Cultural Arts Facilities Feasibility Study
Transcription
Cultural Arts Facilities Feasibility Study
Cultural Arts Facilities Feasibility Study PHASE TWO REPORT SEPTEMBER 2006 AMS Planning & Research 915 D Street Petaluma, CA 94952 707.778.8445 http://AMS-online.com Orem Cultural Arts Feasibility Study Contents Summary .............................................................................................................................1 Facility Alternatives...........................................................................................................4 NEW ARTS FACILITIES FOR OREM ............................................................................4 1. SCERA Center for the Arts ..........................................................................................4 Scope of Work ..............................................................................................................5 Architectural Description of Work .................................................................................6 Design Features ............................................................................................................6 SCERA Theater Renovation Plan - Description of Work .................................................9 2. Arts Education Center ................................................................................................ 10 3. Orem Heritage Museum ............................................................................................. 11 4. Children’s Museum.................................................................................................... 11 The Timpanogos Storytelling Festival .......................................................................... 11 Option – Combining the Children’s Museum and Heritage Museum............................... 11 Project Budget Estimate ................................................................................................. 12 Phasing ...................................................................................................................... 12 SCERA Park Master Plan ............................................................................................ 13 Management and Operations..........................................................................................14 Governance, Management and Staffing........................................................................... 14 Operating Estimate ........................................................................................................ 14 Children’s Museum ..................................................................................................... 14 Arts Education Center ................................................................................................. 15 Heritage Museum........................................................................................................ 16 APPENDICES A. Preliminary Space Requirements B. Concept Plans SCERA Center SCERA Park Arts District C. SCERA Center Structural and Building Systems Report D. Project Budget Detail AMS Planning & Research September 2006 Orem Cultural Arts Feasibility Study Summary In May 2006, AMS Planning & Research was retained to conduct a feasibility study for cultural facilities for the City of Orem. The impetus for the study was a voter-approved tax (CARE Tax) in November 2005 to fund the development of cultural and recreational facilities for the community. The feasibility study has been conducted in two phases. The first phase of study comprised an analysis of community interest (including surveys of arts organizations, artists, educational institutions, and business) in new cultural arts facilities, assessment of the market potential for arts and cultural programs, research into program opportunities, evaluation of existing and planned cultural facilities in the area, and comparable case studies. Initial recommendations were presented to City Council in July 2006 for continued examination of the feasibility of four facilities — renovations to the SCERA Center, a Heritage Museum, a Children’s Museum, and an arts education facility. Phase two of the study, the results of which are summarized in this report, entailed defining the recommended facilities, cost projections, site considerations, and management and operating estimates. The following summarizes the key recommendations: 1. Renovation of SCERA Center SCERA Center for over 70 years has been operated as a private non profit provider of a range of cultural programs. The Center is currently undertaking plans for renovations to its lobby and auditorium which are projected to cost up to $1 million, funded primarily by a corporate sponsorship from Xango. The theater is to be renamed in recognition of the gift. This feasibility study outlines a more extensive renovation of the SCERA Center, focusing on its technical deficiencies in providing first class facilities for the live performing arts, and increasing the theater’s seating capacity to expand its programming options and competitiveness. The proposed renovation would provide a new state of the art stagehouse with advanced scenery handling capabilities and a stage suitable for a full orchestra, ballet company or musical theater production. Technical support spaces, including dressing rooms and a loading dock, would be built. A balcony seating area would be added, increasing the seating capacity from 600 to 900. A new larger lobby with a glass frontage onto State Street would be built, giving the Center a striking new image. Additional upgrades would be done to the administrative support spaces and performing arts classrooms. The total estimated cost for the proposed renovations as outlined in the report is approximately $40 million. While this estimate seems to be a considerable sum, on the basis of cost per square foot it is calculated as $246 (construction cost) which compares to over $400 per square foot for a comparable new building with similar facilities. 2. Arts Education Center SCERA currently provides a range of performing arts classes at their Center and the proposed renovations to the Center as outlined in this report incorporate expanded spaces. This feasibility study recommends the creation of an arts education building that would provide classrooms for the visual arts, including painting, ceramics, photography and other arts and crafts. Space for the immensely successful Timpanogos Storytelling Festival to expand its programming year-round would be included along with a gallery to exh ibit art by local artists and touring shows. AMS Planning & Research September 2006 Page 1 Orem Cultural Arts Feasibility Study An arts education building of about 22,000 square feet is envisioned, with up to 7 purposedesigned and multipurpose classrooms. The estimated budget to construct and equip the facility would be about $10 millio n. Classes and programs at the facility would attract an estimated 7 to 10,000 annually plus attendees at events and exhibits. Annual operating cost (i.e., funding requirement) would be in the range of $150-175,000. 3. Children’s Museum Over the past few years a citizen’s group has been striving to establish a children’s museum in Orem. Their efforts have resulted in securing a tentative commitment from a local developer for an unused warehouse in a central area of Orem. The museum has suffered from a lack of resources and the limited organizational capacity of its volunteer base. This study supports and recommends establishment of a Children’s Museum. The Museum, which would initially comprise up to 12,000 square feet, should reflect the needs and interests of Orem families, perhaps focusing on the heritage of the community. (This may offer an opportunity to partner or combine with the Heritage Museum discussed below.) A program focus on the region’s heritage would provide the museum with a distinct image from other existing children’s museums in the region such as in Logan and Salt Lake City and one being planned at Thanksgiving Point. This study recommends that the preferred location for a Children’s Museum would be proximate to the SCERA Center, becoming an important element in an Arts District (see below for further details). The estimated cost for a children’s museum is $5 to $7 million. Annual attendance would be in the range of 20 to 40 thousand and operating cost would be between $150,000 to $250,000 (net funding requirement). 4. Heritage Museum The Orem Heritage Museum is currently accommodated in a room at the SCERA Center and is operated by a dedicated core of volunteers. A preliminary analysis of the museum’s (existing and potential) collections and a review of similar museums suggests a building of about 10,000 to 14,000 sq. ft. to fully accommodate the collections and future programming opportunities for the museum. Co-location with the other facilities outlined in this report could reduce the overall requirement and offer administrative efficiencies. Exhibits would focus on Orem history and artifacts and one gallery would be available for special exhibits and multi-media presentations. A professionally operated museum would require a staff of 2 to 3 persons and an annual operating budget of $150 to $200,000 (net funding requirement after admissions and fees). Attendance is estimated at 5,000 to 20,000 annually. 5. Additional Considerations 1. Combining Facilities Three of the new arts facilities described in this report could be combined into one or two buildings. Continued planning and discussion with potential partners, such as the Children’s Museum or the Orem Heritage Museum, could result in shared and joint use of space, collaborative programs, and administrative coordination or consolidation. AMS Planning & Research September 2006 Page 2 Orem Cultural Arts Feasibility Study 2. SCERA Park Arts District and Master Plan We have noted the potential to establish a much-needed focus for the arts in Orem and an opportunity to create a “sense of place” for the community by concentrating the proposed new arts facilities in SCERA Park contiguous to the SCERA Center which is now the focus of considerable activity and community pride. 3. Arts Funding The proposed new arts facilities and renovated SCERA Center will require ongoing financial support. The Heritage Museum, Children’s Museum and Arts Education Center, if built as separate facilities, may require annual funding o$600 to $800,000. SCERA Center, which receives minimal annual support from the City, has indicated a desire for public fundin g, perhaps as much as $1 million, to support their ongoing development and operation. As planning progresses for the new facilities, more detailed operating plans will be necessary, including the feasibility of establishing operating endowments, private fundraising or other sources of ongoing funding. AMS Planning & Research September 2006 Page 3 Orem Cultural Arts Feasibility Study Facility Alternatives NEW ARTS FACILITIES FOR OREM Based on the research and recommendations in Phase One of the Feasibility Study, AMS has recommended that four facilities be considered. These are: 1) renovation of the SCERA theater, 2) a new arts education center, 3) a heritage museum and 4) a children’s museum. To aid in planning and budgeting, preliminary space programs were developed for each component. Detailed space requirements are provided in Appendix A; the table below provides a summary. Figure 1: Building Space Requirements Component Proposed facilities Total Building Requirement (minimum footprint) Theater improvements and additions 86,000 (includes existing building) Seven classrooms, administration, support, exhibit space 22,000 (±15,000) Three exhibit galleries, two classrooms, exhibition support space, offices, museum store 12,000 (±12,000) Exhibit space, classrooms, exhibit support, offices 12,000 (±10,000) SCERA Arts Center Arts Education Center Orem Heritage Museum Children’s Museum The following outlines recommended renovations/expansion to the SCERA Center theater that meet the needs for a performing arts facility to serve the community and then a description of each new facility and its components. 1. SCERA Center for the Arts Skidmore, Owings & Merrill LLP Arts Studio, conducted a preliminary visual and programmatic evaluation of the SCERA theater building and the surrounding site to explore the viability of developing an expanded performing arts capability and accommodate other arts facilities as identified in the initial phase of the feasibility study. The SCERA Center for the Arts, based in Orem, Utah, was founded in 1933 as a family-focused provider of entertainment, culture, recreation and education for the citizens of Sharon Tract which became the city of Orem. In 1942 a movie theater was built to provide a setting for the screening of popular family films and occasional live entertainment. The theater was intended to provide activity to “touch the soul, improve the mind, and unify the family.” AMS Planning & Research September 2006 Page 4 Orem Cultural Arts Feasibility Study SCERA Theater in 1942 The original building, built of reinforced concrete, included a small lobby and refreshment area, box office, restrooms, a 749-seat single level movie house, shallow stage house with limited wings, and basement support areas. The facility continued to function adequately until 1996 at which point it was determined that an expansion was necessary. This included an additional performance space of 459 seats, lobby expansion (including “gallery” space), administrative expansion, rehearsal and education spaces, and a room which serves a heritage museum. SCERA Theater addition Scope of Work The following goals were identified: • • Increased seating capacity for the SCERA theater to ±900 seats Lobby expansion and renovation to accommodate the projected increased attendance • • • Amenities (Scoop) renovation and public facilities expansion Adding a full stage house to the SCERA theater to provide state-of-the-art capability Small theater renovation • • Administrative expansion and relocation Artistic and technical support expansion for both halls • • Education wing addition Relocation of Heritage Museum to a new site AMS Planning & Research September 2006 Page 5 Orem Cultural Arts Feasibility Study • Potential new arts education building • Potential new children’s museum The space programs developed to guide the planning is shown in the Appendix. Architectural Description of Work Introduction Our research, interviews and meetings with arts groups, arts presenters and educators, as well as analysis of existing and planned performance venues and the market analysis, have provided us with many insights into the needs and desires for new performance facilities. Potential interest in a performance facility with about 1,000 seats was expressed by some local organizations. This facility would meet the needs for a full range of music, theater, dance, and musical theater performances as well as meetings, conferences, film and public assembly events for businesses, government agencies, educational institutions, social organizations and others. The user research indicates that local demand for performance uses of a large venue is moderately strong and will depend upon many factors, including the future stability of the region’s major performing arts organizations and the cost of using the theater. Examples of local users include the Utah Valley Symphony, Utah Regional Ballet and several choral groups. Figure 2, below illustrates the types of uses and the technical requirements for each. Figure 2: Proposed Uses – Large Theater Proposed Uses Performance Type Stage Requirements Choral and Instrumental Music Symphony, band, choirs 40 – 130 performers plus chorus of up to 100, excellent natural acoustics with high reverberation value Dance Ballet, Jazz, Tap, Modern, Folk, Ethnic Fully staged ballet with up to 60 dancers, Recitals for up to 100 children, Orchestra (in pit) Opera, Musical Theater Musicals and theater productions by local and touring companies Up to 60 performers, orchestra up to 40 musicians (in pit), extensive scenery Stage Plays Full repertoire of plays Large range of cast sizes, extensive scenery flying Community Events Wide range of assembly types Minimal stage Touring Arts Programs Popular, jazz, folk, ethnic recitals, Broadway, children’s theater Up to 60 performers. Orchestra pit, scenery flying Design Features A modern performing arts facility should incorporate features that enable it to be flexible yet provide a first-class environment for music and theatrical performances for performers and audiences alike. The chart below indicates the major spaces and their features that should be incorporated into a first-class facility. It should be noted that the description below is for a theater facility that would be a “showcase” venue and not incorporate extensive set, prop or costume construction spaces. Equipment and AMS Planning & Research September 2006 Page 6 Orem Cultural Arts Feasibility Study support facilities for touring companies (e.g., laundry, wardrobe repair, storage) are included. A well designed theater should allow for multiple uses of spaces such as the lobby, green room, meeting rooms and practice rooms. AMS Planning & Research September 2006 Page 7 Orem Cultural Arts Feasibility Study Figure 3: Design and Technical Features – Large Theater Feature Description Auditorium Excellent sight lines and acoustics for every seat; maximum distance from stage to farthest seat should be 80 feet; multiple levels to enable flexible seating capacity Stage Generous stage dimensions; full fly system; proscenium arch with apron or thrust; orchestra pit. Lobby Allow minimum 6 sq. ft. per person; suitable for informal performances, meetings, receptions, wall hanging system for art exhibits Rehearsal Minimum size of stage playing area, dance floor, portable mirrors; music rehearsal rooms with risers, “sectional” rehearsal rooms Dressing Rooms At least 60 performers, include showe rs and toilets, green room, “star” dressing rooms (2 person), two 4 -6 person rooms, two 8-12 person rooms, on-stage “quick-change room, plus one (dividable) or two chorus dressing room for up to 25 each. Set Production Shops Not included Offices Accommodate staff of ±15 Storage Plentiful “live” storage and permanent storage for equipment, supplies and orchestra instruments Box Office Central box office with minimum three windows Concessions Built-in counters in lobby plus portable concessions Food Service Catering service kitchen for receptions, social events, meetings, etc. Floors Resilient floor for all stages and large rehearsal room Sound System Reinforcement, stage monitor, intercom, sound effects, hearing impaired system Stage lighting Computer system (dimmer per circuit) for theaters Acoustics Adjustable acoustics for music and speech using retractable drapes and reflectors (to adjust reflection and reverberation); acoustical shell on stage, acoustical separation of rooms to enable spaces to be used simultaneously. Very low ambient noise. Parking On-site parking; ideal is one parking space for 2.5 seats. Handicapped access Required throughout building for performers, technicians, staff and public Restrooms To serve maximum audiences in lobby and front of house. Restrooms to serve administrative and technical staff offices and rehearsal rooms. AMS Planning & Research September 2006 Page 8 Orem Cultural Arts Feasibility Study SCERA Theater Renovation Plan - Description of Work Level 1 The existing lobby is expanded to include a new box office and support spaces as well as expanded restrooms to meet current building code requirements. The existing gallery area is modified in footprint to extend the sweeping arc of the lobby and to provide access to the new education wing. The lobby, stretching along State Street could be faced with glass, offering a strong visual connection to the center for passersby. The existing refreshments area (Scoop) is modified to allow access to a new corridor between the two halls to satisfy code requirements for emergency egress. A new corridor on the north side of the main hall allows for disabled and public access from this face of the complex. Sound and light locks are provided for the main hall, as well as for the second hall at both audience levels. The stage area of the main hall is replaced by a new stage house which is asymmetrically placed on the site, made necessary by the existence of the small theater on the south. A stage crossover and technical support spaces are provided behind the new stage house. A lift is provided at the stage apron that in the lowered position will accommodate an orchestra pit and raised to extend the stage apron. Within the main hall itself, a balcony level is inserted above the main floor; the roof level will be raised to allow for appropriate natural acoustic volume for larger-scale musical performances and the like. Two options for additional seating are possible, one adding 250 seats or alternatively, adding 306 seats for a total of 845 seats or 896 seats. The existing small theater is retained essentially as is although it has been assumed in the budget estimate that all spaces throughout the building will be renovated to provide a higher level of finish. New support spaces (storage, rehearsal) are provided to the south of the small theater, A new education wing is proposed on the south side that includes two rehearsal halls, a dance studio and multipurpose classrooms. An enclosed hallway links the education wing to the lobby, providing direct public access from the parking lot at the east side of the building. This enables use of the classrooms without necessitating opening the entire building. Separate loading docks are envisioned for each theater to facilitate operational efficiency. Level 2 An extended lobby anchors the complex, related in plan and section to the main floor. Open stairs at each end of the sweeping arc at the façade link the two levels. An aperture in the upper lobby between the two halls visually connects it with the lower lobby. The upper level includes circulation corridors around the main hall and additional restrooms. The main hall balcony also includes new control rooms as well as sound and light locks. The small theater balcony is modified to expand the control room (to meet ADA requirements) and provide vestibules similar to the main hall. Adjacent to and south of the second hall, the existing space is reconfigured to accommodate administrative offices. AMS Planning & Research September 2006 Page 9 Orem Cultural Arts Feasibility Study The rehearsal halls are visible from the second level, allowing viewers to see “theater in action”. A roof terrace is provided above the classrooms. Basement The basement level below the large theater is modified in organization to provide artistic support space including dressing and green rooms to serve both theaters, wardrobe, lighting, sound, rigging and drapery support spaces and building services areas. New basement area is provided below and to the north and east of the new large theater stage for artistic support functions, as well as building services space. PARKING Current parking availability for SCERA park and the SCERA Center has been studied by the City Development Services Department. The study enumerated 512 parking stalls that serve SCERA Park and an additional 101 stalls available adjacent to the SCERA Center. SCERA Center also contracts with the Lincoln Square commercial complex to use about 200 parking stalls on the contiguous property. The City of Orem Municipal Zoning regulations (Section 22-15-4) indicates that for theaters, one parking space for 3.5 seats is required. The plans outlined above indicate that the SCERA theater seating can be increased by either 96 or 147 seats. Following the zoning regulations, additional dedicated parking for 27 or 42 vehicles will be required. PHASING POTENTIAL We have considered possible phasing of the renovation and expansion. One scenario might start with renovation and reconstruction of the large theater stage and auditorium seating. A second phase might include the lobby and amenities renovation and expansion. A third phase would include the new education wing. 2. Arts Education Center The Arts Education Center would accommodate a wide range of arts classes in specially designed teaching studios and art exhibit spaces. The following spaces are proposed: • • Drawing and Painting Photography • • • Ceramics Computer Graphics/Digital Design Three Dimensional Art/Sculpture • • Children’s art General Purpose Classroom • Art exhibition space(s) The building would comprise approximately 22,000 sq. ft. Additional spaces, such as studios for individual artists might be included, and made available for rent to local or visiting artists. The studios should be designed so visitors can witness “artists in action.” If the facility were built as part of another building, several of the administrative and support spaces could be combined to reduce the overall requirement. AMS Planning & Research September 2006 Page 10 Orem Cultural Arts Feasibility Study Potential collaboration with UVSC’s Woodbury Museum should be explored. Options for collaboration may include using their expert advice on planning and programming, developing joint programs, or sharing exhibition space. A Museum representative has expressed interest in a range of opportunities. 3. Orem Heritage Museum The Orem Heritage Museum exhibit is currently accommodated in a room of about 1,500 sq. ft. on the second floor of the SCERA Center. Based on review of comparable museums and a preliminary analysis of the museum’s collections and goals, a building of about 10,000 to 14,000 sq. ft. is indicated. If co-located with other facilities, several administrative and support spaces could be combined to reduce the overall requirement. Two dedicated exhibit halls would focus on Orem history and artifacts and one gallery would be available for special exhibits and multimedia presentations. 4. Children’s Museum The Children’s Museum is envisioned as at least a 9,000 to 12,000 sq. ft. building with dedicated exhibits designed for young people from toddlers through pre-teens, or perhaps older youths. The scale and scope of this facility may be determined in collaboration with local organizations with an interest in a children’s museum such as The Utah Valley Children’s Museum or the Timpanogos Storytelling Festival. The management of Thanksgiving Point has indicated to the consultants that they plan to open a children’s museum at their site and they may also have an interest in collaborating with a museum in Orem. At this time, it is recommended that decisions regarding specific elements for this facility (number and purpose of individual spaces – exhibit, teaching/interactive, play) be reserved pending discussion with these potential partners. The Timpanogos Storytelling Festival Space for the Timpanogos Storytelling Festival should be integrated into the facilities, whether the Children’s Museum, Arts Education Center or the Heritage Museum. The rapid growth of the 17-year old Festival, which attracted an attendance of 24,600 for their Fall 2006 event, has fomented an immediate need for additional office space. Spaces for storytelling workshops during the Festival, and for occasional use throughout the year, should be allowed for. These spaces could be shared with other activities of the museum or arts center. The Festival also foresees use of a large multipurpose theater for lectures and presentations both during the Fall festival and year-round. Option – Combining the Children’s Museum and Heritage Museum Consideration should be given to combining the Heritage Museum with the Children’s Museum. There is significant public interest in Orem’s history and the Heritage Museum has attracted a strong core of volunteers and a modest visitation. The Children’s Museum has also engaged a core of volunteers who are committed to the creation of a facility for the community’s youth. Combining these two efforts would draw on the strengths of these groups and create a distinctive niche for a museum in Orem. A combined museum would offer children and families opportunities to explore Orem’s history using both traditional displays of artifacts, stories of local people and events, and hands-on interactive exhibits. The museum’s programs could tie in with Social Studies Core Curriculum standards of the Utah State Office of Education as well as other subjects and potentially draw large numbers of school tours. AMS Planning & Research September 2006 Page 11 Orem Cultural Arts Feasibility Study Project Budget Estimate AMS/SOM have prepared order of magnitude budget estimates for the construction/renovation of the recommended facilities based on research into recently completed comparable facilities. The table below summarizes the estimates; the variation in per square foot construction costs is related to the location, design and functional components of the facility. The following assumptions have been made: • Construction costs are based on 2006 costs • Soft costs include professional fees & expenses, furnishings, fixtures and equipment, owners costs (financing, legal fees, permits, testing, owner’s staff and management) • Theater systems and exhibit design and construction Figure 4: Estimated Project Budgets Component Area Total Construction cost (per sq.ft.) Soft Costs Equipment, Exhibits Estimated Project Budget ($million) SCERA Center 86,000 $250 - $275 $15.5 million $2.5 million $39.5 – $41.7 Arts Education Center 22,000 $250 - $300 $2.75 million $1.0 million $9.25 - $10.4 Heritage Museum 10,000 – 12,000 $275 - $300 $1.8 million $2.0 million $6.6 – $7.0 Children’s Museum 9,000 – 12,000 $250 - $300 $1.4 - $2.0 million $1.2 million $4.9 - $7.0 Phasing As noted above the project to renovate the SCERA Center could be phased, starting with the theater renovation, followed by lobby and public space improvements and the new educational classrooms. A preliminary breakdown of costs for a three phase project is shown below. Figure 5: Project Phasing Component Estimated cost Auditorium, seating, balcony addition, stage addition and equipment $26 million Lobbies, public spaces $ 8 million Administration, classrooms $ 5 million AMS Planning & Research September 2006 Page 12 Orem Cultural Arts Feasibility Study SCERA Park Master Plan Locating these facilities in SCERA Park would offer a unique opportunity to establish a significant arts complex that would complement the expanded and renovated SCERA Theater. As shown in the illustrations in the Appendix, these facilities might be located on an “Avenue for the Arts” to the north and east of SCERA theater along 720 South Street. Closing this street between State Street and 400 East Street to vehicular traffic (either permanently or on special occasions) would enable the street to serve as a site for festivals and special events. Some of the properties on 720 South Street are owned by the City, others would need to be acquired. Certain of the existing office buildings may be suitable for renovation to meet the program needs. Improvements to SCERA Park to improve its image from passing vehicular traffic is recommended. This could be accomplished by an expanded planting and landscape plan, a pathway network which interconnects the new and existing facilities, and public art. Views of the Park and water park could be improved by relocating or masking the parking lot on the east side of State Street with landscaping. All parking and service access to the Park should be limited to perimeter locations which are screened from surrounding areas. The plan and concepts outlined herein for expansion and improvements to the facilities and SCERA Park site require substantial further study and discussion. An enhanced SCERA Park and SCERA Theater would provide Orem and its citizens an extraordinary opportunity to create first class arts facilities and an outstanding park and festival site in the heart of the city. AMS Planning & Research September 2006 Page 13 Orem Cultural Arts Feasibility Study Management and Operations This section of the report provides preliminary recommendations related to operating the proposed arts facilities as described in this report. Since the sites have not been designated and plans not prepared, these operational estimates are inherently very tentative. The focus is on the Arts Education Facilities, the Heritage Museum and the Children’s Museum, as it is anticipated that operation of the SCERA Center will be the concern of SCERA, an independent non-profit organization. The following is a list of general assumptions regarding the operating analysis: − − − − − − Facilities would be owned and operated by the City of Orem. All estimates are made assuming a “base-stable” year of operations, assumed to be the third year after opening. Funds will be in place to build the facilities, capitalize their initial years of operation; they will be debt free on opening. Pre-opening costs that will be required during the planning and development are not included. Such costs would include personnel and any fundraising expenses. The funding requirement for these expenses, which would be approximately equal to one year’s operating budget, should be included in the capital cost for the project. The estimates include basic programming costs for hosting or presenting exhibits, classes, gallery functions and other programs. All estimates are in 2006 dollars. It should be noted that the projections represent a forecast of the most likely results of operation and are based on conditions and forecasts of use currently known. It must be recognized that this is not an exact forecast of activity, given that the buildings will not be operational for several years. Governance, Management and Staffing It is envisioned that the facilities would operate under a City Department Director with each being administered by a Manager who would oversee a small staff of full and part time workers and volunteers. Part time and contract personnel would be employed, such as receptionists, bookkeepers, gallery workers, development, marketing, etc. Custodial services would be contracted or provided by City workers. Volunteers will also provide staffing for programs and administrative support. If a gift shop and/or food service are provided, these could be operated by a non-profit support organization. Operating Estimate Children’s Museum Based on AMS’s research into comparable museums and review of data from members of the Association of Children’s Museums, it is estimated that the annual operating budget for the children’s museum of the size and type envisioned would between $450,000 and $550,000. AMS Planning & Research September 2006 Page 14 Orem Cultural Arts Feasibility Study The museum would be staffed by 4 to 5 full time persons (Manager, Assistant, Program Coordinator, and Visitor Services) and paid and volunteer part time workers. The principal source of earned revenue for the Children’s Museum would be admissions and fees for events and classes. We estimate that annual admission would be at least 30,000 with an admission fee in the range of $3 - $4.00. Additional revenues would be earned through memberships, events, classes, facility rentals and birthday parties. A museum shop, most likely operated by a volunteer group could realize $20-$30,000 annually, based on experience at similar museums. Children’s museums of the size and type envisioned for Orem typically earn between 40% and 60% of their expenses. The museum would meet the operating shortfall by raising money through fundraising events, charitable donations and grants, which could range from 25% to more than 60% of the operating budget. As a City-owned and operated museum, it would be anticipated that the City would provide financial support—at a minimum for the building operations and maintenance. This would be in the range of $150 - $200,000 annually. The table below provides a range of anticipated operating budgets for a 10 - 15,000 sq. ft. museum. Figure 6: Attendance Scenarios - Children’s Museum Pessimistic Conservative Optimistic 20,000 30,000 40,000 Total Annual Budget $400,000 $500,000 $600,000 Earned Revenue $100,000 $250,000 $330,000 Contributions $50,000 $75,000 $150,000 Funding Requirement $250,000 (63%) $175,000 (35%) $150,000 (25%) Annual Attendance Arts Education Center Annual operating budgets for arts education facilities similar to that envisioned for Orem can vary widely depending on the programs offered. The majority of revenue is derived from class fees. Arts education centers frequently are able to cover direct costs for teachers, supplies and marketing from class fees. Most publicly-owned arts education centers rely on government subsidy for staffing and operating overhead. Some, however, receive additional funds from grants, donations and fundraising events. One example, the Irvine Fine Arts Center, a similar facility to that described in this report (18,100 sq.ft.) operates on an annual budget of about $1 million and receives an average of $300,000 in city funding in addition to the cost of building operations. A smaller arts center in Burbank (about 12,000 sq. ft. with a small gallery and 6 classrooms) operates with 5 staff (4 FTE) on an annual budget of about $650,000 and earns about $350,000 in fees from over 500 visual and performing arts classes a year. The table below illustrates a range of scenarios for an arts education center as described in this report. AMS Planning & Research September 2006 Page 15 Orem Cultural Arts Feasibility Study Figure 7: Operating Cost Scenarios – Arts Education Center Pessimistic Conservative Optimistic 7,000 8,000 10,000 Total Annual Budget $500,000 $650,000 $800,000 Earned Revenue $100,000 $300,000 $500,000 Funding requirement $400,000 (60%) $350,000 (34%) $300,000 (33%) Annual Attendance Heritage Museum Based on AMS’s research into comparable museums and review of data from American Association of Museums, it is estimated that the annual operating budget for a Heritage Museum of the size and type envisioned would range between $200,000 and $300,000. The museum would be staffed by 2 to 3 full time persons (Manager, Program Coordinator) supported by paid workers and volunteers. The museum’s primary revenue would likely be derived from fees paid for school tours and a general admission fee of $3-$4.00. Memberships, a museum shop, facility rentals and events are other sources of potential revenue. Heritage museums similar to that envisioned typically earn only small portion of their operating costs from earned revenue, ranging from 20% to 30%. Donations, grants and fundraising events could realize an additional 20% to 30%. A City subsidy in the range of $150 - $200,000 annually may be estimated, including building operations. Figure 8: Operating Cost Scenarios – Heritage Museum Pessimistic Conservative Optimistic 5,000 12,000 20,000 Total Annual Budget $200,000 $250,000 $300,000 Earned Revenue $50,000 $75,000 $125,000 Funding requirement $150,000 (80%) $175,000 (68%) $175,000 (58%) Annual Attendance AMS Planning & Research September 2006 Page 16 Orem Cultural Arts Feasibility Study REVISED DRAFT not for circulation APPENDIX A: Preliminary Space Requirements AMS Planning & Research September 2006 OREM Community Art Park Program Space List Unit Multiplier Net Area Gross Comments Performing Arts Center Main Hall Performance Spaces 101 Auditorium 102 Stage House 103 Shell Tower Storage 104 Counterweight Pit 105 Dimmer Room 106 Amplifier Rack Room 107 Lighting Control Booth 108 Sound Control Booth 109 Crossover 110 Followspot Booth 111 Projection Booth Subtotal Backstage/Support 201 Star Dressing Rooms 202 Group Dressing Rooms 203 Performer's Lounge 204 Backstage Toilets 205 Wardrobe Work Room 206 Wardrobe Storage 207 Fitting Rooms 208 Laundry Room 209 Visiting Company Office 210 Stage Loading Dock 211 Stage Receiving 212 Lighting/AV Workroom 213 Sound Workroom 214 Piano Storage 215 Stands/Chairs Storage 216 Draperies Storage 217 General Storage 218 Crew Lounge 219 Tool Storage 220 Dance Floor Storage 221 Freight Elevator 222 Stage Door Lobby Subtotal Building Services 301 Building Engineering 302 Janitorial Office 303 Janitorial Supplies 304 Janitorial Crew 305 Janitors Closets 306 Electrical Closets 307 Telephone Closets Subtotal 8 40 150 16 150 180 108 108 80 165 165 900 80 1 1 1 1 1 1 10 1 1 7,200 3,200 150 16 150 180 108 108 800 165 165 12,242 175 600 250 35 15 50 35 150 120 10 20 10 10 15 15 10 15 20 5 15 10 10 4 2 1 2 15 20 3 1 1 20 30 15 10 5 20 10 7 15 10 10 15 8 700 1,200 250 70 225 1,000 105 150 120 200 600 150 100 80 300 100 100 300 50 150 150 75 6,175 10 8 10 10 5 6 6 20 10 5 15 6 6 6 200 80 50 150 30 36 36 582 1 900 seats @ 8 sf/seat 80w 40d 70togrid 40 prosc 10 person Rooms Apron Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall Shared with second hall OREM Community Art Park Program Space List Unit Flexible Theater Performance Spaces 401 Flexible Hall 402 Prop/Crossover 403 Seating Unit Storage 404 Dimmer Room 405 Amplifier Rack Room 406 Control Booth 407 Followspot Booth Subtotal Multiplier Net Area NA NA NA NA NA NA NA Gross Comments Retain as existing Retain as existing Retain as existing Retain as existing Retain as existing Retain as existing Retain as existing 6,928 Backstage/Support 501 Group Dressing Rooms 502 Backstage Toilets 503 Performers Lounge 504 Wardrobe 505 Visiting Company Office 506 Stage Loading Dock 507 Stage Receiving Subtotal 300 35 10 10 10 10 - Front of House 601 Box Office 602 Box Office Manager 603 Box Office Foyer 604 Main Hall Public Lobby 605 Flexible Hall Public Lobby 606 Coatroom 607 Lobby Restroom 608 FOH Storage 609 Program Storage 610 House Manager 611 Public Elevator 612 Donors Lounge 613 Pantry 614 Snack Bar 615 Snack Bar Storage Subtotal Rehearsal/Education 701 Main Rehearsal Hall 702 Medium Rehearsal Hall 703 Dance Studio 704 Classrooms 705 Rehearsal Storage 706 Education Restrooms Subtotal 2 2 20 15 15 10 600 70 200 150 150 100 1,270 50 10 10 900 300 300 45 10 5 8 10 30 10 30 10 3 10 15 7 6 1 42 10 10 8 10 60 8 20 10 150 100 150 6,075 1,800 300 1,890 100 50 64 100 1,800 80 600 100 13,359 70 30 50 900 20 45 22 22 22 3 10 8 1,540 660 1,100 2,700 200 360 6,560 - 2 10 person rooms outdoor space See crossover 402 28 womens 14 mens fix/29 5 womens 3 mens fix/29 OREM Community Art Park Program Space List Unit Administration 801 CEO 15 802 Assistant 6 803 Artistic Director 10 804 Assistant 6 805 Facilities Manager 10 806 Assistant 6 807 Development Director 10 808 Assistant 6 809 Finance Director 10 810 Assistant 6 811 Marketing Director 10 812 Assistant 6 813 Interns 48 814 Board Room 15 815 Conference Room 12 816 File Room 8 817 Supply/Copy 8 818 Rest Rooms 35 819 Lunchroom 10 Subtotal Multiplier 15 8 15 8 10 8 15 8 10 8 10 8 6 22 18 15 15 2 15 3 Net Area 225 48 150 48 100 48 150 48 100 48 100 48 288 330 216 120 120 70 150 2,407 Gross Comments Orem Cultural Arts Feasibility Study REVISED DRAFT not for circulation APPENDIX B: Concept Plans AMS Planning & Research September 2006 7 6 ST ST ATE P PRO ERT REE Y LIN T 5 A 4 E 3 2 1 B X ING E EXIST O IC T POR STOR FOH 608 NCE EXIST NG V ESTIB ULE L FFICE O BOX 601 "SCO TING EXIS ATED C O REL E OFFIC 3 BOX 60 R E Y FO OP" D HALL MAIN RIUM O IT D U A A: IT ) 101 T O P OOR ARE 8sqf ) FL T S ( 4 ,5 3 N IU M IR E F C L S A O (*TOT ft , T O P R q s 4 ,9 8 8 96 ADA SEAT T 5SQ.F -5,14 L LOBBY L OBBY A L H L ) A MAIN L LOBBY TOT UDES AL (INCL EXIBLE H FL AND 96 SE SNAC 614 K BA 160 S E EATS MECH R EAT 590 S /L A Y OF LINE ADA SEAT TIO CULA COAT 606 ONY L SE A EXIT AT ST S - F IR FLOO ME RE DIUM HEAR 702 SAL H ALL O LINE F BA LCO TH IBLE FLEX A T S E 180 S EATE R CORR IDOR F DS E STAN /STORAG S CHAIR 215 R MECH E PIT USTA BLE AN ICAL ADA SEAT G E( " WID 45'-0 ENIUM C S O PR IC PUBL T O R 6 1 1 A ELEV BOV NY A PED BOVE ADJ MIN.) ADA SEAT S ROOM REST 1A / 7 0 6 LE:9W FEMA M :5 OMS MALE STRO D RE : NOTE REQUIRE N FIRST L E TOTA D BETWE O R S E LO DIVID ECOND F S AND AL ATS 37 SE STAG N CO S EATS TOTA CIR ADA IDOR CORR ROOM ANIC OM STRO D RE : NOTE REQUIRE N FIRST L E TOTA D BETWE O R S E LO DIVID ECOND F S AND ADA SEAT S SEAT *590 P DICA )HAN (ADA SIBLE S E C AC IDOR CORR OUT BALC 162 S STAIR S SEAT ATS 37 S ROOM REST 1B / 7 0 6 LE:9W FEMA M :5 MALE ATOR ELEV ADA SEAT R RRIDO STAIR C OBBY SOUTH STREET MA TRA IN EN AGE E HOUS ER RAM AG PROG GE MAN A 610 STOR 609 E OFFIC BOX G E R 6 0 2 A MAN TE RIOR E E STAG R ND T PIT A W) (BELO ( 9 5 'USE E H O 102 G A T S APS 0"X4 0 '- 0 " ) TER COUN T PIT H WEIG 104 401 TOWE 103 R STO RAGE STAIR IDOR CORR E STU E STAG BACK S (4) T E TOIL T 204 DIO T PROPERTY LINE DANC 703 SEAT 403 MAIN 701 REHE ARSA ING ST UNIT ORAG T E ET STAG BACK 5 0 2 ING EXIST STAIR L /C PROP DIN E LOA STAG 5 0 6 K C DO IDOR CORR ROSS OVER 402 HT FREIG TOR 221 A ELEV ING DING E LOA STAG 210 ) N O (APR T RU ERY/T DELIV D A O L UN CKS ATOR ELEV OR E DO 2 STAG 2 Y 2 LOBB OR E DO S T A G NCE A ENTR IDOR NOTE: BUILDING SECTIONS REQUIRED TO DETERMINE ADA ACCESSABILITY M SROO CLAS 4 70 S 21 TOR-2 LEVA HT E GE-219 IG E A R F 20 STOR GE-2 TOOL STORA -214 E E DANC STORAG O P IA N ECEIV STAIR CORR M SROO CLAS 4 70 OILET ER STAG 211 G BACK Y ENTR PROPERTY LINE R SOVE CROS PROPERTY LINE RAGE L STO ARSA 5 S 70 OOM ESTR ION R T A C EDU 706 REHE 109 M SROO CLAS 4 70 PARKING Program 7.Aug.2006 Program Area = 47,532 sf +10% Construction Gross = 4,750 sf +15% Circulation Gross = 7,100 sf Sub-total = 59,382 sf +15% M.E.P. Gross = 8,900 sf Gross = 68,282 sf Scale: 1/16" = 1'-0" FIRST FLOOR PLAN OREM -SCERA THEATER Orem, Utah 2006 Skidmore, Owings & Merrill LLP ASK-005 Skidmore, Owings & Merrill LLP 31 August 2006 7 6 5 A 4 3 ROOF 2 1 STAIR H 10 BOOT ROL T ) E N V O C BO TING 110 (A LIGH S P O T OOTH 111 W O FOLL CTION B E PROJ .F T 9 6 S Q LCONY Y - 6 ,0 A B B B L HAL L LO L T O T A ES MAIN IBLE HAL D X U E L FL (INC D N YA Y) LOBB LOBB ONY BALC ROOF 120 S 7 ATOR ELEV EATS 93 SE C ATS Y HALL LCON MAIN ORIUM BA IT D AU 101 93 SE ATS EAT 306 S TOTA ROOF D L-BA LCON P DICA )HAN (ADA SIBLE S E ACC IDOR CORR Y ADA SEAT PED ADA SEAT MECH OPEN TO B ROOF ANIC E AL ROOF ELOW OPEN TO B ELOW F : ROLS CONT STAIR IC PUBL T O R 6 1 1 A ELEV B TER THEA IBLE 2 FLEX A T S @ 2 E 44 S S ROOM REST 2 607/ OPEN TO B ADMIN TO B ALCO NY G LE:9W FEMA M :4 MALE OMS STRO D RE : NOTE REQUIRE N FIRST L E TOTA D BETWE O R S E LO DIVID ECOND F S AND ELOW OPEN 5 M 10 ER R DIMM IER IF L P 06 AM RM 1 RACK 4 5 M 4 0 RM 4 0 ER R K D IM M IER RAC H 406 IF T 07 AMPL OL BOO VE) 4 TR (ABO CON SPOT W O FOLL ELOW OPEN TO B IDOR CORR ISTRA ELOW TO TO OPEN W BELO TO OPEN W BELO TION: R 805 - 8 0 1 M A N A G E TOR 807 CEO EC IES IR IT D IL T F A C OPMEN L DEVE T A N T 8 0 8 OR 809 T ASSIS CE DIREC CTOR 811 E N FINA TING DIR E MARK T A N T 8 1 2 IS ASS NS 813 R 814 INTE D ROOM BOAR OOM 816 7 R 81 FILE OPY L Y /C 8 S U P P OOMS 81 9 1 R REST ROOMS 8 H C LUN ING EXIST STAIR OPEN W BELO OPEN T TO OPEN W BELO LOW O BE TO OPEN W BELO ROOF OPEN TO B ELOW ROOF ROOF GARD EN Program 7.Aug.2006 Program Area = 47,532 sf +10% Construction Gross = 4,750 sf +15% Circulation Gross = 7,100 sf Sub-total = 59,382 sf +15% M.E.P. Gross = 8,900 sf Gross = 68,282 sf Scale: 1/16" = 1'-0" SECOND FLOOR PLAN OREM -SCERA THEATER Orem, Utah 2006 Skidmore, Owings & Merrill LLP ASK-006 Skidmore, Owings & Merrill LLP 31 August 2006 1 BE PACE UM S PLEN SEATING LOW MEP STAG E PIT R IDO RR CO RT: 202 UPPO GE S ING RMS A T S 3 BACK P D R E S S U N G E 2 0 U LO 05 2 'S GRO R M E RK R ORM PERF ROBE WO RAGE 206 D WAR ROBE STO D WAR ES: 1 ERVIC ERING 30 E ING S BUILD G ENGIN ICE 302 IN F D L OF PLIES 303 BUIL ORIA P JANIT RIAL SU W 304 O E JANIT RIAL CR TS 305 O 6 SE JANIT RS CLO OSETS 30 O L JANIT RICAL C SETS 307 O T ELEC HONE CL P T: TELE PPOR 5 0 1 E SU M STAG SSING R E 503 K C A B RE OUNG UP D GRO RMERS L E 505 O PERF ROBE 504 NY OFFIC A D WAR G COMP IN E 615 VISIT ORAG R ST A B K SNAC Y 613 R PANT E STAG IDOR CORR PIT A ND T RAPS 17 GE 2 FICE 209 TORA F RAL S MPANY O E N E O G ING C IT IS V R IDO RR CO M2 KROO WOR M 213 V A OO TING LIGH D WORK R AGE 216 R SOUN RIES STO E DRAP 12 STAIR MEP HT FREIG TOR 221 A ELEV ATOR ELEV ING EXIST STAIR MEP No existing plan currently available. This plan diagram limited to program area laid over existing First Floor Plan. Program 7.Aug.2006 Program Area = 47,532 sf +10% Construction Gross = 4,750 sf +15% Circulation Gross = 7,100 sf Sub-total = 59,382 sf +15% M.E.P. Gross = 8,900 sf Gross = 68,282 sf Scale: 1/16" = 1'-0" BASEMENT PLAN OREM -SCERA THEATER Orem, Utah 2006 Skidmore, Owings & Merrill LLP ASK-007 Skidmore, Owings & Merrill LLP 31 August 2006 41'-0165 " STAGE STAGE HOUSE CORRIDOR 2006 Skidmore, Owings & Merrill LLP Orem, Utah SECTION THROUGH MAIN HALL WITH BALCONY OPTIONS A&B OREM -SCERA THEATER 10'-0" CROSSOVER PROSCENIUM OPENING PIT ORCHESTRA 63'-0"=HEIGHT AT 350CUFT/SEAT 30'-0" 9'-0" VISIO N LIN E PLENUM SPACE V LIN LINE ES ON VISI N ISIO S 81'-0" EXISTING DEPTH AUDIENCE CHAMBER (900 SEATS) VOLUMETRIC RANGE FOR ACOUSTIC ENHANCEMENT FOR 900 SEAT THEATER(BALCONY OPTION A) ACOUSTICAL VOLUME AT 300 CUFT/SEAT SEAT STOR. 54'-0"=HEIGHT AT 300 CUFT/SEAT ACOUSTICAL VOLUME AT 350 CUFT/SEAT 19'-6" MECHANICAL VENTILATION AND STRUCTURE A B VISIO N LIN E CONTROL BOOTH CONTROL BOOTH BALCONY OPTION WITH MAIN FLOOR SEATING OF 590 A. 306 SEATS=896 TOTAL (APPROX. 900 SEATS) B. 250 SEATS=840 TOTAL PLENUM SPACE 250 SEATS BALCONY OPTION B 33'-0" 306 SEATS BALCONY OPTION A 39'-0" 3'-6"TYP. 16'-6" Skidmore, Owings & Merrill LLP 31 August 2006 ASK-008 Scale: 1/8" = 1'-0" 7 6 ST ST ATE P PRO ERT REE Y LIN T 5 A 4 E 3 2 1 B X ING E EXIST O IC T POR STOR FOH 608 NCE EXIST NG V ESTIB ULE L FFICE O BOX 601 "SCO TING EXIS ATED C O REL OP" D HALL MAIN RIUM O IT D U A A: IT ) 101 T O P OOR ARE 8sqf ) FL T S ( 4 ,5 3 N IU M IR E F C L S A O (*TOT ft , T O P R q s 4 ,9 8 8 ADA SEAT 96 ADA SEAT T 5SQ.F -5,14 L LOBBY L OBBY A L H L ) A MAIN L LOBBY TOT UDES AL (INCL EXIBLE H FL AND 96 SE SNAC 614 K BA 160 S ATS B /L A Y 37 TIO CULA P DICA )HAN (ADA SIBLE S E C AC IDOR CORR OUT ONY TOTA L SE A EXIT AT ST S - F IR FLOO ME RE DIUM HEAR 702 SAL H ALL O LINE MECH E PIT DANC 703 E STU E E STAG USTA PROPERTY LINE SEAT 403 ARSA ING ORAG BLE L ADA SEAT T ROSS OVER D DIN E LOA STAG 5 0 6 K C DO 402 OR E DO S T A G NCE A ENTR 2006 Skidmore, Owings & Merrill LLP R STO RAGE R OILET S 109 ER STAG 211 21 TOR-2 LEVA HT E GE-219 IG E A R F 20 STOR GE-2 TOOL STORA -214 E E DANC STORAG O P IA N ECEIV ING HT FREIG TOR 221 A ELEV DING E LOA STAG 210 ) N O (APR T RU ERY/T DELIV D A O L UN CKS A. RENOVATED EXISTING SPACE B. NEW PUBLIC SUPPORT SPACE C. NEW & RENOVATED AUDITORIUM D. NEW STAGE & SUPPORT SPACE E. NEW EDUCATIONAL SPACE = 6,928SF =13,632SF = 5,120SF = 9,214SF = 7,956SF *SUB-TOTAL AT FIRST FLOOR = 42,850SF TOTAL SQUARE FOOTAGE: BASEMENT FIRST FLOOR SECOND FLOOR *TOTAL: =24,490SF =42,850SF =18,725SF =86,065SF M SROO CLAS 4 70 PARKING Orem, Utah TER COUN T PIT H WEIG 104 OR E DO 2 STAG 2 Y 2 LOBB NOTE: BUILDING SECTIONS REQUIRED TO DETERMINE ADA ACCESSABILITY AREA CALCULATION FIRST FLOOR PLAN OREM -SCERA THEATER ) ATOR STAIR IDOR M SROO CLAS 4 70 0 '- 0 " FIRST FLOOR AREA CALCULATION: CORR M SROO CLAS 4 70 APS 0"X4 ELEV G BACK Y ENTR PROPERTY LINE ( 9 5 'USE E H O 102 G A T S SOVE /C PROP IDOR G CROS ET STAG BACK 5 0 2 CORR AN STAIR E ING EXIST STAIR DS E STAN /STORAG S CHAIR 215 ICAL TOWE 103 T ST UNIT F D 401 DIO REHE R ND T PIT A W) (BELO E STAG BACK S (4) T E TOIL T 204 E MAIN 701 R IDOR E( " WID 45'-0 ENIUM C S O PR A RAGE L STO ARSA 5 S 70 OOM ESTR ION R T A C EDU 706 IDOR LCO TE THEA IBLE FLEX A T S E 180 S REHE CORR F BA CORR R IC PUBL T O R 6 1 1 A ELEV BOV NY A PED BOVE ADJ MIN.) ADA SEAT S ROOM REST 1A / 7 0 6 LE:9W FEMA M :5 OMS MALE STRO D RE : NOTE REQUIRE N FIRST L E TOTA D BETWE O R S E LO DIVID ECOND F S AND AL ATS 37 SE STAG N CO S EATS S SEAT CIR ADA IDOR CORR ANIC OM STRO D RE : NOTE REQUIRE N FIRST L E TOTA D BETWE O R S E LO DIVID ECOND F S AND ADA SEAT BALC 162 S *590 STAIR MECH OF LINE ADA SEAT COAT 606 E EATS EAT 590 S ROOM S SEAT C R S ROOM REST 1B / 7 0 6 LE:9W FEMA M :5 MALE ATOR ELEV PROPERTY LINE E OFFIC 3 BOX 60 R E Y FO R RRIDO STAIR C OBBY SOUTH STREET MA TRA IN EN AGE E HOUS ER RAM AG PROG GE MAN A 610 STOR 609 E OFFIC BOX G E R 6 0 2 A MAN TE RIOR Scale: 1/16" = 1'-0" ASK-005 Skidmore, Owings & Merrill LLP 31 August 2006 7 6 5 A 4 3 ROOF 2 1 STAIR H 10 BOOT ROL T ) E N V O C BO TING 110 (A LIGH S P O T OOTH 111 W O FOLL CTION B E PROJ .F T 9 6 S Q LCONY Y - 6 ,0 A B B B L HAL L LO L T O T A ES MAIN IBLE HAL D X U E L FL (INC D N YA Y) LOBB LOBB ONY BALC ROOF 120 S EATS 93 SE ATS EAT 306 S TOTA TO B C ATS ROOF ROOF D L-BA ADA SEAT OPEN ATOR ELEV Y HALL LCON MAIN ORIUM BA IT D AU 101 93 SE B 7 LCON P DICA )HAN (ADA SIBLE S E ACC IDOR CORR Y ADA SEAT C PED MECH ANIC E AL ROOF ELOW OPEN TO B ELOW F : ROLS CONT STAIR IC PUBL T O R 6 1 1 A ELEV A B TER THEA IBLE 2 FLEX A T S @ 2 E 44 S S ROOM REST 2 607/ OPEN TO B ADMIN TO B ALCO NY G LE:9W FEMA M :4 MALE OMS STRO D RE : NOTE REQUIRE N FIRST L E TOTA D BETWE O R S E LO DIVID ECOND F S AND ELOW OPEN 5 M 10 ER R DIMM IER IF L P 06 AM RM 1 RACK 4 5 M 4 0 RM 4 0 ER R K D IM M IER RAC H 406 IF T 07 AMPL OL BOO VE) 4 TR (ABO CON SPOT W O FOLL ELOW IDOR CORR E OPEN TO B ISTRA TO TO OPEN W BELO TO OPEN W BELO TION: R 805 - 8 0 1 M A N A G E TOR 807 CEO EC IES IR IT D IL T F A C OPMEN L DEVE T A N T 8 0 8 OR 809 T ASSIS CE DIREC CTOR 811 E N FINA TING DIR E MARK T A N T 8 1 2 IS ASS NS 813 R 814 INTE D ROOM BOAR OOM 816 7 R 81 FILE OPY L Y /C 8 S U P P OOMS 81 9 1 R REST ROOMS 8 H C LUN OPEN T TO OPEN W BELO LOW O BE TO OPEN W BELO A ING EXIST STAIR ELOW OPEN W BELO ROOF OPEN TO B ELOW ROOF ROOF GARD EN SECOND FLOOR AREA CALCULATION: A. RENOVATED EXISTING SPACE B. NEW PUBLIC SUPPORT SPACE C. NEW & RENOVATED AUDITORIUM D. NONE AT THIS LEVEL E. NEW EDUCATIONAL SPACE = 3,830SF = 8,671SF = 5,494SF *SUB-TOTAL AT SECOND FLOOR = 18,725SF TOTAL SQUARE FOOTAGE: BASEMENT FIRST FLOOR SECOND FLOOR *TOTAL: =24,490SF =42,850SF =18,725SF =86,065SF = 730SF Scale: 1/16" = 1'-0" AREA CALCULATION SECOND FLOOR PLAN OREM -SCERA THEATER Orem, Utah 2006 Skidmore, Owings & Merrill LLP ASK-006 Skidmore, Owings & Merrill LLP 31 August 2006 1 C BE PACE UM S PLEN SEATING LOW MEP STAG E PIT R IDO RR CO A RT: 202 UPPO GE S ING RMS A T S 3 BACK P D R E S S U N G E 2 0 U LO 05 2 'S GRO R M E RK R ORM PERF ROBE WO RAGE 206 D WAR ROBE STO D WAR ES: 1 ERVIC ERING 30 E ING S BUILD G ENGIN ICE 302 IN F D L OF PLIES 303 BUIL ORIA P JANIT RIAL SU W 304 O E JANIT RIAL CR TS 305 O 6 SE JANIT RS CLO OSETS 30 O L JANIT RICAL C SETS 307 O T ELEC HONE CL P T: TELE PPOR 5 0 1 E SU M STAG SSING R E 503 K C A B RE OUNG UP D GRO RMERS L E 505 O PERF ROBE 504 NY OFFIC A D WAR G COMP IN E 615 VISIT ORAG R ST A B K SNAC Y 613 R PANT E STAG IDOR CORR PIT A ND T D RAPS 17 GE 2 FICE 209 TORA F RAL S MPANY O E N E O G ING C IT IS V STAIR R IDO RR CO M2 KROO WOR M 213 V A OO TING LIGH D WORK R AGE 216 R SOUN RIES STO E DRAP 12 MEP HT FREIG TOR 221 A ELEV ATOR ELEV ING EXIST STAIR D MEP No existing plan currently available. This plan diagram limited to program area laid over existing First Floor Plan. BASEMENT FLOOR AREA CALCULATION: A. RENOVATED EXISTING SPACE = 7,046SF B. NONE AT THIS LEVEL C. NEW & RENOVATED AUDITORIUM PLENUM = 5,120SF D. NEW STAGE & SUPPORT SPACE = 12,324SF E. NONE AT THIS LEVEL AREA CALCULATION BASEMENT PLAN OREM -SCERA THEATER Orem, Utah 2006 Skidmore, Owings & Merrill LLP *SUB -TOTAL AT BASEMENT FLOOR =24,490SF TOTAL SQUARE FOOTAGE: BASEMENT FIRST FLOOR SECOND FLOOR *TOTAL: =24,490SF =42,850SF =18,725SF =86,065SF Scale: 1/16" = 1'-0" ASK-007 Skidmore, Owings & Merrill LLP 31 August 2006 Existing Park Existing ExistingAmphitheater Amphitheater Existing Park Existing Pool Site Existing Pool Site Potential ExpansionSites Sites PotentialArts Arts District District Expansion Main Street for the Arts Main Street for the Arts Existing Existing Scera Scera Theatre Potential Arts District Expansion Sites Potential Arts District Expansion Sites Theatre c APPENDIX C 1.0 STRUCTURAL DESCRIPTION 2.0 BUILDING SYSTEMS DESCRIPTION SOM ©2006 Skidmore, Owings & Merrill LLP 1.0 STRUCTURAL DESCRIPTION Seismic Design The existing 1930-1940 structure would need to be updated to meet current seismic structural requirements. The newer, 1996 modifications to the original theatre would need to be verified for seismic behavior, if portions of this 1996 work are deleted in the current 2006 building program proposal. New Building Elements – 2006 The proposed new building elements would utilize a combination of new structural steel and reinforced concrete structural elements, all with new foundations. Interface with the existing structures would certainly require penetration, and/or removal of existing façade elements, portions of which may need to remain even under the new renovation program. Existing Theatre Renovation The proposed new stage, stage pit/lift, and the staging “fly tower,” at the rear, should be a completely new structure utilizing structural steel systems, all with new foundation systems extending below the existing, single basement level. New foundations that should be evaluated for these elements would include “micro-piles” which can be installed within “tight,” confined existing conditions. Introduction of a new balcony within the existing, relatively small theatre, would involve complex structural work especially with the basement below and the theatre sidewalls, of unknown construction, being the only source of structural support. All of the new construction work would need to be completed below the exiting roof structure, as well as, being integrated with the seismic retrofit. If the existing roof structural system needs to be removed, due to its existing condition, then a carefully sequenced structural system renovation program, including the proposed new balcony, could be optimized with respect to construction time and potential final product. However, a new roof structure would be an additional cost. From a structural viewpoint, all of the SOM proposed renovations scheme can be designed and constructed within reasonable cost and construction time feasibility parameters. A careful existing conditions survey of the existing structural elements would be needed prior to the start of final design SOM ©2006 Skidmore, Owings & Merrill LLP SCERA Theater Study 1 2.0 BUILDING SYSTEMS DESCRIPTION Mechanical Original Building HVAC System Based on the existing conditions assessment report, mechanical cooling was added to the building approximately 15 to 20 years ago. It is unclear if this equipment maintains adequate indoor environmental conditions during theatrical events. Additionally, it is unclear if the air handling unit and rooftop units provide the code-required amount of outside air to the building. If outside air needs to be increased to meet code, it is unlikely the equipment can handle the increased cooling load. The proposed alterations and additions to the building indicate that the existing outdoor air-cooled condensing unit will need to be, at a minimum, relocated. However, per ASHRAE 2003 Applications Handbook, the estimated service life for air-cooled condensing units and DX coils is 20 years. Therefore, it is recommended that this equipment be replaced with new sized to meet the new building loads (people, lighting, etc.), code-required amount of outside air, and minimum equipment efficiencies per ASHRAE Standard 90.1-2001 Energy Standard for Buildings Except Low-Rise Residential Buildings. One rooftop unit was replaced two years ago, according to the existing conditions assessment report. Since this unit has at least 15 years of useful service life, it should be reused if the unit has adequate capacity to meet the new building loads and minimum outside air requirements. It is recommended that the projection booth be provided with a dedicated air conditioning unit to maintain the required environmental conditions for the equipment housed in this space. It is recommended that the Staefa Smart II direct digital control (DDC) building automation system serving the South Addition be extended and all new equipment provided with DDC controls. This will provide the facility operators with the ability to optimize system performance via programmed start/stop schedules and early alarm detection and troubleshooting. An additional energy optimizing recommendation is to provide carbon dioxide sensors in the theater spaces to reduce outside air quantities during low-occupancy events. The sensors ensure that an acceptable indoor environment is still achieved with a reduced outside air quantity and energy is conserved by reducing the amount of outside air that has to be heated or cooled. It is also recommended that the existing boiler, steam piping, convectors and steam coil that were abandoned in place be removed. It is encouraged that the materials be discarded via a comprehensive on-site recycling program to minimize the amount of construction waste delivered to landfills. The proposed building envelope upgrades such as window glazing, door glazing, etc. should meet the minimum performance requirements of ASHRAE 90.1-2001 to minimize heating and air conditioning loads due to the heat loss and gain through building components. South Addition HVAC System Based on the existing conditions assessment report, a semi-custom unit was installed in 1994 to serve the addition. The unit is equipped with variable frequency drives (VFD) and economizer capability to provide energy efficient operation. However, the return fan VFD experiences occasional problems. It is unclear if this equipment maintains adequate indoor environmental conditions for all spaces served by this unit. Additionally, it is unclear if the unit provides the code-required amount of outside air to all spaces. If outside air needs to be increased to meet code, it is unclear if the equipment can handle the increased cooling load. SOM ©2006 Skidmore, Owings & Merrill LLP SCERA Theater Study 2 The existing unit has been in service for 12 years. Per ASHRAE 2003 Applications Handbook, the estimated service life for air-cooled condensing units is 20 years. Since the unit has only been in service for half its estimated life, it is recommended that a detailed analysis be conducted to determine if it has the capacity to meet the new building loads and minimum required outside air load. It is recommended that the projection booth be provided with a dedicated air conditioning unit to maintain the required environmental conditions for the equipment housed in this space. New Addition New building program elements will require heating and air conditioning. The new building envelope should be designed to exceed the adopted energy code, ASHRAE 90.1-2001. Optimizing the building envelope will assist in reducing the heating and air conditioning loads. The new system(s) should be designed to be energy efficient by utilizing a variable air volume (VAV) system with VFDs on the supply and return fan and VAV boxes for zone temperature control. All new systems shall be provided with DDC controls and interface with the building automation system. Building pressurization should be controlled to minimize untreated outdoor air from entering the building via glazing leakage and potentially creating indoor air quality issues via formation of condensation on surfaces. It is highly recommended that the mechanical systems be designed to optimize the energy use of the facility via energy efficient systems and building controls to optimize system operation. The USGBC (U.S. Green Building Council) has created a rating system called LEED® (Leadership in Energy and Environmental Design) that provides guidance on ways to achieve these goals. Refer to section E. Sustainable Design for more details. Electrical System Existing Power Service Entrance and Distribution The 1994 upgraded 1200 amp 3 phase service would need to be replaced in order to meet the projected design needs. Based upon the projected increased footprint and the additional HVAC loads, the power service entrance is likely to require a minimum 480V, 2,500A 3ph, 4w. Note: the existing 1200A 3ph service panels could be removed and re-installed as remote power distribution equipment. An option for this site would be to provide two voltage sources to the building: 1) 480V, 1,6000A 3ph, 4w. to feed Lighting, HVAC and large motor/equipment. 2) 208V, 1,600A 3ph, 4w to feed Receptacles and Technology Based Systems. The two voltage source Power Service Entrances eliminates in-building transformers which optimized electrical room/closet footprints. Telecommunications Service Entrance and Distribution The Technology based services need to be addressed in order to meet the projected design needs. Relocation of the facility Utility entrance cabling (SBC, Comcast, etc.) will need to be upgraded for the projected Technology Based systems. A centralized Telecommunications room for modern convergent technologies with dedicated UPS power and HVAC methods should be SOM ©2006 Skidmore, Owings & Merrill LLP SCERA Theater Study 3 employed. Consider the following Technologies centralized to maximize footprint, integration, and MEP/FP requirements: • Audiovisual/Multimedia Centralized Racks/Equipment for: Projection/Display Systems Video Systems Audio Systems Control Systems IP Based Video on Demand • Data Networking Systems Centralized Racks/Equipment for: Wired and Wireless LAN/WAN Networking and its applications. Voice over IP –OR. - PBX. Convergence (IP based Video, IP Based Video on Demand, Security and Temperature Control) • Stage and Facility Performance Sound, and Building Intercom Systems • Centralized Racks/Equipment for: Performance Sound Control Racks/Equipment Audio Systems Control Systems IP Based Digital Sound on Demand Convergence (IP based Video, IP Based Sound Integrated to LAN and Digital Multimedia Control) • Stage and Facility Performance Lighting, and Building Lighting Systems • Centralized Racks/Equipment for: Performance Lighting Control Racks/Equipment Building Energy Efficiency Control Systems Convergence (IP based Performance Equipment Head end, IP Based Building EE Lighting fully integrated to LAN and Digital Multimedia Control) • Security Systems Centralized Racks/Equipment for Access Control and CCTV Systems Wired and Wireless LAN or Proprietary Systems for Access Control. IP Camera – OR – CCTV Camera Head-ends. Convergence (IP based CC-Video, Based Building EE Lighting Security Access Control, and Temperature Control). • Temperature Control Systems Centralized Racks/Equipment for Access Control and CCTV Systems: Wired and Wireless LAN or Proprietary Systems for Building Management Control IP Based Digital (Ethernet Ready with SNMP protocols). Convergence (IP based BMS, Based Building EE Lighting Security Access Control, and CCTV). SOM ©2006 Skidmore, Owings & Merrill LLP SCERA Theater Study 4 • Technology Systems Cabling Plant: With convergence of above systems a comprehensive structured cabling solution would optimize installation cost and minimize repeated labor cost from different proprietary cabling venders and installers: Inter-Systems backbone cabling centrally defined pathway means (cable tray, conduits, support hanger, etc) • Comprehensive pre-engineered Cable plant design (future proofing) Life Safety and Building Protection Systems Lightning Protection System The entire building would need to be equipped with a UL Master-Labeled listed Lighting Protection System. All components shall conform to the requirements of UL 96A and NFPA 780 for the structure. Provide TVSS and GFP protection methods on all Utility Service Entrances. Life Safety Lighting and Egress The entire building would need to be equipped with a UL listed battery units and exits and a redundant UPS system for the Main Hall Auditorium. Rescue Assistance space and intercom/lighted annunciation would be employed at designated stairs and main accessibility pathways. Life Safety Fire Alarm Detection and Speaker Annunciation System The entire building would need to be equipped with a UL listed intelligent addressableanalog system with manual and automatic alarm initiation; automatic sensitivity control of certain smoke detectors; and multiplexed signal transmission dedicated to fire alarm service only. The entire building would need to be equipped with a UL listed speaker and handset phone analog system with manual and automatic alarm two-way communication and annunciation system. Lighting Systems; Building Interior, Exterior and Site The current lighting fixtures and control would need to be addressed in order to meet the projected design and per the Energy Efficiency Codes adapted by the AHJ in 2006. Therefore, all incandescent lighting fixtures would be replaced with T5 and T8 fluorescent ballast and bulbs type fixtures. Indirect lighting methods would be employed for wattage-to-square feet ratio compliance. In addition, room by room day-light harvesting and occupancy sensors would be used. Finally, intelligent programmable lighting control methods would be employed for building interior and exterior control. A few of the ASHRAE 90.1-2004 and IECC 2003 Lighting Energy codes are listed below: The entire building would need to be equipped with Energy Efficient Lighting per ASHRAE 90.12004 and IECC 2003 which includes requirements for interior and exterior building lighting. Mandatory individual space control. The energy codes require at least one lighting control for each room or space enclosed by ceiling-height partitions. These must generally be readily accessible to occupants, but remote location is allowed to accommodate areas where safety or security is a concern. Both ASHRAE 90.1 and IECC require that controls to turn off permanently when unoccupied. The IECC includes a “bi-level” switching requirement for all spaces with the capability to uniformly reduce the connected load by 50% with some exceptions. SOM ©2006 Skidmore, Owings & Merrill LLP SCERA Theater Study 5 Mandatory automatic shutoff. Automatic lighting shutoff of all building lighting is required in both ASHRAE 90.1 and IECC for buildings larger than 5,000 square feet. This can be done with timescheduling devices, occupant-sensing devices, or a similar signal from another control or alarm system that indicates the area is unoccupied. IECC 2000 only requires this in spaces larger than 250 square feet. Mandatory exterior lighting control. Exterior building lighting must be controlled using photocells (for dawn-to-dusk lighting) or seven-day/seasonal programmable controls with astronomic correction and 4-hour battery backup. ASHRAE 90.1 exempts covered vehicle entrances and exits from buildings or parking structures where lighting is required for safety, security, or eye adaptation. In addition, ASHRAE 90.1 requires tandem wiring of fixtures when single-lamp magnetic ballasts are used. Limits are also placed on exit signs with a limit of 5 watts per face for most of the codes. Energy code compliance. Compliance with energy codes is typically a combination of documenting the proposed energy features of the building and passing related inspections. Many jurisdictions require documentation of the proposed design before issuing building permits. The form of documentation will depend on what the local jurisdiction requires. Plumbing System Fixtures Given the proposed alterations and additions to this facility it appears that all existing plumbing fixtures and bathrooms are anticipated to be demolished. It is not evident based upon the existing conditions assessment report if the plumbing fixtures installed during the 1994 addition are in compliance with the 1992 Energy Policy Act (EPA-1992) – a requirement of all fixtures installed per current model plumbing codes. It is required that all new plumbing fixtures installed during the renovation and additions comply with the minimum flow requirements per the applicable plumbing codes and EPA-1992. Piping All new piping installed during the 1994 addition would be maintained to the extent possible as this piping is relatively new and well within the 50+ year life expectancy. The underground waste piping for the original facility appears to have been replaced in areas where problems have been identified. It is recommended that this existing underground piping (that is any underground piping installed prior to 1994) be routed clean and inspected using camera inspection technology. In this way an accurate assessment of the existing conditions of this piping can be made to determine the future life of this piping system. It is possible that some of this piping could be maintained despite the age of the original piping, but further analysis should be performed to assist in determining the disposition of this piping. An evaluation of the existing sanitary and domestic water piping sizes will need to be conducted to determine if the new demand of the plumbing fixtures can be accommodated with the existing accommodations. Attempts can be made during the design to limit the amount of additional water and waste demand created by utilizing ultra low flow plumbing fixtures such as dual flush water closets, waterless urinals, and renewable energy sensor faucets. It is recommended that local hot water heating be provided for the new toilet core areas as the demand is fairly low and this will limit the need for a separate hot water distribution loop. A water SOM ©2006 Skidmore, Owings & Merrill LLP SCERA Theater Study 6 heater with storage capacity may be required in the stage area for shower facilities that may be provided. It is anticipated at this time that the existing energy source used to generate hot water for both domestic use and HVAC use will be sufficient to provide energy for hot water for the future modifications. Fire Protection System The existing sprinkler system that is installed in the new portion of the facility shall be modified to accommodate the proposed modifications. The fire protection system will be required to be extended to the original building areas (currently not protected) as well as to all renovated spaces within the facility. Further analysis of the existing water pressures will be required during future phases to determine the pipe sizing for the sprinkler system. Sustainable Design Given the cost of energy today as well as the desire to maintain existing natural resources, consideration should be given to providing a facility that is high-performance and sustainable. One such measure of this goal is defined by the USGBC’s (U.S. Green Building Council) rating system LEED® (Leadership in Energy and Environmental Design). Consideration should be given to constructing a facility utilizing LEED® as a guideline. A meeting with all design, construction and building operation team members during the schematic design will guide the team through the achievable rating (certified, silver, gold, etc.) for the project. Further consideration should be given to the financial incentives available on both a state and federal level for implementation of sustainable strategies and technologies such as solar powered hot water, solar hybrid lighting, fuel cells, etc. SOM ©2006 Skidmore, Owings & Merrill LLP SCERA Theater Study 7 APPENDIX D Preliminary Project Budget – SCERA Center Renovations & Addition Area Level 1 A-second hall B-new lobby C-main hall D-new stage house E-new education wing Level 2 A-2nd hall balcony and admin B-new upper lobby C-main hall E-new education corridor Basement Level A-renovated existing space C-new and renovated main hall plenum D-new stage and support space Area Total Hard Cost Grand Total Performance Lighting Rigging Concert Enclosure Variable Acoustics Loose Equipment Performance Audio Audience Seating Subtotal Multiplier $150 $250 $350 $350 $250 $1,039,200 $3,408,000 $1,792,000 $3,224,900 $1,989,000 $11,453,100 Renovated existing space New public support space New and renovated main hall New stage and support space New education space 3,830 8,671 5,494 730 18,725 $150 $250 $350 $250 $574,500 $2,167,750 $1,922,900 $182,500 $4,847,650 Renovated existing space New public support space New and renovated main hall New education space 7,046 5,120 12,324 24,490 86,065 $150 $150 $250 $1,056,900 $768,000 $3,081,000 $4,905,900 artistic support zone unconfirmed plenum area artistic support and building systems $21,206,650 900 $300 Total Project Cost (2006 dollars) Hard Cost per square foot Project cost per square foot $400,000 $600,000 $350,000 $250,000 $70,000 $600,000 $270,000 $2,540,000 $23,746,650 10% 12% 5% 5% Total Building Cost Soft Costs Comments 6,928 13,632 5,120 9,214 7,956 42,850 Building Cost Design Contingency Contractor's Overhead & Profit Bidding Contingency Change Order Contingency Total $2,374,665 $2,849,598 $1,187,333 $1,187,333 $31,345,578 25% $7,836,395 $39,181,973 includes fees, expenses, FFE etc. No escalation included $246 $455 This analysis was undertaken as a theoretical exercise prepared solely for your benefit and for program confirmation and such calculations are not to be relied upon by any third party for final calculations, confirmation of the final configuration of a buildable design, Project financing, cost estimating, tenant leasing or for any other purpose. Because construction costs are affected by unpredictable fluctuations in the costs of labor, materials and equipment, by contractors’ differing methods of determining bid prices, by the competitiveness of the bidding, by market conditions and by other factors beyond our control, our preparation of any estimates of material quantities and/or probable Construction Cost for the Work are intended solely for informational purposes and we cannot guarantee that quantities, bids or construction costs for the Work will not vary from such estimates. Our review of your Initial Budget or any Client Approved Budget and quantities and cost estimates prepared by others shall be general in nature and shall not be deemed to be an indication that we have made a detailed study of the quantities and probable costs or Construction Cost or that we are responsible for the accuracy of such estimates.