City of Faribault, Minnesota
Transcription
City of Faribault, Minnesota
City of Faribault, Minnesota Capital Improvement Plan 2015 thru 2019 DEPARTMENT SUMMARY 2015 Department 2016 2017 2018 2019 Total Engineering 2, 505, 000 2, 950,000 4, 050, 000 4, 000, 000 7, 610, 000 21, 115, 000 Sewer 1, 300, 000 1, 525, 000 50, 000 350, 000 50, 000 3, 275, 000 50, 000 50, 000 50, 000 50, 000 50, 000 250, 000 350, 000 550, 000 950, 000 400, 000 750, 000 3, 000, 000 4, 205, 000 5, 075, 000 5, 100, 000 4, 800,000 8, 460, 000 27,640,000 Storm Water Water TOTAL 167 City of Faribault, Minnesota Capital Improvement Plan 2015 thru 2019 FUNDING SOURCE SUMMARY Source GO/ SA Bond 2015 2016 2017 2018 2019 560, 000 540, 000 500, 000 650,000 810, 000 3, 060, 000 775, 000 550, 000 1, 500, 000 750,000 3, 575, 000 1, 500, 000 275, 000 525, 000 450, 000 3, 700, 000 Municipal State Aid Sanitary Sewer Fund 950, 000 State - Infrastructure Grant 625, 000 625, 000 State - MnDOT 3, 900, 000 State - MnDOT Bridge Bonds 1, 200, 000 Storm Water Fund Street Imp Projects Fund Water Fund GRAND TOTAL Total 3, 900, 000 1, 200, 000 300, 000 300, 000 300, 000 300, 000 300, 000 1, 500, 000 1, 095, 000 1, 050, 000 1, 050, 000 1, 050, 000 1, 025, 000 5, 270, 000 675, 000 910, 000 1, 225, 000 775, 000 1, 225, 000 4, 810, 000 4, 205, 000 5, 075, 000 5, 100, 000 4, 800, 000 8, 460, 000 27,640,000 168 City of Faribault, Minnesota Capital Improvement Plan thru 2015 2019 PROJECTS & FUNDING SOURCES BY DEPARTMENT Project# Department lEngineering Priority 2015 2018 2016 2017 100, 000 1, 800, 000 200, 000 50, 000 50, 000 Total 1 2015 - 2019 Bridges BRIDGE 2 2015 - 2019 Downtown Area Parking Lot/Alley Imp DWNTWN 3 95, 000 50,000 2015 - 2019 Sidewalk Improvements SIDWLK 3 60, 000 150, 000 2015 - 2019 Street Reconstruction STCON 1 1, 500, 000 1, 600, 000 1, 500, 000 2015 - 2019 Street Overlays STOVLY 2 850, 000 950, 000 700, 000 2015- 2019 Trail Improvements TRAIL 3 Engineering Total GO/SA Bond 50, 000 295,000 60, 000 270, 000 2, 600, 000 6, 400, 000 13, 600, 000 1, 150, 000 1, 100, 000 4, 750, 000 100, 000 2, 505, 000 2, 950, 000 4, 050, 000 4, 000, 000 7, 610, 000 21, 115, 000 560, 000 500,000 500,500, 000000 600,600, 000000 810,810, 000000 2,2, 970,970, 000000 775,775, 000000 550, 000 1, 500, 000 750, 000 3, 575, 000 250,000 225,225, 000000 225, 000 400,000 1, 375, 000 3, 900, 000 3, 900, 000 275, 000 Sanitary Sewer Fund 2, 100, 000 100, 000 Municipal State Aid State - MnDOT 1,1, 200,200, 000000 1, 200, 000 State - MnDOT Bridge Bonds Storm Water Fund Street Imp Projects Fund Water Fund Engineering Total Sewer 2019 250, 000 150, 000 250, 000 250, 000 250, 000 1, 150, 000 1, 095, 000 925, 000 1, 050, 000 1, 050, 000 1, 025, 000 5, 145, 000 325, 000 350, 000 275,000 375, 000 475, 000 1, 800, 000 2, 505, 000 2, 950, 000 4, 050, 000 4, 000, 000 7,7, 610,610, 000000 21,21, 115,115, 000000 1 3, 025, 000 300, 000 2015- 2019 Sanitary Sewer System Improvements SWR 11 1,1, 250,250, 000000 1, 475, 000 Sanitary Sewer Structure Rehabilitation SWR REHAB 1 50, 000 50, 000 50, 000 50, 000 50,000 250, 000 1, 300, 000 1, 525, 000 50, 000 350, 000 50, 000 3, 275, 000 Sewer Total 675, 000 Sanitary Sewer Fund 1, 250, 000 90, 000 50, 000 40, 000 GO/SA Bond 50, 000 300, 000 50, 000 625,000 625, 000 State - Infrastructure Grant Storm Water Fund Street Imp Projects Fund Water Fund Sewer Total 1, 300, 000 Storm Water 169 2, 325, 000 100, 000 100, 000 125, 000 125, 000 10, 000 10, 000 1, 525, 000 50, 000 350, 000 50, 000 3, 275, 000 Department Storm Water Structure Rehabilitation Project# Priority STWTR REHAB 2015 2 2016 2017 2018 2019 Total 50, 000 50, 000 50, 000 50, 000 50, 000 250, 000 50, 000 50, 000 50, 000 50, 000 50, 000 250, 000 50, 000 50, 000 50, 000 50, 000 50, 000 250, 000 50, 000 50, 000 50, 000 50, 000 50, 000 250, 000 350,000 550, 000 950, 000 400,000 750, 000 3, 000, 000 350, 000 550, 000 950, 000 400, 000 750, 000 3, 000, 000 350, 000 550, 000 950, 000 400, 000 750, 000 3, 000, 000 350, 000 550, 000 950, 000 400, 000 750, 000 3, 000, 000 4, 205, 000 5,075, 000 5, 100, 000 4, 800, 000 8, 460, 000 27, 640, 000 Stonn Water Total Storni Water Fund Storm Water Total Water 2015 - 2019 Water System Improvements WATER 1 Water Total Water Fund Water Total Grand Total 170 171 Capital Improvement Plan 2015 thru 2019 Department Engineering City of Faribault, Minnesota Contact Engineering Type BRIDGE Project # Useful Life Project Name 2015 - 2019 Bridges Category Capital Asset # Priority Improvement Improvement 40 years Infrastructure 2 Medium Unit # Description BRIDGE -16 Teepee Tonka Park Entrance ( over Straight River) BRIDGE -17 2nd Avenue West (over Division Street) BRIDGE -18 Ladonna Lane ( over Crockers Creek) Justification 16) Repainting and other routine/on-going maintenance work to preserve structural components. 17) Replacement of deficient bridge (restricted load rating and geometrics) 18) Replacement of multiple lines of aged CMP culverts. Expenditures 2015 Construction Total 2015 Funding Sources 2016 2017 Total 200,000 2, 100, 000 100, 000 1, 800, 000 200, 000 2, 100, 000 2016 2017 State - MnDOT Bridge Bonds 2018 2019 Total 550,000 550,000 1, 200, 000 1, 200,000 Storm Water Fund Total 2019 1, 800, 000 Municipal State Aid Street Imp Projects Fund 2018 100,000 75, 000 75, 000 100, 000 50, 000 125, 000 275, 000 100, 000 1, 800, 000 200, 000 2, 100,000 Budget Impact/Other 172 CityOf. Farlbault 11 1 HsTw ii..a 2015- 2019 C. I.P. Bridge Improvements 2 \< 38TH STNW 6 1 46 0 a = r. • oonno t. _..: 7 (" X93 O 30 2017 2nd Avenue Bridee Over Division Street 1 1'- STNi ER AR PL Z Off- i Mj 2PiN ST NW ' •. 24THSTNW i 78TN Deno 0 j 7 1 RGP TN A w•. R ' voovoono s• S 1 17HSTNW J .. 1• Lake TH 1 i 31ERSCHE RD R aTli6 TN h > 6 hSYST 1x3 u Wells : 1 BMTTESON S7 z ( NNONCR : JQ L ayk ST w i W S IT S i S• E NE ST s= 6 T Z. Sw,w.•. S Tsw ' G a 1 f1T IN — • s I tV. O¢ ' STSE rN el y ! e w 4 1 TH ST SW c 2018 Ladonna Lane Bridge Over Crockers Creek _ . Improvement Year +] 02016 2017 '. -••— . 2018 , a D m\ In e c ^'} 2 2016 Teepee Tonka 1 Park Entrance F rcxE a N CRES T` E ' s '\ Q l•_ T' BTHsI 31j ee3 I9n4 ST `+ Ysl a .. G41 onn Feet 0 173 2, 000 4, 000 Capital Improvement Plan 2015 thru 2019 Department Engineering City of Faribault, Minnesota Contact Engineering Type DWNTWN Project # Useful Life Project Name 2015 - 2019 Downtown Area Parking Lot/Alley Imp Category Capital Asset # Priority Improvement 20 years Infrastructure 3 Low Unit # Description arious major improvements to the public parking lots, alleys, and streetscape in the Downtown Area. Justification Overlay or reconstruction of aged or failing pavements, alleys or sidewalks. Expenditures 2015 Construction Total Funding Sources Total 2017 2018 2019 Total 50, 000 50, 000 50, 000 50, 000 295, 000 95,000 50, 000 50, 000 50, 000 50, 000 295,000 2015 Street Imp Projects Fund 2016 95, 000 2016 2017 2018 2019 Total 95, 000 50, 000 50, 000 50, 000 50, 000 295, 000 95,000 50, 000 50, 000 50,000 50, 000 295, 000 Budget Impact/ Other Downtown Area" as defined in Resolution 2009- 063, dated April 14, 2009. 174 175 Capital Improvement Plan 2015 thru 2019 Department City of Faribault, Minnesota Type SIDWLK Project # Engineering Contact Engineering Useful Life Project Name 2015 - 2019 Sidewalk Improvements Category Capital Asset # Priority Improvement 30 years Infrastructure 3 Low Unit # Description tear 2015 Erblang Avenue TH 60/ 1st Street NE to CSAH 20/ St Paul Ave)* 2015 Westwood Drive 17th Street SW to 19th Street SW) 2016 CSAH 20/ St. Paul Ave. ( Parshall St. to Roosevelt Trail) Cardinal Ave. to Twin Lakes Ct) 2016 30th Street NW 2018 Highland Place 2019 Cardinal Avenue Woodland Drive to Park Avenue NW) 2019 18th Avenue NW Paulis Drive to 17th Street NW) CP Railroad to Prairie Avenue)* Note: Costs for new sidewalk construction are listed with street reconstruction project. Justification Installation in accordance with the 2000 Comprehensive Sidewalk/ Trail Improvement Plan. Sidewalks will be considered in conjunction with other roadway improvements, but may not be built due to feasibility of construction Expenditures 2015 Construction Total Funding Sources 2017 2018 2019 60, 000 270, 000 60, 000 150, 000 60, 000 270, 000 10, 000 Municipal State Aid 2016 2017 25, 000 2018 2019 10, 000 125,000 Street Imp Projects Fund 50, 000 Total Total 150, 000 2015 GO/ SA Bond 2016 60, 000 60, 000 150, 000 Budget Impact/ Other Jew sidewalk construction typically done in conjunction with related street improvements. 176 Total 45, 000 125,000 50, 000 100, 000 60, 000 270, 000 1 1 1 CityOf. Fartbault i e,-- ••ILI 2015- 2019 C. I.P. Sidewalk Improvements w , w 6 19TH STNW w F 6 .' o. L.. La 1 3 i3 E AR PLL MDR 3 y. F 4 ' a — 29TH STNW 2 J'r GREENLEAF RD " •• ovv ocv ovvvavecvvm. l[ .. 7 a c iii zarRsrNw Ak 7 i // l=' xorx i r 1 6 v 17HSTNIV i S j= F a r Cb' a u 1. ion- •.. e 3 fLake" z / uTNs t '' nwTFsoN ST ' J f1ST sn Wells., DAN L a k W. T br E 5 ST , I IN sr. F' b. s Sr 3 .. ., o` x Ei A•• a S NV ON 3115 STNS L :. T ST m .•. i \ z a n s Yy x N a 3 „ w - .., 7 1\ ` .• qvo r1 9rH ST SE i PTH ST ,. A..•..._.._.....— • 0 L V,' ' `> i •^' of < 9 1v} 1 Si SW ITH ST SW 6 ITC ML N ORES 1 Improvement Year SUN 1 •~ INE T 2015WTNS W 2016 201 6 9TH si, 2017 N 2018 2019 oop I Fact 0 177 2, 000 4, 000 Capital Improvement Plan 2015 rhru 2019 Department City of Faribault, Minnesota Contact Engineering Type STCON Project # Engineering Useful Life Project Name 2015 - 2019 Street Reconstruction Category Capital Asset # Priority Improvement 50 years Infrastructure I High Unit # Description iTCON- 15 Division Street ( TH 298/ 6th Ave. NE to Shumway Ave.) Erblang Avenue ( TH 60 to CSAH 20/ St. Paul Ave.) Ravine Street ( CSAH 20/ St. Paul Ave. to east end) Seabury Lane ( TH 298/ 6th Ave. SE to west end) 16 lst Ave. NW ( Division Street to 2nd Street NW) 1st Street NW ( 3rd Ave. NW to 200 feet east of 1st Ave. NW) 1st Street SE/ SW ( Ist Ave. SW to Willow Street) 3rd Avenue NW ( TH 60/ 4th Street NW to 5th Street NW) STCON- 17 Brand Avenue ( Division Street E. to 5th Street SE) 4th Street NE ( 5th Avenue NE to west end) 5th Avenue NE ( 4th Street NE to 5th Street NE) STCON- 18 Central Avenue ( Division Street to 1st Street N) Division Street ( 1st Ave. W. to 1st Ave. E.) Park Place ( Division Street to Willow Street) 11th Avenue NE ( Parshall Street to Maple Lane) Maple Lane ( 11th Avenue NE to east end) Highland Place ( Westwood Dr. to Prairie Ave.) STCON- 19 TH 60/4th Street N ( Central Ave. to CP Railroad Crossing) 2nd Street SE/ SW ( 1st Ave. SW to Willow Street) 3rd Avenue SW ( Division Street W. to 3rd Street SW) Justification of pavements at end of design life (typically 50- 60 years). replacements/ extensions/ upgrades evaluated and undertaken as warranted. improvement of roadways (turn lanes, alignment,widths, etc. Expenditures 2015 2016 2018 2019 Construction 1, 500, 000 1, 600, 000 1, 500, 000 2, 600, 000 6, 400, 000 13,600,000 1, 500, 000 1, 600, 000 1, 500, 000 2, 600, 000 6, 400, 000 13,600, 000 2015 2016 2018 2019 Total Total Funding Sources GO/ SA Bond 250, 000 2017 2017 275, 000 250,000 Municipal State Aid Sanitary Sewer Fund Total 350, 000 375,000 800,000 750,000 1, 550, 000 375,000 1, 250, 000 3, 900,000 3, 900, 000 1, 500, 000 250, 000 225,000 200, 000 200,000 Storm Water Fund 100, 000 100,000 200, 000 150,000 150,000 700, 000 Street Imp Projects Fund 600, 000 725,000 600,000 750,000 400, 000 3, 075, 000 Water Fund 300, 000 275,000 250, 000 350,000 450, 000 1, 625, 000 1, 500, 000 1, 600,000 1, 500,000 2, 600,000 6,400, 000 13, 600, 000 State - MnDOT Total 178 a iIW Far°fibault 1 i_•MTH• T v I vw— 2015- 2019 C. I.P. Street Reconstruction w om° 8 A momom._ 5 2 38TI15TNW v o mommomo m a z m 46 • • m 714Y1 yQR 4 9T j 3 i Lfk w3 1 • 1 °° f • ST TlN' .'.; • • Ju v • E OSEDR AR PL 2Y a °; ' 2PTH STNW , y$ r• _ ljf GREENLEAF RD yt vmvvamm _ v_• v® vvovv vva S 2sPHSiNW My' VV r..1 ITrxsrNnv i , F a r I b' a u 1. "_* 3 I9PT f E P• wTEsoN sr ' z J flake/. IJTM v J R ST lV . m z E : it < f 41 WSDR S BRSCHEROJ- 0 el P° Wells L a k i s_ j ST 5 I E Sr , 1 i INE ST e 4P. 1.' J• S srnH eR IV u H 6 u [! F 3 L•• y II{ 1 • p r' 1• ..' Xvv• j' m V e_ PTH Si - j' F v® ev o••_• 9 df ST SW I L• k - ` rx sT sw r t e 1\ 9.. 6 ITCHELL A? - ° C NCRES - i LL H a 7 l T .. RPP auyu° O I. RiP0.1NG 0.0 P91-,-„--- . w. _ Improvement Year -• 1 ' f 18 — SUN I n •... =. rte l _..® ' v °> ' i INE @ :: Y:: T F.*eF:. •• i 2015 2016 2017 1• 2018 , .. P mommom., r 2019` ; Feet 0 179 2, 000 4, 000 OFa lbault_ 180 2115 thru 2019 Capital Improvement Plan Department Engineering Contact Engineering City of Faribault, Minnesota Type Improvement STOVLY Project # Useful Life Project Name 2015 - 2019 Street Overlays Category Priority Capital Asset # Unit # Description 2015 STREETS 1st Street SE 10th Ave. SE to Tischler Ave.) Tischler Avenue 1st Street SE to 2nd Street SE) 5th Street NE 5th Ave. NE to Shumway Ave.) 11th Street SW Mills Place to 9th Ave. SW) Mills Place Willow St. to 11th St. SW) Faribault Road Highland Place to Jensen Drive) 2nd Street NW 20th Ave. NW to 21st Ave. NW) 4- 1/ 2th Street NW Sundet Lane to 23rd Ave. NW) 20th Avenue NW Old 4th Street to 2nd Street NW) 20- 1/ 2th Ave. NW 2nd Street NW to Grant Street) 23rd Avenue NW Sundet Lane 4- 1/ 2th Street NW to Sundet Lane) Old 4th Street wo Western Avenue) Patricks Bay Westwood Drive to Westwood Drive) Westwood Drive ( 17th Street SW to 19th Street SW) 16 STREETS i Street NW 8th8th AvenueAvenue NWNW toto LincolnLincoln AvenueAvenue NW)NW) i Steet SW 6th Avenue SW to 7th Avenue SW) i Avenue SW Tatepaha Blvd. to 4th Street SW) tsford Circle rlton Avenue ander Street Carlton Avenue to north end) CSAH 18/ 9th Avenue SW to 8th Street SW) 7th Avenue SW to Tyman Place) tepaha Blvd. Carlton Avenue to 6th Avenue SW) th Street NW Cardinal Ave. to Industrial Drive) rshall Street Shumway Avenue to St. Paul Avenue) Spring Road to 17th Street SW) iirie Avenue 2017 STREETS Albers Path CSAH CSAHCSAH 45/ 45/45/ Willow WillowWillow St StSt to toto CSAH CSAHCSAH 19/ 19/19/ Glynview GlynviewGlynview Trl) Trl)Trl) Aldrich Court Buckingham Path to end cul- de- sac) Aldrich Way Albers Path to Del Ln.) Babbitt Court Buckingham Path CSAR 19/ Glynview Tri. To end/ cul- de- sac) Aldrich Ct. to Aldrich Ct.) Buckingham Way CSAR 19/ Glynview Trl. To Aldrich Ct.) Del Lane Aldrich Way to end/ cul-de- sac) Southview Dr. CSAH 19/ Glynview Trl. To end/ cul- de- sac) 2018 STREETS 32nd Street NW ( CSAR 76/ Park Avenue NW to Industrial Drive) Highland Place CSAH 48/ Lyndale Avenue to Westwood Drive) Industrial Drive Industrial Drive 30th Street NW to north end) 30th Street NW to south end) Lincoln Ave. SW 8th Street SW to 9th Street SW) 8th Street SW to 9th Street SW) 8th Street SW CSAR 18/ 9th Ave. SW to Home Place) 9th Street SW CSAH 18/ 9th Ave. SW to Prairie Ave.) 10th Avenue SW 8th Street SW to 9th Street SW) Home Place 3rd Street NW Irving Avenue to Old 4th Street) Highland Place CSAH 48/Lyndale Avenue to Westwood Drive) Shumway Avenue CSAR 20/ St. Paul Avenue to Legacy Court) Townsquare Lane CSAR 48/ Lyndale Avenue to Prairie Avenue) 181 15 years Infrastructure 2 Medium Capital Improvement Plan 2015 thru 2019 Department Ulty of Farlbault, Minnesota Engineering Contact Engineering 2019 STREETS Cardinal Avenue ( Woodland Dr. to Park Ave. NW) ** Allen Avenue Allen Path to Allen Path) Allen Lane Allen Path to Sunbird Dr.) Allen Path CSAH 45/ Willow St. to Allen Ave.) Sunbird Drive Sunshine Ln. to south end) 18th Avenue NW 160 ft. south of Paulis Dr. to 16th St. NW) ** 19th Avenue NW South end to 16th St. NW) Eagle Court 18th Avenue NW to west end/ c- d- s) Paulis Dr. to 15th St. NW) Fairway Drive Paulis Drive 18th Avenue NW to Fairway Drive) Flynn Street Francis St. to Fowler St.) Fowler Street Francis St. to Lind St.) Francis Street Locust St. to 325' south of Lind St.) Lind Street Willow St. to Fowler St.) Willow St. to Francis St.) Locust Street Poplar Street Willow St. to Francis St.) Rice Street Francis St. to 300' south of Lind St.) Short Street Francis St. to south end) Designated for sidewalk construction per Comprehensive Sidewalk & Trail Plan Justification xtend useful life of existing pavement. Expenditures 2015 Construction Total Funding Sources 2017 2019 Total 700, 000 1, 150, 000 1, 100, 000 4, 750, 000 850, 000 950,000 700, 000 1, 150, 000 1, 100,000 4, 750,000 300,000 Municipal State Aid 2016 2017 200,000 250, 000 550, 000 Sanitary Sewer Fund 2018 950, 000 2015 GO/ SA Bond 2016 850, 000 2018 2019 250, 000 425,000 700, 000 Total 1, 425,000 1, 250, 000 25, 000 25, 000 25, 000 25, 000 25, 000 125, 000 Storm Water Fund 150,000 50, 000 50, 000 25, 000 100, 000 375, 000 Street Imp Projects Fund 350, 000 50, 000 350, 000 125, 000 525,000 1, 400, 000 25, 000 75, 000 25, 000 25, 000 25, 000 175, 000 850, 000 950, 000 700, 000 1, 150, 000 1, 100, 000 4, 750, 000 Water Fund Total Budget Impact/ Other 182 CitY0f Faribault 0_ HST 2015- 2019 C.I.P. Street Overlay Improvements 6 o• oovvoo•_ 14TH ST NW t Y 46 O r aO yon L k' - IT AR PL 3 0 OSE DR Q, e' i 24TH STNW _„_,• Y 7 ORvvwn F• F RD •._.•_/._•/_/._/• tl' W E 2ITH ST I.' tV ' i30TH 7 i WTTESON ST 1••_ o sT R r194i S i E w ,• MRSCHE RD R o Ctr` 4. 5 1 6 t WeI15R 4' Lak 3 No • m srsrw . a° xaxE a STNE q IV 3 1s QN`Q m ON T sx w 4 ` 3 • sxx s _ u 9 ITN IT SW i. 6 ITCHELL N CRES 7 fn . 43RY3vNu0 Lw SP0.1NG 0.01W Improvement Year - 11•• 7^ a,., , 1 2015 , • Fe L ,+ SUNs 1NE `} RC °® D ® .. v® 4TN 4T W , g"!' 2016 N. 2017 2018 .. m••_•. f k, 201961 I Feer 0 183 2, 000 4, 000 Capital Improvement Plan 2015 thru 2019 Department Engineering City of Faribault, Minnesota Contact Engineering Type TRAIL Project # UsefulUseful LifeLife Project Name 2015- 2019 Trail Improvements Improvement 25 years Category Infrastructure Capital Asset # Priority 3 Low Unit # Description RAIL -16 CSAH 46/ Bagley Avenue Trail RAIL- 18 Mill Towns Trail ( White Sands Trailhead to 17th Street NW) RAIL -Future Northern Link Trail (North Alexander Park to Hulett Avenue) Justification Installation in accordance N ith the 2000 Comprehensive Sidwalk/Trail Improvement Plan. TRAIL -16 Connect existing trail adjacent to Aldi Distribution Center to proposed future trail along TH 21. TRAIL -18 Part of State trail system -DNR project. TRAIL -Future Connection of two existing trail systems including railroad underpass Expenditures 2015 Construction Total hunding sources 2015 Municipal State Aid Total Budget Impact/Other FRAIL -16 2016 2017 2018 2019 Total 100, 000 100,000 100, 000 100, 000 2016 2017 2018 2019 Total 100, 000 100,000 100,000 100,000 I Construct in conjunction with scheduled CSAH 46/Bagley Avenue roadway improvements by Rice County. 184 Feet 00 185 Capital Improvement Plan 2015 thru 2019 City of Faribault, Minnesota Sewer Contact Engineering Type SWR Project # Department Useful Life Project Name 2015- 2019 Sanitary Sewer System Improvements Category Capital Asset # Priority ImprovementImprovement 50 years Infrastructure 1 High Unit # Description SWR -15A Relocation of Eastside Interceptor ( 14th Street NE to 2000' 750,000 south) due to Straight River bank erosion SWR -15B Construction of concrete wall at Water Reclamation Facility for 400, 000 Straight River bank stabilization/ protection. SWR -15C Modifications to Viaduct Lift Station for flood protection SWR -16 Interceptor #2 Replacement/ Upgrade ( 2nd Avenue NW to 400 feet east of 7th Avenue NW) Note: Includes 14th Street NW reconstruction SWR -18 100,000 1, 500,000 Legacy/ Orchard View Area Sewer Extension $ 300, 000 Justification SWR -15A/ 13 Protection of sewer piping and WRF structures from failure due to Straight River bank erosion. SWR -16 SWR -18 Provide additional capacity and depth ( in accordance with 1993 Comprehensive Sewer Study) Extend sanitary sewer service to unserved neighborhoods where street reconstruction is scheduled. Expenditures 2015 2016 Construction 1, 250,000 1, 475,000 300, 000 3, 025, 000 1, 250, 000 1, 475,000 300,000 3,3, 025,025, 000000 20152015 2016 Total Funding Sources GO/ SA Bond Sanitary Sewer Fund 625, 000 State - Infrastructure Grant 625, 000 2017 2017 2018 2018 2019 2019 Total Total 40,000 50,000 90, 000 1, 200, 000 250,000 2, 075,000 625,000 Storm Water Fund 100, 000 100,000 Street Imp Projects Fund 125, 000 125,000 Water Fund 10,000 Total 1, 250, 000 1, 475,000 Budget [ mpact/ Other State/ Federal funding assistance -Flood mitigation for SWR -15 projects. 186 10, 000 300,000 3,025, 000 CityOf FarMault 2015- 2019 C.I.P. Sanitary Sewer Improvements 2015 Eastside Interceptor Relocation ` Y L 4,k dj ' / ST I, i J"•• • 7 4' ..% WRF River Wall Construction Interceptor Relocation due to Straight River Erosion. Straight River bank protection. M 2016 Interceptor Replacement P i' Interceptor 2 7th Avenue NW to 1st Avenue NW r Hells Lake. 2018 Sanitary Sewer Extension Legacy/ Orchard View Area 11th Avenue NE and Maple Lane 2015 Lift Station Modifications Viaduct Lift Station Flood Protection Improvement Year 2015 2016 2017 2018 2019 FPPt I 187 0 2, 000 4, 000 Capital Improvement Plan 2015 thru 2019 Department City of Faribault, Minnesota Sewer Contact Engineering Type Project # SWR REHAB Project Name Sanitary Sewer Structure Rehabilitation Useful Life Category Capital Asset # Priority Improvement 3 years Infrastructure 1 High Unit # Description Witional sanitary sewer rehabilitation work that was not able to be completed in 2014. Justification Additional structures need to be rehabilitated to reduce system failures and Inflow/Infiltration. Expenditures 2015 Facility Maintenance Total Funding Sources TotalTotal 2017 2018 2019 Total 50, 000 50, 000 50, 000 50, 000 250,000 50,000 50, 000 50,000 50, 000 50,000 250, 000 2015 Sanitary Sewer Fund 2016 50, 000 2016 2017 2018 2019 Total 50, 000 50, 000 50, 000 50, 000 50,000 250, 000 50,50, 000000 50,50, 000000 50,50, 000000 50,50, 000000 50,50, 000000 250,250, 000000 BudgetBudget Impact/Impact/ OtherOther 188188 2015 rhru 2019 Capital Improvement Plan Department City of Faribault, Minnesota Contact Type STWTR REHAB Project # Useful Life Project Name Storm Water Structure Rehabilitation Category Capital Asset # Priority Storm Water Public Works Improvement 20 years Infrastructure 2 Medium Unit # Description Storm Water infrastructure improvements. Justification I Ceep infrastucture updated and in good working order in areas not scheduled for street construction projects. Additional structures need to be ehabilitated to reduce system failures. Expenditures 2015 Construction Total Total 2017 2018 2019 Total 50, 000 50, 000 50, 000 50, 000 250, 000 50, 000 50, 000 50, 000 50, 000 50, 000 250, 000 2015 Funding Sources Storm Water Fund 2016 50, 000 2016 2017 2018 2019 Total 50, 000 50, 000 50, 000 50, 000 50, 000 250, 000 50, 000 50, 000 50, 000 50, 000 50, 000 250, 000 189 Capital Improvement Plan 2015 rhru 2019 City of Faribault, Minnesota Water Contact Engineering Type WATER Project # Department Useful Life Project Name 2015 - 2019 Water System Improvements ImprovementImprovement 50 years Category Infrastructure Capital Asset # Priority 11 High High Unit # Description WAT- 15 Replacement of two watermain crossings under the Straight River 350, 000 WAT- 16A Construction of Southeast Area Distribution Main ( Willow Street 350,000 and 12th Street SW) WAT- 16B Replacement of PVC Watermain-30th St. NW (Park Ave. to 800' 200, 000 west of Industrial Dr.) WAT- 17 Construction of Southwest Area Distribution Main - Phase 3 950, 000 Highland Pace. To 17th Street SW) WAT- 18 Construction of Eastside High Pressure Zone Distribution 400,000 Improvements - North (Matteson Street to Legacy Drive) WAT- 19 Westside watermain looping improvements ( Old 4th Street/ 750, 000 to Calvary Drive & Western Ave/ West Airport Drivel Justification System improvements in accordance with 2001 Water Distribution System Analysis Study and 2005 Urban Growth Study. WAT- 15 Replace aged piping/provide additional cover. WAT- 16A Improved system distribution and pressure. WAT- 16B Replace piping that has had multiple break history. WAT- 17 Improved system distribution and pressure. WAT- 18 Expansion of HPZ area to Legacy Drive. WAT- 19 Elimination of long " dead- end" watermains/ provide future Qrowth area capacity. Expenditures 2015 Construction TotalTotal Funding Sources Total 2017 WAT- 18 Total 400,400, 000000 750, 000 3, 000, 000 350,350, 000000 550, 000 950,000 400, 000 750,750, 000000 3, 000, 000 2016 2017 2018 20192019 350, 000 550,550, 000000 950, 000 400, 000 750, 000 3, 000,000 350, 000 550, 000 950, 000 400,000 750, 000 3, 000,000 Evaluate directional drilling as low impact construction. WAT- 16B Construct with planned overlay and sidewalk improvements. WAT- 19 2019 950, 000 Budget Impact/ Other WAT- 15 2018 550,000 20152015 Water Fund 2016 350, 000 Construct with sanitary sewer extension imrpovements. Utilize existing case pipes installed under I-35. 190 Total b m. CityOfi FarbauIt 2015- 2019 C.I.P. 2016 30th St. NW PVC Pipe Replacement P Water Improvements 2015 Watermain River Crossing Replacements Straight River Matteson Street Legacy Drive Old 4th St. NW to Calvary Dr. Western Ave. to W. Airport Dr. 1. Wells Laker 2016 Southeast Watermain Willow Street 12th Street SW 2017 Southwest Watermain Lyndale Avenue Highland Place to 17th St. SW) Improvement Year 2015 2016 2017 A' 2018 2019 0 J Feet 0 2, 000 4, 000 CityOf FaribaW 192