the canyon

Transcription

the canyon
THE CANYON
1
Kaiser Permanente Hospital Campus
2
The Crossing - Transit-Oriented Development
3
Boeing Site
4
Pacificenter
5
Anaheim Metrolink Canyon Station
6
Concourse Bowling
The Canyon - Development Update
July 2010
4 -1
1
KAISER PERMANENTE HOSPITAL CAMPUS
Conditional Use Permit No. 2006-05146
Planner:
Dave See ([email protected])
Location:
3400-3450 East La Palma Avenue
Site Size:
27 acres
General Summary:
A master planned hospital campus to be constructed in 3 phases. Phase I medical office building (MOB) 118,500 square feet, expected to be occupied
spring of 2009. Phase II - Professional Office Building 180,000 square foot,
260 bed hospital, central utility plant, expected to be occupied summer 2014.
Phase III consists of two MOB’s (100,000 s.f. and 120,000 s.f.) and expansion
to the hospital to add 100 beds, and a second 6-story parking structure. Final
occupancy is expected by 2020.
Contact/Developer:
Kaiser Permanente, Barbara Shipnuck, Director of Public Affairs,
(714)796-2660, [email protected]
Status:
Under construction.
The Canyon - Development Update
July 2010
4 -2
2
THE CROSSING- TRANSIT-ORIENTED
DEVELOPMENT
Conditional Use Permit No. 2006-05109
Planner:
Dave See ([email protected])
Location:
3520-3570 East La Palma
Site Size:
5.2 acres
General Summary:
A 312 unit condominium project with 39 live/work units. 67.5 du/acre.
Contact/Developer:
Sares Regis Group, Sam Hull, [email protected]
Status:
Completed in 2010.
The Canyon - Development Update
July 2010
4 -3
3
BOEING SITE
Pre-file No. 2008-00011
Planner:
Dave See ([email protected])
Location:
3370 East Miraloma (main office)
Site Size:
99 acres
General Summary:
Panattoni Development recently purchased 60 acres of the 100 acre site.
Panattoni proposes to refurbish the existing offices and industrial buildings
and construct new retail stores. Current zoning permits industrial, office, and
limited retail uses. Zoning would permit a maximum of 2,400,000 square feet of
industrial and office space.
Contact/Developer:
Panattoni Development Company, LLC, Jon Marchiorlatti Senior Development
Manager, (949) 296-2957, [email protected]
Status:
In design phase. Developer marketing the properties.
.
The Canyon - Development Update
July 2010
4 -4
4
PACIFICENTER
Planner:
Dave See ([email protected])
Location:
Southwest corner of Tustin Avenue and East La Palma Avenue
Site Size:
25 acres
General Summary:
Intensification of existing office/retail center. Mixed use project with office building, residential units, retail uses, Metrolink train station expansion, and parking
structure.
Contact/Developer:
WCB properties, Chris Mahon or Terry Thompson (949)640-6900,
[email protected]
Status:
Project design and environmental documents under review.
The Canyon - Development Update
July 2010
4 -5
5
ANAHEIM METROLINK CANYON STATION
Planner:
Dave See ([email protected])
Location:
Southwest corner of Tustin Avenue and La Palma Avenue
Site Size:
Approximately 1 acre
General Summary:
The Anaheim Metrolink Canyon Station development
includes an expanded platform, a new plaza area under the existing tracks and
600 foot pedestrian connection from the station to the new Kaiser Permanente
campus.
Contact/Developer:
Jamie Lai, City of Anaheim, Transit Manager, (714) 765-5054,
[email protected]
Status:
In design phase.
The Canyon - Development Update
July 2010
4 -6
6
CONCOURSE BOWLING
Conditional Use Permit No. 2007-05209
Planner:
Dave See ([email protected])
Location:
3364 East La Palma Avenue
Site Size:
2.7 acres
General Summary:
Remodel existing bowling facility, including expanded management office, outdoor patio, relocated telecommunications tower, and two freeway-oriented
business identification signs.
Contact/Developer:
Outer Spring Volcano, LP
Status:
Pending market conditions.
The Canyon - Development Update
July 2010
4 -7