MVA - MISO
Transcription
MVA - MISO
Candidate MVP Reliability Analysis CMVP TSTF June 17th, 2011 Steady State Analysis 2 Reliability Analysis Progress Summary • Reliability Justification of “Northern Path” already presented – – – – – Ellendale to Big Stone Big Stone to Brookings Brookings to Twin Cities North LaCrosse to Cardinal Pleasant Prairie to Zion • Additional Reliability Justification of remaining West Region and some central region MVPs being presented today 3 Topics • Steady State Justification Analysis of MVPs: – Iowa MVPs – Dubuque to Cardinal – Oak Grove to Fargo – Ottumwa to Thomas Hill plus Adair to Palmyra – Palmyra to Pawnee 4 MVP Justification Analysis MVPs in MTEP11 Central DEM Brookston to Greentown 765 Fargo-Oak Grove 345 kV Line Kansas 2nd. Transformer Kansas to Sugar Creek Meredosia to Ipava Meredosia to Pawnee Mt. Zion to Kansas New Pawnee to Pana - 345 kV Line Pana to Mt. Zion Quincy-Meredosia 345 kV Line Rising to Sidney 345 kV line Thomas Hill - Adair - Ottumwa 345 West Adair-Palmyra Tap 345 kV Line East Reynolds to Burr Oak to Hiple 345 kV West Big Stone South to Brookings Brookings, SD - SE Twin Cities 345 kV Dubuque Co - Spring Green 345 kV project Ellendale to Big Stone South Lakefield Jct to Mitchell County 345 kV N LaCrosse-N Madison-Cardinal 345-kV Webster - Hazleton 345 kV line Pleasant Prairie-Zion Energy Center 345 kV line Sheldon - Webster 345 kV line Grand Total Estimated Cost $1,412,875,000 $171,875,000 $146,000,000 $9,000,000 $71,000,000 $80,000,000 $130,000,000 $174,000,000 $81,000,000 $48,000,000 $176,000,000 $31,000,000 $195,000,000 $100,000,000 $150,000,000 $150,000,000 $2,883,192,200 $195,000,000 $735,400,000 $304,187,200 $320,000,000 $590,540,000 $357,600,000 $182,725,000 $25,000,000 $172,740,000 $4,446,067,200 Red Highlights: Reliability Steady State Justification Analysis already presented – ~37% of Total Cost Blue Highlights: Reliability Steady State Justification Analysis being presented today – ~47% of Total Cost Iowa MVPs 6 Constraint Analyses • Constraints shown based on: – Contingency analysis on 2021 cases with and without proposals – Transfer analyses starting at 2021 levels and increasing until limits found – Transfer sources are all incremental wind zones – Transfer sinks are non-wind merit order – RPS milestone wind levels: • • • • • 2022 ~ 454 MW 2023 ~ 909 MW 2024 ~ 1363 MW 2025 ~ 1818 MW 2026 ~ 2272 MW 7 Iowa Constraints Incremental Wind Zone (2021) •Red HighlightsConstraints in CMVP Study 2021 Shoulder pre-IA CMVP Case •Yellow HighlightsConstraints in Transfer Study (Beyond 2021 Wind Levels) •2022 ~ 454 MW •2023 ~ 909 MW •2024 ~ 1363 MW •2025 ~ 1818 MW •2026 ~ 2272 MW 8 CMVP Routes Incremental Wind Zone 9 CMVP Impact on Constraints Constraint doesn’t appear up to 5,000 MW Transfer 200 MW Reduction in Transfer Capability Worst Loading Reduction ~20% 10 Proposed CMVP Effects • Effectively mitigates Fox Lake-Rutland-Winnebago constraint (FCITC limit at ~1,300 MW doesn’t appear post project for upto 5,000 MW of RPS wind transfer) • Mitigates Emery-Floyd-Bremer-Blackhawk constraint – Though loading reduction on path is less than 20% • Doesn’t mitigate Lime Creek-Emery constraint • Reduces transfer capability on Mitchell CountyHazelton 345 kV path (FCITC limit reduced by 200 MW for RPS wind transfer) 11 BES Cat B Overloads BES Constraints Proposed Proposed CMVP Proposed Proposed No Iowa # of CMVP Case CMVP No Iowa Case CMVP Case Case Max Rating Outstanding Loading Case # of Conts Maximum Loading (MVA) Reduction Conts Causing Mitigated Causing Ovld Loading (%) (%) Ovld (%) ? Lime Creek to Emery 161 kV 200.0 5 125.3 NO 123.4 -1.9 5 Boone Junction to Fort Dodge 161 kV 147.0 1 106.9 YES < 80 < -26.9 0 Blackhawk to Union Tap 161 kV 181.0 1 103.7 YES 81.1 -22.6 0 Hayward 161 kV Bus Tie 167.0 2 101.1 YES < 80 < -21.1 0 Floyd to Bremer 161 kV 193.0 5 100.5 YES 85.8 -14.7 0 Adams 345/161 kV Transformer 263.2 1 100.3 YES < 80 < -20.3 0 Red Cedar to Crystal Lake 161 kV 223.1 1 98.9 YES 95.0 -3.9 0 Twin Church to Sioux City 230 kV 351.0 1 96.2 YES 90.8 -5.4 0 Emergy to Floyd 161 kV 240.0 1 95.0 YES 82.8 -12.2 0 Grand Junction to Drager 161 kV Section 167.0 334 128.7 NO 124.8 -3.9 312 Winnebago to Freeborn 161 kV 167.0 3 108.3 NO 108.3 0.0 3 12 BES Cat C Overloads BES Constraints Lime Creek to Emery 161 kV Boone Junction to Fort Dodge 161 kV Ottumwa to Montezuma 345 kV Hayward to Austin 161 kV Emergy to Floyd 161 kV Floyd to Bremer 161 kV Wilmarth 345/115 kV Transformer Red Cedar to Crystal Lake 161 kV Rocky Run 345/161 kV Transformer Hayward 161 kV Bus Tie Bremer to Blackhawk 161 kV Adams 345/161 kV Transformer Sub 1209 to 1231 161 kV Bunge to Hastings 161 kV Grand Junction to Drager 161 kV Section Winnebago to Freeborn 161 kV Manawa to Indian Creek 161 kV Proposed Proposed Proposed No Iowa Proposed CMVP No Iowa Case CMVP CMVP Case Rating Case Max CMVP Case # of # of Conts Case Loading (MVA) Loading Maximum Outstanding Causing Ovld Mitigated Reduction (%) Loading (%) Conts Causing ? (%) Ovld 200.0 147.0 478.0 279.0 240.0 193.0 448.0 223.1 192.0 167.0 193.0 263.2 217.0 199.0 167.0 167.0 335.0 7 4 1 3 7 9 1 1 1 3 1 3 1 1 513 4 1 125.3 117.0 106.2 105.4 104.9 104.1 99.6 97.0 96.0 95.6 95.4 95.4 95.4 95.3 128.1 108.3 98.2 NO YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO 123.4 84.6 94.4 < 80 85.3 84.2 80.7 93.8 94.6 < 80 80.0 < 80 92.9 91.8 124.2 108.3 103.8 -1.9 -32.5 -11.8 < -25.4 -19.6 -19.8 -18.9 -3.1 -1.4 < -15.6 -15.4 < -15.4 -2.5 -3.5 -3.9 0.0 5.6 7 0 0 0 0 0 0 0 0 0 0 0 0 0 479 4 1 13 Alternate Route Incremental Wind Zone 14 Alternate Route • Lakefield to Winnebago 345 kV – Winnebago 345/161 kV transformer • Winnebago to Webster 345 kV • Tie Winnebago to Webster at new station and extend to Lime Creek 345 kV – Lime Creek 345/161 kV transformer • Lime Creek to Emery 345 kV – Emery 345/161 kV transformer • Emery to Floyd to Bremer to Blackhawk 345 kV – Blackhawk 345/161 kV transformer • Blackhawk to Hazelton 345 kV • Connect Sheldon to Winnebago-Webster ROW near Burt 15 Wind Zone Adjustment • IA-F originally in RGOS closer to Buena Vista 161 kV area • Two zones (IA-B and IA-F) had been lumped at Sheldon 345 kV pre-MVP (533 MW) because RGOS Line from Sheldon to Lehigh not part of CMVP portfolio • Reasonable to assume IA-F (262 MW) on 161 kV preMVP • With MVP, connect to new 345 kV MVP sub in area 16 Constraints Incremental Wind Zone 17 Impact of Alternative on Constraints As with proposed CMVPs Constraint doesn’t appear upto 5,000 MW Transfer Overload Eliminated by reducing loading by over 60% Constraint doesn’t appear upto 8,000 MW Transfer Worst Loading Reduction >45% Overload Eliminated by reducing loading by over 30% 18 Alternative Impact • Continues to effectively mitigate Fox Lake-RutlandWinnebago constraint (FCITC limit at ~1,300 MW doesn’t appear post project for up to 5,000 MW of RPS wind transfer). Step Down Transformation at Winnebago provides additional loading reduction. • Mitigates Lime Creek-Emery-Floyd-Bremer-Blackhawk constraint – Offloads existing transmission by at least over 45% on all sections • Attributed to transformers at Lime Creek and Emery which help pick up wind of about 225 MW and 130 MW respectively onto the 345 kV line in base shoulder scenario acting as step up transformers. • Does not negatively impact transfer limit on Mitchell CountyHazelton 345 kV path – Significant increase in transfer capability of over 4,000 MW • No Iowa CMVP FCITC limit on Mitchell County line at about 4,200 MW increases to over 8,500 with limit on Hazelton to Arnold 19 BES Cat B Constraints Mitigated by Alternate Route BES Constraint Rating (MVA) # of Contingencies No Iowa Case Alternate Loading Max Loading Maximum Reduction (%) (%) Loading (%) Lime Creek to Emery 161 kV 200.0 3 121.1 90.8 30.3 Buena Vista to Sac 161 kV 206.0 1 109.4 < 80 >29.4 Hayes to Pomeroy 161 kV 335.0 14 108.2 80.1 28.1 Buena Vista to Wisdom 161 kV 223.0 3 106.3 < 80 > 26.3 Blackhawk to Union Tap 161 kV 181.0 1 105.9 < 80 > 25.9 Floyd to Bremer 161 kV 193.0 5 101.8 87.4 14.3 Fort Dodge to Tatley 161 kV 223.0 1 101.4 < 80 > 21.4 Adams 345/161 kV Transformer 263.3 5 100.1 < 80 >20.1 Red Cedar to Crystal Lake 161 kV 223.1 1 98.9 94.0 4.9 Hayward 161 kV Bus Tie 167.0 2 98.6 < 80 >18.6 Webster to Hayes 161 kV 210.0 1 97.1 < 80 >17.1 Twin Church to Sioux City 230 kV 351.0 1 96.9 91.7 5.2 Emergy to Floyd 161 kV 240.0 5 96.0 84.3 11.7 Pocahontas to Pomeroy 161 kV 335.0 2 95.9 < 80 >15.9 Bremer to Blackhawk 161 kV 193.0 1 95.4 51.5 43.9 20 BES Cat C Constraints Mitigated by Alternate Route BES Constraint Rating (MVA) # of Contingencies No Iowa Case Max Loading (%) Alternate Maximum Loading (%) Loading Reduction (%) Lime Creek to Emery 161 kV 200.0 7 121.1 61.8 59.3 Buena Vista to Sac 161 kV 206.0 1 108.1 < 80 > 28.1 Hayes to Pomeroy 161 kV 335.0 13 108.1 < 80 > 28.1 Emergy to Floyd 161 kV 240.0 8 106.1 57.3 48.8 Buena Vista to Wisdom 161 kV 223.0 2 106.1 < 80 > 26.1 Hayward to Austin 161 kV 279.0 3 105.4 < 80 > 25.4 Floyd to Bremer 161 kV 193.0 9 105.1 58.5 46.6 Raun to Tekamah 161 kV 217.0 2 104.6 93.5 11.0 Webster to Hayes 161 kV 210.0 1 97.1 < 80 > 17.1 Red Cedar to Crystal Lake 161 kV 223.1 1 97.0 92.6 4.3 Bremer to Blackhawk 161 kV 193.0 1 96.6 50.5 46.1 Adams 345/161 kV Transformer 263.3 7 96.4 < 80 > 16.4 Wilmarth 345/115 kV Transformer 448.0 1 96.3 92.4 3.9 Rocky Run 345/161 kV Transformer 192.0 1 96.0 94.8 1.2 Pocahontas to Pomeroy 161 kV 335.0 1 95.9 < 80 > 15.9 Hayward 161 kV Bus Tie 167.0 3 95.6 < 80 > 15.6 Bunge to Hastings 161 kV 199.0 1 95.3 92.9 2.4 Sub 1209 to 1231 161 kV 217.0 1 95.0 93.6 1.4 21 Non-BES Cat B Constraints Mitigated by Alternate Route Rating (MVA) Non-BES Constraints 680339 T TMP 8 69.0 680340 T BRC No Iowa Case Alternate Max Loading Maximum (%) Loading (%) Loading Reduction (%) 69.0 1 17.0 111.2 < 80 >31.2 631174 GLENWRTH5 161 680542 GLENWTH8 69.0 1 100.0 109.0 < 80 >29.0 630097 WBGOJ S8 69.0 631045 WNBAGOS5 161 1 30.0 108.0 < 80 >28.0 619015 GRE-REDWOOD869.0 619017 GRE-SHRDNTP869.0 1 31.6 107.8 93.9 13.9 630128 HAYWD#18 69.0 680275 T GLEN 69.0 1 48.0 105.8 < 80 >25.8 605089 ARLNGTN8 69.0 605090 GRENISL8 69.0 1 34.3 103.6 81.6 22.0 617238 GRE-PENELOP869.0 617239 GRE-PENELTP869.0 1 66.3 99.3 89.8 9.4 630234 DECORAH8 69.0 630245 MADISNT8 69.0 1 36.0 98.6 87.8 10.8 630023 TRIBOJI8 69.0 630474 WAHPETN8 69.0 1 69.0 98.1 91.4 6.6 630120 ALDEN J8 69.0 630121 ALEAWST8 69.0 1 40.0 97.5 < 80 >17.5 630197 LMCK W 8 69.0 631047 LIME CK5 161 1 74.8 97.3 < 80 >17.3 605089 ARLNGTN8 69.0 618723 GRE-JSNLDTP869.0 1 34.3 96.1 < 80 >16.1 630027 TRAER 69.0 656299 TRAERTAP8 69.0 1 41.0 95.5 < 80 >15.5 69.0 630090 MADLIAJ8 69.0 1 40.0 95.4 < 80 >15.4 8 605063 MADELVL8 22 Non-BES Cat C Constraints Mitigated by Alternate Route Non-BES Constraints Rating (MVA) No Iowa Case Max Loading (%) MISO-1 MISO-1 Maximum Loading Loading (%) Reduction (%) 605090 GRENISL8 69.0 605275 CARVRCO8 69.0 1 47.0 136.6 < 80 >56.6 605089 ARLNGTN8 69.0 618723 GRE-JSNLDTP869.0 1 34.3 127.2 < 80 >47.2 630464 KLEMME8 69.0 630821 HANCOCK8 69.0 1 36.0 122.2 < 80 >42.2 680339 T TMP 8 69.0 680340 T BRC 69.0 1 17.0 109.9 85.4 24.5 630139 ADAMS 8 69.0 680379 MCNEIL_W 69.0 1 60.0 106.4 89.8 16.6 630467 NBELMDT8 69.0 630469 BELMNDJ8 69.0 1 40.0 102.3 < 80 >22.3 617238 GRE-PENELOP869.0 617239 GRE-PENELTP869.0 1 66.3 101.7 92.1 9.6 605045 MINNVAL8 69.0 605046 YELWMED8 69.0 1 34.3 99.6 95.8 3.8 605166 EAGLELK8 69.0 617243 GRE-EAGLELK869.0 1 72.0 97.8 94.2 3.5 630197 LMCK W 8 69.0 631047 LIME CK5 161 1 74.8 97.3 < 80 >17.3 630234 DECORAH8 69.0 630245 MADISNT8 69.0 1 36.0 97.2 87.8 9.4 617220 GRE-PNLPNTP869.0 617238 GRE-PENELOP869.0 1 66.3 97.0 87.4 9.7 B$0643 CS KY1A 1.00 652568 CRESTN 8 69.0 1 70.0 96.8 95.0 1.8 605063 MADELVL8 69.0 630090 MADLIAJ8 69.0 1 40.0 96.3 80.6 15.8 630120 ALDEN J8 69.0 630121 ALEAWST8 69.0 1 40.0 96.0 < 80 >16.0 23 Iowa Summary • Alternate Route is superior to proposed CMVPs – Routed through Lime Creek wind heavy area constraints aggravated by through transfers • Alternate Route helps reduce loading on existing transmission path by about half – Relieves congestion on Mitchell-Hazelton 345 kV path increasing wind transfer capability through Iowa by over 4,000 MW – Circumvents wind heavy northern Iowa regions with reliable 345 kV looped system with various transformation stations which would help facilitate future wind connections 24 East of Iowa 25 Overview of West MVPs Northern MVP Path Southern MVP Path 26 East of Iowa – Wisconsin and Illinois 27 East of Iowa – Wisconsin and Illinois • Through transfers enabled by the southern route – New 345 kV injection at Hazelton • Additional Wind Zone in Southwest WI at Salem 345 kV – 370 MW • Two existing 345 kV circuits terminating into ComEd Quad City 345 kV station – Large overloads on existing bottleneck (only W-E 345 kV path) on Quad-Nelson-Electric Junction 345 kV line • Dubuque – Cardinal helps offload the northern feed into Quad by redirecting flow north • Oak Grove – Fargo helps offload the western feed into Quad by redirecting flow south • Together the two projects help enable over 1,100 MW of MISO Wind Dubuque – Cardinal CMVP Mitigated Map 29 BES Transmission Issues Mitigated by Dubuque – Cardinal CMVP – NERC Cat B 2021 Wind Levels 200 MVA Loading Reduction Maximum Loading % Minimum Loading % # of Contingencies 201 99.6 95.1 2 1479 99.4 99.4 4 Ottumwa to Montezuma 345 kV 478 98.7 96.2 4 Princeton Tap to LTV (Tap on Hennepin-Kewanee) 138 kV 143 98.5 98.5 1 Red Cedar to Crystal Cave 161 kV 223 98.1 98.1 1 1528 96.4 96.4 2 208 95.6 95.6 1 176 95.6 95.6 1 BES Element Rating Wabaco to Rochester 161 kV Cordova to Nelson 345 kV Quad City to Nelson 345 kV Oak Grove to Galesburg 161 kV 272362 H445 ;3B 138 272516 STEWA; B 138 1 202 MVA Loading Reduction Table includes constraints derived from only high ComEd NSI 30 Non-BES Transmission Issues Mitigated by Dubuque – Cardinal CMVP – NERC Cat B 2021 Wind Levels Non-BES Element Rating 698351 PET 69 69.0 699808 PETENWEL 698033 BRN 69 69.0 699902 JEN 69 138 1 69.0 1 Maximum Minimum # of Loading % Loading % Contingencies 41 98.9 96.4 4 69 98.1 98.1 2 Table includes constraints derived from only high ComEd NSI 31 BES Transmission Issues Mitigated by Dubuque – Cardinal CMVP – NERC Cat C 2021 Wind Levels 176MVA Loading Reduction BES Element Rating Maximum Minimum # of Loading % Loading % Contingencies Palmyra 345/161 kV Transformer 370 128.9 128.9 1 Byron to Wempletown 345 kV 1726 125.8 125.8 1 Dixon to Cherry Valley 138 kV section 182 119.9 119.9 1 Cordova to Nelson 345 kV 1479 102.5 99.4 3 Galesburg 161/138 kV Transformer 101 99.6 99.6 1 Red Cedar to Crystal Cave 161 kV 223 96.8 96.8 1 Quad City to Nelson 345 kV 1528 96.4 96.1 4 Oak Grove to Galesburg 161 kV 208 95.9 95.9 1 Rocky Run 345/115 kV Transformer 192 95.3 95.3 1 Dundee 161/115 kV Transformer 75 95.0 95.0 1 Table includes constraints derived from only high ComEd NSI 32 Non-BES Transmission Issues Mitigated by Dubuque – Cardinal CMVP – NERC Cat C 2021 Wind Levels Non-BES Element Rating Maximum Minimum # of Loading % Loading % Contingencies 630290 DBQ 8TH8 69.0 630299 EDUBQUE8 69.0 1 69 103.3 103.3 1 698351 PET 69 69.0 699808 PETENWEL 138 1 41 98.4 98.4 1 Table includes constraints derived from only high ComEd NSI 33 Updates to PJM Areas in Model • Based upon stakeholder feedback regarding the Com Ed interchange and a review of historical line data, particularly tie lines between Com Ed and AEP, led to PJM making adjustments to the 2021 generation dispatch to more accurately reflect the interchange during typical shoulder and summer peak hours. • PJM provided an update that placed the line loadings more consistent with historical values for the shoulder peak model, and this update was applied to the MISO models used for this round of analysis. • The same adjustments are also expected to be made for the summer peak model. 34 Updates to PJM Areas in Model • For the shoulder model, the historic data shows that the combined loading on the three direct tie lines between Com Ed and AEP was 2,000 MW or greater for over half of the year in 2009 and 2010. • In the model prior to the PJM update, the combined loading was 1,134 MW (about quarter hrs. of the year). • After reviewing the historical data, PJM increased the combined loading value to around 2,400 MW. • Reasonable to study two Shoulder conditionsrepresenting low and high ComEd exports 35 2009 Com Ed to AEP Count of Total Hourly Average MVA Across Direct Tie Lines 6000 5165 5000 4000 3000 Series1 2378 2000 1000 622 501 94 0 3000 and greater 2000-2999 1000-1999 0-999 less than 0 36 2010 Com Ed to AEP Count of Total Hourly Average MVA Across Direct Tie Lines 6000 4835 5000 4000 3000 Series1 1996 2000 1000 827 757 345 0 3000 and greater 2000-2999 1000-1999 0-999 less than 0 37 BES Transmission Issues Mitigated by Dubuque – Cardinal CMVP – NERC Cat B 2026 Wind Levels Branch Dixon to Cherry Valley 138 kV section Wabaco to Alma 161 kV Kewanee to Galesburg 138 kV North LaCrosse to Marshland 161 kV Adams to Beaver Creek 161 kV Oak Grove to Galesburg 161 kV Albany to Rock Falls 138 kV section Red Rock to Glenmont 115 kV Werner West to Rocky Run 345 kV Palmyra 345/161 kV Transformer Viele to Denmark 161 kV Danvers to Washington Street 138 kV section Wilton to Pontiac 345 kV section Glenmont to River Falls 115 kV North Monroe to Albany 138 kV Marshland to Alma 161 kV Rating (MVA) Maximum Post Minimum Post Contingent Number of Contingent Loading Loading Contingencies (% of Rating) (% of Rating) 182 105.3 105.3 2 223 104.1 96.3 2 143 102.7 96.6 9 162 100.6 100.6 1 240 99.5 99.5 1 208 99.3 99.3 1 182 98.1 97.7 6 196 97.7 97.7 1 829 97.2 97.2 2 370 97.0 97.0 2 167 96.9 96.9 2 132 96.2 96.2 1 1280 96.1 96.1 2 194 96.0 96.0 1 146 95.3 95.3 2 279 95.1 95.1 1 Table includes constraints derived from both low and high ComEd NSI 38 Non-BES Transmission Issues Mitigated by Dubuque – Cardinal CMVP – NERC Cat B 2026 Wind Levels Rating (MVA) Maximum Post Contingent Loading (% of Rating) Minimum Post Contingent Loading (% of Rating) Number of Contingencies 161 1 34 102.8 102.8 1 Branch 630282 TURK RV8 69.0 631060 TRK RIV5 698007 DAR 69 69.0 698035 GTT 69 69.0 1 87 99.3 99.3 2 605351 WISOTBC8 69.0 605523 LFY TAP8 69.0 1 72 97.4 97.4 2 605292 MONROCO8 69.0 680146 SPARTA 69.0 1 72 96.8 96.8 4 698321 A07 69 69.0 698322 MCK 69 69.0 1 42 96.3 95.1 3 605351 WISOTBC8 69.0 680482 DPC TAP8 69.0 1 72 95.2 95.2 2 605353 CADOTT 8 69.0 680482 DPC TAP8 69.0 1 72 95.2 95.2 2 Table includes constraints derived from both low and high ComEd NSI 39 BES Transmission Issues Mitigated by Dubuque – Cardinal CMVP – NERC Cat C 2026 Wind Levels Branch Byron to Wempletown 345 kV Palmyra 345/161 kV Transformer Dixon to Cherry Valley 138 kV section Dundee to Coggon 115 kV Albany to Rock Falls 138 kV section Kewanee to Galesburg 138 kV Oak Grove to Galesburg 161 kV Genoa to Harmony 161 kV Turkey River to Stoneman 161 kV Sigel to Arpin 138 kV Stoneman to Nelson Dewey 161 kV Dixon 138 kV Bus Tie Viele to Denmark 161 kV Lake Side to Osage 138 kV Rock Creek to Albany 161 kV section Red Rock 345/115 kV Transformer Hydro Lane 161/115 kV Transformer St. Croix Falls to Polar Lake 161 kV 1726 Maximum Post Contingent Loading (% of Rating) 132.9 Minimum Post Contingent Loading (% of Rating) 132.9 370 128.9 128.9 1 182 114.6 114.6 1 75 107.3 107.3 1 182 104.9 97.8 7 143 103.2 95 13 Rating (MVA) Number of Contingencies 1 208 103 103 1 223 102.8 95.9 2 200 101.5 101.5 1 339 98.4 98.4 1 221 97.9 97.9 1 332 97.2 97.2 1 167 96.9 96.8 2 141 96.5 96.5 1 223 96.4 96.4 1 448 95.2 95.2 1 187 95.2 95.2 1 400 95.2 95.2 1 Table includes constraints derived from both low and high ComEd NSI 40 Non-BES Transmission Issues Mitigated by Dubuque – Cardinal CMVP – NERC Cat C 2026 Wind Levels Branch Rating (MVA) Maximum Post Contingent Loading (% of Rating) Minimum Post Number of Contingent Loading Contingencies (% of Rating) 605292 MONROCO8 69.0 680146 SPARTA 69.0 1 72 137.9 133.5 2 630290 DBQ 8TH8 69.0 630299 EDUBQUE8 69.0 1 69 107.7 107.7 1 630282 TURK RV8 69.0 631060 TRK RIV5 161 1 34 104.9 95.4 2 630244 BIGSPRT8 69.0 630269 ELKADER8 69.0 1 45 100.3 100.3 1 698007 DAR 69 69.0 698035 GTT 69 69.0 1 87 99.5 98 2 605351 WISOTBC8 69.0 605523 LFY TAP8 69.0 1 72 98.1 95.5 2 630240 MONONA_8 69.0 680477 FARMBURG 69.0 1 48 96.1 96.1 1 630271 GUTNBRG8 69.0 630282 TURK RV8 69.0 1 36 95.9 95.9 1 605351 WISOTBC8 69.0 680482 DPC TAP8 69.0 1 72 95.8 95.8 1 605353 CADOTT 8 69.0 680482 DPC TAP8 69.0 1 72 95.8 95.8 1 630575 KALONA T 69.0 636402 HILLS 8 69.0 1 72 95.2 95.2 1 630024 DUNDEE 8 69.0 630304 MASONVL8 69.0 1 72 95 95 1 Table includes constraints derived from both low and high ComEd NSI 41 Wind Zone Adjustment • WI-B originally in RGOS Line from Nelson Dewey to Paddock closer Hillman 161 kV station • Since RGOS Line Nelson Dewey to Paddock not part of CMVP portfolio, wind zone was moved to Salem 345 kV station • Reasonable to study WI-B (210/333 MW-2021/2026 levels respectively) on Hillman 161 kV pre-MVP • With MVP, connect to Salem 345 kV MVP sub in area 42 New Constraints with Wind Zone Adjustment • Hillman to Darlington to North Monroe 161 kV path overload in base case • Hillman to Nelson Dewey 161 kV path overload for single contingency 43 New Transmission Issues Resulting From Dubuque – Cardinal CMVP – Cat B Element Spring Green 138/69 kV Xfmr 698668 WMD 69 69.0 698674 WTNM 69 Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies 96.0 110 95.6 6 69.0 1 83.0 100.7 96.7 4 44 Oak Grove-Fargo Constraints Mitigated Map BES Transmission Issues Mitigated by Oak Grove to Fargo CMVP – NERC Cat B 2021 Wind Levels BES Element Rating Maximum Minimum # of Loading % Loading % Contingencies Glidden 138 kV Bus Tie 214 100.2 100.2 1 Novelty to Adair 161 kV 167 99.4 99.4 2 Cherry Valley 345/138 kV Transformer 465 97.5 97.5 1 Belvidere to Crystal Lake 138 kV section 428 96.7 96.7 1 Pleasant Prairie to Zion 345 kV 1201 96.5 96.5 1 Prospect 138 kV Bus Tie 465 95.0 95.0 1 Table includes constraints derived from only high ComEd NSI BES Transmission Issues Mitigated by Oak Grove to Fargo CMVP – NERC Cat C 2021 Wind Levels BES Element Rating Maximum Minimum # of Loading % Loading % Contingencies Princeton Tap to LTV (Tap on Hennepin-Kewanee) 138 kV 143 98.6 98.6 4 Cherry Valley to Glidden 138 kV section 602 97.9 97.9 1 Darlington to North Monroe 138 kV 146 97.3 97.3 1 Auburn to Butternut 211 97.2 97.2 1 North Brook 345/138 kV Transformer 442 95.0 95.0 1 Table includes constraints derived from only high ComEd NSI BES Transmission Issues Mitigated by Oak Grove to Fargo CMVP – NERC Cat B 2026 Wind Levels Rating (MVA) Maximum Post Contingent Loading (% of Rating) Minimum Post Contingent Loading (% of Rating) Number of Contingencies Cordova to Nelson 345 kV 1479 108.0 107.9 4 Princeton Tap to LTV (Tap on Hennepin-Kewanee) 138 kV 143 104.6 102.1 2 Quad City to Nelson 345 kV 1528 104.5 104.5 2 Branch 272365 H440 ;RT 138 272516 STEWA; B 138 1 264 100.4 100.4 6 272362 H445 ;3B 138 272516 STEWA; B 138 1 176 99.9 99.9 1 Byron to Cherry Valley 345 kV 1441 98.7 98.7 1 Cherry Valley 138 kV Bus Tie 465 96.0 96.0 1 Cypress to Arcadian 345 kV 586 95.5 95.4 3 Arpin 345/138 kV Transformer 381 95.2 95.2 1 Table includes constraints derived from both low and high ComEd NSI BES Transmission Issues Mitigated by Oak Grove to Fargo CMVP – NERC Cat C 2026 Wind Levels Branch Palmyra 345/161 kV Transformer Cordova to Nelson 345 kV Princeton Tap to LTV (Tap on Hennepin-Kewanee) 138 kV Quad City to Nelson 345 kV Belvidere to Crystal Lake 138 kV section 272365 H440 ;RT 138 272516 STEWA; B 138 1 271096 BHAWK;BT 138 271192 CHERR; B 138 1 Byron to Cherry Valley 345 kV Dixon to Cherry Valley 138 kV section PH117 345/138 kV Transformer Pleasant Prairie to Zion 345 kV North Brook 345/138 kV Transformer North Brook 138 kV Bus Tie Cherry Valley to Alpine 138 kV Granville 345/138 kV Transformer Cherry Valley to Glidden 138 kV section Werner West to Rocky Run 345 kV Dresden 138 kV Bus Tie Galesburg 161/138 kV Transformer Rating (MVA) Maximum Post Contingent Loading (% of Rating) Minimum Post Contingent Loading (% of Rating) Number of Contingencies 370 1479 143 1528 428 264 386 1441 182 465 1667 442 442 602 478 338 829 480 101 137.8 110.6 109.1 104.5 100.0 99.3 99.2 97.8 97.2 96.6 96.4 96.1 96.0 95.8 95.6 95.4 95.4 95.1 95.1 137.8 105.8 109.1 103.0 100.0 95.3 99.2 97.7 97.2 96.6 96.4 96.1 96.0 95.8 95.6 95.4 95.4 95.1 95.1 1 3 4 5 1 6 1 2 1 1 1 1 1 1 1 1 1 1 1 Table includes constraints derived from both low and high ComEd NSI New Transmission Issues Resulting From Oak Grove to Fargo CMVP NERC Category C BES Element 636616 SB 56 5 161 636675 SB 85 5 161 1 Rating Maximum Loading % Minimum Loading % # of Contingencies 223 109.9 109.9 1 Ottumwa-Adair-Palmyra-Thomas Hill Constraints Mitigated Map Ottumwa – Adair – Palmyra – Thomas Hill CMVP • Project adds 345kV line between MEC’s Ottumwa Substation south to Ameren’s Adair Substation, east to Palmyra and further south from Adair to Thomas Hill. • This path provides an outlet for wind generation connected into Adair (500MW max, 450MW dispatched in shoulder case) • Without this path, the connected wind would overload the 161 kV line from Adair to Novelty in the base case, and during other contingencies overloads the 161 kV lines to the north and south, as well as some nearby transformers • Any 161 kV bus outages could result in the wind generation at Adair being disconnected from the transmission system • At 2026 wind levels, the overloads increase in severity along the main outlet from Adair, along with constraints beginning to show up in western Missouri along a parallel path of Ottumwa to Adair 52 BES Transmission Issues Mitigated by Ottumwa to Adair to Palmyra to Thomas Hill CMVP (Shoulder Peak) – NERC Cat B Element Novelty to Adair 161 kV Line* Kewanee South Tap to East Galesburg 138 kV Rating 167 143 Maximum Loading % 154.6 98.8 Minimum # of Loading % Contingencies 93.9 13149 98.8 1 *Novelty to Adair is a base case overload without the MVP, with the wind connected to the 161kV Bus at Adair BES Transmission Issues Mitigated by Ottumwa to Adair to Palmyra to Thomas Hill CMVP (Shoulder Peak) – NERC Cat C Element Rating Adair to Apanoose 161kV Line Thomas Hill to Adair 161kV Line Sub 18 to Sub 85 161kV Line Lucas 161/69kV Transformer Henry 161/69kV Transformer NOTE: For a 161kV bus fault or any of the three 161 kV breaker faults at Adair station, the outlet for 450MW of wind generation is lost without the MVP 223 315 248 96 56 Maximum Loading % 121.0 101.2 99.3 97.8 95.8 Minimum # of Loading % Contingencies 121.0 1 101.2 1 99.3 1 97.8 1 81.7 1 Non-BES Transmission Issues Mitigated by Ottumwa to Adair to Palmyra to Thomas Hill CMVP (Shoulder Peak) NERC Cat B and C Category B Element Jeff to Fairfield NW Tap 69 kV Line Mark to Apanose County 69 kV Line Wooster to Jefferson 69 kV Line Rating 48 48 41 Category C Element North Centerville to Iowa Steel and Wire 69kV Line Wooster to Jefferson 69kV Line Rating 51 41 Maximum Minimum Loading Loading 120.6 106.1 118.9 83.7 96.3 96.1 # of Contingencies 2 7 2 Maximum Minimum Loading Loading 101.4 101.4 99.8 99.8 # of Contingencies 1 1 55 New Transmission Issues Resulting From Ottumwa to Adair to Palmyra to Thomas Hill CMVP – Shoulder Peak Model Category B Element None Rating Maximum Loading % Minimum Loading % Category C Element Palmyra 345/161 kV Transformer Ottumwa to Montezuma 345 kV Line Maximum Minimum Loading % Loading % Rating 370 109.44 109.44 478 106.88 106.88 Note: There is a project that would fix the Ottumwa to Montezuma 345kV Line overload that would be implemented with the MVP BES Transmission Issues Mitigated by Ottumwa to Adair to Palmyra to Thomas Hill CMVP (Shoulder Peak) – NERC Cat B 2026 Wind Levels Element Viele to Denmark 161kV Line Wapello to Ottumwa 161kV Line #2 Wapello to Ottumwa 161kV Line #1 167 Maximum Loading % 100.4 335 99.0 97.0 2 335 95.7 95.7 1 Rating Minimum # of Loading % Contingencies 98.1 3 BES Transmission Issues Mitigated by Ottumwa to Adair to Palmyra & to Thomas Hill CMVP (Shoulder Peak) – NERC Cat C 2026 Wind Levels Element Adair to Apanoose 161kV Line Thomas Hill to Adair 161kV Line Sub 702 to Manawa 161kV Line Ottumwa 345/161kV Transformer Viele to Denmark 161kV Line Council Bluffs to Indian Creek 161kV line Wapello County to Jefferson 161kV Line Maryville to Clarinda 161kV Line Rating 223 315 335 400 167 371 223 153 Maximum Loading % 122 102.1 100.2 98.6 98.1 97.4 97.0 95.5 Minimum # of Loading % Contingencies 122 1 102.1 1 100.2 1 98.6 1 98.1 1 97.4 1 95.8 2 95.5 1 Non-BES Transmission Issues Mitigated by Ottumwa to Adair to Palmyra to Thomas Hill CMVP (Shoulder Peak) NERC Cat B and C 2026 Wind Levels Category B Element Jefferson to Fairfield NW 69kV Line Mark to Apanoose County 69kV Line Wooster to Jefferson 69kV Line Arlington to Green Isle 69kV Line Henry County 161/69kV Transformer Wapello to Eldon 69kV Line Rating 48 48 41 34.25 56 69 Category C Element Venice 138/69kV Transformer North Centeville to Iowa Steel and Wire 69kV Line Wooster to Jefferson 69kV Line Henry County 161/69kV Transformer Wapello County to Eldon 69kV Line Lucas County 161/69kV Transformer Rating 143 51 41 56 69 96 Maximum Minimum Loading Loading 132.5 114.6 125.8 94.9 105.8 103.9 103.2 103.2 99.3 99.3 96.9 96.9 # of Contingencies 2 48 3 1 1 1 Maximum Minimum Loading Loading 103.0 103.0 111.4 111.4 108.0 108.0 100.7 100.7 97.5 97.5 97.1 97.1 # of Contingencies 1 1 1 1 1 1 59 New Transmission Issues Resulting From Ottumwa to Adair to Palmyra to Thomas Hill CMVP – Shoulder Peak Model 2026 Wind Levels Category B Element Ottumwa to Montezuma 345kV Line Jasper 161/69kV Transformer Rating 478 84 Maximum Loading % 110.5 106.4 Minimum Loading % 80.3 106.4 Note: There is a project to fix the Ottumwa to Montezuma 345kV line overload that would be implemented with the MVP Category C Element Ottumwa to Montezuma 345kV Line Palmyra 345/161kV Transformer Dahlberg to Stinson 115kV Line Grimes to Sycamore 345kV Line Granger Tap to 100th and 54th 161kV Line Rating 478 370 98 956 373 Maximum Loading % 130.7 120 103.6 99.7 99.2 Minimum Loading % 80.2 83 103.6 82.8 99.2 Note: There is a project that would fix the Ottumwa to Montezuma 345kV Line overload that would be implemented with the MVP Palmyra – Meredosia – Pawnee – Ipava Constraints Mitigated Map Palmyra – Meredosia – Pawnee + Meredosia – Ipava CMVP • This project adds 345kV lines between Ameren’s Palmyra, Meredosia and Pawnee substations, along with a line from Meredosia to Ipava. This provides an outlet for generation from the west by connecting an east – west path from Adair (MO) to Sugar Creek (IN) across Illinois, as well as a north – south path with the line into Ipava • Without this path, the 138 kV lines will become overloaded out of Palmyra, as well as the 138 kV lines parallel to the proposed Meredosia to Ipava 345 line • When examining this same project at 2026 wind levels, the existing constraints are further aggravated, along with an additional overloads on the path the south of Palmyra 62 BES Transmission Issues Mitigated by Palmyra to Meredosia to Pawnee & Meredosia to Ipava CMVP (Shoulder Peak) – NERC Cat B Element Novelty to Adair 161 kV Line Palmyra 345/161 kV Transformer Hannibal West to Palmyra 161 kV Line Fargo 345/138kV Transformer Kewanee South Street to East Galesburg 138 kV Line Old Danvers Road to Lilly Tap 138 kV Line New Holland Tap Point to Kickapoo 138 kV Line Diamond Star Tap 2 to Old Danvers Road 138 kV Line Rating 167 370 227 560 143 132 120 132 Maximum Loading % 119.0 110.2 101.8 101.0 99.0 96.2 96.2 95.9 Minimum # of Loading % Contingencies 82.7 4 80.1 4 79.9 3 101.0 1 99.0 1 80.0 1 96.2 1 80.2 1 BES Transmission Issues Mitigated by Palmyra to Meredosia to Pawnee & Meredosia to Ipava CMVP (Shoulder Peak) – NERC Cat C Element Fargo 345/138kV Transformer Sub 18 to Sub 85 161kV Line Havana South to Mason City West 138 kV Line Rating 560 248 165 Maximum Loading % 99.4 99.1 95.5 Minimum # of Loading % Contingencies 88.2 3 99.1 1 81.4 3 New Transmission Issues Resulting From Palmyra to Meredosia to Pawnee & Meredosia to Ipava CMVP – Shoulder Peak Model Category B Element None Rating Maximum Loading % Minimum Loading % Rating Maximum Loading % Minimum Loading % Category C Element None BES Transmission Issues Mitigated by Palmyra to Meredosia to Pawnee & Meredosia to Ipava CMVP (Shoulder Peak) – NERC Cat B 2026 Wind Levels Element Palmyra 345/161 kV Transformer Havana to Mason City 138 kV Line Fargo to Radnor 138 kV Line Rating 370 165 233 Maximum Loading % 117.5 100.8 99.8 Minimum # of Loading % Contingencies 96.7 6 100.8 1 99.8 1 BES Transmission Issues Mitigated by Palmyra to Meredosia to Pawnee & Meredosia to Ipava CMVP (Shoulder Peak) – NERC Cat C 2026 Wind Levels Element Havana South to Mason City West 138 kV Line Diamond Star Tap 2 to West Washington Street 138 Spalding to Hannibal West 161 kV Line Spalding to Marion Tap 161 kV Line Hydro Lane 161kV Transformer Rating 165 132 227 227 187 Maximum Loading % 105.9 102.2 100.2 100.1 98.3 Minimum # of Loading % Contingencies 105.9 3 95.0 25 96.2 2 100.1 1 98.3 1 Non-BES Transmission Issues Mitigated by Palmyra to Meredosia to Pawnee to Ipava CMVP (Shoulder Peak) NERC Cat B and C 2026 Wind Levels Category B Element None Rating Category C Element Venice 138/69 kV Transformer Wissota Beach to Lafayette tap 69kV Line Wissota Beach to Cadott Interconection 69kV Line Cadott to Cadott Interconection 69kV Line ACEC Brooks to McKenna 69kV Line Cadott to Boyd 69kV Line Rating 143 72 72 72 42 72 Maximum Minimum Loading Loading # of Contingencies Maximum Minimum Loading Loading 103.1 103.1 101.9 95.0 97.8 97.8 97.8 97.8 96.2 96.2 95.3 95.3 # of Contingencies 1 2 1 1 1 1 68 New Transmission Issues Resulting From Palmyra to Meredosia to Pawnee to Ipava CMVP – Shoulder Peak Model 2026 Wind Levels Category B Element None Rating Maximum Loading % Minimum Loading % Rating 98 Maximum Loading % 103.6 Minimum Loading % 103.6 Category C Element Dahlberg to Stinson-Wisconsin 115kV Line Questions? • Digaunto Chatterjee ([email protected]) • West Sub Region Engineering Questions – Adam Solomon ([email protected]) • Central and East Sub Region Engineering Questions – Mike Dantzler ([email protected]) 70 Appendix 71 Ellendale – Big Stone CMVP Mitigated Map 72 BES Transmission Issues Mitigated by Ellendale – Big Stone CMVP – NERC Cat B Element Oakes - Ellendale 230 kV Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies 320.0 106.5 104.7 2 80.0 171.2 102.8 6 Oakes - Forman 230 kV 352.0 95.0 95.0 1 Forman 230/115 Xfmr 112.0 125.6 95.0 3 80.0 137.0 131.6 3 Forman 230 kV Bus Tie 140.0 104.2 104.2 1 Ellendale 230/115 kV Xfmr 150.0 101.0 98.6 3 Heskett 230/115 kV Xfmr 100.0 105.4 105.4 1 Aberdeen - Ellendale 115 kV Aberdeen Jct - Aberdeen 115 kV 73 BES Transmission Issues Mitigated by Ellendale – Big Stone CMVP – NERC Cat C Element Oakes - Ellendale 230 kV Rating Maximum Minimum (MVA) Loading (%) Loading (%) # of Contingencies 320.0 106.5 104.5 2 80.0 169.0 103.7 10 352.0 95.0 95.0 1 80.0 134.7 131.0 8 Ellendale 230/115 kV Xfmr 150.0 99.6 99.6 1 Forman 230/115 Xfmr 112.0 96.6 96.6 1 Aberdeen - Ellendale 115 kV Oakes - Forman 230 kV Aberdeen Jct - Aberdeen 115 kV 74 New Transmission Issues Resulting From Ellendale-Big Stone CMVP Element Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies ** None ** 75 Alternative-Rejected • • • • 2026 RPS wind zone at Ellendale of 260 MW 2-230 kV lines east and west and 1-115 kV line Analyses show constraints on Big Stone to Blair to An alternative to convert 115 kV path from Ellendale all the way to Huron could alleviate the southern path constraints but downstream transmission may also need to be rebuilt to accommodate wind injection delivered through lower impedance line • The eastern 230 kV path would need to be rebuilt to 345 kV all the way up to Fergus Falls • Cost of this alternative higher than 345 kV path to Big Stone station 76 Big Stone – Brookings CMVP Mitigated Map 77 BES Transmission Issues Mitigated by Big Stone – Brookings CMVP – NERC Cat B Element Rating Maximum Minimum (MVA) Loading (%) Loading (%) # of Contingencies Hankinson - Wahpeton 230 kV 320.0 110.8 110.8 1 Big Stone - Highway 12 115 kV 230.1 99.2 99.2 1 92.3 138.5 96.1 2 Johnson - Morris 115 kV 78 BES Transmission Issues Mitigated by Big Stone – Brookings CMVP – NERC Cat C Element Rating Maximum (MVA) Loading (%) Minimum Loading (%) # of Contingencies Big Stone - Blair 230 kV 480.0 126.0 126.0 1 Hankinson - Wahpeton 230 kV 320.0 111.2 95.0 2 92.3 139.5 108.8 6 Big Stone - Highway 12 115 kV 230.1 100.1 100.1 1 Highway 12 - Ortonville 115 kV 230.1 95.5 95.5 1 Watertown 345/230 kV Xfmr 400.0 98.2 98.2 1 Pipestone - Buffalo Ridge 115 kV 158.8 99.7 99.7 1 Canby - Granite Falls 115 kV 105.0 96.3 96.3 1 Johnson - Morris 115 kV 79 New Transmission Issues Resulting From Big Stone – Brookings CMVP Element Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies ** None ** 80 Alternative-Rejected • 2026 RPS wind zone at Big Stone of 460 MW • Big Stone ties in the N-S Hankinson to Blair 230 kV line with 2-115 kV outlets to Canby and Morris • Analyses show overload on Big Stone to Blair and then 230 kV and 115 kV outlets west (to Watertown) and east (to Granite Falls) • An alternative to build new 345 kV from Big Stone to Canby to Granite Falls to Minnesota Valley and rebuild 230 kV or new 345 kV to Morris could provide an alternative outlet for Brookings wind • Cost of this alternative higher than 345 kV path to Brookings CMVP station 81 N LaCrosse – Cardinal CMVP Mitigated Map 82 BES Transmission Issues Mitigated by N LaCrosse – Cardinal CMVP – NERC Cat B Element Werner - Rocky Run 345 kV N LaCrosse - Mayfair 161 kV N LaCrosse - LaCrosse Tap 161 kV LaCrosse - Mayfair 161 kV Seneca - Gran Grae 161 kV Seneca - Genoa 161 kV Hydro Lane 161/115 kV Xfmr Arpin 345/138 kV Xfmr Sigel - Arpin 138 kV Adams 345/161 kV Xfmr Blackhawk - Bremer Co 161 kV Emery - Floyd 161 kV Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies 829.0 100.6 100.6 2 197.0 131.8 97.3 8 162.0 132.8 95.3 4 196.6 115.8 100.2 3 201.0 108.6 108.6 1 302.0 100.2 96.8 4 187.0 112.5 97.0 3 381.0 104.0 104.0 2 339.0 95.4 95.4 2 263.3 100.4 100.4 1 193.0 95.8 95.8 1 240.0 96.6 96.6 1 83 Non-BES Transmission Issues Mitigated by N LaCrosse – Cardinal CMVP – NERC Cat B Element 605292 MONROCO8 69.0 605294 ROCKLND8 69.0 1 605292 MONROCO8 69.0 680146 SPARTA 69.0 1 605296 WSTSALE8 69.0 605316 LAX 8 69.0 1 605349 WISSOTAG 69.0 605523 LFY TAP8 69.0 1 605351 WISOTBC8 69.0 605523 LFY TAP8 69.0 1 605351 WISOTBC8 69.0 680482 DPC TAP8 69.0 1 605353 CADOTT 8 69.0 680482 DPC TAP8 69.0 1 605355 STANLEY8 69.0 605420 DELMAR 8 69.0 1 605353 CADOTT 8 69.0 605354 BOYD 8 69.0 1 605354 BOYD 8 69.0 605420 DELMAR 8 69.0 1 605300 CATARAC8 69.0 605303 T MEL2 8 69.0 1 698321 A07 69 69.0 698322 MCK 69 69.0 1 Bell Center 161/69 kV Xfmr 698333 HLT 69 69.0 698337 WMT 69 69.0 1 LaCrosse 161/69 kV Xfmr 1 Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies 47.8 147.4 115.8 2 72.0 122.3 122.2 4 84.9 110.1 110.1 1 72.0 113.1 105.4 3 72.0 109.2 101.5 3 72.0 105.0 97.4 3 72.0 105.0 97.4 3 72.0 98.1 98.1 1 72.0 102.3 102.3 1 72.0 100.1 100.1 1 32.0 121.8 96.2 2 42.0 117.6 96.2 16 60.0 100.2 100.2 1 54.0 102.2 95.6 3 70.0 98.9 98.9 1 84 Non-BES Transmission Issues Mitigated by N LaCrosse – Cardinal CMVP – NERC Cat B (Cont.) Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies LaCrosse 161/69 kV Xfmr 2 70.0 99.3 99.3 1 698318 LPS 69 69.0 698321 A07 69 69.0 1 42.0 105.8 96.8 11 698315 CHC 69 69.0 698319 COT 69 69.0 1 36.0 108.5 97.1 11 605297 TMAC 2 8 69.0 605300 CATARAC8 69.0 1 32.0 109.4 109.4 1 698114 WKA 69 69.0 698115 BOS 69 69.0 1 64.0 95.4 95.4 1 698007 DAR 69 69.0 698035 GTT 69 69.0 1 87.0 97.4 97.4 2 698115 BOS 69 69.0 698116 BTA 69 69.0 1 67.0 97.0 96.6 3 Turkey River 161/69 kV Xfmr 34.0 111.7 96.6 2 698322 MCK 69 69.0 698332 A13 69 69.0 1 42.0 108.1 95.7 14 698331 CAR 69 69.0 698332 A13 69 69.0 1 42.0 112.0 96.5 17 630240 MONONA_8 69.0 680477 FARMBURG 69.0 1 48.0 96.0 96.0 1 698016 EEN 69 69.0 698017 MIP 69 69.0 1 49.0 106.1 106.1 2 630244 BIGSPRT8 69.0 630269 ELKADER8 69.0 1 45.0 100.2 100.2 1 Jackson Co 161/69 kV Xfmr 47.0 98.9 98.9 1 630271 GUTNBRG8 69.0 630282 TURK RV8 69.0 1 36.0 95.6 95.6 1 Element 85 BES Transmission Issues Mitigated by N LaCrosse – Cardinal CMVP – NERC Cat C Element Rating Maximum (MVA) Loading (%) Minimum Loading (%) # of Contingencies Werner - Rocky Run 345 kV 829.0 106.7 100.7 5 LaCrosse - Mayfair 161 kV 196.6 130.0 99.6 5 N LaCrosse - LaCrosse Tap 161 kV 162.0 142.8 100.2 7 Seneca - Genoa 161 kV 302.0 97.7 96.3 3 LaCrosse - Monroe Co 161 kV 267.3 96.1 96.1 1 Sigel - Arpin 138 kV 339.0 101.3 101.3 1 Arpin 345/138 kV Xfmr 381.0 104.5 104.5 1 Hydro Lane 161/115 kV Xfmr 187.0 98.7 98.7 1 86 Non-BES Transmission Issues Mitigated by N LaCrosse – Cardinal CMVP – NERC Cat C Element 605292 MONROCO8 69.0 680146 SPARTA 69.0 1 680142 T TC 69.0 699901 TIMBERWOLF 69.0 1 605381 RUSK 8 69.0 605528 RCD TAP8 69.0 1 605292 MONROCO8 69.0 605294 ROCKLND8 69.0 1 605382 ELKMOUN8 69.0 605424 RUSK EM8 69.0 1 605381 RUSK 8 69.0 605424 RUSK EM8 69.0 1 605344 EAUCLAI8 69.0 605382 ELKMOUN8 69.0 1 605311 SW CRK 8 69.0 605316 LAX 8 69.0 1 605318 GALESVI8 69.0 605319 TREMPLO8 69.0 1 605310 COULEE 8 69.0 605311 SW CRK 8 69.0 1 605349 WISSOTAG 69.0 605523 LFY TAP8 69.0 1 605351 WISOTBC8 69.0 605523 LFY TAP8 69.0 1 605353 CADOTT 8 69.0 680482 DPC TAP8 69.0 1 605351 WISOTBC8 69.0 680482 DPC TAP8 69.0 1 605568 BUGLELK8 69.0 680166 INDEPNDN 69.0 1 Tremval 161/69 kV Xfmr 605353 CADOTT 8 69.0 605354 BOYD 8 69.0 1 Spring Green 138/69 kV Xfmr Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies 72.0 86.0 36.0 47.8 36.0 36.0 34.5 53.3 45.1 66.0 72.0 72.0 72.0 72.0 25.0 70.0 72.0 96.0 164.5 127.5 171.0 147.2 160.7 160.5 162.2 128.0 128.1 109.0 105.9 102.1 98.0 98.0 131.2 106.8 95.4 96.6 102.2 127.5 171.0 104.1 160.7 160.5 162.2 98.6 128.1 109.0 103.5 99.8 95.7 95.7 131.2 96.8 95.4 96.6 4 1 1 7 1 1 1 3 1 1 2 2 2 2 1 3 1 1 # of Outstanding Contingencies 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 87 Non-BES Transmission Issues Mitigated by N LaCrosse – Cardinal CMVP – NERC Cat C (Cont.) Element 698321 A07 69 69.0 698322 MCK 69 69.0 1 605318 GALESVI8 69.0 680402 NEW AMST 69.0 1 698333 HLT 69 69.0 698337 WMT 69 69.0 1 605490 WHTEHAL8 69.0 605568 BUGLELK8 69.0 1 Marshland 161/69 kV Xfmr 698007 DAR 69 69.0 698035 GTT 69 69.0 1 698318 LPS 69 69.0 698321 A07 69 69.0 1 698115 BOS 69 69.0 698116 BTA 69 69.0 1 698116 BTA 69 69.0 698119 MUS 69 69.0 1 698114 WKA 69 69.0 698115 BOS 69 69.0 1 698315 CHC 69 69.0 698319 COT 69 69.0 1 605300 CATARAC8 69.0 605303 T MEL2 8 69.0 1 630271 GUTNBRG8 69.0 630282 TURK RV8 69.0 1 630244 BIGSPRT8 69.0 630269 ELKADER8 69.0 1 630240 MONONA_8 69.0 680477 FARMBURG 69.0 1 Whitcomb 115/69 kV 630895 VINTON MUNI869.0 630902 VINTON 8 69.0 1 630019 LIBERTY8 69.0 630321 LIBERTP8 69.0 1 Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies 42.0 45.1 54.0 25.0 112.0 87.0 42.0 67.0 67.0 64.0 36.0 32.0 36.0 45.0 48.0 56.0 72.0 36.0 111.5 103.6 99.6 120.5 97.0 100.2 99.4 99.3 97.0 95.4 100.2 101.5 97.1 101.3 97.0 96.6 102.0 123.9 95.1 103.6 99.6 97.8 95.0 97.9 96.4 97.0 95.5 95.4 96.9 97.8 95.4 100.0 95.8 96.6 95.4 103.4 8 1 1 2 2 2 3 6 5 1 3 2 2 2 2 1 4 3 # of Outstanding Contingencies 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 88 New Transmission Issues Resulting From N LaCrosse – Cardinal CMVP Element Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies ** None ** 89 Alternative-Rejected • Given the number of BES and non-BES constraints alleviated by North LaCrosse CMVP, no low voltage fix at lower cost is conceivable • With wind behind it further enabled by Brookings MVP, new 345 kV out of North LaCrosse essential • Besides alleviating thermal constraints 345 kV line paralleling the existing stability constrained flowgate thereby increasing stability limit and supplying wind energy directly into metro area is the best conceivable alternative 90 Pleasant Prairie – Zion CMVP Mitigated Map 91 BES Transmission Issues Mitigated by Pleasant Prairie – Zion CMVP – NERC Cat B Element Rating Maximum Minimum (MVA) Loading (%) Loading (%) # of Contingencies Kenosha - Lakeview 138 kV 288.0 114.7 114.7 2 Zion - Lakeview 138 kV 264.0 115.0 115.0 2 Waukegan - Zion 138 kV 264.0 102.8 102.8 2 Sctn of Garden - Rock Falls 138 kV 182.0 95.5 95.1 9 92 BES Transmission Issues Mitigated by Pleasant Prairie – Zion CMVP – NERC Cat C Element Rating Maximum Minimum (MVA) Loading (%) Loading (%) # of Contingencies Kenosha - Lakeview 138 kV 288.0 194.2 124.6 3 Zion - Lakeview 138 kV 264.0 200.4 125.7 4 Waukegan - Zion 138 kV 264.0 187.0 113.3 3 Bain - Kenosha 138 kV 438.0 134.3 98.4 3 Sctn of Garden - Rock Falls 138 kV 386.0 138.4 138.4 1 Bain 345/138 kV Xfmr 2 382.0 128.7 106.3 2 Bain 345/138 kV Xfmr 1 382.0 128.2 104.6 2 93 New Transmission Issues Resulting From Pleasant Prairie – Zion CMVP – Cat B Element ** None ** Rating (MVA) Maximum Loading (%) Minimum Loading (%) # of Contingencies New Transmission Issues Resulting From Pleasant Prairie – Zion CMVP – Cat C Element Zion - Zion Energy 345 kV Zion - Pleasant Prairie 345 kV Oak Creek - St Rita 138 kV Rating Maximum Minimum # of (MVA) Loading (%) Loading (%) Contingencies 1201.0 108.6 108.6 1 1528.0 96.8 96.8 1 241.0 105.3 105.3 1 94 Alternative-Rejected • Paralleling the existing 345 kV constraint on Pleasant Prairie-Zion 345 kV and KenoshaLakeview-Zion-Waukegan 138 kV is the most effective transmission solution. • No comparable alternatives identified 95
Similar documents
the value of transmission
cases analyzed, only looking at the actual benefits for the Integrated Marketplace’s (IM) first year of operation – March 2014 through February 2015 – for the 348 projects representing $3.394 billi...
More information