CABLE ROOFS
Transcription
CABLE ROOFS
CABLE ROOFS Stéphane JOYE 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 Content • 1. Cable roofs structures • 2 C 2. Cable bl technologies t h l i • 3. Clamps • 4 Anchorages 4. • 5. Methods • Minsk Arena, Arena Biellorussia (2008) • New Delhi Stadium, India (2010) • BC Place Stadium, Canada (2011) 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 2 1. Cable roof Structures Stadium roofs Minsk Arena New Delhi Stadium BC Place Stadium 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 3 1. Cable roof Structures Minsk Arena 7 strand cable Central node 27 strand cable Struts (steel tubes) 120 m Crossingg cables 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 4 1. Cable roof Structures Compression ring Roof Stabilizing cable (13st) P T New Delhi Stadium Mast Supporting cable (25st) Compression Ring Collars T 130 m New Delhi STadium d 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 5 1. Cable roof Structures Mast Back stays (2 72T15) (2x72T15) Roof Upper Suspension cable (2xØ90) BC Place Stadium Central Node T i ring Tension i (10xØ125) (10 Ø125) Hangers (Ø18 to Ø36) L Lower Stabilizing St bili i cables bl (2xØ70) Compression ring beam 260m BC Place Stadium 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 6 1. Cable roof Structures • El Elements t : • Roof • Supporting suspension cable • Hangers / compression masts • Stabilizing cables • Compression ring • (tension Rings) Characteristics • Avantages: • • • Very large span without supports Light structure Aesthetics 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 7 2. Cable technologies • Prefabricated Cables Spiral strand or Locked Cables • Compactness • Clamp “ability” • Installation drawbacks • heavy cable • large anchorage (big jacks) • Poor durability • rust in the cable Spiral strand cables • high maintenance cost (paint) • low fatigue resistance (100 MPa) Z shaped wire Locked coil cables 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 8 2. Cable technologies Multi strand cables : Cohestrand® Durability requirement & Similarity with suspended bridges lead Freyssinet to propose a Cohestrand solution : • 7 high grade steel wires • Hot dip galvanisation • Resin filling around and withhin strand ensuring full bond of sheath on strand (7MPa) • Full-bonded HDPE coating (patented) • • • Avantages: Sliding forces are transmitted from the HPED duct to the strand steel through the resin High fatigue performance Corrosion protection : • • • Double layer corrosion protection Continuity of the protection all along the cables Strand by strand installation 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 9 3. Clamps Collars Cast iron frame Cohestrand Mast PA shims F Cohestrand F┴ Cohestrand FMAST triangles inserts Continuity of the corrosion protection through the collar Plastic / Plastic tightening 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 10 3. Clamps Deviation « saddle » •Target Target : Accomodates angle variations of the cables while limiting the flexural stresses •Principle of “saddle clamps” : Impose a acceptable radius of curvature of the cables 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 11 4. Anchorages • Classic Classic anchorages (bloc and bearing plate) : In compression ring In central node 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 12 4. Anchorages • Fork Fork anchorages : O central On t l node d In compression ring In tension ring cables On masts 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 13 5. Methods • Ph 1 : Prefabrication Cable prefabrication bench Strand marking Prefabrication bench Storage Marking g and unsheathing g 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 14 5. Methods Ph.2 : Clamp Connections Clamp connection with precurved cable Clamp p installation Strand bundle compaction Stade de Minsk Pre tightening Pre-tightening 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 15 5. Methods Cable launchin with mast installation Ph.3 : Launching Cable net launching 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 16 5. Methods Ph.3 : Launching Initial ref ref. strand launching and adjustment (sag) Strand launching 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 17 5. Methods Ph.3 : Lifting Lifti off prefabricated Lifting f b i t d cable bl nett 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 18 5. Methods Ph.4 : Separation and mast installation 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 19 5. Methods • Ph.5 :Stressing Fabrication at length > (Adjustment (Adj t t att sag if possible) ibl ) > (Pre-load : Central node release) > Application of roof load 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 20 Thank You 1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010 21
Similar documents
Remus USA - Mais Tuning
Errors and changings reserved! • ATTENTION: The pre-formed dents on some silencer are required for installation! The latest developments can be found under www.remus.eu
More informationultersport.eu high performance exhaust systems
how to realize an idea of a unique car. And this will be the most rewarding satisfaction we can think of.
More information