CENRAP Modeling Update
Transcription
CENRAP Modeling Update
CENRAP Modeling Update Calvin Ku Missouri DNR November 4, 2003 CENRAP AP/ESPN Top25 Polls #21 #10 #17 #24 #1 #11 #4 CENRAP Emissions/Modeling Timeline Emissions Modeling Phase 1 Phase 2 Phase 3 Phase 4 Model Selection Perf Evaluation Basecase Control Strategy Jul-Dec 03 Jan & Jul 2002 (1999) Mar-Jul 04 2002 NEI version1 & Update Oct-Dec 04 2002 NEI version 2 state data Jun-Aug 05 2018 Proj. Base & Control S. Nov-Apr 04 Model Evaluation 3 AQ models Apr-Sep 04 Performance Evaluation 1 AQ model Jan-Sep 05 Basecase Performance Evaluation Jul-Sep 05 2018 Base & Sensitivity for Control S. Jan-Apr 04 Sensitivity Chem Mech. Vert layers Apr-Sep 04 Sensitivity EI Improve 12km, IC/BC Apr 04 Selected AQ Model & Dev. Protocol Oct-Dec 05 Control Strategy Runs Jan-Jun 06 Final Strategy Conclusions & Recommendations A MPE Database and Software Designed for Community Use • • • • Comprehensive Processor – data base; binary to NetCDF converter; software – output compatible with common graphics software Versatility – PM, PM components, gases, deposition fluxes User-friendly Design – CENRAP review and community input for software features – Software engineering standard – Based on Fortran 90 and MySQL (free!) Documentation Phase 1 Model Evaluation/Selection • • • • July 1, 2003 - March 30, 2004 CENRAP Domain January and July 2002 Episodes CMAQ, CAMx4.0, and PM-CAMx • • • • • A Systematic Approach to Identify Areas of Deficiencies Uncertainty Assessments to Improve Model Performance Sensitivity Analyses to assist in Model Selection Establish Modeling Infrastructure Develop Modeling Expertise Phase 2&3 2002 Basecase Development • • • • April 1, 2004 - September 30, 2005 CENRAP Domain 2002 NEI versions 1 & 2 Modeling System Selected for PM/Haze • • • • • • • Start with 2002 NEI version 1 Incorporate Emission Inventory Improvements Incorporate Uncertainty Analyses Recommendations Sensitivity Analyses to Improve Model Performance Incorporate State-specific Data (version 2) Conduct 2002 Base Case Modeling Conduct Performance Evaluation Phase 4 Control Strategy Evaluation • • • July 1, 2005 - June 30, 2006 2018 Projection and Control Strategy (NEI version 2) Modeling System Selected for PM/Haze • • • • • Conduct 2018 Basecase after Perf. Evaluation Met Conduct Sensitivity Analyses for Emissions Controls Develop Control strategy Metrix Conduct Control Strategy Modeling Develop Regional Strategies Recommendations