NO MORE COLD FEET
Transcription
NO MORE COLD FEET
Insulate professionally. Profit long-term. EN N O MO RE C O LD F E E T Quality Of Life Can Be Planned 1 2 EXPERIENCE THE WARMEST MOMENTS WITH thermotec® No more cold feet! That's more than just empty words for us at thermotec®. It's a value proposition fastidiously guaranteed. Why? Because floors insulated with thermotec® are simply warmer for your feet. You can feel this with the very first contact. Whether in the morning when getting up, after a shower in the bath- room, while sitting at a desk or a cozy evening on the couch, heat is always flowing over your feet and into the floor. With thermotec®, you can reduce this heat loss significantly. So you save valuable energy while increasing comfort. 3 IN LIFE THERE ARE INTRINSIC INNER VALUES, WHICH ALSO NEED TO BE AFFORDABLE. Quality of life can be planned. With thermotec® on the floor it becomes a reality. The fact is that we at thermotec® apply only half as thick a layer to achieve acceptable insulation values. This means for you as a planning architect: You achieve sufficient heat protection even with low installation heights! 4 The fact is that with thermotec®, you get impact sound insulation, leveling and thermal insulation in one go. You save important working hours, achieve a readiness for covering faster and have all the temperature control of all floor areas. A balance that you can really feel. With thermotec® the floors become a piece of adorable and comfortable living space. No more cold feet. A promise is a promise! COMPARATIVE MEASUREMENT IN TWO PATTERN FLOOR STRUCTURES Measured U-value: 0,988 m2K/W Product: 50 mm EPS-W20 WLG 038 Unevenness is compensated in the screed. Pipes are exposed. Does not correspond to DIN 18560-2 and the NORM B 2232. Measured U-value: 0,818 m2K/W Product: 50 mm thermotec® BEPS-WD 100R WLG 050 Unevenness is compensated in the damp course (no excess consumption with screed!). Pipes are well-covered. Jointless installation. No clippings and no waste. 20% less heat loss. Base layer conforms to norms! NORMS CHECKED! Schematic comparison of thermotec® – Polystyrene concrete Polystyrene concrete thermotec® Thanks to the thin binder film, thermotec® achieves insulation values similar to polystyrene. Polystyrene concrete offers through the dense cement microstructure little insulation properties. Polystyrene concrete needs about twice the mounting strength to reach the insulation values of thermotec®. 5 WHETHER FLOOR, WALL, CEILING OR ROOF – THERMOTEC®-PRODUCTS ARE VERSATILE IN APPLI 1 2 3 6 Attic insulation thermotec® Insulation Filler is used for loft insulations. The jointless insulation material can be used without screed if the insulated surface is not going to be walked upon. Pitched roof insulation thermotec® Insulaion Fillers are blown and without joins under pressure inbetween the rafters. Wall backfill The thermotec® Insulation Filler is injected into the cavities with compressed air. 4 Insulation under flowing screed thermotec® Insulation Fillers insulate and pave the underground under flowing screeds in an ideal way. Thus material consumption is lowered for the leveling screed. 5 Insulation under heated screed thermotec® Insulation Fillers are suitable for installation under floor heating. 6 Insulation under Nano Screed® thermotec® Insulation Fillers can be used under the Nano Screed® in all living areas. 7 Insulation under pre-fab screed The more solid thermotec® products are also suitable as sub-construction for pre-fab (dry) screeds. 8 Arch/vault backfilling Arche/vault backfilling and height backfilling can be designed/created with thermotec®-Insulation Fillers up to a meter in one work process. 9 Cellar backfill Thermal insulation, protection of the basement wall waterproofing, backfill, drain layer and substructure for plaster eaves in one work process. 1 2 2 3 6 5 3 4 12 14 8 14 7 15 9 11 11 13 9 10 CATION 10 Insulation under the cement screed thermotec® Insulation Fillers under cement screeds in all areas of the living space of a building. 11 Insulation under mastic asphalt screed thermotec® Insulation Fillers can be used under mastic asphalt screeds. Fesco slates should be laid before the laying of mastic asphalt screed. 12 13 Flat roof slope insulation You can make the slope in and apply the necessary insulation in one work process. No more long planning and delivery times. Slab floor insulation With the thermotec® Slab Floor Insulation Filler, you can create a flat granular subbase and at the same time provide the necessary thermal insulation in one work process. 14 15 Pool backfill pooltec-Wall insulates and backfills your swimming pool. As a result, the average water temperature is increased by about 4°C. Pool slab floor insulation pooltec-Floor creates a flat, heat-insulating underground for your swimming pool. 7 E-46-45-200-45 Combined heat and footfall sound-absorbing compensation material for normal loads under flowing and cement screed BEPS-T ÖNORM B 6550-1-PS(0-8)R-LD80-FMD124-DMD98-MU6-CC(2,0/1,5/10)10-SD40-CP5 Technical data 8 Sack contents 200 litres (14,9 - 17,1 kg) Sack per pallet 16 units (3,2 m³) Fire behaviour acc. OENORM B 3800 Part 1 B1/TR1/Q1 Fire behaviour acc. EURO CLASS E Fire behaviour acc. DIN 4102 Part 1 B2 Nominal Value of thermal conductivity λD 0,046 W/mK Min. layer thickness 45 mm Max. layer thickness (for details request application table) 200 mm (superficial load 2 kN/m2) 100 mm (superficial load 3,5 kN/m2)*** 100 mm (superficial load 5 kN/m2) Water admixture for every m3 45 litres Grain group of the EPS-aggregate 0-8R Registration Number ON-N 2008 159 EUROPEAN ORGANISATION FOR TECHNICAL APPROVAL European Technical Approval ETA-08/0338 PS Bulk density of the EPS-dry mortar 80 kg/m LD Fresh mortar density 124 kg/m3 FMD Dry bulk 98 kg/m DMD Water vapour diffusion resistance factor ≤ 6μ MU Creep characteristic 10 years at Total compressive strain Creep deformation 10 kPa ≤ 2,0% ≤ 1,5% CC Dynamic stiffness s´ (at 45 mm thickness) ≤ 40 MN/m3 SD Compressibility c ≤ 5 mm CP Water absorption with momentary, partial dunking ≤ 3,0 kg/m2 Processing time (open time, 20˚/60% LF) Min. 45 min. Processing temperature min./max. +5o /+35o C Hard enough to walk on after Ca. 2 days* Ready for covering from (CM-measurement) with a layer thickness up to 50 mm with a layer thickness up to 100 mm with a layer thickness up to 150 mm ≤ 12 M-% Ca. 2 days** Ca. 4 days** Ca. 7 days** Footfall/impact sound improvement at 70 mm thickness and 100 kg of screed 28 dB (solid floors/ceilings) Footfall/impact sound improvement at 45 mm thickness and 100 kg of screed 25 dB (solid floors/ceilings) 3 3 Finished product Free bare floor/ceiling * Dependent on temperature and air moisture. ** The information is to be understood as approximate values. A CM-measurement is required. *** Higher installation thicknesses on request. E-48-30-800-45 Combined heat-absorbing equalising material for normal loads under flowing and cement screed BEPS-ÖNORM 6550-1-PS(0-8)R-LD82-FMD130-DMD102-MU6-CS(10)50-CC(2,5/1,5/10)10-DLT(1)5 Technical data Sack contents 200 litres (14,8 - 18,0 kg) Sack per pallet 16 units (3,2 m³) Fire behaviour acc. OENORM B 3800 Part 1 B1/TR1/Q1 Fire behaviour acc. EURO CLASS E Fire behaviour acc. DIN 4102 Part 1 B2 Nominal Value of thermal conductivity λD 0,048 W/mK Min. layer thickness 30 mm Max. layer thickness (for details request application table) 800 mm (superficial load 2 kN/m2) 500 mm (superficial load 3,5 kN/m2) 300 mm (superficial load 5 kN/m2) Water admixture for every m3 45 litres Grain group of the EPS-aggregate 0-8R Registration Number ON-N 2008 011 EUROPEAN ORGANISATION FOR TECHNICAL APPROVAL European Technical Approval ETA-11/0455 PS LD Bulk density of the EPS-dry mortar 82 kg/m Fresh mortar density 130 kg/m3 FMD Dry bulk 102 kg/m DMD Water vapour diffusion resistance factor ≤ 6μ MU 3 3 Compressive stress at 10% deformation ≥ 50 kPa CS (10) Compressive stress at 2% deformation 25 kPa CS (2) Creep characteristic 10 years at Total compressive strain Creep deformation 10 kPa ≤ 2,5% ≤ 1,5% CC Dimensional stability in pressure and temperature stress ≤ 5% DLT (1) Water absorption with momentary, partial dunking ≤ 2,0 kg/m2 Processing time (open time, 20˚/60% LF) Min. 60 min. Processing temperature min./max. +5o /+35o C Hard enough to walk on after Ca. 2 days* Ready for covering from (CM-measurement) with a layer thickness up to 50 mm (23ºC/50% LF) with a layer thickness up to 100 mm (23ºC/50% LF) with a layer thickness up to 150 mm (23ºC/50% LF) ≤ 12 M-% Ca. 3 days** Ca. 7 days** Ca. 10 days** Footfall/impact sound improvement at 70 mm thickness and 100 kg of screed 28 dB (60 mm installation thickness + 5 mm thermotec® acoustic system rail) Finished product Free bare floor/ceiling * Dependent on temperature and air moisture. ** The information is to be understood as approximate values. A CM-measurement is required. 9 E-50-20-2000-50 Combined heat-absorbing equalising material for heavy loads under flowing and cement screed and for normal loads under precast(dry)and mastic asphalt screed BEPS-ÖNORM 6550-1-PS(0-8)R-LD110-FMD160-DMD130-MU6-CS(10)70-CC(2,5/2,3/10)20-DLT(1)5 Technical data Sack contents 200 litres (19,8 - 24,2 kg) Sack per pallet 16 units (3,2 m³) Fire behaviour acc. OENORM B 3800 Part 1 B1/TR1/Q1 Fire behaviour acc. EURO CLASS E Fire behaviour acc. DIN 4102 Part 1 B2 Nominal Value of thermal conductivity λD 0,050 W/mK Min. layer thickness 20 mm Max. layer thickness (for details request application table) Registration Number ON-N 2008 012 European Technical Approval ETA-11/0455 2000 mm (superficial load 2 kN/m2) 700 mm (superficial load 3,5 kN/m2) 500 mm (superficial load 5 kN/m2) On request (depending on screed thickness and quality): 200 mm (superficial load 10 kN/m2) Water admixture for every m3 50 litres Grain group of the EPS-aggregate 0-8R Bulk density of the EPS-dry mortar 110 kg/m LD Fresh mortar density 3 160 kg/m FMD Dry bulk 130 kg/m3 DMD Water vapour diffusion resistance factor ≤ 6μ MU Compressive stress at 10% deformation ≥ 70 kPa CS (10) Compressive stress at 2% deformation 35 kPa CS (2) Creep characteristic 10 years at Total compressive strain Creep deformation 10 kPa ≤ 1,9% ≤ 0,8% Dimensional stability in pressure and temperature stress ≤ 5% Water absorption with momentary, partial dunking ≤ 2,0 kg/m2 Processing time (open time, 20˚/60% LF) Min. 60 min. Processing temperature min./max. +5o /+35o C Hard enough to walk on after Ca. 2 days* Ready for covering from (CM-measurement) with a layer thickness up to 50 mm (23ºC/50% LF) with a layer thickness up to 100 mm (23ºC/50% LF) with a layer thickness up to 150 mm (23ºC/50% LF) ≤ 12 M-% Ca. 2 days** Ca. 5 days** Ca. 8 days** PS 3 20 kPa ≤ 2,5% ≤ 2,3% * Dependent on temperature and air moisture. ** The information is to be understood as approximate values. A CM-measurement is required. 10 EUROPEAN ORGANISATION FOR TECHNICAL APPROVAL CC Finished product DLT (1) Free bare floor/ceiling E-43-30-2000-25 Combined quick-drying and heat-absorbing equalising material for heavy loads under flowing and cement screed and for normal loads under precast(dry)and mastic asphalt screed BEPS-ÖNORM 6550-1-PS(2-6)N-LD70-FMD95-DMD80-MU5-CS(10)70-CC(1,5/1,0/10)10-DLT(1)5 Technical data Fire behaviour acc. OENORM B 3800 Part 1 B2 Fire behaviour acc. EURO CLASS E Fire behaviour acc. DIN 4102 Part 1 B2 Nominal Value of thermal conductivity λD 0,043 W/mK Min. layer thickness 30 mm Max. layer thickness (for details request application table) 2000 mm (superficial load 2 kN/m2) 500 mm (superficial load 3,5 kN/m2) 300 mm (superficial load 5 kN/m2) Water admixture for every m3 25 litres Grain group of the EPS-aggregate 2-6N Bulk density of the EPS-dry mortar 70 kg/m LD Fresh mortar density 3 95 kg/m FMD Dry bulk 80 kg/m3 DMD Water vapour diffusion resistance factor ≤ 5μ MU Compressive stress at 10% deformation ≥ 70 kPa CS (10) Compressive stress at 2% deformation 35 kPa CS (2) Creep characteristic 10 years at Total compressive strain Creep deformation 10 kPa ≤ 1,5% ≤ 1,0% CC Dimensional stability in pressure and temperature stress ≤ 5% DLT (1) Water absorption with momentary, partial dunking ≤ 2,0 kg/m2 Processing time (open time, 20˚/60% LF) Min. 45 min. Processing temperature min./max. +5o /+30o C Hard enough to walk on after Ca. 24 hours* Ready for covering from (CM-measurement) with a layer thickness up to 50 mm (23ºC/50% LF) with a layer thickness up to 100 mm (23ºC/50% LF) with a layer thickness up to 150 mm (23ºC/50% LF) ≤ 12 M-% Ca. 24 hours** Ca. 24 hours** Ca. 24 hours** Registration Number ON-N 2009 182 EUROPEAN ORGANISATION FOR TECHNICAL APPROVAL European Technical Approval ETA-11/0455 PS 3 * Dependent on temperature and air moisture. ** The information is to be understood as approximate values. A CM-measurement is required. Free bare floor/ceiling 11 E-55-30-150-70 Very fast hardening heat-absorbing equalising material for heavy loads under flowing and cement screed and for normal loads under precast(dry)and mastic asphalt screed BEPS-PS(0-8)R-LD125-FMD195-DMD160-MU7-CS(10)70-CC(2,5/2,3/10)20-DLT(1)5 Technical data Sack contents 200 Liter (21,5 - 24,0 kg) Sack per pallet 16 Sack (3,2 m³) Fire behaviour acc. OENORM B 3800 Part 1 B1/TR1/Q1 Fire behaviour acc. EURO CLASS E Fire behaviour acc. DIN 4102 Part 1 B2 Nominal Value of thermal conductivity λD 0,055 W/mK Min. layer thickness 30 mm Max. layer thickness (for details request application table) 150 mm (superficial load 10 kN/m2) Water admixture for every m3 70 litres Grain group of the EPS-aggregate 0-8R PS Bulk density of the EPS-dry mortar 125 kg/m LD Fresh mortar density 195 kg/m3 FMD Dry bulk 160 kg/m DMD Water vapour diffusion resistance factor ≤ 6μ MU 3 3 Compressive stress at 10% deformation ≥ 70 kPa CS (10) Compressive stress at 2% deformation ≥ 35 kPa CS (2) Creep characteristic 10 years at Total compressive strain Creep deformation 10 kPa ≤ 1,9% ≤ 0,8% Dimensional stability in pressure and temperature stress ≤ 5% Water absorption with momentary, partial dunking ≤ 3,0 kg/m2 20 kPa ≤ 2,5% ≤ 2,3% Processing time (open time, 20˚/60% LF) Min. 30 min. Processing temperature min./max. +5o /+35o C Hard enough to walk on after 2 - 3 hours* Ready for covering from (CM-measurement) with a layer thickness up to 150 mm (23ºC/50% LF) ≤ 12 M-% Ca. 3 - 4 hours** CC DLT (1) * Dependent on temperature and air moisture. ** The information is to be understood as approximate values. A CM-measurement is required. In connection with nanoestrich® – the quickest construction. In only 9 hours, compensation insulation, floor heating and nano-screed® possible. 12 Finished product Free bare floor/ceiling KOWLEDGE AND INFORMATION GIVES YOU A WINNING MARGIN. thermotec® express – Save time and money. Before now, you had to go back and forth to small construction sites. Especially when enormous height compensation was required. thermotec® express gives you time. So you are faster, more efficient and more flexible. Take advantage of its benefits: Foot traffic after 3 hours Compensation insulation and screed in one day Height adjustment up to 25 cm Construction sites must be visited only once Environmentally friendly and energy saving Delivered in the morning, constructed by evening Clean, fast and profitable Ready for covering for screed after 3 hours ur sulates yo in s s e r p x e r costs. thermotec u o y d n a ed time requir tion site! c u r t s n o c velling to aEUR 10.000 per year) a r t e im t e to v ® The dry mix thermotec® express which is premixed at the factory, needs only to be mixed briefly with water on-site and is processed immediately. Sa , that is up (At 100 sites 13 GENERAL INSTALLATION INSTRUCTIONS THERMOTEC® FINISHED PRODUCT AND FREE BARE FLOOR/CEILING PREPARATION: The underground must be dry and clean (swept). thermotec® cannot be laid at temperatures below +5°C and above +35°C at the point of introduction. PROCESSING thermotec® finished product: thermotec® is available in 200 lt After filling the screed pump with sacks (approx. 14-22 kg, depend1 sack of thermotec®, the water is added slowly into the running pump ing on the product) as a factory pre(see table). mixed EPS-dry mortar. No need to add additional binders or For installation thicknesses under additives! 6 cm on dusty underground and ® thermotec is perfect for mixing temperatures above +25°C one litre and handling materials in convenof mixing water should be used. After about 2 minutes mixing time, tional screed pumps or with the MIX the insulation can be spread widely 301D. It is important to ensure that sacks up to 150 m. are not separated. 1 full bag = 1 whole mix Mixing Water each m3 per sack Thickness 50 mm Room Temp. ≥ 25°C BEPS-T 90R 50 litres 10 litres 11 litres 11 litres BEPS-WD 100R 50 litres 10 litres 11 litres 11 litres PRODUCT BEPS-WD 130R 55 litres 11 litres 12 litres 12 litres BEPS-WD 150R express 70 litres 14 litres 15 litres 15 litres PROCESSING free bare ceiling/wall: The processing and installation of thermotec® free bare ceiling/wall is performed with microprocessor-controlled mixing mobiles. Mix 1 sack (200 l) with 10-12 litres of water (depending on product) in a screed pump to a homogenous insulation (ca. 2 min. mixing time). Train (bandage), pour in and compress, and scrape off to level. Rework the connector edge of the wall and compress the applied surface. LAYING: It is important to ensure that the insulation material is compacted over the entire surface before screeding (for example: with a large aluminum blade or with a large trowel). CURING: After laying, a minimum temperature of +5°C must be ensured up to readiness for walking upon. In the first 24 hours drafts should be avoided or prevented. It is necessary to check the insulation layer before the first walking (acc. ÖNORM B 6550-2 and DIN 18560-2). Observe the safety data sheets! 14 The insulation layer may only be used for under-floor heating installation purposes and for screed-laying. Before laying the insulation layer, it must be checked for dryness. Evidence of readiness is when the moisture content is below 12-M%. Level surface ... ... and finished! thermotec® Acoustic System Rail 6/500 - Z-1874 23:21 - B2-6.0-1.0: Impact sound foam with laminated water vapour barrier. No film wrinkle. Ideal under nano-screed® This 6 mm thick impact sound foam with laminated water vapour barrier and self-adhesive overlap is installed in addition to thermotec® BEPS-WD 100R, WD 130R or 70N rapid as impact sound insulation and vapour barrier in one. As a result of the width of 120 cm and the selfadhesive overlap strips, a high laying performance at low extra cost is possible (hardly any tape required). Technical data Length 40 m As system structure, an impact sound improvement of 28 dB at a construction depth of 120 mm is achieved with thermotec® BEPS-WD 100R (from 60 mm) with a laying of thermotec® Acoustic System Rail with 6 mm and 50 mm screed. Width 1,25 m Thickness 6 mm Design Rolled goods with adhesive foil/tape Packaging Roller in PE-sack Nominal value of thermal conductivity λD 0,045 W/mK Equivalent air layer thickness - sd-Wert ≥ 120 m Temperature resistance in the short-term long-term 80 - 85˚C 90˚C Fire behaviour acc. to OENORM EN 13501-1 E Fire behaviour acc. to DIN 4102 B2 Shape retention at +40˚C < 10% Thickness tolerance (acc. to OEN EN 13163) ± 1 mm Length tolerance (acc. to OEN EN 13163) -1%; + °° Width tolerance (acc. to OEN EN 13163) ± 0,6% Leakage test (acc. to DIN 16726) Tight Dynamic rigidity 115 MN/m3 Footfall sound reduction ΔLW, R 14 dB (with 60 mm thermotec® BEPS-WD 100R 28 dB) Compressibility ≤ 1 mm This impact sound rail was developed with thermotec® and nanoscreed® in the system. Contact us for advice! Z-23.21-1874- B2 – 6.0- 1.0 Product composition/material Extruded polyethylene foam, closed-cell with foil lamination, 100% HCFC and HFC free 15 Adhesive tape for fixing onto the wall Water vapour barrier foil SD = 120 m PE-Foam Impact sound quality Adhesive tape for gluing the water vapour barrier 16 thermotec® Vapour Control Layer – 0.2/1500; Polyethylene Construction Film. The thermotec® Edge Strips – 120+30/8 which meet the standard requirements. Your advantage: Wrinkle-free installation Laying of the role Optimal film width for fast, waste-optimized laying Ideally combined with thermotec® Edge Strips Your advantage: Consistant film quality throughout up to the upper edge edge strips Simple foil gluing because of the adhesive tape applied Tape also works at low temperatures Logical assembly by the adhesive tape on the back for fixing to the wall Impact sound insulation material also on the edge strips Technical data Vapour Control Layer Edge Strips Product composition/material Polyethylene foil Extruded polyethylene foam, closed-cell with foil lamination, 100% HCFC and HFC free Length 50 m 40 m Width (at the edge: height) 1,5 m 120 mm (+ 30 mm foot) Thickness 0,2 mm 8 mm Design Rolled goods Rolled goods with adhesive foil/tape Packaging 52 rollers/pallets Roller in PE-sack Fire behaviour acc. to EN 13501-1 F E Water vapour permeability (acc. to EN 1931) sd-Wert 140 m sd-Wert ≥ 120 m The thermotec® Underfloor Heating System – For you, a plus in temperature control. With the thermotec ® System Underfloor Heating, flooring installations with a total thickness of as low as 60 mm can be completely planned and executed (including heat-and impact sound insulation). With good floor insulation and thin screeds, usable floor heating systems can quickly be built. Your plus points of advantages: Ideal construction for any type of underfloor heating system Can be installed in new-builds and renovations Feasible in combination with nanoscreed® low construction heights No more cold feet! Indeed, at any place in the building. With the thermotec® Underfloor Heating System you have the heat evenly distributed over the entire floor surface. Highest efficiency and spatial chararteristics. You have never been so keen on floor before! 17 thermotec® – CHECKED, CERTIFIED AND RELEASED INTERNATIONALLY. All the benefits of thermotec® at a glance. Check for yourself. thermotec® has an ETA (European Technical Approval) by the German Institute for Building Technology (DIBT) Eco-Norm certified heat and impact sound insulation material Laboratory-monitored quality products Seamless installation without insulation value loss Ensures uniform thickness screed plate Dimensionally stable, lightweight, highly resilient * Depending on the mounting strength, temperature, humidity and the product used (see technical data). 18 Fast, dust-free application Ideal for underfloor heating Enormous installation height possible Can be laid on slopes Ready for walking upon from 3 hours* Ready for laying of screed after 3 hours* EUROPEAN ORGANISATION FOR TECHNICAL APPROVAL ÖNORM B 6550 REGISTRIERT! The thermotec® MIXMOBIL has many advantages: Pumping 5-8 m³/hour for free bare ceiling/wall Various products in one visit No additional processing machines (for example, screed pump, compressor, hoses), devices, or tools necessary Computer-controlled production system Quality monitoring as per European Technical Approvals and OENORM B 6550-1 Self and external monitoring Quality and speed in one: The thermotec® MIXMOBIL The thermotec® MIXMOBIL is a microprocessor-controlled mixing system with PC Monitor, for mixing all thermotec® Insulation backfillers. The production quality is factory production control ensured. An external test institute monitors the products in addition. With the thermotec® MIXMOBIL different products can be produced at a construction site in one day. The low set-up times and the small space requirement as well as a clean construction site are equal advantages like the high mixing and pumping capacity. 19 thermotec® − ENERGY SAVINGS AND QUALITY YOU CAN FEEL AND EXPERIENCE. Creation and Monitoring Quality Binding materials, polystyrene ground stock and finished dry mixes as well as and the finished laid insulation are subject to our permanent in-house quality control. In each batch, samples are taken and examined. Along with this, we use state of the art testing methods. In addition, the quality of our product is monitored according to the European Technical Approval and OENORM B 6550 part 1 continuously by external certified testing laboratories. thermotec® partner companies are also subject to the central quality control and are committed to continuous production control. A ++ A+ SAFETY / ENERGY EFFICIENCY RATING Whether planning architects, builders, investors or the processing trade, all use this energy-saving document. With the help of qualified energy consultation, you already know in advance what you can save in energy in the future. Your property gains in value with the energy certification and you can also rent your property more easily, because the warm rent is publicised. A B C D E F G 20 ONE MORE POINT ON SAFETY All thermotec® products are also subject to a variety of tests: for instance fire protection, thermal insulation compressive stress and sound-protection. Thus you have a measurable increase of safety standards with thermotec®. Mixit® – A NAME OF OBLIGATION Develop and producing qualitative high-end products is a constantly renewable obligation for Mixit® and its employees. The result is in a continuous reliability. Together with our partners, we bring an increase of safety and environmental protection to thousands of construction sites. We are also represented in national and international standardization, as well as various labour and expert circles and we are an active co-designer of the technical framework conditions in floor construction. 21 TRUST. BUT VERIFY. How do planners and architects judge thermotec®? Marlies Egbers B.Sc. (Eng.), Architect, Germany I am obliged to carry out construction work according to the latest state of the art technology for the builder owner. This is especially true for sound and heat insulation. Through the use of thermotec® I can ensure all this excellently. In particular, the DIN 18560 is hereby complied with, where pipelines, cables or similar installations on the bare ceiling/wall should be brought together in a bound balanced/ compensated layer. thermotec® – competent and reliable. Research and development are ongoing processes with us. Every little innovation is immediately incorporated into our product range. The most modern production equipment, strict production control and our MIXMOBIL mixture quality on the construction site ensure that you will always receive the perfect thermotec® quality. Quality signed and sealed: thermotec® quality is constantly monitored. thermotec® is an OENORM certified heat and sound insulation material. thermotec® has a European Technical Approval (ETA) from German Institute for Building Technology (DIBT). Give your vote in future to thermotec® and then you take care of a quality-conscious leveling of the floor. 22 Siegbert Schmidt, Installer, Emile Rinnen, Rinnen Company, Franz Wimberger, Master Builder, Company Paul Schmidt, Germany thermotec Contractor Partners, Wimberger Company GmbH, Austria ® Luxembourg For the quality of underfloor heating, a proper instal- For years we have built solid brick lation of the heating systems is not only the crucial For years, I have valued innovative and prefabricated houses for our custom- factor. The quality of a floor structure is largely deter- economical solutions in my business. ers. The thermotec® Insulation System mined by the quality of heat and impact sound insu- thermotec® solved all my problems in guarantees us the highest quality in lation in particular. Therefore, for our customers we floor construction. As a result I have floor construction. The punctual, na- install the thermotec® Under Floor Heating System. been able to gain some more regular tionwide delivery and installation we Underfloor heating, in combination with the ther- customers again. The latest machine leave to the thermotec® Partner Net- motec® balance/compensation insulation materials technology and the latest know-how is work who guarantee the monitored guarantee our customers a long-term, efficient and mediated by thermotec Mixit Manufac- quality until after installation and that desirable living comfort. turers through seminars. at an affordable price. ® 1 German Historical Museum, Berlin Compensation and insulation layers, 10-20 cm below liquid screed in the Schlüterhof. 2 Fördeterrassen, Kiel Here were built about 550 m³ of thermotec® BEPS T 90R and thermotec® BEPS-WD 100R. 3 Office building in Dornbirn, Vorarlberg Floor insulation under cement screed. 4 AQUA DOME Therme Längenfeld, Tirol Gap/slope insulation up to 20 cm below the water tank, filling of the shims/liners in the frames. 23 0137-03 Produktfolder thermotec EN 25.09.2014 THE QUALITY OF SITE IS THE SUM OF ITS DETAILS. www.thermotec.eu THE ORIGINAL IS RED. 1 AUSTRIA: GERMANY: SWITZERLAND: Thermotec Vertriebs GmbH Galgenau 19 A-4212 Neumarkt i. M. Phone: +43 (0) 79 42/778 11 Fax: +43 (0) 79 42/778 11-11 E-Mail: [email protected] Thermotec Deutschland GmbH Breslauer Straße 6 D-29633 Munster Phone: +49 (0) 51 92/98 72 06–0 Fax: +49 (0) 51 92/98 72 06–1 E-Mail: [email protected] Thermotec Schweiz GmbH Gewerbestraße 5 CH-6330 Cham Phone: +43 (0) 676/778 12 02 Fax: +43 (0) 55 72/ 20 37 78 E-Mail: [email protected] Insulate professionally. Profit long-term.