CABLE ROOFS

Transcription

CABLE ROOFS
CABLE ROOFS
Stéphane JOYE
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
Content
•
1. Cable roofs structures
•
2 C
2.
Cable
bl technologies
t h l i
•
3. Clamps
•
4 Anchorages
4.
•
5. Methods
•
Minsk Arena,
Arena Biellorussia (2008)
•
New Delhi Stadium, India (2010)
•
BC Place Stadium, Canada (2011)
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
2
1. Cable roof Structures
Stadium roofs
Minsk Arena
New Delhi Stadium
BC Place Stadium
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
3
1. Cable roof Structures
Minsk Arena
7 strand cable
Central node
27 strand cable
Struts (steel tubes)
120 m
Crossingg cables
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
4
1. Cable roof Structures
Compression ring
Roof
Stabilizing cable (13st)
P
T
New Delhi Stadium
Mast
Supporting cable
(25st)
Compression Ring
Collars
T
130 m
New Delhi
STadium
d
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
5
1. Cable roof Structures
Mast
Back stays
(2 72T15)
(2x72T15)
Roof
Upper Suspension
cable (2xØ90)
BC Place Stadium
Central Node
T i ring
Tension
i (10xØ125)
(10 Ø125)
Hangers (Ø18 to
Ø36)
L
Lower
Stabilizing
St bili i cables
bl
(2xØ70)
Compression ring
beam
260m
BC Place Stadium
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
6
1. Cable roof Structures
•
El
Elements
t :
•
Roof
•
Supporting suspension cable
•
Hangers / compression masts
•
Stabilizing cables
•
Compression ring
•
(tension Rings)
Characteristics
•
Avantages:
•
•
•
Very large span without supports
Light structure
Aesthetics
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
7
2. Cable technologies
•
Prefabricated Cables
Spiral strand or Locked Cables
•
Compactness
•
Clamp “ability”
•
Installation drawbacks
• heavy cable
• large anchorage (big jacks)
•
Poor durability
• rust in the cable
Spiral strand cables
• high maintenance cost (paint)
• low fatigue resistance (100 MPa)
Z shaped wire
Locked coil cables
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
8
2. Cable technologies
Multi strand cables : Cohestrand®
Durability requirement & Similarity with suspended bridges lead Freyssinet to propose a
Cohestrand solution :
•
7 high grade steel wires
•
Hot dip galvanisation
•
Resin filling around and withhin strand
ensuring full bond of sheath on strand (7MPa)
•
Full-bonded HDPE coating (patented)
•
•
•
Avantages:
Sliding forces are transmitted from the HPED duct to the
strand steel through the resin
High fatigue performance
Corrosion protection :
•
•
•
Double layer corrosion protection
Continuity of the protection all along the cables
Strand by strand installation
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
9
3. Clamps
Collars
Cast iron frame
Cohestrand
Mast
PA shims
F

Cohestrand
F┴
Cohestrand
FMAST
triangles inserts
Continuity of the corrosion
protection through the collar
Plastic / Plastic tightening
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
10
3. Clamps
Deviation « saddle »
•Target
Target :
Accomodates angle variations of the cables while
limiting the flexural stresses
•Principle of “saddle clamps” :
Impose a acceptable radius of curvature of the
cables
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
11
4. Anchorages
•
Classic
Classic anchorages (bloc and bearing plate) :
In compression ring
In central node
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
12
4. Anchorages
•
Fork
Fork anchorages :
O central
On
t l node
d
In compression ring
In tension ring cables
On masts
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
13
5. Methods
•
Ph 1 : Prefabrication
Cable prefabrication bench
Strand marking
Prefabrication bench
Storage
Marking
g and unsheathing
g
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
14
5. Methods
Ph.2 : Clamp Connections
Clamp connection with precurved cable
Clamp
p installation
Strand bundle compaction
Stade de Minsk
Pre tightening
Pre-tightening
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
15
5. Methods
Cable launchin with mast installation
Ph.3 : Launching
Cable net launching
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
16
5. Methods
Ph.3 : Launching
Initial ref
ref. strand launching and adjustment (sag)
Strand launching
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
17
5. Methods
Ph.3 : Lifting
Lifti off prefabricated
Lifting
f b i t d cable
bl nett
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
18
5. Methods
Ph.4 : Separation and mast installation
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
19
5. Methods
•
Ph.5 :Stressing
Fabrication at length
> (Adjustment
(Adj t
t att sag if possible)
ibl )
> (Pre-load : Central node release)
> Application of roof load
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
20
Thank You
1st SOLETANCHE BACHY & FREYSSINET MEETING - PARIS - 10 JUNE 2010
21

Similar documents

Remus USA - Mais Tuning

Remus USA - Mais Tuning Errors and changings reserved! • ATTENTION: The pre-formed dents on some silencer are required for installation! The latest developments can be found under www.remus.eu

More information

ultersport.eu high performance exhaust systems

ultersport.eu high performance exhaust systems how to realize an idea of a unique car. And this will be the most rewarding satisfaction we can think of.

More information