exhibit 7 mcaces cost estimate
Transcription
exhibit 7 mcaces cost estimate
EXHIBIT 7 MCACES COST ESTIMATE Sacramento District Colorado Ecosystem Restoration Mesa County, Colorado COST ENGINEERING REPORT October 2012 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report TABLE OF CONTENTS Total Project Cost Summary (TPCS)...……………...………......………….…..…….………ii Cost Estimate Narrative……………………………………………………………………….1 APPENDICES A Site Plan B Project Quantities C Project Schedule D Local Market Labor Rates E Estimated Production Rates F Phone Logs and Emails G Abbreviated Cost and Schedule Risk Analysis H MCACES Construction Cost Estimate i October 2012 Printed:10/22/2012 Page 1 of 9 **** TOTAL PROJECT COST SUMMARY **** PROJECT: LOCATION: Colorado River Ecosystem Restoration DISTRICT: POC: Mesa County, CO This Estimate reflects the scope and schedule in report; Sacramento PREPARED: CHIEF, COST ENGINEERING, xxx 10/22/2012 0 WBS Structure PROJECT FIRST COST Dollar Basis) ESTIMATED COST (Constant TOTAL PROJECT COST (FULLY FUNDED) Program Year (Budget EC): 2013 Effective Price Level Date: 1 OCT 12 WBS NUMBER A 06 14 Civil Works Feature & Sub-Feature Description B FISH & WILDLIFE FACILITIES RECREATION FACILITIES CONSTRUCTION ESTIMATE TOTALS: 01 LANDS AND DAMAGES 30 31 COST ($K) C CNTG ($K) D $2,911 $61 CNTG (%) E $320 $7 11.01% 11.01% __________ __________ $2,972 $327 TOTAL ($K) F ESC (%) G $3,232 $68 0.0% 0.0% __________ $3,299 0.0% COST ($K) H $2,911 $61 CNTG ($K) I $320 $7 Spent Thru: 22-Oct-12 ($K) K TOTAL ($K) J $3,232 $68 $0 $0 _________ _________ __________ $2,972 $327 $3,299 $0 L COST ($K) M $3,070 $63 CNTG ($K) N $338 $7 FULL ($K) O $3,408 $70 _________ _________ ____________ $3,134 $345 $3,478 $1,032 $114 11.01% $1,145 0.0% $1,032 $114 $1,145 $0 $1,044 $115 $1,159 PLANNING, ENGINEERING & DESIGN $299 $33 11.01% $332 0.0% $299 $33 $332 $0 $307 $34 $341 CONSTRUCTION MANAGEMENT $252 $28 11.01% $280 0.0% $252 $28 $280 $0 $281 $31 $312 $4,555 $501 11.01% $5,056 $4,555 $501 $5,056 $4,765 $525 $5,290 PROJECT COST TOTALS: Mandatory by Regulation CHIEF, COST ENGINEERING, xxx Mandatory by Regulation PROJECT MANAGER, xxx Mandatory by Regulation CHIEF, REAL ESTATE, xxx $0 ESTIMATED FEDERAL COST: ESTIMATED NON-FEDERAL COST: ESTIMATED TOTAL PROJECT COST: CHIEF, PLANNING,xxx CHIEF, ENGINEERING, xxx CHIEF, OPERATIONS, xxx CHIEF, CONSTRUCTION, xxx CHIEF, CONTRACTING,xxx O&M OUTSIDE OF TOTAL PROJECT COST: CHIEF, PM-PB, xxxx CHIEF, DPM, xxx Filename: Colorado River_TPCS.xlsx TPCS ii $5,290 Printed:10/22/2012 Page 2 of 9 **** TOTAL PROJECT COST SUMMARY **** SEGMENT 19 **** CONTRACT COST SUMMARY **** Colorado River Ecosystem Restoration PROJECT: LOCATION: Mesa County, CO This Estimate reflects the scope and schedule in report; DISTRICT: POC: Sacramento PREPARED: CHIEF, COST ENGINEERING, xxx 10/22/2012 0 WBS Structure ESTIMATED COST Estimate Prepared: Effective Price Level: PROJECT FIRST COST Dollar Basis) (Constant Program Year (Budget EC): Effective Price Level Date: 2013 1 OCT 12 22-Oct-12 22-Oct-12 TOTAL PROJECT COST (FULLY FUNDED) RISK BASED WBS NUMBER A 06 14 Civil Works Feature & Sub-Feature Description B SEGMENT 19 FISH & WILDLIFE FACILITIES RECREATION FACILITIES COST CNTG CNTG TOTAL ESC COST CNTG ($K) C ($K) D (%) E ($K) F (%) G ($K) H ($K) I LANDS AND DAMAGES 30 ($K) J Mid-Point Date P $277 $31 11.01% $308 0.0% $277 $31 $308 $0 $0 11.01% $0 0.0% $0 $0 $0 INFLATED (%) L COST ($K) M CNTG FULL ($K) N ($K) O 2014Q2 2.0% $283 $31 $314 0 0.0% $0 $0 $0 $0 _________ _________ __________ $277 $31 $308 __________ __________ _________ __________ CONSTRUCTION ESTIMATE TOTALS: $277 $31 11.01% $308 01 TOTAL _________ _________ ____________ $283 $31 $314 $114 $13 11.01% $126 0.0% $114 $13 $126 2013Q4 1.2% $115 $13 $128 1.0% PLANNING, ENGINEERING & DESIGN Project Management $3 $0 11.01% $3 0.0% $3 $0 $3 2013Q2 0.4% $3 $0 $3 1.0% 3.0% 1.0% 1.0% 1.0% Planning & Environmental Compliance Engineering & Design Engineering Tech Review ITR & VE Contracting & Reprographics Engineering During Construction $3 $8 $3 $3 $3 $0 $1 $0 $0 $0 11.01% 11.01% 11.01% 11.01% 11.01% $3 $9 $3 $3 $3 0.0% 0.0% 0.0% 0.0% 0.0% $3 $8 $3 $3 $3 $0 $1 $0 $0 $0 $3 $9 $3 $3 $3 2013Q2 2013Q2 2013Q2 2013Q2 2014Q2 0.4% 0.4% 0.4% 0.4% 3.8% $3 $8 $3 $3 $3 $0 $1 $0 $0 $0 $3 $9 $3 $3 $3 1.0% 1.0% Planning During Construction Project Operations $3 $3 $0 $0 11.01% 11.01% $3 $3 0.0% 0.0% $3 $3 $0 $0 $3 $3 2014Q2 2013Q2 3.8% 0.4% $3 $3 $0 $0 $3 $3 5.5% CONSTRUCTION MANAGEMENT Construction Management $15 $2 11.01% $17 0.0% $15 $2 $17 2014Q2 3.8% $16 $2 $17 $4 $4 $0 $0 11.01% 11.01% $4 $4 0.0% 0.0% $4 $4 $0 $0 $4 $4 2014Q2 2014Q2 3.8% 3.8% $4 $4 $0 $0 $5 $5 $443 $49 $443 $49 $492 $451 $50 $500 31 1.5% 1.5% Project Operation: Project Management CONTRACT COST TOTALS: $492 Filename: Colorado River_TPCS.xlsx TPCS iii Printed:10/22/2012 Page 3 of 9 **** TOTAL PROJECT COST SUMMARY **** SEGMENT 17 **** CONTRACT COST SUMMARY **** Colorado River Ecosystem Restoration PROJECT: LOCATION: Mesa County, CO This Estimate reflects the scope and schedule in report; DISTRICT: POC: ESTIMATED COST Estimate Prepared: Effective Price Level: WBS 06 14 Civil Works Feature & Sub-Feature Description B SEGMENT 17 FISH & WILDLIFE FACILITIES RECREATION FACILITIES PROJECT FIRST COST Dollar Basis) (Constant Program Year (Budget EC): Effective Price Level Date: 2013 1 OCT 12 22-Oct-12 22-Oct-12 COST CNTG CNTG TOTAL ESC COST CNTG ($K) C ($K) D (%) E ($K) F (%) G ($K) H ($K) I LANDS AND DAMAGES 30 TOTAL ($K) J TOTAL PROJECT COST (FULLY FUNDED) Mid-Point Date P INFLATED (%) L COST ($K) M CNTG FULL ($K) N ($K) O $104 $11 11.01% $115 0.0% $104 $11 $115 2014Q2 2.0% $106 $12 $117 $18 $2 11.01% $20 0.0% $18 $2 $20 2014Q2 2.0% $19 $2 $21 $0 _________ _________ __________ $122 $13 $135 __________ __________ _________ __________ CONSTRUCTION ESTIMATE TOTALS: $122 $13 11.01% $135 01 10/22/2012 0 WBS Structure NUMBER A Sacramento PREPARED: CHIEF, COST ENGINEERING, xxx _________ _________ ____________ $124 $14 $138 $53 $6 11.01% $59 0.0% $53 $6 $59 2013Q4 1.2% $54 $6 $60 1.0% PLANNING, ENGINEERING & DESIGN Project Management $1 $0 11.01% $1 0.0% $1 $0 $1 2013Q2 0.4% $1 $0 $1 1.0% 3.0% 1.0% 1.0% 1.0% Planning & Environmental Compliance Engineering & Design Engineering Tech Review ITR & VE Contracting & Reprographics Engineering During Construction $1 $4 $1 $1 $1 $0 $0 $0 $0 $0 11.01% 11.01% 11.01% 11.01% 11.01% $1 $4 $1 $1 $1 0.0% 0.0% 0.0% 0.0% 0.0% $1 $4 $1 $1 $1 $0 $0 $0 $0 $0 $1 $4 $1 $1 $1 2013Q2 2013Q2 2013Q2 2013Q2 2014Q2 0.4% 0.4% 0.4% 0.4% 3.8% $1 $4 $1 $1 $1 $0 $0 $0 $0 $0 $1 $4 $1 $1 $1 1.0% 1.0% Planning During Construction Project Operations $1 $1 $0 $0 11.01% 11.01% $1 $1 0.0% 0.0% $1 $1 $0 $0 $1 $1 2014Q2 2013Q2 3.8% 0.4% $1 $1 $0 $0 $1 $1 5.5% CONSTRUCTION MANAGEMENT Construction Management 31 1.5% 1.5% Project Operation: Project Management CONTRACT COST TOTALS: $7 $1 11.01% $8 0.0% $7 $1 $8 2014Q2 3.8% $7 $1 $8 $2 $2 $0 $0 11.01% 11.01% $2 $2 0.0% 0.0% $2 $2 $0 $0 $2 $2 2014Q2 2014Q2 3.8% 3.8% $2 $2 $0 $0 $2 $2 $197 $22 $197 $22 $219 $201 $22 $223 $219 Filename: Colorado River_TPCS.xlsx TPCS iv Printed:10/22/2012 Page 4 of 9 **** TOTAL PROJECT COST SUMMARY **** SEGMENT 14 **** CONTRACT COST SUMMARY **** Colorado River Ecosystem Restoration PROJECT: LOCATION: Mesa County, CO This Estimate reflects the scope and schedule in report; DISTRICT: POC: ESTIMATED COST Estimate Prepared: Effective Price Level: WBS 06 14 Civil Works Feature & Sub-Feature Description B SEGMENT 14 FISH & WILDLIFE FACILITIES RECREATION FACILITIES PROJECT FIRST COST Dollar Basis) (Constant Program Year (Budget EC): Effective Price Level Date: 2013 1 OCT 12 22-Oct-12 22-Oct-12 COST CNTG CNTG TOTAL ESC COST CNTG ($K) C ($K) D (%) E ($K) F (%) G ($K) H ($K) I LANDS AND DAMAGES 30 TOTAL ($K) J TOTAL PROJECT COST (FULLY FUNDED) Mid-Point Date P INFLATED (%) L COST ($K) M CNTG FULL ($K) N ($K) O $200 $22 11.01% $222 0.0% $200 $22 $222 2015Q2 3.8% $208 $23 $231 $11 $1 11.01% $12 0.0% $11 $1 $12 2015Q2 3.8% $11 $1 $12 $0 _________ _________ __________ $211 $23 $234 __________ __________ _________ __________ CONSTRUCTION ESTIMATE TOTALS: $211 $23 11.01% $234 01 10/22/2012 0 WBS Structure NUMBER A Sacramento PREPARED: CHIEF, COST ENGINEERING, xxx _________ _________ ____________ $219 $24 $243 $60 $7 11.01% $67 0.0% $60 $7 $67 2013Q4 1.2% $61 $7 $67 1.0% PLANNING, ENGINEERING & DESIGN Project Management $2 $0 11.01% $2 0.0% $2 $0 $2 2013Q2 0.4% $2 $0 $2 1.0% 3.0% 1.0% 1.0% 1.0% Planning & Environmental Compliance Engineering & Design Engineering Tech Review ITR & VE Contracting & Reprographics Engineering During Construction $2 $6 $2 $2 $2 $0 $1 $0 $0 $0 11.01% 11.01% 11.01% 11.01% 11.01% $2 $7 $2 $2 $2 0.0% 0.0% 0.0% 0.0% 0.0% $2 $6 $2 $2 $2 $0 $1 $0 $0 $0 $2 $7 $2 $2 $2 2013Q2 2013Q2 2013Q2 2013Q2 2015Q2 0.4% 0.4% 0.4% 0.4% 7.9% $2 $6 $2 $2 $2 $0 $1 $0 $0 $0 $2 $7 $2 $2 $2 1.0% 1.0% Planning During Construction Project Operations $2 $2 $0 $0 11.01% 11.01% $2 $2 0.0% 0.0% $2 $2 $0 $0 $2 $2 2015Q2 2013Q2 7.9% 0.4% $2 $2 $0 $0 $2 $2 5.5% CONSTRUCTION MANAGEMENT Construction Management $12 $1 11.01% $13 0.0% $12 $1 $13 2015Q2 7.9% $13 $1 $14 $3 $3 $0 $0 11.01% 11.01% $3 $3 0.0% 0.0% $3 $3 $0 $0 $3 $3 2015Q2 2015Q2 7.9% 7.9% $3 $3 $0 $0 $4 $4 $309 $34 $309 $34 $343 $319 $35 $354 31 1.5% 1.5% Project Operation: Project Management CONTRACT COST TOTALS: $343 Filename: Colorado River_TPCS.xlsx TPCS v Printed:10/22/2012 Page 5 of 9 **** TOTAL PROJECT COST SUMMARY **** SEGMENT 13 **** CONTRACT COST SUMMARY **** PROJECT: Colorado River Ecosystem Restoration LOCATION: Mesa County, CO This Estimate reflects the scope and schedule in report; DISTRICT: POC: 06 14 Civil Works Feature & Sub-Feature Description B SEGMENT 13 FISH & WILDLIFE FACILITIES RECREATION FACILITIES PROJECT FIRST COST Dollar Basis) ESTIMATED COST Estimate Prepared: Effective Price Level: WBS 22-Oct-12 22-Oct-12 LANDS AND DAMAGES 30 (Constant TOTAL PROJECT COST (FULLY FUNDED) Program Year (Budget EC): 2013 Effective Price Level Date: 1 OCT 12 COST CNTG CNTG TOTAL ESC COST CNTG ($K) C ($K) D (%) E ($K) F (%) G ($K) H ($K) I TOTAL ($K) J FULLY FUNDED PROJECT ESTIMATE Mid-Point Date P INFLATED (%) L COST ($K) M CNTG FULL ($K) N ($K) O $96 $11 11.01% $107 0.0% $96 $11 $107 2015Q2 3.8% $100 $11 $111 $11 $1 11.01% $12 0.0% $11 $1 $12 2015Q2 3.8% $11 $1 $12 $0 _________ _________ __________ $107 $12 $119 __________ __________ _________ __________ CONSTRUCTION ESTIMATE TOTALS: $107 $12 11.01% $119 01 10/22/2012 0 WBS Structure NUMBER A Sacramento PREPARED: CHIEF, COST ENGINEERING, xxx _________ _________ ____________ $111 $12 $123 $41 $5 11.01% $46 0.0% $41 $5 $46 2013Q4 1.2% $42 $5 $46 1.0% PLANNING, ENGINEERING & DESIGN Project Management $1 $0 11.01% $1 0.0% $1 $0 $1 2013Q2 0.4% $1 $0 $1 1.0% 3.0% 1.0% 1.0% 1.0% Planning & Environmental Compliance Engineering & Design Engineering Tech Review ITR & VE Contracting & Reprographics Engineering During Construction $1 $3 $1 $1 $1 $0 $0 $0 $0 $0 11.01% 11.01% 11.01% 11.01% 11.01% $1 $3 $1 $1 $1 0.0% 0.0% 0.0% 0.0% 0.0% $1 $3 $1 $1 $1 $0 $0 $0 $0 $0 $1 $3 $1 $1 $1 2013Q2 2013Q2 2013Q2 2013Q2 2015Q2 0.4% 0.4% 0.4% 0.4% 7.9% $1 $3 $1 $1 $1 $0 $0 $0 $0 $0 $1 $3 $1 $1 $1 1.0% Planning During Construction $1 $0 11.01% $1 0.0% $1 $0 $1 2015Q2 7.9% $1 $0 $1 1.0% Project Operations $1 $0 11.01% $1 0.0% $1 $0 $1 2013Q2 0.4% $1 $0 $1 31 5.5% 1.5% 1.5% CONSTRUCTION MANAGEMENT Construction Management Project Operation: Project Management CONTRACT COST TOTALS: $6 $1 11.01% $7 0.0% $6 $1 $7 2015Q2 7.9% $6 $1 $7 $2 $2 $0 $0 11.01% 11.01% $2 $2 0.0% 0.0% $2 $2 $0 $0 $2 $2 2015Q2 2015Q2 7.9% 7.9% $2 $2 $0 $0 $2 $2 $168 $19 $168 $19 $187 $174 $19 $193 $187 Filename: Colorado River_TPCS.xlsx TPCS vi Printed:10/22/2012 Page 6 of 9 **** TOTAL PROJECT COST SUMMARY **** SEGMENT 12 **** CONTRACT COST SUMMARY **** PROJECT: Colorado River Ecosystem Restoration LOCATION: Mesa County, CO This Estimate reflects the scope and schedule in report; DISTRICT: POC: 06 14 Civil Works Feature & Sub-Feature Description B SEGMENT 12 FISH & WILDLIFE FACILITIES RECREATION FACILITIES PROJECT FIRST COST Dollar Basis) ESTIMATED COST Estimate Prepared: Effective Price Level: WBS 22-Oct-12 22-Oct-12 LANDS AND DAMAGES 30 (Constant TOTAL PROJECT COST (FULLY FUNDED) Program Year (Budget EC): 2013 Effective Price Level Date: 1 OCT 12 COST CNTG CNTG TOTAL ESC COST CNTG ($K) C ($K) D (%) E ($K) F (%) G ($K) H ($K) I TOTAL ($K) J FULLY FUNDED PROJECT ESTIMATE Mid-Point Date P INFLATED (%) L COST ($K) M CNTG FULL ($K) N ($K) O $259 $29 11.01% $288 0.0% $259 $29 $288 2015Q2 3.8% $269 $30 $299 $11 $1 11.01% $12 0.0% $11 $1 $12 2015Q2 3.8% $11 $1 $12 $0 _________ _________ __________ $270 $30 $300 __________ __________ _________ __________ CONSTRUCTION ESTIMATE TOTALS: $270 $30 11.01% $300 01 10/22/2012 0 WBS Structure NUMBER A Sacramento PREPARED: CHIEF, COST ENGINEERING, xxx _________ _________ ____________ $280 $31 $311 $83 $9 11.01% $93 0.0% $83 $9 $93 2013Q4 1.2% $85 $9 $94 1.0% PLANNING, ENGINEERING & DESIGN Project Management $3 $0 11.01% $3 0.0% $3 $0 $3 2013Q2 0.4% $3 $0 $3 1.0% 3.0% 1.0% 1.0% 1.0% Planning & Environmental Compliance Engineering & Design Engineering Tech Review ITR & VE Contracting & Reprographics Engineering During Construction $3 $8 $3 $3 $3 $0 $1 $0 $0 $0 11.01% 11.01% 11.01% 11.01% 11.01% $3 $9 $3 $3 $3 0.0% 0.0% 0.0% 0.0% 0.0% $3 $8 $3 $3 $3 $0 $1 $0 $0 $0 $3 $9 $3 $3 $3 2013Q2 2013Q2 2013Q2 2013Q2 2015Q2 0.4% 0.4% 0.4% 0.4% 7.9% $3 $8 $3 $3 $3 $0 $1 $0 $0 $0 $3 $9 $3 $3 $4 1.0% 1.0% Planning During Construction Project Operations $3 $3 $0 $0 11.01% 11.01% $3 $3 0.0% 0.0% $3 $3 $0 $0 $3 $3 2015Q2 2013Q2 7.9% 0.4% $3 $3 $0 $0 $4 $3 31 CONSTRUCTION MANAGEMENT 5.5% Construction Management 1.5% 1.5% Project Operation: Project Management CONTRACT COST TOTALS: $15 $2 11.01% $17 0.0% $15 $2 $17 2015Q2 7.9% $16 $2 $18 $4 $4 $0 $0 11.01% 11.01% $4 $4 0.0% 0.0% $4 $4 $0 $0 $4 $4 2015Q2 2015Q2 7.9% 7.9% $4 $4 $0 $0 $5 $5 $405 $45 $405 $45 $450 $419 $46 $465 $450 Filename: Colorado River_TPCS.xlsx TPCS vii Printed:10/22/2012 Page 7 of 9 **** TOTAL PROJECT COST SUMMARY **** SEGMENT 10 **** CONTRACT COST SUMMARY **** PROJECT: Colorado River Ecosystem Restoration LOCATION: Mesa County, CO This Estimate reflects the scope and schedule in report; DISTRICT: POC: 06 14 Civil Works Feature & Sub-Feature Description B SEGMENT 10 FISH & WILDLIFE FACILITIES RECREATION FACILITIES PROJECT FIRST COST Dollar Basis) ESTIMATED COST Estimate Prepared: Effective Price Level: WBS 22-Oct-12 22-Oct-12 LANDS AND DAMAGES 30 (Constant TOTAL PROJECT COST (FULLY FUNDED) Program Year (Budget EC): 2013 Effective Price Level Date: 1 OCT 12 COST CNTG CNTG TOTAL ESC COST CNTG ($K) C ($K) D (%) E ($K) F (%) G ($K) H ($K) I TOTAL ($K) J FULLY FUNDED PROJECT ESTIMATE Mid-Point Date P INFLATED (%) L COST ($K) M CNTG FULL ($K) N ($K) O $987 $109 11.01% $1,095 0.0% $987 $109 $1,095 2016Q2 5.7% $1,043 $115 $1,157 $11 $1 11.01% $12 0.0% $11 $1 $12 2016Q2 5.7% $11 $1 $13 $0 _________ _________ __________ $997 $110 $1,107 __________ __________ _________ __________ CONSTRUCTION ESTIMATE TOTALS: $997 $110 11.01% $1,107 01 10/22/2012 0 WBS Structure NUMBER A Sacramento PREPARED: CHIEF, COST ENGINEERING, xxx _________ _________ ____________ $1,054 $116 $1,170 $444 $49 11.01% $493 0.0% $444 $49 $493 2013Q4 1.2% $450 $49 $499 1.0% PLANNING, ENGINEERING & DESIGN Project Management $10 $1 11.01% $11 0.0% $10 $1 $11 2013Q2 0.4% $10 $1 $11 1.0% 3.0% 1.0% 1.0% 1.0% Planning & Environmental Compliance Engineering & Design Engineering Tech Review ITR & VE Contracting & Reprographics Engineering During Construction $10 $30 $10 $10 $10 $1 $3 $1 $1 $1 11.01% 11.01% 11.01% 11.01% 11.01% $11 $33 $11 $11 $11 0.0% 0.0% 0.0% 0.0% 0.0% $10 $30 $10 $10 $10 $1 $3 $1 $1 $1 $11 $33 $11 $11 $11 2013Q2 2013Q2 2013Q2 2013Q2 2016Q2 0.4% 0.4% 0.4% 0.4% 12.1% $10 $30 $10 $10 $11 $1 $3 $1 $1 $1 $11 $33 $11 $11 $12 1.0% 1.0% Planning During Construction Project Operations $10 $10 $0 $1 $1 11.01% 11.01% $11 $11 0.0% 0.0% $10 $10 $1 $1 $11 $11 2016Q2 2013Q2 12.1% 0.4% $11 $10 $1 $1 $12 $11 5.5% CONSTRUCTION MANAGEMENT Construction Management 31 1.5% 1.5% Project Operation: Project Management CONTRACT COST TOTALS: $55 $6 11.01% $61 0.0% $55 $6 $61 2016Q2 12.1% $62 $7 $68 $15 $15 $2 $2 11.01% 11.01% $17 $17 0.0% 0.0% $15 $15 $2 $2 $17 $17 2016Q2 2016Q2 12.1% 12.1% $17 $17 $2 $2 $19 $19 $1,627 $179 $1,627 $179 $1,806 $1,701 $187 $1,889 $1,806 Filename: Colorado River_TPCS.xlsx TPCS viii Printed:10/22/2012 Page 8 of 9 **** TOTAL PROJECT COST SUMMARY **** SEGMENT 9 **** CONTRACT COST SUMMARY **** PROJECT: Colorado River Ecosystem Restoration LOCATION: Mesa County, CO This Estimate reflects the scope and schedule in report; DISTRICT: POC: 06 14 Civil Works Feature & Sub-Feature Description B SEGMENT 9 FISH & WILDLIFE FACILITIES RECREATION FACILITIES PROJECT FIRST COST Dollar Basis) ESTIMATED COST Estimate Prepared: Effective Price Level: WBS 22-Oct-12 22-Oct-12 LANDS AND DAMAGES 30 (Constant TOTAL PROJECT COST (FULLY FUNDED) Program Year (Budget EC): 2013 Effective Price Level Date: 1 OCT 12 COST CNTG CNTG TOTAL ESC COST CNTG ($K) C ($K) D (%) E ($K) F (%) G ($K) H ($K) I TOTAL ($K) J FULLY FUNDED PROJECT ESTIMATE Mid-Point Date P $561 $62 11.01% $623 0.0% $561 $62 $623 $0 $0 11.01% $0 0.0% $0 $0 $0 INFLATED (%) L COST ($K) M CNTG FULL ($K) N ($K) O 2017Q2 7.6% $603 $66 $670 0 0.0% $0 $0 $0 $0 _________ _________ __________ $561 $62 $623 __________ __________ _________ __________ CONSTRUCTION ESTIMATE TOTALS: $561 $62 11.01% $623 01 10/22/2012 0 WBS Structure NUMBER A Sacramento PREPARED: CHIEF, COST ENGINEERING, xxx _________ _________ ____________ $603 $66 $670 $147 $16 11.01% $163 0.0% $147 $16 $163 2013Q4 1.2% $149 $16 $165 1.0% PLANNING, ENGINEERING & DESIGN Project Management $6 $1 11.01% $7 0.0% $6 $1 $7 2013Q2 0.4% $6 $1 $7 1.0% 3.0% 1.0% 1.0% 1.0% Planning & Environmental Compliance Engineering & Design Engineering Tech Review ITR & VE Contracting & Reprographics Engineering During Construction $6 $17 $6 $6 $6 $1 $2 $1 $1 $1 11.01% 11.01% 11.01% 11.01% 11.01% $7 $19 $7 $7 $7 0.0% 0.0% 0.0% 0.0% 0.0% $6 $17 $6 $6 $6 $1 $2 $1 $1 $1 $7 $19 $7 $7 $7 2013Q2 2013Q2 2013Q2 2013Q2 2017Q2 0.4% 0.4% 0.4% 0.4% 16.3% $6 $17 $6 $6 $7 $1 $2 $1 $1 $1 $7 $19 $7 $7 $8 1.0% 1.0% Planning During Construction Project Operations $6 $6 $1 $1 11.01% 11.01% $7 $7 0.0% 0.0% $6 $6 $1 $1 $7 $7 2017Q2 2013Q2 16.3% 0.4% $7 $6 $1 $1 $8 $7 31 CONSTRUCTION MANAGEMENT 5.5% Construction Management 1.5% 1.5% Project Operation: Project Management CONTRACT COST TOTALS: $31 $3 11.01% $34 0.0% $31 $3 $34 2017Q2 16.3% $36 $4 $40 $8 $8 $1 $1 11.01% 11.01% $9 $9 0.0% 0.0% $8 $8 $1 $1 $9 $9 2017Q2 2017Q2 16.3% 16.3% $9 $9 $1 $1 $10 $10 $814 $90 $814 $90 $904 $868 $96 $964 $904 Filename: Colorado River_TPCS.xlsx TPCS ix Printed:10/22/2012 Page 9 of 9 **** TOTAL PROJECT COST SUMMARY **** SEGMENT 8 **** CONTRACT COST SUMMARY **** PROJECT: Colorado River Ecosystem Restoration LOCATION: Mesa County, CO This Estimate reflects the scope and schedule in report; DISTRICT: POC: 06 14 Civil Works Feature & Sub-Feature Description B SEGMENT 8 FISH & WILDLIFE FACILITIES RECREATION FACILITIES PROJECT FIRST COST Dollar Basis) ESTIMATED COST Estimate Prepared: Effective Price Level: WBS 22-Oct-12 22-Oct-12 LANDS AND DAMAGES 30 (Constant COST CNTG CNTG TOTAL ESC COST CNTG ($K) C ($K) D (%) E ($K) F (%) G ($K) H ($K) I TOTAL ($K) J $47 11.01% $474 0.0% $427 $47 $474 $0 $0 11.01% $0 0.0% $0 $0 $0 $10 11.01% $ FULLY FUNDED PROJECT ESTIMATE Mid-Point Date P $427 $89 TOTAL PROJECT COST (FULLY FUNDED) Program Year (Budget EC): 2013 Effective Price Level Date: 1 OCT 12 INFLATED (%) L COST ($K) M CNTG FULL ($K) N ($K) O 2017Q2 7.6% $459 $51 $510 0 0.0% $0 $0 $0 $0 _________ _________ __________ $427 $47 $474 __________ __________ _________ __________ CONSTRUCTION ESTIMATE TOTALS: $427 $47 11.01% 474 01 10/22/2012 0 WBS Structure NUMBER A Sacramento PREPARED: CHIEF, COST ENGINEERING, xxx _________ _________ ____________ $459 $51 $510 98 0.0% $89 $10 $98 2013Q4 1.2% $90 $10 $99 1.0% PLANNING, ENGINEERING & DESIGN Project Management $4 $0 11.01% 4 0.0% $4 $0 $4 2013Q2 0.4% $4 $0 $4 1.0% 3.0% 1.0% 1.0% 1.0% Planning & Environmental Compliance Engineering & Design Engineering Tech Review ITR & VE Contracting & Reprographics Engineering During Construction $4 $13 $4 $4 $4 $0 $1 $0 $0 $0 11.01% 11.01% 11.01% 11.01% 11.01% 4 14 4 4 4 0.0% 0.0% 0.0% 0.0% 0.0% $4 $13 $4 $4 $4 $0 $1 $0 $0 $0 $4 $14 $4 $4 $4 2013Q2 2013Q2 2013Q2 2013Q2 2017Q2 0.4% 0.4% 0.4% 0.4% 16.3% $4 $13 $4 $4 $5 $0 $1 $0 $0 $1 $4 $14 $4 $4 $5 1.0% 1.0% Planning During Construction Project Operations $4 $4 $0 $0 11.01% 11.01% 4 4 0.0% 0.0% $4 $4 $0 $0 $4 $4 2017Q2 2013Q2 16.3% 0.4% $5 $4 $1 $0 $5 $4 31 CONSTRUCTION MANAGEMENT 5.5% Construction Management 1.5% 1.5% Project Operation: Project Management CONTRACT COST TOTALS: $23 $3 11.01% 26 0.0% $23 $3 $26 2017Q2 16.3% $27 $3 $30 $6 $6 $1 $1 11.01% 11.01% 7 7 0.0% 0.0% $6 $6 $1 $1 $7 $7 2017Q2 2017Q2 16.3% 16.3% $7 $7 $1 $1 $8 $8 $592 $65 $592 $65 $657 $632 $70 $702 657 Filename: Colorado River_TPCS.xlsx TPCS x Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report COLORADO ECOSYTEM RESTORATION COST ESTIMATE NARRATIVE 1. Project Description A. General: The scope of this work is to restore several sites located over a 33-mile reach of the Colorado River. These sites are located between the Loma boat launch in Fruita, Colorado and the Riverbend Park in the Town of Palisade. Each of the restoration sites have been selected based on an infestation of invasive species. The proposed construction activities have been designed to restore wetland and riparian habitat, restore habitat for fish species, and to restore terrestrial habitat in the upper floodplain. B. Purpose: The purpose of this work is to develop a detailed cost estimate – consistent to the feasibility level of design – for the cost and quantities of the project features in accordance with U.S. Army Corps of Engineers, Construction Cost Estimating Guide For Civil Works, Engineering Technical Letter 1110-2-573. C. Design Features: Features include clearing; herbicide spraying; tree and shrub planting; excavation; fine grading; gravel placement; wildlife signs; and park benches. 2. Basis of Estimate A. Basis of Design: The project’s design documents are listed below. The project site plan is presented in Attachment A. Colorado River Section 206, Aquatic Ecosystem Restoration, Appendix B, Project Draft Report B. Basis of Quantities: The cost estimate is based on project quantity take-offs that have been calculated in accordance with the documents listed above. Quantities were primarily developed within ArcGIS, by utilizing shapefiles that outlined specific areas within the project boundary. The earthwork quantities were developed in AutoCAD and were based on proposed and existing contours. Quantities for each segment of the project site can be found in Attachment B. 3. Acquisition Plan The cost estimate is based on a single contract being awarded to a prime contractor. The prime contractors would be responsible for the preparatory work, and completion of all associated site work. 4. Construction Schedule It is estimated that overall construction would take approximately five years to complete. This duration has been used in the estimate to determine costs for the contractor to provide construction supervision. A simplified tentative project schedule is presented in Attachment C, and general assumptions are listed below. Assumes construction start date of September 2013. 1 October 2012 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report 5. Project Construction A. Mobilization/Demobilization: Mobilization costs account for the transportation of all construction equipment and personnel to the project site. All equipment and labor is assumed to be available in the Grand Junction, CO area. B. Staging and Site Access: Only one segment would require a staging area. Segment 10 would require the creation of a small staging area for storing of excavated materials for transport. C. Borrow/Disposal Areas and Materials: Borrow stone materials for the recreation features are available nearby in the Grand Junction, CO area and would be trucked to the project site. Any excess earthen material is assumed to be disposed of on site or disposed of at the adjacent property to Segment 10, which is operated by United Granite. This material would not require any disposal fees. It is assumed that this disposal location would be available within 10-miles of the project site. D. Construction Methodology: A total of eight segments along the river have been selected out of the fifteen total segments originally proposed. The following are the segments estimated in this work: o Segment 8: OBY Property o Segment 9: Dupont Island Complex o Segment 10: Walter Walker State Wildlife Area o Segment 12: Bananas Island o Segment 13: Broadway Bridge South Bank Island o Segment 14: Confluence Island and Jarvis o Segment 17: Orchard Mesa and Colorado River Wildlife Areas o Segment 19: Tillie Bishop Wildlife Area Each of these segments would require restoration and resprout control. The construction activities for the restoration process are discussed below: o Mechanical Control: This work would involve the use of heavy equipment to remove dense areas of invasive species. A crew of laborers with backpack sprayers would also utilize Habitat Herbacide to spray the area after equipment removes the brush. o Hand Control: This work would involve the use of laborers with chainsaws to cut down the invasive species. Soon after a crew with backpack sprayers would use Garlon 4 Herbacide on the stumps of the invasive species to prevent regrowth. o Bio Control: This work would include the use of the tamarisk beetle, which would feed on the foliage of the tamarisk plants. The cost estimate includes time for laborers to release and/or monitor the beetles 2 October 2012 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report population. The beetles are assumed to be free of charge, as they would be raised for this purpose. o Biomass Reduction by Fire: This work would require the incineration of debris generated from the removal of the invasive species. This would require heavy equipment to stockpile material and create a safe area for burning. o Secondary Weed Control: This work would involve a crew with backpack sprayers using Milestone Herbacide to spray recommended areas for weed control. o Grass Seeding – Broadcasting: Areas would be required to be reseeded after the invasive species are removed. It has been assumed that an allterrain vehicle (ATV) would be used, and would be dispersed by hand or by a trailing spreader. o Shrubs and Trees: Native plants would also be placed after the invasive species are removed. Shrubs and plants would be grown in preparation for this project, and costs for this growth and transportation to the sites is included. o TRO Resprout Control: To prevent the invasive species from growing back resprout control would be necessary. It is assumed that 20% of the work done in the original site restoration would be required during the resprout control phase. The estimate includes 20% of the original quantities at each site to capture these costs. Five of the segments would also have wildlife viewing areas installed. The wildlife viewing areas would require clearing and grading first. A layer of gravel would be placed over the entire footprint. Lastly a bench and wildlife sign would be installed. The following segments would have wildlife viewing areas installed: o Segment 10 o Segment 12 o Segment 13 o Segment 14 o Segment 17 (two viewing areas) E. Unusual Conditions: (Soil, Water, Weather, Traffic). Near water work, but no unusual conditions for workers in this area. F. Unique Construction Techniques: No specialty equipment is assumed to be required. G. Equipment/Labor Availability and Distance Traveled: All equipment and labor is assumed to be available in the Grand Junction, Co area. 6. Effective Dates for Labor, Equipment and Material Pricing The labor, equipment, and material pricing were developed using the MCACES 2010 English Unit Cost Library, 2012 Labor Library for Mesa County (library has been updated with current 3 October 2012 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report Davis Bacon Wage Rates, which are provided in Attachment D), and the 2009 Equipment Library (Region V) for the base cost estimates. The index pricing data has been prepared in October 2012 dollars. The cost estimate has been updated with current quoted fuel prices of $3.79/gal for off-road diesel, $4.19/gal for on-road diesel and $3.74/gal for gasoline in the Grand Junction area. 7. Estimated Production Rates The estimate contains user created cost items that were developed outside of the MCACES Unit Cost Library. These developed cost items have had crews and production rates created in order to accurately calculate unit costs. See Attachment E for the Estimated Production Rate Calculations for these construction items. 8. Direct and Contractor Markups A. Direct Markups: A 7.65% sales tax has been included in the estimate on all material costs. B. Contractor Markups: The prime contractor Job Office Overhead (JOOH) markup is a calculated running percentage within MCACES. The JOOH calculation is based on the estimated duration for all construction components. A 10% running percentage has been used in the estimate for the prime contractor Home Office Overhead (HOOH) markup. Profit is included for the prime contractor and is calculated using the profit weighted guidelines calculation within MCACES. The bond value is calculated based on the duration of construction as well. 9. Project Markups A. Escalation: Price levels have been escalated from effective price levels of the construction cost estimate for October 2012 (1Q13) to the mid-point of construction for each segment. The appropriate escalation cost factors for each date for each feature account have been calculated within the Total Project Cost Summary spreadsheet. B. Contingency: An 11.01% contingency has been included in the estimate for all Feature Accounts and contracts. An abbreviated Cost and Schedule Risk Analysis (CSRA) has been performed to calculate the contingency listed above. The abbreviated CSRA is presented in Attachment G. 10. Functional Costs Functional costs associated with this work were estimated as follows: A. 01 Account – Lands and Damages: Some easements and right-of-way locations would need to be purchased for construction. These costs are found in the TPCS for each segment. B. 02 Account – Relocations: No costs for relocations are included in the estimate, as none are anticipated to be required for the work in this project. C. 30 Account – Planning, Engineering, and Design: Costs for this account were estimated at 10.0% of the construction costs. This account covers the preparation of plans and specifications. 4 October 2012 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report D. 31 Account – Construction Management: Costs for this account were estimated to be 8.5% of the construction costs. This account covers construction management during construction. 11. MCACES Construction Cost Estimate The construction cost estimate was developed using MCACES 2nd Generation (MII) cost estimating software in accordance with guidance contained in ER 1110-2-1302, Civil Works Cost Engineering. See Attachment H for the MCACES construction cost estimate summary output report. 12. Total Project Cost Summary (TPCS) The TPCS was prepared using the latest TPCS excel spreadsheet provided by the USACE, Walla Walla District. The TPCS incorporates the construction costs developed in the MII, the project markups, and the functional costs. The TPCS contains pages for each of the eight segments plus the total project costs, but all segments are assumed to fall under one contract. 13. References U.S. Army Corps of Engineers, 1993, Engineering and Design Cost Engineering Policy and General Requirements, Engineering Regulation 1110-1-1300, Department of the Army, Washington D.C., 26 March 1993. U.S. Army Corps of Engineers, 1999, Engineering and Design for Civil Works Projects, Engineering Regulation 1110-2-1150, Department of the Army, Washington D.C., 31 August 1999. U.S. Army Corps of Engineers, 2008a, Civil Works Cost Engineering, Engineering Regulation 1110-2-1302, Department of the Army, Washington D.C., 15 September 2008. U.S. Army Corps of Engineers, 2008b, Construction Cost Estimating Guide For Civil Works, Engineering Technical Letter 1110-2-573, Department of the Army, Washington D.C., 30 September 2008. U.S. Army Corps of Engineers, 2009, Civil Works Construction Cost Index System, Engineering Manual 1110-2-1304, Department of the Army, Washington D.C., 31 March 2009. 5 October 2012 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report ATTACHMENT A Site Plan October 2012 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report Site Plan October 2012 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report ATTACHMENT B Project Quantities October 2012 Colorado River Ecosystem Restoration Work Breakdown Structure Quantities MCACES Source Tag [19] [19 06] [19 06 00] [19 06 01] [19 06 01 01] [19 06 01 01 01] [19 06 01 01 02] [19 06 01 01 03] [19 06 01 01 04] [19 06 01 01 05] [19 06 01 01 06] [19 06 01 01 07] [19 06 01 02] [19 06 01 02 01] [19 06 01 02 02] [19 06 01 02 03] [19 06 01 02 04] [19 06 01 02 05] [19 06 01 02 06] [19 06 01 02 07] [17] [17 06] [17 06 00] [17 06 01] [17 06 01 01] [17 06 01 01 02] [17 06 01 01 03] [17 06 01 01 04] [17 06 01 01 05] [17 06 01 01 06] [17 06 01 02] [17 06 01 02 02] [17 06 01 02 03] Waste/Loss Factor (%) - Item Description SEGMENT 19 Fish and Wildlife Facilities Mobilization / Demobilization Segement 8 Site Restoration Site Restoration Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material TRO Resprout Control Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material SEGMENT 17 Fish and Wildlife Facilities Mobilization / Demobilization Segement 8 Site Restoration Site Restoration Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting TRO Resprout Control Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control B1 Unit of Measure LS LS LS LS LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS LS LS LS LS ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE LS ACRE ACRE ACRE GAL ACRE ACRE Quantity 1 1 1 1 1 28.0 28.0 28.0 14.0 1.4 6.2 6.2 6.2 9.9 18.3 18.3 1.6 1.6 25.8 25.8 1.4 25.8 85.6 85.6 6,358 5,616 742 6,358 742 1 5.6 5.6 5.6 2.8 0.3 1.2 1.2 1.2 2.0 3.7 3.7 0.3 0.3 5.2 5.2 0.3 5.2 17.1 17.1 1,272 1,123 148 1,272 148 1 1 1 1 1 11.2 11.2 11.2 17.9 20.7 20.7 6.0 6.0 7.9 7.9 0.4 7.9 39.4 39.4 1 2.2 2.2 2.2 3.6 4.1 4.1 Colorado River Ecosystem Restoration Work Breakdown Structure Quantities MCACES Source Tag [17 06 01 02 04] [17 06 01 02 05] [17 06 01 02 06] [17 14] [17 14 00] [17 14 01] [14] [14 06] [14 06 00] [14 06 01] [14 06 01 01] [14 06 01 01 01] [14 06 01 01 02] [14 06 01 01 03] [14 06 01 01 04] [14 06 01 01 05] [14 06 01 01 06] [14 06 01 01 07] [14 06 01 02] [14 06 01 02 01] [14 06 01 02 02] [14 06 01 02 03] [14 06 01 02 04] [14 06 01 02 05] [14 06 01 02 06] [14 06 01 02 07] [14 14] [14 14 00] [14 14 01] Waste/Loss Factor (%) - Item Description Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Recreation Facilities Mobilization / Demobilization Segment 10 - Walter Walker Wildlife Area Site Clearing Fine Grading Base Course Wildlife Sign Park Bench, Material Park Bench, Concrete Foundation SEGMENT 14 Fish and Wildlife Facilities Mobilization / Demobilization Segement 8 Site Restoration Site Restoration Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material TRO Resprout Control Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material Recreation Facilities Mobilization / Demobilization Segment 10 - Walter Walker Wildlife Area Site Clearing Fine Grading Base Course Wildlife Sign Park Bench, Material Park Bench, Concrete Foundation B2 Unit of Measure ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE LS LS EA SF SF CY EA EA EA LS LS LS LS LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS LS EA SF SF CY EA EA EA Quantity 1.2 1.2 1.6 1.6 0.1 1.6 7.9 7.9 1 1 2 640 640 10 2 2 2 1 1 1 1 1 15.5 15.5 15.5 7.8 0.8 5.6 5.6 5.6 9.0 18.1 18.1 2.9 2.9 15.9 15.9 0.9 15.9 60.0 60.0 4,508 4,181 327 4,508 327 1 3.1 3.1 3.1 1.6 0.2 1.1 1.1 1.1 1.8 3.6 3.6 0.6 0.6 3.2 3.2 0.2 3.2 12.0 12.0 902 836 65 902 65 1 1 1 320 320 5 1 1 1 Colorado River Ecosystem Restoration Work Breakdown Structure Quantities MCACES Source Tag [13] [13 06] [13 06 00] [13 06 01] [13 06 01 01] [13 06 01 01 01] [13 06 01 01 02] [13 06 01 01 03] [13 06 01 01 04] [13 06 01 01 05] [13 06 01 01 06] [13 06 01 01 07] [13 06 01 02] [13 06 01 02 01] [13 06 01 02 02] [13 06 01 02 03] [13 06 01 02 04] [13 06 01 02 05] [13 06 01 02 06] [13 06 01 02 07] [13 14] [13 14 00] [13 14 01] [12] [12 06] [12 06 00] [12 06 01] [12 06 01 01] [12 06 01 01 01] [12 06 01 01 02] [12 06 01 01 03] [12 06 01 01 04] Waste/Loss Factor (%) - Item Description SEGMENT 13 Fish and Wildlife Facilities Mobilization / Demobilization Segement 8 Site Restoration Site Restoration Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material TRO Resprout Control Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material Recreation Facilities Mobilization / Demobilization Segment 10 - Walter Walker Wildlife Area Site Clearing Fine Grading Base Course Wildlife Sign Park Bench, Material Park Bench, Concrete Foundation SEGMENT 12 Fish and Wildlife Facilities Mobilization / Demobilization Segement 8 Site Restoration Site Restoration Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction B3 Unit of Measure LS LS LS LS LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS LS EA SF SF CY EA EA EA LS LS LS LS LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE Quantity 1 1 1 1 1 0.8 0.8 0.8 0.4 0.0 8.6 8.6 8.6 13.8 12.9 12.9 3.8 3.8 8.5 8.5 0.5 8.5 41.2 41.2 259 208 51 259 51 1 0.2 0.2 0.2 0.1 0.01 1.7 1.7 1.7 2.8 2.6 2.6 0.8 0.8 1.7 1.7 0.1 1.7 8.2 8.2 52 42 10 52 10 1 1 1 320 320 5 1 1 1 1 1 1 1 1 20.0 20.0 20.0 10.0 1.0 3.7 3.7 3.7 5.9 33.4 33.4 1.9 Colorado River Ecosystem Restoration Work Breakdown Structure Quantities MCACES Source Tag [12 06 01 01 05] [12 06 01 01 06] [12 06 01 01 07] [12 06 01 02] [12 06 01 02 01] [12 06 01 02 02] [12 06 01 02 03] [12 06 01 02 04] [12 06 01 02 05] [12 06 01 02 06] [12 06 01 02 07] [12 14] [12 14 00] [12 14 01] [10] [10 06] [10 06 00] [10 06 01] [10 06 01 01] [10 06 01 01 01] [10 06 01 01 02] [10 06 01 01 03] [10 06 01 01 04] [10 06 01 01 05] [10 06 01 01 06] [10 06 01 01 07] [10 06 01 02] [10 06 01 02 01] Waste/Loss Factor (%) - Item Description Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material TRO Resprout Control Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material Recreation Facilities Mobilization / Demobilization Segment 10 - Walter Walker Wildlife Area Site Clearing Fine Grading Base Course Wildlife Sign Park Bench, Material Park Bench, Concrete Foundation SEGMENT 10 Fish and Wildlife Facilities Mobilization / Demobilization Segement 8 Site Restoration Site Restoration Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material TRO Resprout Control Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide B4 Unit of Measure ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS LS EA SF SF CY EA EA EA LS LS LS LS LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS ACRE ACRE ACRE GAL Quantity 1.9 20.5 20.5 1.1 20.5 69.8 69.8 7,234 6,853 381 7,234 381 1 4.0 4.0 4.0 2.0 0.2 0.7 0.7 0.7 1.2 6.7 6.7 0.4 0.4 4.1 4.1 0.2 4.1 14.0 14.0 1,447 1,371 76 1,447 76 1 1 1 320 320 5 1 1 1 1 1 1 1 1 30.8 30.8 30.8 15.4 1.5 33.7 33.7 33.7 53.9 141.4 141.4 13.2 13.2 115.5 115.5 6.4 115.5 345.6 345.6 11,473 9,616 1,857 11,473 1,857 1 6.2 6.2 6.2 3.1 Colorado River Ecosystem Restoration Work Breakdown Structure Quantities MCACES Source Tag [10 06 01 02 02] [10 06 01 02 03] [10 06 01 02 04] [10 06 01 02 05] [10 06 01 02 06] [10 06 01 02 07] [10 06 01 03] [10 06 01 03 01] [10 06 01 04] [10 06 01 04 01] [10 06 01 04 02] [10 06 01 04 03] [10 14] [10 14 00] [10 14 01] [09] [09 06] [09 06 00] [09 06 01] [09 06 01 01] [09 06 01 01 01] [09 06 01 01 02] [09 06 01 01 03] [09 06 01 01 04] [09 06 01 01 05] [09 06 01 01 06] [09 06 01 01 07] [09 06 01 02] [09 06 01 02 01] [09 06 01 02 02] Waste/Loss Factor (%) 15% 15% - Item Description Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material Backwater Excavation Excavate Pond Pond Excavation Earth Material Load and Haul Berm and Levee Deconstruction Clearing and Grubbing Clearing and Grubbing Excavate Berm and Levee Pond Excavation Earth Material Load and Haul Fine Grade and Reseed Fine Grading Grass Seeding Broadcasting Recreation Facilities Mobilization / Demobilization Segment 10 - Walter Walker Wildlife Area Site Clearing Fine Grading Base Course Wildlife Sign Park Bench, Material Park Bench, Concrete Foundation SEGMENT 9 Fish and Wildlife Facilities Mobilization / Demobilization Segement 8 Site Restoration Site Restoration Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material TRO Resprout Control Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying B5 Unit of Measure KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS CY CY LCY LS ACRE ACRE CY CY LCY ACRE SF ACRE LS LS EA SF SF CY EA EA EA LS LS LS LS LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE Quantity 0.3 6.7 6.7 6.7 10.8 28.3 28.3 2.6 2.6 23.1 23.1 1.3 23.1 69.1 69.1 2,295 1,923 371 2,295 371 1 3,800 3,800 4,370 1 2.4 2.4 5,500 5,500 6,325 2.4 104,544 2.4 1 1 1 320 320 5 1 1 1 1 1 1 1 1 21.6 21.6 21.6 10.8 1.1 42.8 42.8 42.8 68.5 54.8 54.8 22.5 22.5 77.4 77.4 4.3 77.4 211.0 211.0 5,713 5,151 562 5,713 562 1 4.3 4.3 4.3 2.2 0.2 8.6 8.6 8.6 Colorado River Ecosystem Restoration Work Breakdown Structure Quantities MCACES Source Tag [09 06 01 02 03] [09 06 01 02 04] [09 06 01 02 05] [09 06 01 02 06] [09 06 01 02 07] [08] [08 06] [08 06 00] [08 06 01] [08 06 01 01] [08 06 01 01 01] [08 06 01 01 02] [08 06 01 01 03] [08 06 01 01 04] [08 06 01 01 05] [08 06 01 01 06] [08 06 01 01 07] [08 06 01 02] [08 06 01 02 01] [08 06 01 02 02] [08 06 01 02 03] [08 06 01 02 04] [08 06 01 02 05] [08 06 01 02 06] [08 06 01 02 07] Waste/Loss Factor (%) - Item Description Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material SEGMENT 8 Fish and Wildlife Facilities Mobilization / Demobilization Segement 8 Site Restoration Site Restoration Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material TRO Resprout Control Mechanical Control Excavator with Mulching Head Backpack Spraying Habitat Herbacide Water for Herbacide Hand Control Clearing with Chainsaws Backpack Spraying Garlon 4 Herbacide Bio Control Bio Control Biomass Reduction Incinerate Material Secondary Weed Control Weed Sprarying Milestone Herbacide Dye and Surfactant, Material Grass Seeding Broadcasting Grass Seeding Broadcasting Shrubs and Trees Shrub, Planting Tree, Planting Shrub and Tree, Material Plant Guard, Material B6 Unit of Measure GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS LS LS LS LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA LS ACRE ACRE ACRE GAL KG ACRE ACRE ACRE GAL ACRE ACRE ACRE ACRE ACRE ACRE GAL ACRE ACRE ACRE EA EA EA EA EA Quantity 13.7 11.0 11.0 4.5 4.5 15.5 15.5 0.9 15.5 42.2 42.2 1,143 1,030 112 1,143 112 1 1 1 1 1 31.6 31.6 31.6 15.8 1.6 8.8 8.8 8.8 14.1 41.0 41.0 3.0 3.0 61.5 61.5 3.4 61.5 120.3 120.3 10,993 9,912 1,081 10,993 1,081 1 6.3 6.3 6.3 3.2 0.3 1.8 1.8 1.8 2.8 8.2 8.2 0.6 0.6 12.3 12.3 0.7 12.3 24.1 24.1 2,199 1,982 216 2,199 216 PROJECT: Colorado River Ecosystem Restoration DETAIL: Quantity Summary by Site COMPUTED BY: SKV CHECKED BY: PROJECT NO: T24957 DATE: 9/29/2012 QUANTITY SUMMARY Item Mechanical Control Hand Control Bio Control Biomass Reduction Secondary Weed Control Grass Seeding Broadcasting Shrubs and Trees TRO Resprout Control Wildlife Viewing Area UOM ACRE ACRE ACRE ACRE ACRE ACRE EA LS EA Segment Segment Segment Segment Segment Segment Segment Segment 8 31.6 8.8 41.0 3.0 61.5 120.3 10,993 20% - 9 21.6 42.8 54.8 22.5 77.4 211.0 5,713 20% - 10 30.8 33.7 141.4 13.2 115.5 345.6 11,473 20% 1 12 20.0 3.7 33.4 1.9 20.5 69.8 7,234 20% 1 13 0.8 8.6 12.9 3.8 8.5 41.2 259 20% 1 14 15.5 5.6 18.1 2.9 15.9 60.0 4,508 20% 1 17 11.2 20.7 6.0 7.9 39.4 20% 2 19 28.0 6.2 18.3 1.6 25.8 85.6 6,358 20% - B7 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report ATTACHMENT C Project Schedule October 2012 Mon 10/22/12 Colorado River Ecosystem Restoration Tentative Project Schedule ID Task Name Duration 1 Colorado River Ecosystem Restoration Start Finish 1559 days Mon 9/24/12 Tue 9/18/18 133 days Mon 9/24/12 Mon 4/1/13 2 Complete DPR and EA 3 Prepare Plans and Specifications 84 days Tue 4/2/13 Fri 7/26/13 4 Approve Plans and Specifications 35 days Mon 7/29/13 Fri 9/13/13 5 Acquire Easements 6 Establishment 35 days Mon 7/29/13 Fri 9/13/13 1307 days Mon 9/16/13 Tue 9/18/18 Mon 6/11/18 7 Development of Tree and Plant Material 1236 days Mon 9/16/13 8 Tamarisk and Russian Olive Removal 975 days Mon 9/16/13 Fri 6/9/17 Fri 6/13/14 9 Segment 19 195 days Mon 9/16/13 10 Segment 17 195 days Mon 9/16/13 Fri 6/13/14 11 Segment 14 195 days Thu 9/11/14 Wed 6/10/15 12 Segment 13 195 days Thu 9/11/14 Wed 6/10/15 13 Segment 12 195 days Thu 9/11/14 Wed 6/10/15 14 Segment 10 195 days Fri 9/11/15 Thu 6/9/16 15 Segment 9 195 days Mon 9/12/16 Fri 6/9/17 16 Segment 8 195 days Mon 9/12/16 Fri 6/9/17 17 Resprout Treatments 717 days Thu 9/11/14 Fri 6/9/17 18 Secondary Invasive Weed Treatments 978 days Thu 9/11/14 Mon 6/11/18 19 Native Grass Seeding 978 days Fri 12/12/14 Tue 9/11/18 20 Plant Trees and Shrubs 717 days Fri 9/11/15 Mon 6/11/18 21 Monitor and Maintenance 1307 days Mon 9/16/13 Tue 9/18/18 2013 2014 2015 2016 2017 2018 SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SON Task Progress Summary External Tasks Split Milestone Project Summary External MileTask C1 Split Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report ATTACHMENT D Local Market Labor Rates October 2012 Page 1 of 6 General Decision Number: CO120012 08/31/2012 CO12 Superseded General Decision Number: CO20100012 State: Colorado Construction Type: Heavy Counties: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld Counties in Colorado. HEAVY CONSTRUCTION PROJECTS Modification Number 0 1 2 3 4 5 6 7 8 9 Publication Date 01/06/2012 01/13/2012 01/27/2012 04/20/2012 06/01/2012 07/20/2012 07/27/2012 08/10/2012 08/17/2012 08/31/2012 ASBE0028-001 07/01/2010 Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 30.23 11.53 ---------------------------------------------------------------BRCO0007-004 01/01/2011 ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS AND JEFFERSON COUNTIES Rates Fringes BRICKLAYER.......................$ 22.13 9.89 ---------------------------------------------------------------BRCO0007-006 06/01/2011 EL PASO AND PUEBLO COUNTIES Rates Fringes BRICKLAYER.......................$ 21.97 9.88 ---------------------------------------------------------------ELEC0012-004 09/01/2011 PUEBLO COUNTY D1 http://www.wdol.gov/wdol/scafiles/davisbacon/CO12.dvb?v=9 9/20/2012 Page 2 of 6 Rates Fringes ELECTRICIAN Electrical work where the cost is $150,000 or less....$ 24.25 11.83 Electrical work where the cost is over $150,000.......$ 26.75 11.90 ---------------------------------------------------------------ELEC0068-001 06/01/2011 ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS, JEFFERSON, LARIMER, AND WELD COUNTIES Rates Fringes ELECTRICIAN......................$ 31.60 12.57 ---------------------------------------------------------------ELEC0111-001 09/01/2011 Rates Fringes Line Construction: Cable Splicer...............$ 28.65 13.75%+4.75 Equipment OperatorUnderground.................$ 25.06 12.75%+4.75 Groundman...................$ 21.93 9.55 Line Equipment Operator.....$ 26.77 10.55 Lineman and Welder..........$ 38.36 14.11 ---------------------------------------------------------------ELEC0113-002 06/01/2012 EL PASO COUNTY Rates Fringes ELECTRICIAN......................$ 29.05 14.47 ---------------------------------------------------------------ELEC0969-002 06/01/2010 MESA COUNTY Rates Fringes ELECTRICIAN......................$ 20.75 5.66 ---------------------------------------------------------------ENGI0009-001 06/25/2012 Rates Power equipment operators: Blade: Finish...............$ Blade: Rough................$ Bulldozer...................$ Cranes: 50 tons and under..$ Cranes: 51 to 90 tons......$ Cranes: 91 to 140 tons.....$ Cranes: 141 tons and over...$ Forklift....................$ Fringes 24.57 24.27 24.27 24.42 24.57 24.72 25.48 23.92 8.62 8.62 8.62 8.62 8.62 8.62 8.62 8.62 D2 http://www.wdol.gov/wdol/scafiles/davisbacon/CO12.dvb?v=9 9/20/2012 Page 3 of 6 Mechanic....................$ 24.42 8.62 Oiler.......................$ 23.57 8.62 Scraper: Single bowl under 40 cubic yards........$ 24.42 8.62 Scraper: Single bowl, including pups 40 cubic yards and over and tandem bowls.......................$ 24.57 8.62 Trackhoe....................$ 24.42 8.62 ---------------------------------------------------------------IRON0024-003 07/01/2011 Rates Fringes Ironworkers:.....................$ 23.80 18.07 Structural ---------------------------------------------------------------LABO0086-001 05/01/2009 Rates Fringes Laborers: Pipelayer...................$ 18.68 6.78 ---------------------------------------------------------------PLUM0003-005 07/01/2012 ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS, JEFFERSON, LARIMER AND WELD COUNTIES Rates Fringes PLUMBER..........................$ 33.43 11.44 ---------------------------------------------------------------PLUM0058-002 07/01/2012 EL PASO COUNTY Rates Fringes Plumbers and Pipefitters.........$ 32.55 12.95 ---------------------------------------------------------------PLUM0058-008 07/01/2012 PUEBLO COUNTY Rates Fringes Plumbers and Pipefitters.........$ 32.55 12.95 ---------------------------------------------------------------PLUM0145-002 07/01/2011 MESA COUNTY Rates Fringes Plumbers and Pipefitters.........$ 35.17 11.05 ---------------------------------------------------------------* PLUM0208-004 07/12/2012 D3 http://www.wdol.gov/wdol/scafiles/davisbacon/CO12.dvb?v=9 9/20/2012 Page 4 of 6 ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS, JEFFERSON, LARIMER AND WELD COUNTIES Rates Fringes PIPEFITTER.......................$ 30.10 11.52 ---------------------------------------------------------------SHEE0009-002 01/01/2011 Rates Fringes Sheet metal worker...............$ 31.66 10.98 ---------------------------------------------------------------SUCO2001-006 12/20/2001 Rates Fringes BOILERMAKER......................$ 17.60 Carpenters: Form Building and Setting...$ 16.97 All Other Work..............$ 15.14 2.74 3.37 Cement Mason/Concrete Finisher...$ 17.31 2.85 IRONWORKER, REINFORCING..........$ 18.83 3.90 Laborers: Common......................$ 11.22 Flagger.....................$ 8.91 Landscape...................$ 12.56 2.92 3.80 3.21 Painters: Brush, Roller & Spray.......$ 15.81 3.26 Power equipment operators: Backhoe.....................$ 16.36 2.48 Front End Loader............$ 17.24 3.23 Skid Loader.................$ 15.37 4.41 ---------------------------------------------------------------TEAM0455-002 07/01/2011 Rates Fringes Truck drivers: Pickup......................$ 18.41 3.87 Tandem/Semi and Water.......$ 19.04 3.87 ---------------------------------------------------------------WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). D4 http://www.wdol.gov/wdol/scafiles/davisbacon/CO12.dvb?v=9 9/20/2012 Page 5 of 6 ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * * * an existing published wage determination a survey underlying a wage determination a Wage and Hour Division letter setting forth a position on a wage determination matter D5 http://www.wdol.gov/wdol/scafiles/davisbacon/CO12.dvb?v=9 9/20/2012 Page 6 of 6 * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION D6 http://www.wdol.gov/wdol/scafiles/davisbacon/CO12.dvb?v=9 9/20/2012 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report ATTACHMENT E Estimated Production Rates October 2012 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Mechanical Control Items SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 1 CSI TASK: EXCAVATOR WITH MULCHING HEAD CREW: Mulching Excavator Crew 1 Eq. Operator, Med. 1 Hydraul. Excavator 1 Rotary Cutter 1 crew members 5.00 hrs/acre OVERALL PRODUCTION RATE 0.2 acres/hr CSI TASK: BACKPACK SPRAYING CREW: Backpack Spraying Crew 2 Laborers 2 crew members 5.00 hrs/acre OVERALL PRODUCTION RATE 0.2 acres/hr E1 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Hand Control Items SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 1 CSI TASK: CLEARING W/ CHAINSAWS CREW: Mulching Excavator Crew 6 Laborers 6 crew members 16.00 hrs/acre OVERALL PRODUCTION RATE 0.0625 acres/hr CSI TASK: BACKPACK SPRAYING CREW: Backpack Spraying Crew 2 Laborers 2 crew members 5.00 hrs/acre OVERALL PRODUCTION RATE 0.2 acres/hr E2 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Bio Control Items SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 1 CSI TASK: BIO CONTROL CREW: Bio Control Crew 6 Laborers 6 crew members 2.00 hrs/acre OVERALL PRODUCTION RATE 0.5 acres/hr E3 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Biomass Reduction Items SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 1 CSI TASK: BIOMASS REDUCTION, INCINERATING CREW: 2 2 1 1 1 Incinerator Crew Laborers Equip. Oper. Med. Dozer Rotary Cutter Hydraul. Excavator Stockpile & Prep Area: Incinerate: 1.00 hrs/acre 3.00 hrs/acre 4 crew members OVERALL PRODUCTION RATE 0.25 acres/hr E4 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Secondary Weed Control Items SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 1 CSI TASK: WEED SPRAYER CREW: Backpack Spraying Crew 1 Laborers 1 crew members 10.00 hrs/acre OVERALL PRODUCTION RATE 0.1 acres/hr E5 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Broadcast Seeding Items SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 1 CSI TASK: GRASS SEEDING BROADCASTING CREW: Grass Seeding Crew 1 Eq. Operator, Light 1 ATV 1 crew members 10.00 hrs/acre OVERALL PRODUCTION RATE 0.1 acres/hr E6 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Shrub and Tree Plantings SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 1 CSI TASK: SHRUB PLANTING CREW: Shrub and Tree Crews 2 Laborers 1 Pick-Up Truck 2 crew members 6.00 min/ea OVERALL PRODUCTION RATE 10.0 ea/hr CSI TASK: TREE PLANTING CREW: Shrub and Tree Crews 2 Laborers 1 Pick-Up Truck Plant Tree: Place Guard: 2 crew members 10.00 min/ea 2.00 min/ea OVERALL PRODUCTION RATE 5.0 ea/hr E7 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Excavation SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 2 CSI TASK: POND EXCAVATION [Clamshell excavator, 1-cy Bucket] CREW: 1 1 1 1 Clamshell Excavation Crew [1-cy bucket] Foreman Equip. Oper. Med. Oiler Hydraul. Excavator, 1.5-cy Bucket 3 crew members PRODUCTION 1 0.85 50 0.90 cy bucket % fill min/hr cycle/min 38 cy/crew hr BERM EXCAVATION [Hydraul. Excavator, 1.5-cy Bucket] CREW: 1 1 1 1 Hydraulic Excavation Crew [1.5-cy bucket] Foreman Equip. Oper. Med. Oiler Hydraul. Excavator, 1.5-cy Bucket 3 crew members PRODUCTION 1.5 0.85 50 1.10 cy bucket % fill min/hr cycle/min 70 cy/crew hr E8 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Loading and Hauling of Excavated Material SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 2 CSI TASK: EARTH MATERIAL LOAD AND HAUL [3-cy Loader, 12-cy Dump Truck, 10 Mile Haul, 35-mph Avg.] CREW NAME: 1 1 6 1 6 Excavate, Load and Haul Crew Eq. Oper. Heavy Oilers Truck Driver, Heavy Front End Loader, 3-cy Bucket 12-cy Dump Trucks OVERALL PRODUCTION RATE 8 crew members 115 cy/crew hr LOADING SUB-CREW: Loading Crew 1 Equip. Oper. Heavy 1 Oiler 1 Front End Loader, 3-cy Bucket 2 crew members PRODUCTION 3 0.85 45 1.00 cy bucket % fill min/hr cycle/min 115 cy/crew hr 115 cy/crew hr 1.00 crews/equipment members to match overall production rate 1.00 total number of crews needed E9 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Loading and Hauling of Excavated Material SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 2 of 2 HAUL TO DISPOSAL SITE SUB-CREW: Truck Haul Crew 1 Truck Driver, Heavy 1 12-cy Dump Truck 1 crew members PRODUCTION 12 0.90 6.3 10 35 3.1 55 cy truck % fill min. for loading mi. to disposal location mph haul speed min. dump time min/hr QUANTITY PER TRUCK 10.8 cy/truck DURATION OF HAULING 0.79 hr 13.6 cy/hr 6.00 Number of truck crews required to have little or no back up on route E10 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Grading Items SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 1 CSI TASK: FINE GRADING CREW: Fine Grading Crew 1 Eq. Operator, Med. 1 Laborer 1 Articulated Grader 1 crew members 40.00 hrs/acre OVERALL PRODUCTION RATE 1089 sf/hr E11 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Recreation Items SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 1 of 2 CSI TASK: SITE CLEARING [Small Area] CREW: 1 2 1 1 Site Clearing Crew Eq. Operator, Med. Laborers Eq. Operator, Light Dozer 4 crew members 3.13 hrs/1000-sf OVERALL PRODUCTION RATE 320 sf/hr FINE GRADING [Small Area] CREW: Fine Grading Crew 1 Eq. Operator, Med. 1 Laborer 1 Articulated Grader 1 crew members 6.25 hrs/1000-sf OVERALL PRODUCTION RATE 160 sf/hr CRUSHED STONE [Small Area] CREW: 2 1 2 1 1 Base Course Crew [small area] Equip. Oper. Medium Truck Driver Laborers Front End Loader Grader 2.5 0.50 40 0.10 5 crew members cy bucket % fill min/hr cycle/min OVERALL PRODUCTION RATE 5 cy/hr E12 TITLE: SUBJECT: MADE BY: CHECKED BY: Colorado River Ecosystem Restoration Output Rates for Recreation Items SKV JOB NO.: T24957 DATE: 9/28/2012 Sheet No. 2 of 2 PARK BENCH, CONCRETE FOUNDATION CREW: 1 1 2 1 1 1 Concrete Base Crew Cement Finisher Truck Driver Carpenters Laborers Concrete Truck Concrete Pump 5 crew members 120.00 min/ea OVERALL PRODUCTION RATE 0.5 ea/hr E13 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report ATTACHMENT F Phone Logs and Emails October 2012 6' Memorial Bench with back - Portable/Surface Mount Page 1 of 2 Tip: Enter first 5 characters of sku 6' MEMORIAL BENCH WITH BACK - PORTABLE/SURFACE MOUNT Accessories Related Products Camino City Limits Mounting Plate Covers (Set of 4) Classic Contemporary Courtyard Designer Estate 6' Memorial Bench with back - In- Green Valley Ground Heritage Prestige Shadeland Signature Specialty Items Spyder Tree Grates Uptown Wyatt Qty: Model# SP405 1 Material: $0.00 Rib (Add $728.00) 6' Memorial Bench with back - Seating Surface Plastisol Color: Portable/Surface Mount Black Frame Powder Coat Color: Black Center Arm Package Looking for a modern appearance that's both versatile and practical? You can have it all - and more - with the Contemporary Series. Designed with contoured bends in the framework, these attractive benches really stand out and suit practically any setting. 6' Memorial Bench with back - Our memorial benches give you an ideal way to remember and Portable/Surface Mount pay tribute to others. 4-inch-high by 6-inch-wide bushed stainless steel plaques incorporated in backs for engraving (engraving service not provided). Click here to download CAD Details & Specs. 800.253.8619 Quick Ship | Contact Us | Catalog Request | Privacy Notice | Terms & Conditions F1 http://www.wabashvalley.com/Contemporary/Benches/Memorial-Benches/6-Memorial-Be... 9/20/2012 Shopping Cart - Capitol Supply, Inc. Page 1 of 1 ITEM PRODUCT NAME CS8510840-D2P1ZS OPTIONS UPS/FedExGd (D2P1ZS) (ORG:6240006) 475 - 4Gal Backpack Sprayer QTY 1 Update UNIT PRICE $109.36 SUBTOTAL $109.36 Remove Continue Shopping Save Cart Email Cart SUMMARY SubTotal: Total: $109.36 $109.36 CHECKOUT International Checkout Other Payment Options INT'L CHECKOUT *formerly Google Checkout F2 http://www.capitolsupply.com/default.aspx?pg=mc&id=&pid=8510840&key= 9/19/2012 The Home Depot - Shopping Cart Page 1 of 1 Store Finder For Pros Get It Installed Tool Rental Gift Cards My Store Location: Huntington Park #1002 (Change) Credit Center Local Ad Savings Center How-To Help My Account (Sign in or Register) Shopping Cart FREE Shipping on eligible items. Merchandise: 1 item(s) Description 18 in. 40.2 cc Gas Chainsaw Unit Price Qty $299.00 1 Total Ship or Pick Up $299.00 MYSELF i Ship j k l m n Remove j Pick Up k l m n Choose a Store for Pick Up Model # CS400-18 Store SKU # 834306 Internet/Catalog SKU 100675470 ADD TO LIST Promotion Code If you have a promotion code, please enter it here. Please note that promotion codes are casesensitive. Free Shipping on Most Orders over $45 See Details Need Help? Merchandise Subtotal $299.00 Standard FREE Estimated Total Shipping Charges* FREE See our online FAQs or phone us: homedepot.com: 1-800430-3376 Seven days a week: 6 a.m. - 2 a.m. ET Closed on Christmas day. Sales tax determined during later steps homedepot.com Major Appliances: 1-800-455-3869 Seven days a week: 6 a.m. - 2 a.m. ET Closed on Christmas day. Estimated Total $299.00 Customers Who Bought Items in Your Shopping Cart Also Purchased... $39.99 $299.00 $659.00 $22.68 $44.21 $399.00 ECHO ToughChest 24 in. Chainsaw Case ECHO 162 mph 450 CFM Gas Backpack Blower ECHO 12 in. 17 ft. Bar Telescoping Gas Pole Pruner ECHO XtraGuard Chain for 18 in. Bar ECHO Pro 91 18 in. Chainsaw Bar Honda 21 in. Steel Deck Smart Drive Variable Speed SelfPropelled (26) (81) (2) (2) (1) (658) We accept the following payment methods: † Local store prices may vary from those displayed. Products shown as available are normally stocked but inventory levels cannot be guaranteed. © 2000-2011 Homer TLC, Inc. All Rights Reserved. Use of this site is subject to certain Terms of Use which constitute a legal agreement between you and The Home Depot U.S.A. Inc. F3 http://www.homedepot.com/webapp/wcs/stores/servlet/OrderItemDisplayViewShiptoAsso... 9/19/2012 The Shopping Cart : Keystone Pest Solutions, Low price herbicides and pesticides Ho m e | Lo g I n Page 1 of 1 S h op ping C ar t | C he c ko u t Enter search keywords Search here [help (?)] Your Shopping Cart Contents Welcome to our shopping cart! To change quantities of the same item, enter new amount in qty box & click blue arrows to update. To delete item(s) from shopping cart, click waste can to the right of product line. To calculate shipping charges, enter zip code under estimate shipping charges & click update. If you have any questions or problems, please call us at 877-835-8321 & we will be happy to help you with your order! Total Items: 50 Weight: 175lbs Amount: $5,597.50 Qty. 50 Item Name Unit $111.95 Milestone Herbicide - 1 Quart Total $5,597.50 Sub-Total: $5,597.50 Quantity Discount Deductions: -$391.83 Subtotal After Discounts: $5,205.67 You qualify to get a Alligare 90 - 90% Non-Ionic Surfactant - 1 Quart for $2.50 off Estimate Shipping Costs Country: United States State/Province: Post/Zip Code: 81503 Please select ... Shipping quotes are based on the address information you selected: COLORADO 81503 UNITED STATES Available Shipping Methods Shipping (KVD $94.69 - UPS Ground) Rates $94.69 Shipping (KVD $236.35 - Priority Mail ) ® $236.35 Shipping (KVD $351.33 - 3 Day Select) $351.33 Shipping (KVD $511.95 - 2nd Day Air) $511.95 Shipping (KVD $1,011.29 - FOR NEXT DAY DELIVERY, order must be placed before 12 PM EST - Next Day Air) $1,011.29 | Home | F4 http://www.keystonepestsolutions.com/index.php?main_page=shopping_cart 9/24/2012 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report ATTACHMENT G Abbreviated Cost and Schedule Risk Analysis October 2012 Abbreviated Risk Analysis Project (less than $40M): Colorado Ecosystem Restoration Project Development Stage: Feasibility Level Total Construction Contract Cost = WBS 1 $ Potential Risk Areas 2,972,095 Contract Cost % Contingency $ Contingency Total Mobilization / Demobilization $ 182,520 8.33% $ 15,210 $ 197,730 2 Mechanical Control $ 154,994 12.50% $ 19,374 $ 174,368 3 Hand Control $ 338,229 12.50% $ 42,279 $ 380,508 4 Bio Control $ 48,515 10.42% $ 5,054 $ 53,569 5 Biomass Reduction $ 90,339 22.92% $ 20,703 $ 111,042 6 Secondary Weed Control $ 106,334 12.50% $ 13,292 $ 119,626 7 Grass Seeding Broadcasting $ 627,888 12.50% $ 78,486 $ 706,374 8 Shrubs and Trees $ 734,221 10.42% $ 76,481 $ 810,702 9 TRO Resprout Control $ 420,124 14.58% $ 61,268 $ 481,392 10 Earthwork $ 207,915 12.50% $ 25,989 $ 233,905 Wildlife Viewing Areas $ 61,016 4.17% $ 2,542 $ 63,558 Remaining Construction Items $ - 0.00% $ - $ - 11 06 FISH AND WILDLIFE FACILITIES 14 RECREATION FACILITIES 12 0.0% 13 30 PLANNING, ENGINEERING, AND DESIGN Planning, Engineering, & Design $ 299,000 8.33% $ 24,917 $ 323,917 14 31 CONSTRUCTION MANAGEMENT Construction Management $ 252,000 8.33% $ 21,000 $ 273,000 $ $ $ $ 2,972,095 389,000 332,000 3,693,095 12.14% 6.41% 6.33% 11.01% $ $ $ $ 360,678 24,917 21,000 406,595 $ $ $ $ 3,332,773 323,917 273,000 3,929,690 Totals Total Construction Estimate Total Planning, Engineering & Design Total Construction Management Total G1 Colorado Ecosystem Restoration Feasibility Level Abbreviated Risk Analysis Risk Level Very Likely Likely Unlikely Very Unlikely Meeting Date: DATE Risk Element Potential Risk Areas Concerns PDT Discussions & Conclusions (Include logic & justification for choice of Likelihood & Impact) 2 3 4 1 2 4 0 1 3 0 0 1 Negligible Marginal Significant 5 5 3 2 Critical 5 5 4 4 Crisis Likelihood Impact Risk Level Project Scope PS-1 Mobilization / Demobilization No risks anticipated. Very Unlikely Negligible 0 PS-2 Mechanical Control No risks anticipated. Very Unlikely Negligible 0 PS-3 Hand Control No risks anticipated. Very Unlikely Negligible 0 PS-4 Bio Control No risks anticipated. Very Unlikely Negligible 0 PS-5 Biomass Reduction Scope change Unlikely Significant 3 PS-6 Secondary Weed Control No risks anticipated. Very Unlikely Negligible 0 PS-7 Grass Seeding Broadcasting No risks anticipated. Very Unlikely Negligible 0 PS-8 Shrubs and Trees No risks anticipated. Very Unlikely Negligible 0 PS-9 TRO Resprout Control No risks anticipated. Very Unlikely Negligible 0 PS-10 Earthwork No risks anticipated. Very Unlikely Negligible 0 PS-11 Wildlife Viewing Areas No risks anticipated. Very Unlikely Negligible 0 PS-12 Remaining Construction Items Very Unlikely Negligible 0 PS-13 Planning, Engineering, & Design No risks anticipated. Very Unlikely Negligible 0 PS-14 Construction Management Very Unlikely Negligible 0 Burning of materials may not be accepted manner of biomass reduction as design progresses. No risks anticipated. G2 Acquisition Strategy AS-1 Mobilization / Demobilization No risks anticipated. Very Unlikely Negligible 0 AS-2 Mechanical Control No risks anticipated. Very Unlikely Negligible 0 AS-3 Hand Control No risks anticipated. Very Unlikely Negligible 0 AS-4 Bio Control No risks anticipated. Very Unlikely Negligible 0 AS-5 Biomass Reduction No risks anticipated. Very Unlikely Negligible 0 AS-6 Secondary Weed Control No risks anticipated. Very Unlikely Negligible 0 AS-7 Grass Seeding Broadcasting No risks anticipated. Very Unlikely Negligible 0 AS-8 Shrubs and Trees No risks anticipated. Very Unlikely Negligible 0 AS-9 TRO Resprout Control No risks anticipated. Very Unlikely Negligible 0 AS-10 Earthwork No risks anticipated. Very Unlikely Negligible 0 AS-11 Wildlife Viewing Areas No risks anticipated. Very Unlikely Negligible 0 AS-12 Remaining Construction Items Very Unlikely Negligible 0 AS-13 Planning, Engineering, & Design No risks anticipated. Very Unlikely Negligible 0 AS-14 Construction Management Very Unlikely Negligible 0 No risks anticipated. G3 Construction Complexity CC-1 Mobilization / Demobilization No risks anticipated. Very Unlikely Negligible 0 CC-2 Mechanical Control No risks anticipated. Very Unlikely Negligible 0 CC-3 Hand Control No risks anticipated. Very Unlikely Negligible 0 CC-4 Bio Control No risks anticipated. Very Unlikely Negligible 0 CC-5 Biomass Reduction Use of fire for incineration. Unlikely Significant 3 CC-6 Secondary Weed Control No risks anticipated. Very Unlikely Negligible 0 CC-7 Grass Seeding Broadcasting No risks anticipated. Very Unlikely Negligible 0 CC-8 Shrubs and Trees No risks anticipated. Very Unlikely Negligible 0 CC-9 TRO Resprout Control No risks anticipated. Very Unlikely Negligible 0 CC-10 Earthwork Pond excavation Unlikely Marginal 1 CC-11 Wildlife Viewing Areas No risks anticipated. Very Unlikely Negligible 0 CC-12 Remaining Construction Items Very Unlikely Negligible 0 CC-13 Planning, Engineering, & Design No risks anticipated. Very Unlikely Negligible 0 CC-14 Construction Management Very Unlikely Negligible 0 Incinerating debris has inherent risks that may come about during construction. Material is to be removed from a pond, which may cause unexpected delays due to working in and around water. No risks anticipated. G4 Volatile Commodities Very Unlikely Negligible 0 Cost for gas needed to operate large equipment may be higher once construction begins; herbacide prices may fluxuate at time of construction. Unlikely Marginal 1 Herbacide prices may be higher at the time of construction. Unlikely Marginal 1 No risks anticipated. Very Unlikely Negligible 0 Biomass Reduction No risks anticipated. Very Unlikely Negligible 0 VC-6 Secondary Weed Control Herbacide Prices Herbacide prices may be higher at the time of construction. Unlikely Marginal 1 VC-7 Grass Seeding Broadcasting Seed Prices Seed prices at the time of construction may be different from those currently assumed. Unlikely Marginal 1 VC-8 Shrubs and Trees No risks anticipated. Very Unlikely Negligible 0 VC-9 TRO Resprout Control Gas Prices; Herbacide Prices Cost for gas needed to operate large equipment may be higher once construction begins; herbacide prices may fluxuate at time of construction. Unlikely Marginal 1 VC-10 Earthwork Gas Prices Gas required to operate the large equipment may be higher once construction begins. Unlikely Marginal 1 VC-11 Wildlife Viewing Areas Stone, bench, sign prices Cost of materials for wildlife viewing areas could be different at time of construction Unlikely Marginal 1 VC-12 Remaining Construction Items Very Unlikely Negligible 0 VC-13 Planning, Engineering, & Design No risks anticipated. Very Unlikely Negligible 0 VC-14 Construction Management Very Unlikely Negligible 0 VC-1 Mobilization / Demobilization No risks anticipated. VC-2 Mechanical Control Gas Prices; Herbacide Prices VC-3 Hand Control Herbacide Prices VC-4 Bio Control VC-5 No risks anticipated. G5 Quantities Q-1 Mobilization / Demobilization No risks anticipated. Very Unlikely Negligible 0 Unlikely Significant 3 Unlikely Significant 3 Unlikely Significant 3 Unlikely Significant 3 Unlikely Significant 3 Q-2 Mechanical Control Assumed area of infestation Q-3 Hand Control Assumed area of infestation Q-4 Bio Control Assumed area of infestation Q-5 Biomass Reduction Assumed area of infestation Q-6 Secondary Weed Control Assumed area of infestation The areas assumed requiring this type of control may be different once in the field. Also site conditions may change between now and construction which could change quantities. The areas assumed requiring this type of control may be different once in the field. Also site conditions may change between now and construction which could change quantities. The areas assumed requiring this type of control may be different once in the field. Also site conditions may change between now and construction which could change quantities. The areas assumed requiring this type of control may be different once in the field. Also site conditions may change between now and construction which could change quantities. The areas assumed requiring this type of control may be different once in the field. Also site conditions may change between now and construction which could change quantities. Q-7 Grass Seeding Broadcasting Assumed area of seeding If other areas requiring removal of invasives changes, then the area requiring seeding would change as well. Unlikely Significant 3 Q-8 Shrubs and Trees Quantity assumption per area The quantity assumptions may change as the project progresses through the design phases; Also the area requiring revegetation may change as well. Unlikely Significant 3 Q-9 TRO Resprout Control Assumed area of infestation If the areas from the initial removal changes, then the resprout costs/quantities would be affected. Unlikely Significant 3 Q-10 Earthwork Quantity assumptions Quantities may change as the design progress due to perhaps requiring more material to be removed from the two locations in question. Very Unlikely Significant 1 Q-11 Wildlife Viewing Areas No risks anticipated. Very Unlikely Negligible 0 Q-12 Remaining Construction Items Very Unlikely Negligible 0 Q-13 Planning, Engineering, & Design No risks anticipated. Very Unlikely Negligible 0 Q-14 Construction Management Very Unlikely Negligible 0 No risks anticipated. G6 Fabrication & Project Installed Equipment FI-1 Mobilization / Demobilization No risks anticipated. Very Unlikely Negligible 0 FI-2 Mechanical Control No risks anticipated. Very Unlikely Negligible 0 FI-3 Hand Control No risks anticipated. Very Unlikely Negligible 0 FI-4 Bio Control No risks anticipated. Very Unlikely Negligible 0 FI-5 Biomass Reduction No risks anticipated. Very Unlikely Negligible 0 FI-6 Secondary Weed Control No risks anticipated. Very Unlikely Negligible 0 FI-7 Grass Seeding Broadcasting No risks anticipated. Very Unlikely Negligible 0 FI-8 Shrubs and Trees No risks anticipated. Very Unlikely Negligible 0 FI-9 TRO Resprout Control No risks anticipated. Very Unlikely Negligible 0 FI-10 Earthwork No risks anticipated. Very Unlikely Negligible 0 FI-11 Wildlife Viewing Areas No risks anticipated. Very Unlikely Negligible 0 FI-12 Remaining Construction Items Very Unlikely Negligible 0 FI-13 Planning, Engineering, & Design No risks anticipated. Very Unlikely Negligible 0 FI-14 Construction Management Very Unlikely Negligible 0 No risks anticipated. G7 Cost Estimating Method CE-1 Mobilization / Demobilization Mob and demob assumptions Mob and demob are going to occur such that crews can move from site to site. However construction windows and distance between sites could cause differences from assumed costs. CE-2 Mechanical Control Production rate assumptions Actual site conditions may cause a variation in the production rates from those assumed in the estimate. Unlikely Marginal 1 CE-3 Hand Control Production rate assumptions Actual site conditions may cause a variation in the production rates from those assumed in the estimate. Unlikely Marginal 1 CE-4 Bio Control Production rate assumptions Actual site conditions may cause a variation in the production rates from those assumed in the estimate. Unlikely Marginal 1 CE-5 Biomass Reduction Production rate assumptions Actual site conditions may cause a variation in the production rates from those assumed in the estimate. Unlikely Marginal 1 CE-6 Secondary Weed Control Production rate assumptions Actual site conditions may cause a variation in the production rates from those assumed in the estimate. Unlikely Marginal 1 CE-7 Grass Seeding Broadcasting Production rate assumptions Actual site conditions may cause a variation in the production rates from those assumed in the estimate. Unlikely Marginal 1 CE-8 Shrubs and Trees Production rate assumptions Unlikely Marginal 1 CE-9 TRO Resprout Control Assumption of 20% of first removal costs. Actual production rates for planting shrubs and trees may be more difficult once in the field. Estimate assumes 20% of first removal costs would need to occur again in order to contain resprouting of invasives. This percentage may be different once resprout work begins. LIKELY Marginal 2 CE-10 Earthwork Production rate assumptions Actual production rates may vary from those currently assumed in the estimate. LIKELY Marginal 2 CE-11 Wildlife Viewing Areas No risks anticipated. Very Unlikely Negligible 0 CE-12 Remaining Construction Items Very Unlikely Negligible 0 CE-13 Planning, Engineering, & Design PED estimated percentage Acutal costs for performing the design work may be different from the actual cost. Unlikely Significant 3 CE-14 Construction Management Construction management estimate may be different than actual amount required to manage this project. Unlikely Significant 3 Management effort G8 Unlikely Significant 3 External Project Risks EX-1 Mobilization / Demobilization Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-2 Mechanical Control Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-3 Hand Control Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-4 Bio Control Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-5 Biomass Reduction Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-6 Secondary Weed Control Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-7 Grass Seeding Broadcasting Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-8 Shrubs and Trees Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-9 TRO Resprout Control Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-10 Earthwork Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-11 Wildlife Viewing Areas Weather Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 EX-12 Remaining Construction Items Very Unlikely Negligible 0 EX-13 Planning, Engineering, & Design Project funding Funds may not be available at necessary times, which could impact costs/schedule of project. Unlikely Marginal 1 EX-14 Construction Management Weather can change drastically throughout the year, which may cause some cost/schedule imapcts. Unlikely Marginal 1 Weather G9 Colorado Ecosystem Restoration Feasibility Level Abbreviated Risk Analysis Typical Risk Elements Co ns Ma tructi na g o em n e nt Item s Pla nni ng En gi n , De eerin si g g, & n Re ma Co ining nst r uc tion Ear t hw ork TR O Co Respr ntr out ol Wil dl Are ife Vie as wi n g s Tre e a nd bs Sh ru G ra ss Bro See adc ding ast i ng Sec o C o nda r y ntr We ol ed tion ma ss Bio Bio Ha nd Co Co nt nt r ol r ol Re duc ont r ol al C c ha ni c Me Mo bi l De izatio mo bili n / zat ion Potential Risk Areas Project Scope - - - - 3 - - - - - - - - - Acquisition Strategy - - - - - - - - - - - - - - Construction Complexity - - - - 3 - - - - 1 - - - - Volatile Commodities - 1 1 - - 1 1 - 1 1 1 - - - Quantities - 3 3 3 3 3 3 3 3 1 - - - - Fabrication & Project Installed Equipment - - - - - - - - - - - - - - Cost Estimating Method 3 1 1 1 1 1 1 1 2 2 - - 3 3 External Project Risks 1 1 1 1 1 1 1 1 1 1 1 - 1 1 G10 Colorado Ecosystem Restoration Mesa Co., Colorado Cost Engineering Report ATTACHMENT H MCACES Construction Cost Estimate October 2012 Print Date Mon 22 October 2012 Eff. Date 10/22/2012 U.S. Army Corps of Engineers Project : COLORADO RIVER ECOSYSTEM RESTORATION COE Standard Report Selections Time 14:04:57 Title Page COLORADO RIVER ECOSYSTEM RESTORATION Estimated by Designed by Prepared by Preparation Date Effective Date of Pricing Estimated Construction Time Tetra Tech, Inc. Tetra Tech, Inc. Tetra Tech, Inc 10/22/2012 10/22/2012 1,830 Days This report is not copyrighted, but the information contained herein is For Official Use Only. Labor ID: LNS2009 EQ ID: EP09R05 Currency in US dollars H1 TRACES MII Version 4.1 Print Date Mon 22 October 2012 Eff. Date 10/22/2012 U.S. Army Corps of Engineers Project : COLORADO RIVER ECOSYSTEM RESTORATION COE Standard Report Selections Description Time 14:04:57 Project Cost Summary Report Page 1 Quantity UOM Project Cost Summary Report ContractCost ProjectCost C/O 2,972,095 2,972,095 2,972,095.10 2,972,095.10 1.00 EA 2,972,095 2,972,095 1.00 LS 277,170 277,170 1.00 LS 277,170 277,170 1.00 LS 122,054 122,054 17 06 06 - Fish and Wildlife Facilities 1.00 LS 103,745 103,745 17 14 14 - Recreation Facilities 1.00 LS 18,308 18,308 1.00 LS 210,883 210,883 14 06 06 - Fish and Wildlife Facilities 1.00 LS 200,206 200,206 14 14 14 - Recreation Facilities 1.00 LS 10,677 10,677 1.00 LS 106,787 106,787 13 06 06 - Fish and Wildlife Facilities 1.00 LS 96,110 96,110 13 14 14 - Recreation Facilities 1.00 LS 10,677 10,677 1.00 LS 269,800 269,800 12 06 06 - Fish and Wildlife Facilities 1.00 LS 259,123 259,123 12 14 14 - Recreation Facilities 1.00 LS 10,677 10,677 1.00 LS 997,316 997,316 10 06 06 - Fish and Wildlife Facilities 1.00 LS 986,639 986,639 10 14 14 - Recreation Facilities 1.00 LS 10,677 10,677 1.00 LS 560,997 560,997 1.00 LS 560,997 560,997 1.00 LS 427,088 427,088 1.00 LS 427,088 427,088 Colorado River Ecosystem Restoration 19 Segment 19 19 06 06 - Fish and Wildlife Facilities 17 Segment 17 14 Segment 14 13 Segment 13 12 Segment 12 10 Segment 10 09 Segment 9 09 06 06 - Fish and Wildlife Facilities 08 Segment 8 08 06 06 - Fish and Wildlife Facilities Labor ID: LNS2009 EQ ID: EP09R05 Currency in US dollars H2 TRACES MII Version 4.1