activities
Transcription
activities
vimac PRESENTATION PRESIDENT ADVISOR TO PRESIDENT CHIEF EXECUTIVES QUALITY DEPARTMENT ENVIRONMENTAL DEPARTMENT ORGANISATION DEPARTMENT PREVENTION DEPARTMENT FINANCIAL DEPARTMENT PRODUCTION RESOURCES ESTUDIES AND PROJECTS NEW PROJECTS TECHNICAL COORDINATOR SALES REPRESENTATIVE INTERNATIONAL PRODUCTION CENTRAL REG. MANAGER BASQUE COUNTRY REGIONAL OFFICE DEVELOPMENT NATIONAL PRODUCTION NORTHERN REG. SOUTHERN REG. MANAGER MANAGER EASTERN ANDALUSIA REGIONAL OFFICE EASTERN REG. MANAGER VIMAC is a company with long experience in installations in different sectors. Its origins go back to the beginning of the twentieth century. Since then it has advanced with society, keeping up with its needs and adapting to the new technologies. It offers its considerable experience in installations and maintenance in the electric, electromechanical, industrial, telecommunications, railway and hydraulic sectors. It has an infrastructure capable of undertaking large and highly technical projects, and has its own technology in the railway and telecommunication fields. Its technical team is involved in research projects developing new products and innovative solutions making use of new materials and advanced technologie. ACTIVITIES POWER In the field of Electric Power Installations, our experience includes all the electricity transport, transformation and distribution infrastructures, carried out to the strictest quality and perfection requirements demanded by the electric companies. Our experience includes installation of: • Power Plants • Substations • High and Medium Voltage Lines • Win Energy Evacuation Networks WORK UNDERTAKEN AND WORK UNDERWAY • Ultra speed feeder cells and traction rectifiers substitution, with few reliability on several substations of Zaragoza´s JTMI. Customer: ADIF • 1500 Vcc electrical substations on Madrid´s underground (Line 11). Customer: MINTRA • Different works for Barcelona´s Territorial Headquarters. Substitution of auxiliary service’s transformers on Motcada and Mollet´s substations. Improvement of low tension protection on substations. Substitution of cutter engines, chain conditioning on Barcelona’s tunnels. Customer: ADIF • Electrical substations on Madrid´s prolongation underground (Line 1), Vallecas's Widening. Customer: MINTRA • Rehabilitation and power increase on Las Infantas traction´s substation, Line Madrid - Valencia. Customer: ADIF • Assembling works and auxiliary civil works on Puerto Real´s Substations. Blue Project. Customer: REE • Power renforcement on Manlleu – Puigcerda section. URTX-ALP and Planola´s substation. Customer: ADIF • Avila’s electrical traction substation rehabilitation, MadridHendaya line. Customer: ADIF • 45/15 KV transformer substation for electrical supplier to irrigable zone of Adaja river. Customer: Instituto Tecnológico Agrario, Junta de Castilla y León. • Electric power station harbour for Generalitat Catalana´s railroads, Olesa. Montserrat. Customer: GISA. • Enlargement of the Utrera substation and new substation at Dos Hermanas for the “Duplication of Lines, Sevilla to Cádiz, from Dos Hermanas to Utrera" Project " • Project, Installation and Maintenance of the new Villaverde Bajo Substation for high speed line (LAV) Madrid - Barcelona – French Border. 5 ACTIVITIES RAILROADS VIMAC has all the machinery necessary and specific for installations such as: - Electrification Installations for High Speed Lines (AVE). - Electrification Installations for Conventional Railroad Lines. - Traction Power Substations. - Company Substations. - Railroad signalling. - Communications systems. WORK UNDERTAKEN AND WORK UNDERWAY • Interlocks modernization, 5 KVA SAI's installation of and Termical recorders substitution for electronic systems on T/Grañen – Tormillo substations, Zaragoza - Barcelona line. Stations of Customer: ADIF • 10 KVA and 1 H of autonomy SAI Equipments substitution onT/Calatayud – Ricla substations, Madrid– Barcelona line. Customer: ADIF • Transformation elevators centers installation for supply of II.SS. on Sabadell Sud and St. Vicenç de Castellet. Customer: ADIF. • Power point assembly of cutter conditioner of A.C. Alcázar de San Juan - Manzanares Section 1 and Venta de Cardenas and Correderas substations, Madrid - Seville line. Customer: ADIF. • Pump wells control substitution on San Bernardo's Tunnel, Santa Justa – La Salud section, Seville - Cadiz line. Customer: ADIF. • Mechanical interlocks installation and exit feeders doors improvement on Las Cabezas and El Cuervo´sSubstations. Customer: ADIF. • Critical materials substitution on L.A.C. Tudela de Veguin – Peñarrubia section, El Soto del Rey – Elentrego line. Customer: ADIF. • Renovation sub plain of Insulating Meetings on JTMI´s area of Barcelona. Customer: ADIF. • L.A.C.'s review correcting anomalies between P.K. 155/500 to P.K. 165/500, Section Torralba – Arcos de Jalón, Line Madrid - Barcelona. Customer: ADIF. • Power supplyon Facilities of Security works, (C.T.C. Enclavam, Blockades and Train Earth), to surroundings Murcia - Alicante and Line Chinchilla - Cartagena, SectionChinchilla - Cartagena. Customer: ADIF. • Modernization works of chain Montcada Bifurcación – Vic sections, Barcelona – Puigcerda line. Customer: ADIF. • Tenerifes´s light rail electrification, line 1, between Santacruz and The Lagoon. Customer: EFACEC, S.A • Electrificación de Zuera Northwest Corridor High Speed Line: Zaragoza - Huesca, from Miraflores to Tardienta. • Includes 66 kV High Voltage Park . 2x25 kV Substation and transformation centres, in addition to catenary and supply for 350 Kms/H high speed in all-Spanish CAVE technology system. Customer: MINISTERIO DE FOMENTO • Electrification Tardienta Electrification Work on the Northwest Corridor High Speed. Line Zaragoza - Huesca Canfranc Line Tardienta Huesca. Width adaptation UIC Electrification (catenary and supply) for high speed access between Tardienta and Huesca. Customer: TECSA-DRAGADOS ( Ministerio de Fomento ) • Electrification of Atocha Change of electrification system of Madrid Seville line from 3kV DC to 25 kV AC at 50 Hz. Conditioning of 3000 V catenary to 25000 V (High speed) at Atocha Station (Puerta de Atocha exit) and Negro Hill. Customer: RENFE AVE • Electrification of Irún Rehabilitation of the catenary line at the Irún Station , affecting local tracks with both widths. Customer: RENFE 7 ACTIVITIES SYSTEMS & COMMUNICATIONS • SYSTEMS Our Systems and Development Department also has material and human resources necessary to take on projects of all kinds and sizes, from small modifications in domotic systems, to large Control projects. At Vimac, we believe that there is no such thing a generic solution to the problems of automation at any firm. That is why we give personalized, tailored treatment, so each solution adjusts to the customer's needs . • COMMUNICATIONS At Vimac our Telecommunications Division can take on a wide variety of projects, always sure that our customers will be completely satisfied. Results guaranteed . We offer integral service for our customers, from engineering to system start-up, from supply to installation. WORK UNDERTAKEN AND WORK UNDERWAY Main line optic fibre networks for RENFE • Optic Fibre Infrastructure for the Railway Network, Sevillato-Huelva, (Laying 115 km of underground optic fibre cable, and 110 km. of overhead catenary optic fibre cable) and from Guadalcanal to Rosales (laying 75 km. of underground optic fibre cable). • Optic Fibre Network for the Railway Network Infrastructure, from Seville to Utrera. (Laying 32 km of underground optic fibre cable). • Optic Fibre Network for the Railway Network Infrastructure, from Ariza-Calatayud (Laying 40 km of underground optic fibre cable). • Optic Fibre Network for the Railway Network Infrastructure, from Fuencarral to Majadahonda. Laying 27 Km of underground optic fibre cable). Communications Infrastructure Operators: Optic Fibre Network in Industrial Parks, Operator Ono. • Connection from Polirrosa Industrial Park to Pavipresa Industrial Park, Huelva. • Connection from El Palmar Industrial Park to Las Salinas Industrial Park , Puerto de Santa María. • Connection from Palmones I Industrial Park to Palmones II Industrial Park, Algeciras. • Connection in Avenida San Francisco Javier, Seville. (Laying > 8 Km of underground optic fibre cable.) Laying paired-cable trunk communications line, operator ONO. • Polirrosa, La Esperanza, La Paz, Pavipresa, San Diego, El Rincón, Naviluz and La Luz, Industrial Parks (Huelva). El Palmar and Las Salinas ( Puerto de Santa Maria ) Industrial Parks, and Zona Franca Cadiz. (Laying >11 KM of up to 25 pp cable underground inter-building and overhead) . 9 ACTIVITIES Others • Protection manager installation in Majaravique Substation Customer: ADIF. • Protection manager installation in Las Cabezas Substation Customer: ADIF. • AVE tunnels illumination automation, Madrid-Sevilla line. Customer: RENFE – AVE. • Installation of Communications Line for Train. Madrid to Sigüenza. • Telephone System and 14 cuat. cable segregation in Valdelatas, Getafe , Leganés, Sagunto and Tarrasa substations. • Installation of Railway links on the Madrid-to-Móstoles line. Communications and Signalling. • Communications Line at la Encina Station . • Installation of optic fibre railway network infrastructure, from Zafra to Guadalcanal (70 km). • Communications and Signalling Cables for detour in GetafeSector 3. • Installation of “Proceed” Order Signalling System. • Installation of electronic and remote control equipment at Silla-Gandia Substation. • Telephone System and installation of electronic and distribution control equipment at Torrebonica – Tarrasa Substation. RESEARCH & DEVELOPMENT • Development of overhead contact system analyser plate The Overhead Contact System is a component which, despite the restricted access to the track areas, runs the risk of a multitude of accidents, such as falling rays, breakages, short circuits, the electrocution of persons or animals, etc. Therefore, whatever the incident, it is important to react quickly to avoid causing harm to persons or property. • Development of Distributed Control Created and development as a middle step between the substation systems and the maintenance worker team to ensure a good and safe working process of the substation. • Development of protection manager for traction substations The Protection Manager consists of a programmable automaton (PLC) which functions completely independently of the rest of the PLCs which make up the system. Its main function is supervising the correct operation of the installation, focusing on safety. The main parameter which makes the Protection Manager so efficient is the response speed between the fault diagnosis and the action, which is less than 4 milliseconds. As a result, a multitude of potential disasters are avoided, in which nonsuppression of the fault would result in the total destruction of the affected equipment, or even a fire in the whole installation • Development of demo fitting platform for operation and formation of distributed control substations. The development of this system is very complex, and along with the fact that the final installations are extremely important, this becomes a critical factor. For this reason, it would be desirable to have a location for testing where we could carry out checks of the system which are as similar as possible to a real installation, and which allow us to have guarantees on the developed system before its real introduction. 11 ACTIVITIES INDUSTRY Our highly qualified electromechanical, electronic and automation assemblies enable us to work in nearly all the sectors of industry, petrochemical, food, manufacturing, power, etc. Our offer includes: • Chemical Plants • Industrial Installations • Loading Terminals • Process Control • Gas Ducts • Maintenance WORK UNDERTAKEN AND WORK UNDERWAY • Solid Urban Waste Recycling Plant in Villarrasa (Huelva) • Olive Packing Plant OLISE in Hinojos (Huelva) CONSTRUCTION In the building sector, we collaborate with the main national builders in unique construction such as: • Shopping Malls • Department Stores • Offices • Hotels • Congress and Exhibition Halls • Amusement Parks • Sports Facilities With installations such as: • Lighting and Electrical Services and Distribution • Structured Wiring • Integral Facility Control • Access Control • Closed Circuit Television • Public Address System • Interior and architectural lighting • Alarms • Domotics WORK UNDERTAKEN AND WORK UNDERWAY • Construction works for the stable puppet theatre “La Tía Norica” Customer: Cádiz Council • Los Boliches parking Customer: Fuengirola Council • Underground parking in Luis Martín square, Roquetas de Mar. Customer: Roquetas de Mar • Underground parking in El Caballo square, Jerez de la Frontera. Customer: AZVI.S.A. • Electrical installations (BT and MT), voice - data, security system, PA system, R-TV network and UPS for the "Los Olivares" office building. Others: • Public address system installation, voice-data and video conferencing at the Santa Justa Railway Station (Seville). • Low voltage electrical and communications installation DRASA. 13 ACTIVITIES URBANIZATION & INDUSTRIAL PARKS In traditional installations such as the urbanization of industrial parks and residential areas, Vimac, is characterized by its turnkey construction of the entire installation project, including electrical installation, sanitation and water supply. Our industrial park electrification offer includes: • Electrical service supply • Transformation Centres • Medium and low voltage grids • Street lighting • Excavation and channelling WORK UNDERTAKEN AND WORK UNDERWAY • Industrial estate urbanization MIRABUENO II, TorreDonJimeno, Jaén. Customer: E.P.S.A. • Aguadulce Boulevard urbanization, Project 2, P.K. 428,679-429,437 Roquetas de Mar municipal district. Customer: Roquetas de Mar Council • Urbanization works in Cortijo San Rafael, Fase 4. Customer: Frigiliana Council • Urbanization electrical installation at industrial estate El Fontanal Customer: GESTARQ 21 • Street lighting in Arganda Traffic safety. Installation of Public illumination of the N-III highway from Madrid to Valencia , Sta. Eugenia stretch from PK 10.00 to 22.00, Arganda de Rey Bypass. Province of Madrid. Includes 556 12-metre streetlights. 5 30-m, 14-Kw-power towers including their high and low-voltage power supply. • Tunnel nº 1 & 2 lighting of Ruta del Toro Highway, Cádiz. Customer: AZVI, S.A. • Urbanization for Utebo Council, Zaragoza Customer: Utebo Council • Channels for Parque de Actividades Medioambientales of Aznalcollar Customer: Instituto de Fomento de Andalucía. • Reform works at Prim and Isaac Peral streets, Rota, Cádiz. Customer: Rota Council. • Aguas Vivas Project urbanization. Customer: Ministerio de Fomento. Others: • Traffic safety and Lighting of the Intersection at Lepe (Huelva). • Distribution of Power and Lighting at the Zuera Industrial Park (SEPES) ACTIVITIES HYDRAULIC WORKS & ENVIRONMENT We have created a water treatment department with the technical and human media necessary to respond to all the needs that come up in the Integral Water Cycle, from project development to final execution of construction. Our experience in a wide variety of construction in very diverse sectors, means we have the personnel, the training and the technical media necessary to deliver turnkey construction in which the premise of Quality Assurance in all processes related to the execution of work leaves the customer completely satisfied. WORK UNDERTAKEN AND WORK UNDERWAY • Equipments and systems supply and installation for remote control and chlorinating of water´s supply in San Roque downtown, Jimena y Castellar de la Frontera Customer: ACGISA • Margins conditioning for Trejo and Del Burgo creeks confluence at Setenil de las Bodegas Municipal Term, Cádiz Customer: Confederación Hidrográfica del Guadalquivir. • Reparation and recovering, Alamin´s basin creek. Customer: Guadalajara Council. • Urban reform and conservation, Paseo de Nuestra Señora de la O, Seville Municipal Term. Customer: Hydrographic Federation of the Guadalquivir. QUALITY AND ENVIRONMENT A pioneer in Andalusia in creating a Quality Department, Vimac received the UNE-EN-ISO 9002 certificate for quality in 1995. Later it also was also certified by AENOR with Certificate nº ES-412/1/95, verifying correct application and operation as per the UNE-ENN-ISO 9000 DE 2000 standard. In its internal planning, Vimac has decided on and continues to insist on continued training at all levels, so that all the members of the company are not only linked to quality parameters, but have the knowledge to efficiently put them into practice. From here we therefore wish to transmit a message of trust and a firm promise to search for Excellence in each and every one of the projects that our company undertakes, so that Vimac will continue to be a references for quality in the sector. 17 PREVENTION In the belief that Human Capital is the basic pillar of our organization, Vimac insists on the latest and most modern systems of occupational accident prevention. At Vimac an exhaustive control both a priori in the purchase of individual protection equipment, collective protective measures, related documentation, etc., and during the work itself, with periodic visits, to check that not only legal requirements are complied with, but all those measures considered advisable to maximize the safety of the worker. The continued training of workers in prevention of accidents is another of the company's constant measures, to increase knowledge and awareness of the people involved. It should be pointed out that the atmosphere transmitted by the company's management and its constant concern for the safety of its workers have made it possible for us to reach safety levels far above the sector average, which satisfies us and encourages us not to become careless and to continue working hard to maintain and even to increase our level of safety. SALES VIMAC markets glass insulators: E-40, E70 and E-100. Tempered glass dielectric, transparent or very light green, malleable forged hood with hot dip galvanized coating, forged steel bolt with hot dip galvanized coating, stainless steel cap and pin. A-11 VV and RT-51 VV. Tempered glass dielectric, malleable forged hood and bolt with hot dip galvanised coating in accordance with UE 21.114. • PROTECTION RELAYS The VIMAC Development Department has just completed the Protection Management project. It is the first product completely developed in this department and we hope that it is just the beginning of VIMAC as a TECHNOLOGY SOLUTIONS company. This relay was conceived and developed to protect traction power substations, but is easily applicable to similar facilities such as Transformation Centres, and extendable to a multitude of applications such as domotics. It monitors the critical elements in a substation, initiating an entire sequence of safety actions to detect anything that might not be working properly, with a response time of less than 4 milliseconds, which reduces the time in which human and material losses could occur due to malfunctioning of the substation. 19 vimac CENTRAL: DIR. REG. SUR DIR. REG. CENTRO DIR. REG. NORTE Núcleo GRUPO VIMAC Ctra. Nac.IV Madrid-Sevilla P.K. 531 41309 La Rinconada (SEVILLA) Tlf.: 95 499 93 33 Fax: 95 499 92 14 Fax: 95 499 93 30 e-mail: [email protected] http://www.vimac.es C/ Rosario Pino 18, Planta 3ª. Oficina 3 28020 MADRID Tlf.: 91 745 13 67 Fax: 91 564 96 88 C/ Sardenya, 397-399 2º 4 A 08025-BARCELONA Tlf.: 93 208 15 82 Fax: 93 459 46 89 DEL. ANDALUCIA ORIENTAL DEL. PAIS VASCO DIR. REG. LEVANTE C/ Nécora. nº 5, 4a 18003 GRANADA Tfn: 958 270 916 Fax: 958 270 958 C/ Pablo Gorosabel 1, 1º Dcha 20400 TOLOSA Tlf.: 943 670 185 / 619 077 849 Fax: 943 670 185 Centro de Negocio Trade Center C/ Profesor Beltrán Báguena nº 4, local 415. 46009. VALENCIA Tlf.: 96 347 44 16 Fax: 96 347 44 21