Engineering BOM vs. Assemblage BOM

Transcription

Engineering BOM vs. Assemblage BOM
Engineering BOM vs. Assemblage BOM
Configure me Relatiedag 14 oktober 2015
Ron Sterk | Business Development Consultant | Siemens Industry Software B.V.
Restricted © Siemens AG 2015
Page 1
2015-10-13
Siemens PLM Software
Problems during manufacturing
Business Drivers Impacting Manufacturing
Restricted © Siemens AG 2013 All rights reserved.
Page 5
2015-10-14
Siemens PLM Software
Problems during manufacturing
Current and Future Manufacturing Goals
Restricted © Siemens AG 2013 All rights reserved.
Page 6
2015-10-14
Siemens PLM Software
Example
https://www.youtube.com/watch?v=mlxnuNZIL9o
Restricted © Siemens AG 2013 All rights reserved.
Page 7
2015-10-14
Siemens PLM Software
History
Drawing based
Model based
Modulair approach
Restricted © Siemens AG 2013 All rights reserved.
Page 11
2015-10-14
Siemens PLM Software
Multiple BOM’s
Current way of working
PLM
ERP
Product A
Product A
Item C
Assembly B
Item C
Item D
Item D
Item E
Item F
Item E
eBOM
mBOM
Flattening structure
Additional items
(oil, glue)
Restricted © Siemens AG 2013 All rights reserved.
Page 12
2015-10-14
Siemens PLM Software
BOM Management - General Concept
There is not only one view to a product;
Different disciplines will look differently to products and their describing information
A summary of these views are :
As-Specified
As-Designed
As-to-be-Manufactured
As-Planned
As-Manufactured
As not all views are used by the same disciplines, not all views are therefore created,
maintained and used within the same systems.
Restricted © Siemens AG 2013 All rights reserved.
Page 13
2015-10-14
Siemens PLM Software
Best Practices for
Data Authoring and Information Flows
What and How
When and How Many
PLM
ERP
• Parts
• eBOM / mBOM
• Documents
Parts and mBOM
• Cost
• Inventory
Standard Costs
• Process BOM
• Schedule
• Quantity
• Instructions
As-Planned
As-Designed
As-to-be-Manufactured
MES
Parts, mBOM
Process BOM
Process Feedback
• Transactions
• Material Moves
• Completion
• Dates/Operator
Restricted © Siemens AG 2013 All rights reserved.
Page 14
2015-10-14
Work Orders
Order BOM
Progress/Results
As-Manufactured
Who and Where
Siemens PLM Software
BOM Management - Business Requirements
The As-Designed (eBOM) and As-to-be-Manufactured (mBOM) views do not necessarily have to be the same.
Main reasons for eBOM / mBOM differences are:
Removal of (sub) assemblies that do not exist in the physical world.
Addition of non-design items which are needed for manufacturing the product
Therefore :
Manufacturing Engineers must be able edit the mBOM for restructuring purposes (Manufacturing Kits).
Manufacturing Engineers must be able edit the mBOM to add unique manufacturing content (nondesign items, Consumables) etc'.
mBOM updates should not modify the eBOM structure.
Manufacturing Engineers should control the mBOM update process.
Changes must be accorded, recorded and maintained
Restricted © Siemens AG 2013 All rights reserved.
Page 15
2015-10-14
Siemens PLM Software
Chosen Solution for Customer X
According to the Best Practices from the field…
eBOM and mBOM shall be separate item structures
Manufacturing Engineers shall have read privileges
on the eBOM and write privileges on the mBOM
Modifications to the eBOM and mBOM structures
shall be done using Change Procedures
Restricted © Siemens AG 2013 All rights reserved.
Page 16
2015-10-14
Siemens PLM Software
Multiple BOM’s
Linking eBOM mBOM
ERP
PLM
Product A
Product A
Product A
Item C
Item C
Item C
Item D
Item D
Item D
Item E
Item E
Assembly B
Item E
eBOM
mBOM
Item F
Item F
mBOM
VALUE:
No missing parts in
mBOM
Restricted © Siemens AG 2013 All rights reserved.
Page 17
2015-10-14
Siemens PLM Software
Multiple BOM’s
Adding value with the BOP
PLM
Product A
Product A
W1
Item C
Assembly B
eBOM
Product A
Item C
Item E
Item C
Item D
Item D
Item E
Item F
Item F
Item D
Item E
VALUE:
No missing parts in
BOP
mBOM
ERP
BOP
R1
P1
R3
W2
R2
P2
R4
Virtual commissioning
MES
Speed up
production start-up
Restricted © Siemens AG 2013 All rights reserved.
Page 18
2015-10-14
Siemens PLM Software
Multiple BOM’s
PLM ERP view
Global footprint planning
ERP
(SAP)
Plan
Investment planning
End of life/spare parts
Make or Buy
Plan
Product
Portfolio
Mgmt.
Ramp up
Source
EBOM
Define
Realize
MBOM
Make
BOP
Design for manufacturing
PLM
(Teamcenter)
Deliver
Change requests
M
E
S
Commer cialize /
Operate
Phase out
As-build
Manufacturing
Execution
System (MES)
Return
Restricted © Siemens AG 2013 All rights reserved.
Page 19
2015-10-14
Siemens PLM Software
PLM Value Enhancement - (Multi-) Structure Management
BOM Structures
Restricted © Siemens AG 2013 All rights reserved.
Page 22
2015-10-14
Siemens PLM Software
Assembly Manufacturing & Quality Solutions
Right synchronization across product
engineering, manufacturing engineering,
and production
Right ingenuity to create leaner, more
efficient processes
Right insight into the real-world
performance of plans
Right control of quality and
production operations
Smart, Fast, Lean Manufacturing
Restricted © Siemens AG 2013 All rights reserved.
Page 24
2015-10-14
Siemens PLM Software
Multiple BOM’s
A small scenario
Link structures
Assign Parts and Assy kits
Accountability Checks
1
2
3
Linking EBOM-MBOM
Assign Parts MBOM
Check completeness
4
Add process (BOP)
Template process from classification
Restricted © Siemens AG 2013 All rights reserved.
Page 26
2015-10-14
Siemens PLM Software
Aerospace example
Restricted © Siemens AG 2013 All rights reserved.
Page 27
2015-10-14
Siemens PLM Software
Methods For delivering mfg. information to the shop floor
Teamcenter Mfg. Documentation
Adobe 3D PDF
Work
Instruction
Editor
Teamcenter Mfg. Report
Standard Text WYSIWYG
Restricted © Siemens AG 2013 All rights reserved.
Page 37
2015-10-14
Siemens PLM Software
What do other customers do!
Restricted © Siemens AG 2013 All rights reserved.
Page 48
2015-10-14
Siemens PLM Software
What do other customers do!
Both “Custom Trucks”
Configure to Order
Engineer to Order
Restricted © Siemens AG 2013 All rights reserved.
Page 49
2015-10-14
Siemens PLM Software
BOM Synchronisation
Value
Benefits Summary
Removes silos and
increases team
productivity
Joint Strike Fighter. With 6500
users, Lockheed is currently
managing the “As-Designed,”
“Manufacturing” or “As-Planned,”
and “As-Built” bill of materials
inside of Teamcenter.
Reduce errors providing
increased visibility into the
product lifecycle
Manage, relate and
consolidate product and
process data
Restricted © Siemens AG 2013 All rights reserved.
Page 50
2015-10-14
Siemens PLM Software
Questions?
Restricted © Siemens AG 2013 All rights reserved.
Smarter decisions, better products.

Similar documents