101 Tips and Tricks for wInsight
Copyright Earned Value Associates LLC. All rights reserved.
101
!
!
w
e
N
All
Tips and Tricks for wInsight
Part III
Eleanor Haupt
Earned Value Associates LLC
[email protected]
www.earnedvalue.biz
937-572-2586
Advance Reviews
101 Tips & Tricks III
“Outshines ‘Revenge of the wInsight
Nerds’ . Riveting and powerful.”
Ed Knox
“A stunning work of raw, poetic beauty!!
Two Arrows Up!”
Epert & Roeber
“I can’t believe Eleanor has this much
time on her hands!” her Business Partner
Copyright Earned Value Associates LLC. All rights reserved.
Outline
„
„
„
„
„
Updating your Software
Custom Narrative Input Screens
Risk and Scorecard
Workspaces
Analysis
„
„
„
„
Comparison to Funding
Baseline Analysis
Custom Reports
wInsight Version 6.3 Tips
Copyright Earned Value Associates LLC. All rights reserved.
Updating your Software
w
Copyright Earned Value Associates LLC. All rights reserved.
Upgrading to Version 6.3
„
Prior to Installation – Save your Files!!
„
1
Save your custom settings (custom registry file)
„
„
„
„
Save any custom reports you’ve built
Archive your data base(s)
„
„
2
(wInsight) Click File, Export Custom Items
Archive in a separate location from software
(Admin) Click Utilities, Backup….
Archive in a separate location from software
„
Note: Should always be stored on network drive, not on
C drive!!
Copyright Earned Value Associates LLC. All rights reserved.
Upgrading to Version 6.3
„
3
Installation
„
Remove prior version
„
4
„
Settings, Control Panel, Add or Remove
Programs
Ensure that the following folders are removed
or empty
„
„
„
„
„
CSSI6/bin
CSSI6/data
CSSI6/winst
CSSI6/wsmde
(contains .dll and other files)
(contains blank data bases)
(wInsight, report templates)
(Administrator, report templates)
Install new software
Tips courtesy of Dan Zosh
Copyright Earned Value Associates LLC. All rights reserved.
Upgrading to Version 6.3
Post Installation
5
„
Re-import your custom registry file
„
6
„
(wInsight) Click File, Import Custom Items
Convert 6.2 data base to 6.3 data base
„
Option:
„
„
„
„
7
Open wInsight Administrator version 6.3
Create a data source link to a blank 6.3 data base
Restore archived data base in the blank data base
Option:
„
„
Run wsquery for Access, MSSQL, or Oracle
Example:
„
„
„
C:\cssi6\winst\data\access\updateaccess62to63
Click Database, Connect. Select database to
convert.
Click green triangle
Copyright Earned Value Associates LLC. All rights reserved.
easy
A Note about Compatibility
Don’t hesitate to upgrade!!
8
„
Databases are forward compatible
„
9
„
Can open version 6.2 database in version 6.3
Databases are not backwards compatible
„
If trying to open 6.3 version of database in 6.2, will
get following error
Copyright Earned Value Associates LLC. All rights reserved.
What File do I Send my
Customer?
10
„
Type of file
„
First submission only
„
„
„
Subsequent submissions
„
„
Archived database (.wsa)
Outlook blocks databases – do not send .mdb by e-mail
Transfer file for most recent month only
Version?
„
11
If your customer has a higher version of wInsight
„
„
„
If you have a higher version of wInsight
„
„
Shame on you! Get the upgrade
In the meantime, send the transfer file
Send them a transfer file compatible with their version
Transfer file formats
„
„
X12 format
(.trn)
XML format (if wInsight 6.0 or higher)
Copyright Earned Value Associates LLC. All rights reserved.
(.xml)
Exporting a Different Version
„
12
XML
„
„
„
Utilities, Export File
Click Options button
Can save to older version
„
„
„
„
13
6.2
6.1
6.0
TRN
„
„
„
„
Utilities, Export File
Select X12 as export option
Click Options button
Select version (WSA 5.0, 4.0,
2.0, wInsight 3.x, 2.x, PA)
Copyright Earned Value Associates LLC. All rights reserved.
Contract Names and
Importing Transfer Files
„
14
„
Administrator uses the ContrName field to
match the transfer file to the correct contract
If you get the message that a new contract is
being created during import
„
ContrName may have been changed
„
Open the transfer file in NotePad
„
„
15
„
Click Edit, Find, enter “ContrName”
Edit name to match ContrName in database
Contractors: do not modify ContrName
without informing your customer!
Copyright Earned Value Associates LLC. All rights reserved.
Can I have both versions (i.e. 6.2
and 6.3) on same machine?
16
„
17
„
Yes, but not recommended!
Need to register DLLs in both versions
„
„
18
„
Double click on CSSI6/bin/DoRegAll
Launch correct version of software
Be careful of data base versions
„
„
May need to designate data base version in
title (e.g., MOH-2 Vers 63)
Keep in separate directories
Copyright Earned Value Associates LLC. All rights reserved.
Upgrade your Software
„
If you have a renewal agreement
„
„
„
Visit www.cssi.com/footprints monthly
Download software upgrades
Upgrade may not include all support files &
utilities
„
19
Do not uninstall software or remove support
files
„
„
If asked if you wish to install a support file (e.g.,
xxx.dll), click yes
Should archive registry file in separate location
prior to downloading
Copyright Earned Value Associates LLC. All rights reserved.
Drag and Drop Import
20
„
„
„
21
„
Drag and drop a transfer file directly from
Windows Explorer into the Administrator
window
Drag and drop for several contracts at once
Automatically recalculates
Ensure you have correct options selected
prior to drag & drop
„
„
„
Import
Recalculate
You won’t have a chance during drag & drop
Copyright Earned Value Associates LLC. All rights reserved.
22
Step by Step Data Base Maintenance*
Restore an
Archived
Contract or
Contracts
Recalculate
page 12
page 9
X
option 2
X
option 2
X
X
X
Restore an archived
contract or contracts in an
existing data base
X
X
X
Send periodic data to a
customer
X
X
Send the entire Data Base
or contract to a customer
X
X
X
Archive the database to
back-up the data
X
X
X
'---------------------------Functions -----
Create a
Data Base
Shell
Select the
Data Base
Import a
Transfer File
page 4
page 4
(see page 5 for
entering data
manually)
Recalculate
Backup the
Roll Up the
Export a
Data Base or
Data
Transfer File
Contract
page 11
--Desired Outcome
page 9
page 10
page 10
page 12
FOLLOW THESE STEPS IN ORDER FROM LEFT TO RIGHT
Create a Contract in a new
Data Base
X
X
X
Add a Contract to an
Existing Data Base
X
X
option 1
X
option 1
Import a new month of
data
X
X
X
Restore an archived
contract or contracts in a
new data base
X
X
X
X
*Guide to Mastering wInsight, published by Earned Value Associates, LLC
Copyright 2005
Custom Narrative Input Screens
Copyright Earned Value Associates LLC. All rights reserved.
Custom
Custom
fmt5_narrative.htm
fmt5_narrative.htm
23
generated
generated
generated
generated
24
Input
Input section
section
25
-Provide
-Provideblocks
blocksfor
forCAMs
CAMsto
tofill
fillinin
“If
“Ifyou
youbuild
buildit,it,they
theywill
willwrite
writeit”
it”
Copyright Earned Value Associates LLC. All rights reserved.
Resulting
Resulting Format
Format 55
narrative
narrative
Copyright Earned Value Associates LLC. All rights reserved.
26
WE: Sample
Custom Narrative Input
Templates
27
„
Can modify any of the following standard
input templates
„
„
„
„
„
fmt5_template.htm
sow_template.htm
usernarr_template.htm
Select new template on the Input menu
The data and the new template will be
shown in the corresponding report
„
„
„
rfmt5_template.htm
rsow_template.htm
rusernarr_template.htm
Copyright Earned Value Associates LLC. All rights reserved.
28
Names
Namesare
aresimilar
similar
Be
careful!
Be careful!
Only
Onlyneed
needto
to
modify
modifythe
theinput
input
template,
template,not
notthe
the
report
report
6.3
Customizing Narrative Inputs
Step by Step
„
Copy and save the original template in another
location
„
„
29
in case you want to restore it later!
Customize
„
„
„
„
Open the file using a HTML editor
Add fields to show dynamic data
Add tables and words to indicate input areas
Save with the same name in the winst folder
„
„
Example: C:\cssi6\winst\fmt5_template.htm
Could save Fmt 5 template with contract name
„
„
30
31
Example: C:\cssi6\winst\MOH-2_fmt5_template.htm
Have to close and re-open wInsight to establish automatic link
Demonstrated live in my other presentation!
Copyright Earned Value Associates LLC. All rights reserved.
Customizing Narrative Inputs
How to Use
„
„
Select Active Element
Click on Input, name of narrative input report
„
„
„
„
Hint: if new narrative inputs do not show up, may
need to clear old narrative. Click Edit, Select All,
Edit, Clear All, Save. Close window, then reopen
narrative input.
Enter information
Click Save button
To view report, select report from report menu
Copyright Earned Value Associates LLC. All rights reserved.
32
Customizing Narrative Inputs
How to Use
„
To clear entered information
„
„
„
33
Click Edit, Clear All. Edit, Save.
Close and reopen input screen to refresh template
To copy forward
„
Format 5 Narrative, User Narrative
34
„ Administrator (Utilities, Copy Forward)
„
Can select option to only copy Format 5 narratives for 35
elements that meet the new month’s VAR thresholds
„
„
Click VAR Only
Scope of Work narrative
„
Automatically copies forward
Copyright Earned Value Associates LLC. All rights reserved.
Risk and Scorecard
Copyright Earned Value Associates LLC. All rights reserved.
6.3
New Risk Fields in Version 6.3
„
New fields
„
„
„
„
„
„
„
Warning!
40
Warning!
••Old
Oldfield
field(Risk)
(Risk)still
stillexists.
exists.
••Populate
Populateinin“CPR
“CPRElements”
Elements”table.
table.
••To
Toshow,
show,select
select“RiskColor”,
“RiskColor”,not
not“Risk”
“Risk”
Copyright Earned Value Associates LLC. All rights reserved.
„
„
„
Risk
Technical
Funding
Staffing
Satisfaction
UserKpi6
UserKpi7
UserKpi8
UserKpi9
UserKpi10
36
37
••Colors:
Colors: __RRYYGGBB
••Trend
Trendarrows
arrows
38
••Can
Canbe
be
renamed
renamedininSort
Sort
window
window
39
••Use
for
other
Use for other
risks
risks(schedule,
(schedule,
probability,
probability,
etc.)
etc.)
6.3
New Risk Fields in Version 6.3
Data Entry
„
Enter in Element Data table, Scorecard table
„
Option
„
„
42
„
Faster Option
„
„
„
Select each risk item
Select color from drop down box
Double click in cell
Type in rating directly
Copy to next month
„
„
43
Not automatic
Copy and paste from prior month, edit as needed
Copyright Earned Value Associates LLC. All rights reserved.
41
6.3
Custom Workspace – “Scorecard”
44
Copyright Earned Value Associates LLC. All rights reserved.
Custom Workspace – “Scorecard”
WE: Sample
6.3
Copyright Earned Value Associates LLC. All rights reserved.
Custom
CustomView:
View: Scorecard
Scorecard
45
Fields:
Fields: Risk,
Risk,UserKpi8,
UserKpi8,UserKpi7,
UserKpi7,Technical,
Technical,Staffing,
Staffing,UserKpi6,
UserKpi6,SpiTrCum,
SpiTrCum,
TFloat,
TFloat,Bac,
Bac,Funding,
Funding,CpiTrCum,
CpiTrCum,VacTrCum,
VacTrCum,UserEacMin,
UserEacMin,UserEac,
UserEac,UserEac
UserEac
Max
Max
46
•• Changed
Changedto
toIPT
IPTstructure.
structure.
•• Sized
Sizedand
andarranged
arrangedwindows.
windows.
•• Save
SaveWorkspace
WorkspaceAs…
As…
48
Custom
Customchart
chart
Columns:
Columns: BAC,
BAC,EAC
EAC
Trend
Trendlines:
lines: SPI,
SPI,CPI
CPI
Used
UsedScope
Scopeof
ofWork
Work
report
to
input
report to inputrisk
risk
items,
90
day
look
items, 90 day look
ahead
ahead
47
6.3
Other Potential Uses for new Risk
50
••IfIfentering
colors
for
KPI
Fields
entering colors for KPI
9 and 10 only, must enter
„
Track CAM competencies
„
„
CAMs
No performance data
Use two blank risk fields
„
„
„
49
Create an alternate data structure
„
„
9 and 10 only, must enter
88blank
blankspaces
spaces
••Blanks
Blankswill
willnot
notcopy
copy &&
paste
pasteto
tonext
nextmonth
month
CAM Training (UserKpi9)
VAR Quality (UserKpi10)
Show to PM on regular basis
Copyright Earned Value Associates LLC. All rights reserved.
OffSym
ProjOff
LL
CAM Training VAR Quality
1
IPT 1
Smart
√
↓
↔
2
IPT 1
Bond
√
↔
↔
3
IPT 1
Wayne
√
↓
↔
4
IPT 1
Brown
√
↔
↔
5
IPT 2
Simmons
√
↔
↔
6
IPT 2
Novak
√
↔
↔
7
IPT 2
Smith
√
↔
↔
8
IPT 2
Price
√
↑
↔
9
IPT 3
Hall
√
↔
↔
10
IPT 3
Zepka
√
↔
↔
11
IPT 3
Tideman
√
↑
↔
12
IPT 4
Hall
√
↔
↔
13
IPT 4
Blair
√
↔
↔
14
IPT 4
Troop
√
↔
↔
15
IPT 4
Pino
√
↔
↔
Master wInsight, you can
„
Master the software
„
„
„
„
Read Guide to Mastering wInsight
Explore and have fun!
Fear not the dark side of custom reports
Customize for your team
„
„
„
„
„
„
51
Views, Filters, Charts
Multiple windows
Quad charts
Workspaces
Reports
Share custom registry file, you must
Copyright Earned Value Associates LLC. All rights reserved.
“Try not.
not.
“Try
Do oror dodo not,
not,
Do
there isis nono try.”
try.”
there
Workspaces
Copyright Earned Value Associates LLC. All rights reserved.
Custom Workspaces
„
„
Are only valid for a particular data source
How to create
„
„
„
„
„
„
„
Use during live project reviews in conference room
Customize for project manager, IPT, etc.
54
Save basic Sort window as default
„
„
„
Arrange wInsight components as desired
Filter, sort, custom reports, etc.
Click File, Save Workspace As…
53
Recommend saving to network drive to avoid loss
Uses
„
52
Save Workspace
Automatically opens when you open wInsight
Can open custom workspaces without closing data
Copyright Earned Value Associates LLC. All rights reserved.
Demonstrated live in my other presentation!
Data Validity Workspace
EAC Realism Workspace
Copyright Earned Value Associates LLC. All rights reserved.
VAR Input Workspace
MR Status Workspace
55
56
57
6.3
VAR Track custom workspace
58
Custom
Custom workspaces
workspaces
can
can now
now contain
contain
more
more than
than one
one Sort
Sort
window
window
Copyright Earned Value Associates LLC. All rights reserved.
Analysis Tips
Copyright Earned Value Associates LLC. All rights reserved.
Contract Tree
„
Current/Cum toggle
„
„
„
„
59
Right mouse click
anywhere in Tree
Click Options menu to see
if Current toggle is on
Toggle to OBS structure
Analysis
„
„
Drill down the WBS or
OBS structure
Can select the Active 60
Element on the tree
„
All open charts and
reports are changed
Copyright Earned Value Associates LLC. All rights reserved.
Contract Tree workspace
61
!%#$& Filter Name
„
DO NOT begin the name of
a custom filter with any of
following characters
„
„
!%#$&
It will be at the top of the
pre-filter list in the Open
Data Set dialog box
„
Becomes default unless you
always remember to click on
<All Elements>
Copyright Earned Value Associates LLC. All rights reserved.
62
6.3
Interactive Filters
„
Prompt you to enter value
„
„
Example: name of CAM, WBS begins with,
CPI, etc.
6.3 Enhancement
„
„
63
Click Apply to keep
interactive window open
Can enter new values
Copyright Earned Value Associates LLC. All rights reserved.
Comparison to Funding
Copyright Earned Value Associates LLC. All rights reserved.
Show total funding vs. expected Price at Completion (PAC)
MEGA HERZ ELEC & VEN F04695-86-C-0050 FPI RDPR
Funding vs PACs
Element: 1000
Dollars in Millions
64
2003
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Name: MOH-2
2004
JAN
28.0
27.0
••Use
2,
UseNumber1,
Number1,
2,3,
3,44fields
fieldsin
inAdministrator
Administrator
••Enter
total
funding,
Price
at
Completion
Enter total funding, Price at Completion
26.0
25.0
24.0
23.0
22.0
21.0
20.0
PO Funding
23.00
PAC Min 19.99
PAC ML 21.05
PAC Max 22.02
23.00
20.08
21.10
21.54
23.00
21.11
21.54
21.90
23.00
21.44
21.75
21.66
Copyright Earned Value Associates LLC. All rights reserved.
23.00
21.50
21.90
21.75
23.00
21.54
22.01
22.90
23.00
21.78
22.54
22.98
23.00
24.54
25.01
27.54
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
39
Funding chart
Funding
F04695-86-C-0050 FPI RDPR
Contractor: MEGA HERZ ELEC & VEN
Contract: MOH-2
Complete
Time Now
Start
Dollars in Millions
••Shows
Showsspreads
spreadsof
offunding
funding
25.0••Requires
RequiresCFSR
CFSRdata
data
••Customized
Customizedon
onnext
nextchart
chart
Program: Mohawk Vehicle
AS OF: JAN 93
20.0
15.0
10.0
5.0
0.0
65
••Completion
line
is
the
later
of:
Completion line is the later of:
••ContrCompl
ContrCompl (Administrator)
(Administrator)
••CtrEstCompl
CtrEstCompl (Administrator)
(Administrator)
••POEstCompl
(wInsight)
POEstCompl (wInsight)
1992
BCWS
BCWP
ACWP
7.28
6.85
7.35
Copyright Earned Value Associates LLC. All rights reserved.
1993
Contractor Spread
Automated Spread
Custom Spread
23.36
24.00
25.10
66
Funding
F04695-86-C-0050 FPI RDPR
Contractor: MEGA HERZ ELEC & VEN
Contract: MOH-2
22.5
Complete
Time Now
25.0
Program: Mohawk Vehicle
AS OF: JAN 04
Start
Dollars in Millions
*Guide to Mastering wInsight, published by Earned Value Associates, LLC
Customized Funding chart*
20.0
17.5
15.0
Problem!
Planned obligations
less than Ctr Spread
12.5
10.0
7.5
Copyright 2005
••Changed
Changedfield
fieldon
onstandard
standardFunding
Fundingchart
chart
5.0
••Autospread
field
Budget
field
Autospread field
Budget field(populated
(populatedin
inAdministrator)
Administrator)
•
Legend:
“Planned
Obligations”
• Legend: “Planned Obligations”
2.5
••Changed
Changedlegend
legend
0.0
•“Custom
•“CustomSpread”
Spread”to
to“PMO
“PMOSpread
Spreadof
ofPAC”
PAC”
•“Contractor
Spread”
Spread
•“Contractor
Spread”to
to“Contractor
“Contractor
Spreadof
ofPAC”
PAC”
2003
2004
2005
BCWS
BCWP
ACWP
7.33
7.31
7.35
Copyright Earned Value Associates LLC. All rights reserved.
Contractor Spread of PAC
Planned Obligations
PMO Spread of PAC
23.36
24.10
24.10
Analyze Staffing Forecasts
„
Open Manpower chart
„
„
„
„
Available for all elements in OBS structure
Available at Level 1 for WBS and other structures
Shows actual data for past 3 months and incremental
data for future periods
Look for
67
„
„
„
Significant shifts from prior reports
68
Compare actual costs (past 3 months) to what had been
forecasted
69
Compare end point (EAC data) with
„
„
„
Prior months to see if period has been extended
End point for BAC (if entered)
End point for total program BAC on Format 3
Copyright Earned Value Associates LLC. All rights reserved.
Element: QA
EQP
2003
NOV
MEGA HERZ ELEC & VEN F04695-86-C-0050 FPI RDPR
Manpower
2004
FEB
MAR
APR
MAY
JUN
JUL
DEC
JAN
Name: QUALITY CONTROL
AUG
SEP
OCT
25.0
20.0
••Does
Doesthis
thiscurve
curvesupport
supportthe
thephasing
phasing
of
ofthe
thework?
work? Does
Doesthe
thework
workend
endinin
October?
October?
••What
Whatdoes
doesthe
theFormat
Format33show
showfor
for
Forecasted
ForecastedCompletion
CompletionDate?
Date?
15.0
10.0
5.0
0.0
71
ACTUAL
LRE
BAC
9.00
9.00
0.00
Could
Couldenter
enterBAC
BAC
16.20
18.20
information
for
information
for23.60
15.20
17.40 17.80
manpower
inin 0.00
0.00
0.00
0.00
manpower
Administrator
Administrator
Copyright Earned Value Associates LLC. All rights reserved.
26.00
0.00
26.40
0.00
25.40
0.00
23.60
0.00
16.60
0.00
4.40
0.00
0.00
0.00
70
Baseline Analysis
Copyright Earned Value Associates LLC. All rights reserved.
Review the Baseline Analysis Chart
Baseline Analysis
F04695-86-C-0050 FPI RDPR
Contractor: MEGA HERZ ELEC & VEN
Contract: MOH-2
80
60
40
74
5.0
••Completion
Completionline
lineisisthe
thelater
laterof:
of:
••ContrCompl
(Administrator)
ContrCompl (Administrator)
••CtrEstCompl
CtrEstCompl (Administrator)
(Administrator)
••POEstCompl
(wInsight)
POEstCompl (wInsight)
2.5
0.0
2003
BCWS
BCWP
ACWP
7.28
6.85
7.35
Copyright Earned Value Associates LLC. All rights reserved.
100
2004
JAN 04 Baseline
DEC 03 Baseline
NOV 03 Baseline
20
0
20.80
20.80
19.38
Percent of PMB
•• Look
Lookfor
forshifts
shiftsfrom
fromone
one
17.5
period
periodto
toanother.
another. Should
Should
correlate
with
correlate15.0
withIMS
IMSbaseline
baseline
changes.
changes.12.5
•• Analyze
Analyzespikes,
spikes,flat
flatspots,
spots,
10.0 slopes.
or
ornegative
negative
slopes.
•• MR
UB are spread.
MRand
and
7.5 UB are spread. 73
Complete
72
Time Now
Start
Dollars in Millions
20.0
Program: Mohawk Vehicle
AS OF: JAN 04
Baseline Analysis chart
Program: Mohawk Vehicle
AS OF: JAN 04
100
80
15.0
12.5
60
10.0
40
7.5
5.0
20
2.5
0.0
0
2003
BCWS
BCWP
ACWP
7.28
6.85
7.35
2004
JAN 04 Baseline
DEC 03 Baseline
Sep 03 Rolling Wave
20.80
20.80
19.16
Percent of PMB
Complete
Time Now
Start
Dollars in Millions
75
••Shows
ShowsBCWS
BCWSbaseline
baselinecurves
curvesfor
forlast
last3Baseline
3months
months
Analysis
F04695-86-C-0050
••Can
designate
a
“fixed
period”
for
curves
Can
designate
a ELEC
“fixed
period” for curvesFPI RDPR
Contractor:
MEGA HERZ
& VEN
••Designate
for
Contract: MOH-2
Designate
forOTB,
OTB,rolling
rollingwave,
wave,etc.
etc.
••Click
Define
Chart
Click Define Chart
••Select
one
Select20.0
oneofof33future
futurecurves.
curves.
••Edit
,
click
Absolute
,
select
Edit, click Absolute, selectperiod
period
••Requires
future
period
BCWS
data
17.5
Requires future period BCWS data
Custom
Custom
Reports
Reports for
for
Baseline
Baseline
Analysis
Analysis
Future
Future Period
Period BCWS
BCWS –– Twelve
Twelve Months
Months
76
(banded
(bandedreport
reportfor
forall
allelements)
elements)
77
Baseline
Baseline Analysis
Analysis
for
for WBS
WBS Element
Element
Copyright Earned Value Associates LLC. All rights reserved.
Custom Reports
Copyright Earned Value Associates LLC. All rights reserved.
Custom Reports
„
Keep all custom reports in same folder
„
„
Suggest: C:\CSSI6\winst
If not in same folder, wInsight will
automatically look for a report in last
location that was mapped for any report
„
„
Will get error message
Have to continually re-map
Copyright Earned Value Associates LLC. All rights reserved.
78
Hints for Custom Reports
„
Banded Reports
„
„
„
Show data fields for all elements showing
in Sort window (could be filtered set)
Example: PM Summary report
How to create
„
„
„
79
80
(|Meta|BeginLoop|ce|SyncSortWnd|) Begins “loop”
(|field name|$ce$|)
Specifies field for all elements
(|Meta|EndLoop|ce|) Ends “loop” through all elements
Copyright Earned Value Associates LLC. All rights reserved.
Hints for Custom Reports
„
„
Begin by studying existing reports
Copy and edit existing report 81
„
„
Copy scripts, formats, etc.
Arrange HTML editor window and wInsight
sort window together on screen
„
„
„
Make changes to report
Switch to wInsight, apply report
Verify changes in new report
Copyright Earned Value Associates LLC. All rights reserved.
82
Formatting Custom Reports
(|Lre|(-0)|[c0]|)
Current
period
No
decimals
84
Must use Lre for
field name
instead of Eac
(|Lre|(-1)|[n3]|)
Prior period (relative to
current period)
Specify number
of decimals
(|Lre|(-0)|{+1}|Dollars|)
85
Future period (relative
to current period)
Copyright Earned Value Associates LLC. All rights reserved.
Specify units
If left off, can toggle units
83
EAC Realism - Work Breakdown Structure (Dollars)
As of: JAN 04
Contract Name: MOH-2
Contract Number: F04695-86-C-0050
Contractor: MEGA HERZ ELEC & VEN
Element Code: 1000
Element Name: MOH-2
86
Project Officer: Jones
Office Symbol: JDHD
Method 1 - Comparison of CV to VAC
Cum Cost Variance
-36.0
VAC
0.0
The cumulative cost variance to date is worse than the projected final cost overrun. The EAC appears to
be optimistic or may be outdated.
Cumulative cost performance is overrunning; but final costs are expected to come in at the budget
value.
Method 2 - Comparison of CPI to TCPI-EAC
CPI
0.995
TCPI-EAC
••“EAC
“EACRealism”
Realism”custom
customreport
report
••Verifies
Verifiesrealism
realismby
by44methods
methods
••Also
Alsocreated:
created:
•“EAC
•“EACRealism
Realismsince
sinceOTB”
OTB”
custom
customreport
report
1.002
Comparison of CPI to TCPI-EAC
-0.007
The EAC is relatively consistent with cost efficiency to date.
Method 3 - Compare EAC to Statistical Forecasts
Contractor's EAC
28,389.4
wInsight Independent Statistical Forecasts
•Current Period CPI
•CPI (3 period average)
•CPI (6 period average)
•Cumulative CPI
•Weighted Cost Schedule
•MICOM (CPI6*SPI)
•CPI*SPI
30,874.7
27,167.8
28,414.7
•User EAC (most likely)
•User EAC (max)
28,389.0
Compare the EAC to range of statistical EACs.
If the EAC is below the range, it appears to be unrealistic based on past performance.
If the EAC is within the range, it appears to be realistic based on past performance, but evaluate its
position within the range.
If the EAC is above the range, it may be too pessimistic, unless it is based on knowledge of future risks.
Compare the EAC to the range of User EACs (if input).
28,512.7
28,525.8
Method 4 - Compare EAC to Regression Forecasts
28,600.9
28,696.0
User Input EACs
•User EAC (min)
SPO EAC
28,663.8
Contractor's EAC
28,389.4
Linear Regression
28,643.9
Evaluate the EAC against the linear regression formula. Note that this is not a curvilinear function, but
a straight line projection.
29,580.8
30,169.8
Notes
Weights for Cost + Schedule Forecast: Cost = 50.0%
Forecasts are summed from lower levels.
Copyright Earned Value Associates LLC. All rights reserved.
Schedule = 50.0%
87
Twelve
Twelve Period
Period
Summary
Summary
Copyright Earned Value Associates LLC. All rights reserved.
Copying Reports to Word or
88
PowerPoint
Two
Two Step
Step Process
Process
„
Open wInsight report
„
„
Click Edit, Select All, Edit, Copy
Open new Word or PowerPoint
document
„
„
„
„
Click Edit, Paste Special, HTML
Format
Click on report to select, Cut
Click Edit, Paste Special, Picture
(Enhanced Metafile)
PowerPoint
„
Select script tag (if any) and delete
Copyright Earned Value Associates LLC. All rights reserved.
Allows
Allowsyou
youto
totreat
treatthe
the
report
reportas
asaapicture
picture
(resize,
(resize,etc.)
etc.)
wInsight 6.3
Copyright Earned Value Associates LLC. All rights reserved.
6.3
MEGA HERZ ELEC & VEN F04695-86-C-0050 FPI RDPR
Chart 2
Element: 1000
Name: MOH-2
SPICUM
Index of Dollars
0.95
0.
90
10
.
1
89
•• Select
SelectGauge
Gaugeas
astype
typeof
ofUnits
Units
•• Can
Canchart
chartany
any%
%or
orindex
indexfield
field
•• Clicking
OptionalData
Datashows
shows
ClickingOptional
previous
previous22months
months
AUG 03
0.972
Copyright Earned Value Associates LLC. All rights reserved.
SEP 03
0.993
OCT 03
1.089
6.3
MEGA HERZ ELEC & VEN F04695-86-C-0050 FPI RDPR
Chart 2
Element: 1000
Name: MOH-2
SPICUM
Index of Dollars
0.95
1
0.
0
.1
90
AUG 03
SEP 03
OCT 03
0.972
0.993
1.089
Copyright Earned Value Associates LLC. All rights reserved.
6.3
Custom Animation
for Gauge Chart
90
„
„
„
„
„
Copy and paste to PowerPoint
Cut and Paste Special (Windows
Metafile)
Ungroup picture elements
Animate
Change colors, font sizes
Copyright Earned Value Associates LLC. All rights reserved.
6.3
New Fields
„
„
„
•• Rolling
Rolling averages
averages
•• Show
Show in
in Sort
Sort window
window
•• Plot
Plot on
on trend
trend charts
charts
••Suggest
Suggestbars
barsfor
forrolling
rollingaverages
averages
••Trend
lines
for
cum
indices
Trend lines for cum indices
MEGA HERZ ELEC & VEN F04695-86-C-0050 FPI RDPR
CPI 3
Element: 1000
Index of Dollars
„
CpiCum3
CpiCum6
SpiCum3
SpiCum6
1.200
2003
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Name: MOH-2
2004
JAN
1.150
1.100
1.050
1.000
0.950
0.900
0.850
CPICUM3 1.150 1.051 0.996 0.967 0.903 1.016 0.869 0.872 0.905 0.950
CPICUM 1.150 1.051 0.996 0.987 0.927 1.011 0.906 0.891 0.947 0.932
Copyright Earned Value Associates LLC. All rights reserved.
91
6.3
New Fields in Administrator
„
CprDid
„
Contracts, Contract Set Up table
„
„
„
93
Report Set Up, CPR Header table
„
„
Select “0” for Aug 99 DID
Select “1” for Mar 00 DID
EvmsAppr
„
92
Enter date of system validation
ReprogSch
„
Element, Earned Value table
„
Enter SV adjustments by element
Copyright Earned Value Associates LLC. All rights reserved.
94
6.3
New CPR Formats
„
„
Can be selected by switching CprDid field to
“1”
Files are contained in C:\CSSI6\wsmde
„
„
„
95
Example: cpr_1m1.htm
New formats available on FootPrints with correct
title
View new formats in Administrator
„
„
„
Open Reports in navigation pane
Select CPR format
Can save as HTML file or print
Tips courtesy of Wayne Erwin
Copyright Earned Value Associates LLC. All rights reserved.
Caution
Caution
not
notyet
yet
supported
supportedinin
wInsight
wInsight
6.3
Import File options
„
Recalculate after
import
„
„
„
96
Uses last settings for
Recalculate and Import
Import warnings are
quickly displayed
Generate import
messages only
„
„
Dry run option
No data is imported
Copyright Earned Value Associates LLC. All rights reserved.
Leave
Leave both
both options
options
unchecked
unchecked for
for
normal
normal import
import
6.3
Administrator
Tree Manager
„
Drag and drop element onto new
parent element
„
„
„
On same tree
Only need to open second tree to
save scrolling up and down
Click Insert on your keyboard to
insert new element
„
Generates default number
„
„
„
„
97
parent#.1
Enter element number only
Must enter name in CPR Elements
table
Click Delete on your keyboard
to delete an element
Copyright Earned Value Associates LLC. All rights reserved.
Can
Canonly
onlymove
move
elements
elementswithin
within
same
samestructure
structure
6.3
Administrator
WBS Map
„
„
Drag and drop from WBS (left pane) to
target structure on right
Click Options
„
To show
„
„
„
„
„
„
„
Lowest only
Unmapped
Mapped
Linked WBS elements for selected
target
To filter WBS elements
„
„
98
Example: by CAM
To remove link, click target WBS and
drag to blank area in target area
Click File, Validate/Repair to detect
and repair broken links
Click File, Save
Copyright Earned Value Associates LLC. All rights reserved.
Important
ImportantNext
NextSteps
Steps
••Run
RunUtilities,
Utilities,Run
RunScript,
Script,Set
Set
Linked
LinkedPeriod
PeriodData
Data
••Copies
Copiesdata
datato
tonew
newlinks
links
Script,
Set
Linked
Future
••Run
Run Script, Set Linked Future
Data
Data
••Copies
Copiesfuture
futureperiod
perioddata
data
••Recalculate
Recalculate
One Final Hint about
Administrator
„
If unsure about what you are about to do
„
„
„
„
Step 1
Step 2
Step 3
No worries!
Copyright Earned Value Associates LLC. All rights reserved.
99
Recalculate and archive the
database in a safe place
Try out new techniques
If you blow it, delete the test
database and restore the archived
database
Need Help?
„
Send me an e-mail if you’d like any of
the following
„
„
„
100
wscustom.xml
Custom reports
(my custom registry file)
Visit our website for wInsight resources
„
www.earnedvalue.biz
Copyright Earned Value Associates LLC. All rights reserved.
Copyright Earned Value Associates LLC. All rights reserved.
Tip #101
16
There is only
one copy of
wInsight-opoly
in the world!
Register at our booth to win the only copy!