A0 Cover Sheet

Transcription

A0 Cover Sheet
6 Oct 1
4
12
12
Boston Market - 4,240 SF
14C
2
14C
1HC
3
12
2HC
5
11
Total
541
Parking Count provided by Field Survey
10
12
10
364
163
14
Parking Tabulation
Parking Spaces
Compact Spaces
Accessible Spaces
13C
Area (SF)
25,683
5,689
4,000
2,600
1,218
1,150
2,900
2,400
1,600
1,363
1,800
1,280
1,160
3,400
80
2,800
10,083
2,122
4,500
932
1,360
1,400
8,419
4,240
2,700
94,879
5
ite
10
4C
3
11
8
13C
Su
2
3HC
17
13C
Suite 117 - 3,400 SF
3
2HC
2
SF
2HC
00
,8
-2
00
SF
5B
7
ite
30C
,0
-4
00
Su
89
SF
21
,6
5A
ite
-5
00
Su
5
2
1
1
14C
3
3
Suite 132 - 10,083 SF
19C
5
16
2
2HC
16
Forest Lane
Office Depot 25,683 SF
17
St
or
ag
e
20
0
SF
Contractor's Required Check List
1HC
14
Suite No.
005
005A
005B
100
106
107
108
109
110
111
111A
114
116
117
117A
118
132
134
4
140
154
232
240
248
717
7804
16C
Total
Suite 116 - 1,160 SF
4
Central Forest Parking Count Site Plan
N
0
10
20
40
80
Suite 114 - 1,280 SF
Tenant
Office Depot
BarkTaco
& Purr Bueno
Ashton Podiatry
Chipolte Mexican Grill
On-Site Cellular
State Farm Insurance
Orthopedic Association of Dallas
Vacant
Royal Nails
Which Wich
Euro Market
QVL Pharmacy
Vacant
Vacant
Mechanical Room
Quest Diagnostics
Insight Diagnostics
Asian Mint
HealthSouth
Edward D. Jones
Lenahan Law
Dr. Esedebe
Vacant
Boston Market
Schlotzskys
2
Suite 111A - 1,800 SF
Total
Tenant and Areas provided by Henry S. Miller
Suite 111 - 1,363 SF
28 sq ft
1HC
12
Suite 232 - 1,360 SF
2
Suite 240 - 1,400 SF
8
12
3
154 -
F
932 S
10
Second Floor
14
11
2
Suite
11
1
Suite 248 - 8,419 SF
SF
Suite 140 - 4,500 SF
2,122
Schlotzskys - 2,700 SF
134 -
3
Suite
Parking Tabulation
Parking Spaces
Compact Spaces
Accessible Spaces
Total
Suite 110 - 1,600 SF
Contractor Responsibilities
TITLE BOXING
project documents
Contractor shall have on desk in job site a copy of the City/County
approved plans.
Contractor shall have on desk in job site a copy of the Fire Marshall
approved plans (if separate from City documents).
Submit all ALL written comments issued by the City jurisdiction to the
Architect and the Civil.
Contractor shall remove any Drawings not sealed by the Architect or
Engineers of record from the site.
Contractor shall ceate a Construction Documents (CD) log listing each
document and posting the effective date. Include Addendae, Change
Orders and Clarification Drawings. Send copy monthly or as it changes for
review by Architect.
tenant documents
Tenant Lease Exhibit is contained in the Project Manual, become familiar
with this document to understand the required level of finish. Notify
Architect immediately of any discrepancies noted between Lease Exhibit,
Architectural Plans and Tenant Finish Plans
keep CD Log of all pertinent Tenant Finish Drawings, send copy to
Architect for verification
DO NOT initiate construction on Tenant space until you have a set of
checked Tenant Finish Drawings distributed from Architect's Office.
changes
Submit RFI's in writing to the Archtect or Civil. Maintain a log of RFI's
indicating their status.
Submit all Change Requests in writing to Architect and/or MP&E Engineer
for evaluation. DO NOT proceed with any changes to the Work until written
authorization has been granted by the Architect/Engineer and the Owner.
pay applications
DO NOT front load Pay Applications. G703 shall be consistent with
Subcontractors/Suppliers Contracts and Lien Waivers
Submit accurate Pay Applications of Work exectued, inaccurate Pay
Applications will be rejected, not adjusted
subcontractors
Submit a list, including all contact information, of Subcontractors and
Suppliers to be used on the project. If Subs or Suppliers change during the
course of the Work notify the Architect of the change.
submittals
Submit a minimum of 4 Shop Drawings or Submittals for each category of
Work.
Construction
Document Index
MP & E Engineer
Frank P. Skipper, P.E.
Professional Engineer'
3808 Northridge Court
Irving, TX 75038
A0
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
Texas Firm Registration #F-12758
Project Manager
Claire Bollinger
Dallas, TX 75230
214.707.4085
[email protected]
Landlord Contact:
Owner
Vaughn Miller
Henry S. Miller
1100 Providence Towers West
5001 Spring Valley Road
Dallas, TX 75244
GOVERNMENTAL AGENCIES
City of Dallas/Oak Cliff Municipal Center
320 E Jefferson Blvd. Room 118
Dallas TX 75203
Phone: 214.948.4480
Fax: 214.948.4511
City of Dallas Codes
2006 International Building Code with Dallas Amendments 2006 International Mechanical Code with Dallas Amendments 2006 International Plumbing Code with Dallas Amendments 2008 National Electrical Code with Dallas Amendments
2006 International Fire Code with Dallas Amendments
2006 International Energy Code with 2006 Dallas Amendments
2003 International Existing Building Code with Dallas Amendments
2006 International Fuel & Gas Code with Dallas Amendments
IBC Code Requirements
Occupancy Classification:
A3(Gym w/o seating)
Type of Construction:
Type IIB - unsprinklered
Allowable
Project
Building Height in Stories:
2
1
Building Height in Feet:
40 ft
na
No. of Exits Required per Tenant:
2
2
Building Separation:
3 HR
na
IBC Occupant Load Calculations Table 1004.1.1
Area per
Occupant
Area (SF)
Occupants
50 SF/per
4,351
87
Locker Room
50 SF/per
279
6
DO NOT proceed with any phase of construction without approved Shop
Drawings or Submittals.
Business
100 SF/per
85
1
Storage/Mechanical
300 SF/per
34
1
4,749
95
DO NOT proceed with color selections without the written approval of the
Architect.
Provide and maintain an experienced and qualified Project Superintendent
on site throughout the duration of construction.
Provide and maintain an experienced and qualified Project Manger in the
office throughout the duration of construction.
Follow the procedures set up in the Project Manual.
Submit electronic project photos with captions and progress summary
reports weekly to the Owner, the Architect and the Civil.
Cover Sheet
Specifications
Demo Floor Plan
Floor Plan
Reflected Ceiling Plan
Finish Plan
Occupant Load Plan
Shwr Details
Enlarged Restrooms
TAS
Details
MEP1 Specs
MEP2 Schedules
MEP3 COMCheck
M1
Mechanical Plan
P1
Plumbing Plans
P2
Plumbing Risers
E1
Lighting Plan
E2
Power Plan
Gymnasium
Architect will prepare a color board for the approval of the Owner from the
color samples submitted by the Contractor.
project management
Architect
Duane Meyers AIA Architect
3481 FM 1844
Longview, TX 75605
903.484.4040
[email protected]
Review and stamp the Shop Drawings or Submittals with your comments
before submitting them to the Architect for review.
Submit substitutions for approval if work components vary from those
items specified.
!"# PR $%$$
Uncertain& TX '!""(
)#*+%,%+%#%#
drmeyers@mac+com
9
13C
8
364
163
14
541
Suite 109 - 2,400 SF
Area (SF)
25,683
5,689
4,000
2,600
1,218
1,150
2,900
2,400
1,600
1,363
1,800
1,280
1,160
3,400
80
2,800
10,083
2,122
4,500
932
1,360
1,400
8,419
4,240
2,700
94,879
Suite 108 - 2,900 SF
Tenant
Office Depot
Bark & Purr
Ashton Podiatry
Chipolte Mexican Grill
On-Site Cellular
State Farm Insurance
Orthopedic Association of Dallas
Vacant
Royal Nails
Which Wich
Euro Market
QVL Pharmacy
Vacant
Vacant
Mechanical Room
Quest Diagnostics
Insight Diagnostics
Asian Mint
HealthSouth
Edward D. Jones
Lenahan Law
Dr. Esedebe
Vacant
Boston Market
Schlotzskys
Suite 107 - 1,150 SF
Tenant Improvement Package
"
Totals
refer to A6 Occupant Load Calculation Floor Plan
Scope Of Work - Central Forest SC
The space is an existing interior commercial space within an existing
shopping center.
0. Demolish the existing improvements within the space per Demo
Plan A2.0
1. Build new Interior Partition Walls and Plumbing Walls as shown on
construction documents.
2. Install new Floor Finishes throughout the space as shown on
construction documents.
3. Install new Light Fixtures & relocate existing Light Fixtures as
shown on construction documents.
4. Install new Interior Finishes throughout the space as shown on
construction documents.
5. Install All Mechanical, Electrical and Plumbing Fixtures as shown on
engineering drawings.
6. GC responsible for providing completed space and obtaining CO for
operation of space as Title Boxing.
7. Landlord/Tenant Lease Exhibit can be found on the FTP address
noted below. This document outlines the Tenant's Contractor's
Responsibilities:
http://www.duanemeyers.com/fileserv/Title%20Boxing/BOX
%20Publication%20120207/
Central Forest Shopping Center Dallas, TX
Central Forest Shopping Center
Suite 106 - 1,218 SF
11613 N Central Expressway, Suite 108/109
Dallas, TX 75243
Dallas County
Contractor"
"
"
"
"
Mr. Butch Jones
Commercial Construction Group
500 Turtle Cove, Suite 200
Rockwall, TX 75087
972.415.8117
[email protected]
Architect
Architect
Suite No.
005
005A
005B
100
106
107
108
109
110
111
111A
114
116
117
117A
118
132
134
140
154
232
240
248
717
7804
Central Forest
Shopping Center
"
Duane Meyers AIA
Duane Meyers AIA
Suite 100 - 2,600 SF
TITLE BOXING
Tenant" "
"
"
"
Simon Raphael
DFW Fitness Ventures, LLC
3421 Bryn Mawr Drive
Dallas, TX 75225
TITLE BOXING
A1.
6 Oc
This document
to show Parki
Only (regul
complianc
assessed a
verified) obtai
Field Surv
3 Oct 1
Bldg Area
Configuration
by HS Mil
TITLE BOXING
®
ad
Ro
Central Frontage
Project Directory
Revisions
12
b 20
7 Fe
AREA MAP
A0
7 Feb 12