the empuriabrava wastewater treatment plant and constructed
Transcription
the empuriabrava wastewater treatment plant and constructed
THE EMPURIABRAVA WASTEWATER TREATMENT PLANT AND CONSTRUCTED WETLAND SYSTEM Enric Pallarès Consorci de la Costa Brava 3rd Wetland Pollutant Dynamics and Control Symposium WETPOL 2009 El Cortalet, Aiguamolls de l’Empordà, 23 September 2009 Environmental reuse project • Mid 90’s - Need of a new source of water for the Aiguamolls de l’Empordà Nature Reserve • New WWTP in Empuriabrava (1995), – In the south side of Mega River – Where Nature Reserve is located • Secondary effluent is proposed as alternative source • Nutrient –specially nitrogen- removal is needed – Reclamation through a constructed wetland system • Constructed wetland system: – to provide the treatment – potential interesting habitat by itself WWTP and Wetland System Visitor Center (Cortalet) Goals of the project • Supply water in the 18-ha manmade Cortalet lagoon – to avoid its summer desiccation – and/or to restore wet meadows in the surrounding area – to avoid the eutrophication • removal of nutrients needed! • Reduce discharges in the nearby Muga river • Preservation of the local habitats and their specific flora and fauna Application of polished effluent Wet Meadows Visitor Center Cortalet Lagoon Empuriabrava WWTP • In operation since 1995, it services the touristic community of Empuriabrava municipality of Castelló d’Empúries • Range of treated flows (m3/day): – winter, low season: 1,500 – summer, peak season: 6,500 • Extended aeration (N/DN) + settling tanks + Sludge sedimentation ponds + Polishing ponds • Originally, two independent treatment lines; a third one added in 2007 • Chemical phosphorus removal added recently The Empuriabrava constructed wetland system • In operation since 1998 • Project funded by EU Cohesion Funds (80%) and CCB (20%): – Constructed wetland: • 3 treatment cells of 0,8 ha each • shallow lagoon of 4,5 ha • (total, approx. 7 ha). – Pumping station – 2 km pipeline to deliver reclaimed water to the Parc Natural dels Aiguamolls de l’Empordà (PNAE). – Pedestrian bridge on the Muga river to connect urban area of Empuriabrava with PNAE. The constructed wetland system • Set in operation since 1998 • 3 vegetated cells – – – – 160 m x 50 m: 8,000 m2 average depth of 0.5 m cattail -Typha latifoliareed -Phragmites australis-) • Shallow pond: Estany Europa – – – – average depth 0.2 m Surface of 45.000 m2 additional treatment ecosystem diversity for flora and fauna Diagram of the facilities Operation of the system • 2000-2008: - Average of 78 % of the treated wastewater treated through the wetland system and recycled for environmental purposes - 737.000 m3/year out of 940.000 m3/year ⇒ not discharged to the Muga river - Since 2007, almost all the flow is reused thanks to the new third biological reactor Performance of the System some of the results – Evaluated according to the removal of total inorganic nitrogen (TIN) – Nutrient loads (concentration x flow) calculated for both system inlet and outlet – Removal of 85% of the TIN in 2008 (approx. 6,300 kg N) – Estimations of P removal show greater annual variability; in 2008, 47% of total phosphorus (approx. 2,700 kg P) Other results: Visitors are welcome