Engineering BOM vs. Assemblage BOM
Transcription
Engineering BOM vs. Assemblage BOM
Engineering BOM vs. Assemblage BOM Configure me Relatiedag 14 oktober 2015 Ron Sterk | Business Development Consultant | Siemens Industry Software B.V. Restricted © Siemens AG 2015 Page 1 2015-10-13 Siemens PLM Software Problems during manufacturing Business Drivers Impacting Manufacturing Restricted © Siemens AG 2013 All rights reserved. Page 5 2015-10-14 Siemens PLM Software Problems during manufacturing Current and Future Manufacturing Goals Restricted © Siemens AG 2013 All rights reserved. Page 6 2015-10-14 Siemens PLM Software Example https://www.youtube.com/watch?v=mlxnuNZIL9o Restricted © Siemens AG 2013 All rights reserved. Page 7 2015-10-14 Siemens PLM Software History Drawing based Model based Modulair approach Restricted © Siemens AG 2013 All rights reserved. Page 11 2015-10-14 Siemens PLM Software Multiple BOM’s Current way of working PLM ERP Product A Product A Item C Assembly B Item C Item D Item D Item E Item F Item E eBOM mBOM Flattening structure Additional items (oil, glue) Restricted © Siemens AG 2013 All rights reserved. Page 12 2015-10-14 Siemens PLM Software BOM Management - General Concept There is not only one view to a product; Different disciplines will look differently to products and their describing information A summary of these views are : As-Specified As-Designed As-to-be-Manufactured As-Planned As-Manufactured As not all views are used by the same disciplines, not all views are therefore created, maintained and used within the same systems. Restricted © Siemens AG 2013 All rights reserved. Page 13 2015-10-14 Siemens PLM Software Best Practices for Data Authoring and Information Flows What and How When and How Many PLM ERP • Parts • eBOM / mBOM • Documents Parts and mBOM • Cost • Inventory Standard Costs • Process BOM • Schedule • Quantity • Instructions As-Planned As-Designed As-to-be-Manufactured MES Parts, mBOM Process BOM Process Feedback • Transactions • Material Moves • Completion • Dates/Operator Restricted © Siemens AG 2013 All rights reserved. Page 14 2015-10-14 Work Orders Order BOM Progress/Results As-Manufactured Who and Where Siemens PLM Software BOM Management - Business Requirements The As-Designed (eBOM) and As-to-be-Manufactured (mBOM) views do not necessarily have to be the same. Main reasons for eBOM / mBOM differences are: Removal of (sub) assemblies that do not exist in the physical world. Addition of non-design items which are needed for manufacturing the product Therefore : Manufacturing Engineers must be able edit the mBOM for restructuring purposes (Manufacturing Kits). Manufacturing Engineers must be able edit the mBOM to add unique manufacturing content (nondesign items, Consumables) etc'. mBOM updates should not modify the eBOM structure. Manufacturing Engineers should control the mBOM update process. Changes must be accorded, recorded and maintained Restricted © Siemens AG 2013 All rights reserved. Page 15 2015-10-14 Siemens PLM Software Chosen Solution for Customer X According to the Best Practices from the field… eBOM and mBOM shall be separate item structures Manufacturing Engineers shall have read privileges on the eBOM and write privileges on the mBOM Modifications to the eBOM and mBOM structures shall be done using Change Procedures Restricted © Siemens AG 2013 All rights reserved. Page 16 2015-10-14 Siemens PLM Software Multiple BOM’s Linking eBOM mBOM ERP PLM Product A Product A Product A Item C Item C Item C Item D Item D Item D Item E Item E Assembly B Item E eBOM mBOM Item F Item F mBOM VALUE: No missing parts in mBOM Restricted © Siemens AG 2013 All rights reserved. Page 17 2015-10-14 Siemens PLM Software Multiple BOM’s Adding value with the BOP PLM Product A Product A W1 Item C Assembly B eBOM Product A Item C Item E Item C Item D Item D Item E Item F Item F Item D Item E VALUE: No missing parts in BOP mBOM ERP BOP R1 P1 R3 W2 R2 P2 R4 Virtual commissioning MES Speed up production start-up Restricted © Siemens AG 2013 All rights reserved. Page 18 2015-10-14 Siemens PLM Software Multiple BOM’s PLM ERP view Global footprint planning ERP (SAP) Plan Investment planning End of life/spare parts Make or Buy Plan Product Portfolio Mgmt. Ramp up Source EBOM Define Realize MBOM Make BOP Design for manufacturing PLM (Teamcenter) Deliver Change requests M E S Commer cialize / Operate Phase out As-build Manufacturing Execution System (MES) Return Restricted © Siemens AG 2013 All rights reserved. Page 19 2015-10-14 Siemens PLM Software PLM Value Enhancement - (Multi-) Structure Management BOM Structures Restricted © Siemens AG 2013 All rights reserved. Page 22 2015-10-14 Siemens PLM Software Assembly Manufacturing & Quality Solutions Right synchronization across product engineering, manufacturing engineering, and production Right ingenuity to create leaner, more efficient processes Right insight into the real-world performance of plans Right control of quality and production operations Smart, Fast, Lean Manufacturing Restricted © Siemens AG 2013 All rights reserved. Page 24 2015-10-14 Siemens PLM Software Multiple BOM’s A small scenario Link structures Assign Parts and Assy kits Accountability Checks 1 2 3 Linking EBOM-MBOM Assign Parts MBOM Check completeness 4 Add process (BOP) Template process from classification Restricted © Siemens AG 2013 All rights reserved. Page 26 2015-10-14 Siemens PLM Software Aerospace example Restricted © Siemens AG 2013 All rights reserved. Page 27 2015-10-14 Siemens PLM Software Methods For delivering mfg. information to the shop floor Teamcenter Mfg. Documentation Adobe 3D PDF Work Instruction Editor Teamcenter Mfg. Report Standard Text WYSIWYG Restricted © Siemens AG 2013 All rights reserved. Page 37 2015-10-14 Siemens PLM Software What do other customers do! Restricted © Siemens AG 2013 All rights reserved. Page 48 2015-10-14 Siemens PLM Software What do other customers do! Both “Custom Trucks” Configure to Order Engineer to Order Restricted © Siemens AG 2013 All rights reserved. Page 49 2015-10-14 Siemens PLM Software BOM Synchronisation Value Benefits Summary Removes silos and increases team productivity Joint Strike Fighter. With 6500 users, Lockheed is currently managing the “As-Designed,” “Manufacturing” or “As-Planned,” and “As-Built” bill of materials inside of Teamcenter. Reduce errors providing increased visibility into the product lifecycle Manage, relate and consolidate product and process data Restricted © Siemens AG 2013 All rights reserved. Page 50 2015-10-14 Siemens PLM Software Questions? Restricted © Siemens AG 2013 All rights reserved. Smarter decisions, better products.