Sviluppo e Progettazione Sistemi

Transcription

Sviluppo e Progettazione Sistemi
Sviluppo e
Progettazione
Sistemi
Development and System Design
1 Updated: November, 2015
http://www.spsautomazione.it
1
Presentation
Of our services
-
-
-
PLC design, Operator panels and SCADA;
Assistance and advice, during the system
architecture planning stage;
Drawing up of logical specifications for
details;
System start-up;
Updated: November, 2015
2
Presentation
Our customer
Customer type :
- General Contractors;
- Mechanical and electrical installers;
- Companies dealing with maintenance and
Service;
- Engineering consultancies;
Updated: November, 2015
3
Our staff


SPS was founded in 2002, first as a professional
office and since 2006 in this configuration;
Today we have eight engineers and seven
technicians shipyard.
Updated: November, 2015
4
Our experiences
REMOTE MANAGEMENT AND CONTROL OF THE FOLLOWING
SECTORS:

Security systems for Underground

Road and motorway Tunnels

Air control Systems (Industrial and Building)

Industrial water treatment Systems

Cooling Systems

Electricity substations and photovoltaic systems

Motor testing cells

Air compressor stations

Waterwork Stations

Waste treatment plant

Technological and special plants

General control and turning up of Pressure/ Temperature/Load Levels
in the industrial field.
Updated: November, 2015
5
Our services
Formulation P&ID (Process and Instrument Diagram) according to
ISA:
Updated: November, 2015
6
Our services
Technical specifications (detailed description of the logics)
At the very beginning projects do not always mention
all the detailed information a Systems engineer
needs to fulfill his task. In this case it is necessary to
help the customer in a clear and comprehensive
formulation of the possible event/action diagram of
the system in progress.
INIZIO
SI
SI
T.int < T.MAX
T.int > T.MIN
NO
NO
PID OFF
PID OFF
NO
NO
T.int < T.est
T.int > T.est
SI
PORTATA= P.MIN
SI
PORTATA= P.MAX
PORTATA= P.MIN
PORTATA= P.MAX
A
The aim is to create a single “bridge document”
between the Application designer and the System
process engineer.
FINE
The final document will be either in a descriptive
format, a flowchart or with ligical operators (and, or,
xor, etc).
Updated: November, 2015
7
Our services
•
•
•
•
•
•
•
•
Wiring Loop Diagram and Auxiliary Board Electric
Schemes;
Electric Power LT/HT (Low Voltage - Hight Voltage);
I/O List;
Design and execution of the Application software:
• PLC
• Local Operator Panels;
• Supervision systems (SCADA);
System start-up;
Manuals and Operartor Courses;
Post start-up assistance and maintenance;
Possible remote assistance for SCADA systems with
external linking.
Updated: November, 2015
8
The most important projects
The Turin Underground
Realization the electrical distribution control system and of the automation
system for ventilation, in regular and fire emergency tilt, of stations and
ventilation shafts.
Realization of the station evacuation automatic system in case of fire
emergency.
Realization of the SCADA system for the management of the safety
systems NOT of the line system. The application manages 20,000 points
I/O coming from the field.
Updated: November, 2015
9
Example Pages graphics
The Turin Underground – Main Page
Updated: November, 2015
10
Example Pages graphics
The Turin Underground -
Updated: November, 2015
11
The most important projects
Infrastructure
TAV - Bologna Florence (High Speed Train)
Realization of the PLC software for the ventilation control and the fire safety
systems of the leg tunnels.
___________________________________________________________
Control and supervision of the management systems for: regular and
emergency ventilation, environmental measures, traffic lights, sos systems:
• City Tunnel C.so Mortara – TO (Italy)
• Tunnel “del Pino” – TO (Italy)
• City Tunnel – Cuneo (Italy)
• City Tunnel C.so Spezia – TO (Italy)
• Main road tunnel “Le Casse” – Val Formazza (Italy)
• Tunnel International Tunnel “Col di Tenda” ((Italy-France)
• Main road tunnel “Pieve di Teco” (Liguria – IT)
•TEEM – Tangenziale Esterna Est di Milano (Outer ring road east of Milan)
Updated: November, 2015
12
The most important projects
Infrastructure
TEEM (Tangenzia Esterna Est di Milano - Outer ring road east of Milan)
Realization of PLC and SCADA software to control the entire section, all the
lots (32km), to the following plants:
- Systems of toll highway toll
- Electrical distribution
- Lighting junctions. tollbooths and rest areas fog lights
- Collection and treatment of the first rains
The system consists of 58 networked PLCs - about 6,000 I / O devices 127 of
wired managed to half bus for a total of approximately 10,000 I / O managed.
Aggiornato a ottobre 2015
13
Example Pages graphics
General monitoring TEEM
Updated: November, 2015
14
Example Pages graphics
General monitoring TEEM - First details
Updated: November, 2015
15
Example Pages graphics
Example of system architecture
Updated: November, 2015
16
Example Pages graphics
Example of system architecture (detailed diagnostics)
Updated: November, 2015
17
Example Pages graphics
Monitoring ventilation in road tunnel
Updated: November, 2015
18
Example Pages graphics
Monitoring ventilation in road tunnel
Updated: November, 2015
19
Example Pages graphics
Fire detection system in road tunnel
Updated: November, 2015
20
Example Pages graphics
Monitoring lighting
Updated: November, 2015
21
Example Pages graphics
Diagnostic electrical distribution
Updated: November, 2015
22
Example Pages graphics
Diagnostic electrical distribution
Updated: November, 2015
23
Example Pages graphics
Control Rains
Updated: November, 2015
24
Contacts
Via San Secondo 88, 10128 – Torino
Tel:+39 011.501188 / fax +39 011.5099310
e-mail: [email protected]
http://www.spsautomazione.it
Updated: November, 2015
25