A0 Cover Sheet
Transcription
A0 Cover Sheet
6 Oct 1 4 12 12 Boston Market - 4,240 SF 14C 2 14C 1HC 3 12 2HC 5 11 Total 541 Parking Count provided by Field Survey 10 12 10 364 163 14 Parking Tabulation Parking Spaces Compact Spaces Accessible Spaces 13C Area (SF) 25,683 5,689 4,000 2,600 1,218 1,150 2,900 2,400 1,600 1,363 1,800 1,280 1,160 3,400 80 2,800 10,083 2,122 4,500 932 1,360 1,400 8,419 4,240 2,700 94,879 5 ite 10 4C 3 11 8 13C Su 2 3HC 17 13C Suite 117 - 3,400 SF 3 2HC 2 SF 2HC 00 ,8 -2 00 SF 5B 7 ite 30C ,0 -4 00 Su 89 SF 21 ,6 5A ite -5 00 Su 5 2 1 1 14C 3 3 Suite 132 - 10,083 SF 19C 5 16 2 2HC 16 Forest Lane Office Depot 25,683 SF 17 St or ag e 20 0 SF Contractor's Required Check List 1HC 14 Suite No. 005 005A 005B 100 106 107 108 109 110 111 111A 114 116 117 117A 118 132 134 4 140 154 232 240 248 717 7804 16C Total Suite 116 - 1,160 SF 4 Central Forest Parking Count Site Plan N 0 10 20 40 80 Suite 114 - 1,280 SF Tenant Office Depot BarkTaco & Purr Bueno Ashton Podiatry Chipolte Mexican Grill On-Site Cellular State Farm Insurance Orthopedic Association of Dallas Vacant Royal Nails Which Wich Euro Market QVL Pharmacy Vacant Vacant Mechanical Room Quest Diagnostics Insight Diagnostics Asian Mint HealthSouth Edward D. Jones Lenahan Law Dr. Esedebe Vacant Boston Market Schlotzskys 2 Suite 111A - 1,800 SF Total Tenant and Areas provided by Henry S. Miller Suite 111 - 1,363 SF 28 sq ft 1HC 12 Suite 232 - 1,360 SF 2 Suite 240 - 1,400 SF 8 12 3 154 - F 932 S 10 Second Floor 14 11 2 Suite 11 1 Suite 248 - 8,419 SF SF Suite 140 - 4,500 SF 2,122 Schlotzskys - 2,700 SF 134 - 3 Suite Parking Tabulation Parking Spaces Compact Spaces Accessible Spaces Total Suite 110 - 1,600 SF Contractor Responsibilities TITLE BOXING project documents Contractor shall have on desk in job site a copy of the City/County approved plans. Contractor shall have on desk in job site a copy of the Fire Marshall approved plans (if separate from City documents). Submit all ALL written comments issued by the City jurisdiction to the Architect and the Civil. Contractor shall remove any Drawings not sealed by the Architect or Engineers of record from the site. Contractor shall ceate a Construction Documents (CD) log listing each document and posting the effective date. Include Addendae, Change Orders and Clarification Drawings. Send copy monthly or as it changes for review by Architect. tenant documents Tenant Lease Exhibit is contained in the Project Manual, become familiar with this document to understand the required level of finish. Notify Architect immediately of any discrepancies noted between Lease Exhibit, Architectural Plans and Tenant Finish Plans keep CD Log of all pertinent Tenant Finish Drawings, send copy to Architect for verification DO NOT initiate construction on Tenant space until you have a set of checked Tenant Finish Drawings distributed from Architect's Office. changes Submit RFI's in writing to the Archtect or Civil. Maintain a log of RFI's indicating their status. Submit all Change Requests in writing to Architect and/or MP&E Engineer for evaluation. DO NOT proceed with any changes to the Work until written authorization has been granted by the Architect/Engineer and the Owner. pay applications DO NOT front load Pay Applications. G703 shall be consistent with Subcontractors/Suppliers Contracts and Lien Waivers Submit accurate Pay Applications of Work exectued, inaccurate Pay Applications will be rejected, not adjusted subcontractors Submit a list, including all contact information, of Subcontractors and Suppliers to be used on the project. If Subs or Suppliers change during the course of the Work notify the Architect of the change. submittals Submit a minimum of 4 Shop Drawings or Submittals for each category of Work. Construction Document Index MP & E Engineer Frank P. Skipper, P.E. Professional Engineer' 3808 Northridge Court Irving, TX 75038 A0 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 Texas Firm Registration #F-12758 Project Manager Claire Bollinger Dallas, TX 75230 214.707.4085 [email protected] Landlord Contact: Owner Vaughn Miller Henry S. Miller 1100 Providence Towers West 5001 Spring Valley Road Dallas, TX 75244 GOVERNMENTAL AGENCIES City of Dallas/Oak Cliff Municipal Center 320 E Jefferson Blvd. Room 118 Dallas TX 75203 Phone: 214.948.4480 Fax: 214.948.4511 City of Dallas Codes 2006 International Building Code with Dallas Amendments 2006 International Mechanical Code with Dallas Amendments 2006 International Plumbing Code with Dallas Amendments 2008 National Electrical Code with Dallas Amendments 2006 International Fire Code with Dallas Amendments 2006 International Energy Code with 2006 Dallas Amendments 2003 International Existing Building Code with Dallas Amendments 2006 International Fuel & Gas Code with Dallas Amendments IBC Code Requirements Occupancy Classification: A3(Gym w/o seating) Type of Construction: Type IIB - unsprinklered Allowable Project Building Height in Stories: 2 1 Building Height in Feet: 40 ft na No. of Exits Required per Tenant: 2 2 Building Separation: 3 HR na IBC Occupant Load Calculations Table 1004.1.1 Area per Occupant Area (SF) Occupants 50 SF/per 4,351 87 Locker Room 50 SF/per 279 6 DO NOT proceed with any phase of construction without approved Shop Drawings or Submittals. Business 100 SF/per 85 1 Storage/Mechanical 300 SF/per 34 1 4,749 95 DO NOT proceed with color selections without the written approval of the Architect. Provide and maintain an experienced and qualified Project Superintendent on site throughout the duration of construction. Provide and maintain an experienced and qualified Project Manger in the office throughout the duration of construction. Follow the procedures set up in the Project Manual. Submit electronic project photos with captions and progress summary reports weekly to the Owner, the Architect and the Civil. Cover Sheet Specifications Demo Floor Plan Floor Plan Reflected Ceiling Plan Finish Plan Occupant Load Plan Shwr Details Enlarged Restrooms TAS Details MEP1 Specs MEP2 Schedules MEP3 COMCheck M1 Mechanical Plan P1 Plumbing Plans P2 Plumbing Risers E1 Lighting Plan E2 Power Plan Gymnasium Architect will prepare a color board for the approval of the Owner from the color samples submitted by the Contractor. project management Architect Duane Meyers AIA Architect 3481 FM 1844 Longview, TX 75605 903.484.4040 [email protected] Review and stamp the Shop Drawings or Submittals with your comments before submitting them to the Architect for review. Submit substitutions for approval if work components vary from those items specified. !"# PR $%$$ Uncertain& TX '!""( )#*+%,%+%#%# drmeyers@mac+com 9 13C 8 364 163 14 541 Suite 109 - 2,400 SF Area (SF) 25,683 5,689 4,000 2,600 1,218 1,150 2,900 2,400 1,600 1,363 1,800 1,280 1,160 3,400 80 2,800 10,083 2,122 4,500 932 1,360 1,400 8,419 4,240 2,700 94,879 Suite 108 - 2,900 SF Tenant Office Depot Bark & Purr Ashton Podiatry Chipolte Mexican Grill On-Site Cellular State Farm Insurance Orthopedic Association of Dallas Vacant Royal Nails Which Wich Euro Market QVL Pharmacy Vacant Vacant Mechanical Room Quest Diagnostics Insight Diagnostics Asian Mint HealthSouth Edward D. Jones Lenahan Law Dr. Esedebe Vacant Boston Market Schlotzskys Suite 107 - 1,150 SF Tenant Improvement Package " Totals refer to A6 Occupant Load Calculation Floor Plan Scope Of Work - Central Forest SC The space is an existing interior commercial space within an existing shopping center. 0. Demolish the existing improvements within the space per Demo Plan A2.0 1. Build new Interior Partition Walls and Plumbing Walls as shown on construction documents. 2. Install new Floor Finishes throughout the space as shown on construction documents. 3. Install new Light Fixtures & relocate existing Light Fixtures as shown on construction documents. 4. Install new Interior Finishes throughout the space as shown on construction documents. 5. Install All Mechanical, Electrical and Plumbing Fixtures as shown on engineering drawings. 6. GC responsible for providing completed space and obtaining CO for operation of space as Title Boxing. 7. Landlord/Tenant Lease Exhibit can be found on the FTP address noted below. This document outlines the Tenant's Contractor's Responsibilities: http://www.duanemeyers.com/fileserv/Title%20Boxing/BOX %20Publication%20120207/ Central Forest Shopping Center Dallas, TX Central Forest Shopping Center Suite 106 - 1,218 SF 11613 N Central Expressway, Suite 108/109 Dallas, TX 75243 Dallas County Contractor" " " " " Mr. Butch Jones Commercial Construction Group 500 Turtle Cove, Suite 200 Rockwall, TX 75087 972.415.8117 [email protected] Architect Architect Suite No. 005 005A 005B 100 106 107 108 109 110 111 111A 114 116 117 117A 118 132 134 140 154 232 240 248 717 7804 Central Forest Shopping Center " Duane Meyers AIA Duane Meyers AIA Suite 100 - 2,600 SF TITLE BOXING Tenant" " " " " Simon Raphael DFW Fitness Ventures, LLC 3421 Bryn Mawr Drive Dallas, TX 75225 TITLE BOXING A1. 6 Oc This document to show Parki Only (regul complianc assessed a verified) obtai Field Surv 3 Oct 1 Bldg Area Configuration by HS Mil TITLE BOXING ® ad Ro Central Frontage Project Directory Revisions 12 b 20 7 Fe AREA MAP A0 7 Feb 12