- AWP Conference 2016

Transcription

- AWP Conference 2016
Advanced Work Packaging & WorkFace Planning
Solutions for Project Delivery
Joe Hobbs
Manager of Engineering - CoSyn Technology (WorleyParsons)
COAA - AWP Steering Committee member
CII - Research Team member
RT310 - Improving Engineering and Procurement Alignment and
Coordination with Construction
RULES OF ENGAGEMENT?
WHY ARE WE HERE?
HOW does WorleyParsons
apply Advanced Work Packaging (AWP) and WorkFace Planning (WFP)?
WHY ARE WE HERE?
WHAT?
WHY?
HOW?
ONEWAY MOMENT
“Safety outweighing every other consideration”
ONEWAY MOMENT
“The formal processes were too complicated”
ONEWAY MOMENT
“Uh‐oh!”
ONEWAY MOMENT
“It will never happen again”
WHAT IS WFP?
WorkFace Planning (WFP)
WHAT IS WFP?
The detailed PLAN to ensure you have the right:
PEOPLE
TOOLS
PLACE
TIME
SCOPE
WHAT IS WFP?
WHAT IS WFP?
Construction
Work
Package
WHAT IS WFP?
Engineering
Work
Package
WHAT IS WFP?
Installation
Work
Package
WHAT IS AWP?
Advanced WorkPackaging
(AWP)
?
WHAT IS AWP?
THINKING WITH THE END IN MIND
AT THE START
WHAT IS AWP/WFP?
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
FEED
Improve
4 EXECUTE
Detailed
Engineering
CII – IR 272, Advanced Work Packaging:
Implementation Resource 272-2 version 3.0, Volume 2, Sect 1.1, Figure 1
Construct
5 OPERATE
Completions
Operate
Decommission
/mothball
WHAT IS AWP/WFP?
OPERATIONS
OWNER
MAINTENANCE
CONSTRUCTION
ENGINEERING
SUPPLY
NETWORK
WHAT IS AWP/WFP?
OWNER
CONSTRUCTION
ENGINEERING
ADVANCED WORK
PACKAGING
SUPPLY
NETWORK
WHAT IS AWP/WFP?
Early ALIGNMENT on the project of ENGINEERING, SUPPLY NETWORK and CONSTRUCTION to successfully implement the WorkFace Plan
WHY WE DO IT?
WHY WE DO IT?
WHY WE DO IT?
ENGINEERING
CONSTRUCTION
SUPPLY
NETWORK
WHY WE DO IT?
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
FEED
Improve
4 EXECUTE
Detailed
Engineering
Construct
5 OPERATE
Completions
Operate
100%
Max
Cost
Min
0%
Completion
Concept
INFLUENCE CURVE
Project Cumulative
Opportunities for Savings
Ability to influence
Decommission
/mothball
BENEFITS
P
R
O
PREDI
U
C
T
I
V
I
SA F E TY
Y
S
C
H
E
D
U
L
E
Q
U
A
T A B I L IT Y
I
C OST
Y
BENEFITS
Material Movement / Planning
23%
Current Practice
Tool Time
33%
WFP Productivity Improvement
Wait / idle
44%
Material Movement & Planning
23%
Wait / idle
33%
CII – IR 272, Advanced Work Packaging:
Implementation Resource 272-2 version 3.0, Volume 1, Sect 1.3.1
Tool Time
33%
Improved
Tool Time 11%
BENEFITS
25%
INCREASE IN
LABOR
PRODUCTIVITY
BENEFITS
10%
PROJECT COST
SAVINGS
HOW?
(WHAT HAS CHANGED?)
HOW?
CHALLENGES
PEOPLE
CUSTOMER FOCUS
SYSTEMS, PROCESSES & TOOLS
PEOPLE
OWNER
CONSTRUCTION
ENGINEERING
ADVANCED WORK
PACKAGING
SUPPLY
NETWORK
PEOPLE
MODEL MANAGER
What’s Different
CONSTRUCTION
ENGINEERING
SUPPLY
NETWORK
PEOPLE
CONSTRUCTION ADVISOR
What’s Different
CONSTRUCTION
ENGINEERING
SUPPLY
NETWORK
PEOPLE
PROCUREMENT MANAGER
What’s Different
CONSTRUCTION
ENGINEERING
SUPPLY
NETWORK
PEOPLE
PLANNER
What’s New
CONSTRUCTION
ENGINEERING
ADVANCED WORK
PACKAGING
SUPPLY
NETWORK
PEOPLE
CHAMPIONS
What’s New
CONSTRUCTION
ENGINEERING
ADVANCED WORK
PACKAGING
SUPPLY
NETWORK
PEOPLE
CONSTRUCTION
ENGINEERING
ADVANCED WORK
PACKAGING
RIGHT
PERSON
SUPPLY
NETWORK
RIGHT
ROLE
SYSTEMS,PROCESSES &TOOLS
CHALLENGES
PEOPLE
CUSTOMER FOCUS
SYSTEMS, PROCESSES & TOOLS
SYSTEMS,PROCESSES &TOOLS
THINKING WITH THE END IN MIND
AT THE START
SYSTEMS,PROCESSES &TOOLS
Installation
Work
Package
SYSTEMS,PROCESSES &TOOLS
EWP
CWP
IWP
Engineering
Deliverable
Engineering/Construction
Deliverable
Construction
Deliverable
1 EWP = 1 CWP (?)
Area Scope ~ 40k – 200k hours
Scope of Work
Construction Scope of Work
Engineering Information
Craft / Manpower
Direct Field Equip / Mat’l
Safety
Quality (QA / QC)
Special Permits / Regulatory
Subcontractors
Vendor support data
Rigging studies
Scaffold
Special equip / tools/ consum.
Waste management
Risk register
WFP
Project Controls
Turn-over documents
Contact List
Work Face Plan for ~ 500-1000
hours work (2 weeks)
Scope
Deliverable
Activities
Resources:
equipment, tools
materials, labour, work
instructions, safety
equipment, drawings,
vendor data, …
Special Conditions
Quality Control
Interdependencies
Risk Planning
Error Proofing
Drawings
Engineering
specifications &
standards
Procurement
information
Vendor documents
Quality requirements
Risks/Hazards
Procurement
Required on site dates
Long lead items
Transportation
Materials Management
SYSTEMS,PROCESSES &TOOLS
EWP
CWP
IWP
Engineering
Deliverable
Engineering/Construction
Deliverable
Construction
Deliverable
1 EWP = 1 CWP (?)
Area Scope ~ 40k – 200k hours
Scope of Work
Construction Scope of Work
Engineering Information
Craft / Manpower
Direct Field Equip / Mat’l
Safety
Quality (QA / QC)
Special Permits / Regulatory
Subcontractors
Vendor support data
Rigging studies
Scaffold
Special equip / tools/ consum.
Waste management
Risk register
WFP
Project Controls
Turn-over documents
Contact List
Work Face Plan for ~ 500-1000
hours work (2 weeks)
Scope
Deliverable
Activities
Resources:
equipment, tools
materials, labour, work
instructions, safety
equipment, drawings,
vendor data, …
Special Conditions
Quality Control
Interdependencies
Risk Planning
Error Proofing
Drawings
Engineering
specifications &
standards
Procurement
information
Vendor documents
Quality requirements
Risks/Hazards
Procurement
Required on site dates
Long lead items
Transportation
Materials Management
SYSTEMS,PROCESSES &TOOLS
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
4 EXECUTE
Detailed
Engineering
FEED
Improve
Construct
5 OPERATE
Completions
Operate
Decommission
/mothball
Area or System
EWP
WBS
CWP
=
EWP
EWP
CWP
OR
EWP
EWP
EWP
EWP
IWP
Distinct
Definable =
Tangible
CWP
=
Contractual
Pay item
EWP
EWP
EWP
EWP
IWP
SYSTEMS,PROCESSES &TOOLS
SYSTEMS,PROCESSES &TOOLS
NOT JUST THE WHAT BUT ALSO THE HOW
SYSTEMS,PROCESSES &TOOLS
KEY DOCUMENTS
Distinct
Definable
Tangible
SCOPE
SCHEDULE
SYSTEMS,PROCESSES &TOOLS
KEY DOCUMENTS
AWP Execution
Interface Management
Approvals
3D (Space)
4D (Time)
5D (IMM)
6D (Ops/Mtce)
PEP
Path-of-Construction
Contract Strategy
WFP Execution
CWP
EWP
IWP
CBS
MODEL
SCOPE
SCHEDULE
WBS
SYSTEMS,PROCESSES &TOOLS
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
FEED
Improve
4 EXECUTE
Detailed
Engineering
Construct
5 OPERATE
Completions
Operate
Decommission
/mothball
PROJECT EXECUTION METHODOLOGY
OPERATING AND MAINTENANCE PHILOSOPHY
OWNER
PATH-OF-CONSTRUCTION - EXAMPLE
SYSTEMS,PROCESSES &TOOLS
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
FEED
Improve
4 EXECUTE
Detailed
Engineering
Construct
5 OPERATE
Completions
Operate
Decommission
/mothball
WBS – DEFINED CWP/EWPS
PATH-OF-CONSTRUCTION (OUTLINED)
LONG LEAD ITEMS IDENTIFIED
CONTRACT STRATEGY
ENGINEERING
CONSTRUCTION
OWNER
PATH-OF-CONSTRUCTION - EXAMPLE
SYSTEMS,PROCESSES &TOOLS
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
FEED
Improve
4 EXECUTE
Detailed
Engineering
Construct
5 OPERATE
Completions
Operate
Decommission
/mothball
WBS – IDENTIFY IWPS
PATH-OF-CONSTRUCTION (FINALIZED)
INTEGRATED MATERIALS MANAGEMENT
ENGINEERING
CONSTRUCTION
SUPPLY
CHAIN
PATH-OF-CONSTRUCTION - EXAMPLE
SYSTEMS,PROCESSES &TOOLS
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
FEED
Improve
4 EXECUTE
Detailed
Engineering
Construct
5 OPERATE
Completions
Operate
Decommission
/mothball
EWPS (COMPLETE)
CWPS (SUBSTANTIALLY COMPLETE) / IWPS (INITIATED)
FABRICATIONS/MATERIALS ON-SITE
ENGINEERING
CONSTRUCTION
SUPPLY
CHAIN
PATH-OF-CONSTRUCTION - EXAMPLE
SYSTEMS,PROCESSES &TOOLS
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
FEED
Improve
4 EXECUTE
Detailed
Engineering
Construct
5 OPERATE
Completions
Operate
Decommission
/mothball
PATH-OF-CONSTRUCTION EXECUTION
AREA IWPS (IMPLEMENTATION)
FIELD ERECTION & ASSEMBLY
ENGINEERING
CONSTRUCTION
SUPPLY
CHAIN
PATH-OF-CONSTRUCTION - EXAMPLE
SYSTEMS,PROCESSES &TOOLS
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
FEED
Improve
4 EXECUTE
Detailed
Engineering
Construct
5 OPERATE
Completions
Operate
Decommission
/mothball
SYSTEM IWPS (IMPLEMENTATION) / COMMISSIONING
ENGINEERING
CONSTRUCTION
OWNER
PATH-OF-CONSTRUCTION - EXAMPLE
CUSTOMER FOCUS
CHALLENGES
PEOPLE
CUSTOMER FOCUS
SYSTEMS, PROCESSES & TOOLS
CUSTOMER FOCUS
SAFE
BUILDABILITY
Scalable AGILE Adaptable
CHANGE
ALIGNMENT
CHALLENGES
CHALLENGES
PEOPLE
CUSTOMER FOCUS
SYSTEMS, PROCESSES & TOOLS
CHALLENGES
OWNER
DO IT THIS WAY
LACK OF BUY-IN
CONTRACTS
CONSTRUCTION
ENGINEERING
ADVANCED WORK
PACKAGING
SUPPLY
NETWORK
CHALLENGES
OWNER
CONSTRUCTION
ENGINEERING
ADVANCED WORK
PACKAGING
SUPPLY
NETWORK
WFP
CHALLENGES
OWNER
CONSTRUCTION
ENGINEERING
SUPPLY
NETWORK
CHALLENGES
GLOBALIZATION
TECHNOLOGY CULTURE
CHANGE
CONTRACTS
RECAP
HOW does WorleyParsons
apply Advanced Work Packaging (AWP) and WorkFace Planning (WFP)?
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
FEED
Improve
4 EXECUTE
Detailed
Engineering
Construct
5 OPERATE
Completions
WORKFACE PLANNING
ADVANCED WORK PACKAGING
Operate
Decommission
/mothball
RECAP
WHAT?
Deliver
Select
1 IDENTIFY
Asset
Definition
3 DEFINE
2 EVALUATE
Conceptual
Development
FEED
Improve
4 EXECUTE
Detailed
Engineering
Construct
ADVANCED WORK PACKAGING
5 OPERATE
Completions
Operate
Decommission
/mothball
WORKFACE PLANNING
RECAP
Improved SAFETY
VALUE
Efficiency
Being Leaders
Better Capital Efficiency
Good Business
25% increased labor
productivity
10% PROJECT COST
SAVINGS
WHAT?
WFP Productivity Mat’l
Mvmt & Improvement
WHY?
Planning
23%
Wait / idle
33%
Tool Time
33%
Gained 11%
RECAP
WHAT?
WHY?
HOW?
SYSTEMS,PROCESSES &TOOLS
CHALLENGES
PEOPLE
CUSTOMER FOCUS
SYSTEMS, PROCESSES & TOOLS
RECAP
RIGHT PEOPLE
RIGHT ROLE
SYSTEMS,PROCESSES &TOOLS
CHALLENGES
PEOPLE
CUSTOMER FOCUS
SYSTEMS, PROCESSES & TOOLS
RECAP
THINKING WITH THE END IN MIND
AT THE START
RECAP
NOT JUST THE WHAT BUT ALSO THE HOW
CUSTOMER FOCUS
CHALLENGES
PEOPLE
CUSTOMER FOCUS
SYSTEMS, PROCESSES & TOOLS
RECAP
THINK SAFETY ADAPTABILITY SCALABILITY
CHALLENGES
CHALLENGES
PEOPLE
CUSTOMER FOCUS
SYSTEMS, PROCESSES & TOOLS
RECAP
BUY‐IN
QUALIFIED PEOPLE
CULTURE
RECAP
Thank-you
QUESTIONS?
Contact Me…
[email protected]
Joe Hobbs

Similar documents