Production must go on. Logic and logistics in an

Transcription

Production must go on. Logic and logistics in an
INTEGRATED SOLUTIONS FOR STEEL CONSTRUCTION
Production must go on.
Logic and logistics in an
industrial construction.
www.grupposimeon.it
INTEGRATED SOLUTIONS FOR STEEL CONSTRUCTION
Industrial building with 42 meters light, built in steel structure.
All the construction has been made without interrupting the
productive cycle
–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
PROJECT
Lesonit d.o.o. - Slovenia
–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
CLIENT
Fantoni SpA
–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
TYPE
Industrial building
–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
FIRMS OF THE SIMEON GROUP BUILDERS OF THE PROJECT
Simeon Carpenterie srl: architectural steel systems
Simco Tecnocovering srl: facades and coverings
www.grupposimeon.it

Similar documents