.20 0.80 0.50 0.10 0.20 0.60 1.50 0.30 0.20 0.10 0.30 0.30 7.20 0.20 0.10 0.30 0.30 8.00 0.30 0.70 0.15 0.35 0.45 1.05 0.45 1.05 19.25 34.45 1.00 0.50 1.50 1.50 44.70 0.30 0.15 0.45 0.45 10.25 7 8 2 4 5 1 2 3 5 2 0 2 1 3 3 72 I 46 II III Not Graded Not yet processed TABLE-M(PA)B4: ACTIVITIES RELATED TO LIVELIHOODS BY SELF HELP GROUPS (SHGS) UNDER PRODUCTION SYSTEM & MICRO ENTERPRISES IN THE PROJECT AREA Rs. In Lakh Sl No Name of the State Name of the District Name of Project Name of Scheme Physical Target Livelihood Activities (Asset less) Livestock Development Works by S.H.G. (1 unit to each SHG Group) 1 Assam Udalguri Nonoi Nos. of SHGs involve A. Piggery – Breaded 3 B. Duck Rearing C. Milch Cow A. Bicycle Repairing B. Handloom C.Pottary Making D. Fruit Processing E. Carpenter F. Mobile Repairing G. Bike Repairing I. Vermi Compost J. Fishery Dev./ Fish Farming (25 x 30) m2 K. Bamboo Craft L. Wood Craft M. Blacksmith N. Jaru Making O. Tarja Making P. Bee-Keeping Total 8 10 7 14 3 8 8 2 2 4 7 2 2 2 0 5 5 92 Average annual income from per SHG 0.80 0.50 0.80 0.50 0.80 0.50 0.80 0.50 0.50 0.50 0.50 0.80 0.50 0.50 0.50 0.50 0.50 0.50 0.50 Contd……. 47 Nos. of SHGs to be given training 3 8 10 7 14 3 8 8 2 2 4 7 2 2 2 0 5 5 92 Total assistance received by the SHG Loan from revolving fund 0.30 0.80 1.00 0.70 1.40 0.30 0.80 0.80 0.20 0.20 0.40 0.70 0.20 0.20 0.20 Traini ng 0.50 0.50 9.20 0.50 0.50 10.60 Materi al Total Total annual income Total annual savings Nos of SHG greaded as I 0.30 0.80 1.00 0.70 2.80 0.30 0.80 0.80 0.20 0.20 0.40 0.70 0.20 0.20 0.20 1.50 1.60 5.00 1.40 4.20 0.60 3.20 1.60 0.40 0.40 0.40 2.10 0.30 0.30 0.30 2.10 3.20 7.00 2.80 8.40 1.20 4.80 3.20 0.80 0.80 1.20 3.50 0.70 0.70 0.70 2.40 4.00 8.00 3.50 11.20 1.50 6.40 4.00 1.00 1.00 2.00 5.60 1.00 1.00 1.00 0.30 0.80 1.00 0.70 2.80 0.30 1.60 0.80 0.20 0.20 0.80 2.10 0.30 0.30 0.30 0.75 1.75 0.75 1.75 24.80 44.60 3.25 3.25 60.10 1.50 1.50 15.50 48 II III Total amount of loan sanction by the Bank Nos of SHG federate d 3 Not yet Graded Under process 8 10 7 14 3 8 8 2 2 4 7 2 2 2 0 5 5 92 9 49 Any other Total cost (please specify) incurred (Rs. In lakhs) (b) (a) (b) (a) Not relevant (b) - (a) Not started Not started - Not started - Not started - Not started - Not started (b) - 15 14 Pasture Veterinary Non-conv. Fishery dev. dev. services energy (a) (b) (a) (b) (a) (b) (a) (b) (a) (b) (a) (b) (a) Not started 13 - Crop demon 12 11 - Ridge Drainage Nursery Land area line raising dev. treatmenttreatment 10 Not started 8 - 7 Not started 6 - Names of project 5 Not started 4 Nonoi 3 Udalguri 1. State S. No. 2 Assam 1 District TABLE-M(PA)B5: OTHER ACTIVITIES OF WATERSHED WORKS PHASE* TABLE-M(PA)B6: DETAILS OF ENGINEERING STRUCTURES IN WATERSHED WORKS* Pvt. Comm. UG 6 nos. / 10047.50 rm Pvt. Comm. - UG Sub total : Total : 50 6 nos. / 7840 rm 2nd , 3rd year & 4th year 6 nos. / 10047.50 rm 6 nos. / 7840 rm 1.72 8.55 34.43 10.27 12.05 22.79 2.90 0.69 0.14 0.73 18.23 79.63 8.22 20.66 2.05 0.55 22.79 1.7 1 6.8 4 2nd , 3rd & 4th Year 4.56 10.27 34.43 6.8 4 8.55 1st, 2nd year, 3rd , 7 nos. 4th year / 136.25 m3 5.13 7 nos. / 136.25 m3 Not yet started Not yet started Not yet started Not yet started 4.10 UG 2 nos. / 9000 m3 7.71 Comm. 2nd & 3rd Year 48.37 - 2 nos. / 9000 m3 9.64 DL UG 15.76 - - Not yet started 158.53 78.90 (iv) Earthen embankment without core wall (In RM) Comm. 1no. / 719 rm 12.61 LD - 5 2.44 DL (iii) Distribution Channel earthen (In RM) Kulsi MWS LD 7 4.30 (ii) RCC Check dam (In M2) - 4.10 - 29.0 0 16.9 i) Excavated Pond (In M3) 1.03 31.1 5 46.6 Sub Total 2nd year Not yet started 2.03 1no. / 719 rm 1no. / 1000 rm 0.14 UG 3rd year 31.1 5 46.6 2 1.86 1no. / 1000 rm Not yet started 3rd & 4th Year Not yet started 1.03 - 7 nos. / 11395 rm 29.0 0 16.9 3 2.44 Pvt. - 2nd. 3rd and 4th year 1.93 LD Comm. 5 nos. / 10698 rm 3.15 - - 3rd & 4th Year Not yet started 1st, 2nd year & 4th year 35.1 1 41.4 4 2.44 - - 5 nos. / 97 m2 66.2 5 87.9 7 4.30 vi) Const. of earthen canal in Rm. DL 2.90 - 0.69 - 1st, 2nd year & 4th year 79.63 7 nos. / 11395 rm 5.13 UG 48.37 Pvt. Comm. 9.64 - 15.76 DL - 158.53 78.90 (iv) Earthen embankment without core wall (In RM) 1.72 5 nos. / 10698 rm 0.14 UG 1.7 Pvt. Comm. 2 1.86 LD 3 2.44 (iii) Distribution Channel earthen (In RM) 12.05 5 nos. / 97 m2 20.66 UG 8.22 Comm. 2.05 4 nos. / 15000 m3 4.56 UG 18.23 (iii) Others (pl. specify) - 10 Achievement Expenditure Expected Actual month Estimated cost No. of units incurred (Rs. in Status of month & year of & year of (Rs. in lakh) (No./ cu.m./ lakh) completion completion completion rmt) (mm/yyyy) (mm/yyyy) M W O T M W O T 2nd, 3rd, & 4th 4 nos. Not yet started 2nd, 3rd, & 4th Year / 15000 m3 Year 0.73 (ii) Community Comm. No. of units (No./ cu.m./ Rmt) 7.71 Udalguri Assam - DL v) Boulder spur 1 LD (i) UG (ii)SHG (iii) Others (pl. specify) 9 Target 1.93 Nonoi MWS (ii) RCC Check dam (In M2) - (i) Private - (iii) Land dev. (L) i) Excavated Pond (In M3) (ii) Drainage line (D) (i) Ridge area (R) Project District State Sl. No. Name of Structures 8 Executing Agency 2.03 7 Type of land 0.55 6 Type of treatment 0.14 5 3.15 4 12.61 3 35.1 1 41.3 2 66.2 5 87.9 1 2nd. 3rd and 4th year 3rd year 2nd year 2nd & 3rd Year 1st, 2nd year, 3rd , 4th year 2nd , 3rd & 4th Year 2nd , 3rd year & 4th year Kulsi MWS Udalguri 1 Assam Aff. Regeneration Crop Demo (Paddy) Rubber Plantation Protective Afforestation Plantation RA 7 - - Pvt. Comm. - UG 25.48 - 4.71 - - Pvt. Comm. - UG 2.5 2500 0.68 3rd year June 2011 Pvt. - - UG 1.75 1000 1.27 2nd year RA (ii) Community Type of land 8 Executing agency (I) Ug (Ii)Shg (Iii) Individual Beneficiary Type of (ii) Drainage treat line ment (D) (iii) Others (pl. specify) Protective Afforestation Rubber plantation Crop Demo (Paddy) Crop Demo (Veg) Plantation Nursery (i) Private Nonoi MWS Aff. Regeneration 6 (i) Ridge area (R) 5 Name of structure/ work 4 Project 3 District Sl. No. 2 State 1 (iii) Land dev. (L) TABLE-M(PA)B7: DETAILS OF ACTIVITIES CONNECTED WITH VEGETATIVE COVER IN WATERSHED WORKS* 9 Target Area (ha) No. of plants Estimated cost (Rs. in lakh) Expected month & year of completion (mm/ yyyy) 2nd year June 2010 3rd year June 2011 4th year June 2012 - - L Pvt. - - IB 2.73 - 0.41 2nd year - - L Pvt. - - IB 1 - 0.24 2nd year - - L - Comm. - UG 1 - 3.00 2nd year Sub Total 34.46 3500 10.31 3.64 2rd year & 4th year - 0.30 2nd year 5 - 3.64 2nd year 13.38 - 3.66 2rd & 4th Year 11.24 21.55 - Plantation - - Pvt. Comm - UG 19.70 - - L Pvt. Comm. - IB 2.00 RA - - PVT. Comm. - UG RA - - Pvt. Comm. - UG Sub Total 40.08 Grand Total 74.54 51 TABLE-M(PA)B8: DETAILS OF ALLIED / OTHER ACTIVITIES 1 2 3 4 5 6 Type of land Sl. No. State District Project Name of activity@ 1. Assam Udalguri Nonoi Nil (i) Private (ii) Community Nil Nil 52 (iii) Others (pl. specify) Nil 7 Executing agency (i) UG (ii)SHG (iii) Others (pl. specify) Nil 8 Target Expected Estimated month & year cost of completion (Rs. in lakh) (mm/yyyy) Nil Nil Micro WS Nonoi & Kulsi Project Nonoi District Udalguri 1. Assam Sl. No. State TABLE-M(PA)B9: LIVELIHOOD PROPOSED TO BE CREATED FOR ASSET LESS PEOPLE Name of activity@ A. Piggery – Breaded B. Duck Rearing C. Milch Cow Other Activities A. Bicycle Repairing B. Handloom C.Pottary Making D. Fruit Processing E. Carpenter F. Mobile Repairing G. Bike Repairing I. Vermi Compost J. Fishery Dev./ Fish Farming (25 x 30) m2 K. Bamboo Craft L. Wood Craft M. Blacksmith N. Jaru Making O. Tarja Making P. Bee-Keeping Total Cost per Unit (Rs. In lakh) Estimated cost (Rs. in lakh) Expected income per unit (BC Ratio) No. of HH by social group Pre-Project Income (Avg./ HH) in Rs. SC 10 ST 10 Others - SC - ST - Others - 1.20 2.40 100% 20 70 50 40 40 10 20 30 10 10 30 20 30 50 - - - 0.12 1.20 0.40 0.50 0.44 0.50 0.24 0.30 0.50 0.225 0.60 1.44 12.00 2.80 4.00 0.88 2.00 1.20 0.30 1.00 0.68 3.00 100% 100% 10 10 10 30 30 20 20 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 20 20 10 30 30 - - - 0.55 0.40 0.30 0.50 0.20 100% 100% 100% 100% 100% 170 200 350 720 1.10 0.80 0.30 1.50 0.60 36.00 20 10 20 0 10 10 - 53 Total 20 120 100 - 70 80 20 40 50 10 100% 100% 100% 100% 100% 100% 100% 100% 100% Micro WS Nonoi & Kulsi Project Nonoi Udalguri 1. Assam State Sl. No. District TABLE-M(PA)B10: LIVELIHOOD PROPOSED TO BE CREATED FOR FARMERS Name of activity@ No. of Land owning HH MF SF LF No. of HH by social group SC ST Others Pre-Project Income (Avg./ HH) MF SF LF Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Total: Nil Nil Nil Nil Nil Nil Nil (Rs.. in lakhs) Expected income per unit (BC Ratio) Cost per Unit Estimated cost Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 54 CHAPTER V: PLANNING TABLE-M (PA)A1: ENTRY POINT ACTIVITIES (EPA) PROPOSED ACTION PLAN UNDER ENTRY POINT ACTIVITIES (EPA) District: Udalguri Name of the Project: Nonoi IWMP Name of the MWS: Nonoi & Kulsi MWS Treatable Area: 3000 ha. 1 Sl No 1 Financial Outlay; Rs. 14.40 lakhs 2 3 Name of the Village Entry Point Activities planned Tokankata Central Horticulture Nursery (1 ha.) Kacharitol Central Afforestation Nursery (0.5 ha.) Open wells (12 nos.) one in each village Tube wells (21 nos.) one in each village 1.50 - - 1.05 - - 2.10 - - Dolagrant Improvement & Repairing of Dolagrant L.P. School 0.80 - - Tokankata Improvement & Repairing of Tokankata L.P. School Improvement & Repairing of Tokankata M.E. School Improvement & repairing of Kalaguru Bishnu Rabha Smiriti School 0.90 - 0.93 0.70 Makelikanda, Tolkenkata and Naharbari village Tamaru, Tokankata, Naharbari, Hirapara, Pub Jungalpara, Pachim Jungalpara, Ganakpara, Nanjalah, No. 1 Batabari, Maugaon, Dolagrant, Uttar Badulikanda, Makelikanda, No. 1 Amguri, Nizdola, Bhalabari and Bholabari Bagisa. Tokankata Kacharitol 55 4 5 6 Estimated Expenditure Balance cost incurred 3.50 - (financial figures in lakh Rs.) 7 8 Actual Expected outcome outcome Seedlings to be distributed -doFor drinking purpose. For drinking purpose. - - - To protect & improve public property --do-- - - --do-- - - - --do-- - - - Nizdola Ganakpara Dakhin Bhokelikanda Improvement & repairing of Sitaram Sarma M.E. School Improvement & Repairing of Ganakpara Gandhi Smiriti M.E. School Improvement & repairing of Dakhin Bhokelikanda M.E. School Grand Total: 56 1.00 - - --do-- - 0.90 - - --do-- - 1.02 - - --do-- - 14.40 Table: DPR: 6- YEAR WISE PHASING OF WORKS UNDER NONOI IWM PROJECT Name of the district:-Udalguri Name of the watershed:- Nonoi Total project area:-4586 ha. Component Name of the MWS: Nonoi & Kulsi Treatable area:-3000 ha. 1st year 2nd year 3rd year Total project cost:-360 Lakhs 4th year 5th year Total amount Administrative 10% 2.50 Amount 9.00 14% 2.00 Amount 7.20 14% 2.00 Amount 7.20 13% 2.00 Amount 7.20 8% 1.50 Amount 5.40 10% 10.00 Amount 36.00 Monitoring 0.10 0.36 0.30 1.08 0.30 1.08 0.30 1.08 0.00 0.00 1.00 3.60 Evaluation 0.40 1.44 0.00 0.00 0.00 0.00 0.00 0.00 0.60 2.16 1.00 3.60 Entry Point Activities Institution & Capacity Biulding 4.00 14.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 14.40 2.00 7.20 1.00 3.60 1.00 3.60 1.00 3.60 0.00 0.00 5.00 18.00 Detail Project Report (DPR) Watershed development Works 1.00 3.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3.60 10.00 36.00 13.70 49.32 13.70 49.32 12.60 45.36 0.00 0.00 50.00 180.00 0.00 0.00 4.00 14.40 3.00 10.80 3.00 10.80 0.00 0.00 10.00 36.00 0.00 0.00 5.00 18.00 4.00 14.40 4.00 14.40 0.00 0.00 13.00 46.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 18.00 5.00 18.00 20.00 72.00 26.00 93.60 24.00 86.40 22.90 82.44 7.10 25.56 100.00 360.00 Livelihood Activities (Assetless) Production system Consolidation Total: 57 Table DPR: 7- YEAR WISE PHYSICAL & FINANCIAL TARGET UNDER WATERSHED WORK PHASE Name of the district:-Udalguri Name of the watershed:- Nonoi Total project area:-4586 ha. Sl. No. Name of village 1 Name of the MWS: Nonoi & Kulsi Treatable area:-3000 ha. Name of Schemes 2 3 Physical target 4 Unit cost 5 Total project cost:-360 Lakhs Year wise financial target 1st year 2nd year 3rd year 4th year 5th year 10% 13.7% 13.7% 12.6% (Consolidation) 5% 6 7 8 9 10 Total 11 NONOI MWS 1 2 3 4 5 Tamura Pub Jangalpara Hirapara Gaon No. 1 Batabari Niz Dolagaon 1. Afforestation Regeneration 2. Excavated pond 3.Earthen embankment without core walling 4. Crop demo (paddy) in ha. 5. RCC Check dam 1.Constn. of distn. canal for agri field (Earthen) 2 Earthen embankment without core walling 3. Afforestation Regeneration 4. RCC check dam 1 Constn. of distn. canal for agri field (Earthen) 2. Excavated pond 3. RCC check dam 6 ha 2000 m3 3755 rm 18500 57 200 1.73 ha 20 m2 1500 rm 15000 35500 96 2000 rm 200 3 ha 20 m2 4000 rm 18500 35500 96 3000 m3 20 m2 57 35500 1. Excavated pond 2. Afforestation Regeneration 1.Earthen embankment without core 6000 m3 4 ha 3000 rm 57 18500 200 58 1.11 1.14 7.51 0.26 0.26 7.10 1.44 7.10 1.44 4.00 4.00 0.55 0.55 7.10 3.84 7.10 3.84 1.71 7.10 3.42 0.74 6.00 1.11 1.14 7.51 1.71 7.10 3.42 0.74 6.00 6 Namjala 7 Mougaon 8 9 10 Naharbari Gaon Dalagrant Gaon Tokankata Gaon walling 2. Afforestation Regeneration 3.Earthen embankment without core walling 1. Boulder spur 2.Earthen embankment without core walling 3. RCC Check dam 1. Afforestation Regeneration 2. Drainage canal 3. Crop demo (paddy) in ha. 1. Rubber plantation 2. Excavated pond 3. Constn. of distn. canal for agri field (Earthen) 4. RCC Check dam 1.Earthen embankment without core walling 2. Constn. of distn. canal for agri field (Earthen) 3. Const. of earthen canal in Rm. 4. Protective afforestation 5. Afforestation Regeneration 6. Crop demo (paddy) in ha. 1.Earthen embankment without core walling 2. Plantation Nursery 3. Afforestation Regeneration 3.18 ha 1000 rm 18500 200 1000 rm 500 rm 2900 200 17 m2 4 ha 3125 Rm. 1 ha 1.75 ha 4000 m3 1500 rm 35500 18500 96 20 m2 800 rm 35500 200 7.10 1.60 7.10 1.60 573 rm 96 0.55 0.55 719 rm 2.5 ha 2.5 ha 96 27300 18500 0.69 0.68 1ha 340 rm 15000 200 0.15 0.68 1 ha 2.8 ha 300000 18500 3.00 Subtotal: 24000 72900 57 96 0.59 2.00 0.59 2.00 2.90 1.00 2.90 1.00 6.03 3.00 6.03 0.74 3.00 1.44 0.24 1.27 2.28 1.44 0.74 0.24 1.27 2.28 0.69 0.68 0.46 0.15 0.68 0.46 0.52 14.20 26.54 21.16 28.04 59 3.00 0.52 89.94 KULSI MWS 11 12 13 14 No.1 Amguri Gaon Ganakpara Kacharitol Uttar Bhikalikanda 15 Pachim Jangalpara 16 Makelikanda Bholabari Bagicha 17 1 Constn. of distn. canal for agri field (Earthen) 2. RCC Check dam 3 Afforestation Regeneration 4. Protective afforestation 1Constn. of distn. canal for agri field (Earthen) 2. Afforestation Regeneration 3. Excavated pond 4. Rubber plantation 5. RCC Check dam 2000 rm 96 20 m2 4 ha 0.90 ha 2200 rm 35500 18500 27300 96 4 ha 3000 m3 2.5 ha 20 m2 18500 57 72900 35500 6. Crop demo (paddy) in ha. 1. Excavated pond 2. Afforestation Regeneration 3. RCC check dam 1.Earthen embankment without core walling 2. Constn. of distn. canal for agri field (Earthen) 3. RCC check dam 1. Earhen embankment without core walling 2. Afforestation Regeneration 1.Earthen embankment without core walling 2. RCC Check dam 3. Rubber plantation 4. Protective afforestation 1.Constn. of distn. canal for agri field (Earthen) 2. Afforestation Regeneration 3.Earthen embankment without core 1 6000 m3 2.70 ha 18 m2 200 rm 15000 57 18500 35500 200 2000 rm 96 18.25 m2 1340 rm 35500 200 4 ha 800 rm 18500 200 20 m2 2.5 ha 10.48 ha 562.50 rm 4 ha 2000 rm 35500 72900 27300 96 60 18500 200 1.92 1.92 7.10 0.74 0.25 2.11 0.74 1.71 1.82 7.10 0.15 3.42 0.50 6.39 0.40 1.92 6.48 0.74 1.71 1.82 7.10 0.15 3.42 0.50 6.39 0.40 1.92 6.48 2.68 2.68 0.74 0.74 1.60 7.10 7.10 1.82 2.86 0.54 0.74 0.74 4.00 1.60 1.82 2.86 0.54 4.00 7.10 0.74 0.25 2.11 walling 3. RCC check dam 18 19 Dakhin Bhokelikanda Bholabari Gaon 20 m2 1.Constn. of distn. canal for agri field (Earthen) 2. Protective Afforestation 3. Constn. of distn. canal for agri field (Earthen) 4.Earthen embankment without core walling 5. Crop demo (paddy) in ha. 1.Earthen embankment without core walling 2. Afforestation Regeneration 3. RCC check dam 35500 1770 rm 96 2 ha 1515 rm 27300 96 1500 rm 200 1 ha 2000 rm 15000 200 1 ha 20 m2 18500 35500 Subtotal: 7.10 7.10 1.70 1.70 0.55 1.45 0.55 1.45 3.00 0.15 4.00 0.18 7.10 21.30 23.50 28.16 17.10 35.50 50.04 49.32 45.14 Grand Total: 61 3.00 0.15 4.00 0.18 7.10 90.06 180.00 TABLE DPR: 8 - YEAR WISE PHYSICAL & FINANCIAL TARGET Name of Watershed: Nonoi Sl. No. Name of Micro Watershed Name of Villages 1 Nonoi MWS (3A2C1/I) 1 2 Tamura Hirapara Gaon 2 Kulsi MWS (3A2C1/II) 3 No. 1 Amguri gaon Bholabari bagicha Bhulabari Gaon 4 5 A. First Year Name of Schemes Financial Year: 2009-10 No. Unit Cost (Rs.) Area to be benefitted Financial Target: 36.00 lakh Estimated Cost No. of Beneficiary No. of Mandays. RCC ccheck dam (in m2) RCC ccheck dam (in m2) 21 20 35500 35500 120 100 M 4.56 4.26 Sub Total: RCC ccheck dam (in m2) 20 35500 220 100 8.82 4.26 5.14 2.48 0.74 0.36 14.70 7.10 171 81 5140 2480 RCC ccheck dam (in m2) RCC ccheck dam (in m2) 20 20 35500 35500 100 100 4.26 4.26 2.48 2.48 0.36 0.36 7.10 7.10 81 81 2480 2480 Sub Total: 300 12.78 7.44 1.08 21.30 243 7440 1st Year Total: 520 21.60 12.58 1.82 36.00 414 12580 62 W 2.66 2.48 O 0.38 0.36 T 7.6 7.10 90 81 2660 2480 Name of Watershed: Nonoi Sl. No. Name of Micro Watershed Name of Villages 1 Nonoi MWS (3A2C1/I) 1 Tamura 2 Pub Jangalpara 3 4 5 6 7 3 Kulsi MWS (3A2C1/II) 5 6 7 8 9 Niz Dolagaon Mougaon Naharbari gaon Dalagrant gaon Tokankata gaon No. 1 Amguri gaon Ganakpara Kacharitol Uttar Bhikalikanda Makelikanda B. 2nd Year Name of Schemes Excavated pond in M3 Crop demo (paddy) in ha. E/ embankment without core wall (in m2) RCC check dam (in m2) E/ embankment without core wall (in m2) Afforestation regeneration in ha. Afforestation regeneration in ha. Crop demo (veg.) in ha. Rubber plantation in ha. Bench terracing for barren land in Rm Crop demo (paddy) in ha. Protective afforestation in ha. E/ embankment without core wall (in m2) Afforestation nursery in ha. Sub Total: Afforestation regeneration in ha. Excavated pond in m3 Rubber plantation in ha. Crop demo (paddy) in ha. RCC check dam (in m2) E/ embankment without core wall (in m2) RCC check dam (in m2) E/ embankment without core Financial Year: 2010-11 No. Unit Cost (Rs.) 1315 1 Financial Target: 49.32 Lakh 57 15000 Area to be benefit ted 10 1 No. of Beneficiary No. of Mandays. M 0.15 0.06 W 0.6 0.09 O 0 0.00 T 0.75 0.15 18 1 600 90 2000 20 200 35500 80 100 0.8 4.26 3.2 2.48 0 0.36 4.00 7.10 135 81 3200 2480 3000 200 150 1.20 4.80 0 6.00 200 4800 3.18 18500 4 0.24 0.35 0 0.59 7 450 4 1 18500 24000 4 1 0.29 0.09 0.45 0.15 0 0.00 0.74 0.24 7 2 450 150 1.75 72900 1.75 0.5 0.77 0 1.27 4 500 1500 1 2.5 46 15000 27300 0.75 1 2.5 0.13 0.06 0.27 0.56 0.09 0.41 0 0.00 0 0.69 0.15 0.68 2 1 4 560 90 410 340 1 200 300000 15 1 372 0.14 1.2 9.39 0.54 1.8 16.29 0.03 0 0.39 0.68 3.00 26.04 4 4 470 540 1800 16120 4 3000 2.5 1 18 18500 57 72900 15000 35500 4 5 2.5 1 80 0.29 0.34 0.72 0.06 3.83 0.45 1.37 1.1 0.09 2.23 0 0 0 0.00 0.33 0.74 1.71 1.82 0.15 6.39 7 9 4 1 135 450 1370 1100 90 2230 200 19.1 800 200 35500 200 20 100 50 0.08 3.88 0.32 0.32 2.26 1.28 0 0.34 0 0.40 6.48 1.6 36 179 90 320 2370 1280 63 Estimated Cost 10 11 Bholabari Bagicha Dakhin Bhokelikanda Name of Watershed: Nonoi Sl. No. Name of Micro Watershed 1 Nonoi MWS (3A2C1/I) Name of Villages 1 2 3 4 5 6 7 8 9 Tamura Pub Jangalpara Hirapara gaon No. 1 Batabari Niz Dologaon Namjala Mougaon Naharbari Gaon Dalagrant gaon wall (in m2) Rubber plantation in ha. Const. of distn. Canal for agri field in Rm. Const. of distn. Canal for agri field in Rm. Crop demo (paddy) in ha. 2.5 72900 2.5 0.72 1.1 0 1.82 4 1100 562.5 96 80 0.11 0.43 0 0.54 4 430 170 1 96 15000 40 1 0.34 0.06 1.36 0.09 0 0.00 1.70 0.15 72 1 1360 90 Sub Total: 386 10.75 12.08 0.67 23.50 542 12190 2nd Year Total: 758 22.88 25.48 0.87 49.32 1012 25480 C: 3rd year Name of Schemes Afforestation Regeneration in ha. Const. of distn. Canal for agri field in Rm. Afforestation Regeneration in ha. Const. of distn. Canal for agri field in Rm. Excavated pond in m3 E/ embankment without core wall (in m2) Boulder spur in Rm E/ embankment without core wall (in m2) Drainage Canal in Rm Const. of distn. Canal for agri field in Rm. Afforestation Regeneration in ha. Financial Year: 2011-12 No. Unit Cost (Rs.) Area to be benefitted Financial Target: 49.32 Lakhs. Estimated Cost M W O No. of Beneficiary No. of Mandays. 11 670 T 6 18500 6 0.44 0.67 0 1.11 1500 96 80 0.28 1.16 0 1.44 3 18500 3 0.22 0.33 0 0.55 5 330 4000 96 200 0.76 3.08 0 3.84 179 3080 6000 57 20 0.68 2.74 0 3.42 90 2740 1000 1000 200 2900 80 0 0.4 2.03 1.6 0.87 0 0 2 2.9 135 9 1600 870 500 3125 200 96 20 40 0.2 0.6 0.8 2.4 0 0 1 3 45 54 200 2400 1500 96 30 0.28 1.16 0 1.44 54 1160 2.5 18500 2.5 0.18 0.28 0 0.46 7 280 64 135 1160 3 Kulsi MWS (3A2C1/II) 10 11 12 13 No. 1 Amguri Ganakpara Kacharitol Pachim Jangalpara 14 Makelikanda 15 Bholabari Bagicha Dakhin Bhokelikanda 16 17 Bholabari gaon Name of Watershed: Nonoi Sl. No. Name of Micro Watershed 1 Nonoi MWS (3A2C1/I) Name of Villages Sub Total: Const. of distn. Canal for agri field in Rm. 481.5 6.07 15.09 0 21.16 724 14490 2000 20 96 35500 80 100 0.38 4.26 1.54 2.48 0 0.36 1.92 7.10 135 81 1540 2480 6000 57 20 0.68 2.74 0 3.42 90 2740 1340 200 120 0.40 2.14 0.14 2.68 24 2140 10.48 27300 10.48 1.15 1.71 0 2.86 24 1710 2000 200 60 0.8 3.2 0 4.00 135 3200 2 27300 2 0.22 0.33 0 0.55 20 500 1515 96 130 0.29 1.16 0 1.45 45 1160 2000 200 60 0.8 3.2 0 4.00 135 3200 1 18500 1 0.07 0.11 0 0.18 2 110 Sub total:- 583.48 9.05 18.61 0.5 28.16 691 18780 3rd Year Total:- 1065 15.12 33.7 0.5 49.32 1415 33270 RCC check dam in m2 Excavated pond in m3 E/ embankment without core wall (in m2) Protective Afforestation in Ha E/ embankment without core wall (in m2) Protective Afforestation in Ha Const. of distn. Canal for agri field in Rm. E/ embankment without core wall (in m2) Afforestation Regeneration in ha. C: 4th year Name of Schemes 1 Tamura E/ embankment without core wall (in Rm) 2 Hirapara Gaon 3 No. 1 Batabari 4 Namjala Excavated pond in m3 Afforestation Regeneration in ha. RCC check dam in m2 5 Naharbari gaon Excavted pond in m3 Financial Year: 2012-13 No. Unit Cost (Rs. In Lakhs) Area to be benefitted 3755 200 3000 4 57 18500 17 4000 65 Financial Target: 45.36 Lakhs. Estimated Cost No. of Beneficiary No. of Mandays. M W O T 120 10 1.5 0.34 6.01 1.37 0 0.00 7.51 1.71 179 18 2400 1370 4 0.29 0.45 0.00 0.74 9 450 35500 80 3.61 2.11 0.31 6.03 135 2110 57 10 0.45 1.83 0.00 2.28 18 1830 RCC ccheck dam (in m2) 6 7 3 Kulsi MWS (3A2C1/II) 1 2 Dalagrant gaon Tokankata gaon No.1 Amguri Gaon Ganakpara 3 Kacharitol 4 Uttar Bhikalikanda Pachim Jangalpara Makelikanda Bholabari Bagicha Dakhin Bhokelikanda 5 6 7 8 20 35500 100 4.26 2.48 0.36 7.10 81 2480 E/ embankment without core wall (in Rm) Const. of distn. Canal for agri field in Rm. Afforestation Regeneration in ha. Sub Total 800 200 15 0.24 1.28 0.08 1.60 22 1280 573 96 10 0.11 0.44 0.00 0.55 4 440 2.8 18500 2.8 0.21 0.31 0.00 0.52 9 310 351.8 11.01 16.28 0.75 28.04 475 12670 Protective afforestation in ha. Const. of distn. Canal for agri field in Rm. Afforestation regeneration in ha. Afforestation Regeneration in ha. Const. of distn. Canal for agri field in Rm. Afforestation regeneration in ha. RCC ccheck dam (in m2) 0.9 27300 0.9 0.1 0.15 0 0.25 2 150 2200 96 80 0.42 1.69 0 2.11 135 1690 4 2.7 18500 18500 4 2.7 0.29 0.20 0.45 0.30 0 0.00 0.74 0.50 7 4 450 300 50 0.38 1.54 0.00 1.92 90 1540 2000 96 4 20 18500 35500 4 100 0.29 4.26 0.45 2.48 0 0.36 0.74 7.10 7 81 450 2480 4 1500 18500 200 4 60 0.29 0.60 0.45 2.40 0 0.00 0.74 3.00 7 135 450 2400 305.6 6.83 9.91 0.36 17.10 468 9910 4th Year total 657.4 17.84 26.19 1.11 45.14 943 22580 Grand Total for the Project 3000 77.44 97.95 4.30 179.78 3784 93910 Afforestation regeneration in ha. E/ embankment without core wall (in Rm) Sub Total 66 TABLE DPR 9: VILLAGE WISE GPS POINTS FOR SCHEMES: DISTRICT: UDALGURI PROJECT: NONOI IWMP Sl. No. Name of village Name of Schemes Physical target 1 2 3 4 GPS STATIONS LATITUDE 5 LONGITUDE 6 ALTITUDE 7 26036/31.6// 91055/20.6// 61 mt 26038/30.4// 91055/29.1// 54 mt 26035/42.5// 26036/51.1// 91055/31.8// 91054/40.9// 55 mt 56 mt 26035/54.3// 91055/57.2// 63 mt NONOI MWS 1 Tamura 1. Afforestation Regeneration 6 ha 2. Excavated pond 1315 m3 3.Earthen embankment without core walling 3755 rm 4. Crop demo (paddy) in ha. 1 ha 5. RCC Check dam 2 Pub Jangalpara 21 m2 1.Constn. of distn. canal for agri field (Earthen) 2 Earthen embankment without core walling 3. Afforestation Regeneration 4 5 Hirapara Gaon No. 1 Batabari Niz Dolagaon 20 m2 1 Constn. of distn. canal for agri field (Earthen) 2. Excavated pond 4000 rm 3000 m3 3. RCC check dam 1. Excavated pond 20 m2 6000 m3 2. Afforestation Regeneration 4 ha 1.Earthen embankment without core walling 2. Afforestation Regeneration 6 Namjala 2000 rm 3 ha 4. RCC check dam 3 1500 rm 3000 rm 3.18 ha 3.Earthen embankment without core walling 1000 rm 1. Boulder spur 1000 rm 2.Earthen embankment without core walling 67 500 rm 7 Mougaon 2. Drainage canal 3. Crop demo (paddy) in ha. 8 9 Naharbari Gaon Dalagrant Gaon 17 m2 4 ha 26037/37.8// 91054/42.8// 60 mt 3125 Rm. 1 26036/25.9// 91053/57.2// 55 mt 26035/07.2// 26036/5.3// 91056/13.1// 91054/28.4// 61 mt 54 mt 26037/41.7// 91055/40.3// 59 mt 26036/31.6// 91056/45// 61 mt 26035/2.8// 91056/26.9// 56 mt 3. RCC Check dam 1. Afforestation Regeneration 1. Rubber plantation 1.75 ha 2. Excavated pond 4000 m3 3. Constn. of distn. canal for agri field (Earthen) 4. RCC Check dam 1.Earthen embankment without core walling 1500 rm 2. Constn. of distn. canal for agri field (Earthen) 3. Protective afforestation 20 m2 800 rm 573 rm 2.5 ha 4. Afforestation Regeneration 2.5 ha 3. Const. of earthen canal in Rm. 719 rm 5. Crop demo (paddy) in ha. 10 Tokankata Gaon 1 1.Earthen embankment without core walling 2. Nursery 340 rm 1 ha 3. Afforestation Regeneration 2.8 ha KULSI MWS 11 No.1 Amguri Gaon 1 Constn. of distn. canal for agri field (Earthen) 2. RCC Check dam 3 Afforestation Regeneration 2000 rm 20 m2 4 ha 4. Protective afforestation 12 Ganakpara 0.90 ha 1Constn. of distn. canal for agri field (Earthen) 2. Afforestation Regeneration 2200 rm 3. Excavated pond 3000 m3 4 ha 4. Rubber plantation 2.5 ha 5. RCC Check dam 20 m2 68 6. Crop demo (paddy) in ha. 13 Kacharitol 1 1. Excavated pond 6000 m3 2. Afforestation Regeneration 14 15 16 Uttar Bhikalikanda 2.70 ha 3. RCC check dam 1.Earthen embankment without core walling 2. Constn. of distn. canal for agri field (Earthen) 3. RCC check dam Pachim Jangalpara 1. Earhen embankment without core walling 2. Afforestation Regeneration Makelikanda 1.Earthen embankment without core walling 2. RCC Check dam 3. Rubber plantation 17 18 Bholabari Bagicha Dakhin Bhokelikanda Bholabari Gaon 26037/54.9// 91056/40.6// 61 mt 18.25 m2 26038/9.4// 91057/31.8// 58 mt 26038/13.9// 91054/52.1// 56 mt 26037/7.7// 91056/37.1// 60 mt 26035/00// 91057/30.1// 65 mt 26037/02.7// 91057/09.7// 62 mt 26035/14.9// 91056/40.5// 63 mt 1340 rm 4 ha 800 rm 20 m2 2.5 ha 4. Protective afforestation 10.48 ha 1.Constn. of distn. canal for agri field (Earthen) 2. Afforestation Regeneration 562.50 rm 4 ha 3.Earthen embankment without core walling 4. RCC check dam 1.Constn. of distn. canal for agri field (Earthen) 3. Constn. of distn. canal for agri field (Earthen) 3.Earthen embankment without core walling 4. Crop demo (paddy) in ha. 19 18 m2 200 rm 2000 rm 2000 rm 20 m2 1770 rm 1515 rm 1500 rm 1 1.Earthen embankment without core walling 2. Afforestation Regeneration 2000 rm 1 ha 3. RCC check dam 20 m2 69 CHAPTER VI - INSTITUTIONAL STRUCTURES TABLE-M(IS)9: DETAILS OF SELF HELP GROUPS (SHGS) IN THE PROJECT AREA 4 5 Name of project Name of the District 3 Total no. of registered SHGs With only Men With only Wome n With both Tota l Total - - - 6 No. of members (Proposed New SHG) Categories (i) Landless (ii) SF (iii) MF (iv) LF Under process Nonoi Udalguri 1 Name of the State S. No. 2 Assam 1 - Total 7 No. of SC/ST in each category 8 No. of BPL in each category M F M M F 470 210 680 350 150 500 680 120 70 760 50 30 290 170 100 950 70 35 30 15 100 50 170 650 850 455 Total 195 F Total (M – Male, F – Female) 4 5 6 Total no. of UGs No. of members Nonoi Name of District 3 Udalguri 1 Name of State S. No. 2 Assam 1 Name of Project TABLE-M(IS)10: DETAILS OF UGS IN THE PROJECT AREA Men - Wome n - Total Both 70 Nos. 70 Nos. Categorie s (i) Landless (ii) SF 7 No. of SC/ST in each category 8 No. of BPL in each category M F Total M F Total M F Total - - 550 - - 320 - - 550 - - 400 - - 230 - - 250 (iii) MF - - 450 - - 100 - - (iv) LF - - - - - - - - - - - - - Total (M – Male, F – Female) 70 1400 650 800 CHAPTER VII - CAPACITY BUILDING TABLE-M(CB)2: CAPACITY BUILDING ACTIVITIES FOR THE YEAR 1 Sl. No. 1. 2 3 4 5 6 7 State Project Stakeholders Total no. of persons No. of persons trained so far No. of persons to be trained during current financial year No. of persons trained during current financial year 15 15 960 950 20 12 - Nil. Nil Nil Nil Nil Nil - 15 15 250 190 20 12 - Nil Nil Nil Nil Nil Nil - Assam Udalguri Nonoi SLNA DRDA/ZP cell PIAs WDTs UGs SHGs WCs GPs Community Others (Pl. specify) Total: 1972 8 Sources of funding for training 9 Funds utilized a) DoLR b)Any other (pl. specify) a) DoLR DoLR DoLR DoLR DoLR DoLR DoLR - - Nil Nil Nil Nil Nil Nil - b)Any other (pl. specify) - 502 * From Column no. 2, total no. of States implementing the programme, from Column no. 4 to 7, Stakeholder-wise totals may be given at the end of the table for the entire country 71 TABLE-M(CB)3: INFORMATION, EDUCATION & COMMUNICATION (IEC) ACTIVITIES FOR THE YEAR 2010-11 1 Sl. No. 1 2 3 4 State/Dist/Proj. Activity Executing agency 1. Awareness campaign 2. Capacity building Assam Udalguri Nonoi PIA PIA Total: 5 Estimated expenditure (Rs.) To be decided by SLNA 6 Expenditure incurred (Rs.) Nil Nil 7 Outcome (may quantify, wherever possible) - - * From Column no. 2, total no. of States implementing the programme, from Column no. 4, total no. of agencies, from column no. 5 & 6, totals may be given at the end of the table for the entire country. =00= 72 73 74 75 76