2015 Road Project Overview
Note: Weather and other factors can affect the construction schedules of the projects listed below.
NORTHWEST
1
A reconfiguration and widening of the I-270 and U.S.
33/S.R. 161 Interchange includes an approximately fourmonth closure of U.S. 33/S.R. 161 at I-270. Expect other
restrictions on I-270 and U.S. 33/S.R. 161 as this reconfiguration is
completed. March 2015 to September 2017 (ODOT)
2
S.R. 315 work will be added to the Northside “Mega” Fix at
I-270 and N. High Street (U.S. 23). Expect various
restrictions including two-month closures for the eastbound
I-270 to northbound S.R. 315 ramp and the southbound S.R.
315 to eastbound I-270 ramp. Through September 2017
(ODOT) Through September 2017 (ODOT)
3
I-70 will be reconstructed between Hilliard-Rome Road and
Wilson Road. Expect lane restrictions on I-70.
September 2015 to October 2017 (ODOT)
4
Intersection improvements are planned at Fishinger Road
and Dublin Road. Expect various lane closures.
Spring 2015 to Fall 2015 (Franklin County)
5
Riggins Road will be extended from Wilcox Road to Avery
Road. Expect detours for Wilcox Road during construction.
Spring 2015 to Summer 2016 (Franklin County)
6
The interchange at S.R. 161 and Riverside Drive will be
reconfigured and improved. Expect turn restrictions and
lane closures for this major project. May 2015 to Fall 2016
(Dublin)
7
A roundabout will be constructed at the intersection of
S.R. 161 and Eiterman Road in Dublin. Expect closures and
detours. May 2015 to Fall 2015 (Dublin)
8
Hard Road will be widened and reconstructed between
Sawmill Road and Smoky Row Road. Expect various lane
closures. Dublin will improve the intersection of Hard Road
and Sawmill Road as part of this project. Summer 2015 to Fall
2016 (Columbus/Dublin)
9
Sidewalks will be constructed and improvements will be
made to Smoky Row Road north of Hard Road. Expect
some flagging operations. Spring 2015 to Winter 2015
(Columbus)
10
Bridge replacement will take place on West 5th Avenue
immediately west of Dublin Road. West 5th Avenue will be
closed between Dublin Road and McKinley Avenue for this
project that includes construction of a new shared-use path.
May 2015 to November 2015 (Columbus)
11
A new shared-use path will be constructed on Olentangy
River Road between John Herrick Drive and Lane Avenue.
Expect various lane restrictions. Through Fall 2015
(Columbus)
12
The John H. Herrick Drive Bridge over the Olentangy
River will be rehabilitated. Expect some posted detours.
May 2015 to August 2015 (OSU)
13
Phase 1 of the Tremont Road Project will improve Tremont
Road between Kenny Road and Ridgeview Road. Traffic will
be maintained through most of the work. July 2015 to July
2016 (Upper Arlington)
14
East Powell Road will be reconstructed and improved
between South Old State Road and Worthington Road.
Traffic will be maintained on East Powell Road. Expect some
local road closures. September 2015 to August 2016.
(Delaware County)
15
28
Worthington Road will be widened between Powell Road
and Africa Road. Two-way traffic will be maintained for most
of the work. July 2015 to July 2016 (Delaware County)
17
Sawmill Parkway will be extended from Hyatts Road to
immediately north of U.S. 42. Expect some local road
closures. July 2015 to October 2016 (Delaware County)
18
Pavement and interchange signal improvements will be
made on S.R. 315 between Ackerman Road and I-270.
Expect lane closures and nighttime ramp closures. May 2015
to October 2015 (ODOT)
40
A roundabout will be constructed at the intersection of
Alkire Road and Demorest Road. Expect closures and
detours. Spring 2015 to Fall 2015 (Franklin County)
E
Expect
lane restrictions and some detours as
im
improvements are made to the intersections on East Main
Street at Lancaster Avenue and Jackson Street in
S
R
Reynoldsburg. May 2015 to August 2015 (Reynoldsburg)
41
29
Orders Road will be widened between Old Haughn Road
and Discovery Drive. Expect lane restrictions and a closure
for a roundabout to be built at the intersection of Orders
Road and Haughn Road. April 2015 to December 2015
(Grove City)
30
S
South
Hamilton Road will be improved and resurfaced
between East Main Street and East Broad Street. Traffic will
b
be maintained. April 2015 to October 2015 (Whitehall)
b
42
Expect various restrictions on Broadway (U.S. 62) in Grove
City and a closure of Columbus Street at Broadway as part
of the Grove City Town Center Improvements project.
April 2015 to December 2015 (Grove City)
31
Im
Improvements
will be made to East Main Street near
Collingwood Avenue. Expect lane restrictions. June 2015 to
C
November 2015 (Whitehall)
N
43
Southwest Boulevard in Grove City will have various
restrictions for improvement work including an
eastbound-only traffic pattern near Broadway (U.S. 62).
May 2015 to August 2015 (Grove City)
32
The Hudson Street Bridge will be replaced over I-71. Expect
a closure of the East Hudson Street Bridge over I-71 after the
Ohio State Fair. I-71 through traffic will be maintained using
O
the entrance and exit ramps. The ramps will not be available
th
for exit or entry to the freeway. August 2015 to November
fo
2015 (ODOT)
2
44
Expect a closure of, and detour for, Broadway (U.S. 62) in
Grove City at Casa Boulevard for a culvert replacement.
June 2015 to July 2015 (Grove City)
Home Road will be realigned at U.S. 23. Expect lane
restrictions and a 30-day summer closure of Home Road.
April 2015 to August 2015 (Delaware County)
16
Hamilton Road will be widened to five lanes between Clark
State Road and Johnstown Road. Expect lane restrictions,
S
including a closure of Clark State Road and a 60-day closure
in
of northbound Hamilton Road. Spring 2015 to Spring 2017
o
(Franklin County)
(F
NORTHEAST
19
E
East
Broad Street will be reconstructed in Bexley. Traffic will
be maintained. April 2015 to August 2016 (Bexley)
b
20
New water line installation continues at, and near, the
N
in
intersection of Cleveland Avenue and Ferris Road. Expect
lane and turn restrictions. Through July 2015 (Columbus)
la
21
Improvements continue on Joyce Avenue between East
12th Avenue and immediately north of East 17th Avenue,
and on East 17th Avenue between Billiter Boulevard and
a
Brentnell Avenue. Expect various restrictions and
B
side-street closures, including a one-way northbound-only
si
pattern on Joyce Avenue between East 12th Avenue and East
p
23rd Avenue. Through late 2015 (Columbus)
22
CENTRAL
SOUTHEAST
33
T
The
Carroll Interchange, U.S. 33 interchanges northeast of
Lancaster will be improved. Traffic will be maintained on
L
U.S. 33. Spring 2015 to Spring 2017 (ODOT)
U
34
S
S.R.
256 will be improved and resurfaced in Pickerington.
Expect lane closures and night time paving work.
E
Late April 2015 to October 2015 (ODOT/Pickerington)
L
35
E
Expect
lane restrictions as utility work starts for the
Parsons Avenue Street Rehabilitation Project, south of East
P
Broad Street. Utility relocation: Summer and Fall 2015.
B
Project: 2016 to 2017. (Columbus)
P
36
A intersection improvement and pedestrian crossing
An
project will be constructed on Chatterton Road at Fontaine
p
Road and Reynard Road. Chatterton Road traffic will be
R
maintained. Spring 2015 to Fall 2015 (Franklin County/
m
Columbus)
C
37
The adjacent intersections of Winchester Pike and Bixby
Road and Winchester Pike and Brice Road will be realigned
into a single intersection. Winchester Pike traffic will be
maintained. Fall 2015 to Fall 2016 (Franklin County)
A water valve replacement project will take place on Morse
Road, Karl Road and Olentangy River Road north of
R
Henderson Road. Expect various restrictions. October 2015
H
to July 2016 (Columbus)
23
Se
Sewer
work will take place on Central College Road near
So
South Hamilton Road. Expect a temporary closure of
C
Central College Road. June 2015 to Spring 2016 (Columbus)
24
Th interchange improvement project at I-270 at Cleveland
The
A
Avenue continues. Expect various lane restrictions. Through
October
2015 (ODOT)
O
25
B
Bridge
improvements will be made at South Ohio Avenue,
South Champion Avenue and Linwood Avenue over I-70.
So
Expect lane closures. May 2015 to October 2015 (ODOT)
Ex
26
T
The
ramp from southbound I-270 to westbound East Main
Street (U.S. 40) will be closed for a bridge replacement
S
on East Main Street. Expect lane restrictions on East Main
o
Street, west of I-270. February 2015 to July 2015 (ODOT)
S
27
B
Beech
Road will be widened and reconstructed between
Smith’s Mill Road North and Jug Street. Beech Road will be
S
closed and detoured for this work. March 2015 to July 2015
c
(N
(New Albany)
SOUTHWEST
38
West Broad Street (U.S. 40) will get safety and other
various improvements between Hilliard-Rome Road and
I-270. Expect lane closures. May 2015 to June 2016 (ODOT)
39
I-71 will be widened between Stringtown Road and S.R.
665. Expect nighttime lane closures. September 2015 to July
2017 (ODOT)
45
Expect lane closures and some delays as crews work on U.S.
23 resurfacing and bicycle accommodation improvements
between downtown and East Hudson Street. Parts of High
Street, Summit Street, 3rd Street and 4th Street are among
the streets included. June 2015 to October 2015
(ODOT/Columbus)
Several jurisdictions have major resurfacing
programs planned for 2015. Traffic is typically
maintained for resurfacing projects. Expect delays
and be alert for workers and equipment. Access
to businesses and residences will be maintained.
Segments of West Broad Street,
Georgesville
Road, Olentangy River Road, Weber Road, Hayden
Run Road, Morse Crossing and King Avenue are a
few of the larger streets to be resurfaced in 2015.
Check
pavingtheway.org
for
more
details.
(Columbus, Various)
Printed on 30 percent post consumer waste recycled
paper. Please share this with a friend or recycle it
when you no longer need it.