Production must go on. Logic and logistics in an
Transcription
Production must go on. Logic and logistics in an
INTEGRATED SOLUTIONS FOR STEEL CONSTRUCTION Production must go on. Logic and logistics in an industrial construction. www.grupposimeon.it INTEGRATED SOLUTIONS FOR STEEL CONSTRUCTION Industrial building with 42 meters light, built in steel structure. All the construction has been made without interrupting the productive cycle ––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––– PROJECT Lesonit d.o.o. - Slovenia ––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––– CLIENT Fantoni SpA ––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––– TYPE Industrial building ––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––– FIRMS OF THE SIMEON GROUP BUILDERS OF THE PROJECT Simeon Carpenterie srl: architectural steel systems Simco Tecnocovering srl: facades and coverings www.grupposimeon.it