is committed to world leadership in Technology & Innovative products.
1. Introduction
Main Field of Business
1.Product
Insoluble Anodes,
Electrolysers,
Electrochlorination System
2.Service
Re-coating & Refurbishment of electrodes
Engineering
Commissioning & Start-up
Supervising
Training, etc.
3
is committed to world leadership in Technology & Innovative products.
1. Introduction
History in Brief
1999
Patent
1993
* High efficiency
* Extended life of insoluble anodes
1998
Founded
POSCO
1997
2000
Utility
models
Incorporated
2001
Register
-ed
* Electrolyzer
* Transparent Electrolyzer
* Components etc.
Qualified Supplier
By Korea Electric Power Co. (KEPCO)
and their subsidiaries
2002
R&D
Center
4
is committed to world leadership in Technology & Innovative products.
1. Introduction
Certificate of Registration in a qualified supplier
5
is committed to world leadership in Technology & Innovative products.
1. Introduction
History in Brief
2005
Export
2003
2003
Certificate
Promising
Export
Firm
Export
2004
2006
Acquired
M.O.U
ACG s.r.l
– Italy
Babcock, - Germany
UEME – U.A.E
2008
ISO
9001 : 2000
CMS Power Co.
– U.A.E
Export
2009
PLTU Muara Karang
Plant in Indonesia
→ Manufacturing,
Engineering,
installation,
Supervising etc.
ITM O&M Co.
– U.A.E
2010
2010
Ongoing
Branch
Office
Hyundai Green Power Plant
Turn-Key – Korea
Project
KEPCO Lebanon
– Lebanon
PT. Wookyoung
international
in Indonesia
6
is committed to world leadership in Technology & Innovative products.
1. Introduction
7
is committed to world leadership in Technology & Innovative products.
1. Introduction
Organization
CEO & President
Audit
H.O & Factory # 1
Quality Control Committee
Factory #2, 3
Sales & Marketing
R & D Center
QA/QC
QA/QC
Plant & Electrodes
Laboratory
Production
Licensing
Investment
Administration
Planning
Procurement
# 1 Production
Procurement
Co-Operative R&D
Administration
# 2 Production
8
is committed to world leadership in Technology & Innovative products.
1. Introduction
Manpower
Division
Number
Sales
3
Customer Service
2
Engineering
5
R&D
5
Production
16
Purchasing
2
QA / QC
3
Other
2
TOTAL
38
9
is committed to world leadership in Technology & Innovative products.
1. Introduction
Manpower
Division
Name
General manager
Sang-soo, KIM
Sales manager
Grace, PARK
Customer Service manager
Haejin, KIM
Engineering manager
Tae-heum, HONG
Production manager
Tae-hyo, KIM
Purchasing manager
In-hwa, LEE
QA / QC manager
Hyun-chul, Byun
EHS manager
Sang-soo, HAN
R & D manager
Sung-soo, KIM
10
is committed to world leadership in Technology & Innovative products.
1. Introduction
Facility
H.O & Factory # 1
In Changwon
Size : 1,655 m2
⊙ Seoul office
Engineering,
Fabrication & Coating
30 % of
Fabrication Load
Kwangyang
⊙ no.3 factory
⊙
office ⊙ no.2
⊙ H.O &
55 % of Manpower
factory no.1 factory
Sales & Marketing,
Production
Factory # 2
In Haman
Size : 3,738 m2
Fabrication & Coating
Factory # 3
In Gyungju
Size : 990 m2
Fabrication & Coating
45 %
25 %
30 %
15 %
Production
Production
11
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Over view
12
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
R & D Shop
Storage Shop
Over view
13
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
R & D Shop
Storage Shop
Over view
14
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
R & D Shop
Storage Shop
Over view
15
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
R & D Shop
Storage Shop
Over view
16
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
R & D Shop
Storage Shop
Over view
17
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
Heating Furnaces
R & D Shop
for heat treatment of electrode
Storage Shop
18
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
R & D Shop
Storage Shop
Over view
19
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
R & D Shop
Storage Shop
Over view
20
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
R & D Shop
Storage Shop
Over view
21
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
- facility
R & D Shop
Machining for housing of an electrolyzer
Storage Shop
Machining for Components of an electrolyzer
22
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
R & D Shop
Storage Shop
Over view
23
is committed to world leadership in Technology & Innovative products.
1. Introduction
H.O & Factory # 1 in Changwon
Welding Shop
Coating Shop
Fabrication Shop
R & D Shop
Titanium raw
material, sheet
etc.
Storage Shop
Over view
24
is committed to world leadership in Technology & Innovative products.
1. Introduction
Factory # 2 in Haman
Over view
Testing Benches
25
is committed to world leadership in Technology & Innovative products.
1. Introduction
Factory # 2 in Haman
Auto Sand / Blast Machine
for surface treatment of electrodes
26
is committed to world leadership in Technology & Innovative products.
1. Introduction
Factory # 2 in Haman
Heating Furnaces for electrodes
Machining
27
is committed to world leadership in Technology & Innovative products.
1. Introduction
Factory # 2 in Haman
Chemical site
28
is committed to world leadership in Technology & Innovative products.
1. Introduction
Factory # 3 in Gyungju
Over View
29
is committed to world leadership in Technology & Innovative products.
1. Introduction
Factory # 3 in Gyungju
Over View
30
is committed to world leadership in Technology & Innovative products.
1. Introduction
Factory # 3 in Gyungju
Electric Furnace (Continuous Type)
Electric Furnace (Box Type)
for Electrodes
for Electrodes
31
is committed to world leadership in Technology & Innovative products.
1. Introduction
Certificate of R & D Center
32
is committed to world leadership in Technology & Innovative products.
1. Introduction
R & D Center in Changwon
Laboratory “A”
Instruments for Coating Thickness Measurement and Materials Testing
X-Ray Spectrometer for Quantitative Analysis
33
is committed to world leadership in Technology & Innovative products.
1. Introduction
R & D Center in Changwon
Laboratory “A”
Digital Rotary Evaporatortor for Platinoid Sol.
Fume scrubber
34
1. Introduction
R & D Center in Changwon
Laboratory “A”
Electrode samples for Test
Incubator
35
is committed to world leadership in Technology & Innovative products.
1. Introduction
R & D Center in Changwon
Laboratory “B”
Over view
36
is committed to world leadership in Technology & Innovative products.
1. Introduction
R & D Center in Changwon
Laboratory “B”
Over view
37
is committed to world leadership in Technology & Innovative products.
1. Introduction
Certificate (ISO 9001 : 2008, 14001 : 2004)
38
is committed to world leadership in Technology & Innovative products.
1. Introduction
Certificate (NEP : New Excellent Product)
39
is committed to world leadership in Technology & Innovative products.
1. Introduction
Certificate of Registration in Construction
40
is committed to world leadership in Technology & Innovative products.
Content
1. Introduction
Main Business, History, Organization, Manpower
2. Track Record
Domestic, Overseas
41
is committed to world leadership in Technology & Innovative products.
2. Track Records (Domestic)
CLASS.
DAELIM
YEAR
PROJECT
2009 Hyundai Green
Power Plant
END USER /
PURCHASER
Daelim
Industrial Company
TAEAN
Korea 2008
WP (Korea Western
Thermal
Pow er
Electric
Pow er Co., Ltd)
Plant
Power
SEOUL
KOMIPO (Korea Midland
Co.
2009
2010
Korea 2009
HydroNuclear
2010
Power
Co.
POSCO 2008
LOCATION /
COUNTRY
Dangjin,
Choongnam
Province
Taean,
Choongnam
Province
Seoul city
Thermal Pow er
Pow er Co., Ltd.)
Plant
Gosung,
SAMCHEONPO
KOSEP(Korea South
Gyungnam
Thermal Pow er
East Pow er Co,.Ltd.)
Province
Plant
WOOLSAN
Woolsan
KOEWP (Korea East &
Combined Cycle
Metropolitan
West Pow er Co., Ltd.)
& Thermal
City
SEOCHON
Seochon,
KOMIPO (Korea Midland
Thermal Pow er
Choongnam
Pow er Co., Ltd.)
Plant
Province
HADONG
Hadong,
KOSPO (Korea Southern
Thermal Pow er
Gyungnam
Pow er Co., Ltd)
Plant
Province
DANGJIN
Dangjin,
KOEWP (Korea East &
Thermal Pow er
Choongnam
West Pow er Co., Ltd.)
Plant
Province
WOOLJIN
Wooljin,
Korea Hydro-Nuclear
Nuclear Pow er
Gyungbuk
Pow er Co., Ltd.
Plant
Province
KORI
Busan,
Korea Hydro-Nuclear
Nuclear Pow er
metropolitan
Pow er Co., Ltd.
Plant
city
Gw angyang
Gw angyang,
Steam Pow er
Geonnam
POSCO
Plant # 1
Province
POHANG
Pohang,
LNG Pow er
Gyungbuk
POSCO
Plant
Province
POHANG
Pohang,
Steam Pow er
Gyungbuk
POSCO
Plant #2,3
Province
Q'ty
CAPA' Contract Delivery Design m anuf installa com m is Guarantee
(Kg Cl2/hr)
acture
tion
sioning
O
O
2 units
60
-
Sep.
O
O
7 cell
35
03.24
04.23
O
O
14 cell
70
04.03
w ithin 50
days
O
O
O
O
5 years
144 cell
108
01.13
w ithin 50
days
O
O
O
5 years
3 cell
30
04.30
07.09
O
O
O
O
5 years
6 cell
60
09.30
w ithin 60
days
O
O
O
O
5 years
12 cell
60
05.03
w ithin 40
days
O
O
O
O
5 years
6 cell
30
05.12
06.16
O
O
O
O
5 years
56 cell
280
03.05
04.10
O
O
5 years
2 cell
10
05.11
06.10
O
O
5 years
1 unit
36
-
Feb.
O
O
O
5 years
2 units
15
-
Mar.
O
O
O
5 years
2 units
45
-
May
O
O
O
5 years
is committed to world leadership in Technology & Innovative products.
5 years
5 years
42
2. Track Records
2-1 Main Customer (Domestic)
Domestic
Design
Manufacture
Installation
Commissioning
O
O
O
O
DAELIM Industrial Co.
Korea Electric Power Co.
Korea Gas Corporation
POSCO
•Type : Mono-Polar Plate Type,
Hyundai Green Power Plant
Capacity : 30 Kg Cl2/hr/unit x 2 Units, September. 2009
43
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-1 Main Customer (Domestic)
Domestic
Design
Manufacture
Installation
Commissioning
O
O
O
O
DAELIM Industrial Co.
Korea Electric Power Co.
Korea Gas Corporation
POSCO
•Type : Mono-Polar Plate Type,
Hyundai Green Power Plant
Capacity : 30 Kg Cl2/hr/unit x 2 Units, September. 2009
44
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-1 Main Customer (Domestic)
Design
Domestic
Manufacture
Installation
Commissioning
O
DAELIM Industrial Co.
Korea Electric Power Co.
Korea Gas Corporation
POSCO
•Type : Mono-Polar Plate Type,
HADONG Thermal Power Plant
Capacity : 60 Kg Cl2/hr/unit x 2 Units, January. 2010
45
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-1 Main Customer (Domestic)
Design
Manufacture
Installation
Commissioning
O
O
O
Domestic
DAELIM Industrial Co.
Korea Electric Power Co.
Korea Gas Corporation
POSCO
•Type : Tubular type,
Samcheonpo Thermal Power Plant
Capacity :108 Kg Cl2/hr/unit x 1 Unit, April. 2008
46
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-1 Main Customer (Domestic)
Design
Domestic
Manufacture
Installation
Commissioning
O
DAELIM Industrial Co.
Korea Electric Power Co.
Korea Gas Corporation
POSCO
•Type : Mono-Polar Plate Type,
INCHEON Producing Center
Capacity : 40 Kg Cl2/hr/unit x 1 Unit, September. 2009
47
is committed to world leadership in Technology & Innovative products.
3. Experience
2-1 Main Customer (Domestic)
Design
Domestic
Manufacture
Installation
Commissioning
O
O
O
DAELIM Industrial Co.
Korea Electric Power Co.
Korea Gas Corporation
POSCO
•Type : MHI Electrolytic Cell (L-type)
POSCO Steam Power Plant #1
Capacity : 36 Kg Cl2/hr/unit x 1 Unit, February. 2008
48
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-1 Main Customer (Domestic)
Design
Manufacture
Installation
Commissioning
O
O
O
Domestic
DAELIM Industrial Co.
Korea Power Generation Co.
Korea Gas Corporation
POSCO
•Type : Bi-Polar type
POSCO LNG Power Plant
Capacity : 15 Kg Cl2/hr/unit x 2 Units, March. 2008
49
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-1 Main Customer (Domestic)
Design
Domestic
Manufacture
Installation
Commissioning
O
O
O
DAELIM Industrial Co.
Korea Power Generation Co.
Korea Gas Corporation
POSCO
•Type : (MHI) Bi-Polar type
POSCO LNG Power Plant
Capacity : 45 Kg Cl2/hr/unit x 2 Units, March. 2008
50
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-1 Main Customer (Domestic)
Design
Domestic
Manufacture
Installation
Commissioning
O
O
O
DAELIM Industrial Co.
Korea Power Generation Co.
Korea Gas Corporation
POSCO
•Type : (MHI) Bi-Polar type
POSCO LNG Power Plant
Capacity : 45 Kg Cl2/hr/unit x 2 Units, March. 2008
51
is committed to world leadership in Technology & Innovative products.
2. Track Records (Overseas)
YEAR
PROJECT
END USER /
PURCHASER
2008
Um m Al Nar
Water & Pow er
Plant
ITM O&M
Com pany
ditto
ditto
ditto
Electrode Assembly (w ithout
housing)
Um m Al Nar
Water & Pow er
Plant
ITM O&M
Com pany
Abu Dhabi,
UAE
ditto
ditto
2009
Hypochloriantion Azienda chim ica
Plant
Genovese s.r.l
2010
LOCATION /
COUNTRY
DESCRIPTION
Q'ty
Abu Dhabi, Housing Cell, Transparent Housign
12 sets
UAE
for Electrolyser BP-Ⅳ
CAPA' Contract Delivery Design m anuf installa com m is Guarantee
acture
(Kg Cl2/hr)
tion
sioning
50.4
06.12
08.30
O
5 years
12 sets
50.4
06.19
08.30
O
5 years
Electrode Assembly (w ithout
housing)
6 sets
25.2
04.21
07.10
O
5 years
ditto
Electrode Assembly (w ithout
housing)
6 sets
25.2
12.28
03.20
O
5 years
Genova,
Italy
Electrolyzer skid
1 set
10
03.27
06.01
O
5 years
Deir Am ar
Pow er Plant
KELECO / KEPCO
Lebanon S.A.R.L
Lebanon
Electrochlorination System
1 unit
40
03.31
08.05
Al Taw eelah A2
Pow er &
Desalination Plant
Em irates CMS
Pow er Co.
Abu Dhabi,
UAE
Electrolytic cells w ith non Transparent Housing
8 sets
33.6
08.11
08.25
O
5 years
Hypochloriantion
Plant
PREMABERGO
ITALIANA stl
ITALY
Electrolytic Cell
1 set
2
12.23
02.19
O
5 years
Hypochloriantion
Plant
Um m Al Nar
Water & Pow er
Plant
Abu Dhabi,
UAE
Spare Parts for electrolytice Cell
section
1
-
06.07
08.01
O
5 years
ditto
ditto
ditto
Spare Parts for electrolytice Cell
section
2
-
06.07
12.10
O
5 years
O
O
O
O
52
is committed to world leadership in Technology & Innovative products.
5 years
2. Track Records
2-2 Main Customer (Overseas)
Design
Manufacture
Installation
Commissioning
O
O
O
Overseas
KELECO (Lebanon)
ITM O&M Co. (U.A.E)
ACG s.r.l. (Italy)
Premabergo (Italy)
PLTU MuaraKarang (Indonesia)
•Type : Tubular-type
Deir Amar Power Plant (Lebanon)
Capacity : 40 Kg Cl2/hr/unit x 1 Unit, July. 2009
53
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-2 Main Customer (Overseas)
Design
Overseas
Manufacture
Installation
Commissioning
O
KELECO (Lebanon)
ITM O&M Co. (U.A.E)
ACG s.r.l. (Italy)
Premabergo (Italy)
PLTU MuaraKarang (Indonesia)
•Type : PEPCON Type BP-Ⅳ
Umm Al Nar Power & Desalination “B” (U.A.E)
Capacity : 5 Kg Cl2/hr/unit x 36 Sets, November. 2004
54
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-2 Main Customer (Overseas)
Design
Manufacture
Installation
Commissioning
O
Overseas
KELECO (Lebanon)
ITM O&M Co. (U.A.E)
ACG s.r.l. (Italy)
Premabergo (Italy)
PLTU MuaraKarang (Indonesia)
Type : Bi-polar type
Capacity : 10 Kg Cl2/hr/unit x 1 Sets, May, 2009
55
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-2 Main Customer (Overseas)
Design
Manufacture
Installation
Commissioning
O
Overseas
KELECO (Lebanon)
ITM O&M Co. (U.A.E)
ACG s.r.l. (Italy)
Premabergo (Italy)
PLTU MuaraKarang (Indonesia)
•Type : Tubular-type
Capacity : 2 Kg Cl2/hr/unit x 1 Set, February. 2010
56
is committed to world leadership in Technology & Innovative products.
2. Track Records
2-2 Main Customer (Overseas)
Design
Manufacture
Installation
Commissioning
O
O
O
Overseas
KELECO (Lebanon)
ITM O&M Co. (U.A.E)
ACG s.r.l. (Italy)
Premabergo (Italy)
PLTU MuaraKarang (Indonesia)
•Type : Daiki type –
monopolar
Capacity : 65 Kg Cl2/hr/unit x
2 Units,
February. 2011 (off the ground)
57
is committed to world leadership in Technology & Innovative products.
Thank you !
Q&A
58
is committed to world leadership in Technology & Innovative products.