some projects carried
Transcription
some projects carried
SOME PROJECTS CARRIED-OUT BY: EVOLU-TECH LTD LTEE CATALYTIC WATER TREATMENT TYPICAL SAVINGS : 6 to 29 % ON ENERGY 90% + ON CHEMICALS 6% + ON ROUTINE MAINTENANCE 2008 Evolu-Tech Ltd 1 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE MONTREAL ARCHIVES BUILDING TWO 80HP LOW PRESSURE STEAM BOILERS USED FOR BUILDING HUMIDIFICATION. TWO 250 TONS COOLING TOWER ONE CLOSED CIRCUIT HOT WAT ER HEATING SYSTEM ONE CLOSED CIRCUIT CHILLED WATER SY STEM ONE CLOSED CIRCUIT GLYCOL SYSTEM CATALYTI C TREATMENT RESULTS : CHEMICAL FREE STEAM HUMIDIFICATION FOR BETTER PRESERVATI ON OF ARCHIVES. CIRCUIT ENERGY SAVINGS ESTIMATED AT 10%/YEAR 2008 Evolu-Tech Ltd 2 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE BECANCOUR SKATING RINK ARENA TWO CARRIER 40 TONS COMPRESSORS TWO HEAT EXCHANGERS FOR ENERGY RECUPERATION FROM HOT GAS ONE 600 GAL. HOT WATER RESERVOIR ONE 36 KW 100 GAL. HOT WATER HEATER CATALYTI C TREATMENT RESULTS : CATALYTI CAL DESCALING OF HEAT EXCHANGERS AND HOT WAT ER HEATER PROVIDING AN 11.57% MONITORED ENERGY SAVINGS IN ONE SEASON AND A BETTER ICE QUALITY. 2008 Evolu-Tech Ltd 3 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE BELL CANADA TELEPHONE COMPANY TWO 80 HP STEAM BOILERS TWO 600 HP HOT WAT ER HEATING BOILERS CATALYTI C TREATMENT RESULTS : CATALYTI CAL DESCALING OF BOILERS 95% CHEMICAL CONSUMPTION REDUCTION ENERGY SAVINGS ESTIMATED AT 8 %/YEAR 2008 Evolu-Tech Ltd 4 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE BOURGET COLLEGE TWO 80HP HIGH PRESSURE STEAM BOILERS FOUR 100HP HOT WAT ER HEATING BOILERS CATALYTI C TREATMENT RESULTS : A) CATALYTICAL CLEANING AND DESCALING OF ALL CIRCUITS B) CHEMICAL FREE STEAM FOR KITCHEN C) RECUPERATION OF ALL CLOGGED RADIATORS D) 95 % CHEMICAL REDUCTION C) 90% REDUCTION IN STEAM-TRAP REPAIRS AND REPLACEMENTS D) ESTIMATED SAVINGS OF MORE THAN $750,000 DUE TO NON-REPLACEMENT OF RADIATORS WITH ELECTRIC BASE BOARDS 2008 Evolu-Tech Ltd 5 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE CHUL(LAVAL UNIVERSI TY HOSPITAL CENTER) 3000 TONS (21,000 GAL) CHILLED WATER CI RCUIT CATALYTI C TREATMENT RESULTS : A) CATALYTICAL CLEANING AND DESCALING OF ALL CIRCUITS B) 95 % CHEMICAL CONSUMPTION REDUCTION C) 99.99% BACTERIA REDUCTION 2008 Evolu-Tech Ltd 6 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE CLSC PAT (MEDICAL CENTER) 300 KW ELECTRIC HOT WATER SYSTEM FOUR ELECTRONIC HUMIDIFIERS CATALYTI C TREATMENT RESULTS : A) CLEANING OF RUST AND SCALE IN HOT WATER HEATING SYSTEM B) 95 % CHEMICAL REDUCTION C) HUMIDIFIERS ARE MAINTAINED SCALE FREE ( ACID CLEANED BEFORE EVERY WINTER) 2008 Evolu-Tech Ltd 7 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE DEMIX BÉTON, A DIVISION OF ST. LAW RENCE CEMENT INC. A LEADING SUPPLIER OF READY-MIX CONCRETE 1 000 000 BTU HOT WATER GAS FIRED HEAT ER COUPLED WITH A 8 000 GAL. TANK CATALYTI C TREATMENT RESULTS : A) CLEANING OF RUST AND SCALE IN HOT WATER HEATING SYSTEM B) HOT WATER HEATER MAINTAINED S CALE FREE (WAS ACID CLEANED EVERY 6 WEEKS BEFORE CATALYTIC TREATMENT) C) ENERGY SAVINGS ESTIMATED ABO VE 15% 8 2008 Evolu-Tech Ltd Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE GLOBENSKY MANOR REBUILT IN 1903, ORIGINAL HOT WATER H EATING SYSTEM WITH AN OIL HEATING CAST IRON BOILER INSTALLED IN THE THIRTIES. CATALYTI C TREATMENT RESULTS : A) RUSTY WATER AND CORROSION STOPPED B) UNCLOGGING OF RADIATORS C) UNCLOGGING OF THERMOSTATIC VALVES (NO M ORE REPLACEMENT SINCE CATALYTI C TREATMENT) D) RADIATORS AND CIRCUIT MAINTAINED SCALE-FREE WITH CATALYTIC TREATMENT 2008 Evolu-Tech Ltd 9 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE IMPERIAL TOBACCO CANADIAN HEAD OFFICE IN MONTREAL TWO 250 TONS COOLING TOWER ONE CLOSED CIRCUIT HOT WAT ER HEATING SYSTEM ONE CLOSED CIRCUIT CHILLED WATER SYSTEM ONE CLOSED CIRCUIT GLYCOL SYSTEM NEW BUILDING CATALYTI C TREATMENT SELECTED BY DUPRAS-LEDOUX ENGINEERING CONSULTANT AND DESIGNER CATALYTI C TREATMENT RESULTS : ECOLOGICAL, HIGH ENERGY EFFICIENT, V ERY LOW CHEMICAL CONSUMPTION AND LOWER MAINTENANCE WATER TREATMENT 2008 Evolu-Tech Ltd 10 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE JEANNE-MANCE HABITATION COMPLEX (THREE 12 STORY HIGH APARTMENT BUILDINGS) TW0 HIGH PRESSURE (200 PSI) HOT WATER 500 HP WATER TUBE BOILERS CATALYTI C TREATMENT RESULTS : A) A 200% FLOW RATE INCREASE THROUGH BOILER WAS REACHED IN FIRST MONTH OF OPERATION B) 95% CHEMICAL CONSUMPTION REDUCTION C) ESTIMATED ENERGY SAVINGS ABOVE 15 %/YEAR 2008 Evolu-Tech Ltd 11 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE JOLIETTE COMMUNITY COLLEGE ONE 250HP HIGH PRESSURE STEAM BOILERS TWO 150HP HIGH PRESSURE STEAM BOILERS ONE 80 HP, HIGH PRESSURE STEAM BOILERS CATALYTI C TREATMENT RESULTS : A) CHEMICAL FREE STEAM FOR KITCHEN C) 95 % CHEMICAL REDUCTION ($8,500 SAVING/YEAR) C) 90% REDUCTION IN STEAM-TRAP REPAIRS AND REPLACEMENTS D) 13.5% MONITORED GAZ SAVINGS/YEAR 2008 Evolu-Tech Ltd 12 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE MONTREAL HARBOUR HEATING PLANT TWO 100HP 15 PSI STEAM BOILERS CATALYTI C TREATMENT RESULTS : A) CHEMICAL FREE STEAM FOR HUMIDIFICATION OF OFFICES B) MAJOR DESCALING OF BOILER TUBES (BOILER WAS CONSIDERED SCRAP) C) 90% REDUCTION IN STEAM-TRAP REPAIRS AND REPLACEMENTS D) MONITORED 13.74% OIL CONSUMPTION REDUCTION THE FIRST YEAR NOTE: THE MAG-O-PURE CATALYTIC SYSTEM WAS INSTALLED I N 1987 AND HAS BEEN RUNNING EVER SINCE WITH ONLY SODI UM BI-CARBONATE AND SODIUM SULFITE CHEMICALS UPON REQUEST. 2008 Evolu-Tech Ltd 13 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE MOUNTAIN PLACE TWO 178 APARTMENTS BUILDINGS CATALYTI C TREATMENT RESULTS : A) CLEANING OF PARTIALLY CL OGGED 14 RISERS B) CHEMICAL FREE FOR TWO 80 TONS COOLING TOWERS C) 95% CHEMICAL REDUCTION D) CHILLED WATER TEMPERATURE DROPPED FROM PREVIOUS MINIMUM OF 48ºF TO DESIRED 42ºF IN ONE OPERATING MONTH E) ESTIMATED SAVINGS ABOVE $1,000,000 FOR NOT HAVING TO REPLACE CLOGGED PIPING 14 2008 Evolu-Tech Ltd Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE OKA'S ABBEY BOILER ROOM THREE STEAM BOILERS : ONE 250 HP 125 PSI GAZ FIRED ONE 1500 KW 125 PSI ELECTRIC ONE 150 HP 125 PSI GAZ FIRED CATALYTI C TREATMENT RESULTS : SAVINGS IN CHEMICALS = $12 000 PER YEAR SAVINGS IN ENERGY ESTIMATED ABOVE 10% PER YEAR 2008 Evolu-Tech Ltd 15 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE QUEBEC POLICE ACADEMY BUIDING EXTENSION TWO 250 TONS COOLING TOWER ONE CLOSED CIRCUIT HOT WAT ER HEATING SYSTEM ONE CLOSED CIRCUIT CHILLED WATER SY STEM ONE CLOSED CIRCUIT GLYCOL SYSTEM NEW BUILDING EXTENTION CATALYTI C TREATMENT SELECTED BY DUPRAS-LEDOUX ENGINEERING CONSULTANT AND DESIGNER CATALYTI C TREATMENT RESULTS : ECOLOGICAL, HIGH ENERGY EFFICIENT, V ERY LOW CHEMICAL CONSUMPTION AND LOWER MAINTENANCE WATER TREATMENT 2008 Evolu-Tech Ltd 16 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE SAINT-EUSTACHE POLICE STATION GAZ FIRED HOT WATER HEATI NG SYSTEM BUILT IN 1958, ORIGINAL HOT WATE R HEATING SYSTEM. CATALYTI C TREATMENT RESULTS : A) CLARIFICATION OF RUSTY WATER B) UNCLOGGING OF RADIATORS C) UNCLOGGING OF THERMOSTATIC VALVES D) CATALYTICAL DESCALING OF BOILER TUBES E) MONITORED ENERGY SAVINGS NOT CONSIDERING PRICE INCREASE FIRST YEAR = -21.96 % SECOND YEAR = -28.86 % 2008 Evolu-Tech Ltd 17 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE RL-LAMINATION POST PRINTING PLASTIC LAMINATOR CATALYTI C TREATMENT RESULTS : A) LAMINATING DRUMS CAT ALYTICALLY UNS CALED B) BETTER TEMPERATURE CONTROL AFTER CATAL YTIC TREATMENT C) CLOGGED SOLENOID VALVES CAT ALYTICALLY CLEANED D) LIFE OF DRUM SPINDLES WAS EXTENDED FROM 6 MONTHS TO 6 YEARS 2008 Evolu-Tech Ltd 18 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE ROBERT-GIFFARD HOSPITAL CATALYTI C TREATMENT OF A) 38,600 GAL HOT WATER CI RCUIT B) 150 HP, 100 PSI STEAM GENERATOR C) WATER COOLED COMPRESSORS D) 300 GPM HOT DOMESTIC HOT WATER SERVICE E) HEAT EXCHANGER (40 GPM) FOR THE HEATING OF OLYMPIC SIZE SWIMMING POOL. CATALYTI C TREATMENT RESULTS : A) CATAL YTICAL DESCALING OF OVERHEATING COMPRESSORS B) UNCLOGGING OF HEAT EXCHANGERS FOR HOT WATER HEATING SYSTEM C) FREEING OF JAMMED ZONE VALVES D) CHEMICAL FREE STEAM E) ELIMINATION OF SURFACE BL OW-DOWNS ON STEAM GENERATOR F) SAME HEAT EXCHANGER FOR POOL HEATING RUNNING FOR OVER FIVE YEARS WITH MAG-O-PURE TREATMENT UP TO NOW. HAD TO BE REPLACED ANNUALLY BEFORE CATALYTI C TREATMENT. C 2008 Evolu-Tech Ltd 19 Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE SAINT-ANNE CONGREGATI ON MOTHERHOUSE SITUATED AT LACHI NE,QUEBEC CATALYTIC TREATMENT OF A) ONE 100 HP 35 PSI STEAM BOILER B) TWO 100 HP, 15 PSI STEAM BOILER C) ONE 2.6 MBTU HEAT RECORY UNIT CATALYTI C TREATMENT RESULTS : A) LIFE EXTENSION OF BOILER AND HEAT RECOVERY TUBES B) CHEMICAL FREE STEAM C) 95% CHEMICAL REDUCTION D) ELIMINATION OF SURFACE BL OW-DOWNS ON STEAM GENERATOR E) ESTIMATED ENERGY SAVING ABOVE 10 %/YEAR C 2008 Evolu-Tech Ltd Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. 20 SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE GREEN BUILDING PROJECT Mag-O-Pure specified by engineering consultant ETS UNIVERSITY- MONTREAL NEW CAMPUS 2008 Evolu-Tech Ltd Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE GREEN BUILDING PROJECT Mag-O-Pure specified by engineering consultant NEW CONDOMINIUM TOWERS IN MONTREAL 2008 Evolu-Tech Ltd Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE GREEN BUILDING PROJECT Mag-O-Pure specified by engineering consultant NEW CONDOMINIUM TOWERS IN MONTREAL 2008 Evolu-Tech Ltd Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C SOME PROJECTS CARRIED-OUT BY:: EVOLU-TECH LTD LTEE GREEN BUILDING PROJECT Mag-O-Pure specified by engineering consultant NEW HOTEL/ CONDOMINIUM TOWERS IN MONTREAL 2008 Evolu-Tech Ltd Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C TYPICAL MAG-O-PURE : CATALYTIC ASSEMBLIES EVOLU-TECH LTD LTEE • ONE YEAR MONEY-BACK POLICY • FIVE YEAR LIMITED WARRANTY • EASY INSTALLATION (SIDE STREAM NOT AFFECTING EXISTING CIRCUITS) • SOFT CHEMICALS ONLY (NaHCO 3, Na2CO3 , Na2SO3) => No Acid, No Caustic . TM • CONSTANTLY PROVEN Mag-O-Pure CATALYTIC TREATMENT WITH SUCCESSFUL INSTALLATIONS, MANY OVER 10 YEARS, AND SOME OVER 15 YEARS. Contact your local Mag-O-PureTM distributor: H.E. MILISKI CO., INC. Tel/Fa• 860-22 3-2921 Toll Free 1-800-327-4567 Email : << [email protected] >> Since 1945 2008 Evolu-Tech Ltd Reproduced with the permission of Evolu-Tech Ltd Process protected by US patent 5,149,438, Canadian Patent 2,019,185, other patents pending. C