Photos
Transcription
Photos
Princeton Dam 35% Design Report DFD Project Number 13K1I Prepared by For State of Wisconsin Wisconsin Department of Administration Division of Facilities Development February 2015 Princeton Dam 35% Design Princeton Dam Wisconsin Department of Natural Resources Green Lake County, WI DFD Project No. 13K1I 35% Design Report Appendix Appendix A – Background and Design Concept Appendix B – Reduction of Downstream Hydraulic Appendix C – Raised Fixed Crest to Replace Flashboard System Appendix D – Bypass Fishway Appendix E – Site Improvements Appendix F – Construction Considerations Appendix G – Opinion of Probable Construction Cost Appendix H – Project Schedule Attachment A – 35% Design Drawings Attachment B – Site Improvement Photographs Final Report 1 February 2015 Princeton Dam 35% Design DISCLAIMER The findings, interpretations of data, recommendations, specifications or professional opinions presented in this report are based upon available information at the time the report was prepared. Studies described in this report were conducted in accordance with generally accepted professional engineering and geological practice, and in accordance with the requirements of the Client. There is no other warranty, either expressed or implied. The findings of this report are based on the readily available data and information obtained from public and private sources, and information obtained from the State of Wisconsin and Lake Puckaway Association. Additional studies (at greater cost) may or may not disclose information that may significantly modify the findings of this report. MWH accepts no liability for completeness or accuracy of the information presented and/or provided to us, or for any conclusions and decisions that may be made by the Client or others regarding the subject site or project. The Client acknowledges that MWH has no control over costs of labor, materials, competitive bidding environments and procedures, unidentified field conditions, financial and/or market conditions, or other factors likely to affect any Opinion of Probable Construction Cost of the concepts described in this report, all of which are and will unavoidably remain in a state of change, especially in light of the high volatility of the market attributable to Acts of God and other market events beyond the control of the parties. Client further acknowledges that any cost opinions are a “snapshot in time” and that the reliability will inherently degrade over time. Client agrees that MWH cannot and does not make any warranty, promise, guarantee, or representation, either express or implied, that proposals, bids, project construction costs, or cost of operation or maintenance will not vary substantially from MWH’s good faith estimates of Opinion of Probable Construction Cost or Schedule. This report was prepared solely for the benefit of the Client. No other entity or person shall use or rely upon this report or any of MWH's work products unless expressly authorized by MWH. Any use of or reliance upon MWH's work product by any party, other than the Client, shall be solely at the risk of such party. Final Report 2 February 2015 Princeton Dam 35% Design Appendix A – Background and Design Concept Operation of the Princeton Dam in its current configuration presents a significant safety hazard with potentially perilous consequences. Recent evidence of this is the near drowning by the contract operator in 2012 while removing flashboards to lower the summer water levels for the winter season. Aside from the primary purpose of reducing the safety risk, modifying the dam may stabilize water levels for the residents of the Lake Puckaway Association and may help implement future water quality and fisheries improvements. These are the desired outcomes for both the Wisconsin Department of Natural Resources (WDNR) and the local public both upstream and downstream from the existing dam. Subsequently, MWH was retained by the WDNR to prepare a 35% design for modifications to Princeton Dam to meet WDNR objectives. The project consists of the placement of rip rap downstream of the dam to reduce the downstream hydraulic, replacement of the flashboard system with a raised fixed crest, and construction of a bypass fishway structure within the dam’s left abutment (looking downstream). Additional site improvements include: Replacement of the lock slide gates, guides and upgraded actuators; Removal of trees and brush adjacent to the dam and lock dry masonry structures: Reconstruction of the lock gate structure access steps; Relocation of the gate operations control panel; Replacement of the wooden gateway decking with steel grating; and Additional security fencing. The 35% design also includes the deactivation of the existing electric fish barrier. Final Report 3 February 2015 Princeton Dam 35% Design Appendix B – Reduction of Downstream Hydraulic Operation of the Princeton Dam in its current configuration presents a significant safety hazard with potentially perilous consequences. Recent evidence of this is the near drowning by the contract operator in 2012 while removing flashboards to lower the summer water levels for the winter season. The potential for a hydraulic forming downstream of Princeton Dam can be greatly reduced by filling in the area downstream of the dam with a gently sloping rip rap fill. The rip rap would have to be large enough to prevent movement when subjected to flows plunging over the dam’s raised fixed crest. The 35% design assumes that the downstream rip rap can be placed in the wet, and that sufficient quantities of material can be obtained within 20 miles of the project site. Previous studies(1) have been conducted to identify means of reducing dangerous hydraulics from forming downstream of fixed crest dams in Illinois. The studies have indicated that the rip rap would be placed approximately 2 feet below the fixed crest and have a slope no steeper that 1V:10H. These studies have also indicated that a D30 of 1.3 feet would be required. In addition, the rip rap would have to be sufficiently sized to resist movement resulting from plunging flow velocities associated with an assumed drop of 2 feet over the raised fixed crest. Using USACE HDC712-1(2) and assuming turbulent flow similar to the condition downstream of a stilling basin, the required size for rip rap would have a D15 of 1.0 foot, D50 of 1.9 feet, and D100 of 2.4 feet. WSDOT extra heavy rip rap gradation meets the D100 requirement regarding the maximum size, but would not meet the size requirement over the entire gradation. Consequently, the WSDOT extra heavy rip rap material would need to be further processed to improve its gradation to reduce the hydraulic as well as resist movement during the critical plunging flow condition. During final design, reducing the size of the rip rap beneath the upper layer of extra heavy rip rap will be studied to utilize more locally available and lower cost material. The possibility of terminating the “feathering” at the downstream end of the rip rap and changing the rip rap gradation immediately downstream of the bypass fishway will also be considered during the final design phase to further reduce the costs. References: (1) Evaluation of Public Safety at run-of-River Dams, and Illinois Statewide Program, Capital Development Board of Illinois, CDB Project # 102-00-061, CTE/AECOM, July20, 2007 (2) US Army Corps of Engineers, Hydraulic Design Criteria, Vicksburg, Mississippi Final Report 4 February 2015 Princeton Dam 35% Design Appendix C – Raised Fixed Crest to Replace Flashboard System Current operations involve installing flashboards in the late spring-early summer to increase Lake Puckaway summer recreational levels, and removing them in late summer-early fall to lower lake levels for the winter season. The current flashboard system consists of placement of three levels of 2-in by 6in (nominal) wooden boards totaling 16.5 inches in height against steel pins inserted in the crest 4-foot on centers. The flashboard installation and removal often occurs with flow passing over the dam which subjects workers to difficult and potentially dangerous working conditions. The 35% design features replacing the flashboard system with a 16.5-in thick by 15-foot-wide raised fixed crest concrete slab overlay. The overlay would be sloped to match the slope of the existing crest. The sloping crest would allow floating debris which is currently collecting in the flashboards to pass over the dam. The sloping crest would also reduce the winter ice loads on the dam. The reinforced cast-in-place concrete slab overlay would be doweled into the existing 6-in-thick overlay and supporting timber cribbing. The design assumes that dowels would be spaced one foot on centers and the slab would be placed in a “checkerboard” fashion with waterstops along the upstream edge intermediate construction-contraction joints. The 35% design assumes that the Fox River can be lowered sufficiently to place the slab overlay in the dry without the use of a cofferdam during summer low flow conditions while diverting flows through the lock gate structure. The 35% design layout of the raised fixed crest slab overlay is presented on Drawings 01 and 02. Final Report 5 February 2015 Princeton Dam 35% Design Appendix D – Bypass Fishway The ability to provide seasonal fish passage is an important feature of the 35% design. A stepped bypass fishway located in the left abutment of the dam will allow fish passage at critical times, as well as incorporate a stop log system to provide a barrier to unwanted species. The 35% design bypass fishway (Drawings 01 and 02) was prepared with dimensions similar to those at the upstream Montello Dam. The bypass fishway features stepped stilling pools approximately 24-feetwide by 30-feet-long located within the dam’s left abutment. The bypass fishway consists of two “steps” featuring rest pool boulders, located at the upstream and downstream sections. The upstream section of the bypass fishway projects approximately 15 feet into the reservoir upstream of the dam and has an entrance weir at a level approximately 6 inches lower than the raised fixed crest level. The downstream section is located within the timber crib dam and has a weir in line with, and at a level 18 inches lower than, the raised fixed crest dam. The upstream section forming half of the bypass fishway is a sheetpile “box”. The 35% design assumes that the most appropriate and available sheeting for this application would be PZC 13 sheeting. The sheeting would be driven in the wet. The downstream section of the bypass fishway consists of a precast concrete-lined channel placed within the timber crib dam. Placement of the channel would require the removal of 7.5 feet of the rockfilled timber crib dam in the wet. The upstream sheetpile cutoff and bypass fishway sheetpile “box” would serve as the upstream cofferdam to divert flow around the work area during the removal of the timber cribbing and placement of the pre-cast concrete-lined channel. The 35% design assumes that each of the timber crib “cells” measure 15-feet by 12-feet, which sets the interior width of the concrete bypass fishway channel at 22 feet. During the final design the dimensions of the timber cribbing cells will be verified and the final precast bypass fishway width will be selected. Should the cribbing width be 15 feet, the bypass fishway will be reduced to 13 feet, and if the cribbing width be 10 feet, the bypass fishway will be reduced to 18 feet. In order to reduce the weight of the precast concrete-lined channel and construction crane requirements, the channel would be fabricated in two pieces. During the final design phase consideration could be given to precast the base slab and walls separately to further reduce the weight and crane requirements. The precast channel would feature a center pier at the downstream end with access walkway to allow the placement of wooden stoplogs to close the bypass fishway to prevent the upstream migration of invasive species during warm water conditions. The downstream rip rap gradation and depth associated with the reduction of the hydraulic would be altered immediately downstream to attract and pass game fish through the bypass fishway. The bypass fishway would be lined with WISDOT light rip rap similar to the material gradation used to line the Montello Dam, and will provide randomly placed rest pool boulders. Final Report 6 February 2015 Princeton Dam 35% Design Appendix E – Site Improvements The evaluation study included a site visit to observe the condition of the primary water retaining structures. The observation included the dam, intermediate embankment, and lock walls and lock gate system located at the upstream entrance to the lock. The 35% design includes the following site improvements: Removal of brush and trees near and in the dam and lock dry masonry abutments and walls. Removal of the brush within the gate control panel area and lining the area with geotextile material and stone to prevent future growth. Construction of concrete stairs at both entrances to the lock gate walkway, replacing the deteriorated wooden steps. Replacement of the timber walkway decking with steel grating. Relocate the motor control panel to the walkway sufficiently high to prevent future water damage during high flow events. Replacement of the lock slide gates with new upstream frame supporting new gate guides, gates and actuators. Installation of security fencing around the perimeter of the lock abutments and walkway. Since the 35% design features a raised fixed crest to replace the flashboard system, the upstream safety cable system will no longer need to be improved. In addition, the ability to close the bypass fishway with stoplogs, the electric fish barrier will no longer be required, and will be deactivated. Drawing 03 indicates the general areas where the site improvements will be made. Photographs of the critical areas needing improvements are provided as an attachment to the Appendix. Final Report 7 February 2015 Princeton Dam 35% Design Appendix F – Construction Considerations The timber crib rockfill dam serves as a fixed crest spillway. The project improvements are to reduce the downstream hydraulic by placing processed extra heavy rip rap downstream of the dam, and replace the seasonal installation and removal of the flashboards with a 16.5-in thick concrete slab overlay on the crest of the dam. Finally, a 24-foot-wide section of the timber crib dam will be removed for the installation of a two-section precast concrete bypass fishway channel. A sheetpile “box” located upstream of the precast channel will complete the bypass fishway. It is MWH’s opinion that due to the high water levels, excessive scour downstream of the dam, and difficulty in dewatering the construction area for placing the slab overlay, the use of a cofferdam may not be an economically viable option. The 35% design assumes that the placement of the slab overlay could be completed without a cofferdam during the summer low flow period with the Fox River diverted through the opened lock gates. However, the construction bid documents will allow the contractor to propose a cofferdam arrangement in their bid. The partial demolition of the timber crib and placement of the bypass fishway will be performed in the wet behind the sheetpile cutoff wall and upstream sheet pile “box”. The placement of the fixed crest slab overlay can be performed in the dry during the diversion of the low Fox River summer flows through the adjacent lock gates. The placement of the downstream rip rap rockfill will be placed in the wet after the completion of the dam improvements. The 35% design included a preliminary constructability review resulting in the development of a possible sequence of possible construction activities that could be used to avoid the use of an expensive cofferdam. The flowing possible sequence of construction activities is presented on Drawings 01 and 02. Stage 1 – Place a partial sheetpile cutoff along the upstream face of the dam Stage 2 – Place the bypass fishway sheetpile “box” upstream of the dam Stage 3 – Remove the 24-foot-wide section of the timber crib dam Stage 4 – Place the precast concrete bypass fishway channel sections with walkway and flashboards within the left dam abutment Stage 5 – Excavate the interior of the sheetpile “box and place rip rap liner into the bypass fishway Stage 6 – Place the 16.5-in raised fixed crest slab overlay Stage 7 – Place the downstream extra heavy processed rip rap rockfill downstream of the dam Modifications to the dam could be completed in a three month period during low flow summer conditions. Final Report 8 February 2015 Princeton Dam 35% Design Appendix G – Opinion of Probable Construction Cost The following spreadsheet provides MWH’s Level 5 opinion of probable construction cost to modify the Princeton Dam and implement site improvements is based on the 35% design concept selected by the WDNR. Unit and lump sum prices are based on costs for similar projects, engineering judgment, published cost data, and budgetary quotes from contractors. A 25% contingency was applied to the unit costs for site conditions which may impact final construction costs. The opinion probable construction cost is in 2018 dollars. Opinion of Probable Construction Cost Date: Project Client Location Prepared by Estimator: J. Bello Checked by: J. Borg Item 1.0 2.0 3.0 Princeton Dam DFD Green Lake County MWH Description Quantity Units 1 1 LS LS Hydraulic Rip Rap 2.1 WISDOT Extra Heavy Rip Rap 2.2 Adjustment for Transportation 2.3 Material Placement 5555 5551 5555 Fixed Crest Raise 3.1 Surface Preparation 3.2 Dowels 3.3 Wire Mesh 3.4 Formwork 3.5 Waterstops 3.6 CIP Concrete (pumped) 3.7 Surface Finish 2348 1200 120 510 90 120 2348 Site Preparation 1.1 Insurance and Bonds 1.2 Mobilization/Demobilization Final Report 9 16-Feb-15 Unit Cost Total $ 10,000.00 $ $ 90,000.00 $ Subtotal: $ 10,000.00 90,000.00 100,000.00 Ton LCY Ton $ $ $ 42.00 23.63 47.25 Subtotal: $ $ $ $ 233,310.00 131,147.10 262,473.75 626,930.85 SF EA Sheet LF LF CY SF $ $ $ $ $ $ $ 1.31 3.81 177.19 16.94 26.91 34.13 1.08 Subtotal: $ $ $ $ $ $ $ $ 3,081.75 4,573.80 21,262.50 8,637.62 2,422.04 4,095.00 2,539.36 46,612.06 February 2015 Princeton Dam 35% Design 4.0 5.0 6.0 Bypass Fishway 4.1 Upstream Sheetpile Cutoff 4.2 Sheetpile Box Walls 4.3 Timber Crib Demolition 4.4 Timber Crib Offsite Disposal 4.5 Precast Concrete Channel 4.6 WISDOT Light Rip Rap 4.7 WISDOT Medium Rip Rap 4.8 Walkway and Stoplogs 4.9 Security Fencing 732 891 1 72 2 66 38 1 100 SF SF LS LCY EA Ton Ton LS LF $ 65.63 $ $ 65.63 $ $ 26,250.00 $ $ 23.63 $ $ 21,000.00 $ $ 98.44 $ $ 98.44 $ $ 19,031.25 $ $ 65.63 $ Subtotal: $ 48,040.78 58,471.88 26,250.00 1,690.37 42,000.00 6,496.88 3,740.63 19,031.25 6,562.50 212,284.28 Equipment Rental 5.1 Crane Rental (20 ton) 5.2 Backhoe Rental 5.3 Miscellaneous Equipment 1 1 1 LS LS LS $ 59,062.50 $ $ 59,062.50 $ $ 98,437.50 $ Subtotal: $ 59,062.50 59,062.50 98,437.50 216,562.50 Site Improvements 6.1 Tree Removal 5.2 Brush removal 5.3 Access Stairs 5.4 New Decking 5.5 Relocated Control Panel 5.6 Lock Gate Preplacements 5.7 Security Fencing 8 300 28 300 1 5 100 EA SF LFSN SF LS EA LF $ 459.38 $ $ 6.56 $ $ 40.69 $ $ 6.56 $ $ 39,375.00 $ $ 33,468.75 $ $ 65.63 $ Subtotal: $ 3,675.00 1,968.75 1,139.25 1,968.75 39,375.00 167,343.75 6,562.50 222,033.00 Subtotal (Items 1-6 above): Construction Contingency (10%): DFD Management Fee: Phase II Final Design: Construction Residence Engineering: Other Fees: Total Estimated Cost: $ 1,424,422.69 $ 142,442.27 $ 62,674.60 $ 141,017.85 $ 62,674.60 $ 23,625.00 $ 1,856,857.00 Other fees include the following reimbursable expenses: Final Report Dam Failure Analysis: Topo Survey: Geotechnical Investigations: 10 Dam Stability Analysis: $ 7,875.00 $ 1,575.00 $ February 10,500.00 2015 $ 3,675.00 Subtotal: $ 23,625.00 Princeton Dam 35% Design Other fees include the following reimbursable expenses: Dam Failure Analysis: Topo Survey: Geotechnical Investigations: Dam Stability Analysis: Final Report 11 $ $ $ $ Subtotal: $ 7,875.00 1,575.00 10,500.00 3,675.00 23,625.00 February 2015 Princeton Dam 35% Design Appendix H – Project Schedule It is the WDNR’s goal to construct the modifications to Princeton Dam and to the project site improvements in accordance with the following schedule milestones: Submission of 35% Design Documents for Review: February 16, 2015 Submission of Final Design Documents for Review: Fall 2017 Bid Opening: Spring 2018 Start of Construction: Summer 2018 Substantial Completion / Occupancy: Summer 2019 Final Report 12 February 2015 Princeton Dam 35% Design Attachment A 35% Design Drawings Final Report A-1 February 2015 Princeton Dam 35% Design Attachment B Site Improvement Photographs Final Report B-1 February 2015 Princeton Dam 35% Design Photograph 1 – Flashboard Installation with Safety Cable System Photograph 2 – Flashboard Installation with Safety Cable System Final Report B-2 February 2015 Princeton Dam 35% Design Photograph 3 – South Access to Lock Gate Structure Photograph 4 – North Access to Lock Gate Structure Final Report B-3 February 2015 Princeton Dam 35% Design Photograph 5 – South Lock Abutment Brush Photograph 6 – North Lock Abutment Brush Final Report B-4 February 2015 Princeton Dam 35% Design Photograph 5 – North Lock Wall Brush Photograph 6 – North Lock Wall Tree Final Report B-5 February 2015 Princeton Dam 35% Design Photograph 7 – South Lock Wall Tree Photograph 8 – South Dam Abutment Brush and Trees Final Report B-6 February 2015 Princeton Dam 35% Design Photograph 9 – North Dam Abutment Brush and Trees Photograph 10 - Lock Gate Motors, Switches and Screw Drives Final Report B-7 February 2015