2012 Annual Report - Energy Regulatory Commission

Transcription

2012 Annual Report - Energy Regulatory Commission
2012 Annual Report
TABLE OF CONTENTS
Page
Message from the Chair
3
The ERC Organizational Structure
5
The Commission Officials
6
Resolutions
7
Enforcement of Rules
13
Consumer Affairs
74
Challenges Ahead
75
Financial Highlights
78
Directory of ERC Officials
83
Annex 1 – Status of Cases Filed
85
Sec. 43 (n) of the EPIRA
(n) Before the end of April of each year, submit to the Office of the President of the Philippines and Congress, copy
furnished the DOE, an annual report containing such matters or cases which have been filed before or referred to it
during the preceding year, the actions and proceedings undertaken and its decision or resolution in each case.
2
MESSAGE FROM THE CHAIR
ERC:TOWARDS ENHANCED REGULATION AND INNOVATION
FY 2012 was a defining year for the Energy Regulatory
Commission (ERC). Armed with more than a decade of solid
experience as an independent and professional regulator of the
Philippine electric power industry, the ERC conquered
challenges and advanced by leaps and bounds in 2012.
The ERC positioned itself towards Enhanced Regulation,
establishing and strengthening frameworks and systems, and
introducing innovations along the way. These frameworks,
systems, and innovations provided the foundation for quality and
effective regulation. In working towards Enhanced Regulation, the ERC sought to inform
the electricity consumers about the fundamental concepts of electric service regulation
which include, among others, the unbundled electricity bill’s components, the
determination of electric power rates, and mechanisms how to effectively participate in
public hearings in the ERC.
As part of the innovations for 2012, the ERC produced its very first Television
Infomercial (TVI) with the assistance of the Presidential Communications Office
(PCOO), through the Philippine Information Agency (PIA). The TVI generates
awareness about the ERC’s functions and mandates, answers basic electricity
questions, and provides information on demand side management.
Likewise, the ERC introduced in 2012 the Online Certificate of Compliance (COC) Filing
System. The online filing system facilitates the application, issuance, and renewal of
COC and promotes easy access to applicants of COCs.
As the country is getting ready for the competitive retail electricity market, the ERC
issued the Transitory Rules for the Implementation of Open Access and Retail
Competition Regime to ensure the smooth transition of the electric power industry to a
more competitive environment, as well as to promote the interests of all the
stakeholders in the industry. To give the retail electricity market participants sufficient
amount of time to evaluate, plan and contract for supply of electricity, a six (6) month
transition period starting December 26, 2012 until June 25, 2013 was set, after which
the contestable customers who are able to contract with suppliers of their own choice,
may already implement their supply contracts.
To provide transparency and ensure that the costs and activities are fairly and
reasonably allocated and reflected as efficient costs of the respective activities and
services of the electric cooperatives, the ERC developed the Accounting and Cost
Allocation Manual (ACAM) in line with the Business Separation Guidelines (BSG), as
amended, which implements the requirement under the Electric Power Industry Reform
3
Act (EPIRA) for the structural and functional unbundling of the business activities of
electric power industry participants. The ACAM ensures the separation of the audited
accounts of each business-related undertaking of the electric cooperatives and provides
full and proper documentation of the accounting policies and principles that apply to the
electric cooperatives in preparing their Accounting Separation Statements in
accordance with the BSG.
In pursuance of the ERC’s mandate to promulgate, approve and enforce rules,
regulations, resolutions and policies, including the issuances of permits and licenses,
the ERC issued seventeen (17) Resolutions, rendered one hundred forty-seven (147)
Decisions, issued two hundred eight (208) major Orders, and conducted seven hundred
thirty-eight (738) hearings in various provinces and localities all over the country. In
terms of the issuance of licenses, the ERC issued two thousand six hundred (2,600)
Certificates of Compliance (COCs) to Generation Companies, licensed three (3)
Wholesale Aggregators (WA) and issued eleven (11) Retail Electricity Supplier (RES)
Licenses in 2012.
In terms of promotion of consumer interest, the ERC resolved eight hundred one (801)
consumer complaints, rendered eight thousand one hundred thirty-nine (8,139) frontline
services, conducted six hundred sixty-five (665) consumer education/information
dissemination activities, and tested and calibrated four million four hundred sixty-one
thousand three hundred fifty-four (4,461,354) new and in-service watt-hour meters,
including reference standards in 2012.
On the renewable energy front, the year 2012 brought us one step closer to realizing
our goal of establishing and administering the Feed-In Tariff System. After conducting a
series of hearings, consultations, and careful study and deliberation, the ERC set the
FITs for run-of-river hydro plants, biomass, wind, and solar.
The success of our initiatives, as reflected in the number of rules, regulations and
decisions issued, the innovations and breakthrough projects put in place, and the
information, education and communication projects developed and implemented, would
not have been possible if not for the dedication and commitment of our people, who are
the driving force for all the achievements and actions that we make. As we look forward
to the challenges ahead, we aim to strengthen our organization further in order to
achieve the highest efficiency and effectiveness in our operations. Our modest
accomplishments each year are testaments to our continued growth and eagerness to
scale greater heights in the years to come.
ZENAIDA G. CRUZ-DUCUT
Chairperson and CEO
30 April 2013
4
5
6
2012 RESOLUTIONS
RESOLUTION NO. 1
A RESOLUTION ADOPTING CERTAIN GUIDELINES FOR THE IMPLEMENTATION
BY THE DISTRIBUTION UTILITIES OF THE UNIFORM REPORTORIAL
REQUIREMENTS STARTING JANUARY 2012
This Resolution supplements Resolution No. 17, series of 2009 adopting the Uniform
Reportorial Requirements (URR) to be used by all the distribution utilities (DUs) in lieu
of ERC DU-M01, ERC DU-M02 and reportorial requirements imposed in various
automatic adjustment mechanisms authorized by the ERC and Resolution No. 24,
series of 2011 approving and adopting the revised URR excel model to be implemented
starting January 2012. Under the Resolution No. 1, the ERC transmitted to each DU a
customized model with its unique password for its use in the monthly computation of
various monthly pass-through rates as mandated under Resolution No. 16, series of
2009, with instructions on how to use such customized URR model.
RESOLUTION NO. 2
RESOLUTION AUTHORIZING THE OFFICE OF THE SOLICITOR GENERAL (OSG)
TO FILE A PETITION BEFORE THE SUPREME COURT PURSUANT TO RULE 45
OF THE REVISED RULES OF COURT, AS AMENDED, AND APPEAL THE
DECISION OF THE COURT OF APPEALS DATED JULY 29, 2011 AND ITS
RESOLUTION DATED JANUARY 12, 2012 IN CA G.R. SP NO. 114198
The Resolution embodies the ERC’s decision to appeal the Decision of the Court of
Appeals dated July 29, 2011 and its Resolution dated January 12, 2012 in CA G.R. SP
No. 114198 to the Supreme Court and for this purpose the ERC authorized the Office of
the Solicitor General (OSG) to file the appropriate petition and represent it in the said
case.
RESOLUTION NO. 3
A RESOLUTION ADOPTING THE AMENDMENTS TO SECTIONS 2.6 AND 2.7 OF
THE DISTRIBUTION SERVICES AND OPEN ACCESS RULES (DSOAR)
Pursuant to Resolution No. 3, certain amendments were introduced to Sections 2.6 and
2.7 of the DSOAR to clarify and address the gray areas therein and reconcile them with
related rules and regulation of the ERC. These amended sections relate to the
applicable general principles and rules on the modifications and new physical
connections for residential of non-residential customers of the DUs. A major feature of
the amendments is on the right to extension of lines and facilities wherein a prospective
customer shall be entitled to extension of lines and facilities at the expense of the DU
7
even if the connection is considered not viable, in cases of socialized housing projects
undertaken by a government agency by itself or through a developer.
RESOLUTION NO. 4
A RESOLUTION SETTING THE INSTALLED GENERATING CAPACITY PER GRID,
NATIONAL GRID AND THE MARKET SHARE LIMITATIONS PER GRID AND THE
NATIONAL GRID FOR 2012
Section 45(a) of Republic Act No. 9136 (EPIRA) prescribes market share caps to
generation companies and their affiliates. To implement this, the ERC issued the
Guidelines for the Determination of Installed Generating Capacity in a Grid and the
National Installed Generating Capacity and Enforcement of the Limits of Concentration
of Ownership, Operation or Control of Installed Generating Capacity, under which the
ERC shall adjust the installed generating capacity per grid and national grid and market
share limitations on or before the 15th day of March of each year and/or as often as may
be necessary. Resolution No. 4 sets the installed generating capacity per grid, and
national grid and the market share limitations per grid and the national grid for 2012, as
follows:
Grid
Installed Generating
Capacity (kW)
Luzon
Visayas
Mindanao
National
11,387,538.53
2,063,199.00
1,768,848.00
15,219,630.53
% Market Share
Limitations as per
RA 9136
30%
30%
30%
25%
Installed Generating
Capacity Limit (kW)
3,416,275.06
618,959.70
530,654.40
3,804,907.63
RESOLUTION NO. 6
A RESOLUTION ADOPTING THE RULES ON ACCREDITATION OF EXTERNAL
AUDITORS AND AUDITING FIRMS FOR THE PURPOSE OF CONDUCTING
VERIFICATION ON THE DOCUMENTS OF DISTRIBUTION UTILITIES RELATIVE TO
THE COMPLIANCE CASES FILED BEFORE THE COMMISSION
To establish a systematized confirmation process of the pass-through rates being
imposed by the DUs, the ERC issued Resolution No. 16, series of 2009. Under such
process established under said Resolution, the ERC indicated that it may refer the audit
of the DUs’ submissions to accredited independent auditors. To implement this, the
ERC issued Resolution No. 6 to establish the rules on how these third party external
auditors will be accredited and what requirements they will have to comply with as a
prerequisite for said accreditation.
8
RESOLUTION NO. 7
A RESOLUTION ADOPTING THE ACCOUNTING AND COST ALLOCATION
MANUAL (ACAM) FOR ELECTRIC COOPERATIVES
In line with the Business Separation Guidelines (BSG) as amended which implement
the requirement under EPIRA for the structural and functional unbundling of the
business activities of electric power industry participants, the ERC developed the ACAM
for electric cooperatives (ECs) and upon their joint petition, it adopted the same for use
by the ECs. The ACAM ensures the separation of the audited accounts of each
business related undertaking of the ECs,the fair and reasonable allocation of these
costs, and the proper documentation of the accounting policies and principles that apply
to the ECs when they prepare their Accounting Separation Statements in accordance
with the BSG.
RESOLUTION NO. 8
A RESOLUTION DIRECTING ALL DISTRIBUTION UTILITIES TO REMIT THEIR
RESPECTIVE PROPORTIONATE SHARES TO THE DISTRIBUTION MANAGEMENT
COMMITTEE’S 2012 BUDGET
After approving the PhP19,786,558.67 2012 Budget of the Distribution Management
Committee (DMC), which was created pursuant to the Philippine Distribution Code, the
ERC issued Resolution No. 8 to direct all the DUs to pay and remit to the DMC their
respective shares computed based on their annual energy sales.
RESOLUTION NO. 9
A RESOLUTION ADOPTING THE GRID MANAGEMENT COMMITTEE (GMC) RULES
AND PROCEDURES TO GOVERN THE MONITORING OF COMPLIANCE OF GRID
USERS TO THE PHILIPPINE GRID CODE
GMC’s Rules and Procedures reiterate the standards and measurements in the
Philippine Grid Code (PGC) and specify how the concerned Grid users shall comply
with them. It prescribes also the templates for the Compliance Monitoring Report to be
submitted by the Reporting entities on or before May 31 of every year.
RESOLUTION NO. 10
RESOLUTION APPROVING THE FEED-IN TARIFF RATES
Following the conduct of several public hearings, and in consultation with the National
Renewable Energy Board (NREB), the ERC initially set the feed-in tariff rates for wind,
biomass, solar, and hydro, as follows:
9
1.
2.
3.
4.
Wind
Biomass
Solar
Hydro
ERC-Approved FIT
Rates
(PhP/kWh)
8.53
6.63
9.68
5.90
ERC-Approved Degression Rates
0.5% after year 2 from effectivity of FIT
0.5% after year 2 from effectivity of FIT
6% after year 1 from effectivity of FIT
0.5% after year 2 from effectivity of FIT
RESOLUTION NO. 11
A RESOLUTION DIRECTING THE 140 DISTRIBUTION UTILITIES (DUS) OF THE
PHILIPPINES TO PLAY THE 3-MINUTE ERC CORPORATE IDENTITY (ID) AUDIOVISUAL PRESENTATION (AVP) AND THE 1-MINUTE AND THE 30-SECOND
TELEVISION INFOMERCIALS (TVIS) IN THEIR BUSINESS LOUNGES (PAYMENT
CENTERS, CUSTOMERS WELFARE DESKS & SIMILAR PUBLIC AREAS) AND/OR
AIR THE SAME AUDIO-VISUAL MATERIALS IN THEIR AFFILIATED CABLE
TELEVISION NETWORKS IN THE NAME OF CONSUMER EDUCATION
With the assistance of the Presidential Communications Office (PCOO) through the
Philippine Information Agency (PIA), the ERC produced TVIs to generate awareness
about the ERC’s mandates and demand side management. To ensure the widest
dissemination of these TVIs, the ERC circulated among the DUs its advisory for them to
air the TVIs in their payments centers and affiliate cable companies.
RESOLUTION NO. 12
A RESOLUTION AUTHORIZING THE CHAIRPERSON, ZENAIDA G. CRUZ-DUCUT,
TO ENTER INTO A MEMORANDUM OF AGREEMENT (MOA) WITH THE
DEPARTMENT OF PUBLIC WORK AND HIGHWAYS (DPWH), FOR AND IN BEHALF
OF THE ENERGY REGULATORY COMMISSION (ERC), FOR THE CONSTRUCTION
OF THE ERC OFFICE BUILDING ON THE PARCEL OF LAND SUBJECT OF THE
“AGREEMENT OF USUFRUCT OVER A PARCEL OF LAND” EXECUTED WITH THE
POWER SECTOR ASSETS AND LIABILITIES MANAGEMENT CORPORATION
(PSALM)
Following the approval of the budget for the construction of the ERC’s Office Building
and in recognition that the ERC does not have the expertise to undertake the project
management for such construction, the ERC resolved to contract out the task to the
DPWH, and for this purpose, it authorized Chairperson Zenaida G. Cruz-Ducut to
represent the ERC in the execution of the appropriate documents with the DPWH.
RESOLUTION NO. 12-A
A RESOLUTION CLARIFYING RESOLUTION NO. 12, SERIES OF 2012
10
The Resolution only clarifies that the entity referred to in Resolution No. 12 to undertake
the project management for the construction of the ERC Office Building is the DPWHNational Capital Region (NCR), which has jurisdiction over the proposed location of the
ERC Office Building.
RESOLUTION NO. 13
A RESOLUTION ADOPTING THE JUDICIAL AFFIDAVIT RULE (A.M. NO. 12-8-8-SC)
PROMULGATED BY THE HONORABLE SUPREME COURT ON SEPTEMBER 4,
2012 WHICH SHALL FORM PART OF THE COMMISSION’S RULES OF PRACTICE
AND PROCEDURE, PARTICULARLY SECTION 6, RULE 18 THEREOF
To supplement Section 6, Rule 18 of the ERC’s of Practice and Procedure, the ERC
resolved to adopt the Supreme Court’s Judicial Affidavit Rule.
RESOLUTION NO. 14
A RESOLUTION IMPLEMENTING THE ONLINE CERTIFICATE OF COMPLIANCE
(COC) FILING SYSTEM
The ERC designed and developed an online COC filing system to provide easy access
to applicants of COC and help facilitate COC renewals.
RESOLUTION NO. 15
RESOLUTION ADOPTING THE POSITION OF THE COMMISSION ON THE ISSUES
PAPER PUBLISHED ON 02 APRIL 2012 AND THE CORRESPONDING
AMENDMENTS TO THE FEED-IN TARIFF RULES
Regarding the 3 issues listed in the ERC’s Issues Paper published on 02 April 2012, the
ERC, after conducting public consultations thereon, resolved the following:
a) On the proposed competitive bidding process to set the FITs, the ERC posited
that, while competitive bidding may have been resorted to in some jurisdictions,
the mechanism adopted in the FIT Rules may still be carried out, as in fact this
has been what was done in some other jurisdictions as well, at least for the initial
FIT implementation.
b) On the FIT-All Administrator, the ERC accepted the proposal to substitute the
National Grid Corporation of the Philippines with the National Transmission
Corporation as FIT-All Administrator.
c) On the FIT-All calculation, the ERC maintained that this shall be addressed in the
FIT-All Payment and Collection Guidelines.
11
RESOLUTION NO. 16
A RESOLUTION
ADOPTING THE TRANSITORY RULES
IMPLEMENTATION OF OPEN ACCESS AND RETAIL COMPETITION
FOR
THE
To ensure the smooth transition from the existing power industry structure to a
competitive environment, the ERC issued these transitory rules to govern the transition
to and initial implementation of Open Access and Retail Competition (OARC). In the
Transitory Rules, the ERC declared a transitory period from December 26, 2012 until
June 25, 2013 during which the contestable customers shall continue to be served by
their incumbent suppliers. From June 26, 2012 until December 25, 2013, the
contestable customers who are not able to contract with a retail electricity supplier
(RES) of their own choice, after exhausting all means, shall also be served by their
incumbent suppliers. From December 26, 2013 onwards, all the contestable customers
shall already be served by their own RES, otherwise they shall fall under the supplier of
last resort (SOLR) arrangement and they shall be served by the designated SOLR at
SOLR rates.
RESOLUTION NO. 17
A RESOLUTION ADOPTING THE AMENDMENTS TO THE RULES FOR PREPAID
RETAIL ELECTRIC SERVICE USING A PREPAID METERING SYSTEM
The ERC adopted certain amendments to the Rules for Prepaid Retail Electric Service
(PRES) using a Prepaid Metering System, which was approved on July 13, 2009. In
these amendments, the ERC expanded the coverage of the PRES to include all
customer classifications and approved the use of all available types of technologies in
the implementation of the PRES. The ERC also adopted the use of the postpaid retail
rate current at the particular month the credited load was consumed as the applicable
prepaid rate.
12
ENFORCEMENT OF RULES
BUSINESS SEPARATION AND UNBUNDLING PLAN (BSUP) & ACCOUNTING AND
COST ALLOCATION MANUAL (ACAM)
On March 26, 2012, the ERC approved the application for BSUP and ACAM of Subic
Enerzone Corporation (SEZ) after finding SEZ to be in compliance with the
requirements under the Business Separation Guidelines (BSG), as Amended. In
addition, SEZ submitted an undertaking together with a plan to separate the business
segments to ensure full compliance to the BSG, as well as a plan to comply with the
Code of Conduct for Competitive Retail Market Participants.
CAPITAL EXPENDITURE PROJECTS
It is the ERC’s mandate to ensure the quality, reliability, security and affordability of the
supply of electric power, as provided for in Republic Act No. 9136 or the Electric power
Industry Reform Act (EPIRA). Consistent with its mandate, on 03 December 2012, the
ERC approved the application filed by the National Grid Corporation of the Philippines
(NGCP) for its Sta. Barbara 230 kV project, with a total approved cost of
PhP691,794,000.00.
Moreover, in order to ensure the supply of a quality and reliable electricity within their
franchise areas, the ERC approved twelve (12) applications filed by various Distribution
Utilities (DUs), to wit:
No.
1
ERC CASE
NUMBER
2010-049 RC
2
2010-050 RC
3
2010-099 RC
4
2010-101 RC
5
2010-105 RC
APPLICANT
Agusan Del Norte
Electric Cooperative,
Inc. (ANECO)
Zamboanga
del
Norte
Electric
Cooperative,
Inc.
(ZANECO)
Aurora
Electric
Cooperative,
Inc.
(AURELCO)
Davao del Sur
Electric Cooperative,
Inc. (DASURECO)
DATE OF DECISION/
PROJECT COST
PARTICULARS
December 19, 2011
PhP50,054,323.00
Capital projects for years 2011
to 2012
December 19, 2011
PhP529,667,270.00
Capital projects for years 2009
to 2013
December 05, 2011
PhP74,049,393.00
Capital projects for years 2010
to 2013
April 16, 2012
PhP124,432,370.00
Capital projects for years 2010
to 2012
Sorsogon I Electric December 19, 2011
PhP233,277,178.40
Cooperative,
Inc. Capital projects for years 2010
(SORECO I)
to 2014
13
No.
6
ERC CASE
NUMBER
2010-160 RC
7
2011-001 RC
8
2011-006 RC
9
2011-022 RC
10
2011-066 RC
11
2012-044 RC
12
2012-080 RC
APPLICANT
Negros Oriental I
Electric Cooperative,
Inc. (NORECO I)
Tablas
Island
Electric Cooperative,
Inc. (TIELCO)
Bohol I Electric
Cooperative,
Inc.
(BOHECO I)
Zamboanga
del
Norte
Electric
Cooperative,
Inc.
(ZANECO)
Palawan
Electric
Cooperative,
Inc.
(PALECO)
Misamis Oriental I
Rural
Electric
Service Cooperative,
Inc. (MORESCO I)
DATE OF DECISION/
PROJECT COST
PARTICULARS
July 16, 2012
PhP150,554,777.00
Capital projects for years 2011
to 2015
April 02, 2012
PhP14,807,000.00
Capital projects for year 2010
April 23, 2012
Capital projects for years 2011
to 2015
December 19, 2011
Unplanned capital project,
particularly the upgrading of the
Roxas Substation
May 22, 2012
Capital projects for years 2011
to 2016
October 01, 2012
Force majeure capital project
for year 2012 due to Typhoon
Sendong, particularly the
rehabilitation of the 1 MVA
Cabula Substation, 69 kV line
structures and accessories,
34.5 kV line structures and
accessories, 13.2 kV line
structures and accessories,
and distribution transformers
and arresters
Angeles
Electric November 12, 2012
Corporation (AEC)
2012 major capital project
PhP354,092,130.08
PhP17,325,269.00
PhP364,258,387.00
PhP10,024,670.00
PhP49,463,792.91
CERTIFICATE OF COMPLIANCE (COC)
The ERC approved 1,146 new COCs (approximately 1,103 MW installed capacity) and
1,454 COC renewal applications (approximately 1,643 MW installed capacity) in 2012 to
the following Generation Companies (GenCos) and Self-Generation Facilities (SGFs).
This brings the total number of COCs issued by the ERC to 26,844 as of December 31,
2012.
Below is the list of new COCs issued from January to December 2012:
14
No.
1
2
3
4
5
6
7
8
9
10
11
Name of Applicant
Caltex Barotac - Norberto T. Braga
Cooperative Bank of Nueva Vizcaya - Maddela Branch
Laguna Sino-Filipino Educational Foundation, Inc.
Landbank of the Philippines - Petit Barracks
Mandaue Foam Industries, Inc. - Dela Paz
Mandaue Foam Industries, Inc. - Lanang Executive Homes
POS Marketing Enterprises, Inc.
Times Trading, Inc. - Binondo
Times Trading, Inc. - Pasig
LCC Central Mall
Coca-Cola Bottlers Philippines Incorporated-Misamis Oriental
Date Approved
January 5, 2012
January 5, 2012
January 5, 2012
January 5, 2012
January 5, 2012
January 5, 2012
January 5, 2012
January 5, 2012
January 5, 2012
January 13, 2012
January 13, 2012
12
Maynilad Water Services, Inc.- Putatan Water Treatment Plant
January 13, 2012
13
14
15
Yamashin Cebu Filter Manufacturing Corp.
Allied Banking Corporation - Samson Road Branch
Allied Banking Corporation - E Rodriguez G. Araneta Branch
January 13, 2012
January 13, 2012
January 13, 2012
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Allied Banking Corporation - Mindanao Avenue Branch
Allied Banking Corporation - Parang Marikina
Allied Banking Corporation - Elcano Branch
Allied Banking Corporation -Reina Regente Branch
Allied Banking Corporation - San Andres Branch
Allied Banking Corporation - Lubao Branch
Allied Banking Corporation - Mabalacat Branch
Allied Banking Corporation - San Agustin Branch
Allied Banking Corporation - Naga Magsaysay Branch
Allied Banking Corporation - Kumintang Batangas
Allied Banking Corporation - Sta Cruz Laguna Branch
Allied Banking Corporation - Sta Barbara Branch
Allied Banking Corporation - Malaybalay Branch
Allied Banking Corporation - Nunez Extention
Allied Banking Corporation - SK Pendatum Branch
JJACCIS Development Corporation
MLMN Foods, Inc.
National Grid Corporation of the Philippines - Naga Converter
Substation
National Grid Corporation of the Philippines - Ormoc Converter Station
National Grid Corporation of the Philippines - Head Office
Brothers of Christ of Banneux, Inc.
City of San Fernando Water District - PS No.10
City of San Fernando Water District - PS No.14
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
34
35
36
37
38
15
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
No.
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
Name of Applicant
City of San Fernando Water District - PS No.2
City of San Fernando Water District - PS No.4
City of San Fernando Water District - PS No.9
City of San Fernando Water District Genset 1
City of San Fernando Water District Genset 2
Ember Shell Service Station
Gentri Gasoline Station
Hensonly Plaza
Ilocos Norte Water District - Bacarra
Ilocos Norte Water District - Balacad
Ilocos Norte Water District - Brgy. 22
Ilocos Norte Water District - Mabusag
Ilocos Norte Water District - Nagbacalan
Ilocos Norte Water District - Paltit
Ilocos Norte Water District - Paratong
Ilocos Norte Water District - Piddig
Ilocos Norte Water District - Solsona
Ilocos Norte Water District - Suyo
Ilocos Norte Water District - Vintar
Land Bank of the Philippines - Polangui Branch
Land Bank of the Philippines - Tigaon Extension
Rural Bank of Sta. Ignacia, Inc. - Camiling
Rural Bank of Sta. Ignacia, Inc. - Capas
Rural Bank of Sta. Ignacia, Inc. - Gerona
Rural Bank of Sta. Ignacia, Inc. - Ligtasan
Rural Bank of Sta. Ignacia, Inc. - San Jose
Rural Bank of Sta. Ignacia, Inc. - San Manuel
Rural Bank of Sta. Ignacia, Inc. - Victoria
Verde Foods Inc.
National Grid Corporation of the Philippines - North Luzon Area Regional Office
National Grid Corporation of the Philippines - North Luzon Area - Mt.
Mataba RS
National Grid Corporation of the Philippines - North Luzon Area Bacnotan SS
National Grid Corporation of the Philippines - North Luzon Area - San
Esteban SS
National Grid Corporation of the Philippines - North Luzon Area Bantay SS
National Grid Corporation of the Philippines - North Luzon Area Palauig RS
16
Date Approved
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
No.
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
Name of Applicant
National Grid Corporation of the Philippines - North Luzon Area - La
Trinidad SS
National Grid Corporation of the Philippines - North Luzon Area Nagsaag SS
National Grid Corporation of the Philippines - North Luzon Area - San
Manuel SS
National Grid Corporation of the Philippines - North Luzon Area - Bolo
SS
National Grid Corporation of the Philippines - North Luzon Area Labrador SS
National Grid Corporation of the Philippines - North Luzon Area Bayombong SS
National Grid Corporation of the Philippines - North Luzon Area Santiago SS
National Grid Corporation of the Philippines - North Luzon Area - Gamu
SS
National Grid Corporation of the Philippines - North Luzon Area Tuguegarao SS
National Grid Corporation of the Philippines - North Luzon Area - Limay
SS
National Grid Corporation of the Philippines - North Luzon Area Hermosa SS
National Grid Corporation of the Philippines - North Luzon Area Olongapo SS
National Grid Corporation of the Philippines - North Luzon Area Botolan SS
National Grid Corporation of the Philippines - North Luzon Area Mexico SS
National Grid Corporation of the Philippines - North Luzon Area Concepcion SS
National Grid Corporation of the Philippines - North Luzon Area Cabanatuan SS
National Grid Corporation of the Philippines - North Luzon Area - Cruz
na Daan SS
National Grid Corporation of the Philippines - North Luzon Area Araneta SS
National Grid Corporation of the Philippines - North Luzon Area - Hill
399
National Grid Corporation of the Philippines - North Luzon Area Dolores SS
National Grid Corporation of the Philippines - North Luzon Area Malaya SS
National Grid Corporation of the Philippines - North Luzon Area - San
Jose 500kV SS
17
Date Approved
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
No.
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
Name of Applicant
National Grid Corporation of the Philippines - North Luzon Area - San
Jose 115kV SS
National Grid Corporation of the Philippines - North Luzon Area - Mt.
Mataba RS
National Grid Corporation of the Philippines - South Luzon Area Batangas SS
National Grid Corporation of the Philippines - South Luzon Area - Dela
Paz RS
National Grid Corporation of the Philippines - South Luzon Area Dasmariñas SS
National Grid Corporation of the Philippines - South Luzon Area Zapote SS
National Grid Corporation of the Philippines - South Luzon Area Rosario SS
National Grid Corporation of the Philippines - South Luzon Area - Biñan
SS
National Grid Corporation of the Philippines - South Luzon Area - Sucat
SS
National Grid Corporation of the Philippines - South Luzon Area Tayabas SS
National Grid Corporation of the Philippines - South Luzon Area Gumaca SS
National Grid Corporation of the Philippines - South Luzon Area Caliraya SS
National Grid Corporation of the Philippines - South Luzon Area Daraga SS
National Grid Corporation of the Philippines - South Luzon Area - Naga
SS
National Grid Corporation of the Philippines - South Luzon Area - Labo
SS
National Grid Corporation of the Philippines - South Luzon Area Calapan RS
National Grid Corporation of the Philippines - South Luzon Area - Sta.
Magdalena Cable
National Grid Corporation of the Philippines - South Luzon Area Camalig RS
National Grid Corporation of the Philippines - South Luzon Area Tamayo RS 1
National Grid Corporation of the Philippines - South Luzon Area Tamayo RS 2
National Grid Corporation of the Philippines - South Luzon Area Guinyangan RS
National Grid Corporation of the Philippines - South Luzon Area Kalayaan RS
18
Date Approved
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
No.
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
Name of Applicant
National Grid Corporation of the Philippines - South Luzon Area - Looc
RS 1
National Grid Corporation of the Philippines - South Luzon Area - Looc
RS 2
National Grid Corporation of the Philippines - South Luzon Area Lucban RS
National Grid Corporation of the Philippines - South Luzon Area Matnog RS
National Grid Corporation of the Philippines - South Luzon Area - New
Bacman RS
National Grid Corporation of the Philippines - South Luzon Area Maunong RS
National Grid Corporation of the Philippines - South Luzon Area - Old
Bacman RS
National Grid Corporation of the Philippines - South Luzon Area Pasacao RS 1
National Grid Corporation of the Philippines - South Luzon Area Pasacao RS 2
National Grid Corporation of the Philippines - South Luzon AreaPinamalayan RS
National Grid Corporation of the Philippines - South Luzon Area - San
Aquilino RS
National Grid Corporation of the Philippines - South Luzon Area Maintenance & Testing Division B-SLOM
National Grid Corporation of the Philippines - Visayas Area - Talisay
CTS
National Grid Corporation of the Philippines - Visayas Area Compostela SS
National Grid Corporation of the Philippines - Visayas Area - Quiot SS
Date Approved
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
National Grid Corporation of the Philippines - Visayas Area - Mandaue
January 13, 2012
GS 4
National Grid Corporation of the Philippines - Visayas Area - Mactan
January 13, 2012
GS 5
National Grid Corporation of the Philippines - Visayas Area - Cebu SS 6 January 13, 2012
National Grid Corporation of the Philippines - Visayas Area - Samboan
SS
National Grid Corporation of the Philippines - Visayas Area - Ubay SS
January 13, 2012
National Grid Corporation of the Philippines - Visayas Area - Calongcalong SS
National Grid Corporation of the Philippines - Visayas Area - Colon
(New Naga) SS
National Grid Corporation of the Philippines - Visayas Area - Cadiz SS
January 13, 2012
19
January 13, 2012
January 13, 2012
January 13, 2012
No.
141
Name of Applicant
National Grid Corporation of the Philippines - Visayas Area Kabankalan SS
National Grid Corporation of the Philippines - Visayas Area - Maricalum
SS
National Grid Corporation of the Philippines - Visayas Area - Amlan SS
Date Approved
January 13, 2012
January 13, 2012
147
National Grid Corporation of the Philippines - Visayas Area - Mabinay
SS
National Grid Corporation of the Philippines - Visayas Area - Bacolod
SS
National Grid Corporation of the Philippines - Visayas Area - Panit-an
SS
National Grid Corporation of the Philippines - Visayas Area - Dingle SS
148
National Grid Corporation of the Philippines - Visayas Area - Nabas SS
January 13, 2012
149
National Grid Corporation of the Philippines - Visayas Area - Panit-an
SS
National Grid Corporation of the Philippines - Visayas Area
National Grid Corporation of the Philippines - Visayas Area - Isabel SS
January 13, 2012
National Grid Corporation of the Philippines - Visayas Area - Tabango
SS (Genset 25)
National Grid Corporation of the Philippines - Visayas Area - Tabango
SS (Genset 26)
National Grid Corporation of the Philippines - Visayas Area - Babatngon
SS
National Grid Corporation of the Philippines - Visayas Area - Paranas
SS (Genset 28)
National Grid Corporation of the Philippines - Visayas Area - Paranas
SS (Genset 29)
National Grid Corporation of the Philippines - Visayas Area - Masbate
RS (Genset 30)
National Grid Corporation of the Philippines - Visayas Area - Maasin RS
(Genset 31)
National Grid Corporation of the Philippines - Visayas Area Cabacungan CTS (Genset 32)
National Grid Corporation of the Philippines - Visayas Area - Busay RS
January 13, 2012
National Grid Corporation of the Philippines - Visayas Area - Camotes
RS
National Grid Corporation of the Philippines - Visayas Area - Majic RS
January 13, 2012
National Grid Corporation of the Philippines - Visayas Area - Mauagao
RS
National Grid Corporation of the Philippines - Visayas Area Buenavista RS
January 13, 2012
142
143
144
145
146
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
20
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
No.
165
Name of Applicant
National Grid Corporation of the Philippines - Visayas Area - Loon RS
Date Approved
January 13, 2012
166
January 13, 2012
169
National Grid Corporation of the Philippines - Visayas Area - Canlandog
RS
National Grid Corporation of the Philippines - Visayas Area Caniapasan RS (Genset 40)
National Grid Corporation of the Philippines - Visayas Area Caniapasan RS (Genset 41)
National Grid Corporation of the Philippines - Visayas Area - Ivisan RS
170
National Grid Corporation of the Philippines - Visayas Area - Jawili RS
January 13, 2012
171
National Grid Corporation of the Philippines - Visayas Area - Panit-an
RS
National Grid Corporation of the Philippines - Visayas Area - Palompon
RS
National Grid Corporation of the Philippines - Visayas Area - Siquijor
RS
National Grid Corporation of the Philippines - Visayas Area - Masbate
RS
National Grid Corporation of the Philippines - Mindanao Area - Aurora
SS
National Grid Corporation of the Philippines - Mindanao Area - Sta.
Clara SS
National Grid Corporation of the Philippines - Mindanao Area - Sangali
SS
National Grid Corporation of the Philippines - Mindanao Area - Pitogo
SS
National Grid Corporation of the Philippines - Mindanao Area - Overton
SS
National Grid Corporation of the Philippines - Mindanao Area - Lugait
SS
National Grid Corporation of the Philippines - Mindanao Area - Abaga
SS
National Grid Corporation of the Philippines - Mindanao Area - Carmen
SS
National Grid Corporation of the Philippines - Mindanao Area Tagoloan SS
National Grid Corporation of the Philippines - Mindanao Area - Aplaya
SS
National Grid Corporation of the Philippines - Mindanao Area - Kibawe
SS
National Grid Corporation of the Philippines - Mindanao Area Maramag SS
National Grid Corporation of the Philippines - Mindanao Area - Nasipit
SS
January 13, 2012
167
168
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
21
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
No.
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
Name of Applicant
Date Approved
National Grid Corporation of the Philippines - Mindanao Area January 13, 2012
Anislagan SS
National Grid Corporation of the Philippines - Mindanao Area - Bislig SS January 13, 2012
National Grid Corporation of the Philippines - Mindanao Area - Butuan
SS
National Grid Corporation of the Philippines - Mindanao Area - San
Francisco SS
National Grid Corporation of the Philippines - Mindanao Area - Davao
SS Gen 1
National Grid Corporation of the Philippines - Mindanao Area - Davao
SS Gen 2
National Grid Corporation of the Philippines - Mindanao Area - Matanao
SS
National Grid Corporation of the Philippines - Mindanao Area Bunawan SS
National Grid Corporation of the Philippines - Mindanao Area Nabunturan SS
National Grid Corporation of the Philippines - Mindanao Area Pintatagan Switching Station
National Grid Corporation of the Philippines - Mindanao Area - Maco
SS
National Grid Corporation of the Philippines - Mindanao Area Kidapawan SS
National Grid Corporation of the Philippines - Mindanao Area - General
Santos (Klinan) SS
National Grid Corporation of the Philippines - Mindanao Area Tacurong SS
National Grid Corporation of the Philippines - Mindanao Area - Nuling
SS
National Grid Corporation of the Philippines - Mindanao Area - SO
Control Center
National Grid Corporation of the Philippines - Mindanao Area - MRCC
January 13, 2012
National Grid Corporation of the Philippines - Mindanao Area - Bucagan
RS
National Grid Corporation of the Philippines - Mindanao Area - Mt. Buga
RS
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Maligaya RS
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Taguite RS
National Grid Corporation of the Philippines - Mindanao Area Mercedes RS
National Grid Corporation of the Philippines - Mindanao Area - Ilihan
January 13, 2012
22
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
No.
Name of Applicant
Date Approved
RS
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
National Grid Corporation of the Philippines - Mindanao Area Lunzuran/Sangali RS
National Grid Corporation of the Philippines - Mindanao Area - Signal
Hill RS
National Grid Corporation of the Philippines - Mindanao Area - Lugait
Hill RS
National Grid Corporation of the Philippines - Mindanao Area - Dongue
Hill RS
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Langilanon RS
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Kitanglad RS
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Haruray RS
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Pangsikan RS
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Rojales RS
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Josefa RS
National Grid Corporation of the Philippines - Mindanao Area - Mt. Silop
RS
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Magdiwata RS
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Libaylibay RS
National Grid Corporation of the Philippines - Mindanao Area - Matina
Hill
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Pasian RS
National Grid Corporation of the Philippines - Mindanao Area - Mt. Tupi
RS
National Grid Corporation of the Philippines - Mindanao Area Batulawan RS/Pikit
National Grid Corporation of the Philippines - Mindanao Area - Mt.
Malalag RS
Oriental Mindoro Electric Cooperative, Inc. - Linao-Cawayan MiniHydroelectric Power Plant
Bangko Sentral ng Pilipinas - Naga Branch
Dinalupihan Water District - Lower Roosevelt
Dinalupihan Water District - Pita
Dinalupihan Water District - Sta. Isabel
23
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 13, 2012
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
No.
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
Date Approved
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
January 24, 2012
February 1, 2012
February 1, 2012
February 1, 2012
February 1, 2012
February 1, 2012
February 1, 2012
February 6, 2012
February 6, 2012
254
255
256
257
258
259
260
261
262
263
264
265
266
267
Name of Applicant
Dinalupihan Water District - Upper Roosevelt
Goldenfield Milling Corporation
Gromix Poultry Farm, Inc. - Duhat
Gromix Poultry Farm, Inc. - Paltoc
Kingswood Rubber Corporation
Lapaz Petron Service Station
Makoto Metal Technology, Inc.
Metro Vigan Water District - Paing
Metro Vigan Water District - Raois
Rural Bank of Cebu - Daanbantayan
San Manuel Water District - District 4
San Manuel Water District - Sandiat Centro
Petron Corporation - Ariel Tan
Petron Corporation - Billy Baguio
Petron Corporation - Brigida Llorente
Petron Corporation - G. Yabes
Petron Corporation - Genalyn Cornejo
Petron Corporation - Ma. Esther Te
Mindanao Energy Systems, Inc.
Cummins Sales and Service Philippines, Inc. - San Jose, Occidental
Mindoro
Petron Corporation –Cornelio Mirelles
Petron Corporation - Leony De Los Reyes
Petron Corporation - Caridad Garcia
Petron Corporation - Vicente Licante
Petron Corporation - Gina C. Yap
Petron Corporation - Emil Lizares
Petron Corporation - Manuel Winston Ko
Petron Corporation - Susan Fortich
Petron Corporation - Rodney C. Bandojo
Petron Corporation - Arturo Onas
Petron Corporation - Linarda Nulada
Petron Corporation - Robert P. Uy
Petron Corporation - Lorenzo Kilayko
Petron Corporation - Emilio L. Teves
268
Cummins Sales and Service Philippines, Inc. - Roxas, Palawan
February 13, 2012
269
270
271
Hastings Motor Corp. - Masbate
Agubella Fuel Distributions - Bgry. E. Rodriguez
Agubella Fuel Distributions - Bgry. Socorro
February 13, 2012
February 13, 2012
February 13, 2012
24
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
February 7, 2012
No.
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
Name of Applicant
Bacolod CJH Corp./ JP 227 Residences
Baylober Trading
Eagle Broadcasting Corporation - Bulacan
Eagle Broadcasting Corporation - Davao City
GM Bank of Luzon, Inc. - Sta. Rosa
Joey's Foods Corporation - Jollibee Baliuag Bayan
Landbank of the Philippines - Roxas Oriental Mindoro
Landbank of the Philippines- Gumaca Branch (Quezon)
Landbank of the Philippines- Sta. Cruz Branch (Laguna)
Landbank of the Philippines-Bajada Branch
Liponpon Elementatry School
Parang Cueva Elementary School
Parang Elementary School
River Valley Broiler
San Agapito Elementary School
San Agustin Kanluran Elementary School
San Agustin Silangan Elementary School
SK Hardware & General Merchandise Nable St. Branch
Wellington Food Products
ACR Shell Service Station
Buenavista Water District- Pump Station No. 3
Burauen Shell Station
Fort Bonifacio Development Corporation
Goldland Tower Condominium Corporation
Grand Batangas Resort Development, Inc.
Honeywell Shell Service Station
Ivoclar Vivadent, Inc.
Landbank of the Philippines - Barracks Branch
Landbank of the Philippines - Camiguin Branch
LGU Bayawan City
MMJ 1 Shell Station
MMJ 2 Shell Station
New Shell Marina Shell Service Station
R and L Shell Gas Station
Rural Bank of Cebu South Inc. - Argao Branch
Rural Bank of Cebu South Inc. - Carcar Branch
Rural Bank of Cebu South Inc. - Dalaguete Branch
Rural Bank of Cebu South Inc. - Sibonga Branch
Subic Central Supermart
The Roman Catholic Archbishop of Manila 25
Date Approved
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 13, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
February 17, 2012
No.
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
Date Approved
February 17, 2012
February 23, 2012
February 23, 2012
February 23, 2012
February 23, 2012
February 23, 2012
February 23, 2012
February 23, 2012
March 7, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 20, 2012
March 26, 2012
March 26, 2012
March 26, 2012
March 26, 2012
343
Name of Applicant
Treasure Island Shell Service Station
Jollibee Foods Corporation-Pinnacle
Northbeacon Commercial Corporation
Philippine Townships, Inc. (Fairways Tower)
San Miguel Yamamura Packaging Corpration Manila Glass Plant
Serendra Commercial Strip/Ayala Land, Inc.
SM Investments Corporation - SM Corporate Offices
Yazaki-Torres Parts Lima Mfg. Inc. (YTMI Realty Corp.)
China Banking Corporation - Las Pinas - Manuela Branch
United Coconut Planters Bank - Aurora Blvd. Branch
United Coconut Planters Bank - Banaue Branch
United Coconut Planters Bank - Calbayog Branch
United Coconut Planters Bank - Clarkfield Banch
United Coconut Planters Bank - Dasmariñas Branch
United Coconut Planters Bank - Dumaguete Branch
United Coconut Planters Bank - General Santos Branch
United Coconut Planters Bank - Grace Park Branch
United Coconut Planters Bank - Iznart Branch
United Coconut Planters Bank - Jaro Branch
United Coconut Planters Bank - Kalibo Branch
United Coconut Planters Bank - Lacson-Galo Branch
United Coconut Planters Bank - Libertad Branch
United Coconut Planters Bank - Mabini Branch
United Coconut Planters Bank - North Drive Branch
United Coconut Planters Bank - San Juan Branch
United Coconut Planters Bank - Tanauan Branch
Luuk Diesel Power Plant
Tandubanak Diesel Power Plant
Sacol Island Diesel Power Plant
DMCI Masbate Power Corp. - Aroroy Satellite Diesel Power Plant
(Additional Unit)
DMCI Masbate Power Corp. - Cataingan Satellite Diesel Power Plant
(Additional Unit)
Cummins Sales and Services Philippines, Inc. - Sultan Kudarat
344
345
346
347
348
349
Bangko Sentral Ng Pilipinas - Bacolod Branch
Banner Plasticard, Inc.
Bohol Island State University
Chang Chuen Cotton Paper Mfg. Co., Ltd. - Philippines, Inc.
Dole Philippines, Inc. Stanfilco Division - MIS Office Davao
Dole Philippines, Inc. Stanfilco Division - North Skyland, Pumping
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
342
26
March 26, 2012
March 26, 2012
No.
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
Name of Applicant
Station 1
Dole Philippines, Inc. Stanfilco Division - North Skyland, Pumping
Station 2
Dole Philippines, Inc. Stanfilco Division - North Skyland, Pumping
Station 3
Dole Philippines, Inc. Stanfilco Division - North Skyland, Pumping
Station 4
Dole Philippines, Inc. Stanfilco Division - Alejal
Dole Philippines, Inc. Stanfilco Division - Panabo Zone (Dapco Hangar)
Dole Philippines, Inc. Stanfilco Division - Compostela Hangar
Dole Philippines, Inc. Stanfilco Division - PP 79
Dole Philippines, Inc. Stanfilco Division - Atlae (Pump Stn. 1)
Dole Philippines, Inc. Stanfilco Division - Maknit (Pump Stn. 1)
Dole Philippines, Inc. Stanfilco Division - Malandag
Dole Philippines, Inc. Stanfilco Division - Atlae (Pump Stn. 2)
Dole Philippines, Inc. Stanfilco Division - Socsargen Zone
Dole Philippines, Inc. Stanfilco Division - Atlae (Pump Stn. 3)
Dole Philippines, Inc. Stanfilco Division - South Hangar
Dole Philippines, Inc. Stanfilco Division - Kapalong Zone, PP 54
Dole Philippines, Inc. Stanfilco Division - Lunga. Og
Dole Philippines, Inc. Stanfilco Division - Kinamayan
Dole Philippines, Inc. Stanfilco Division - Pag-Asa
Dole Philippines, Inc. Stanfilco Division - Kapalong Zone, PP 62
Sampao
Dole Philippines, Inc. Stanfilco Division - Guinhalinan
Dole Philippines, Inc. Stanfilco Division - Dayo. An
Hiltop Shell Station
Kuting Shell Station
Davao Agricultural Ventures Corporation
Lloyd Laboratories, Inc.
Remec Broadband Wireless, International, Inc.
Winsome Development Corp - Waltermart Sucat
Balatubat DPP (NPC-SPUG)
Minabel DPP (NPC-SPUG)
Lahuy DPP (NPC-SPUG)
Haponan DPP (NPC-SPUG)
Quinalasag DPP (NPC-SPUG)
Ticao DPP (NPC-SPUG)
Guinawayan DPP (NPC-SPUG)
Gilotongan DPP (NPC-SPUG)
Nabuctot DPP (NPC-SPUG)
27
Date Approved
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
March 28, 2012
April 2, 2012
April 2, 2012
April 2, 2012
April 2, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
No.
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
Name of Applicant
Peña DPP (NPC-SPUG)
Chico DPP (NPC-SPUG)
Burias DPP (NPC-SPUG)
Dangcalan DPP (NPC-SPUG)
Mababangbaybay DPP (NPC-SPUG)
Malaking Ilog DPP (NPC-SPUG)
Osmeña DPP (NPC-SPUG)
Penafrancia DPP (NPC-SPUG)
Quezon DPP (NPC-SPUG)
Paluan DPP (NPC-SPUG)
Palimbang DPP (NPC-SPUG)
Batbatan DPP (NPC-SPUG)
Sibolo DPP(NPC-SPUG)
Guiwanon DPP(NPC-SPUG)
B. Titong MGE 1 & 2(NPC-SPUG)
Cawayan Ext.(NPC-SPUG)
Cawayan Ext. (Bel-at)(NPC-SPUG)
Ubongan Dacu (NPC-SPUG)
Bolo MGE 1(NPC-SPUG)
Bolo MGE 2 & 3(NPC-SPUG)
Tinago MG1(NPC-SPUG)
Cabangcalan (NPC-SPUG)
Pinanaan (NPC-SPUG)
Lanang (NPC-SPUG)
San Isidro (NPC-SPUG)
Syndicate (NPC-SPUG)
Sawang MG 1 & 2(NPC-SPUG)
Talib MG1(NPC-SPUG)
Talib MG2(NPC-SPUG)
Concepcion (NPC-SPUG)
Balete (NPC-SPUG)
Amutag MG1(NPC-SPUG)
Amutag MG2(NPC-SPUG)
Calanay MG1(NPC-SPUG)
Calanay MG2(NPC-SPUG)
Balawing (NPC-SPUG)
Cabas-an (NPC-SPUG)
Dayhagan MG1(NPC-SPUG)
Dayhagan MG2(NPC-SPUG)
Gumahang MG1(NPC-SPUG)
28
Date Approved
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
No.
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
Name of Applicant
Gumahang MG2(NPC-SPUG)
Gumahang MG3(NPC-SPUG)
Macabug (NPC-SPUG)
Mariposa (NPC-SPUG)
Mataba (NPC-SPUG)
Matalangtang (NPC-SPUG)
Matongog MG1(NPC-SPUG)
Matongog MG2(NPC-SPUG)
San Agustin MG1(NPC-SPUG)
San Agustin MG2(NPC-SPUG)
Tigbao MG1(NPC-SPUG)
Tigbao MG2(NPC-SPUG)
Tigbao MG3(NPC-SPUG)
Tigbao MG4(NPC-SPUG)
Tinigban MG1 & 2(NPC-SPUG)
Tinigban MG3(NPC-SPUG)
Tinigban MG4(NPC-SPUG)
Jamorawon MG1(NPC-SPUG)
Jamorawon MG2(NPC-SPUG)
Jamorawon MG3(NPC-SPUG)
Jamorawon MG4(NPC-SPUG)
Tagbon (NPC-SPUG)
Tigbao MG1 & 2(NPC-SPUG)
Tigbao MG3(NPC-SPUG)
Tigbao MG4(NPC-SPUG)
Tigbao MG5(NPC-SPUG)
Magsalangi (NPC-SPUG)
Pamangpangon (NPC-SPUG)
Calumpang (NPC-SPUG)
Calasuche (NPC-SPUG)
Docol (NPC-SPUG)
Baao (NPC-SPUG)
Looc, Mandaon (NPC-SPUG)
Lantangan MG1(NPC-SPUG)
Lantangan MG2(NPC-SPUG)
Bugtong (NPC-SPUG)
Tumalaytay MG1(NPC-SPUG)
Tumalaytay MG2(NPC-SPUG)
Tumalaytay MG3(NPC-SPUG)
Cabangcalan (NPC-SPUG)
29
Date Approved
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
No.
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
Name of Applicant
Calumpang (NPC-SPUG)
Locsoan (NPC-SPUG)
Tan-Awan (NPC-SPUG)
Luna MG1(NPC-SPUG)
Luna MG 2 & 3(NPC-SPUG)
Mahayahay (NPC-SPUG)
Nagarao (NPC-SPUG)
Itombato (NPC-SPUG)
Iraya, Cawayan (NPC-SPUG)
Cabayugan MG1(NPC-SPUG)
Cabayugan MG2(NPC-SPUG)
Calumpang (NPC-SPUG)
Pananawan MG1(NPC-SPUG)
Pananawan MG2(NPC-SPUG)
Campana (NPC-SPUG)
Candelaria MG1 & 2(NPC-SPUG)
Bonifacio MG1(NPC-SPUG)
Bonifacio MG2(NPC-SPUG)
San Jose (NPC-SPUG)
Matayum MG1(NPC-SPUG)
Matayum MG2(NPC-SPUG)
Matayum MG3(NPC-SPUG)
Pitogo MG1(NPC-SPUG)
Pitogo MG2(NPC-SPUG)
Madamba MG1 & 2(NPC-SPUG)
Libtong(NPC-SPUG)
Osmena (NPC-SPUG)
Aguada (NPC-SPUG)
San Rafael (NPC-SPUG)
Nadawisan (NPC-SPUG)
Magcaraguit MG1(NPC-SPUG)
Magcaraguit MG2(NPC-SPUG)
MagcaraguitMG3(NPC-SPUG)
T. R. Yangco (NPC-SPUG)
Jintotolo MG1(NPC-SPUG)
Jintotolo MG2(NPC-SPUG)
JintotoloMG3(NPC-SPUG)
San Antonio MG1 & 2(NPC-SPUG)
Cantil MG1(NPC-SPUG)
Cantil MG2(NPC-SPUG)
30
Date Approved
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
No.
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
Name of Applicant
Cantil MG3(NPC-SPUG)
Cantil MG4(NPC-SPUG)
Sapatos Island(NPC-SPUG)
Sawmill (NPC-SPUG)
Baang (NPC-SPUG)
Mabuhay (NPC-SPUG)
Sorosimbajan MG1(NPC-SPUG)
Sorosimbajan MG2(NPC-SPUG)
Costa Rica (NPC-SPUG)
Matabao, Batuan(NPC-SPUG)
Rizal, Batuan(NPC-SPUG)
Luna (NPC-SPUG)
Alta Vista (NPC-SPUG)
Don Pablo Dela Rosa (NPC-SPUG)
Pangle (NPC-SPUG)
Bara MG1 & 2(NPC-SPUG)
Bara MG3(NPC-SPUG)
Guiluthangan MG1(NPC-SPUG)
Guiluthangan MG2(NPC-SPUG)
Sawmill MG1 & 2(NPC-SPUG)
Matagbak (NPC-SPUG)
San Carlos (NPC-SPUG)
Buri (NPC-SPUG)
Cagmasoso (NPC-SPUG)
Polo Dacu (NPC-SPUG)
R M Magbalon (NPC-SPUG)
Cobre Is. Pena (NPC-SPUG)
San Vicente (NPC-SPUG)
Buracan (NPC-SPUG)
Quinayangan Diotay (NPC-SPUG)
Quinayangan Tonga (NPC-SPUG)
San Andres (NPC-SPUG)
San Roque (NPC-SPUG)
Bugtong (NPC-SPUG)
Sto. Nino (NPC-SPUG)
Danao (NPC-SPUG)
San Antonio (NPC-SPUG)
Agumil Philippines, Inc. - Agusan Plantation
Cabadbaran Shell Service Station
Caballero Shell Service Station - Los Baños
31
Date Approved
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 10, 2012
April 24, 2012
April 24, 2012
April 24, 2012
No.
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
Name of Applicant
Cagayan De Oro College - PEN (Main)
Davao Central Warehouse Club, Inc. - Kidapawan
Davao Central Warehouse Club, Inc. - Mati
Freemont Foods Corp. - 'Jollibee DMC Drive Thru
General Santos City Water District
J Marketing Corporation - Ipil Branch
Jolisa Agribusiness Corporation - Bajada
Jolisa Agribusiness Corporation-Victoria Plaza
Landbank of the Philippines - Puerto Princesa Extension Office
Landbank of the Philippines - Velez Branch Sayre National Highway
Landbank of the Philippines - Velez Branch Macabalan
Landbank of the Philippines - Velez Branch Malaybalay
Landbank of the Philippines - Velez Branch Valencia
Philippine Ports Authority - PMO North Harbor (Admin. Bldg.)
Philippine Ports Authority - PMO North Harbor (IPB Terminal)
Philippine Ports Authority - PMO North Harbor (Pier 2 Terminal)
Philippine Ports Authority - PMO North Harbor (Pier 8 Terminal)
Philippine Ports Authority - PMO North Harbor (Pier 12 Terminal)
Philippine Ports Authority - PMO North Harbor (Pier 16 Terminal)
Philippine Ports Authority - PMO North Harbor (Pier 18 Terminal)
Philippine Ports Authority - PMO North Harbor (R-2 Terminal)
Rawlings Foundations, Inc.
SVN Petroleum Station
Hedcor, Inc. - Irisan 1 Hydroelectric Power Plant
BAG Electronics, Inc.
Bangko Sentral Ng Pilipinas - Legazpi Branch
Bangko Sentral ng Pilipinas-Tacloban
Calamba Water District - Makiling
Calamba Water District - NHA Canlubang
Calamba Water District - Villa De Calamba
Cang's Inc. - Maria Cristina
Davao Agricultural Ventures Corporation
Florete Land, Inc.
Glory (Philippines), Inc. - Main
Glory (Philippines), Inc. - Plant 4
Green Pine Agricultural Dev't. Corporation
LV Shell Filling Station
Mc Colby's - Bayambang
Mc Colby's - Lucao
Mc Colby's - San Carlos
32
Date Approved
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 24, 2012
April 30, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
No.
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
Name of Applicant
Mc Colby's - Urdaneta
Mc Colby's - Alaminos
Mc Colby's - Dagupan
Monkayo Shell Service Station
Philippine Long Distance Telephone Co. - Daet Branch
Stronghold Steel Corp.
Surigao Metropolitan Water District - Ceniza Reservoir
Surigao Metropolitan Water District - Serna 2 Deepwell
Yamaha Motor Philippines, Inc.
Davao Oriental Electric Cooperative (DORECO)
Integra Business Processing Solutions, Inc.
Khornerstone Group Corp. (Landbank - Alicia)
Pagsanjan Binan Hope Shell Gasoline Service Station
Petron Corporation - Esel Ike Limkakeng
Petron Corporation - Francis Llaban
Petron Corporation - Jaysel Sato - Cebu City
Petron Corporation - Wilfred Tan
Philippine Allied Enterprises, Inc. - Laguna
Philippine Allied Enterprises, Inc. - Muntinlupa
Philippine Allied Enterprises, Inc. - Taguig
Rizal Commercial Banking Corp. - Tacloban City
The Hongkong & Shanghai Banking Corp. - Taguig City
Universal Leaf Philippines (formerly Lancaster Philippines, Inc.) Isabela
Wee Eng Construction, Inc.
KCC Property Holdings, Inc. - Koronadal City
KCC Property Holdings, Inc. - Gen. Sanots City
Khi-Ali Manila, Inc.
Amkor Technology Philippines
SM Prime Holdings, Inc. (SM Masinag)
Bridgebury Realty Corporation - Zuellig Bldg.
Chevron Philippines, Inc.
Maynilad Water Services, Inc. - La Mesa Pumping Station
Maynilad Water Services, Inc. - Villamor Reservoir and Pumping
Station
ON Semiconductor Philippines, Inc. - Carmona
Vicsal Development Corporation
ON Semiconductor Philippines, Inc. - Carmona
The Persimmon Condominium Corp.
Iglesia ni Cristo ( Church Of Christ) - Barocboc, Apayao
Iglesia ni Cristo ( Church Of Christ) - Bangan, Cagayan
33
Date Approved
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 2, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 7, 2012
May 9, 2012
May 9, 2012
May 9, 2012
May 9, 2012
May 9, 2012
May 16, 2012
May 16, 2012
May 16, 2012
May 16, 2012
May 16, 2012
May 16, 2012
May 16, 2012
May 16, 2012
May 30, 2012
May 30, 2012
No.
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
Name of Applicant
Iglesia ni Cristo ( Church Of Christ) - Curva, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Libertad, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Sanchez Mira, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Zinarag, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Paruddon Norte, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Apayao, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Isabela, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Tuguegarao, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Baliuag, Bulacan
Iglesia ni Cristo ( Church Of Christ) - Angat, Bulacan
Iglesia ni Cristo ( Church Of Christ) - San Rafael, Bulacan
Iglesia ni Cristo ( Church Of Christ) - San Miguel, Bulacan
Iglesia ni Cristo ( Church Of Christ) - Pulilan, Bulacan
Iglesia ni Cristo ( Church Of Christ) - San Isidro, Bulacan
Iglesia ni Cristo ( Church Of Christ) - Francisco Homes, Bulacan
Iglesia ni Cristo ( Church Of Christ) - San Jose del Monte, Bulacan
Iglesia ni Cristo ( Church Of Christ) - Guiguinto, Bulacan
Iglesia ni Cristo ( Church Of Christ) - Baguio City
Iglesia ni Cristo ( Church Of Christ) - San Francisco, Batangas
Iglesia ni Cristo ( Church Of Christ) - San Jose, Batangas
Iglesia ni Cristo ( Church Of Christ) - Tambo, Batangas
Iglesia ni Cristo ( Church Of Christ) - Tingloy, Batangas
Iglesia ni Cristo ( Church Of Christ) - Marawoy, Batangas
Iglesia ni Cristo ( Church Of Christ) - Ibaan, Batangas
Iglesia ni Cristo ( Church Of Christ) - Tanauan, Batangas
Iglesia ni Cristo ( Church Of Christ) - Lemery, Batangas
Iglesia ni Cristo ( Church Of Christ) - Brgy. Namunga, Batangas
Iglesia ni Cristo ( Church Of Christ) - Felix Manalo St., Batangas
Iglesia ni Cristo ( Church Of Christ) - Bauan, Batangas 1
Iglesia ni Cristo ( Church Of Christ) - Bauan, Batangas 2
Iglesia ni Cristo ( Church Of Christ) - Pob 011, Batangas
Iglesia ni Cristo ( Church Of Christ) - Ibaan, Batangas
Iglesia ni Cristo ( Church Of Christ) - Matala, Batangas
Iglesia ni Cristo ( Church Of Christ) - Morong, Bataan
Iglesia ni Cristo ( Church Of Christ) - Balanga, Bataan
Iglesia ni Cristo ( Church Of Christ) - Abucay, Bataan
Iglesia ni Cristo ( Church Of Christ) - Orani, Bataan
Iglesia ni Cristo ( Church Of Christ) - Dinalupihan, Bataan
Iglesia ni Cristo ( Church Of Christ) - LImay, Bataan
Iglesia ni Cristo ( Church Of Christ) - Mariveles, Bataan
34
Date Approved
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
No.
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
Name of Applicant
Iglesia ni Cristo ( Church Of Christ) - Parang-Parang, Bataan
Iglesia ni Cristo ( Church Of Christ) - Puerto Rivase, Bataan
Iglesia ni Cristo ( Church Of Christ) - Samal, Bataan
Iglesia ni Cristo ( Church Of Christ) - Sibol, Bataan
Iglesia ni Cristo ( Church Of Christ) - Aurora
Iglesia ni Cristo ( Church Of Christ) - Culasi, Antique
Iglesia ni Cristo ( Church Of Christ) - San Jose, Antique
Iglesia ni Cristo ( Church Of Christ) - Legazpi City, Albay
Iglesia ni Cristo ( Church Of Christ) - Boracay, Albay
Iglesia ni Cristo ( Church Of Christ) - Ligao City, Albay
Iglesia ni Cristo ( Church Of Christ) - Pioduran, Albay
Iglesia ni Cristo ( Church Of Christ) - Malay, Aklan
Iglesia ni Cristo ( Church Of Christ) - Kalibo, Aklan
Iglesia ni Cristo ( Church Of Christ) - J. Rosales Ave., Agusan del Norte
Iglesia ni Cristo ( Church Of Christ) - Nasipit, Agusan del Norte
Iglesia ni Cristo ( Church Of Christ) - Cabadbaran City, Agusan del
Norte
Iglesia ni Cristo ( Church Of Christ) - Tacloban City
Iglesia ni Cristo ( Church Of Christ) - Tandang Sora, Quezon City
Iglesia ni Cristo ( Church Of Christ) - Batasan Hills, Quezon City
Iglesia ni Cristo ( Church Of Christ) - Araneta Ave., Quezon City
Iglesia ni Cristo ( Church Of Christ) - Old Balara, Quezon City
Iglesia ni Cristo ( Church Of Christ) - San Francisco del Monte, Quezon
City
Iglesia ni Cristo ( Church Of Christ) - Bago Bantay, Quezon City
Iglesia ni Cristo ( Church Of Christ) - Cubao, Quezon City
Iglesia ni Cristo ( Church Of Christ) - Rodriguez, Rizal
Iglesia ni Cristo ( Church Of Christ) - Project 4, Quezon City
Iglesia ni Cristo ( Church Of Christ) - H. Lopez Blvd., Manila
Iglesia ni Cristo ( Church Of Christ) - Bo. Magsaysay, Manila
Iglesia ni Cristo ( Church Of Christ) - Sampaloc, Manila
Iglesia ni Cristo ( Church Of Christ) - Sta. Cruz, Manila
Iglesia ni Cristo ( Church Of Christ) - Tondo, Manila
Iglesia ni Cristo ( Church Of Christ) - Sta. Ana, Manila
Iglesia ni Cristo ( Church Of Christ) - Tagum
Iglesia ni Cristo ( Church Of Christ) - Cov. Province
Iglesia ni Cristo ( Church Of Christ) - Davao del Sur
Iglesia ni Cristo ( Church Of Christ) - Kabacan, Cotabato
Iglesia ni Cristo ( Church Of Christ) - Kidapawan, Cotabato 1
Iglesia ni Cristo ( Church Of Christ) - Kidapawan, Cotabato 2
Iglesia ni Cristo ( Church Of Christ) - Pardo, Cebu City
35
Date Approved
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
No.
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
Name of Applicant
Iglesia ni Cristo ( Church Of Christ) - Duljo-Fatima, Cebu City
Iglesia ni Cristo ( Church Of Christ) - Maxilom Ave., Cebu City
Iglesia ni Cristo ( Church Of Christ) - Dasmariñas, Cavite
Iglesia ni Cristo ( Church Of Christ) - Trece Martires City
Iglesia ni Cristo ( Church Of Christ) - Gen. Trias, Cavite
Iglesia ni Cristo ( Church Of Christ) - Brgy. Slitran IV, Cavite
Iglesia ni Cristo ( Church Of Christ) - Mambusao, Capiz
Iglesia ni Cristo ( Church Of Christ) - Jamindan, Capiz
Iglesia ni Cristo ( Church Of Christ) - Naga City
Iglesia ni Cristo ( Church Of Christ) - Ragay, Camarines Sur
Iglesia ni Cristo ( Church Of Christ) - Calabanga, Camarines Sur
Iglesia ni Cristo ( Church Of Christ) - Calabang, Camarines Sur
Iglesia ni Cristo ( Church Of Christ) - Iriga City, Camarines Sur
Iglesia ni Cristo ( Church Of Christ) - Matacla Goa, Camarines Sur
Iglesia ni Cristo ( Church Of Christ) - Nabua, Camarines Sur
Iglesia ni Cristo ( Church Of Christ) - San Francisco Ocampo,
Camarines Sur
Iglesia ni Cristo ( Church Of Christ) - San Agustin, Camarines Sur
Iglesia ni Cristo ( Church Of Christ) - Daet, Camarines Norte
Iglesia ni Cristo ( Church Of Christ) - San Vicente, Camarines Norte
Iglesia ni Cristo ( Church Of Christ) - Mercedes, Camarines Norte
Iglesia ni Cristo ( Church Of Christ) - Bansud, Camarines Norte+C195
Iglesia ni Cristo ( Church Of Christ) - Calamburnay, Camarines Norte
Iglesia ni Cristo ( Church Of Christ) - Basud, Camarines Norte
Iglesia ni Cristo ( Church Of Christ) - Brgy. 4, Palawan
Iglesia ni Cristo ( Church Of Christ) - Bo. Marcilla, Palawan
Iglesia ni Cristo ( Church Of Christ) - Brgy. Turda, Palawan
Iglesia ni Cristo ( Church Of Christ) - L. Aviente, Gattaran, Cagayan 1
Iglesia ni Cristo ( Church Of Christ) - Decalchao, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Brgy. San Jose, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Busuanga, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Cullon, Palawan
Iglesia ni Cristo ( Church Of Christ) - Gonzaga, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Nabanggagan West, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Peru, Cagayan
Iglesia ni Cristo ( Church Of Christ) - L. Aviente, Gattaran, Cagayan 2
Iglesia ni Cristo ( Church Of Christ) - Camalanuigan, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Aparri, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Centro 2, Cagayan
Iglesia ni Cristo ( Church Of Christ) - Mercado, Marinduque
36
Date Approved
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
No.
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
Name of Applicant
Iglesia ni Cristo ( Church Of Christ) - Poblacion Gasan, Marinduque
Iglesia ni Cristo ( Church Of Christ) - Sta. Cruz, Marinduque
Iglesia ni Cristo ( Church Of Christ) - San Antonio, Marinduque
Iglesia ni Cristo ( Church Of Christ) - Mogpos, Marinduque
Iglesia ni Cristo ( Church Of Christ) - Balagsan, Marinduque
Iglesia ni Cristo ( Church Of Christ) - Boac, Marinduque 1
Iglesia ni Cristo ( Church Of Christ) - Boac, Marinduque 2
Iglesia ni Cristo ( Church Of Christ) - Pob. Buenavista, Marinduque
Iglesia ni Cristo ( Church Of Christ) - Upi, Maguindanao
Iglesia ni Cristo ( Church Of Christ) - Libungan, Cotabato
Iglesia ni Cristo ( Church Of Christ) - Biliran, Leyte
Iglesia ni Cristo ( Church Of Christ) - San Fernando City, La Union
Iglesia ni Cristo ( Church Of Christ) - Cabaroan, La Union
Iglesia ni Cristo ( Church Of Christ) - Rosario, La Union
Iglesia ni Cristo ( Church Of Christ) - Bauang, La Union
Iglesia ni Cristo ( Church Of Christ) - Biñan City, Laguna
Iglesia ni Cristo ( Church Of Christ) - Calamba City, Laguna
Iglesia ni Cristo ( Church Of Christ) - San Pablo City, Laguna
Iglesia ni Cristo ( Church Of Christ) - Sta. Rosa, Laguna
Iglesia ni Cristo ( Church Of Christ) - Sta. Cruz, Laguna
Iglesia ni Cristo ( Church Of Christ) - Sto. Tomas, Laguna
Iglesia ni Cristo ( Church Of Christ) - Bantug, Roxas
Iglesia ni Cristo ( Church Of Christ) - Burgos Ramon, Isabela
Iglesia ni Cristo ( Church Of Christ) - Diadi, Nueva Vizcaya
Iglesia ni Cristo ( Church Of Christ) - Isabela, Isabela
Iglesia ni Cristo ( Church Of Christ) - Jones, Isabela
Iglesia ni Cristo ( Church Of Christ) - Cauayan City, Isabela
Iglesia ni Cristo ( Church Of Christ) - Malam, Isabela
Iglesia ni Cristo ( Church Of Christ) - Calamagui, Isabela
Iglesia ni Cristo ( Church Of Christ) - Gamo, Isabela
Iglesia ni Cristo ( Church Of Christ) - Soliven, Isabela
Iglesia ni Cristo ( Church Of Christ) - Rizal St., Iloilo City 1
Iglesia ni Cristo ( Church Of Christ) - La Paz, Iloilo City
Iglesia ni Cristo ( Church Of Christ) - Oton, Iloilo City
Iglesia ni Cristo ( Church Of Christ) - Rizal St., Iloilo City 2
Iglesia ni Cristo ( Church Of Christ) - Jaro, Iloilo City
Iglesia ni Cristo ( Church Of Christ) - Pavia, Iloilo City
Iglesia ni Cristo ( Church Of Christ) - Molo, Iloilo City
Iglesia ni Cristo ( Church Of Christ) - Balasan, Iloilo City
Iglesia ni Cristo ( Church Of Christ) - Laoag City
37
Date Approved
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
No.
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
Name of Applicant
Iglesia ni Cristo ( Church Of Christ) - San Nicolas, Ilocos Norte
Iglesia ni Cristo ( Church Of Christ) - Dingras, Ilocos Norte
Iglesia ni Cristo ( Church Of Christ) - Talian, Davao Oriental
Iglesia ni Cristo ( Church Of Christ) - Mapawa, Davao Oriental
Iglesia ni Cristo ( Church Of Christ) - Tibanban, Davao Oriental
Iglesia ni Cristo ( Church Of Christ) - Pantukan, Davao Oriental
Iglesia ni Cristo ( Church Of Christ) - Mati, Davao Oriental
Iglesia ni Cristo ( Church Of Christ) - Agdao, Davao
Iglesia ni Cristo ( Church Of Christ) - Gen. Malvar St., Davao
Iglesia ni Cristo ( Church Of Christ) - Brgy. Banggot, Nueva Vizcaya
Iglesia ni Cristo ( Church Of Christ) - Brgy. Barat, Nueva Vizcaya
Iglesia ni Cristo ( Church Of Christ) - San Antonio, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - San Isidro, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - Cabanatuan City, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - Guimba, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - Burgos, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - Palitan Norte, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - Rizal, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - Bunga, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - Brgy. R.A. Padilla, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - San Jose City, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - Bongabon, Nueva Ecija
Iglesia ni Cristo ( Church Of Christ) - Bacolod City, Negros Occidental
Iglesia ni Cristo ( Church Of Christ) - Talisay City, Negros Occidental
Iglesia ni Cristo ( Church Of Christ) - Valladolid, Negros Occidental
Iglesia ni Cristo ( Church Of Christ) - East Candoni, Negros Occidental
Iglesia ni Cristo ( Church Of Christ) - Himamaylan City, Negros
Occidental
Iglesia ni Cristo ( Church Of Christ) - San Carlos City, Negros
Occidental
Iglesia ni Cristo ( Church Of Christ) - Calatrava, Negros Occidental
Iglesia ni Cristo ( Church Of Christ) - Sagay City, Negros Occidental
Iglesia ni Cristo ( Church Of Christ) - Bontoc
Iglesia ni Cristo ( Church Of Christ) - Misamis Occidental
Iglesia ni Cristo ( Church Of Christ) - Montelago 1
Iglesia ni Cristo ( Church Of Christ) - Montelago 2
Iglesia ni Cristo ( Church Of Christ) - Pala, Oriental Mindoro
Iglesia ni Cristo ( Church Of Christ) - Concepcion, Mindoro
Iglesia ni Cristo ( Church Of Christ) - Mar Francisco, Oriental Mindoro
Iglesia ni Cristo ( Church Of Christ) - Banilad, Oriental Mindoro
Iglesia ni Cristo ( Church Of Christ) - Socorro, Oriental Mindoro
38
Date Approved
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
No.
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
Name of Applicant
Iglesia ni Cristo ( Church Of Christ) - Nag Iba 1
Iglesia ni Cristo ( Church Of Christ) - Calapan City, Oriental Mindoro
Iglesia ni Cristo ( Church Of Christ) - Bongabong, Oriental Mindoro
Iglesia ni Cristo ( Church Of Christ) - Pinagsabangan II
Iglesia ni Cristo ( Church Of Christ) - Bansud, Oriental Mindoro
Iglesia ni Cristo ( Church Of Christ) - Alaminos, Pangasinan
Iglesia ni Cristo ( Church Of Christ) - Rosales, Pangasinan
Iglesia ni Cristo ( Church Of Christ) - Urdaneta City, Pangasinan
Iglesia ni Cristo ( Church Of Christ) - Abongan, Palawan
Iglesia ni Cristo ( Church Of Christ) - Brgy. Alimanguan, Palawan
Iglesia ni Cristo ( Church Of Christ) - Bagong Sikat, Palawan
Iglesia ni Cristo ( Church Of Christ) - El Nido, Palawan
Iglesia ni Cristo ( Church Of Christ) - Brooke's Point, Palawan
Iglesia ni Cristo ( Church Of Christ) - Brgy. Alakailan, Palawan
Iglesia ni Cristo ( Church Of Christ) - Brgy. Maligaya, Palawan
Iglesia ni Cristo ( Church Of Christ) - Rizal, Palawan
Iglesia ni Cristo ( Church Of Christ) - So. Lamuro, Palawan
Iglesia ni Cristo ( Church Of Christ) - Luzviminda, Palawan
Iglesia ni Cristo ( Church Of Christ) - Aborlan, Palawan
Iglesia ni Cristo ( Church Of Christ) - Brgy. New Capino, Palawan
Iglesia ni Cristo ( Church Of Christ) - Port Barton, Palawan
Iglesia ni Cristo ( Church Of Christ) - Princess Urduja, Palawan
Iglesia ni Cristo ( Church Of Christ) - Pob. Quezon, Palawan
Iglesia ni Cristo ( Church Of Christ) - Roxas, Palawan
Iglesia ni Cristo ( Church Of Christ) - Sta. Monica, Palawan
Iglesia ni Cristo ( Church Of Christ) - Bantulan, Palawan
Iglesia ni Cristo ( Church Of Christ) - Swam Aberawan, Palawan
Iglesia ni Cristo ( Church Of Christ) - Montevista Pob., Palawan
Iglesia ni Cristo ( Church Of Christ) - TDC, Palawan
Iglesia ni Cristo ( Church Of Christ) - Guinayangan, Quezon
Iglesia ni Cristo ( Church Of Christ) - Gumaca, Quezon
Iglesia ni Cristo ( Church Of Christ) - Plaridel, Quezon
Iglesia ni Cristo ( Church Of Christ) - Brgy. Pilion, Quezon
Iglesia ni Cristo ( Church Of Christ) - Patnanungan, Quezon
Iglesia ni Cristo ( Church Of Christ) - Polilio, Quezon
Iglesia ni Cristo ( Church Of Christ) - Mandaon, Masbate
Iglesia ni Cristo ( Church Of Christ) - Makbug, Masbate
Iglesia ni Cristo ( Church Of Christ) - Jamorawon Mil., Masbate
Iglesia ni Cristo ( Church Of Christ) - Aroroy, Masbate
Iglesia ni Cristo ( Church Of Christ) - Malinta, Masbate
39
Date Approved
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
No.
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
Name of Applicant
Iglesia ni Cristo ( Church Of Christ) - Bagong Sirang, Masbate
Iglesia ni Cristo ( Church Of Christ) - Cawayan, Masbate
Iglesia ni Cristo ( Church Of Christ) - Uson, Masbate
Iglesia ni Cristo ( Church Of Christ) - San Jose Road, Zamboanga City
Iglesia ni Cristo ( Church Of Christ) - Canelar St., Zamboanga City
Iglesia ni Cristo ( Church Of Christ) - Masinloc, Zambales
Iglesia ni Cristo ( Church Of Christ) - Sta. Cruz, Zambales
Iglesia ni Cristo ( Church Of Christ) - San Marcelino, Zambales
Iglesia ni Cristo ( Church Of Christ) - Pamatawan, Zambales
Iglesia ni Cristo ( Church Of Christ) - Calapacuan, Zambales
Iglesia ni Cristo ( Church Of Christ) - Olongapo City, Zambales
Iglesia ni Cristo ( Church Of Christ) - San Antonio, Zambales
Iglesia ni Cristo ( Church Of Christ) - San Felipe, Zambales
Iglesia ni Cristo ( Church Of Christ) - Masalasa, Tarlac
Iglesia ni Cristo ( Church Of Christ) - Capas, Tarlac
Iglesia ni Cristo ( Church Of Christ) - San Nicolas, Tarlac
Iglesia ni Cristo ( Church Of Christ) - Cutcut II, Tarlac
Iglesia ni Cristo ( Church Of Christ) - Bamban, Tarlac
Iglesia ni Cristo ( Church Of Christ) - San Juan de Mata, Tarlac
Iglesia ni Cristo ( Church Of Christ) - Maligaya, Tarlac
Iglesia ni Cristo ( Church Of Christ) - Sapang Maragul, Tarlac
Iglesia ni Cristo ( Church Of Christ) - San Roque, Tarlac
Iglesia ni Cristo ( Church Of Christ) - San Fernando, Tarlac
Iglesia ni Cristo ( Church Of Christ) - Bislig City
Iglesia ni Cristo ( Church Of Christ) - Washington, Surigao
Iglesia ni Cristo ( Church Of Christ) - Brgy. Lakandula, Surigao del
Norte
Iglesia ni Cristo ( Church Of Christ) - Brgy. Sarni-Sani, Surigao del
Norte
Iglesia ni Cristo ( Church Of Christ) - Dapa, Surigao del Norte
Iglesia ni Cristo ( Church Of Christ) - Guinhadap, Masbate
Iglesia ni Cristo ( Church Of Christ) - Pob. Monreal, Masbate
Iglesia ni Cristo ( Church Of Christ) - Bulan, Sorsogon
Iglesia ni Cristo ( Church Of Christ) - Bagong Nayon, Rizal
Iglesia ni Cristo ( Church Of Christ) - Burgos, Quezon
Iglesia ni Cristo ( Church Of Christ) - Ibabang Pole, Pagbilao, Quezon
Iglesia ni Cristo ( Church Of Christ) - Candelaria, Quezon
Iglesia ni Cristo ( Church Of Christ) - Sariaya, Quezon
Iglesia ni Cristo ( Church Of Christ) - Granja St., Lucena City
Iglesia ni Cristo ( Church Of Christ) - Mayao, Lucena
Iglesia ni Cristo ( Church Of Christ) - Ilayang Pulo, Pagbilao, Quezon
40
Date Approved
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
No.
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
Name of Applicant
Iglesia ni Cristo ( Church Of Christ) - Edaño St., SFQ, Quezon
Iglesia ni Cristo ( Church Of Christ) - Gen. Luna, Quezon
Iglesia ni Cristo ( Church Of Christ) - Tayuman, SFQ, Quezon
Iglesia ni Cristo ( Church Of Christ) - Brgy. 9, Catanauan Quezon 1
Iglesia ni Cristo ( Church Of Christ) - Tagbacanllaya, Catanauan
Quezon
Iglesia ni Cristo ( Church Of Christ) - Brgy. 9, Catanauan Quezon 2
IM Digital Philippine, Inc.
Automax Gasoline Station - Edsa Greeenhills
Bangko Sentral ng Pilipinas - Roxas City
Clark Water Corporation
Industrial Galvanizers Corporation of the Philippines
Janice Minor Export, Inc.
Maynilad Water Services, Inc. - Algeciras Reservoir
Maynilad Water Services, Inc. - Caloocan Reservoir
Maynilad Water Services, Inc. - Commonwealth Pumping Station
Maynilad Water Services, Inc. - D.Tuazon Reservoir
Maynilad Water Services, Inc. - Noveleta Reservoir
Monde M.Y. San Corporation
Q Plaza Building 2
Rizal Avenue Tourist Development Corporation
Roman Catholic Archbishop of Manila - Archdiocesan Shrine of Divine
Mercy
SMB Prestige Corporation
Wordtext Systems, Inc.
Zuellig Pharma Corporation
Cummins Sales and Service Philippines, inc. - Basco
7 MG Gasoline Station
A. Lim Development, Inc
Bangko Sentral ng Pilipinas
Butuan City Water District - Km. 5 Baan
Butuan City Water District - Taguibo
City Savings Bank - Iloilo Branch
City Savings Bank - Kalibo Branch
City Savings Bank - La Union Branch
City Savings Bank - Pampanga Branch
De La Salle - College of St. Benilde - Benilde Bldg.
De La Salle - College of St. Benilde - Dverr Bldg.
Landbank of the Philippines - Oroquieta Branch
Metropolitan Bank & Trust Company - Davao City
Metropolitan Bank & Trust Company - General Santos City
41
Date Approved
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
May 30, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
June 29, 2012
July 9, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
No.
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
Name of Applicant
Metropolitan Bank & Trust Company - Mati City
Metropolitan Bank & Trust Company - Oroquieta City
Metropolitan Bank & Trust Company - Ozamis City
Metropolitan Bank & Trust Company - Zamboangay Sibugay
Pacific Rare Specialty Metals & Chemicals, Inc.
Panay Telephone Corp. - New Washington Exchange
Society of the Divine Word-Southern Province, Inc.
8 Wack Wack Road Condominium
B/E Aerospace B.V. Philippine Branch
Maxim Philippine Operating Corp.
ON Semiconductor Philippines, Inc. - Carmona
Philippine Sinter Corporation
SM Prime Holdings, Inc. - SM City Olongapo
Bantayan Island Power Corp. (BIPCOR) - new
SN Aboitiz Power-Benguet, Inc. - Binga Hydroelectric Power Plant
Date Approved
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 19, 2012
July 23, 2012
July 30, 2012
955
July 30, 2012
965
Cummins Sales and Service Philippines, Inc. - Pulang Lupa, Occidental
Mindoro
King Energy Generation, Inc.
AboitizLand, Inc.
LTS Malls, Inc./NCCC Mall MA-A
Monde MY San Corporation
Nestle Philippines, Inc.
Oceanagold (Philippines), Inc.
One Corporate Centre Condominium Unit Owners Association, Inc.
SM Prime Holdings, Inc./ SM City San Fernando
Cummins Sales and Service Philippines, Inc. - Calapan City, Oriental
Mindoro
CBK Power Company Limited - Cavinti
966
967
968
969
970
971
972
973
974
975
976
CBK Power Company Limited - Lumban
CBK Power Company Limited - San Juan
Japlas Injection Moulders Corporation
Maynilad Water Services Inc. - La Mesa Water Treatment 2
Megaworld Corporation - Tuscany Private Estate
Metro Wear, Inc. 2
MH Boss Oil Service Station
Yeeloofa Development Corporation
Nepo Mall Angeles Pampanga
Sunnyfield E-Officer Coporation
2GO Logistics, Inc.
September 3, 2012
September 3, 2012
September 3, 2012
September 3, 2012
September 3, 2012
September 3, 2012
September 3, 2012
September 3, 2012
September 7, 2012
September 7, 2012
September 18, 2012
956
957
958
959
960
961
962
963
964
42
August 6, 2012
August 13, 2012
August 13, 2012
August 13, 2012
August 13, 2012
August 13, 2012
August 13, 2012
August 13, 2012
August 28, 2012
September 3, 2012
No.
977
978
979
980
981
982
983
984
985
986
987
988
989
990
Date Approved
September 18, 2012
September 18, 2012
September 18, 2012
September 18, 2012
September 18, 2012
September 18, 2012
September 18, 2012
September 18, 2012
September 18, 2012
September 18, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
1001
Name of Applicant
Cebu Whitesands Resort and Spa
Landbank of the Philippines - Biñan Branch
Landbank of the Philippines - Concepcion, Tarlac Branch
Landbank of the Philippines - Lemery Branch
Marquee Place Homeowners Association, Inc.
Steel Asia Manufacturing Corporation
The Sapphire Residences Condominium Corporation
Aboitizland, Inc.
Coca-Cola Bottlers Philippines, Incorporated
Petron Corporation - Refining Division
CJ ToyotaTsusho Philippines, Inc.
Innoland Development Corporation
Covelandia, Gasoline Refilling Station
Energy Development Corporation-Mindanao Geothermal Production
Field (MGPF)
JMS International, Inc. - Muntinlupa Branch
Landbank of the Philippines - Cabuyao Laguna Branch
Landbank of the Philippines - Capas Branch
Landbank of the Philippines - San Carlos Pangasinan Branch
N. De La Merced & Sons, Inc.
National Grid Corporation of the Philippines - Head Office
National Grid Corporation of the Philippines - North Luzon Area - Bolo
(Kadampat EHV) Substation
National Grid Corporation of the Philippines - North Luzon Area - MTDB Garrage
National Grid Corporation of the Philippines - North Luzon Area Western Benguet T/L Office
National Grid Corporation of the Philippines - Visayas Area - Calbayog
Substation
National Grid Corporation of the Philippines - Visayas Area - VNCC
1002
National Grid Corporation of the Philippines - Visayas Area - Loon RS
October 9, 2012
1003
National Grid Corporation of the Philippines - Visayas Area - Murcia
(Canlandog) RS
National Grid Corporation of the Philippines - Visayas Area - Ivisan RS
October 9, 2012
National Grid Corporation of the Philippines - Visayas Area - Tangalan
(Jawili) RS
National Grid Corporation of the Philippines - Visayas Area - Pio
Corpuz (Masbate RS)
National Grid Corporation of the Philippines - Visayas Area - MTDA Visayas O&M
October 9, 2012
991
992
993
994
995
996
997
998
999
1000
1004
1005
1006
1007
43
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
October 9, 2012
No.
1008
1009
1010
1011
Name of Applicant
Date Approved
National Grid Corporation of the Philippines - Visayas Area - AMLAN
October 9, 2012
Substation
National Grid Corporation of the Philippines - Visayas Area - Pondol
October 9, 2012
Cable Terminal Station
National Grid Corporation of the Philippines - Mindanao Area - MRRCC October 9, 2012
October 29, 2012
1012
1013
1014
1015
1016
1017
Mindanao Energy Systems, Inc. (MINERGY) - Cabulig MiniHydroelectric Power Plant
Monark Equipment Corp. - Basilan DPP
Monark Equipment Corp. - Jolo DPP
Monark Equipment Corp. - Bongao DPP
Manila Water Company, Inc. - Bagong Nayon
Manila Water Company, Inc. - STP Ayala
Manila Water Company, Inc. - STP U.P.
1018
Manila Water Company, Inc. - Main Bldg.
November 6, 2012
1019
Manila Water Company, Inc. - Diego Silang STP
November 6, 2012
1020
Manila Water Company, Inc. - Fort Bonifacio Global City
November 6, 2012
1021
Manila Water Company, Inc. - Brookside
November 6, 2012
1022
Manila Water Company, Inc. - DOST
November 6, 2012
1023
Manila Water Company, Inc. - Mobile (Chapagnat)
November 6, 2012
1024
Manila Water Company, Inc. - JICA Mobile 1
November 6, 2012
1025
Manila Water Company, Inc. - Masinag
November 6, 2012
1026
Manila Water Company, Inc. - JICA Mobile 2
November 6, 2012
1027
Manila Water Company, Inc. - Jala Treatment
November 6, 2012
1028
Manila Water Company, Inc. - San Rafael
November 6, 2012
1029
Manila Water Company, Inc. - Holy Family
November 6, 2012
1030
Manila Water Company, Inc. - Celina 1
November 6, 2012
1031
Manila Water Company, Inc. - Celina 2
November 6, 2012
1032
Manila Water Company, Inc. - Curayao - PS, DW 1,3,4 & 5
November 6, 2012
1033
Manila Water Company, Inc. - Central Lab
November 6, 2012
1034
Manila Water Company, Inc. - Manggahan
November 6, 2012
1035
Manila Water Company, Inc. - Molave
November 6, 2012
1036
Manila Water Company, Inc. - San Jose
November 6, 2012
1037
Manila Water Company, Inc. - Aranzazu
November 6, 2012
1038
Manila Water Company, Inc. - Botong
November 6, 2012
1039
Manila Water Company, Inc. - San Mateo STP
November 6, 2012
1040
Manila Water Company, Inc. - Modesta
November 6, 2012
44
October 29, 2012
October 29, 2012
October 29, 2012
November 6, 2012
November 6, 2012
November 6, 2012
No.
1041
Date Approved
November 6, 2012
1042
Name of Applicant
Manila Water Company, Inc. - Truck Mntd-1 SFV 396,797, 426, 435,
766 & 739
Manila Water Company, Inc. - Amity
1043
Manila Water Company, Inc. - Baras DW-1
November 6, 2012
1044
Manila Water Company, Inc. - Jala DW-2
November 6, 2012
1045
Manila Water Company, Inc. - I.T. Data Center 1 & 2
November 6, 2012
1046
Manila Water Company, Inc. - TAY PTP
November 6, 2012
1047
Manila Water Company, Inc. - La Mesa Dam
November 6, 2012
1048
Manila Water Company, Inc. - FTI STP
November 6, 2012
1049
Manila Water Company, Inc. - U.P. Reuse
November 6, 2012
1050
Manila Water Company, Inc. - BLC
November 6, 2012
1051
Manila Water Company, Inc. - Maharlika
November 6, 2012
1052
Manila Water Company, Inc. - Centenial
November 6, 2012
1053
Manila Water Company, Inc. - Pag - Asa
November 6, 2012
1054
Manila Water Company, Inc. - Guadalupe Bliss
November 6, 2012
1055
Manila Water Company, Inc. - Fortville
November 6, 2012
1056
Manila Water Company, Inc. - Philam
November 6, 2012
1057
Manila Water Company, Inc. - Palosapis
November 6, 2012
1058
Manila Water Company, Inc. - Belarmino
November 6, 2012
1059
Manila Water Company, Inc. - Karangalan 1
November 6, 2012
1060
Manila Water Company, Inc. - Karangalan 2
November 6, 2012
1061
Manila Water Company, Inc. - Karangalan 3
November 6, 2012
1062
Manila Water Company, Inc. - Karangalan 4
November 6, 2012
1063
Manila Water Company, Inc. - Karangalan 5
November 6, 2012
1064
Manila Water Company, Inc. - Karangalan 6
November 6, 2012
1065
Manila Water Company, Inc. - Karangalan 7
November 6, 2012
1066
Manila Water Company, Inc. - Karangalan 8
November 6, 2012
1067
Manila Water Company, Inc. - Karangalan 9
November 6, 2012
1068
Manila Water Company, Inc. - Makati Pabahay
November 6, 2012
1069
Manila Water Company, Inc. - Fusion
November 6, 2012
1070
Manila Water Company, Inc. - Balara BA
November 6, 2012
1071
Manila Water Company, Inc. - Cubao BA
November 6, 2012
1072
Manila Water Company, Inc. - Marikina BA
November 6, 2012
1073
Manila Water Company, Inc. - Taguig BA
November 6, 2012
45
November 6, 2012
No.
1074
Name of Applicant
Manila Water Company, Inc. - Pasig BA
Date Approved
November 6, 2012
1075
Manila Water Company, Inc. - Makati BA
November 6, 2012
1076
Manila Water Company, Inc. - Panorama
November 6, 2012
1077
Manila Water Company, Inc. - Grandvillas
November 6, 2012
1078
Manila Water Company, Inc. - BG Molina
November 6, 2012
1079
Manila Water Company, Inc. - Pineda STP
November 6, 2012
1080
Manila Water Company, Inc. - Road 5
November 6, 2012
1081
Manila Water Company, Inc. - Holy Family TP
November 6, 2012
1082
Manila Water Company, Inc. - East Ave.
November 6, 2012
1083
Manila Water Company, Inc. - Imelda
November 6, 2012
1084
Manila Water Company, Inc. - Olandes
November 6, 2012
1085
Manila Water Company, Inc. - Sikatuna
November 6, 2012
1086
Manila Water Company, Inc. - Kalayaan
November 6, 2012
1087
Manila Water Company, Inc. - Heroes Hill
November 6, 2012
1088
Manila Water Company, Inc. - Lake View
November 6, 2012
1089
Manila Water Company, Inc. - Fisheries
November 6, 2012
1090
Manila Water Company, Inc. - A. Luna
November 6, 2012
1091
Manila Water Company, Inc. - MRH
November 6, 2012
1092
De La Salle College of Saint Benilde - Angelo King Int'l. Center
November 6, 2012
1093
ePLDT, Inc.
November 6, 2012
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
Interbev Philippines, Inc.
WF Plaza Bldg. Administration Inc. / Intellectual Property Center
Willin Sales Inc. - Waltermart Guiguinto, Bulacan
Manila Water Company, Inc. - Balara
Manila Water Company, Inc. - San Juan
Manila Water Company, Inc. - Makati
Manila Water Company, Inc. - Fort Bonifacio
Manila Water Company, Inc. - Cubao
Manila Water Company, Inc. - Pasig
Manila Water Company, Inc. - Filter 1 & 2
Manila Water Company, Inc. - Lukban 1 & 2
Manila Water Company, Inc. - Kinsville 1 & 2
November 6, 2012
November 6, 2012
November 6, 2012
November 6, 2012
November 6, 2012
November 6, 2012
November 6, 2012
November 6, 2012
November 6, 2012
November 6, 2012
November 6, 2012
November 6, 2012
1106
Manila Water Company, Inc. - Siruna 1 & 2
November 6, 2012
1107
Manila Water Company, Inc. - Siruna 1 & 2
November 6, 2012
1108
Manila Water Company, Inc. - El Niño (1-22)
November 6, 2012
1109
Manila Water Company, Inc. - Rodriguez - 1-3
November 6, 2012
46
No.
1110
Name of Applicant
Green Future Innovations, Inc.
Date Approved
November 12, 2012
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
City of Koronadal Water District
City Savings Bank - Borongan Branch
City Savings Bank - Dagupan Branch
City Savings Bank - Legazpi Branch
De La Salle College of Saint Benilde
LandBank of the Philippines Ombudsman Extension Office
Majestic Press, Inc. - 4th Street
Mariphil Orphanage Foundation Atung Pinuy Anan
Lafarge Republic, Inc.
PowerSource Philippines, Inc.
GNPower Mariveles Coal Plant Ltd., Co.
Monark Equipment Corp. - Dinagat DPP
Monark Equipment Corp. - Siquijor DPP
Land Bank of the Philippines – Sablayan, Occidental Mindoro
SM Development Corporation
Hantex Land Corporation
Metrobank Data Center
Aderans Philippines, Inc.
November 12, 2012
November 12, 2012
November 12, 2012
November 12, 2012
November 12, 2012
November 12, 2012
November 12, 2012
November 12, 2012
November 26, 2012
November 26, 2012
December 3, 2012
December 3, 2012
December 3, 2012
December 3, 2012
December 3, 2012
December 3, 2012
December 3, 2012
December 7, 2012
1129
1130
1131
1132
Blue Sapphire Residences Condominium Corporation
Bangko Sentral Ng Pilipinas-Dumaguete Branch
Bangko Sentral Ng Pilipinas-Naga Branch
The Beacon Tower
December 7, 2012
December 7, 2012
December 7, 2012
December 7, 2012
1133
Acbel Polytech Phils., Inc.
December 7, 2012
1134
Hillsford Property Corp.
December 7, 2012
1135
Metrobank Data Center Building
December 7, 2012
1136
Hantex Land Corporation
December 7, 2012
1137
1138
Lunang Diesel Power Plant
Biasong Diesel Power Plant
December 10, 2012
December 10, 2012
1139
Costa Rica Diesel Power Plant
December 10, 2012
1140
Cabunga-an Diesel Power Plant
December 10, 2012
1141
1142
1143
1144
1145
1146
Takut Diesel Power Plant
Ilijan Diesel Power Plant
Monark Equipment Corp. - Roxas DPP, Palawan
Amkor
The Beaufort
Accendo Commercial Corp.
December 10, 2012
December 10, 2012
December 17, 2012
December 18, 2012
December 18, 2012
December 18, 2012
47
CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY
The ERC, on 08 November 2011, approved the application filed by Cagayan Electric
Power and Light Company, Inc. (CEPALCO) for the renewal of its CPCN to operate in
the City of Cagayan de Oro and its suburbs, effective June 17, 2011 to August 2, 2044,
to coincide with its approved Congressional franchise. CEPALCO established that it has
the expertise and resources to adequately and reliably serve the present and future
electrical power needs of its customers.
CERTIFICATE OF REGISTRATION
The ERC issued three (3) Certificates of Registration filed by the following Wholesale
Aggregators (WA) in 2012:
Wholesale Aggregator (WA)
Date of Approval
1. Angeles Power, Inc.
April 2, 2012
2. First Gen Energy Solutions, Inc.
May 22, 2012
3. Manta Energy, Inc. (Formerly named iN2Power, Inc.)
June 25, 2012
CONNECTION ASSETS
On 20 February 2012, the ERC approved the application filed by Kepco-SPC Power
Corporation (KSPC) for the construction of connection assets for its 2x100 Circulating
Fluidized Bed Combustor (CFBC) Boiler Coal-Fired Power Plant, particularly the 138 kV
DC-ST transmission line from KEPCO Power Plant to New Naga (Cebu) Substation.
CONSUMER COMPLAINTS
Section 41 of Republic Act No. 9136 or the Electric Power Industry Reform Act (EPIRA)
mandated the ERC to handle consumer complaints and ensure the adequate promotion
of consumer interests. In line with this, the ERC, on 16 November 2011, resolved the
complaint filed by Corinthian Realty Corp. and Renato Dragon, versus Manila Electric
Company (MERALCO), under ERC Case No. 2009-091 CC. The ERC ruled that there
was no tampering of the meters which could have resulted to overbilling or illegal
disconnection committed by MERALCO. The ERC found that the outstanding electric
bills issued to Corinthian Realty Corp. from September 2006 to June 2010 were correct
based on numerous tests and verification conducted by the ERC. Accordingly,
Corinthian Realty Corp was directed to pay MERALCO the amount of PhP2,091,119.70
which represents its bills in arrears.
48
DISPUTE RESOLUTION
The EPIRA, under Section 43(u), gave the ERC the original and exclusive jurisdiction
over all cases involving disputes between and among participants or players in the
energy sector. As such, the ERC, in 2012, resolved three (3) disputes filed before it,
namely:
1. Angeles Electric Corporation (AEC) and Tarlac Electric, Inc. (TEI) versus Power
Sector Assets and Liabilities Management Corporation (PSALM) and National
Grid Corporation of the Philippines (NGCP);
2. Stronghold Steel Corporation (SSC) versus National Grid Corporation of the
Philippines (NGCP); and
3. Melters Steel Corporation (MSC) versus National Grid Corporation of the
Philippines (NGCP).
AEC and TEI filedtheir petition with ERC to nullify the Value Added Tax (VAT) charges
on Default Wholesale Supply Arrangement (DWSA). The ERC, in its Decision dated 03
December 2012 made permanent the Status Quo Order issued on 19 April 2011. AEC
and TEI were able to prove that their PEZA or BOI-registered customers were granted
tax incentives under Section 4, 108-5 and 108-6, Revenue Regulation No. 16-2005,
therefore qualifying them under Zero Rate Sale of Services and effectively Zero Rate
Sale of Services, respectively. Accordingly, PSALM was directed to refrain from
collecting the 12% VAT on the electricity sales to PEZA and BOI-registered customers
of AEC and TEI.
On the other hand, SCC filed a petition for dispute resolution against NGCP relative to
its billing determinant arrangement with the National Transmission Corporation
(TRANSCO). On 26 November 2012, the ERC made permanent the Cease and Desist
Order issued on 10 September 2012, upon confirming that the transmission charges for
SSC should be calculated on the basis of the Coincident Peak Demand (CPD) of the
Luzon System Peak Demand. As a result, NGCP was directed to (a) use SSC's actual
demand coincident with the Luzon System Peak Demand as its billing determinant in
the calculation of its transmission charges, subject to the approved minimum billing
determinant of 17 MW; (b) refund to SSC the total amount of over-recovery in the
transmission charges from the time it shifted from CPD to Non-Coincident Peak
Demand (NCPD); and (c) submit its compliance within 10 days from receipt of Decision.
Similar to the case above, MSC filed its petition for the adoption of the same billing
methodology approved for SKK Steel Corporation (SKK) and SSC by TRANSCO. Thus,
on the same date as the SSC’s petition was resolved, the ERC approved MSC's
application for the adoption of the same billing methodology approved for SSC in ERC
Case No. 2011-060 MC.
49
FEED-IN TARIFF (FIT) RATE
Section 7 of the Republic Act No. 9513 or the Renewable Energy Act of 2008 mandated
the ERC to formulate a feed-in tariff system to encourage development of renewable
energy in the country. The Feed-in Tariff Rules of the ERC further provides that the
National Renewable Energy Board (NREB) file its recommended FITs per technology to
the ERC for its approval.
On 27 July 2012, the ERC approved the NREB's application for feed-in tariff for
biomass, run-of-river (ROR) hydropower, solar and wind energy. The ERC-approved
FIT rates were as follows:
TECHNOLOGY
Wind
Biomass
Solar
Hydro
APPROVED FIT
PhP8.53/kWh
PhP6.63/kWh
PhP9.68/kWh
PhP5.90/kWh
DEGRESSION RATE
0.5% after year 2 from effectivity of FIT
0.5% after year 2 from effectivity of FIT
6% after year 1 from effectivity of FIT
0.5% after year 2 from effectivity of FIT
Meanwhile, the ERC deferred decision on the proposed FIT for ocean until sufficient
data shall become available upon which it may base its determination.
FUEL AND LUBRICANT COST RECOVERY
The ERC approved Cotabato Light and Power Company, Inc.’s application for the
recovery of its actual fuel and lubricant costs incurred for the period March 15, 2010 up
to January 2011. Accordingly, the ERC authorized CLPC to recover the fuel and
lubricant costs (on top of the existing fuel recovery charge of PhP0.0298/kWh)
amounting to PhP17,275,184.43 which is equivalent to PhP0.1554/kWh, effective on the
next billing cycle from receipt of the Decision until its full recovery.
GENERATION RATE ADJUSTMENT MECHANISM (GRAM)
On 26 March 2012, the ERC approved the application of the National Power
Corporation (NPC) and Power Sector Assets and Liabilities Management Corporation
(PSALM) for the recovery of its fuel and IPP costs under the 10th to 17th GRAM (under
ERC Case Nos. 2008-042 RC, 2008-053 RC, 2008-063 RC, 2009-032 RC, 2009-056
RC, 2010-003 RC, 2010-068 RC, and 2010-074 RC) for test period January 2007 to
April 2011. The following are the approved Deferred Accounting Adjustment (DAA),
recovery rate and recovery period for Luzon, Visayas and Mindanao, effective March
26, 2012 to April 25, 2012 billing period until the end of the corresponding recovery
periods or until such time that the full amount shall have been recovered, whichever
comes earlier:
50
LUZON
VISAYAS
MINDANAO
DAA
(PHP)
26,281,952,768.34
7,706,055,072.95
1,908,403,425.72
RECOVERY
(PHP/KWH)
0.3267
0.4847
0.0536
RECOVERY
PERIOD
120 months
126 months
54 months
On 24 September 2012, the ERC also approved the application of National Power
Corporation - Small Power Utilities Group (NPC-SPUG) for the recovery of its fuel and
IPP costs under the 13th GRAM for test period January 2005 to December 2005. The
following are the approved Deferred Accounting Adjustment (DAA), recovery rate and
recovery period for Luzon, Visayas and Mindanao, effective the next billing period until
the end of the corresponding recovery periods or until such time that the full amount
shall have been recovered, whichever comes earlier:
LUZON
VISAYAS
MINDANAO
DAA
(PHP)
1,467,086,778.00
152,045,847.42
344,188,432.00
RECOVERY
(PHP/KWH)
0.5585
0.8043
1.0773
RECOVERY
PERIOD
64 months
57 months
12 months
Meanwhile, the ERC, on 03 December 2012, approved the petitions filed by
Cabanatuan Electric Corporation (CELCOR) under ERC Case Nos. 2010-022 RC and
2010-040 RCfor lower generation charges for billing months of March 2010 and April
2010 and for the recovery of the differential generation charges within a 6 month period.
CELCOR was authorized to recover the amount of PhP13,161,725.58 equivalent to
PhP0.0651/kWh, and was directed to refund the amount of PhP1,485,795.10 equivalent
to PhP0.0073/kWh starting the next billing period from receipt of the Decision until such
time that the full amount shall have been recovered/refunded. Further, CELCOR was
directed to revisit and renegotiate its Power Supply Contract (PSC) with First
Cabanatuan Ventures Corporation (FCVC) relative to its Minimum Energy Off-Take
(MEOT).
INCREMENTAL CURRENCY EXCHANGE RATE ADJUSTMENT (ICERA)
The ERC approved the petitions filed by National Power Corporation (NPC) and Power
Sector Assets and Liabilities Management Corporation (PSALM)for the recovery of their
15th and 16th ICERA under ERC Case Nos. 2010-067 RC and 2010-073 RC on 26
March 2012. NPC and PSALM were authorized to recover the Deferred Accounting
Adjustments (DAAs) on ICERA, covering test period July 2009 to April 2010 and the
remaining balance of the 14th ICERA, effective March 26, 2012 to April 25, 2012 billing
period until it is fully recovered/ refunded, to wit:
51
DAA
(PHP)
LUZON
VISAYAS
MINDANAO
RECOVERY /
(REFUND)
(PHP/KWH)
0.3637
0.1213
(0.0094)
8,193,293,149.95
918,421,045.84
(224,300,499.43)
RECOVERY/
(REFUND)
PERIOD
96 months
60 months
36 months
The ERC also approved the application of National Power Corporation - Small Power
Utilities Group (NPC-SPUG) for the recovery of its 3rd ICERA on 24 September 2012, in
the amount of PhP341,418,352.54. Accordingly, NPC-SPUG was authorized to recover
from SPUG consumers the amount of PhP0.3907/kWh within a period of 2 years or until
such time that it is fully recovered starting the next billing system from receipt of the
Decision.
LEASE OF PROPERTY
The ERC approved, on 28 November 2011 and 19 December 2011 the applications
filed by Angeles Electric Corporation (AEC) and Cabanatuan Electric Corporation
(CELCOR), respectively, for authority to lease Regulatory Asset Base (RAB) properties.
The ERC’s approval of AEC's and CELCOR’s pole space rentals was subject to the
R.A. 9136 and its IRR’s provision that a portion of a Distribution Utilities' net annual
income from related business undertaking shall be used to reduce its Distribution
Wheeling Charges provided that such shall not exceed 50% of the net income derived
from such undertaking. As such, it will be beneficial to the consumers of AEC and
CELCOR in terms of reduced rates.
The 2010 pole rental income of AEC reached PhP3,427,673.02 relative to the Joint Pole
Agreements with Angeles City Telephone System, Angeles City Cable Television
Network, Inc., Dau Telephone Company, Digital Telecommunications Philippines, Inc.,
Innove Communications, Inc., Philippine Long Distance Telephone Company, and
Angeles University Foundation.
On the other hand, the summary of the pole rental income submitted by CELCOR for a
10 year contract period with Philippine Long Distance Telephone Company, Digital
Telecommunications Philippines, Inc., MultiNetwork Cable Television, Inc., Bayan
Telecommunications, Inc., Innove Communications, Inc., and Smart Communications,
Inc. shows a total income of PhP54,032,581.08.
MARKET TRANSACTION FEES
The ERC, on 05 December 2011, approved the Philippine Electricity Market
Corporation’s(PEMC) additional Market Transaction Fees in the amount of
PhP26,380,586.00 to cover the additional budget necessary for operating the WESM in
the Visayas, as well as the hiring of additional personnel as a result of its
52
reorganization. The approved amount includes the Visayas funding requirement
amounting to PhP23,706,457.00, additional adjustments amounting to PhP474,129.00
and provision for external auditor amounting to PhP2,200,000.00. Accordingly, PEMC
was authorized to collect the said fees from WESM participants in the Visayas Grid
retroactive from the billing month of January 2011, and was directed to submit a
mechanism for the collection of the fees within 10 days from receipt of the Decision.
Moreover, the ERC granted PEMC's request for authority to allocate the amount of
PhP26,518,272.00 from the unutilized market transaction fees for calendar year 2010
for its proposed Market Dispatch Optimization Model (MDOM) Software Modification
Project.
OVER / UNDER RECOVERIES IN THE IMPLEMENTATION OF THE AUTOMATIC
ADJUSTMENTS
Pursuant to ERC Resolution No. 16, Series of 2009 and Resolution No. 21, Series of
2010, the ERC approved twelve (12) applications for verification and confirmation of the
over/under recoveries incurred by the Distribution Utilities in their implementation of the
various automatic cost adjustments and true-up mechanisms authorized by the ERC.
No. ERC Case
Applicant
Date of Decision/ Details
No.
(Date of Decision)
1
2011-006 Sorsogon I Electric SORECO I was directed to refund starting the next billing
CF
Cooperative, Inc. cycle from receipt of Decision until its full refund, the total
(SORECO I)
amount of PhP943,873.73 equivalent to PhP0.0040/kWh
generation cost over-recoveries; the total amount of
(November
2, PhP17,023,168.44 equivalent to PhP0.0935/kWh for
2011)
residential, PhP0.0476/kWh for commercial, PhP0.0178/kWh
for public building, PhP0.0092/kWh for industrial low voltage,
PhP14.8583/kW for industrial high voltage and
PhP0.0546/kWh for streetlight representing transmission cost
over-recoveries; the total amount of PhP21,337,522.15
equivalent to PhP0.0906/kWh representing system loss overrecoveries; and the total amount of PhP1,166,914.16
equivalent to PhP0.0552/kWh representing inter-class cross
subsidy over recoveries. On the other hand, SORECO I was
directed to collect starting the next billing cycle from receipt of
Decision until its full recovery the total amount of
PhP310,643.10 equivalent to PhP0.0014/kWh representing
lifeline subsidy under-recoveries to be recovered only from
non-lifeline customer.
2
2011-011 Cagayan I Electric CAGELCO I was directed to refund starting the next billing
CF
Cooperative, Inc. cycle from receipt of Decision until its full refund, the total
(CAGELCO I)
amount of PhP551,663.34 equivalent to PhP0.0005/kWh
representing generation cost over-recoveries. On the other
(October 1, 2011) hand, CAGELCO I was directed to collect starting the next
53
No. ERC Case
Applicant
No.
(Date of Decision)
3
2011-015
CF
Tarlac
Electric
Incorporated (TEI)
(June 4, 2012)
4
2011-028
CF
Nueva Ecija II
Electric
Cooperative, Inc. Area 2 (NEECO IIAREA 2)
Date of Decision/ Details
billing cycle from receipt of Decision until its full recovery the
total amount of PhP1,507,944.39 equivalent to
PhP0.0013/kWh for residential, PhP0.0013 for Low Voltage
and PhP0.3120/kW for Higher Voltage representing
transmission cost under-recoveries; the total amount of
PhP28,666,496.20
equivalent
to
PhP0.0243/kWh
representing system loss under recoveries; the total amount of
PhP1,498,710.53 equivalent to PhP0.0013/kWh representing
lifeline subsidy under-recoveries; the total amount of
PhP2,773,376.71 equivalent to PhP0.0103/kWh representing
inter-class cross subsidies under-recoveries; and the total
amount of PhP110,764.29 equivalent to PhP0.0006/kWh for
residential and Low voltage and PhP0.1912/kW for higher
voltage representing reinstated prompt payment discount
under-recoveries.
TEI was directed to refund starting the next billing cycle from
receipt of Decision until its full refund, the total amount of
PhP20,010,583.84 equivalent to PhP0.0155/kWh for
residential/small commercial, PhP5.4450/kW for secondary,
PhP6.1141/kW for primary, PhP6.1361/kW for 69kV and
PhP0.0203/kWh for flat/streetlights representing transmission
cost over-recoveries; the total amount of PhP12,323,597.27
equivalent to PhP0.0534/kWh representing inter-class cross
subsidy over-recoveries; and the total amount of
PhP1,490,327.22 equivalent to PhP0.0059/kWh for
residential, PhP2.0614/kW for secondary, PhP2.3148/kW for
primary, PhP2.3231/kW for 69 kV and PhP0.0077/kWh for
flat/streetlights, representing reinstated prompt payment
discount over-recoveries. On the other hand, TEI was
directed to collect starting the next billing cycle from receipt of
Decision until its full recovery the total amount of
PhP4,307,133.04 equivalent to PhP0.0034/kWh representing
generation cost under-recoveries; the total amount of
PhP1,064,084.98 equivalent to PhP0.0008/kWh for
residential/small commercial/69 kV, PhP0.0009/kWh for
secondary/primary and PhP0.0011/kWh for flat/streetlights,
representing system loss under-recoveries; and the total
amount of PhP211,440.44 equivalent to PhP0.0002/kWhfor
lifeline subsidy under-recoveries.
NEECO II-AREA 2 was directed to refund starting the next
billing cycle from receipt of Decision until its full refund, the
total amount of PhP62,407,443.81 equivalent to
PhP0.0709/kWh for streetlights, PhP0.0829/kWh for
residential, PhP0.1328/kWh for sale for resale,
54
No. ERC Case
Applicant
No.
(Date of Decision)
(December
2012)
5
2011-037
CF
Zambales
II
Electric
Cooperative, Inc.
(ZAMECO II)
(December
2011)
6
2011-040
CF
12,
12,
Masbate Electric
Cooperative, Inc.
(MASELCO)
(October 10, 2011)
Date of Decision/ Details
PhP0.0882/kWh for small commercial, PhP0.1206/kWh for
special lights, PhP0.0709/kWh for public building,
PhP6.5801/kW for large commercial and PhP15.4330/kW for
industrial, representing transmission cost over-recoveries; the
total
amount
of
PhP18,299,515.46equivalent
to
PhP0.0236/kWh representing lifeline subsidy over-recoveries;
and the total amount of PhP5,933,560.90 equivalent to
PhP0.0389/kWh representing inter-class cross subsidy over
recoveries. On the other hand, NEECO II-AREA 2 was
directed to collect starting the next billing cycle from receipt of
Decision until its full recovery the total amount of
PhP13,517,114.82
equivalent
to
PhP0.0175/kWh
representing generation cost under-recoveries; and the total
amount of PhP15,414,730.17 equivalent to PhP0.0199/kWh
representing system loss under-recoveries.
ZAMECO II was directed to refund starting the next billing
cycle from receipt of Decision until its full refund, the total
amount of PhP31,194,688.48 equivalent to PhP0.1314/kWh
for residential, PhP0.1120/kWh for Low Voltage and
PhP46.58/kW for High Voltage representing transmission cost
over-recoveries; the total amount of PhP1,629,225.20
equivalent to PhP0.0064/kWh representing system loss overrecoveries; and the total amount of PhP57,215.67 equivalent
to PhP0.0002/kWh representing lifeline cost over recoveries.
On the other hand, ZAMECO II was directed to collect
starting the next billing cycle from receipt of Decision until its
full recovery the total amount of PhP9,710,425.29 equivalent
to PhP0.0383/kWh representing generation cost underrecoveries, and the total amount of PhP1,241,461.60
equivalent to PhP0.0006/kWh representing inter-class cross
subsidies under-recoveries.
MASELCO was directed to refund starting the next billing
cycle from receipt of Decision until its full refund, the total
amount of PhP3,083,669.28 equivalent to PhP0.0093/kWh
representing generation cost over-recoveries, and the total
amount of PhP1,878,912.73 equivalent to PhP0.0538/kWh
representing inter-class cross subsidies over-recoveries. On
the other hand, MASELCO was directed to collect starting the
next billing cycle from receipt of Decision until its full recovery
the total amount of PhP98,862.75 equivalent to
PhP0.0003/kWh representing system loss rate underrecoveries, and the total amount of PhP14,217,295.07
equivalent to PhP0.0694/kWh representing lifeline subsidy
under-recoveries.
55
No. ERC Case
Applicant
No.
(Date of Decision)
7
2011-041 First
Laguna
CF
Electric
Cooperative, Inc.
(FLECO)
(December
2011)
8
2011-044
CF
12,
Central
Pangasinan
Electric
Cooperative, Inc.
(CENPELCO)
(October 1, 2012)
9
2011-051
CF
Ibaan Electric and
Engineering
Corporation (IEEC)
(October 10, 2011)
Date of Decision/ Details
FLECO was directed to refund starting the next billing cycle
from receipt of Decision until its full refund, the total amount of
PhP321,133.22 equivalent to PhP0.0006/kWh representing
generation cost over-recoveries; the total amount of
PhP79,704,343.22 equivalent to PhP0.1431/kWh for
residential, PhP0.1409/kWh for low voltage and
PhP55.6462/kW for higher voltage representing transmission
cost over-recoveries; the total amount of PhP9,564,124.75
equivalent to PhP0.0172/kWh representing lifeline subsidy
over-recoveries; and the total amount of PhP5,801,281.15
equivalent to PhP0.0717/kWh representing inter-class cross
subsidy over-recoveries. On the other hand, FLECO was
directed to collect starting the next billing cycle from receipt of
Decision until its full recovery the total amount of
PhP16,314,074.75
equivalent
to
PhP0.0293/kWh
representing system loss under-recoveries.
CENPELCO was directed to refund starting the next billing
cycle from receipt of Decision until its full refund, the total
amount of PhP145,542,661.95 equivalent to PhP0.1502/kWh
for residential, PhP0.1478/kWh for low voltage and
PhP138.04/kW for higher voltage representing transmission
cost over-recoveries; the total amount of PhP24,330,398.06
equivalent to PhP0.0268/kWh representing lifeline subsidy
over-recoveries; the total amount of PhP53,109,337.67
equivalent to PhP0.1698/kWh representing inter-class cross
subsidy over-recoveries; and the total amount of
PhP1,613,302.12 equivalent to PhP0.0075/kWh for residential
and PhP1.8607/kW for low/higher voltage, representing
reinstated prompt payment discount over-recoveries. On the
other hand, CENPELCO was directed to collect starting the
next billing cycle from receipt of Decision until its full recovery
the total amount of PhP21,436,972.93 equivalent to
PhP0.0231/kWh representing generation cost underrecoveries; and the total amount of PhP44,837,279.12
equivalent to PhP0.0484/kWh representing system loss
under-recoveries.
IEEC was directed to refund starting the next billing cycle
from receipt of Decision until its full refund, the total amount of
PhP10,831,137.90 equivalent to PhP0.0783/kWh for
residential, PhP0.0791/kWh for Commercial, PhP15.4078/kW
for Industrial and PhP0.0789/kWh for streetlights representing
transmission cost over-recoveries; and the total amount of
PhP581,062.67 equivalent to PhP0.0042/kWh representing
lifeline cost over recoveries. On the other hand, IEEC was
56
No. ERC Case
Applicant
No.
(Date of Decision)
10
2011-053
CF
Zambales I Electric
Cooperative, Inc.
(ZAMECO I)
(October 1, 2012)
11
2011-055
CF
Cagayan II Electric
Cooperative, Inc.
(CAGELCO II)
(July 9, 2012)
Date of Decision/ Details
directed to collectstarting the next billing cycle from receipt of
Decision until its full recovery the total amount of
PhP673,190.19 equivalent to PhP0.0049/kWh representing
generation cost under-recoveries; the total amount of
PhP2,315,176.59 equivalent to PhP0.0168/kWh representing
system loss under recoveries; and the total amount of
PhP1,679,902.33 equivalent to PhP0.0278/kWh representing
inter-class cross subsidies under-recoveries.
ZAMECO I was directed to refund starting the next billing
cycle from receipt of Decision until its full refund, the total
amount of PhP59,245,711.99 equivalent to PhP0.2316/kWh
for residential, PhP0.3414/kWh for low voltage and
PhP65.7421/kW for higher voltage representing transmission
cost over-recoveries; the total amount of PhP3,995,420.15
equivalent to PhP0.0175/kWh representing lifeline subsidy
over-recoveries; the total amount of PhP1,275,052.34
equivalent to PhP0.0411/kWh representing inter-class cross
subsidy over-recoveries; and the total amount of
PhP3,421,301.76 equivalent to PhP0.0739/kWh representing
reinstated prompt payment discount over-recoveries. On the
other hand, ZAMECO I was directed to collect starting the
next billing cycle from receipt of Decision until its full recovery
the total amount of PhP8,033,453.24 equivalent to
PhP0.0347/kWh representing generation cost underrecoveries; and the total amount of PhP7,631,949.09
equivalent to PhP0.0329/kWh representing system loss
under-recoveries.
CAGELCO II was directed to refund starting the next billing
cycle from receipt of Decision until its full refund, the total
amount of PhP19,977,018.72 equivalent to PhP0.0309/kWh
for residential, PhP0.0309/kWh for low voltage and
PhP10.9952/kW for high voltage representing transmission
cost over-recoveries; the total amount of PhP5,799,631.54
equivalent to PhP0.0092/kWh representing lifeline subsidy
over-recoveries; the total amount of PhP1,416,223.56
equivalent to PhP0.0307/kWh representing inter-class cross
subsidy over recoveries; and the total amount of
PhP581,790.09 equivalent to PhP0.0648/kWh for residential
and low voltage, and PhP1.0024/kW for high voltage,
representing reinstated prompt payment discount overrecoveries. On the other hand, CAGELCO II was directed to
collect starting the next billing cycle from receipt of Decision
until its full recovery the total amount of PhP17,522,511.13
equivalent to PhP0.0271/kWh representing generation cost
57
No. ERC Case
Applicant
No.
(Date of Decision)
12
2011-063
CF
Date of Decision/ Details
under-recoveries; and the total amount of PhP5,204,393.38
equivalent to PhP0.0080/kWh representing system loss
under-recoveries.
Camiguin Electric CAMELCO was directed to collect starting the next billing
Cooperative, Inc. cycle from receipt of Decision until its full recovery the
(CAMELCO)
Franchise Tax for the Province of Camiguin amounting to
PhP191,982.24 at the rate of PhP0.0134/kWh for a period of
(July 3, 2012)
one year, and the Business Tax for the Municipality of
Mambajao amounting to PhP339,984.18 at a rate of
PhP0.0187/kWh for a period of two years.
PERFORMANCE-BASED REGULATION
The ERC, on 24 September 2012, approved the application filed by the National Grid
Corporation of the Philippines (NGCP) for the Maximum Allowable Revenue (MAR) for
the Calendar Year 2012 and Performance Incentive Scheme (PIS) Compliance in
accordance with the Alternative Form of Rate Setting Methodology under the Rules for
Setting Transmission Wheeling Rates (RTWR). The approved MAR amounted to
PhP42,903.05 million while the approved PIS amounted to PhP503.12 million. Further,
NGCP was directed to submit in subsequent application for approval of CY 2013 MAR
an ancillary services availability register for each ancillary service for each grid.
On 29 October 2012, the ERC approved the application of the following Distribution
Utilities (DUs) for theRecalculated MAP for Regulatory Year 2013 and its translation into
distribution rates of different customer classes for the 3 rd Regulatory Year of the ERCARR:
ERC Case Distribution Utility
MAP 2013
S FACTOR
OVERNo.
RECOVERY
2012-048
La
Union
Electric PhP1.5438/kWh
PhP0.0039/kWh PhP0.0648/kWh
RC
Company (LUELCO)
2012-049
Cabanatuan
Electric PhP1.6488/kWh
PhP0.0263/kWh PhP0.0912/kWh
RC
Corporation (CELCOR)
2012-050
Tarlac
Electric, PhP1.7305/kWh
PhP0.0113/kWh PhP0.0434/kWh
RC
Incorporated (TEI)
The ERC directed LUELCO, CELCOR and TEI to implement the detailed table (as provided in the
Decision) of the approved distribution, supply and metering charges effective its next billing period.
Similarly, on 19 December 2011 and 01 October 2012, the ERC decided on the
application filed by Cagayan Electric Power and Light Company, Incorporated
(CEPALCO) for its Maximum Average Price (MAP) and its translation into distribution,
supply and metering charges for the different customer classes for 2012 and 2013,
respectively. The ERC made permanent the provisional approval granted to CEPALCO
58
on August 22, 2011 on its application for MAP 2012 and its translation into rates. The
overall reduction in CEPALCO's existing rate of PhP1.5705/kWh vis-a-vis its MAP2012 of
PhP1.3467/kWh is Php0.2238/kWh. Meanwhile, the ERC approved CEPALCO's
MAP2013 and its translation into distribution charges, with a total average rate of
PhP1.2849/kWh. The ERC directed CEPALCO to implement the detailed table of
approved rates effective its next billing period from receipt of the Decision.
Likewise, on 23 April 2012, the ERC approved the application of Bohol Light Company,
Incorporated (BLCI) and Clark Electric Distribution Corporation (CEDC) for the
translation into distribution rates for the First Regulatory Year of the ERC-Approved
Annual Revenue Requirement (ARR) for the Regulatory Period 2012-2015 and October
1, 2011 - September 30, 2015, respectively. The ERC directed BLCI and CEDC to
implement the detailed table of the approved charges effective its next billing period
from receipt of the Decision, with a total average rate of PhP1.0181/kWh for BLCI and
PhP0.8527/kWh for CEDC. BLCI was also directed to implement a revised lifeline
discount of 100% for 20kWh and below, 50% for 21-35kWh, 40% for 36-55kWh, 30%
for 56-66kWh, and 20% for 66-75kWh; and a subsidy rate to non-lifeline customers at
PhP0.0661/kWh.
Eleven (11) other cases decided by the ERC in 2012 on the approval of the MAP and its
translation into distribution rates for various regulatory years/ periods are detailed in a
table below:
No
ERC Case No.
Date of
Decision
November 14,
2011
1
2011-106 RC
2
2011-122 RC
February 27,
2012
3
2011-124 RC
4
2011-173 RC
December 19,
2011
March19, 2012
5
2011-176 RC
June 11, 2012
6
2011-180 RC
April 2, 2012
7
2012-051 RC
October 29,
2013
Distribution Utility
Dagupan Electric
Corporation’s
(DECORP)
San Fernando Electric
Light and Power
Company,
Incorporated
(SFELAPCO)
Angeles Electric
Corporation (AEC)
Cotabato Light and
Power Company, Inc.
(CLPC)
Iligan Light and
Power, Inc. (ILPI)
Mactan Electric
Company (MECO)
Visayan Electric
Company,
Incorporated’s
(VECO)
59
Regulatory
Year
First
Regulatory
Period
2011-2015
First
2012-2015
First
2012-2015
Fourth
2009-2013
Fourth
2010-2013
Fourth
2009-2013
Third
2011-2014
No
ERC Case No.
8
2012-052 RC
9
2012-055 RC
10 2012-088 RC
11 2012-089 RC
Date of
Decision
October 29,
2013
October 29,
2013
December 3,
2012
December 10,
2012
Distribution Utility
Davao Light and
Power Company,
Incorporated (DLPC)
Ibaan Electric and
Engineering
Corporation (IEEC)
Bohol Light Company,
Inc. (BLCI)
Angeles Electric
Corporation (AEC)
Regulatory
Year
Third
Regulatory
Period
July 1, 2010 June 30, 2014
Third
2010-2014
Second
2012-2015
Second
2012-2015
The ERC directed the Distribution Utilities listed above to implement the detailed table
(included in the Decision) of the approved distribution, supply and metering charges
effective the next billing period from receipt of the ERC Decision on their respective
applications.
RATE ADJUSTMENT
On 19 December 2011, the ERC approved Romblon Electric Cooperative, Inc.’s
(ROMELCO) petition for rate adjustment, granting ROMELCO a Total Revenue
Requirement (TRR) amounting to PhP20,406,667.00 and an Overall Average Tariff
Adjustment (OATA) amounting to PhP0.4663/kWh on its total distribution, supply and
metering charges. Rate schedule per customer class as detailed in the Decision shall
be effective on the next billing cycle from receipt of the Decision. Moreover, the ERC
directed ROMELCO to implement a 25% lifeline discount to customers consuming 15
kWh and below, and 20% lifeline discount to customers consuming 16-20 kWh.
Further, the Reinvestment Fund of PhP0.4431/kWh shall be part of the contribution from
the member-consumers.
RETAIL ELECTRICITY SUPPLIERS (RES) LICENSE
The ERC issued a total of eleven (11) Retail Electricity Suppliers (RES) License in 2012
to the following entities:
RES
1.
2.
3.
4.
5.
6.
7.
Kratos RES, Inc.
Team (Philippines) Energy Corp.
Ecozone Power Management, Inc.
DirectPower Services, Inc.
PRISM Energy, Inc.
GN Power Ltd.
Adventenergy, Inc.
60
Date of Approval
January 9, 2012
January 24, 2012
March 19, 2012
March 26, 2012
May 22, 2012
May 28, 2012
June 18, 2012
RES
8. Subic Enerzone Corporation (Local RES)
9. Bohol Light Company, Inc. (Local RES)
10. Aboitiz Energy Solutions, Inc.
11. Trans-Asia Oil and Energy Development Corporation
RETIREMENT AND WITHDRAWAL FROM
MACHINERIES AND OTHER PROPERTIES
SERVICE
Date of Approval
July 24, 2012
October 5, 2012
October 29, 2012
November 19, 2012
OF
EQUIPMENT,
The ERC grantedManila Electric Company’s (MERALCO) petition to retire the Cavite,
Lucena II, Pagbilao, Forbes Park and Tondo Substations and the withdrawal from the
service of the equipment and machineries installed therein. The total cost of the retired
assets amounting to PhP24,798,169.00 shall be subject to adjustment and optimization
during reset process for the 4th Regulatory Period in accordance with the Rules for
Setting Distribution Wheeling Rates (RDWR) and other pertinent issuances of the ERC.
RULES FOR SETTING ELECTRIC COOPERATIVES’ WHEELING RATES (RSECWR)
The ERC, in 2012, decided on two (2) applications for approval of an adjustment in
rates under the RSEC-WR. On 17 October 2011, The ERC approved Cotabato Electric
Cooperative, Inc.’s (COTELCO) proposed rate adjustment with a detailed Final
Transition Rates Schedule for the following periods, effective its January 2011 to
December 2013 billing period: (1) Start of transition from January 2011 to December
2011; (2) End of Year 1 from January 2012 to December 2012; and (3) End of transition
from January 2013 to December 2013.
On 12 March 2012, the ERC approved Pampanga III Electric Cooperative, Inc.’s
(PELCO III) proposed rate adjustment and provided a detailed Final Transition Rates
Schedule for the following periods, effective its January 2012 to December 2014 billing
period: (1) Start of transition from January 2012 to December 2012; (2) End of Year 1
from January 2013 to December 2013; and (3) End of transition from January 2014
onwards.
SALE OF SUBTRANSMISSION LINES/ ASSETS
The ERC approved three (3) applications of the National Transmission Corporation
(TRANSCO) for the sale of the following subtransmission assets:
ERC
Case No.
2009-174
Franchise
Area
Date of
Decision
Manila Electric March 6, 2012
Subtransmission Lines/ Assets
1. Makban-Los Baños 69kV Line
61
Agreed
Purchase Price
(in PhP)
84.945.335.09
ERC
Case No.
Franchise
Area
Date of
Decision
RC
Company
(MERALCO)
2009-036
MC
Lima Utilities March 12, 2012
Corporation
(LUC)
Visayan
March 12, 2012
Electric
Company
(VECO)
2010-159
RC
Subtransmission Lines/ Assets
Agreed
Purchase Price
(in PhP)
2. Makban-Calamba 69kV Line
(structures 122 to 250)
3. Calamba-CSE 13.8kV Line
4. Los-Baños-Boy Scout of the
Philippines 13.8kV Line
5. Los Baños-IRRI, ERDB, FPRDI
13.8kV Line
6. Calamba Substation Equipment
7. Los
Baños
Substation
Equipment
8. Makban-Substation
Termination Equipment
Batangas-Lima Land 69kV Line
54,453,096.77
1. 100 MVA 138/69/13.8 kV, 3 125,775,969.00
Phase Transformer
2. Power Circuit Breakers
3. Potential Transformers
4. Switchbay 69kV Single CB Bay
with 1 Breaker, Feeder
5. Switchbay 69kV Single CB Bay
with 1 Breaker, Feeder
Protection
6. Switchbay 69kV Single CB Bay
with 1 Breaker, Transformer
7. Switchbay 69kV Single CB Bay
with 1 Breaker, Transformer
Protection
8. Switchbay 69kV Single CB Bay
with 1 Breaker, b Coupler
9. Switchbay 69kV Single CB Bay
with 1 Breaker, b Coupler
Protection
10. Type 4 - 69kV Site
Development
SECURING LOANS
Pangasinan I Electric Cooperative, Inc.’s (PANELCO I) application to secure a loan
amounting to PhP13 million from the Bank of the Philippine Islands was approved by
the ERC on 19 December 2011. This is to finance the implementation of its power
62
distribution expansion and rehabilitation projects, namely: (1) installation of a 10MVA
substation in Dasol, Pangasinan; (2) rehabilitation of its Bolinao and Tara substations;
and (3) construction and acquisition of transmission lines in its franchise area. The
loan, as certified by BPI, shall be for a maximum term of 7 years with 1 year grace
period on principal payments. PANELCO I shall repay the loan in equal quarterly
installments of PhP2,825,000.00 commencing at the end of the 4th quarter from the
initial drawdown.
SUPPLY AGREEMENTS
The ERC resolved, on 26 September 2011 and 03 October 2011, theapplication for
approval of the Electric Power Purchase Agreement (EPPA) of Cebu Energy
Development Corporation (CEDC) with Mactan Electric Company, Incorporated
(MECO) and Bohol I Electric Cooperative, Incorporated (BOHECO I), respectively.
Upon Commercial Operation Date (at 80% load factor), the rate shall be
PhP5.9176/kWh with the following breakdown:
Capital Recovery Fee
Peso O&M Fee
Dollar O&M Fee
Fuel Cost
MECO (in PhP/kWh)
BOHECO 1 (in PhP/kWh)
2.7853
2.2282
0.3871
0.3434
0.4810
0.3688
2.2642
2.2642
For additional electric power in excess of 1,545,264,000/kWh per year, on the
other hand, the approved O&M variable fee shall be PhP0.1685/kWh and fuel
cost shall be computed based on a consumption rate of 0.70kg/kWh or actual,
whichever is lower.
On 22 August 2011, the ERC resolved the application for approval of the Contract for
the Sale of Electricity (CSE) entered into by Masinloc Power Partners Company, Limited
(MPPCL) with Dagupan Electric Corporation (DECORP) under ERC Case No. 2010-005
RC and the Supplemental Agreement to the CSEE under ERC Case No. 2010-092 RC.
The ERC approved an average time of use generation rate of PhP2.5494/kWh, with the
following components: PhP0.6619/kWh Capacity Recovery Charge; PhP0.4057/kWh
Fixed O&M Charge; PhP0.0120/kWh Variable O&M Charge; and PhP1.4698/kWh Fuel
Cost. The ERC allowed the indexation of Fuel to Fuel Cost Index and exchange rate
provided that the actual cost is reflected, and also the Allowable Contract Reimbursable
(ACR) and TRANSCO Service Charge (TSC) and Generation Service Charge (GSC).
On the other hand, the ERC disallowed the use of coefficient factors, the step increases
in the SoLO TOU, as well as the condition in the FXRo, particularly, when FXRn/FXRo,
1 shall be deemed to be 1.0000, to reflect the actual value of FXRo. Also, ERC clarified
that the re-declaration of Bilateral Contract Quantities (BCQ) should have been until
January 17, 2011 only, in congruence to DOE's directive to PEMC. Finally, the ERC
directed MPPCL to refrain from entering into any contract for the 51.97 MW allocated for
its in-house consumption as the same was not considered in the computation of its base
rate.
63
On 26 December 2011, the ERC resolved the application for approval of CSEE filed by
Batangas II Electric Cooperative, Inc. (BATELEC II) and Trans-Asia Oil and Energy
Development Corporation (TA-OIL), and authorized TA-OIL to charge BATELEC II the
approved National Power Corporation (NPC) Time-of-Use (TOU) rates for Luzon from
the time it started supplying electricity to BATELEC.
On 02 July 2012, the ERC resolved the application for approval of Electricity Supply
Agreement (ESA) filed by Catanduanes Power Generation, Inc. (CPGI) and First
Catanduanes Electric Cooperative, Inc. (FICELCO). The applicable base tariff that was
approved consists of a non-fuel charge component, fuel oil charge and lube oil charge.
The PhP2.0018/kWh non-fuel charge includes a capacity fee of PhP0.5471/kWh, Fixed
Operations and Maintenance (O&M) of PhP0.8647/kWh subject to Philippine CPI
adjustment at base index date of July 2003, and Variable O&M of PhP0.5900/kWh
subject to adjustments in US CPI at base index of July 2003 and Philippine Peso-US
Dollar foreign exchange adjustment at base date of July 2003. On the other hand, both
the fuel oil and lube oil charges are pass through cost but limited to a fuel efficiency cap,
to wit: (1) for load of up to 50%, a hear rate of 0.2680 li/kWh or actual, whichever is
lower; and (2) for load of above 50%, a heat rate of 0.2604 or actual, whichever is
lower. The above cap may be adjusted depending on the result of a capacity/fuel
consumption test run to be conducted by an independent third party or the National
Power Corporation- Small Power Utilities Group (NPC-SPUG).
On 01 October 2012, the ERC resolved the application for approval of the ESA between
Therma Marine, Inc. (TMI) and Zamboanga del Norte Electric Cooperative, Inc.
(ZANECO). The ERC approved the following capacity fees (in PhP/kW/month) which
shall not be subject to indexation but to true-up mechanism at the beginning of the
following year: 379 for 2011; 360 for 2012; 342 for 2013; 323 for 2014; and 305 for
2015. Moreover, a Fixed O&M Fee and Energy Fee were approved in the amount of
PhP239/kW/month and PhP0.1486/kWh, respectively, both subject to their respective
indexation factor. On the other hand, the Fuel and Lube Oil Rate is a pass thru cost
based on fuel consumption rates of 0.2358 liter/kWh or actual, whichever is lower for
Heavy Fuel Oil and 0.0024 liter/kWh or actual, whichever is lower, for Lube Oil.
The ERC approvedPalawan Power Generation, Inc.’s (PPGI)Amended Electricity
Supply Agreement (ESA) with Palawan Electric Cooperative, Inc. (PALECO) on 01
October 2012 under ERC Case Nos. 2011-099 RC and 2011-102 RC.
The amended ESA covers the change in the indexation of foreign Operations and
Maintenance (O&M) Fee of Engines 1 and 2 imported from France from US Dollar to
Euro and of Engines 3 and 4 imported from Japan from US Dollar to Japan Commodity
Index and Philippine Peso-Yen Exchange Rate. The amendments also cover the
removal of the associated Lube Oil Cost from the O&M Fee, which shall be charged as
a separate item subject to an efficiency cap of 0.00291li/kWh or actual, whichever is
lower for Engines 1 and 2, and 0.003165li/kWh or actual, whichever is lower for Engines
3 and 4.The amendments of the ESA have no direct impact on the generation rates
64
imposed on PALECO customers considering Palawan is within the area served by the
NPC-SPUC and thus, they shall continue to be charged the approved Socialized
Average Generation Rate (SAGR) of PhP5.6404/kWh plus the prevailing GRAM and
ICERA charges and the difference between the True Cost Generation Rate (TCGR) of
PPGI and the SAGR shall be collected from the UC-ME.
On 16 July 2012, the ERC made permanent the provisional authority granted to
Guimaras Electric Cooperative, Incorporated (GUIMELCO) and Trans-Asia Oil and
Energy Development Corporation (TA-OIL) on the application for approval of the
Amended ESA, subject to the conditions that in the event of any increase in fuel
consumption due to fuel quality, deterioration of equipment or for any reasons, TA-OIL
shall bear the cost while any savings on fuel consumption shall be passed on to
GUIMELCO's member-consumers.
Meanwhile, the ERC approved the application filed by Ilocos Norte Electric Cooperative,
Inc. (INEC) and Northwind Power Development Corporation (NORTHWIND) for the
approval of the Memorandum of Agreement (MOA) on the termination of the ESA and
interconnection of the Burgos Substation of INEC. The termination of the ESA shall not
be deemed a waiver or forfeiture of INEC and NORTHWIND's respective claims or
rights which arose prior to the termination, and shall be without prejudice to the
resolution of the motion for reconsideration filed by INEC on November 18, 2010.
Moreover, no additional obligations shall be incurred except as provided in the said
MOA. As a result of such termination, effective February 25, 2011, all NORTHWIND
generation shall be deemed delivered to the grid. However, during the transition period
from March 26, 2010 to February 25, 2011, the NPC Effective Rates shall be replaced
by the rates of SMEC in the computation of the rates for Burgos Generation.
Additionally, INEC is entitled to a Prompt Payment Discount (PPD) of 3% should it pay
the bill in full within 10 days from receipt thereof. On the interconnection of INEC's
Burgos Substation, the ERC directed INEC to construct the distribution line as soon as
possible and the Interconnection Agreement shall terminate on the date INEC notifies
NORTHWIND that such distribution line is commissioned into operation.
The ERC decided the followingapplications relating to thePower Supply Agreements
(PSAs) entered into by Manila Electric Company (MERALCO) with various generation
companies, to wit:
ERC Case No.
ERC Case No. 2011-098 RC
South Premiere Power Corporation
(SPPC)
Details
A basic generation rate of PhP3.9429/kWh was approved, which
was considered as an interim rate and applicable only until
December 25, 2011. In case of extension beyond December
25, 2011, MERALCO shall file a separate application for
approval and detailed cost evaluation by the Commission.
Decision dated: December 12, 2011
ERC Case No. 2012-036 RC
Approved Rates:
1. Annual Capacity Fee of US$276.39/kW/Yr
Masinloc Power Partners Co., Ltd.
2. Annual Fixed O&M Fee of US$55.30/kW/Yr
65
ERC Case No.
(MPPCL)
Details
3. Annual Fixed O&M Fee of PhP1,285.63/kW/Yr
4. Variable O&M Fee of US$0.0002/kWh
Decision dated: December 17, 2012
5. Variable O&M Fee of PhP0.05382/kWh
6. Pass through fuel cost
7. Guaranteed Net Plant Heat Rate of 10,300 Btu/kWh
ERC Case No. 2012-087 RC
Approved Capacity Fee in US$/kW-Month:
1. Year 1 - 7.663829
San Miguel Energy Corporation
2. Year 2 - 8.198146
(SMEC)
3. Year 3 - 9.74211
4. Year 4 - 10.128603
Decision dated: December 17, 2012
5. Year 5 - 10.357072
6. Year 6 - 10.594849
7. Year 7 - 10.842314
Approved Capacity Fee in PhP/kW-Month arethe following:
1. Year 1 - 658.478714
2. Year 2 - 697.650329
3. Year 3 - 821.344268
4. Year 4 - 837.802607
5. Year 5 - 855.032095
6. Year 6 - 872.198398
7. Year 7 - 890.474465
Annual Fixed O&M is set at PhP955.81/kW-Year while Variable
O&M Fee (US$) is set at US$0.0015/kWh and US$0.0012/kWh
from June 26, 2012 to December 25, 2009, and December 26,
2009 to October 25, 2024, respectively. Variable O&M Fee
(PhP) is set at PhP0.0083/kWh from June 26, 2012 to October
25, 2024.
ERC Case No. 2012-037 RC
The approved fees are the following:
1. Annual Capacity Fee - PhP9,684.02/kW/Yr
Sem-Calaca Power Corporation
2. Annual Fixed O&M Fee - PhP4,785.12/kW/Yr
(SCPC)
3. Variable O&M Fee (US$) - PhP0.0162/kWh
4. Variable O&M Fee - PhP0.05382/kWh
Decision dated: December 17, 2012
5. Pass through fuel cost
6. Guaranteed Net Plant Heat Rate of 10,500 Btu/kWh.
ERC Case No. 2012-034 RC
The approved Capacity Fees in US$ and PhP are detailed in the
Decision from December 26, 2012 up to July 22, 2022. Annual
South Premiere Power Corporation
Fixed O&M Fee is set at PhP258.3875/kW/Yr while
(SPPC)
Administration
Fee
escalating
is
set
at
PhP84.745576271/kW/Yr. Further, energy payments (inclusive
Decision dated: December 17, 2012 of start-up cost) based on energy declared at BCQ to the WESM
and the applicable plant heat rate actually paid by PSALM to the
IPP are pass through.
66
ERC Case No.
ERC Case No. 2012-035 RC
Therma Luzon, Inc. (TLI)
Decision dated: December 17, 2012
Details
The Capacity Fees in US$ and PhP are detailed in the Decision
from December 26, 2011 up to December 26 2018 or until end
of the contract. Annual Fixed O&M Fee is set at
PhP444.47/kW/Yr. Meanwhile, Variable O&M (US$) for the first
75% utilization of the contract capacity is set at US$0.0020/kWh
and US$0.0019/kWh in excess of the 75% utilization of contract
capacity. Variable O&M Fee (PhP) is set at PhP0.0107.
Other PSAs approved by the ERC in 2012 are the following:
ERC Case No.
2009-140 RC
2010-140 RC
2011-138 RC
Parties
Sorsogon I
Electric
Cooperative, Inc.
(SORECO I) and
AP Renewables
Incorporated
(APRI)
Ifugao Electric
Cooperative, Inc.
(IFELCO) and
Provincial
Government of
Ifugao (PGI)
South Cotabato
II Electric
Cooperative, Inc.
(SOCOTECO II),
and Sarangani
Energy
Corporation
(SEC)
Date of
Decision
December 19,
2011
July 30, 2012
July 30, 2012
67
Details of the Decision
Time of Use (TOU) rates for the 1st year shall
be 1% lower than the National Power
Corporation (NPC) rates and 30% PhP-US$
escalation adjustment shall be adopted. TOU
rates for the 2nd year shall be adjusted using
the actual Philippine Consumer Price Index
(CPI).
The ERC approved a Total Generation Rate of
PhP3.62/kWh effective the next billing period
from receipt of the Decision, with the following
components: Capital Recovery Fee (CRF) at
PhP1.25/kWh; O&M Fee at PhP2.36/kWh; and
Share to Host Communities (ER1-94) at
PhP0.01/kWh. CRF proceeds shall be used for
the major refurbishment and replacement of the
Ambangal Mini-Hydro Power Plant (AMPP)
while the unutilized portion of the CRF shall be
allocated to the community.
Upon commercial operation, Foreign
Component of the CRF (in USD/kW/month)
shall be 20.32 in Year 1, 23.33 in Year 2, and
28.69 in Years 3 & 4 and onwards. Local
Component of the CRF (in PhP/kW/month) shall
be 427.32 for Year 1, 490.56 for Years 2 & 3,
and 603.37 for Year 4 and onwards. Fixed
O&M Fee and Variable O&M Fee approved
are333.23/kW/month and 0.3170/kWh,
respectively, subject to adjustment based on
economic indices provided in the PSA.
Interconnection CRF isset at
USD1.25/kW/month for the foreign component
and PhP43.68/kW/month for the local
ERC Case No.
Parties
Date of
Decision
Details of the Decision
component. Fuel cost is a pass through cost
subject to efficiency cap of 0.70kg/kWh plus
0.5% degradation factor or the actual fuel
consumed, whichever is lower. Start-up cost
per event shall be charged as follows: cold
start-up at PhP4,208,906.51; warm-up start-up
at PhP2,872,221.20; and hot start-up at
PhP1,227,515.30. Commissioning Output
Charge is computed at PhP0.3170/kWh
variable O&M fee and the actual cost of fuel to
be a pass through cost.
Likewise, the ERC decided the application for approval of the Commissioning Power
Sales Contract between Kepco SPC Power Corporation (KSPC) and the following
distribution utilities, and approved a testing and commissioning rate of PhP2.3300/kWh,
pre-commercial rate of PhP2.8729/kWh, and an adjustment formula which shall be
(Kadj=1x(CFn/CFo):
ERC Case No.
2010-085 RC
2010-125 RC
2010-130 RC
2010-141 RC
2011-012 RC
2011-020 RC
2011-024 RC
Distribution Utility (DU)
Negros Occidental Electric Cooperative, Inc. (NOCECO)
Negros Oriental I Electric Cooperative, Inc. (NORECO I)
VMC Rural Electric Service Cooperative, Inc. (VRESCO)
Negros Oriental II Electric Cooperative, Inc. (NORECO II)
Central Negros Electric Cooperative, Inc. (CENECO)
Cebu II Electric Cooperative, Inc. (CEBECO II)
Cebu I Electric Cooperative, Inc. (CEBECO I)
Date of Decision
September 05, 2011
October 10, 2011
October 03, 2011
October 10, 2011
August 22, 2011
September 26, 2011
September 26, 2011
The ERC, on 06 March 2012, approved the Memorandum of Agreement (MOA) for the
Sale of Generated Power during Commissioning between Smith Bell Mini-Hydro
Corporation (SBMHC) and Nueva Vizcaya Electric Cooperative, Inc. (NUVELCO). As
such, SBMHC shall charge NUVELCO at the rate of PhP1.52/kWh from October 26,
2010 to December 26, 2010. From December 27, 2010 until the time it will qualify for
the feed-in tariff (FIT), the interim rate to be applied by SBMHC for the sale of its
generated power shall be PhP4.24/kWh, of which PhP2.72/kWh is for the Capital
Recovery Rate and PhP1.52/kWh is for the Operational and Maintenance Rate. The
variable component of the O&M shall be escalated or de-escalated annually by the
Philippine Consumer Price Index (CPI). On the other hand, the PhP2 million annual
payment of SBMHC for the utilization of the distribution lines of NUVELCO cannot be
passed upon in the instant application, but should be subject of a separate application
to be filed by SBMHC and NUVELCO.
On 14 November 2011, the ERC made permanent the provisional authority issued on
May 9, 2011, approving the Power Sector Assets and Liabilities Management
Corporation’s (PSALM) Contracts to Supply Electric Energy (CSEE) and Letters of
68
Agreement (LOA) Entered Into with Distribution Utilities (DUs) Located in the Visayas
Grid under ERC Case No. 2011-039 RC and 2011-021 RC. The ERC approved the
CSEEs and LOAs with ANTECO, CEBECO I, CEBECO II, ILECO II, ILECO III,
LEYECO III, LEYECO IV, LEYECO V, NOCECO, NORECO I, SAMELCO II and
VRESCO, in varying amounts of average contracted energy as specified in the Decision
for the contract duration from December 26, 2010 up to December 25, 2011. Likewise,
the ERC approved the CSEEs and LOAs with BILECO, NORSAMELCO, SAMELCO I,
VECO, CENECO, LEYECO I/DORELCO and LEYECO II, in varying amounts of
average contracted energy as specified in the Decision for the contract duration from
December 26, 2010 up to December 25, 2011, with only LEYECO II having a contract
duration from November 26, 2010 up to December 25, 2011. The ERC also made
permanent, on 24 January 2012, the provisional authority issued on May 9, 2011 to
Power Sector Assets and Liabilities Management Corporation (PSALM), approving the
CSEEs and LOAs with LASURECO and ZAMCELCO, in varying amounts of average
contracted energy as specified in the Decision.
TAX RECOVERY
The ERC granted, on 27 February 2012,Manila Electric Company’s
(MERALCO)application for recovery of Local Franchise Tax (LFT) for the 5 provinces
and 14 cities under its franchise area, specifically the areas of Bulacan Province,
Batangas Province, Cavite Province, Laguna Province, Rizal Province, San Jose Del
Monte City, Batangas City, San Pablo City, Tagaytay City, Lucena City, Mandaluyong
City, Marikina City, Quezon City, Caloocan City, Pasay City, Las Piñas City, City of
Manila, Pasig City, and Calamba City. MERALCO was authorized to recover the LFT
and impose the Tax Recovery Adjustment Charges (TRAC) as detailed in the Decision,
and to reflect the Tax Recovery Adjustment Charges (TRAC) in customers' bills as a
separate item.
UNIVERSAL CHARGE (UC)
The ERC, on 16 July 2012, approved the application of National Power Corporation
(NPC) for the availment of the Environmental Charge/Share from the Universal Charge
for the Rehabilitation and Management of Watershed Areas. The Power Sector Assets
and Liabilities Management Corp. (PSALM) was authorized to release the amount of
PhP58,829,083.10 to fund NPC's Watershed Management Program for 2007, and
PhP100,554,854.56 for 2008. Disbursement and utilization, as directed by the ERC,
shall be in accordance with the Rules and Procedures Governing the Utilization and
Disbursement of the UC-EC.
Meanwhile, on 30 July 2012, the ERC approved the petition of the National Power
Corporation - Small Power Utilities Group (NPC-SPUG) for the recovery from the UC of
the shortfalls in the Missionary Electrification (ME) Subsidy for CY 2003 to CY
2009under the True-Up Mechanism Pursuant to ERC Resolution No. 11, Series of 2005
69
and the corresponding adjustment of the UCME. As a result, PSALM was authorized to
release the amount of PhP6,326,090,190.46 to NPC-SPUG and all distribution utilities
and the National Grid Corporation of the Philippines (NGCP) were directed to collect
from the consumers the UC-ME charge in the amount of PhP0.0709/kWh, on top of the
existing UC-ME rate of PhP0.0454/kWh for a period of 17 months or until such time that
the full amount shall have been collected, whichever comes earlier. This will start on
the August 2012 billing period and shall be remitted to PSALM on or before the 15th day
of the succeeding month.
VIOLATION OF ERC RULES, REGULATIONS AND POLICIES
The ERC, in line with its mandate under Section 43(i) of Republic Act No. 9136, decided
thirty-three (33) violation cases filed against entities for violating the EPIRA and its IRR,
and the rules and regulations promulgated by ERC, specifically, for:
1. Failure to renew their Certificates of Compliance (COCs) within the prescribed
period and operating a generation facility without a valid COC;
2. Inclusion of Power Supply Contract Cost (PSC) in the Retail Rates Without Prior
Approval from the Commission
3. Failure to Comply with ERC Resolution No. 16, Series of 2009, As Amended by
ERC Resolution No. 21, Series of 2010;
4. Implementation of Unapproved Additional Rate;
5. Implementing Capital Projects Without Prior Approval from the Commission;
6. Failure to Submit Annual Report;
7. Violation of Chapter 3, Sections 3.2.3.3 and 3.2.3.4 of the Philippine Distribution
Code (PDC) and Section 1.7.6 of the Distribution Services and Open Access
Rules (DSOAR);
8. Failure to Implement the Inter-Class Cross-Subsidy Removal;
9. Failure to Furnish the Commission a Copy of the Written Notices dated
November 4, 2009 and September 1, 2010 Denying Team (Philippines) Energy
Corporation's (TPEC) Application as a WESM Member.
Twenty-eight (28) out of the thirty-three (33) or 85% pertain to violations on COC
renewal, PSC cost inclusions in the retail rates, non-compliance to Resolution No. 16,
series of 2009, and non-submission of Annual Report.
The following are the details of the violation cases decided per nature of violation:
Failure to renew their COCs within the prescribed period and operating a generation
facility without a valid COC
No.
1
ERC Case
No.
2011-013 MC
Entity
Date of Decision
Action
National Power Corporation Small Power Utilities Group
(NPC-SPUG) and Catanduanes
February 24, 2012
Approved Settlement
70
No.
ERC Case
No.
2
2011-037 MC
3
2011-047 MC
4
2011-054 MC
5
2011-055 MC
6
2011-056 MC
7
2011-057 MC
8
2011-058 MC
9
2011-061 MC
10
2011-081 MC
11
2012-014 MC
12
2012-016 MC
Entity
Power Generation, Inc. (CPGI)
Panasia Energy Holdings, Inc.
(Panasia)
SPC Island Power Corporation
(SIPC)
SPC Power Corporation (SPC)
Power Sector Assets and
Liabilities
Management
Corporation (PSALM)
Lubang Electric Cooperative,
Inc. (LUBELCO)
Oriental
Mindoro
Electric
Cooperative, Inc. (ORMECO)
Samar I Electric Cooperative,
Inc. (SAMELCO I)
SPC Island Power Corporation
(SIPC)
Southern
Leyte
Electric
Cooperative, Inc. (SOLECO)
Hastings Motor Corporation
(HASTINGS)
Monark Equipment Corporation
(MONARK)
Date of Decision
Action
March 21, 2012
Approved Settlement
April 30, 2012
Closed and
Terminated
Closed and
Terminated
Approved Settlement
April 2, 2012
February 8, 2012
January 24, 2012
January 24, 2012
April 2, 2012
December 20, 2011
March 21, 2012
Closed and
Terminated
Closed and
Terminated
Closed and
Terminated
Approved settlement
December 11, 2012
Closed and
Terminated
Approved settlement
July 19, 2012
Approved settlement
Inclusion of PSC in the Retail Rates Without Prior Approval from the Commission
No.
1
ERC Case
No.
2011-042 MC
2
2012-004 MC
3
2012-005 MC
4
2012-022 MC
5
2012-023 MC
6
2012-029 MC
7
2012-031 MC
Entity
Date of Decision
Central
Negros
Electric November 27, 2012
Cooperative, Inc. (CENECO)
Sorsogon II Electric Cooperative, November 27, 2012
Inc. (SORECO II)
Iloilo III Electric Cooperative, Inc.
June 6, 2012
(ILECO III)
Capiz Electric Cooperative, Inc. September 24, 2012
(CAPELCO)
Batangas I Electric Cooperative, November 5, 2012
Inc. (BATELEC I)
Pangasinan
III
Electric November 20, 2012
Cooperative, Inc. (PANELCO III)
Nueva Ecija II Area-I Electric
October 24, 2012
Cooperative, Inc. (NEECO II
AREA I)
71
Action
Approved settlement
Approved settlement
Approved settlement
Approved settlement
Approved settlement
Approved settlement
Approved settlement
No.
8
ERC Case
No.
2012-061 MC
Entity
Ilocos Sur Electric Cooperative,
Inc. (ISECO)
Date of Decision
Action
December 7, 2012
Approved settlement
Failure to Comply with ERC Resolution No. 16, Series of 2009, As Amended by ERC
Resolution No. 21, Series of 2010
No. ERC
Case Entity
No.
1 2012-041 MC Leyte II Electric Cooperative, Inc.
(LEYECO II)
2 2011-072 MC San
Jose
City
Electric
Cooperative, Inc. (SAJELCO)
3 2011-077 MC Isabela II Electric Cooperative,
Inc. (ISELCO II)
Date of Decision
Action
October 24, 2012
Approved settlement
October 2, 2012
Approved settlement
March 5, 2012
Approved Settlement
Implementation of Unapproved Additional Rate
No.
1
ERC Case
No.
2012-020 MC
Entity
Date of Decision
Pangasinan
I
Electric September 10, 2012
Cooperative, Inc. (PANELCO I)
Action
Approved settlement
Implementing Capital Projects Without Prior Approval from the Commission
No.
1
ERC Case
No.
2011-010 MC
Entity
Date of Decision
San Fernando Electric Light and January 24, 2012
Power
Company,
Inc.
(SFELAPCO)
Action
Closed and
Terminated
Failure to Submit Annual Report
No.
1
2
3
4
5
ERC Case
No.
2011-014 MC
Entity
Date of Decision
Action
Ticao
Island
Electric
Cooperative, Inc. (TISELCO)
Maguindanao
Electric
Cooperative, Inc. (MAGELCO)
South Cotabato II Electric
Cooperative, Inc. (SOCOTECO
II)
Misamis Oriental I Electric
Cooperative, Inc. (MORESCO I)
Romblon Electric Cooperative,
July 9, 2012
July 10, 2012
Closed and
Terminated
Reprimanded
July 20, 2012
Reprimanded
November 15, 2012
Exonerated
November 5, 2012
Reprimanded
72
Inc. (ROMELCO)
Violation of Chapter 3, Sections 3.2.3.3 and 3.2.3.4 of the Philippine Distribution Code
(PDC) and Section 1.7.6 of the Distribution Services and Open Access Rules (DSOAR)
No.
1
ERC Case
No.
2012-009 MC
Entity
Date of Decision
Action
La Union Electric Cooperative,
Inc. (LUELCO)
October 1, 2012
Exonerated
Failure to Implement the Inter-Class Cross-Subsidy Removal
No.
1
ERC Case
No.
2007-474 MC
Entity
Date of Decision
Action
Quezon II Electric Cooperative,
Inc. (QUEZELCO II)
July 10, 2012
Reprimanded
Failure to Furnish the Commission a Copy of the Written Notices dated November 4,
2009 and September 1, 2010 Denying Team (Philippines) Energy Corporation's (TPEC)
Application as a WESM Member
No.
1
ERC Case
No.
2011-015 MC
Entity
Philippine Electricity Market
Corporation (PEMC)
Date of Decision
Action
September 19,
2011
Reprimanded
PEMC was directed
to amend the WESM
Rules so that in all
circumstances, ERC
shall be furnished a
copy of the denial of
an application for
membership in the
WESM. Further, the
ERC enjoined PEMC
and TPEC to resolve
TPEC's application
within a period of 6
months from receipt
of the Decision.
CONSUMER AFFAIRS
The ERC received a total of 510 letter-complaints from electricity consumers directed
against various DUs. As part of its mandate to promote and protect the electricity
consumers’ interests, the ERC acted on these complaints and mediated between these
73
complainants and the DUs they were complaining against. Through this mediation
process, a huge number of these letter-complaints, including those filed in the previous
years were resolved and/or amicably settled to the satisfaction of the complainants.
Throughout this process, the ERC issued 3,855 Letters, 2,121 Orders, and conducted
1,802 conferences in 2012.
For some of those unresolved complaints, the complainants invoked the ERC’s
jurisdiction by filing their formal complaints. Several of these complaints were also
eventually amicably settled, while some of those that were not were resolved by the
ERC based on the evidences submitted by the parties.
Below is the Summary of the Filed and Resolved Consumers Complaints for Mediation
and Arbitration.
Old (Prior to 2012)
January
February
March
April
May
June
July
August
September
October
November
December
Subtotal for 2012
TOTAL
Filed
8,379
Resolved
6,036
Letters
Orders
64
58
39
27
44
28
63
41
21
52
45
28
90
97
115
55
106
68
63
41
21
68
51
26
435
393
501
418
385
302
341
183
280
315
172
130
236
202
226
141
210
172
189
188
162
152
132
111
510
8,889
801
6,837
3,855
3,855
2,121
2,121
CHALLENGES AHEAD
ERC’S STRATEGIC PLANS FOR 2013
The ERC formulated its strategic plans for 2013.These strategic plans are translated
into specific and measureable targets. The systems and procedures needed in 2013 are
likewise drawn up. Among the major targets lined up for 2013are the Finalization of the
74
FIT-All Payment and Collection Guidelines/Renewable Energy Payment Agreement
(REPA) Template, Regulatory Support for the Interim Market for Energy in Mindanao,
and the Issuance of Rules to address other transition issues in the implementation of
Retail Competition and Open Access.
PRIORITY AREAS
ENHANCED
REGULATION
ENHANCED MARKET
COMPETITION
EFFECTIVE
MONITORING
PROMOTION OF
CONSUMER
INTEREST
BUILD TECHNICALLY
COMPETENT PEOPLE
SYSTEMS
&PROCEDURES
2013
Review and enhance Rules on Consumer Service Policy
Improve Procedure in Handling Consumer Complaints
Review and revise the RSEC-WR & RDWR-RT
Finalize FIT-All Payment & Collection Guidelines/ REPA
Template
Finalize Net Metering Interconnection Guidelines
Draft and finalize Rulesfor the Review &Evaluation of
Power Supply Agreement
Provide Regulatory Support for Interim Market for Energy
in Mindanao
Draft and finalize Rules to address other transition issues
in the implementation of Retail Competition & Open
Access
Accomplish deliverables/pre-conditions for Retail
Competition & Open Access
Draw up roadmap for more Effective Market Monitoring
Enhance Monitoring Tools & Manuals
Intensify Contestable Consumer Awareness Campaign
Inform and Educate the Public through the Use of TriMedia
Draw up and propose a New Organizational Structure
Develop Compensation & Benefits Scheme
Refine and implement the PBB Scheme
Conduct a comprehensive Training Needs Assessment
and develop a Training Plan
Improve Process Flow on Disposition of Cases
Conduct an Agency-wide Inventory of all Records
Develop the Records Disposition Systemand Executive
Information System (Electricity Rates)
The strategic plans listed above are supported by second level plans. These plans
detail all the tasks to be carried out by each Service/Division/Unit. The implementation
75
of these plans shall be strictly monitored using a Monitoring and Evaluation System
approved by the ERC.
COMPETITIVE RETAIL ELECTRICITY MARKET (CREM)
In the preparation for the implementation of the Open Access and Retail Competition
Regime (OARC) in the islands of Luzon and the Visayas, the ERC needs to ensure the
smooth transition of the entire electric power industry to a more competitive
environment as well as to promote the interests of all the stakeholders in the said
industry. A six (6) month transition period starting December 26, 2012 until June 25,
2013 will be implemented to give retail electricity market participants a sufficient amount
of time to evaluate, plan and contract for supply of electricity. During this period,
distribution utilities (DUs) shall continue to provide supply of electricity to contestable
customers operating in their franchise areas.
The ERC anticipates that several implementation issues may be encountered once
retail competition is implemented. The ERC is preparing to address all these issues by
coming out with regulations to ensure the smooth transition to this new environment and
the protection of the interests of both the Captive and Contestable Customers.
INTERIM MINDANAO ELECTRICITY MARKET (IMEM)
The Interim Mindanao Electricity Market was mandated under the DOE Circular No.
2013-01-0001 to address the power situation in the Mindanao region. The IMEM is a
venue forthe transparent and efficient utilization of all available capacities in Mindanao
grid to meet the supply deficiency in the region. It aims to encourage all embedded
generators in the grid to participate in the market and also to draw out voluntary load
customers who are willing to curtail their load to lower the demand in the system.
The Energy Regulatory Commission (ERC) is cognizant of its critical role in ensuring the
establishment of the IMEM and the realization of its objectives. It is committed to
effectively discharge this role by expediting its evaluation and action on all the
necessary regulatory filings to be made as precondition to the establishment and
operation of the IMEM.
RENEWABLE ENERGY (RE)
Net Metering for RE is an incentive mechanism that encourages end-users to
participate in renewable electricity generation. All end-userscan put up and invest in RE
systems and sell excess electricity to the grid. The ERC, in consultation with the
National Renewable Regulatory Board (NREB), is tasked to put up rules and pricing
methodology for the program.
76
The ERC’s work as regards the FIT System is not yet complete. Although the ERC
approved in 2012 the initial Feed-In Tariff (FIT) rates for wind, biomass, solar and hydro
renewable energy resources, it has yet to set the FIT rate for ocean generated
electricity. This will depend on the availability of sufficient data to be used as basis for
its initial FIT rate. To finally implement the FIT System, the ERC will have to already
finalize the remaining rules and guidelines that will complement the FIT Rules it earlier
issued and work on setting the FIT Allowance. The ERC is optimistic that this will be
accomplished soon.
FINANCIAL HIGHLIGHTS
Balance Sheet
December 31, 2012
Source: 2012 ERC Unaudited Financial Statements
(Pending COA’s ERC Annual Audit Report)
ASSETS
Current Assets
Cash
Cash on Hand
Cash in Banks
Receivables
Accounts Receivables
Inter-Agency Receivables
Other Receivables
Inventories
Office Supplies Inventory
Accountable Forms Inventory
Spare Parts Inventory
Prepayments
Prepaid Rent
Prepaid Insurance
Other Prepaid Expenses
Other Current Assets
Total Current Assets
220,308.00
325,429.04
545,737.04
96,021.50
1,710,605.38
100,571.94
1,907,198.82
1,881,282.08
166,201.78
9,630.00
2,057,113.86
1,000.00
385,691.47
106,490.28
493,181.75
37,620.00
5,040,851.47
Property, Plant and Equipment
Leasehold Improvements, Buildings
Office Equipment
Furniture and Fixtures
IT Equipment and Software
Library Books
Communication Equipment
Medical, Dental and Laboratory Equipment
5,094,692.50
1,784,232.08
13,777,977.41
60,338,852.69
92,964.21
3,394,681.02
28,900.00
77
Technical and Scientific Equipment
Transportation Equipment
Other Property, Plant and Equipment
Total Property, Plant and Equipment
Less: Accumulated Depreciation
Property, Plant and Equipment (Net)
44,984,658.18
14,274,016.05
13,685,779.74
157,456,753.88
76,497,316.60
80,959,437.28
Other Assets
446,877.35
TOTAL ASSETS
86,447,166.10
LIABILITIES
Current Liabilities
Accounts Payable
Due to Officers and Employees
Due to BIR
Due to GSIS
Due to PAG-IBIG
Due to PHILHEALTH
Performance/Bidders/Bail Bonds Payable
Other Payables
5,214,452.64
493,573.79
408,631.65
29,368.71
4,525.37
750.00
529,090.00
436,637.89
TOTAL LIABILITIES
7,117,030.05
EQUITY
Government Equity
79,330,136.05
TOTAL EQUITY
79,330,136.05
TOTAL LIABILITIES AND EQUITY
86,447,166.10
78
2012 ERC REVENUE RESOURCES
The ERC’s revenue collection for 2012 amounted to PhP1.042 billion. This was 112%
higher than the projected 2012 income of PhP492.855 million. The details are as
follows:
1.
2.
3.
4.
5.
Total
NATURE OF INCOME
Permits and Licenses
Meter Testing Fees and Meter Type Approval
Supervision Fees
Fines and Penalties
Other Income
COLLECTION (PhP)
284,553,413.46
42,211,708.09
710,871,935.47
4,069,347.89
897,421.95
1,042,603,826.86
The bulk of the 2012 collection came from the supervision fees, in the amount of
PhP710,871,935.47 or 68.18% of the total income, while the permits and licenses
accounted for 27.29% of the total 2012 income. The remaining income generated by the
ERC came from meter testing fees and meter type approval (4.05%), fines and
penalties (0.39%) and other general income (0.09%). See pie chart below for
comparison:
BREAKDOWN OF 2012 ERC INCOME
79
Supervision Fees
PhP710,871,935.47
(68.18%)
Fines and Penalties
PhP4,069,347.89
(0.39%)
Permits and Licenses
PhP284,553,413.46
(27.29%)
Meter Testing Fees &
Meter Type Approval
PhP42,211,708.09
(4.05%)
Other Income
PhP897,421.95
(0.09%)
2012 BUDGET APPROPRIATIONS
The 2012 ERC approved budget was PhP213.717 million. PhP143.026 million or
66.92% of which was for Personnel Services (PS), PhP70.191 million or 32.84% was for
Maintenance & Other Operating Expenses (MOOE) and the remaining PhP.5 million or
.23% was for Capital Outlay (CO).
CO
0.23%
MOOE
32.84%
PS
66.92%
2012 REVENUE VS. BUDGET
80
The 2012 approved budget was only 20% of the total revenue collection of ERC. The
graph below shows the difference between ERC’s 2012 budget and revenue:
1,200,000.00
1,000,000.00
800,000.00
600,000.00
400,000.00
200,000.00
Budget
Revenue
2011 AND 2012 COMPARISON OF BUDGETS AND REVENUES
ERC’s 2012 budget of PhP213.717 million is only 3.7% higher than the 2011 budget of
PhP206.170 million and the ERC’s 2011 and 2012 budget are only 20% of ERC’s actual
revenues for both years. This clearly indicates that the ERC generates revenue for the
government.
1,200,000.00
1,000,000.00
800,000.00
Budget
600,000.00
Revenue
400,000.00
200,000.00
2011
2012
81
82
83
Annex 1
STATUS OF 393 CASES FILED IN 2012
No.
Case No.
Case Title
1
2012-001 CC
2
2012-002 CC
3
2012-003 CC
4
2012-004 CC
5
2012-005 CC
6
2012-006 CC
7
2012-007 CC
8
2012-008 CC
9
2012-009 CC
10
2012-010-CC
11
2012-011-CC
12
2012-012-CC
13
2012-013-CC
14
2012-014-CC
15
2012-015-CC
Atty. Bernardo Q. Cuaresma vs.
Manila Electric Company (MERALCO)
Antardhana Holdings Corporation /
Jade Vincent R. Yupangco vs. Manila
Electric Company (MERALCO)
Oddball A. Paulino vs. Manila Electric
Company (MERALCO)
Darryl Briones Ong vs. Manila Electric
Company (MERALCO)
Darryl Briones Ong vs. Manila Electric
Company (MERALCO)
Spouses Jerry S. Batang & Mildred T.
Batang vs. Manila Electric Company
(MERALCO)
Amalia C. Cailian vs. Manila Electric
Company (MERALCO)
Sps. Alfredo M. Manalili and Gloria A.
Manalili vs. Pampanga III Electric
Cooperative, Inc. (PELCO III)
Jay S. Gutierrez vs. Manila Electric
Company (MERALCO)
Homer Flores vs. Manila Electric
Company (MERALCO)
Elmer A. Mendoza vs. Manila Electric
Company (MERALCO)
Conrado G. Fernandez / Maria Angela
J. Fernandez vs. Manila Electric
Company (MERALCO)
Gloria Dela Cruz vs. Manila Electric
Company (MERALCO)
Consuelo M. Inocencio vs. Manila
Electric Company (MERALCO)
Beatriz D. Ignacio represented by
Adelaida G. Ignacio vs. Manila Electric
Company (MERALCO)
84
Applicant/
Complainant/
Respondent/
Petitioner
Atty. Bernardo Q.
Cuaresma
Antardhana Holdings
Corporation / Jade
Vincent R. Yupangco
Oddball A. Paulino
Status
On-going
On-going
On-going
Darryl Briones Ong
On-going
Darryl Briones Ong
On-going
Spouses Jerry S.
Batang & Mildred T.
Batang
Amalia C. Cailian
On-going
Sps. Alfredo M.
Manalili and Gloria A.
Manalili
Jay S. Gutierrez
On-going
Homer Flores
On-going
Elmer A. Mendoza
On-going
Conrado G. Fernandez
/ Maria Angela J.
Fernandez
Gloria Dela Cruz
On-going
Consuelo M. Inocencio
On-going
Beatriz D. Ignacio
represented by
Adelaida G. Ignacio
On-going
On-going
On-going
On-going
No.
Case No.
16
2012-016-CC
17
2012-017-CC
18
2012-018-CC
19
2012-019-CC
20
2012-020-CC
21
2012-021-CC
22
2012-022-CC
23
2012-023-CC
24
2012-024-CC
25
2012-025-CC
26
2012-026-CC
27
2012-027-CC
28
2012-028-CC
29
2012-029-CC
30
2012-030-CC
31
2012-031-CC
32
2012-032-CC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
Atty. Rodolfo U. Jimenez vs. Manila Atty. Rodolfo U.
Electric Company (MERALCO)
Jimenez
Jesus Trajano Loreto vs. Manila Jesus Trajano Loreto
Electric Company (MERALCO)
Juanito Lopez vs. Manila Electric Juanito Lopez
Company (MERALCO)
Larry Ang vs. Manila Electric Larry Ang
Company (MERALCO)
Mega Asia Bottling Corporation vs. Mega Asia Bottling
San Fernando Electric Light and Corporation
Power Company, Inc. (SFELAPCO),
Fe Varona and Jose T. Lazatin
Vilma P. Austero vs. Manila Electric Vilma P. Austero
Company (MERALCO)
Inocencia Villanueva vs. Manila
Inocencia Villanueva
Electric Company (MERALCO)
Ma. Angelica Aquino-Kabasakalli vs.
Ma. Angelica AquinoPioneer Highlands South
Kabasakalli
Condominium Corp. and Manila
Electric Company (MERALCO)
Delfin Sulit, Jr. vs. Manila Electric
Delfin Sulit, Jr.
Company (MERALCO)
Romulo O. Pabilonia vs. Manila
Romulo O. Pabilonia
Electric Company (MERALCO)
Emiliano M. Quiday, Jr. vs. Manila
Emiliano M. Quiday,
Electric Company (MERALCO)
Jr.
LBC Properties, Inc. / Josie S.
LBC Properties, Inc. /
Maceren vs. Manila Electric Company Josie S. Maceren
(MERALCO)
Estrella B. Mejarito vs. Manila Electric Estrella B. Mejarito
Company (MERALCO)
Teresita C. Buluran daugther of
Teresita C. Buluran
Prudencia B. Caluag (deceased) vs.
daugther of Prudencia
Manila Electric Company (MERALCO) B. Caluag (deceased)
Teresita C. Buluran vs. Manila Electric Teresita C. Buluran
Company (MERALCO)
Lucia R. Valdez vs. Manila Electric
Lucia R. Valdez
Company (MERALCO)
Spouses Michael S. Santiago and
Spouses Michael S.
Jennifer B. Santiago vs. Manila
Santiago and Jennifer
Electric Company (MERALCO)
B. Santiago
85
Status
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Case Title
33
2012-033-CC
34
2012-034-CC
35
2012-035-CC
36
2012-036-CC
37
2012-037-CC
38
2012-038-CC
39
2012-039-CC
40
2012-040-CC
41
2012-041-CC
42
2012-042-CC
43
2012-043-CC
44
2012-044-CC
45
2012-045-CC
46
2012-046-CC
47
2012-047-CC
48
2012-048-CC
49
2012-049-CC
Emerencia S. Ocampo vs. Manila
Electric Company (MERALCO)
Bernardo S. De Vera vs. Manila
Electric Company (MERALCO)
Carmie Yeung and Emilia T. Chua vs.
Manila Electric Company (MERALCO)
Lolida O. Manuel vs. Manila Electric
Company (MERALCO)
Joezer B. Bolalin vs. Manila Electric
Company (MERALCO)
James Francis Anthony S. Garcia vs.
VMC Rural Electric Services
Cooperative, Inc. (VRESCO)
Jane Tiamson vs. Manila Electric
Company (MERALCO)
Intercon Garments, Inc. vs. Manila
Electric Company (MERALCO)
Adoracion Fernandez vs. Manila
Electric Company (MERALCO)
Jose Ong represented by Carlos
Acuesta vs. Manila Electric Company
(MERALCO)
Danilo G. Pulongbarit vs. Manila
Electric Company (MERALCO)
represented by Cecilio C. Javier,
Squad Leader, Valenzuela NMS
Edita B. Cabaña vs. Manila Electric
Company (MERALCO)
Jose Y. Encarnacion, Jr. vs. Manila
Electric Company (MERALCO)
Harold B. Silva vs. Manila Electric
Company (MERALCO)
Illumina Learning Institution, Inc. vs.
Manila Electric Company (MERALCO)
Noel Florento vs. Manila Electric
Company (MERALCO)
Gencars Legaspi, Inc. vs. Albay
Electric Cooperative, Inc. (ALECO)
86
Applicant/
Complainant/
Respondent/
Petitioner
Emerencia S. Ocampo
On-going
Bernardo S. De Vera
On-going
Carmie Yeung and
Emilia T. Chua
Lolida O. Manuel
On-going
Joezer B. Bolalin
On-going
James Francis
Anthony S. Garcia
On-going
Jane Tiamson
On-going
Intercon Garments,
Inc.
Adoracion Fernandez
On-going
Jose Ong represented
by Carlos Acuesta
On-going
Danilo G. Pulongbarit
On-going
Edita B. Cabaña
On-going
Jose Y. Encarnacion,
Jr.
Harold B. Silva
On-going
Illumina Learning
Institution, Inc.
Noel Florento
On-going
Gencars Legaspi, Inc.
On-going
Status
On-going
On-going
On-going
On-going
No.
Case No.
Case Title
50
2012-050-CC
Alpha
Grandview
Condominium
Corporation represented by Roberto
Abad vs. Manila Electric Company
(MERALCO)
51
2012-051-CC
52
2012-052-CC
53
2012-053-CC
54
2012-054-CC
55
2012-055-CC
56
2012-056-CC
57
2012-057-CC
58
2012-058-CC
59
2012-059-CC
60
2012-060-CC
Amando Tetangco vs. Meralco Electric
Company (MERALCO) - Tutuban
Business Center
Wilfredo H. Calma vs. Manila Electric
Company (MERALCO)
Gloria D. Gutierrez vs. Manila Electric
Company (MERALCO)
Regner Santos Neri vs. Manila Electric
Company (MERALCO)
Roger T. Manaog vs. Manila Electric
Company (MERALCO)
Edilberto A. Camillo vs. Manila Electric
Company (MERALCO)
Edita R. Villafuerte vs. Meralco
Electric Company (MERALCO) and
Lea Sta. Maria and Carmen Magnial
Ricardo G. Zaldua vs. Manila Electric
Company (MERALCO)
Manuel V. De Veyra/Juanito T. De
Veyra vs. Manila Electric Company
(MERALCO)
Manuel A. Alejandro vs. "John Doe"
Dalupang Branch Manager, Isabela II
Electric Cooperative, Inc. (ISELCO II),
Gami Branch, "Richard Doe",
Institution Manager, ISELCO II, "Peter
DOE, Siquian, ISELCO II, Atty. Arlan
A. Castañeda, ISELCO II legal
Counsel and/or Ms. Joan Macaro
61
2012-061-CC
62
2012-062-CC
Applicant/
Complainant/
Respondent/
Petitioner
Alpha Grandview
Condominium
Corporation
represented by
Roberto Abad
Amando Tetangco
On-going
On-going
Wilfredo H. Calma
On-going
Gloria D. Gutierrez
On-going
Regner Santos Neri
On-going
Roger T. Manaog
On-going
Edilberto A. Camillo
On-going
Edita R. Villafuerte
On-going
Ricardo G. Zaldua
On-going
Manuel V. De
Veyra/Juanito T. De
Veyra
Manuel A. Alejandro
On-going
Myrla P. Nicandro vs. Manila Electric Myrla P. Nicandro
Company (MERALCO)
Victor V. Bonus vs. Manila Electric Victor V. Bonus
Company (MERALCO)
87
Status
On-going
On-going
On-going
No.
Case No.
Case Title
63
2012-063-CC
LSD Construction Corporation
/
Crescenciano M. Pitogo vs. Visayan
Electric Company, Inc. (VECO)
64
2012-064-CC
65
2012-065-CC
66
2012-066-CC
67
2012-067-CC
68
2012-068-CC
69
2012-069-CC
70
2012-070-CC
71
2012-071-CC
Ramon S. Mercurio/Margareth B.
Mercurio vs. Manila Electric Company
(MERALCO)
Araceli Cabangis vs. Manila Electric
Company (MERALCO)
Marlon L. Castañeda vs. Manila
Electric Company (MERALCO)
Romulo M. Abancio, Jr. vs. VMC Rural
Electric Services Cooperative, Inc.
(VRESCO)
Gary Cooper D. Cunanan vs. Manila
Electric Company (MERALCO)
Noel V. Binuya vs. Manila Electric
Company (MERALCO)
Elenita M. Mamporte vs. Manila
Electric Company (MERALCO)
Heirs of Pablito V. Mendoza, Sr.
represented by their AIF Gertrudes C.
Lopez vs. Manila Electric Company
(MERALCO)
72
2012-072-CC
73
2012-073-CC
74
2012-074-CC
75
2012-075-CC
76
2012-076-CC
77
2012-077-CC
Applicant/
Complainant/
Respondent/
Petitioner
LSD Construction
Corporation /
Crescenciano M.
Pitogo
Ramon S.
Mercurio/Margareth B.
Mercurio
Araceli Cabangis
On-going
On-going
On-going
Marlon L. Castañeda
On-going
Romulo M. Abancio,
Jr.
On-going
Gary Cooper D.
Cunanan
Noel V. Binuya
On-going
Elenita M. Mamporte
On-going
Heirs of Pablito V.
Mendoza, Sr.
represented by their
AIF Gertrudes C.
Lopez
Ma. Victoria Frialde vs. Manila Electric Ma. Victoria Frialde
Company (MERALCO)
Luciano Sarne, Jr. vs. Manila Electric Luciano Sarne, Jr.
Company (MERALCO)
Ricky Co Ongchan vs. Manila Electric Ricky Co Ongchan
Company (MERALCO)
Concordio D. Ponce/Alberto C. Ponce Concordio D.
vs. Manila Electric Company Ponce/Alberto C.
(MERALCO)
Ponce
Anatolia J. Madronero vs. Manila Anatolia J. Madronero
Electric Company (MERALCO)
Raul R. Balagot / Mario H. Balagot vs. Raul R. Balagot /
Manila Electric Company (MERALCO) Mario H. Balagot
88
Status
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Case Title
78
2012-078-CC
Sr. Sto. Niño De Cebu Resources and
Development Corporation represented
by its President Guillermo C. Uy, Jr.
vs. Manila Electric Company
(MERALCO)
79
2012-079-CC
80
2012-080-CC
81
2012-081-CC
82
2012-082-CC
83
2012-083-CC
Richie Trinidad F. De Guia vs. Manila
Electric Company (MERALCO)
Luz Ignacio vs. Manila Electric
Company (MERALCO)
Emilia U. Calaunan vs. Manila Electric
Company (MERALCO)
Amelia J. Capili vs. Manila Electric
Company (MERALCO)
Arthur S. Remigio herein represented
by his Attorney-In-Fact Añonuevo S.
Remigio, Anna Lyn T. Remigio, Aileen
Jade T. Remigio and Aimee Lou T.
Remigio vs. Manila Electric Company
(MERALCO), Mr. Manolo M. Torres Head, Kamuning Business Center
84
2012-084-CC
85
2012-085-CC
86
2012-086-CC
87
2012-087-CC
88
2012-088-CC
89
2012-089-CC
90
2012-090-CC
91
2012-091-CC
Stella Dela Cruz vs. Manila Electric
Company (MERALCO)
Meynardo U. Palma vs. Manila Electric
Company (MERALCO)
Anastacio G. Mañago, Jr. vs. Manila
Electric Company (MERALCO)
Araceli V. Tolentino vs. Manila Electric
Company (MERALCO)
Vicente H. Reyes vs. Manila Electric
Company (MERALCO)
Manuel R. Padilla vs. Manila Electric
Company (MERALCO)
Placido Policarpio vs. Manila Electric
Company (MERALCO)
Magdalena D. Melendres vs. Manila
Electric Company (MERALCO)
89
Applicant/
Complainant/
Respondent/
Petitioner
Sr. Sto. Niño De Cebu
Resources and
Development
Corporation
represented by its
President Guillermo C.
Uy, Jr.
Richie Trinidad F. De
Guia
Luz Ignacio
Status
On-going
On-going
On-going
Emilia U. Calaunan
On-going
Amelia J. Capili
On-going
Arthur S. Remigio
herein represented by
his Attorney-In-Fact
Añonuevo S. Remigio,
Anna Lyn T. Remigio,
Aileen Jade T.
Remigio and Aimee
Lou T. Remigio
On-going
Stella Dela Cruz
On-going
Meynardo U. Palma
On-going
Anastacio G. Mañago,
Jr.
Araceli V. Tolentino
On-going
Vicente H. Reyes
On-going
Manuel R. Padilla
On-going
Placido Policarpio
On-going
Magdalena D.
Melendres
On-going
On-going
No.
Case No.
Case Title
92
2012-092-CC
Barangay Subic (Baliuag, Bulacan)
Rep. By its Barangay Chairman,
Enrico Buenaventura vs. Manila
Electric Company (MERALCO)
93
2012-093-CC
94
2012-094-CC
95
2012-095-CC
96
2012-096-CC
97
2012-097-CC
98
2012-098-CC
99
2012-099-CC
100
2012-100-CC
101
2012-101-CC
102
2012-102-CC
103
2012-103-CC
104
2012-104-CC
105
2012-105-CC
106
2012-106-CC
Rolando V. San Miguel vs. Manila
Electric Company (MERALCO)
Elizabeth C. Polintan vs. Manila
Electric Company (MERALCO)
Pepito B. Santiago vs. Manila Electric
Company (MERALCO)
Rizaldy T. Villanueva vs. Manila
Electric Company (MERALCO)
Dr. Omar T. Cortes vs. Manila Electric
Company (MERALCO)
Carlito V. Lacuayan vs. Manila Electric
Company (MERALCO)
Dolores D. Carpio vs. Manila Electric
Company (MERALCO)
Antonio Atendido Tan vs. Ilocos Norte
Electric Cooperative, Inc. (INEC)
employees named as: Renato Balintec
- General Manager, Rosita Bumanlag Finance Manager, Manuel Flore - Rate
Specialist and Assct. RCO and
Lindbergh Castillo - Regulatory
Compliance Officer (RCO)
Eugene C. Tan vs. Manila Electric
Company (MERALCO)
Felicitas B. Tenia vs. Manila Electric
Company (MERALCO)
Cristina B. Viloria vs. Manila Electric
Company (MERALCO)
Victor James C. Bayan vs. Manila
Electric Company (MERALCO)
Ramynah B. Felonia vs. Manila
Electric Company (MERALCO)
Nicanor C. Arugay vs. Manila Electric
Company (MERALCO)
90
Applicant/
Complainant/
Respondent/
Petitioner
Barangay Subic
(Baliuag, Bulacan)
Rep. By its Barangay
Chairman, Enrico
Buenaventura
Rolando V. San
Miguel
Elizabeth C. Polintan
Status
On-going
On-going
On-going
Pepito B. Santiago
On-going
Rizaldy T. Villanueva
On-going
Dr. Omar T. Cortes
On-going
Carlito V. Lacuayan
On-going
Dolores D. Carpio
On-going
Antonio Atendido Tan
On-going
Eugene C. Tan
On-going
Felicitas B. Tenia
On-going
Cristina B. Viloria
On-going
Victor James C. Bayan
On-going
Ramynah B. Felonia
On-going
Nicanor C. Arugay
On-going
No.
Case No.
107
2012-107-CC
108
2012-108-CC
109
2012-109-CC
110
2012-110-CC
111
2012-111-CC
112
2012-112-CC
113
2012-113-CC
114
2012-114-CC
115
2012-001 CF
116
2012-002 CF
117
2012-003 CF
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
Emma Bautista Tabian, as Attorney- Emma Bautista
In-Fact of Indalecia C. Dimaano vs. Tabian, as Attorney-InManila Electric Company (MERALCO) Fact of Indalecia C.
Dimaano
Amir Lamani vs. Manila Electric Amir Lamani
Company (MERALCO)
Jennie M. Sebastian vs. Manila Jennie M. Sebastian
Electric Company (MERALCO)
Ma. Cleofe A. Imperial vs. Manila Ma. Cleofe A. Imperial
Electric Company (MERALCO)
Virgilio M. Ibarra by Rosalia M. Ibarra Virgilio M. Ibarra by
vs. Manila Electric Company Rosalia M. Ibarra
(MERALCO)
Emma M. Ibarra by Rosalia M. Ibarra Emma M. Ibarra by
vs. Manila Electric Company Rosalia M. Ibarra
(MERALCO)
Arlene P. Ferrer vs. Manila Electric Arlene P. Ferrer
Company (MERALCO)
Hershey Co vs. Manila Electric Hershey Co
Company (MERALCO)
In the Matter of the Application for Nueva Vizcaya Electric
Confirmation of Over and Under Cooperative, Inc.
Recoveries From Automatic Cost (NUVELCO)
Adjustments Pursuant to ERC
Resolution No. 16, Series of 2009 and
Resolution No. 21, Series of 2010
In the Matter of the Application for Isabela II Electric
Approval of Over/Under Recoveries in Cooperative, Inc.
the Implementation of Automatic Cost (ISELCO II )
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for Central Negros Electric
Approval of Over/Under Recoveries in Cooperative, Inc.
the Implementation of Automatic Cost (CENECO)
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
91
Status
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
ERC Resolution No. 16, Series of
2009 as Amended by Resolution No.
21, Series of 2010
118
2012-004 CF
119
2012-005 CF
120
2012-006 CF
121
2012-007 CF
In the Matter of the Application for
Approval of Over/Under Recoveries in
the Implementation of Automatic Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for
Approval of Over/Under Recoveries in
the Implementation of Automatic Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for
Approval of Over/Under Recoveries in
the Implementation of Automatic Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for
Approval of Over/Under Recoveries in
the Implementation of Automatic Cost
Adjustments
and
True-Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
92
Guimaras Electric
Cooperative, Inc.
(GUIMELCO)
On-going
Aklan Electric
Cooperative, Inc.
(AKELCO)
On-going
Biliran Electric
Cooperative, Inc.
(BILECO)
On-going
Cebu III Electric
Cooperative, Inc.
(CEBECO III)
On-going
No.
Case No.
122
2012-008 CF
123
2012-009 CF
124
2012-010 CF
125
2012-011 CF
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Antique Electric
Approval
of
the
Over/Under Cooperative, Inc.
Recoveries Based on the Formula on (ANTECO)
the Various
Automatic Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 and Resolution No. 21, Series of
2010
In the Matter of the Application for Bohol Light and
Approval
of
the
Over/Under Company, Inc. (BLCI)
Recoveries Based on the Formula on
the Various
Automatic Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 and Resolution No. 21, Series of
2010
In the Matter of the Application for Capiz Electric
Approval of Over/Under Recoveries Cooperative, Inc.
Based in the Implementation of (CAPELCO)
Automatic Cost Adjustments and True
- Up Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for Leyte V Electric
Approval of Over/Under Recoveries Cooperative, Inc.
Based in the Implementation of (LEYECO V)
Automatic Cost Adjustments and True
- Up Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
93
Status
On-going
On-going
On-going
On-going
No.
Case No.
126
2012-012 CF
127
2012-013 CF
128
2012-014 CF
129
2012-015 CF
130
2012-016 CF
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Iloilo III Electric
Approval of Over/Under Recoveries Cooperative, Inc.
Based in the Implementation of (ILECO III)
Automatic Cost Adjustments and True
- Up Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for Visayan Electric
Approval
of
the
Over/Under Company, Inc. (VECO)
Recoveries Based on the Formula on
the Various
Automatic Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 and Resolution No. 21, Series of
2010
In the Matter of the Application for Leyte IV Electric
Approval of Over/Under Recoveries Cooperative, Inc.
in the Implementation of Automatic (LEYECO IV)
Cost Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for Cagayan I Electric
Authority to Include in Customer's Bill Cooperative, Inc.
a Tax Recovery Adjustment Clause (CAGELCO I)
(TRAC) for Business Tax Paid in the
Province of Cagayan for the Years
1997 - 2006
In the Matter of the Application for Cagayan I Electric
Authority to Include in Customer's Bill Cooperative, Inc.
a Tax Recovery Adjustment Clause (CAGELCO I)
(TRAC) for Business Tax Paid in the
City of Tuguegarao for the Years 1997
- 2006
94
Status
On-going
On-going
On-going
On-going
On-going
No.
Case No.
131
2012-017 CF
132
2012-018 CF
133
2012-019 CF
134
2012-020 CF
135
2012-021 CF
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Southern Leyte
Approval of Over/Under Recoveries in Electric Cooperative,
the Implementation of Automatic Cost Inc. (SOLECO)
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for Negros Oriental II
Approval of Over/Under Recoveries in Electric Cooperative,
the Implementation of Automatic Cost Inc. (NORECO II)
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for VMC Rural Electric
Approval of Over/Under Recoveries in Service Cooperative,
the Implementation of Automatic Cost Inc. (VRESCO)
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for Cebu I Electric
Approval of Over/Under Recoveries Cooperative, Inc.
Based on the Formula on the Various (CEBECO I)
Automatic Cost Adjustments and True
- Up Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 and Resolution No. 21, Series of
2010
In the Matter of the Application for Cebu II Electric
Approval of Over/Under Recoveries Cooperative, Inc.
Based on the Formula on the Various (CEBECO II)
Automatic Cost Adjustments and True
- Up Mechanisms and Corresponding
Confirmation Process Pursuant to
95
Status
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
ERC Resolution No. 16, Series of
2009 and Resolution No. 21, Series of
2010
136
2012-022 CF
137
2012-023 CF
138
2012-024 CF
139
2012-025 CF
140
2012-026 CF
In the Matter of the Application for
Approval of Over/Under Recoveries in
the Implementation of Automatic Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 and Resolution No. 21, Series of
2010
In the Matter of the Application for
Approval to Recover Payments of
Franchise Tax to the Govenrment of
Surigao City
In the Matter of the Application for
Approval of Over/Under Recoveries in
the Implementation of Automatic Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 and Resolution No. 21, Series of
2010
In the Matter of the Application for
Confirmation of Calculations of Over
and Under Recoveries in the
Implementation of the Automatic Cost
Adjustments for the Billing Months
from June 2004 to December 2011
In the Matter of the Application for
Approval of Over/Under Recoveries in
the Implementation of Automatic Cost
Adjustments
and
True-Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
96
Negros Occidental
Electric Cooperative,
Inc. (NOCECO)
On-going
Surigao del Norte
Electric Cooperative,
Inc. (SURNECO)
On-going
Iloilo II Electric
Cooperative, Inc.
(ILECO II)
On-going
Bohol II Electric
Cooperative, Inc.
(BOHECO II)
On-going
Samar II Electric
Cooperative, Inc.
(SAMELCO II)
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
21, Series of 2010
141
2012-027 CF
142
2012-028 CF
143
2012-029 CF
144
2012-030 CF
In the Matter of the Application for
Approval of Over/Under Recoveries in
the Implementation of Automatic Cost
Adjustments
and
True-Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for
Approval
of
the
Over/Under
Recoveries Based on the Formula for
the Various
Automatic Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for
Approval of Over/Under Recoveries in
the Implementation of Automatic Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 as Amended by Resolution no.
21, Series of 2010
In the Matter of the Application for
Approval
of
the
Over/Under
Recoveries Based on the Formula for
the
Various
Automatic
Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
97
Negros Oriental I
Electric Cooperative,
Inc. (NORECO I)
On-going
Bohol I Electric
Cooperative, Inc.
(BOHECO I)
On-going
Bantayan Island
Electric Cooperative,
Inc. (BANELCO)
On-going
Camotes Electric
Cooperative, Inc.
(CELCO)
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
2009, as Amended by Resolution No.
21, Series of 2010
145
2012-031 CF
146
2012-032 CF
147
2012-033 CF
In the Matter of the Application for
Approval
of
the
Over/Under
Recoveries Based on the Formula for
the
Various
Automatic
Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for
Approval
of
the
Over/Under
Recoveries In the Implementation of
Automatic Cost Adjustments and True
- Up Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for the
Approval of the Calculations for the
Automatic Cost Adjustment and TrueUp Mechanisms for the a) Generation
Rate; b) Transmission Rate; c) System
Loss Rate; d) Lifeline Subsidy Rate; e)
Interclass Cross Subsidy Rate; and f)
Local Franchise Tax, Under ERC
Resolution No. 16, Series of 2009, as
Amended
98
Province of Siquijor
Electric Cooperative,
Inc. (PROSIELCO)
On-going
Don Orestes
Romualdez Electric
Cooperative, Inc.
(DORELCO)
On-going
Panay Electric
Company, Inc. (PECO)
On-going
No.
Case No.
148
2012-034 CF
149
2012-035 CF
150
2012-036 CF
151
2012-037 CF
152
2012-038 CF
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for the Mactan Electric
Approval of the Calculations for the Company (MECO)
Automatic Cost Adjustment and TrueUp Mechanisms for the a) Generation
Rate; b) Transmission Rate; c) System
Loss Rate; d) Lifeline Subsidy Rate;
and e) Interclass Cross Subsidy Rate,
Under ERC Resolution No. 16, Series
of 2009, as Amended
In the Matter of the Application for Iloilo I Electric
Approval of Over/Under Recoveries in Cooperative, Inc.
the Implementation of Automatic Cost (ILECO I)
Adjustments
and
True
Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for Samar I Electric
Approval of Over/Under Recoveries in Cooperative, Inc.
the Implementation of Automatic Cost (SAMELCO I)
Adjustments
and
True
Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for Pampanga III Electric
Approval of Over/Under Recoveries in Cooperative, Inc.
the Implementation of Automatic Cost (PELCO III)
Adjustments
and
True
Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for Leyte III Electric
Approval of Over/Under Recoveries in Cooperative, Inc.
the Implementation of Automatic Cost (LEYECO III)
Adjustments
and
True
Up
Mechanisms During the Period 20042011 Pursuant to ERC Resolution No.
99
Status
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
16, Series of 2009, as Amended by
Resolution No. 21, Series of 2010
153
2012-039 CF
154
2012-040 CF
155
2012-041 CF
156
2012-042 CF
In the Matter of the Application to
Confirm the Generation Rate
Over/Under
Recovery
(GOUR)l
Transmission
Rate
Over/Under
Recovery (TOUR), System Loss Rate
Over/Under Recovery (SLOUR); and
Lifeline Subsidy Over/Under Recovery
(LSOUR) Covering the Period January
2011 to December 2011 and for
Authority
to
Refund/Recover
Confirmed Over/Under Recoveries,
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for
Authority to Include in Customer's Bill
a Tax Recovery Adjustment Clause
(TRAC) for Business Tax Paid in the
11 Municipalities of Pangasinan
In the Matter of the Application for
Approval
of
the
Over/Under
Recoveries in the Implementation of
Automatic Cost Adjustments and True
Up Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, as Amended by Resolution No.
21, Series of 2010
In the Matter of the Application for
Approval
of
the
Over/Under
Recoveries Based on the Formula for
the
Various
Automatic
Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009, and Resolution No. 21, Series of
100
Manila Electric
Company (MERALCO)
On-going
Central Pangasinan
Electric Cooperative,
Inc. (CENPELCO)
On-going
Leyte II Electric
Cooperative, Inc.
(LEYECO II)
On-going
Northern Samar
Electric Cooperative,
Inc. (NORSAMELCO)
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
2010
157
2012-043 CF
158
2012-001 MC
159
2012-002 MC
160
2012-003 MC
161
2012-004 MC
In the Matter of the Application for
Approval
of
the
Over/Under
Recoveries Based on the Formula on
the
Various
Automatic
Cost
Adjustments and True - Up
Mechanisms and Corresponding
Confirmation Process Pursuant to
ERC Resolution No. 16, Series of
2009 as Amended by Resolution No.
21, Series of 2010
In the Matter of the Petition or the
Issuance of a Cease and Desist Order
(Default Wholesale Supplier Charges
from September 2009 to April 2010 in
the Amount of PhP 141,996,576.85 Contract for the Supply of Electric
Energy (CSEE) expired September
2009 and No Longer Renewed)
Camarines Sur III
Electric Cooperative,
Inc. (CASURECO III)
On-going
Sorsogon II Electric
Cooperative, Inc.
(SORECO II) and
Power Sector Assets
and Liabilities
Management
Corporation (PSALM) Hon. Emmanuel L.
Ledesma and Ms.
Lourdes S. Alzona
On-going
In the Matter of the Application for the
Franchising of a Consortium to Own
and Operate Sub-transmission Assets
and Issuance of Certificate of Public
Convenience and Necessity (CPCN)
In the Matter of the Violation of ERC
Orders, Rules and Regulations (Noncompliance / Late Filing of Emergency
CAPEX Application)
In the Matter of the Violation of ERC
Orders, Rules and Regulations
(Inclusion of Power Supply Contract
Cost in the Retail Rates Without
Approval from the Commission)
Cagayan Subtransmission
Company, Inc.
On-going
Sorsogon II Electric
Cooperative, Inc.
(SORECO II)
On-going
Sorsogon II Electric
Cooperative, Inc.
(SORECO II)
On-going
101
No.
Case No.
162
2012-005 MC
163
2012-006 MC
164
2012-007 MC
165
2012-008 MC
166
2012-009 MC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Violation of ERC Iloilo III Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (ILECO III)
Cost in the Retail Rates Without
Approval from the Commission)
In the Matter of the Violation of ERC Ilocos Norte Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (INEC)
Cost in the Retail Rates Without
Approval from the Commission)
In the Matter of the Violation of ERC Negros Oriental I
Orders, Rules and Regulations Electric Cooperative,
(Inclusion of Power Supply Contract Inc. (NORECO I)
Cost in the Retail Rates Without
Approval from the Commission)
In the Matter of the Violation of ERC Bukidnon Second
Orders, Rules and Regulations Electric Cooperative,
(Imposition of Other Charges Without Inc. (BUSECO)
Prior Approval from the Commission)
In the Matter of the Violation of ERC La Union Electric
Orders, Rules and Regulations (Non- Cooperative, Inc.
compliance with the Philippine (LUELCO)
Distribution Code (PDC) and
Distribution Services and Open
Access Rules [DSOAR])
102
Status
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Case Title
167
2012-010 MC
For: Refund of Philippine Electric
Market
Corporation's
(PEMC)
Consumer Education Fund Availed
and Collected by National Association
of Electricity Consumers for Reforms
(NASECORE) in Years 2004 to 2007
168
2012-011 MC
169
2012-012 MC
Petition for the Issuance by the
Commission of a Resolution Adopting
and Approving a Proposed Power
Supply Agreement (PSA) Template
In re: Petition for Dispute Resolution
Involving Refund of Transmission
Charges Payments During Typhoon
Ondoy
170
2012-013 MC
Applicant/
Complainant/
Respondent/
Petitioner
Region - 8 National
Association of General
Managers of Electric
Cooperatives (ECs)
Represented by its
President, Atty. Jerry
Gwen L. Conde and
National Association of
Electricity Consumers
for Reforms
(NASECORE)
Represented by its
President, Pete L.
Ilagan and Philippine
Electricity Market
Corporation (PEMC)
Represented by its
President, Melinda L.
Ocampo
On-going
National Power
Corporation (NPC)
On-going
Cathay Pacific Steel
Corporation
(CAPASCO), Manila
Electric Company
(MERALCO), and
National Grid
Corporation of the
Philippines (NGCP)
On-going
In the Matter of the Application for Manila Electric
Approval of Authority to Lease Company (MERALCO)
Regulatory Asset Base (RAB)
Properties Classified as: a) Pole
Attachment; and b) Lease of
Lots/Space/Other
Equipment,
Together with the Attached Pro-Forma
Agreements,
with
Prayer
for
Provisional Authority (PA)
103
Status
On-going
No.
Case No.
171
2012-014 MC
172
2012-015 MC
173
2012-016 MC
174
2012-017 MC
175
2012-018 MC
176
2012-019 MC
177
2012-020 MC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Violation of ERC Hasting Motor
Orders, Rules and Regulations Corporation (Hastings)
(Operating Without Certificate of
Compliance [COC])
In the Matter of the Violation of ERC Cummins Sales and
Orders, Rules and Regulations Services Philippines,
(Operating Without Certificate of Inc. (CSSPI)
Compliance [COC])
In the Matter of the Violation of ERC Monark Equipment
Orders, Rules and Regulations Corporation
(Operating Without Certificate of (MONARK)
Compliance [COC])
In the Matter of the Petition for Direct Real Steel Corporation
Connection with the National (RSC), National Grid
Transmission
Corporation Corporation of the
(TRANSCO) in Accordance with ERC Philippines (NGCP),
Resolution No. 48, Series of 2006 and and Pampanga III
Resolution No. 27, Series of 2010, Electric Cooperative,
with Prayer for Provisional Authority Inc. (PELCO III)
(PA)
In the Matter of the Violation of ERC Pampanga II Electric
Order, Rules and Regulations Cooperative, Inc.
(Philippine Grid Code [PGC])
(PELCO II) and
National Grid
Corporation of the
Philippines (NGCP)
In the Matter of the Petition for Direct Victoria Park Realty
Connection with the National Grid and Development
Corporation of the Philippines (NGCP) Corporation (VPRDC),
in Accordance with ERC Resolution National Grid
No. 48, Series of 2006 and Resolution Corporation of the
No. 27, Series of 2010, with Prayer for Philippines (NGCP)
Provisional Authority (PA)
and Capiz Electric
Cooperative, Inc.
(CAPELCO)
In the Matter of the Violation of ERC Pangasinan I Electric
Orders, Rules and Regulations Cooperative, Inc.
(Implementation
of
Unapproved (PANELCO I )
Additional Rate Re: Cyclone Emong)
104
Status
On-going
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
178
2012-021 MC
179
2012-022 MC
180
2012-023 MC
181
2012-024 MC
182
2012-025 MC
183
2012-026 MC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Violation of ERC Manila Electric
Orders, Rules and Regulations Company (MERALCO)
(Inclusion of Power Supply Contract
Cost in the Retail Rates Without
Approval from the Commission [2012037 RC with SEM CALACA])
In the Matter of the Violation of ERC Capiz Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (CAPELCO)
Cost in the Retail Rates Without
Approval from the Commission [No
Application with SPC])
In the Matter of the Violation of ERC Batangas I Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (BATELEC I)
Cost in the Retail Rates Without
Approval from the Commission [2011132 RC with SEM CALACA])
In the Matter of the Violation of ERC Ilocos Norte Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (INEC)
Cost in the Retail Rates Without
Approval from the Commission [2012079 RC with San Miguel Energy
Corporation {SMEC}])
In the Matter of the Violation of ERC Pampanga III Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (PELCO III)
Cost in the Retail Rates Without
Approval from the Commission [2012101 RC with San Miguel Energy
Corporation {SMEC}])
In the Matter of the Violation of ERC Pampanga II Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (PELCO II)
Cost in the Retail Rates Without
Approval from the Commission [No
Application with San Miguel Energy
Corporation {SMEC}])
105
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
184
2012-027 MC
185
2012-028 MC
186
2012-029 MC
187
2012-030 MC
188
2012-031 MC
189
2012-032 MC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Violation of ERC First Laguna Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (FLECO)
Cost in the Retail Rates Without
Approval from the Commission [2012019 RC with San Miguel Energy
Corporation {SMEC}])
In the Matter of the Violation of ERC Leyte V Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (LEYECO V)
Cost in the Retail Rates Without
Approval from the Commission [2011082 RC with Green Core Geothermal,
Inc. {GCGI}])
In the Matter of the Violation of ERC Pangasinan III Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (PANELCO III)
Cost in the Retail Rates Without
Approval from the Commission [2010143 RC with SMEC])
In the Matter of the Violation of ERC Peninsula Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (PENELCO)
Cost in the Retail Rates Without
Approval from the Commission [No
Application with Bataan 2020)
In the Matter of the Violation of ERC Nueva Ecija II - Area I
Orders, Rules and Regulations Electric Cooperative,
(Inclusion of Power Supply Contract Inc. (NEECO II-Area 1)
Cost in the Retail Rates Without
Approval from the Commission [2012028 RC with San Miguel Energy
Corporation {SMEC}])
In the Matter of the Violation of ERC Eastern Samar Electric
Orders, Rules and Regulations (For Cooperative, Inc.
Failure to Comply with ERC (ESAMELCO)
Resolution No. 16, Series of 2009, as
Amended by ERC Resolution No. 21,
Series of 2010)
106
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
190
2012-033 MC
191
2012-034 MC
192
2012-035 MC
193
2012-036 MC
194
2012-037 MC
195
2012-038 MC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Iloilo I Electric
Approval of Business Separation and Cooperative, Inc.
Unbundling Plan (BSUP) Pursuant to (ILECO I)
Section 36 of Republic Act No. 9136
and Rule 10 of its Implementing Rules
and Regulations (IRR)
In the Matter of the Application for Allied Power Industries
Issuance of a Certificate of Public of Mindanao Inc. (AConvenience & Necessity (CPCN), Power)
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for Cagayan Electric
Authority to Assign Distribution Assets Power & Light
& Facilities Within PIE-MO Area to A- Company, Inc.
Power, With Prayer for Provisional (CEPALCO)
Authority (PA)
In the Matter of the Application for Cebu III Electric
Approval of Applicant's (1) Business Cooperative, Inc.
Separation and Unbundling Plan (CEBECO III)
(BSUP); and (2) Accounting and Cost
Allocation Manual (ACAM) in
Accordance with Section 36 of R.A.
9136 and Rule 10 of the Implementing
Rules and Regulations (IRR)
In the Matter of the Application for Cebu I Electric
Approval of Applicant's (1) Business Cooperative, Inc.
Separation and Unbundling Plan (CEBECO I)
(BSUP); and (2) Accounting and Cost
Allocation Manual (ACAM) in
Accordance with Section 36 of R.A.
913 and Rule 10 of the Implementing
Rules and Regulations (IRR)
In the Matter of the Application for Cebu II Electric
Approval of Applicant's (1) Business Cooperative, Inc.
Separation and Unbundling Plan (CEBECO II)
(BSUP); and (2) Accounting and Cost
Allocation Manual (ACAM) in
Accordance with Section 36 of R.A.
913 and Rule 10 of the Implementing
Rules and Regulations (IRR)
107
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
196
2012-039 MC
197
2012-040 MC
198
2012-041 MC
199
2012-042 MC
200
2012-043 MC
201
2012-044 MC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Violation of ERC Northern Samar
Orders, Rules and Regulations (For Electric Cooperative,
Failure to Comply with ERC Inc. (NORSAMELCO)
Resolution No. 16, Series of 2009, as
Amended by ERC Resolution No. 21,
Series of 2010)
In the Matter of the Violation of ERC Leyte III Electric
Orders, Rules and Regulations (For Cooperative, Inc.
Failure to Comply with ERC (LEYECO III)
Resolution No. 16, Series of 2009, as
Amended by ERC Resolution No. 21,
Series of 2010)
In the Matter of the Violation of ERC Leyte II Electric
Orders, Rules and Regulations (For Cooperative, Inc.
Failure to Comply with ERC (LEYECO II)
Resolution No. 16, Series of 2009, as
Amended by ERC Resolution No. 21,
Series of 2010)
In the Matter of the Application for Therma Mobile, Inc.
Authority to Develop, Own and (TMO)
Operate Dedicated Point - to - Point
Limited Facilities to Connect the
Distribution System of Manila Electric
Company (MERALCO), with Prayer for
Provisional Authority (PA)
In the Matter of the Application for Manila Electric
Approval of Authority to Dispose of Company (MERALCO)
and/or Sell a Parcel of Land, (1,956.10
Sq.m) Including the Improvements
Therein, Located at San Marcelino
Street, Ermita District, City of Manila,
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for Central Negros Electric
Approval of Business Separation and Cooperative, Inc.
Unbundling Plan (BSUP) Pursuant to (CENECO)
Section 36 of Republic Act No. 9136
and Rule 10 of its Implementing Rules
and Regulations (IRR)
108
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
202
2012-045 MC
203
2012-046 MC
204
2012-047 MC
205
2012-048 MC
206
2012-049 MC
207
2012-050 MC
208
2012-051 MC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for La Union Electric
Approval of Business Separation and Cooperative, Inc.
Unbundling Plan (BSUP) Pursuant to (LUELCO)
Section 36 of Republic Act No. 9136
and Rule 10 of its Implementing Rules
and Regulations (IRR)
In the Matter of the Application for Peninsula Electric
Approval of Business Separation and Cooperative, Inc.
Unbundling Plan (BSUP) Pursuant to (PENELCO)
Section 36 of Republic Act No. 9136
and Rule 10 of its Implementing Rules
and Regulations (IRR)
In the Matter of the Application for Ilocos Norte Electric
Approval of Business Separation and Cooperative, Inc.
Unbundling Plan (BSUP) Pursuant to (INEC)
Section 36 of Republic Act No. 9136
and Rule 10 of its Implementing Rules
and Regulations (IRR)
In the Matter of the Application for Aklan Electric
Approval of Business Separation and Cooperative, Inc.
Unbundling Plan (BSUP) Pursuant to (AKELCO)
Section 36 of Republic Act No. 9136
and Rule 10 of its Implementing Rules
and Regulations (IRR)
In the Matter of the Application for Leyte II Electric
Approval of Business Separation and Cooperative, Inc.
Unbundling Plan (BSUP) Pursuant to (LEYECO II)
Section 36 of Republic Act No. 9136
and Rule 10 of its Implementing Rules
and Regulations (IRR)
In the Matter of the Petition for Tarlac II Electric
Approval/Review of the Business Cooperative, Inc.
Separation and Unbundling Plans (TARELCO II)
(BSUP), Pursuant to the Provisions of
Section 36 of R. A. 9136, and Rule 10
of the Implementing Rules and
Regulations (IRR)
In the Matter of the Application for Batangas I Electric
Approval of Business Separation and Cooperative, Inc.
Unbundling Plan (BSUP) Pursuant to (BATELEC I)
Section 36 of Republic Act 9136 and
Rule 10 of its Implementing Rules and
109
Status
On-going
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
Regulations (IRR)
209
2012-052 MC
210
2012-053 MC
211
2012-054 MC
212
2012-055 MC
213
2012-056 MC
214
2012-057 MC
In the Matter of the Application for the
Approval of the Business Separation
and Unbundling Plan (BSUP)
Pursuant to Section 36 of Republic Act
9136 and Rule 10 of its Implementing
Rules and Regulations (IRR)
In the Matter of the Application for the
Approval of the Business Separation
and Unbundling Plan (BSUP)
Pursuant to Section 36 of Republic Act
9136 and Rule 10 of its Implementing
Rules and Regulations (IRR)
In the Matter of the Application for
Approval of Business Separation and
Unbundling Plan (BSUP) Pursuant to
Section 36 of Republic Act 9136 and
Rule 10 of its Implementing Rules and
Regulations (IRR)
In the Matter of the Application for
Direct Connection with the National
Power Corporation (NPC) and the
National Transmission Corporation
(TRANSCO), with Prayer for the
Provisional Authority (PA) and
Issuance of a Temporary Mandatory
Order and/or Writ of Preliminary
Injunction
Camarines Sur II
Electric Cooperative,
Inc. (CASURECO II)
On-going
Batangas II Electric
Cooperative, Inc.
(BATELEC II)
On-going
Quezon I Electric
Cooperative, Inc.
(QUEZELCO I)
On-going
XRC Mall Developer,
Inc. and National
Power Corporation
(NPC), National Grid
Corporation of the
Philippines (NGCP)
and Isabela I Electric
Cooperative, Inc.
(ISELCO I)
On-going
In the Matter of the Violation of ERC
Orders, Rules and Regulations (For
Failure to Comply with ERC
Resolution No. 16, Series of 2009, as
Amended by ERC Resolution No. 21,
Series of 2010)
In the Matter of the Application for
Authority to Secure Loan from the
National Electrification Administration
(NEA) and Other Financial Institutions
Camarines Sur III
Electric Cooperative,
Inc. (CASURECO III)
On-going
Surigao del Norte
Electric Cooperative,
Inc. (SURNECO)
On-going
110
No.
Case No.
215
2012-058 MC
216
2012-059 MC
217
2012-060 MC
218
2012-061 MC
219
2012-062 MC
220
2012-063 MC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Violation of ERC Negros Occidental
Orders, Rules and Regulations (Re: Electric Cooperative,
Implementing a Recovery Scheme Inc. (NOCECO)
Without the Commission's Prior
Approval)
In the Matter of the Application for the Manila Electric
Approval of Authority to Dispose of Company (MERALCO)
and/or Sell Non-Regulatory Asset
Base (Non-RAB) Properties, with
Prayer for Provisional Authority (PA)
In the Matter of the Application for Therma South, Inc.
Authority to Develop, Own and (TSI)
Operate a 138 KV Dedicated Point-toPoint Line and Associated Assets from
the Coal - Fired Power Plant of
Therma South, Inc. (TSI) in Davao
City and Davao Del Sur to the New
Toril Substation of the National Grid
Corporation of the Philippines
(NGCP), with Prayer for Provisional
Authority (PA)
In the Matter of the Violation of ERC Ilocos Sur Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (ISECO)
Cost in the Retail Rates Without
Approval from the Commission [2011113 RC])
In the Matter of the Violation of ERC Camarines Sur I
Orders, Rules and Regulations Electric Cooperative,
(Inclusion of Power Supply Contract Inc. (CASURECO I)
Cost in the Retail Rates Without
Approval from the Commission [2012011 RC])
In the Matter of the Violation of ERC Peninsula Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (PENELCO)
Cost in the Retail Rates Without
Approval from the Commission [2011141 RC])
111
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
221
2012-064 MC
222
2012-065 MC
223
2012-066 MC
224
2012-067 MC
225
2012-068 MC
226
2012-069 MC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Violation of ERC Isabela I Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (ISELCO I)
Cost in the Retail Rates Without
Approval from the Commission [2011096 RC])
In the Matter of the Violation of ERC Nueva Vizcaya Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (NUVELCO)
Cost in the Retail Rates Without
Approval from the Commission [2011175 RC])
In the Matter of the Violation of ERC Pangasinan III Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (PANELCO III)
Cost in the Retail Rates Without
Approval from the Commission [2012042 RC])
In the Matter of the Violation of ERC Tarlac II Electric
Orders, Rules and Regulations Cooperative, Inc.
(Inclusion of Power Supply Contract (TARELCO II)
Cost in the Retail Rates Without
Approval from the Commission [2010086 RC with SMEC])
In the Matter of the Application for Benguet Electric
Approval of Business Separation and Cooperative, Inc.
Unbundling Plan (BSUP) Pursuant to (BENECO)
Section 36 of Republic Act 9136 and
Rule 10 of its Implementing Rules and
Regulations (IRR)
In the Matter of the Petition for Altima Empire Steel
Direction Connection with the National Corporation (AESC),
Grid Corporation of the Philippines National Grid
(NGCP) in Accordance with ERC Corporation of the
Resolution No. 48, Series of 2006 and Philippines (NGCP)
Resolution No. 27, Series of 2010, and Pampanga III
with Prayer for Provisional Authority Electric Cooperative,
(PA)
Inc. (PELCO III)
112
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Case Title
227
2012-070 MC
228
2012-071 MC
229
2012-072 MC
230
2012-073 MC
231
2012-074 MC
232
2012-075 MC
233
2012-076 MC
In the Matter of the Petition for
Direction Connection with the National
Grid Corporation of the Philippines
(NGCP) in Accordance with ERC
Resolution No. 48, Series of 2006 and
Resolution No. 27, Series of 2010,
with Prayer for Provisional Authority
(PA) and Issuance of a Temporary
Mandatory Order and/or a Writ of
Preliminary Injunction
In the Matter of the Application for
Approval of Business Separation and
Unbundling Plan (BSUP) Pursuant to
Section 36 of Republic Act 9136 and
Rule 10 of its Implementing Rules and
Regulations (IRR)
In the Matter of the Violation of ERC
Orders, Rules and Regulations
(Failure to Implement the Decision
Under ERC Case No. 2011-037 CF)
In the Matter of the Violation of ERC
Orders, Rules and Regulations
(Failure to Implement the Order Under
ERC Case No. 2001-932 [Order dated
February 7, 2011])
In the Matter of the Violation of ERC
Orders, Rules and Regulations
(Improper Utilization of the 5%
Reinvestment Fund in 2005 and 2006)
In the Matter of the Violation of ERC
Orders, Rules and Regulations
(Inclusion of Power Supply Contract
Cost in the Retail Rates Without
Approval from the Commission [2011142 RC])
In the Matter of the Application for
Authority to Secure Loan from the
National Electrification Administration
(NEA) to Finance Approved Capital
Expenditure Projects, with Prayer for
Provisional Authority (PA)
113
Applicant/
Complainant/
Respondent/
Petitioner
Flo Water Resources
Iloilo, Inc. (FWRII),
National Grid
Corporation of the
Philippines (NGCP)
and Iloilo II Electric
Cooperative, Inc.
(ILECO II)
Status
On-going
Nueva Ecija I Electric
Cooperative, Inc.
(NEECO I)
On-going
Zambales II Electric
Cooperative, Inc.
(ZAMECO II)
On-going
Leyte II Electric
Cooperative, Inc.
(LEYECO II)
On-going
Leyte II Electric
Cooperative, Inc.
(LEYECO II)
On-going
Mountain Province
Electric Cooperative,
Inc. (MOPRECO)
On-going
Davao Oriental Electric
Cooperative, Inc.
(DORECO)
On-going
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Petition for Dispute Taiheyo Cement
Resolution
to
Determine
the Philippines, Inc. and
Appropriate
Sub-transmission Visayan Electric
Wheeling Charge
Company, Inc. (VECO)
No.
Case No.
234
2012-077 MC
235
2012-078 MC
In the Matter of the Petition for the
Approval of the Direct Connection with
the National Power Corporation
(NPC), National Grid Corporation of
the Philippines (NGCP) and Team
(Philippines) Energy Corporation
NPC Alliance
Corporation, National
Power Corporation
(NPC), National Grid
Corporation of the
Philippines (NGCP),
Team (Philippines)
Energy Corporation
(TPEC) and Peninsula
Electric Cooperative,
Inc. (PENELCO)
On-going
236
2012-079 MC
Kalinga Apayao
Electric Cooperative,
Inc. (KAELCO)
On-going
237
2012-080 MC
Camarines Norte
Electric Cooperative,
Inc. (CANORECO)
On-going
238
2012-081 MC
PowerSource
Philippines,
Incorporated (PSP)
On-going
239
2012-082 MC
In the Matter of the Application for the
Approval of the Business Separation
and Unbundling Plan (BSUP)
Pursuant to Section 36 of Republic Act
9136 and Rule 10 of its Implementing
Rules and Regulations (IRR)
In the Matter of the Application for the
Approval of the Business Separation
and Unbundling Plan (BSUP)
Pursuant to Section 36 of Republic Act
9136 and Rule 10 of its Implementing
Rules and Regulations (IRR)
In the Matter of the Violation of ERC
Orders, Rules and Regulations (For:
Operating
Generation
Facilities
Without Certificates of Compliance
(COC) 1.05 MW DPP of PowerSource
Philippines,
Incorporated
(PSP)
Commenced Operation on December
10, 2009)
In the Matter of the Application for
Approval of Business Separation and
Unbundling Plan (BSUP) Pursuant to
Section 36 of Republic Act No. 9136
and Rule 10 of its Implementing Rules
Pampanga I Electric
Cooperative, Inc.
(PELCO I)
On-going
114
Status
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
and Regulations (IRR)
240
2012-083 MC
241
2012-084 MC
242
2012-085 MC
In the Matter of the Application for the
Approval of Business Separation and
Unbundling Plan (BSUP) Pursuant to
Section 36 of Republic Act No. 9136
and Rule 10 of its Implementing Rules
and Regulations (IRR)
In the Matter of the Application for the
Approval
of
the
Consortium
Agreement among Batangas II Electric
Cooperative, Inc. (BATELEC II), First
Bay Power Corporation (FBPC) and
Manila Electric Company (MERALCO)
and the Issuance of a Franchise and a
Certificate of Public Convenience and
Necessity (CPCN) to Own, Operate
and Maintain Sub-transmission Assets
in Favor of the Consortium of
BATELEC II, FBPC and MERALCO,
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for the
Approval
of
the
Consortium
Agreement Between Batangas II
Electric Cooperative, Inc. (BATELEC
II) and Manila Electric Company
(MERALCO) and the Issuance of a
Franchise and a Certificate of Public
Convenience and Necessity (CPCN)
to Own, Operate and Maintain Subtransmission Assets in Favor of the
Consortium of BATELEC II and
MERALCO, with Prayer for Provisional
Authority (PA)
115
Pangasinan I Electric
Cooperative, Inc.
(PANELCO I)
On-going
Batangas II Electric
Cooperative, Inc.
(BATELEC II), First
Bay Power
Corporation (FBPC)
and Manila Electric
Company (MERALCO)
On-going
Batangas II Electric
Cooperative, Inc.
(BATELEC II) and
Manila Electric
Company (MERALCO)
On-going
No.
Case No.
Case Title
243
2012-086 MC
244
2012-001 RC
245
2012-002 RC
246
2012-003 RC
247
2012-004 RC
In the Matter of the Application for the
Approval
of
the
Consortium
Agreement Between First Bay Power
Corporation (FBPC) and Manila
Electric Company (MERALCO) and
the Issuance of a Franchise and a
Certificate of Public Convenience and
Necessity (CPCN) to Own, Operate
and Maintain Sub-transmission Assets
in Favor of the Consortium of FBPC
and MERALCO, with Prayer for
Provisional Authority (PA)
In the Matter of the Application for
Approval of Proposed Electric Capital
Projects for the Year 2011 to 2015,
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for the
Approval of the Renewable Power
Supply Agreement (RPSA) Between
Dagupan
Electric
Corporation
(DECORP) and SN Aboitiz Power Benguet, Inc., with Prayer for Issuance
of Provisional Authority (PA)
Joint Application for the Approval of
the Power Purchase and Sale
Agreement (PPSA) Entered Into By
and Between First Laguna Electric
Cooperative, Inc. (FLECO) and
GNPower Mariveles Coal Plant Ltd.
Co. (GMCP)
In the Matter of the Application for
Approval of Capital Projects for the
Year 2011 to 2015 and Authority to
Secure Loan from the National
Electrification Administration (NEA) in
Accordance with the Provisions of R.
A. No. 9136 and the Rules for the
Approval of Regulated Entities' Capital
Expenditure Projects
116
Applicant/
Complainant/
Respondent/
Petitioner
First Bay Power
Corporation (FBPC)
and Manila Electric
Company (MERALCO)
Status
On-going
Camotes Island
Electric Cooperative,
Inc. (CELCO)
On-going
Dagupan Electric
Corporation
(DECORP)
On-going
First Laguna Electric
Cooperative, Inc.
(FLECO) and
GNPower Mariveles
Coal Plant Ltd. Co.
(GMCP)
On-going
Surigao del Sur II
Electric Cooperative,
Inc. (SURSECO II)
On-going
No.
Case No.
Case Title
248
2012-005 RC
249
2012-006 RC
250
2012-007 RC
251
2012-008 RC
252
2012-009 RC
253
2012-010 RC
In Re: Petition for Approval of the
Power Supply Agreement (PSA) and
Amendatory Agreement and NPPTrue Cost Generation Rate (NPPTCGR), with Prayer for Provisional
Authority (PA)
In the Matter of the Application for
Authority to Implement 2012 Major
Electrical Capital Projects (ECPs) and
Non-Electrical Capital Projects (NONECPs), with Prayer for Provisional
Authority (PA)
In the Matter of the Application for the
Approval of the Contracts for the
Supply of Electric Energy (CSEEs)
Entered Into with Distribution Utilities
(DUs) Located in the Mindanao Grid,
with Prayer for the Issuance of
Provisional Authority (PA)
In the Matter of the Application for the
Approval of the Contracts for the
Supply of Electric Energy (CSEEs)
Entered Into with Distribution Utilities
(DUs) Located in the Visayas Grid,
with Prayer for the Issuance of
Provisional Authority (PA)
In the Matter of the Application or the
Approval of Power Supply Agreement
(PSA) Executed on December 10,
2011 Between the Green Core
Geothermal, Inc. (GCGI) and Leyte III
Electric Cooperative, Inc. (LEYECO
III), with Motion for the Issuance of
Provisional Authority (PA)
In the Matter of the Application for
Approval of (A) Amended Power
Supply Agreement Between Bantayan
Island Power Corporation (BIPCOR)
and Bantayan Island Electric
Cooperative, Inc. (BANELCO), (B)
Increase in Load Generation , and (C)
Energy Tariff Adjustment, with Prayer
117
Applicant/
Complainant/
Respondent/
Petitioner
Busuanga Island
Electric Cooperative,
Inc. (BISELCO) and
Calamian Islands
Power Corp. (CIPC)
Status
On-going
Tarlac Electric
Incorporated (TEI)
On-going
Power Sector Assets
and Liabilities
Management
Corporation (PSALM)
On-going
Power Sector Assets
and Liabilities
Management
Corporation (PSALM)
On-going
Leyte III Electric
Cooperative, Inc.
(LEYECO III)
On-going
Bantayan Island Power
Corporation (BIPCOR)
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
for Provisional Authority
254
2012-011 RC
255
2012-012 RC
256
2012-013 RC
257
2012-014 RC
In the Matter of the Application for
Approval of the Energy Supply
Contract (ESC) Between Camarines
Sur I Electric Cooperative, Inc.
(CASURECO I) and San Miguel
Energy Corporation (SMEC), with
Prayer for Provisional Authority (PA)
In the Matter of the Application for the
Approval of Force Majeure Event
Capital Expenditure Project, re: Repair
and
Restoration
of
Damage
Distribution System Due to Typhoons
Pedring and Quiel, with Prayer for
Authority to Secure Loan from the
National Electrification Administration
(NEA)
In the Matter of the Application for
Approval of Emergency
Capital
Expenditure Projects, re: Installation of
a New 10MVA Substation at San
Rafael, Roxas and Construction of
5.63 KMS of 69KV Transmission Line
from San Jose to San Rafael, Roxas
and Relocation of the 10MVA
Substation from Munoz, Roxas to San
Manuel and Construction of 10.53
KMS of 69KV Transmission Line from
San Rafael, Roxas to San Manuel
In the Matter of the Application for
Approval of Proposed
Capital
Expenditure Projects for the Years
2011 to 2015 (Regular Projects)
118
Camarines Sur I
Electric Cooperative,
Inc. (CASURECO I)
and San Miguel
Energy Corporation
(SMEC)
On-going
Isabela I Electric
Cooperative, Inc.
(ISELCO I)
On-going
Isabela II Electric
Cooperative, Inc.
(ISELCO II)
On-going
Isabela II Electric
Cooperative, Inc.
(ISELCO II)
On-going
No.
Case No.
258
2012-015 RC
259
2012-016 RC
260
2012-017 RC
261
2012-018 RC
262
2012-019 RC
263
2012-020 RC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Central Negros Electric
Approval of the Power Supply Cooperative, Inc.
Agreement (PSA) Between Central (CENECO)
Negros Electric Cooperative, Inc.
(CENECO)
and
Green
Core
Geothermal, Inc. (GCGI), with Prayer
for the Issuance of Provisional
Authority (PA)
In the Matter of the Application for Iloilo II Electric
Approval of Capital Expenditure Cooperative, Inc.
Program for the Years 2012 to 2013, (ILECO II)
with Prayers for Authority to Secure
Loan and Provisional Authority (PA)
In the Matter of the Application for Visayan Electric
Approval of the Power Supply Company, Inc. (VECO)
Agreement (PSA) Between Visayan
Electric Company, Inc. (VECO) and
Green Core Geothermal, Inc. (GCGI),
with Prayer for the Issuance of
Provisional Authority (PA)
In the Matter of the Application fro Province of Siquijor
Approval of the Power Supply Electric Cooperative,
Agreement (PSA) as Revised, Inc. (PROSIELCO)
Between Province of Siquijor Electric and S. I. Power
Cooperative, Inc. (PROSIELCO) and Corporation (SIPCOR)
S. I. Power Corporation (SIPCOR)
In the Matter of the Application for First Laguna Electric
Approval of the Energy Supply Cooperative, Inc.
Contract (ESC) Between First Laguna (FLECO) and San
Electric Cooperative, Inc. (FLECO) Miguel Energy
and San Miguel Energy Corporation Corporation (SMEC)
(SMEC), with Prayer for Provisional
Authority (PA)
In the Matter of the Application for the National Transmission
Approval of the Sale of Various Sub- Corporation
Transmission Lines/Assets of the (TRANSCO) and
National Transmission Corporation Cagayan Sub(TRANSCO) to the Cagayan Sub- Transmission
Transmission Company, Inc. As Company, Inc.
Covered by
a Lease Purchase
Agreement (LPA)
119
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Case Title
264
2012-021 RC
265
2012-022 RC
266
2012-023 RC
267
2012-024 RC
268
2012-025 RC
In the Matter of the Application for the
Approval of the Sale of Various SubTransmission Lines/Assets of the
National Transmission Corporation
(TRANSCO) to Dagupan Electric
Corporation (DECORP) As Covered
by a Contract to Sell
In the Matter of the Application for the
Approval of the Sale of Various SubTransmission Lines/Assets of the
National Transmission Corporation
(TRANSCO) to
Don Orestes
Romualdez Electric Cooperative, Inc.
(DORELCO) as Covered by a Lease
Purchase Agreement (LPA)
In the Matter of the Application for
Approval of the Contract for the Sale
of Electricity (CSE) Between TransAsia Oil and Energy Development
Corporation (TA-OIL) (as Wholesale
Aggregator) and Sorsogon I Electric
Cooperative, Inc. (SORECO I), with
Prayer for the Issuance of Provisional
Authority (PA)
In the Matter of the Application for
Approval of the Contract for the Sale
of Electricity (CSE) Between TransAsia Oil and Energy Development
Corporation (TA-OIL) (as Wholesale
Aggregator) and Quezon II Electric
Cooperative, Inc. (QUEZELCO II), with
Prayer for the Issuance of Provisional
Authority (PA)
In the Matter of the Application for the
Approval of the Proposed Five (5)
Year Interim Capital Expenditure
Projects
120
Applicant/
Complainant/
Respondent/
Petitioner
National Transmission
Corporation
(TRANSCO) and
Dagupan Electric
Corporation
(DECORP)
Status
On-going
National Transmission
Corporation
(TRANSCO) and Don
Orestes Romualdez
Electric Cooperative,
Inc. (DORELCO)
On-going
Sorsogon I Electric
Cooperative, Inc.
(SORECO I)
On-going
Quezon II Electric
Cooperative, Inc.
(QUEZELCO II)
On-going
Cotabato Electric
Cooperative, Inc.
(COTELCO)
On-going
No.
Case No.
269
2012-026 RC
270
2012-027 RC
271
2012-028 RC
272
2012-029 RC
273
2012-030 RC
274
2012-031 RC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for City of Olongapo
Approval of Emergency Capital
Projects, Namely: 1) Construction of
13.8 KV Tie-Line Between CMBU and
Mercurio Substations; 2) Rehabilitation
of
Mercurio
Substation;
3)
Development of Customer Information
Management System & Bill On - Site
System; and 4) Rehabilitation of 69 KV
Line, for Olongapo City's Electric
Distribution System
In the Matter of the Application for the First Bukidnon Electric
Approval of the Contract for the Cooperative, Inc.
Supply of Electric Energy (CSEE) (FIBECO)
Between First Bukidnon Electric
Cooperative, Inc. (FIBECO) and King
Energy Generation, Inc. (KEGI)
In the Matter of the Application for Nueva Ecija II Area 1
Approval of the Energy Supply Electric Cooperative,
Contract (ESC) Between Nueva Ecija Inc. (NEECO II - Area
II Area 1 Electric Cooperative, Inc. I) and San Miguel
(NEECO II - Area I) and San Miguel Energy Corporation
Energy Corporation (SMEC), with (SMEC)
Prayer for Provisional Authority (PA)
In the Matter of the Application for Central Pangasinan
Approval of Capital Expenditure Electric Cooperative,
Program for the Years 2011 to 2014, Inc. (CENPELCO)
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for the SPC Island Power
Approval of the Power Sales Contract Corporation (SIPC)
(PSC) Between SPC Island Power and Iloilo I Electric
Corporation (SIPC) and Iloilo I Electric Cooperative, Inc.
Cooperative, Inc. (ILECO I), with (ILECO I)
Motion for the Issuance of Provisional
Authority (PA)
In the Matter of the Application for the SPC Island Power
Approval of the Power Sales Contract Corporation (SIPC)
(PSC) Between SPC Island Power and Iloilo II Electric
Corporation (SIPC) and Iloilo II Electric Cooperative, Inc.
Cooperative, Inc. (ILECO II), with (ILECO II)
Motion for the Issuance of Provisional
121
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
Authority (PA)
275
2012-032 RC
276
2012-033 RC
277
2012-034 RC
278
2012-035 RC
279
2012-036 RC
280
2012-037 RC
In the Matter of the Application for
Approval of Capital Expenditure
Program for Years 2011 to 2013, with
Prayer for Provisional Authority (PA)
In the Matter of the Application for
Authority to Substitute Various
Approved Third Regulatory Period
Capital Expenditure Projects with the
Implementation Services of Prepaid
Electric Management System (ISPEMS) Project, with Urgent Prayer for
Provisional Authority (PA)
In the Matter of the Application for
Approval of the Power Supply
Agreement (PSA) Between Manila
Electric Company (MERALCO) and
South Premiere Power Corporation
(SPPC)
In the Matter of the Application for
Approval of the Power Supply
Agreement (PSA) Between Manila
Electric Company (MERALCO) and
Therma Luzon, Inc. (TLI)
In the Matter of the Application for
Approval of the Power Supply
Agreement (PSA) Between Manila
Electric Company (MERALCO) and
Masinloc Power Partners, Co., Ltd.
(MPPLC)
In the Matter of the Application for
Approval of the Power Supply
Agreement (PSA) Between Manila
Electric Company (MERALCO) and
Sem-Calaca Power Corporation
(SCPC), with Prayer for Provisional
Authority (PA)
122
Don Orestes
Romualdez Electric
Cooperative, Inc.
(DORELCO)
Manila Electric
Company (MERALCO)
On-going
Manila Electric
Company (MERALCO)
On-going
Manila Electric
Company (MERALCO)
On-going
Manila Electric
Company (MERALCO)
On-going
Manila Electric
Company (MERALCO)
On-going
On-going
No.
Case No.
281
2012-038 RC
282
2012-039 RC
283
2012-040 RC
284
2012-041 RC
285
2012-042 RC
286
2012-043 RC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Batangas II Electric
Approval of the Power Supply Cooperative, Inc.
Agreement (PSA) Between Batangas (BATELEC II)
II Electric Cooperative, Inc. (BATELEC
II) and Bac-Man Geothermal Inc. (for
Load Following / Mid-Merit Power
Requirements), with Prayer for the
Issuance of Provisional Authority (PA)
In the Matter of the Application for Zamboanga City
Approval of the Energy Supply Electric Cooperative,
Agreement
(ESA)
Between Inc. (ZAMCELCO)
Zamboanga City Electric Cooperative,
Inc. (ZAMCELCO) and Therma
Marine, Inc. (TMI), with Prayer for
Provisional Authority (PA)
In the Matter of the Petition for the National Power
Availment of the Environmental Corporation (NPC)
Charge (EC) / Share from the
Universal Charge (UC) for the
Rehabilitation and Management of
Watershed Areas (Plan 9), with Prayer
for Provisional Authority (PA)
Joint Application for the Approval of Sorsogon I Electric
the Power Purchase and Sale Cooperative, Inc.
Agreement (PPSA) Entered Into By (SORECO I) and
and Between Sorsogon I Electric GNPower Mariveles
Cooperative, Inc. (SORECO I) and Coal Plant Ltd., Co.
GNPower Mariveles Coal Plant Ltd., (GMCP)
Co. (GMCP)
In the Matter of the Application for Pangasinan III Electric
Approval of the Energy Supply Cooperative, Inc.
Contract (ESC) Between Pangasinan (PANELCO III) and
III
Electric
Cooperative,
Inc. San Miguel Energy
(PANELCO III) and San Miguel Corporation (SMEC)
Energy Corporation (SMEC), with
Prayer for Provisional Authority (PA)
In the Matter of the Application for Nueva Vizcaya Electric
Approval of Proposed Capital Cooperative, Inc.
Expenditure Projects for the Years (NUVELCO)
2011-2014
123
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Case Title
287
2012-044 RC
288
2012-045 RC
289
2012-046 RC
290
2012-047 RC
In the Matter of the Application for the
Approval of the Force Majeure Capital
Projects of Misamis Oriental Rural
Electric Service Cooperative - 1
(MORESCO-1) for 2012 Arising from
the Damage to its Distribution Assets
Due to Typhoon "Sendong", with
Authority to Secure Loan from the
National Electrification Administration
(NEA) and with Prayers for the
Issuance of Provisional Authority (PA)
In the Matter of the Application for the
Energy Supply Agreement (ESA)
Between Misamis Occidental I Electric
Cooperative, Inc. (MOELCI I) and
Therma Marine, Inc. (TMI), with Prayer
for Provisional Authority (PA)
In the Matter of the Petition for the
Approval of the Recovery from the
Universal Charge (UC) of the
Shortfalls
in
the
Missionary
Electrification Subsidy for CY 2010
Under the True Up Mechanism
Pursuant to ERC Resolution No. 11,
Series of 2005 and the Corresponding
Adjustment of the Universal Charge
(UC) for Missionary Electrification
(UCME), with Prayer for the Issuance
of a Provisional Authority (PA)
In the Matter of the Application for
Approval of the Maximum Average
Price (MAP) for the 2nd Regulatory
Year of the 3rd Regulatory Period
(MAP2013) and its Corresponding
Translation into Distribution Charges
for Each Rate Schedule Applicable for
the Regulatory Year 2013
124
Applicant/
Complainant/
Respondent/
Petitioner
Misamis Oriental Rural
Electric Service
Cooperative - 1
(MORESCO 1)
Status
On-going
Misamis Occidental I
Electric Cooperative,
Inc. (MOELCI I)
On-going
National Power
Corporation - Small
Power Utilities Group
(NPC-SPUG)
On-going
Cagayan Electric
Power and Light
Company, Inc.
(CEPALCO)
Decicion dated
October 1,
2012.
No.
Case No.
291
2012-048 RC
292
2012-049 RC
293
2012-050 RC
294
2012-051 RC
Applicant/
Complainant/
Case Title
Status
Respondent/
Petitioner
In the Matter of the Application for La Union Electric
On-going
Approval of the Translation Into Company, Inc.
Distribution Rates of Different (LUECO)
Customer Classes for the Third
Regulatory Year of the ERC-Approved
Annual Revenue Requirement (ARR)
for La Union Electric Company, Inc.
(LUECO) under the Performance
Based Regulation (PBR) for the
Regulatory Period 2011-2014
In the Matter of the Application for Cabanatuan Electric
Decision dated
Approval of the Translation Into Corporation (CELCOR) October 29,
Distribution Rates of Different
2012.
Customer Classes for the Third
Regulatory Year of the ERC-Approved
Annual Revenue Requirement for
Cabanatuan Electric Corporation
(CELCOR) under the Performance
Based Regulation (PBR) for the
Regulatory Period 2011-2014
In the Matter of the Application for Tarlac Electric,
On-going
Approval of the Translation Into Incorporated (TEI)
Distribution Rates of Different
Customer Classes for the Third
Regulatory Year of the ERC-Approved
Annual Revenue Requirement (ARR)
for Tarlac Electric, Incorporated (TEI)
under the Performance Based
Regulation (PBR) for the Regulatory
Period 2011-2014
In the Matter of the Application for Visayan Electric
On-going
Approval of: (a) Recalculated Company, Inc. (VECO)
Maximum Average Price (MAP) for
Regulatory Year 2013; and (b) The
Translation Into Distribution - Related
Rates of Different Customer Classes
for the Third Regulatory Year of the
ERC-Approved Annual Revenue
Requirement (ARR) for Visayan
Electric Company, Inc. (VECO) Under
the Performance Based Regulation
(PBR) for the Regulatory Period 2011125
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
2014
295
2012-052 RC
296
2012-053 RC
297
2012-054 RC
In the Matter of the Application for
Approval of the Recalculated
Maximum Average Price (MAP) for
Regulatory Year 2013 and
the
Translation Into Distribution Related
Rates of Different Customer Classes
for the Third Regulatory Year of the
ERC- Approved Annual Revenue
Requirement (ARR) for Davao Light
and Power Company, Inc. (DLPC)
Under the Performance Based
Regulation (PBR) for the Regulatory
Period July 1, 2010 - June 30, 2014
In the Matter of the Application for
Approval of the Translation Into
Distribution Rates of Different
Customer Classes for the Second
Regulatory Year of the ERC-Approved
Annual Revenue Requirement (ARR)
for Dagupan Electric Corporation
(DECORP) Under the Performance
Based Regulation (PBR) for the
Regulatory Period Year 2011-2015
In the Matter of the Application for
Approval of: (a) Maximum Average
Price (MAP) for the RY2013; and (b)
Translation of the Maximum Average
Price (MAP) for RY2013 Into
Distribution Rates for its Various
Customer Classes, with Prayer for the
Issuance of a Provisional Authority
(PA)
126
Davao Light and
Power Company, Inc.
(DLPC)
On-going
Dagupan Electric
Corporation
(DECORP)
On-going
Manila Electric
Company (MERALCO)
On-going
No.
Case No.
298
2012-055 RC
299
2012-056 RC
300
2012-057 RC
301
2012-058 RC
302
2012-059 RC
303
2012-060 RC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Ibaan Electric and
Approval of: (a) Maximum Average EngineerinG
Price (MAP) for the RY2013; and (b) Corporation (IEEC)
Translation of the Maximum Average
Price (MAP) for RY2013 Into
Distribution Rates for its Various
Customer Classes, with Prayer for the
Issuance of a Provisional Authority
(PA)
In the Matter of the Application for the Surigao del Norte
Approval of the Proposed Interim Electric Cooperative,
Capital Expenditure Projects
Inc. (SURNECO)
In the Matter of the Application for Bukidnon Second
Approval of the Energy Supply Electric Cooperative,
Agreement (ESA) Between Bukidnon Inc. (BUSECO)
Second Electric Cooperative, Inc.
(BUSECO) and Therma Marine, Inc.
(TMI), with Prayer for Provisional
Authority (PA)
In the Matter of the Application for Cotabato Electric
Approval of the Energy Supply Cooperative, Inc.
Agreement (ESA) Between Cotabato (COTELCO)
Electric Cooperative, Inc. (COTELCO)
and Therma Marine, Inc. (TMI), with
Prayer for Provisional Authority (PA)
In the Matter of the Application for Dinagat Island Electric
Approval of Capital Projects for the Cooperative, Inc.
Years 2012 to 2016 and Authority to (DIELCO)
Secure Loan from the National
Electrification Administration (NEA) in
Accordance with the Provisions of R.
A. No. 9136 and the Rules for the
Approval of Regulated Entities' Capital
Expenditure Projects, with Prayer for
Issuance of Provisional Authority (PA)
In the Matter of the Application for Camiguin Electric
Approval of the Energy Supply Cooperative, Inc.
Agreement (ESA) Between Camiguin (CAMELCO)
Electric Cooperative, Inc. (CAMELCO)
and Therma Marine, Inc. (TMI), with
Prayer for Provisional Authority (PA)
127
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
304
2012-061 RC
305
2012-062 RC
306
2012-063 RC
307
2012-064 RC
308
2012-065 RC
309
2012-066 RC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for the Davao del Norte
Approval of Emergency Capital Electric Cooperative,
Expenditure Project, Re: Replacement Inc. (DANECO)
of Damaged Power Transformer in
MACO Substation, with Prayer for
Authority to Secure Loan from the
National Electrification Administration
(NEA)
In the Matter of the Application for the National Transmission
Approval of the Sale of Various Corporation
Subtransmission Lines/ Assets of the (TRANSCO) and
National Transmission Corporation Manila Electric
(TRANSCO) to Manila Electric Company (MERALCO)
Company (MERALCO) as covered by
the Contract to Sell, with Prayer for
Provisional Authority (PA)
In the Matter of the Application for Misamis Occidental II
Approval of the Energy Supply Electric Cooperative,
Agreement (ESA) Between Misamis Inc. (MOELCI II)
Occidental II Electric Cooperative, Inc. represented by Jemilo
(MOELCI II) and Therma Marine Inc. L. Pelimer
(TMI), with Prayer for Provisional
Authority (PA)
In the Matter of the Application for Tarlac I Electric
Approval of the Energy Supply Cooperative, Inc.
Contract (ESC) Between Tarlac I (TARELCO I) and San
Electric Cooperative, Inc. (TARELCO) Miguel Energy
and San Miguel Energy Corporation Corporation (SMEC)
(SMEC), with Prayer for Provisional
Authority (PA)
In the Matter of the Application for Cebu II Electric
Approval of the Power Supply Cooperative, Inc.
Agreement (PSA) Between Cebu II (CEBECO II) and
Electric Cooperative, Inc. (CEBECO II) Desco, Inc.
and Desco, Inc., with Prayer for
Provisional Approval (PA)
In the Matter of the Application for the National Grid
Approval of the Opol Substation Corporation of the
Project, with Prayer for the Issuance of Philippines (NGCP)
a Provisional Authority (PA)
128
Status
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Case Title
310
2012-067 RC
311
2012-068 RC
312
2012-069 RC
313
2012-070 RC
In the Matter of the 2nd Application for
the True Up Adjustments of Fuel and
Purchased Power Costs (TAFPPC),
and Foreign Exchange - Related
Costs (TAFxA) under the Rules for the
Automatic Recovery of Monthly Fuel
and Purchased Power Costs and
Foreign Exchange - Related Costs by
the National Power Corporation
(NPC), as Amended, with Prayer for
the Issuance of Provisional Authority
(PA)
In the Matter of the Application for
Amendment of the Rate Approved in
ERC Case No. 2010-066 RC In re:
Approval of the Electric Power
Purchase Agreement (EPPA) Between
Antique Electric Cooperative, Inc.
(ANTECO) and Panay Energy
Development Corporation (PEDC)
In the Matter of the Application to
Approve the Purchase and Installation
of One 83 MVA Power Transformer
Used in the Diliman Substation and for
Authority to Maintain at All Times, and
Install During Emergency, A Spare
Power Transformer
In the Matter of the Application of the
National Grid Corporation of the
Philippines (NGCP) for the Approval of
Force Majeure (FM) Event Regulated
FM Pass Through for Flooding in
Mindanao,
Typhoon
Bebeng,
Landslide in Mindanao and Typhoon
Juaning in Accordance with the Rule
for Setting Transmission Wheeling
Rates, with Prayer for Provisional
Authority (PA)
129
Applicant/
Complainant/
Respondent/
Petitioner
Power Sector Assets
and Liabilities
Management
Corporation (PSALM)
Status
On-going
Antique Electric
Cooperative, Inc.
(ANTECO) and Panay
Energy Development
Corporation (PEDC)
On-going
Manila Electric
Company (MERALCO)
On-going
National Grid
Corporation of the
Philippines (NGCP)
On-going
No.
Case No.
Case Title
314
2012-071 RC
In the Matter of the Petition for
Approval of the Adoption of Special
Hydro-Electric Energy Rate and
Revision of Transmission and Ancillary
Service Charges for the Lanao Del Sur
Electric
Cooperative,
Inc.
(LASURECO), with Prayer for
Provisional Authority (PA)
315
2012-072 RC
316
2012-073 RC
317
2012-074 RC
318
2012-075 RC
In the Mater of the Application for the
Approval of the Renewable Energy
Supply Agreement (RESA) Between
Davao del Sur Electric Cooperative,
Inc. (DASURECO) and Municipality of
Malita, Davao Del Sur
In the Matter of the Application for
Authority to Implement Proposed
Additional Capital Project for Years
2013-2014, with Prayer for Provisional
Authority (PA)
In the Matter of the Application for
Authority to Implement Proposed
Additional Capital Project for Years
2012-2014, with Prayer for Provisional
Authority (PA)
In the Matter of the Application for the
Approval of the Sale of Various
Subtransmission Lines/ Assets of the
National Transmission Corporation
(TRANSCO) to Iligan Light and Power,
Inc. (ILPI) as covered by the Contract
to Sell
130
Applicant/
Complainant/
Respondent/
Petitioner
Lanao Del Sur Electric
Cooperative, Inc.
(LASURECO)
represented by
General Manager
(GM) Sultan Ashary P.
Maongco, National
Power Corporation
(NPC)/Power Sector
Assets and Liabilities
Management
Corporation (PSALM),
National Transmission
Corporation
(TRANSCO), and
National Grid
Corporation of the
Philippines (NGCP)
Status
On-going
Davao del Sur Electric
Cooperative, Inc.
(DASURECO) and
Municipality of Malita,
Davao Del Sur
On-going
Visayan Electric
Company, Inc. (VECO)
On-going
Visayan Electric
Company, Inc. (VECO)
On-going
National Transmission
Corporation
(TRANSCO) and Iligan
Light and Power, Inc.
(ILPI)
On-going
No.
Case No.
319
2012-076 RC
320
2012-077 RC
321
2012-078 RC
322
2012-079 RC
323
2012-080 RC
324
2012-081 RC
325
2012-082 RC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for the Negros Oriental I
Approval of Force Majeure (FM) Event Electric Cooperative,
Capital Expenditure Project, Re: Inc. (NORECO I)
Repair and Restoration of Distribution
System Destroyed by the February 6,
2012 Earthquake
In the Matter of the Application for Southern Leyte
Approval of Capital Expenditure for the Electric Cooperative,
Years 2012 to 2015, with Prayer for Inc. (SOLECO)
Provisional Authority (PA)
In the Matter of the Application for the Manila Electric
Approval of the Contract for the Company (MERALCO)
Supply of Electric Energy (CSEE)
Between Pangea Green Energy,
Philippines, Inc. (Pangea) and Manila
Electric Company (MERALCO), with
Prayer for Provisional Authority (PA)
In the Matter of the Application for Ilocos Norte Electric
Approval of the Energy Supply Cooperative, Inc.
Contract (ESC) Between Ilocos Norte (INEC) and San Miguel
Electric Cooperative, Inc. (INEC) and Energy Corporation
San Miguel Energy Corporation (SMEC)
(SMEC), with Prayer for Provisional
Authority (PA)
In the Matter of the Application for Angeles Electric
Authority to Implement 2012 Major Corporation (AEC)
Electrical Capital Projects, with Prayer
for the Immediate Issuance of a
Provisional Authority (PA)
In the Matter of the Application for Negros Oriental II
Approval of Force Majeure (FM) Event Electric Cooperative,
Capital Expenditure Project, Re: Inc. (NORECO II)
Repair and Restoration of Distribution
Lines and Facilities and Replacement
of KWH Meters Damaged by Typhoon
Sendong
In the Matter of the Application for Cagayan I Electric
Approval of the Interim Power Supply Cooperative, Inc.
Agreement (PSA) with San Miguel (CAGELCO I)
Energy Corporation (SMEC), with
Prayer for Provisional Authority (PA)
131
Status
On-going
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
326
2012-083 RC
327
2012-084 RC
328
2012-085 RC
329
2012-086 RC
330
2012-087 RC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Cagayan II Electric
Approval of the Interim Power Supply Cooperative, Inc.
Agreement with San Miguel Energy (CAGELCO II)
Corporation (SMEC) with Prayer for
Provisional Authority
In the Matter of the Application for the Philippine Electricity
Approval of the Level of Market Market Corporation
Transaction Fees for the Calendar (PEMC)
Year 2013 for the Philippines
Wholesale Electricity Spot Market
(WESM)
In the Matter of the Petition for the National Power
Approval of the Following Pursuant to Corporation (NPC)
ERC Resolution No. 21, Series of
2011: (a) Availments from the
Universal Charge of the Share for
Missionary Electrification (UCME)
Subsidy for the Years 2012 to 2016;
and (b) Recovery from the Universal
Charge (UC) of the Shortfall in
Missionary
Electrification
(ME)
Subsidy for CY2011 and the
Corresponding Adjustment of the
UCME, with Prayer for Provisional
Authority (PA)
In the Matter of the Application for Negros Oriental II
Approval of Emergency Capital Electric Cooperative,
Expenditure Project, Re: Procurement Inc. (NORECO II)
of Brand New 10 MVA Power
Transformer for Bayawan Substation
In the Matter of the Application for Manila Electric
Approval of the Power Supply Company (MERALCO)
Agreement (PSA) Between Manila
Electric Company (MERALCO) and
San Miguel Energy Corporation
(SMEC)
132
Status
On-going
On-going
On-going
On-going
On-going
No.
Case No.
331
2012-088 RC
332
2012-089 RC
333
2012-090 RC
334
2012-091 RC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Bohol Light Company,
Approval of the Maximum Average Inc. (BLCI)
Price (MAP RY 2013) and its
Translation Into Distribution Rates of
Different Customer Classes for the
Second Regulatory Year of the ERCApproved
Annual
Revenue
Requirement (ARR) for Bohol Light
Company, Inc. (BLCI) Under the
Performance- Based Regulation
(PBR) for the Regulatory Period 20122015
In the Matter of the Application for Angeles Electric
Approval of the Translation Into Corporation (AEC)
Distribution Rates of Different
Customer Classes for the Second
Regulatory Year of the ERC-Approved
Annual Revenue Requirement (ARR)
for Angeles Electric Corporation
(AEC) Under the Performance Based
Regulation (PBR) for the Regulatory
Period 2012-2015
In the Matter of the Application for Davao del Norte
Approval of the Power Supply Electric Cooperative,
Agreement (PSA) Between Davao del Inc. (DANECO)
Norte Electric Cooperative, Inc
(DANECO)
and
EEI
Power
Corporation, with Prayer for the
Issuance of Provisional Authority (PA)
In the Matter of the Application for Busuanga Island
Approval of Proposed Electric Capital Electric Cooperative,
Projects for the CY 2012-2016 and the Inc. (BISELCO)
Authority to Secure Loans from
National Electrification Administration
(NEA), with Prayer for Provisional
Authority (PA)
133
Status
On-going
On-going
On-going
On-going
No.
Case No.
Case Title
335
2012-092 RC
336
2012-093 RC
337
2012-094 RC
338
2012-095 RC
In the Matter of the Application for
Approval of: a) Recalculated Maximum
Average Price (MAP) for Regulatory
Year 2013; and b) The Translation Into
Distribution - Related Rates of
Different Customer Classed for the
Second Regulatory Year of the ERCApproved
Annual
Revenue
Requirement (ARR) for San Fernando
Electric Light and Power Company,
Inc.
(SFELAPCO) Under the
Performance Based Regulation (PBR)
for the Regulatory Period 2012-2015
In the Matter of the Application for
Approval of Capital Expenditure
Program for the Years 2011 to 2015,
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for
Approval of Unplanned Capital
Expenditure Project for Year 2012, Re:
Installation of New 10 MVA Substation
in Laoag City and Construction of
69KV Sub-transmission Line Due to
Unexpected Significant New Load,
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for the
Proposed Interim Capital Expenditure
Projects for the Years 2011-2013 and
Authority to Secure Loan from the
National Electrification Administration
(NEA) and Development Bank of the
Philippines (DBP)
134
Applicant/
Complainant/
Respondent/
Petitioner
San Fernando Electric
Light and Power
Company, Inc.
(SFELAPCO)
Status
On-going
Quirino Electric
Cooperative, Inc.
(QUIRELCO)
On-going
Ilocos Norte Electric
Cooperative, Inc.
(INEC)
On-going
Agusan Del Sur
Electric Cooperative,
Inc. (ASELCO)
On-going
No.
Case No.
339
2012-096 RC
340
2012-097 RC
341
2012-098 RC
342
2012-099 RC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Subic Enerzone
Approval of: a) the Recalculated Corporation (SEZ)
Maximum Average Price (MAP) for
Regulatory Year 2013; and b) the
Translation Into Distribution Rates of
Different Customer Regulatory Year of
the ERC-Approved Annual Revenue
Requirement (ARR) for Subic
Enerzone Corporation (SEZ) Under
the Performance - based Regulation
(PBR) for the Regulatory Period
October 1, 2011 - September 30,
2015
In the Matter of the Application for the Philippine Electricity
Approval of the Level of Market Market Corporation
Transaction Fees for the Repayment (PEMC)
of the Market Management System
(MMS) Loan for the Philippine
Wholesale Electricity Spot Market
(WESM)
In the Matter of the Application for Camarines Sur III
Approval of the Energy Supply Electric Cooperative,
Contract (ESC) Between Camarines Inc. (CASURECO III)
Sur III Electric Cooperative, Inc. and San Miguel
(CASURECO III) and San Miguel Energy Corporation
Energy Corporation (SMEC), with (SMEC)
Prayer for Provisional Authority (PA)
In the Matter of the Application for Clark Electric
Approval of the Translation Into Distribution
Distribution Rates of Different Corporation (CEDC)
Customer Classes for the Second
Regulatory Year of the ERC-Approved
Annual Revenue Requirement (ARR)
for the Clark Electric Distribution
Corporation (CEDC) Under the
Performance Based Regulation (PBR)
for the Regulatory Period October 1,
2011 - September 30, 2015
135
Status
On-going
On-going
On-going
On-going
No.
Case No.
343
2012-100 RC
344
2012-101 RC
345
2012-102 RC
346
2012-103 RC
347
2012-104 RC
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
In the Matter of the Application for Panay Electric
Approval of the Translation Into Company, Inc. (PECO)
Distribution Rates of Different
Customer Classes for the Second
Regulatory Year of the ERC-Approved
Annual Revenue Requirement for the
Panay Electric Company, Inc. (PECO)
Under the Performance Based
Regulation (PBR) for the Regulatory
Period October 1, 2011 - September
30, 2015
In the Matter of the Application for Pampanga III Electric
Approval of the Energy Supply Cooperative, Inc.
Contract (ESC) Between Pampanga III (PELCO III) and San
Electric Cooperative, Inc. (PELCO III) Miguel Energy
and San Miguel Energy Corporation Corporation (SMEC)
(SMEC), with Prayer for Provisional
Authority) (PA)
In the Matter of the Application for Visayan Electric
Approval of the Supplement to the Company, Inc. (VECO)
Power Supply Agreement (PSA)
Between Visayan Electric Company,
Inc. (VECO) and Cebu Private Power
Corporation (CPPC), with Prayer for
the Issuance of Provisional Authority
(PA)
In the Matter of the Application for Kalinga - Apayao
Approval of the Power Supply Electric Cooperative,
Agreement (PSA) Between the Inc. (KAELCO)
Kalinga-Apayao Electric Cooperative,
Inc. (KAELCO) and AP Renewables,
Inc. (APRI), with Prayer for Provisional
Authority (PA)
In the Matter of the Application for Bukidnon SubApproval of the Capital Expenditure Transmission
Projects
Corporation (BSTC)
136
Status
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Case Title
348
2012-105 RC
349
2012-106 RC
350
2012-107 RC
351
2012-108 RC
352
2012-109 RC
In the Matter of the Application for the
Approval of the Sale of Various
Subtransmission Lines/Assets of the
National Transmission Corporation
(TRANSCO to Cagayan Electric
Power and Light Company, Inc.
(CEPALCO) as Covered by an
Amended Contract to Sell dated 27
February 2012
In the Matter of the Application of the
National Grid Corporation of the
Philippines (NGCP) for the Approval of
Force Majeure (FM) Event Regulated
FM Pass Through for Typhoons Quiel
and Sendong in Accordance with the
Rules for Setting Transmission
Wheeling Rates, with Prayer for
Provisional Authority (PA)
In the Matter of the 8th Application for
the Recovery of the Incremental Costs
on Foreign Currency Exchange Rate
Fluctuations Under the Incremental
Currency Exchange Rate Adjustment
(ICERA), with Prayer for Provisional
Authority (PA)
In the Matter of Application for the
Approval of the 8th Generation Rate
Adjustment Mechanism (8th GRAM),
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for
Approval of the Maximum Allowable
Revenue (MAR) for the Calendar Year
2013 and the Performance Incentive
Scheme (PIS) Under the Rules for
Setting the Transmission Wheeling
Rates, with Prayer for Provisional
Authority (PA)
137
Applicant/
Complainant/
Respondent/
Petitioner
National Transmission
Corporation
(TRANSCO) and
Cagayan Electric
Power and Light
Company, Inc.
(CEPALCO)
Status
On-going
National Grid
Corporation of the
Philippines (NGCP)
On-going
National Power
Corporation - Small
Power Utilities Group
(NPC-SPUG)
On-going
National Power
Corporation - Small
Power Utilities Group
(NPC-SPUG)
On-going
National Grid
Corporation of the
Philippines (NGCP)
On-going
No.
Case No.
Case Title
353
2012-110 RC
354
2012-111 RC
355
2012-112 RC
356
2012-113 RC
357
2012-114 RC
358
2012-115 RC
359
2012-116 RC
360
2012-117 RC
In the Matter of the Application for
Approval of the Memorandum of
Agreement (MOA) Between DMCI
Power Corporation (DPC) and
Palawan Electric Cooperative, Inc.
(PALECO), with Prayer for Provisional
Authority (PA)
In the Matter of the Application for
Approval of Capital Expenditure
Program for the Years 2011 to 2013,
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for the
Approval of the Power Purchase
Agreement (PSA) Between Agusan
Power Corporation (APC) and Agusan
del Norte Electric Cooperative, Inc.
(ANECO), with Motion for the
Issuance of Provisional Authority (PA)
In the Matter of the Application for
Approval of the Emergency Installation
of One (1) 83 MVA Power Transformer
in the New Teresa Substation
In the Matter of the Application for the
Construction of a Substation, with
Prayer for Provisional Authority (PA)
In the Matter of the Application for
Approval of Capital Expenditure
Program for the Years 2012 to 2013,
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for
Approval of Force Majeure (FM) Pass
Through Amount Resulting from
Damage to Facilities Due to Typhoon
"Sendong" a Force Majeure (FM)
Event, in Accordance with the Rules
for Setting Distribution Wheeling Rates
(RDWR)
In the Matter of the Application for
Approval of Revised Time-Of-Use
(TOU) Retail Rates to End-Users, with
138
Applicant/
Complainant/
Respondent/
Petitioner
Palawan Electric
Cooperative, Inc.
(PALECO) and DMCI
Power Corporation
(DPC)
Status
On-going
Peninsula Electric
Cooperative, Inc.
(PENELCO)
On-going
Agusan Power
Corporation (APC) and
Agusan del Norte
Electric Cooperative,
Inc. (ANECO)
On-going
Manila Electric
Company (MERALCO)
On-going
Batangas II Electric
Cooperative, Inc.
(BATELEC II)
Zamboanga City
Electric Cooperative,
Inc. (ZAMCELCO)
On-going
Cagayan Electric
Power and Light
Company, Inc.
(CEPALCO)
On-going
Manila Electric
Company (MERALCO)
On-going
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
Prayer for Provisional Authority (PA)
361
2012-118 RC
362
2012-119 RC
363
2012-120 RC
364
2012-121 RC
365
2012-122 RC
366
2012-123 RC
In the Matter of the Application for the
Approval of the Power Supply
Agreement (PSA) Between Quirino
Electric
Cooperative,
Inc.
(QUIRELCO) and SN Aboitiz PowerMagat, Inc. (SNAP), with Prayer for
Issuance of a Provisional Authority
(PA)
In the Matter of the Application for the
Approval of the Power Supply
Agreement (PSA) Between Ifugao
Electric Cooperative, Inc. (IFELCO)
and SN Aboitiz Power-Magat, Inc.
(SNAP), with Prayer for Issuance of a
Provisional Authority (PA)
In the Matter of the Application for the
Approval of the Power Supply
Agreement (PSA) Between Isabela II
Electric Cooperative, Inc. (ISELCO II)
and SN Aboitiz Power-Magat, Inc.,
with Prayer for Issuance of a
Provisional Authority (PA)
In the Matter of the Application for
Approval of an Emergency Capital
Expenditure Project to Replace the 5
MVA Power Transformer at the Alicia
Substation, with Prayer for Provisional
Authority (PA)
In the Matter of the Application for
Approval of the Power Supply
Agreement (PSA) Between the Nueva
Ecija I Electric Cooperative, Inc.
(NEECO I) and AP Renewables, Inc.
(APRI), with Prayer for Provisional
Authority (PA)
In the Matter of the Application for
Approval of an Adjustment in Rates
Under the Rules of Setting Electric
Cooperatives' Wheeling Rates (RSEC139
Quirino Electric
Cooperative, Inc.
(QUIRELCO)
On-going
Ifugao Electric
Cooperative, Inc.
(IFELCO)
On-going
Isabela II Electric
Cooperative, Inc.
(ISELCO II)
On-going
Bohol II Electric
Cooperative, Inc.
(BOHECO II)
On-going
Nueva Ecija I Electric
Cooperative, Inc.
(NEECO I)
On-going
Maguindanao Electric
Cooperative, Inc.
(MAGELCO)
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Status
WR), with Prayer for Provisional
Authority (PA)
367
2012-124 RC
368
2012-125-RC
369
2012-126-RC
370
2012-127-RC
371
2012-128-RC
In the Matter of the Application for
Approval of the Overall Rate
Adjustment, with Urgent Prayer for the
Issuance of Provisional Authority (PA)
In the Matter of the Application for
Approval of the Energy Supply
Contract (ESC) Between Quezon I
Electric
Cooperative,
Inc.
(QUEZELCO I) and San Miguel
Energy Corporation (SMEC), with
Prayer for provisional Authority (PA)
In the Matter of the Joint Application
for the Approval of the Power
Purchase and Sale Agreement
(PPSA) entered into by and between
Biliran Electric Cooperative Inc.
(BILECO) and GNPOWER Mariveles
Coal Plant Ltd., Co. (GMCP)
In the Matter of the Application for the
Approval of the Power Supply
Agreement (PSA) Between the
Mountain
Province
Electric
Cooperative, Inc. (MOPRECO) and
AP Renewables, Inc. (APRI), with
Prayer for Provisional Authority (PA)
In the Matter of the Application for
Approval of Unplanned Capital
Expenditure (CAPEX) Re: 1)
Proposed 2 - 35/43.75 MVA
Substation; 2) Proposed Installation of
2 units 69 kV Sectionalizing Circuit
Breaker; and 3) South Cotabato II
Electric
Cooperative,
Inc.
(SOCOTECO II) Proposed New
Headquarters
140
Negros Oriental I
Electric Cooperative,
Inc. (NORECO I)
On-going
Quezon I Electric
Cooperative, Inc.
(QUEZELCO I) and
San Miguel Energy
Corporation (SMEC)
On-going
Biliran Electric
Cooperative Inc.
(BILECO), and
(GNPOWER Mariveles
Coal Plant Ltd., Co.
(GMCP)
On-going
Mountain Province
Electric Cooperative,
Inc. (MOPRECO)
On-going
South Cotabato II
Electric Cooperative,
Inc. (SOCOTECO II)
On-going
No.
Case No.
Case Title
372
2012-129-RC
In the Matter of the Joint Application
for the Approval of the Power
Purchase and Sale Agreement
(PPSA) Entered Into by and Between
I) Each of Don Orestes Romualdez
Electric
Cooperative,
Inc.
(DORELCO); Leyte IV Electric
Cooperative, Inc. (LEYECO IV); and
Samar II Electric Cooperative, Inc.
(SAMELCO II); and II) GNPOWER
Mariveles Coal Plant Ltd. Co. (GMCP)
373
2012-130-RC
374
2012-131-RC
375
2012-132-RC
376
2012-133-RC
In the Matter of the Application for
Approval of the Settlement Agreement
Between Central Negros Electric
Cooperative, Inc. (CENECO) and
Panay
Energy
Development
Corporation (PEDC)
In the Matter of the Application for
Approval of the Generation Rate
Recovery for the Oriental Mindoro
Electric
Cooperative,
Inc.'s
(ORMECO) 2.1 MW Linao-Cawayan
Mini-Hydro Power Plant - Lower
Cascade, with Prayer for the Issuance
of Provisional Authority (PA)
In the Matter of the Application for
Approval of the Sale for Resale
Agreement by and Between First
Bukidnon Electric Cooperative, Inc.
(FIBECO) and Bukidnon Second
Electric Cooperative, Inc. (BUSECO),
with Prayer for Provisional Authority
(PA)
In the Matter of the Application for
Approval of Capital Expenditure
Program for the Years 2012 to 2014,
with Prayer for Provisional Authority
(PA)
141
Applicant/
Complainant/
Respondent/
Petitioner
Don Orestes
Romualdez Electric
Cooperative, Inc.
(DORELCO); Leyte IV
Electric Cooperative,
Inc. (LEYECO IV);
Samar II Electric
Cooperative, Inc.
(SAMELCO II); and
GNPOWER Mariveles
Coal Plant Ltd. Co.
(GMCP)
Status
On-going
Central Negros Electric
Cooperative, Inc.
(CENECO) and Panay
Energy Development
Corporation (PEDC)
On-going
Oriental Mindoro
Electric Cooperative,
Inc. (ORMECO)
On-going
First Bukidnon Electric
Cooperative, Inc.
(FIBECO) and
Bukidnon Second
Electric Cooperative,
Inc. (BUSECO)
On-going
Sorsogon II Electric
Cooperative, Inc.
(SORECO II)
On-going
No.
Case No.
Case Title
377
2012-134-RC
378
2012-135-RC
379
2012-136-RC
380
2012-137-RC
In the Matter of the Application for
Approval of the Ancillary Services
Procurement Agreement (ASPA)
Between the National Grid Corporation
of the Philippines (NGCP) and
Panasia Energy, Inc., with Prayer for
the Issuance of Provisional Authority
(PA)
In the Matter of the Application for
Approval of the Ancillary Services
Procurement Agreement (ASPA)
Between the National Grid Corporation
of the Philippines (NGCP) and TransAsia Power Generation Corporation,
with Prayer for the Issuance of
Provisional Authority (PA)
In the Matter of the Application for
Approval of the Ancillary Services
Procurement Agreement (ASPA)
Between the National Grid Corporation
of the Philippines (NGCP) and TransAsia Oil and Energy Development
Corporation (TA-OIL), with Prayer for
the Issuance of Provisional Authority
(PA)
In the Matter of the Application for the
Approval of the Sale of Various
Subtransmission Lines/Assets of the
National Transmission Corporation
(TRANSCO) to the Consortium of
Manila Electric Company (MERALCO)
and First Bay Power Corporation
(FBPC), as Covered by a Contract to
Sell, as Amended, with Prayer for
Provisional Authority (PA)
142
Applicant/
Complainant/
Respondent/
Petitioner
National Grid
Corporation of the
Philippines (NGCP)
and Panasia Energy,
Inc.
Status
On-going
National Grid
Corporation of the
Philippines (NGCP)
and Trans-Asia Power
Generation
Corporation
On-going
National Grid
Corporation of the
Philippines (NGCP)
and Trans-Asia Oil and
Energy Development
Corporation (TA-OIL)
On-going
National Transmission
Corporation
(TRANSCO), Manila
Electric Company
(MERALCO) and First
Bay Power
Corporation (FBPC)
On-going
No.
Case No.
Case Title
381
2012-138-RC
382
2012-139-RC
383
2012-140-RC
384
2012-001 RM
385
2012-002 RM
386
2012-003 RM
In the Matter of the Application for the
Approval of the Sale of Various
Subtransmission Lines/Assets of the
National Transmission Corporation
(TRANSCO) to the Consortium of
Manila
Electric
Company
(MERALCO), Batangas II Electric
Cooperative, Inc. (BATELEC II) and
First Bay Power Corporation (FBPC),
as Covered by a Contract to Sell, as
Amended, with Prayer for Provisional
Authority (PA) (Batangas-MabiniCuenca 69kV Line and Batangas S/S
69kV Termination )
In the Matter of the Application for the
Approval of the Sale of Various
Subtransmission Lines/Assets of the
National Transmission Corporation
(TRANSCO) to the Consortium of
Manila Electric Company (MERALCO)
and Batangas II Electric Cooperative,
Inc. (BATELEC II), as Covered by a
Contract to Sell, as Amended, with
Prayer for Provisional Authority (PA)
(Circuit 59BS, 59BS12, Circuit 56MB
and 56MB4)
In the Matter of the Application for
Approval of Proposed Unplanned and
Contingency Capital Expenditures
In the Matter of the Petition to Initiate
Rule Making to Amend Resolution No.
16, Series of 2010, Otherwise Known
as the "Feed In Tariff Rules"
In the Matter of Amendments of
Resolution No. 15, Series of 2009
Prepaid Retail Electricity Service
Using Prepaid Metering System
In the Matter of the Draft Guidelines
for Transmission Planning
143
Applicant/
Complainant/
Respondent/
Petitioner
National Transmission
Corporation
(TRANSCO), Manila
Electric Company
(MERALCO),
Batangas II Electric
Cooperative, Inc.
(BATELEC II) and First
Bay Power
Corporation (FBPC)
Status
On-going
National Transmission
Corporation
(TRANSCO), Manila
Electric Company
(MERALCO) and
Batangas II Electric
Cooperative, Inc.
(BATELEC II)
On-going
Ibaan Electric and
Engineering
Corporation (IEEC)
Visayan Electric
Company, Inc. (VECO)
On-going
Rey I. Prolles
On-going
Energy Regulatory
Commission (ERC)
On-going
On-going
No.
Case No.
387
388
2012-004 RM
389
2012-005 RM
390
2012-006 RM
391
2012-007 RM
392
2012-008 RM
393
2012-009 RM
Applicant/
Complainant/
Case Title
Respondent/
Petitioner
A Resolution Enjoining Compliance Energy Regulatory
with the Department of Energy (DOE) Commission (ERC)
Circular no. DC2012-03-0004, Entitled
"Directing Compliance with the Electric
Power Industry Report Act of 2011
(EPIRA) to Address the Power Supply
Situation Including the Rationalization
of the Available Capacities in the
Mindanao Grid" and Providing for
Fines and Penalties for Violations
Therefor
A Resolution Setting Aside and Energy Regulatory
Rendering Ineffective for Purposed of Commission (ERC)
Expediency, Several Open Access
and Retail Competition Rules to Allow
the Completion of the Retail Market
Framework Within the Timeline Issued
by the Department of Energy (DOE)
In the Matter of the Petition for the Association of
Adoption of Rules for the Demand Mindanao Rural
Aggregation and Joint Power Supply Electric Cooperatives
Contracting of Electric Cooperatives (AMRECO)
(ECs)
In the Matter of the Petition for the Philippine Independent
Amendment of ERC Resolution No. 16 Power Producers
or the "Resolution Adopting Amended Association, Inc.
Rules on the Definition and (PIPPA)
Boundaries of Connection Assets for
Customers or Transmission Providers
In the Matter of the Approval of the National Renewable
Rule Enabling the Net-Metering Energy Board (NREB)
Program for Renewable Energy (RE)
In the Matter of the Approval of the National Renewable
Feed-In Tariff Allowance - Payment Energy Board (NREB)
and Collection Guidelines
In the Matter of the Petition to Amend Visayan Electric
Resolution No. 11, Series of 2009, Company, Inc. (VECO)
Otherwise Known as the "Rules to
Govern the Installation and Relocation
of Residential Electric Meters by
Distribution Utilities (DUs) to Elevated
Metering Centers or Individual
144
Status
On-going
On-going
On-going
On-going
On-going
On-going
On-going
No.
Case No.
Applicant/
Complainant/
Respondent/
Petitioner
Case Title
Residential Electric Meter to Other
Elevated Service"
145
Status

Similar documents

Siquijor 2009

Siquijor 2009 There is one diesel-generated power supply on the island owned and operated by the National Power Corporation (NPC). The electric power is purchased by the Province of Siquijor Electric Cooperative...