Network of Sicilian Tourist Ports
Transcription
Network of Sicilian Tourist Ports
ROP SICILIA Network of Sicilian The main nodes of the network will be the three major harbours (HUB harbours): ● Marsala for connections towards the West and the African coasts, ● Milazzo for flows to and from the North, ● Ragusa, as transit towards Malta, Greece and the Oriental Mediterranean coasts. Tourist Ports S icily strategically positioned between the North of the Mediterranean and the African coasts. The presence of an efficient port network able to provide quality services to pleasure boats will enable Sicily to intercept the tourist flows across the Mediterranean. The network of ports will allow yachts to circumnavigate the island in assisted stages with a maximum length of approximately thirty nautical miles. 19* 16* 24* Capo Terrasini Palermo 36* D'Orlando 8* S. Nicola Cefalù S.Vito 16* 20* 6* Balestrate 16* Trapani Termini PA 16* TP Imerese Marsala 13* Mazara EN 21* Portopalo Menfi CL AG 11* Sciacca 31* S.Leone Licata 22* 15* 17* 29* t Milazzo Rosa ME 34* Riposto 18* Catania CT 21* Augusta 12* Siracusa SR Gela RG 26* Marina Ragusa 17* Pozzallo Messina 29* Portopalo Capo P. 17* * Distance in nautical miles 31 From the harbour of Milazzo it is easy to reach the Eolie Islands thanks to the new tourist harbour on the island of Salina The location of HUB harbours was decided, not only on geographical ground but also taking into consideration the availability of larger areas which could be devoted to shipyard activities. HUB harbours contain all the necessary infrastructure for complete craft assistance. A series of interventions aimed at the opening of a few tourist landings had already been started with Community funds from the 1994-1999 programme. These activities included; the tourist port of S. Marina di Salina in the Eolie Islands, commencement of construction of the tourist port of Balestrate in the area of Palermo, the overhaul of some parts of the tourist docks in the harbour at Milazzo. The European funds assigned to Sicily for the 2000-2006 programme and the subsequent completion of various projects will allow the network to be activated. INTERVENTION Completion of the tourist harbour of Fossa del Gallo in Palermo Completion of defence works of the Port Plan of S. Erasmo, Palermo Settlement of the land areas in front of the existing harbour, increased efficiency levels and integration of the existing installations to improve service quality for users of the harbour of San Nicola L'Arena Settlement of the tourist dock in the harbour of Termini Imerese Completion of the tourist harbour of Santa Maria di Salina Completion of the tourist harbour of Riposto Tourist harbour of Marina di Ragusa Harbour of Porto Palo di Menfi Completion of the tourist harbour of Balestrate COST (millions of Euros) OCCUPATION (units) BERTHS 8 18 200 19 15 200 6 12 230 4 15 250 2,8 25 11,2 62 19,5 35 190 20 300 450 1000 10 33 245 400 Each project plans facilities for the treatment of bilge water and sewerage from boats. The facilities are complete with a suction hose and a centrifuge pump with ejector, a total depuration and oxidation facility, prior separation of mineral oils and systems for separate collection of solid waste produced within the harbour. 32