2015 Guide - Paving the Way
Transcription
2015 Guide - Paving the Way
2015 Road Project Overview Note: Weather and other factors can affect the construction schedules of the projects listed below. NORTHWEST 1 A reconfiguration and widening of the I-270 and U.S. 33/S.R. 161 Interchange includes an approximately fourmonth closure of U.S. 33/S.R. 161 at I-270. Expect other restrictions on I-270 and U.S. 33/S.R. 161 as this reconfiguration is completed. March 2015 to September 2017 (ODOT) 2 S.R. 315 work will be added to the Northside “Mega” Fix at I-270 and N. High Street (U.S. 23). Expect various restrictions including two-month closures for the eastbound I-270 to northbound S.R. 315 ramp and the southbound S.R. 315 to eastbound I-270 ramp. Through September 2017 (ODOT) Through September 2017 (ODOT) 3 I-70 will be reconstructed between Hilliard-Rome Road and Wilson Road. Expect lane restrictions on I-70. September 2015 to October 2017 (ODOT) 4 Intersection improvements are planned at Fishinger Road and Dublin Road. Expect various lane closures. Spring 2015 to Fall 2015 (Franklin County) 5 Riggins Road will be extended from Wilcox Road to Avery Road. Expect detours for Wilcox Road during construction. Spring 2015 to Summer 2016 (Franklin County) 6 The interchange at S.R. 161 and Riverside Drive will be reconfigured and improved. Expect turn restrictions and lane closures for this major project. May 2015 to Fall 2016 (Dublin) 7 A roundabout will be constructed at the intersection of S.R. 161 and Eiterman Road in Dublin. Expect closures and detours. May 2015 to Fall 2015 (Dublin) 8 Hard Road will be widened and reconstructed between Sawmill Road and Smoky Row Road. Expect various lane closures. Dublin will improve the intersection of Hard Road and Sawmill Road as part of this project. Summer 2015 to Fall 2016 (Columbus/Dublin) 9 Sidewalks will be constructed and improvements will be made to Smoky Row Road north of Hard Road. Expect some flagging operations. Spring 2015 to Winter 2015 (Columbus) 10 Bridge replacement will take place on West 5th Avenue immediately west of Dublin Road. West 5th Avenue will be closed between Dublin Road and McKinley Avenue for this project that includes construction of a new shared-use path. May 2015 to November 2015 (Columbus) 11 A new shared-use path will be constructed on Olentangy River Road between John Herrick Drive and Lane Avenue. Expect various lane restrictions. Through Fall 2015 (Columbus) 12 The John H. Herrick Drive Bridge over the Olentangy River will be rehabilitated. Expect some posted detours. May 2015 to August 2015 (OSU) 13 Phase 1 of the Tremont Road Project will improve Tremont Road between Kenny Road and Ridgeview Road. Traffic will be maintained through most of the work. July 2015 to July 2016 (Upper Arlington) 14 East Powell Road will be reconstructed and improved between South Old State Road and Worthington Road. Traffic will be maintained on East Powell Road. Expect some local road closures. September 2015 to August 2016. (Delaware County) 15 28 Worthington Road will be widened between Powell Road and Africa Road. Two-way traffic will be maintained for most of the work. July 2015 to July 2016 (Delaware County) 17 Sawmill Parkway will be extended from Hyatts Road to immediately north of U.S. 42. Expect some local road closures. July 2015 to October 2016 (Delaware County) 18 Pavement and interchange signal improvements will be made on S.R. 315 between Ackerman Road and I-270. Expect lane closures and nighttime ramp closures. May 2015 to October 2015 (ODOT) 40 A roundabout will be constructed at the intersection of Alkire Road and Demorest Road. Expect closures and detours. Spring 2015 to Fall 2015 (Franklin County) E Expect lane restrictions and some detours as im improvements are made to the intersections on East Main Street at Lancaster Avenue and Jackson Street in S R Reynoldsburg. May 2015 to August 2015 (Reynoldsburg) 41 29 Orders Road will be widened between Old Haughn Road and Discovery Drive. Expect lane restrictions and a closure for a roundabout to be built at the intersection of Orders Road and Haughn Road. April 2015 to December 2015 (Grove City) 30 S South Hamilton Road will be improved and resurfaced between East Main Street and East Broad Street. Traffic will b be maintained. April 2015 to October 2015 (Whitehall) b 42 Expect various restrictions on Broadway (U.S. 62) in Grove City and a closure of Columbus Street at Broadway as part of the Grove City Town Center Improvements project. April 2015 to December 2015 (Grove City) 31 Im Improvements will be made to East Main Street near Collingwood Avenue. Expect lane restrictions. June 2015 to C November 2015 (Whitehall) N 43 Southwest Boulevard in Grove City will have various restrictions for improvement work including an eastbound-only traffic pattern near Broadway (U.S. 62). May 2015 to August 2015 (Grove City) 32 The Hudson Street Bridge will be replaced over I-71. Expect a closure of the East Hudson Street Bridge over I-71 after the Ohio State Fair. I-71 through traffic will be maintained using O the entrance and exit ramps. The ramps will not be available th for exit or entry to the freeway. August 2015 to November fo 2015 (ODOT) 2 44 Expect a closure of, and detour for, Broadway (U.S. 62) in Grove City at Casa Boulevard for a culvert replacement. June 2015 to July 2015 (Grove City) Home Road will be realigned at U.S. 23. Expect lane restrictions and a 30-day summer closure of Home Road. April 2015 to August 2015 (Delaware County) 16 Hamilton Road will be widened to five lanes between Clark State Road and Johnstown Road. Expect lane restrictions, S including a closure of Clark State Road and a 60-day closure in of northbound Hamilton Road. Spring 2015 to Spring 2017 o (Franklin County) (F NORTHEAST 19 E East Broad Street will be reconstructed in Bexley. Traffic will be maintained. April 2015 to August 2016 (Bexley) b 20 New water line installation continues at, and near, the N in intersection of Cleveland Avenue and Ferris Road. Expect lane and turn restrictions. Through July 2015 (Columbus) la 21 Improvements continue on Joyce Avenue between East 12th Avenue and immediately north of East 17th Avenue, and on East 17th Avenue between Billiter Boulevard and a Brentnell Avenue. Expect various restrictions and B side-street closures, including a one-way northbound-only si pattern on Joyce Avenue between East 12th Avenue and East p 23rd Avenue. Through late 2015 (Columbus) 22 CENTRAL SOUTHEAST 33 T The Carroll Interchange, U.S. 33 interchanges northeast of Lancaster will be improved. Traffic will be maintained on L U.S. 33. Spring 2015 to Spring 2017 (ODOT) U 34 S S.R. 256 will be improved and resurfaced in Pickerington. Expect lane closures and night time paving work. E Late April 2015 to October 2015 (ODOT/Pickerington) L 35 E Expect lane restrictions as utility work starts for the Parsons Avenue Street Rehabilitation Project, south of East P Broad Street. Utility relocation: Summer and Fall 2015. B Project: 2016 to 2017. (Columbus) P 36 A intersection improvement and pedestrian crossing An project will be constructed on Chatterton Road at Fontaine p Road and Reynard Road. Chatterton Road traffic will be R maintained. Spring 2015 to Fall 2015 (Franklin County/ m Columbus) C 37 The adjacent intersections of Winchester Pike and Bixby Road and Winchester Pike and Brice Road will be realigned into a single intersection. Winchester Pike traffic will be maintained. Fall 2015 to Fall 2016 (Franklin County) A water valve replacement project will take place on Morse Road, Karl Road and Olentangy River Road north of R Henderson Road. Expect various restrictions. October 2015 H to July 2016 (Columbus) 23 Se Sewer work will take place on Central College Road near So South Hamilton Road. Expect a temporary closure of C Central College Road. June 2015 to Spring 2016 (Columbus) 24 Th interchange improvement project at I-270 at Cleveland The A Avenue continues. Expect various lane restrictions. Through October 2015 (ODOT) O 25 B Bridge improvements will be made at South Ohio Avenue, South Champion Avenue and Linwood Avenue over I-70. So Expect lane closures. May 2015 to October 2015 (ODOT) Ex 26 T The ramp from southbound I-270 to westbound East Main Street (U.S. 40) will be closed for a bridge replacement S on East Main Street. Expect lane restrictions on East Main o Street, west of I-270. February 2015 to July 2015 (ODOT) S 27 B Beech Road will be widened and reconstructed between Smith’s Mill Road North and Jug Street. Beech Road will be S closed and detoured for this work. March 2015 to July 2015 c (N (New Albany) SOUTHWEST 38 West Broad Street (U.S. 40) will get safety and other various improvements between Hilliard-Rome Road and I-270. Expect lane closures. May 2015 to June 2016 (ODOT) 39 I-71 will be widened between Stringtown Road and S.R. 665. Expect nighttime lane closures. September 2015 to July 2017 (ODOT) 45 Expect lane closures and some delays as crews work on U.S. 23 resurfacing and bicycle accommodation improvements between downtown and East Hudson Street. Parts of High Street, Summit Street, 3rd Street and 4th Street are among the streets included. June 2015 to October 2015 (ODOT/Columbus) Several jurisdictions have major resurfacing programs planned for 2015. Traffic is typically maintained for resurfacing projects. Expect delays and be alert for workers and equipment. Access to businesses and residences will be maintained. Segments of West Broad Street, Georgesville Road, Olentangy River Road, Weber Road, Hayden Run Road, Morse Crossing and King Avenue are a few of the larger streets to be resurfaced in 2015. Check pavingtheway.org for more details. (Columbus, Various) Printed on 30 percent post consumer waste recycled paper. Please share this with a friend or recycle it when you no longer need it. For additional copies please contact Paving the Way.