2012 Annual Report - Energy Regulatory Commission
Transcription
2012 Annual Report - Energy Regulatory Commission
2012 Annual Report TABLE OF CONTENTS Page Message from the Chair 3 The ERC Organizational Structure 5 The Commission Officials 6 Resolutions 7 Enforcement of Rules 13 Consumer Affairs 74 Challenges Ahead 75 Financial Highlights 78 Directory of ERC Officials 83 Annex 1 – Status of Cases Filed 85 Sec. 43 (n) of the EPIRA (n) Before the end of April of each year, submit to the Office of the President of the Philippines and Congress, copy furnished the DOE, an annual report containing such matters or cases which have been filed before or referred to it during the preceding year, the actions and proceedings undertaken and its decision or resolution in each case. 2 MESSAGE FROM THE CHAIR ERC:TOWARDS ENHANCED REGULATION AND INNOVATION FY 2012 was a defining year for the Energy Regulatory Commission (ERC). Armed with more than a decade of solid experience as an independent and professional regulator of the Philippine electric power industry, the ERC conquered challenges and advanced by leaps and bounds in 2012. The ERC positioned itself towards Enhanced Regulation, establishing and strengthening frameworks and systems, and introducing innovations along the way. These frameworks, systems, and innovations provided the foundation for quality and effective regulation. In working towards Enhanced Regulation, the ERC sought to inform the electricity consumers about the fundamental concepts of electric service regulation which include, among others, the unbundled electricity bill’s components, the determination of electric power rates, and mechanisms how to effectively participate in public hearings in the ERC. As part of the innovations for 2012, the ERC produced its very first Television Infomercial (TVI) with the assistance of the Presidential Communications Office (PCOO), through the Philippine Information Agency (PIA). The TVI generates awareness about the ERC’s functions and mandates, answers basic electricity questions, and provides information on demand side management. Likewise, the ERC introduced in 2012 the Online Certificate of Compliance (COC) Filing System. The online filing system facilitates the application, issuance, and renewal of COC and promotes easy access to applicants of COCs. As the country is getting ready for the competitive retail electricity market, the ERC issued the Transitory Rules for the Implementation of Open Access and Retail Competition Regime to ensure the smooth transition of the electric power industry to a more competitive environment, as well as to promote the interests of all the stakeholders in the industry. To give the retail electricity market participants sufficient amount of time to evaluate, plan and contract for supply of electricity, a six (6) month transition period starting December 26, 2012 until June 25, 2013 was set, after which the contestable customers who are able to contract with suppliers of their own choice, may already implement their supply contracts. To provide transparency and ensure that the costs and activities are fairly and reasonably allocated and reflected as efficient costs of the respective activities and services of the electric cooperatives, the ERC developed the Accounting and Cost Allocation Manual (ACAM) in line with the Business Separation Guidelines (BSG), as amended, which implements the requirement under the Electric Power Industry Reform 3 Act (EPIRA) for the structural and functional unbundling of the business activities of electric power industry participants. The ACAM ensures the separation of the audited accounts of each business-related undertaking of the electric cooperatives and provides full and proper documentation of the accounting policies and principles that apply to the electric cooperatives in preparing their Accounting Separation Statements in accordance with the BSG. In pursuance of the ERC’s mandate to promulgate, approve and enforce rules, regulations, resolutions and policies, including the issuances of permits and licenses, the ERC issued seventeen (17) Resolutions, rendered one hundred forty-seven (147) Decisions, issued two hundred eight (208) major Orders, and conducted seven hundred thirty-eight (738) hearings in various provinces and localities all over the country. In terms of the issuance of licenses, the ERC issued two thousand six hundred (2,600) Certificates of Compliance (COCs) to Generation Companies, licensed three (3) Wholesale Aggregators (WA) and issued eleven (11) Retail Electricity Supplier (RES) Licenses in 2012. In terms of promotion of consumer interest, the ERC resolved eight hundred one (801) consumer complaints, rendered eight thousand one hundred thirty-nine (8,139) frontline services, conducted six hundred sixty-five (665) consumer education/information dissemination activities, and tested and calibrated four million four hundred sixty-one thousand three hundred fifty-four (4,461,354) new and in-service watt-hour meters, including reference standards in 2012. On the renewable energy front, the year 2012 brought us one step closer to realizing our goal of establishing and administering the Feed-In Tariff System. After conducting a series of hearings, consultations, and careful study and deliberation, the ERC set the FITs for run-of-river hydro plants, biomass, wind, and solar. The success of our initiatives, as reflected in the number of rules, regulations and decisions issued, the innovations and breakthrough projects put in place, and the information, education and communication projects developed and implemented, would not have been possible if not for the dedication and commitment of our people, who are the driving force for all the achievements and actions that we make. As we look forward to the challenges ahead, we aim to strengthen our organization further in order to achieve the highest efficiency and effectiveness in our operations. Our modest accomplishments each year are testaments to our continued growth and eagerness to scale greater heights in the years to come. ZENAIDA G. CRUZ-DUCUT Chairperson and CEO 30 April 2013 4 5 6 2012 RESOLUTIONS RESOLUTION NO. 1 A RESOLUTION ADOPTING CERTAIN GUIDELINES FOR THE IMPLEMENTATION BY THE DISTRIBUTION UTILITIES OF THE UNIFORM REPORTORIAL REQUIREMENTS STARTING JANUARY 2012 This Resolution supplements Resolution No. 17, series of 2009 adopting the Uniform Reportorial Requirements (URR) to be used by all the distribution utilities (DUs) in lieu of ERC DU-M01, ERC DU-M02 and reportorial requirements imposed in various automatic adjustment mechanisms authorized by the ERC and Resolution No. 24, series of 2011 approving and adopting the revised URR excel model to be implemented starting January 2012. Under the Resolution No. 1, the ERC transmitted to each DU a customized model with its unique password for its use in the monthly computation of various monthly pass-through rates as mandated under Resolution No. 16, series of 2009, with instructions on how to use such customized URR model. RESOLUTION NO. 2 RESOLUTION AUTHORIZING THE OFFICE OF THE SOLICITOR GENERAL (OSG) TO FILE A PETITION BEFORE THE SUPREME COURT PURSUANT TO RULE 45 OF THE REVISED RULES OF COURT, AS AMENDED, AND APPEAL THE DECISION OF THE COURT OF APPEALS DATED JULY 29, 2011 AND ITS RESOLUTION DATED JANUARY 12, 2012 IN CA G.R. SP NO. 114198 The Resolution embodies the ERC’s decision to appeal the Decision of the Court of Appeals dated July 29, 2011 and its Resolution dated January 12, 2012 in CA G.R. SP No. 114198 to the Supreme Court and for this purpose the ERC authorized the Office of the Solicitor General (OSG) to file the appropriate petition and represent it in the said case. RESOLUTION NO. 3 A RESOLUTION ADOPTING THE AMENDMENTS TO SECTIONS 2.6 AND 2.7 OF THE DISTRIBUTION SERVICES AND OPEN ACCESS RULES (DSOAR) Pursuant to Resolution No. 3, certain amendments were introduced to Sections 2.6 and 2.7 of the DSOAR to clarify and address the gray areas therein and reconcile them with related rules and regulation of the ERC. These amended sections relate to the applicable general principles and rules on the modifications and new physical connections for residential of non-residential customers of the DUs. A major feature of the amendments is on the right to extension of lines and facilities wherein a prospective customer shall be entitled to extension of lines and facilities at the expense of the DU 7 even if the connection is considered not viable, in cases of socialized housing projects undertaken by a government agency by itself or through a developer. RESOLUTION NO. 4 A RESOLUTION SETTING THE INSTALLED GENERATING CAPACITY PER GRID, NATIONAL GRID AND THE MARKET SHARE LIMITATIONS PER GRID AND THE NATIONAL GRID FOR 2012 Section 45(a) of Republic Act No. 9136 (EPIRA) prescribes market share caps to generation companies and their affiliates. To implement this, the ERC issued the Guidelines for the Determination of Installed Generating Capacity in a Grid and the National Installed Generating Capacity and Enforcement of the Limits of Concentration of Ownership, Operation or Control of Installed Generating Capacity, under which the ERC shall adjust the installed generating capacity per grid and national grid and market share limitations on or before the 15th day of March of each year and/or as often as may be necessary. Resolution No. 4 sets the installed generating capacity per grid, and national grid and the market share limitations per grid and the national grid for 2012, as follows: Grid Installed Generating Capacity (kW) Luzon Visayas Mindanao National 11,387,538.53 2,063,199.00 1,768,848.00 15,219,630.53 % Market Share Limitations as per RA 9136 30% 30% 30% 25% Installed Generating Capacity Limit (kW) 3,416,275.06 618,959.70 530,654.40 3,804,907.63 RESOLUTION NO. 6 A RESOLUTION ADOPTING THE RULES ON ACCREDITATION OF EXTERNAL AUDITORS AND AUDITING FIRMS FOR THE PURPOSE OF CONDUCTING VERIFICATION ON THE DOCUMENTS OF DISTRIBUTION UTILITIES RELATIVE TO THE COMPLIANCE CASES FILED BEFORE THE COMMISSION To establish a systematized confirmation process of the pass-through rates being imposed by the DUs, the ERC issued Resolution No. 16, series of 2009. Under such process established under said Resolution, the ERC indicated that it may refer the audit of the DUs’ submissions to accredited independent auditors. To implement this, the ERC issued Resolution No. 6 to establish the rules on how these third party external auditors will be accredited and what requirements they will have to comply with as a prerequisite for said accreditation. 8 RESOLUTION NO. 7 A RESOLUTION ADOPTING THE ACCOUNTING AND COST ALLOCATION MANUAL (ACAM) FOR ELECTRIC COOPERATIVES In line with the Business Separation Guidelines (BSG) as amended which implement the requirement under EPIRA for the structural and functional unbundling of the business activities of electric power industry participants, the ERC developed the ACAM for electric cooperatives (ECs) and upon their joint petition, it adopted the same for use by the ECs. The ACAM ensures the separation of the audited accounts of each business related undertaking of the ECs,the fair and reasonable allocation of these costs, and the proper documentation of the accounting policies and principles that apply to the ECs when they prepare their Accounting Separation Statements in accordance with the BSG. RESOLUTION NO. 8 A RESOLUTION DIRECTING ALL DISTRIBUTION UTILITIES TO REMIT THEIR RESPECTIVE PROPORTIONATE SHARES TO THE DISTRIBUTION MANAGEMENT COMMITTEE’S 2012 BUDGET After approving the PhP19,786,558.67 2012 Budget of the Distribution Management Committee (DMC), which was created pursuant to the Philippine Distribution Code, the ERC issued Resolution No. 8 to direct all the DUs to pay and remit to the DMC their respective shares computed based on their annual energy sales. RESOLUTION NO. 9 A RESOLUTION ADOPTING THE GRID MANAGEMENT COMMITTEE (GMC) RULES AND PROCEDURES TO GOVERN THE MONITORING OF COMPLIANCE OF GRID USERS TO THE PHILIPPINE GRID CODE GMC’s Rules and Procedures reiterate the standards and measurements in the Philippine Grid Code (PGC) and specify how the concerned Grid users shall comply with them. It prescribes also the templates for the Compliance Monitoring Report to be submitted by the Reporting entities on or before May 31 of every year. RESOLUTION NO. 10 RESOLUTION APPROVING THE FEED-IN TARIFF RATES Following the conduct of several public hearings, and in consultation with the National Renewable Energy Board (NREB), the ERC initially set the feed-in tariff rates for wind, biomass, solar, and hydro, as follows: 9 1. 2. 3. 4. Wind Biomass Solar Hydro ERC-Approved FIT Rates (PhP/kWh) 8.53 6.63 9.68 5.90 ERC-Approved Degression Rates 0.5% after year 2 from effectivity of FIT 0.5% after year 2 from effectivity of FIT 6% after year 1 from effectivity of FIT 0.5% after year 2 from effectivity of FIT RESOLUTION NO. 11 A RESOLUTION DIRECTING THE 140 DISTRIBUTION UTILITIES (DUS) OF THE PHILIPPINES TO PLAY THE 3-MINUTE ERC CORPORATE IDENTITY (ID) AUDIOVISUAL PRESENTATION (AVP) AND THE 1-MINUTE AND THE 30-SECOND TELEVISION INFOMERCIALS (TVIS) IN THEIR BUSINESS LOUNGES (PAYMENT CENTERS, CUSTOMERS WELFARE DESKS & SIMILAR PUBLIC AREAS) AND/OR AIR THE SAME AUDIO-VISUAL MATERIALS IN THEIR AFFILIATED CABLE TELEVISION NETWORKS IN THE NAME OF CONSUMER EDUCATION With the assistance of the Presidential Communications Office (PCOO) through the Philippine Information Agency (PIA), the ERC produced TVIs to generate awareness about the ERC’s mandates and demand side management. To ensure the widest dissemination of these TVIs, the ERC circulated among the DUs its advisory for them to air the TVIs in their payments centers and affiliate cable companies. RESOLUTION NO. 12 A RESOLUTION AUTHORIZING THE CHAIRPERSON, ZENAIDA G. CRUZ-DUCUT, TO ENTER INTO A MEMORANDUM OF AGREEMENT (MOA) WITH THE DEPARTMENT OF PUBLIC WORK AND HIGHWAYS (DPWH), FOR AND IN BEHALF OF THE ENERGY REGULATORY COMMISSION (ERC), FOR THE CONSTRUCTION OF THE ERC OFFICE BUILDING ON THE PARCEL OF LAND SUBJECT OF THE “AGREEMENT OF USUFRUCT OVER A PARCEL OF LAND” EXECUTED WITH THE POWER SECTOR ASSETS AND LIABILITIES MANAGEMENT CORPORATION (PSALM) Following the approval of the budget for the construction of the ERC’s Office Building and in recognition that the ERC does not have the expertise to undertake the project management for such construction, the ERC resolved to contract out the task to the DPWH, and for this purpose, it authorized Chairperson Zenaida G. Cruz-Ducut to represent the ERC in the execution of the appropriate documents with the DPWH. RESOLUTION NO. 12-A A RESOLUTION CLARIFYING RESOLUTION NO. 12, SERIES OF 2012 10 The Resolution only clarifies that the entity referred to in Resolution No. 12 to undertake the project management for the construction of the ERC Office Building is the DPWHNational Capital Region (NCR), which has jurisdiction over the proposed location of the ERC Office Building. RESOLUTION NO. 13 A RESOLUTION ADOPTING THE JUDICIAL AFFIDAVIT RULE (A.M. NO. 12-8-8-SC) PROMULGATED BY THE HONORABLE SUPREME COURT ON SEPTEMBER 4, 2012 WHICH SHALL FORM PART OF THE COMMISSION’S RULES OF PRACTICE AND PROCEDURE, PARTICULARLY SECTION 6, RULE 18 THEREOF To supplement Section 6, Rule 18 of the ERC’s of Practice and Procedure, the ERC resolved to adopt the Supreme Court’s Judicial Affidavit Rule. RESOLUTION NO. 14 A RESOLUTION IMPLEMENTING THE ONLINE CERTIFICATE OF COMPLIANCE (COC) FILING SYSTEM The ERC designed and developed an online COC filing system to provide easy access to applicants of COC and help facilitate COC renewals. RESOLUTION NO. 15 RESOLUTION ADOPTING THE POSITION OF THE COMMISSION ON THE ISSUES PAPER PUBLISHED ON 02 APRIL 2012 AND THE CORRESPONDING AMENDMENTS TO THE FEED-IN TARIFF RULES Regarding the 3 issues listed in the ERC’s Issues Paper published on 02 April 2012, the ERC, after conducting public consultations thereon, resolved the following: a) On the proposed competitive bidding process to set the FITs, the ERC posited that, while competitive bidding may have been resorted to in some jurisdictions, the mechanism adopted in the FIT Rules may still be carried out, as in fact this has been what was done in some other jurisdictions as well, at least for the initial FIT implementation. b) On the FIT-All Administrator, the ERC accepted the proposal to substitute the National Grid Corporation of the Philippines with the National Transmission Corporation as FIT-All Administrator. c) On the FIT-All calculation, the ERC maintained that this shall be addressed in the FIT-All Payment and Collection Guidelines. 11 RESOLUTION NO. 16 A RESOLUTION ADOPTING THE TRANSITORY RULES IMPLEMENTATION OF OPEN ACCESS AND RETAIL COMPETITION FOR THE To ensure the smooth transition from the existing power industry structure to a competitive environment, the ERC issued these transitory rules to govern the transition to and initial implementation of Open Access and Retail Competition (OARC). In the Transitory Rules, the ERC declared a transitory period from December 26, 2012 until June 25, 2013 during which the contestable customers shall continue to be served by their incumbent suppliers. From June 26, 2012 until December 25, 2013, the contestable customers who are not able to contract with a retail electricity supplier (RES) of their own choice, after exhausting all means, shall also be served by their incumbent suppliers. From December 26, 2013 onwards, all the contestable customers shall already be served by their own RES, otherwise they shall fall under the supplier of last resort (SOLR) arrangement and they shall be served by the designated SOLR at SOLR rates. RESOLUTION NO. 17 A RESOLUTION ADOPTING THE AMENDMENTS TO THE RULES FOR PREPAID RETAIL ELECTRIC SERVICE USING A PREPAID METERING SYSTEM The ERC adopted certain amendments to the Rules for Prepaid Retail Electric Service (PRES) using a Prepaid Metering System, which was approved on July 13, 2009. In these amendments, the ERC expanded the coverage of the PRES to include all customer classifications and approved the use of all available types of technologies in the implementation of the PRES. The ERC also adopted the use of the postpaid retail rate current at the particular month the credited load was consumed as the applicable prepaid rate. 12 ENFORCEMENT OF RULES BUSINESS SEPARATION AND UNBUNDLING PLAN (BSUP) & ACCOUNTING AND COST ALLOCATION MANUAL (ACAM) On March 26, 2012, the ERC approved the application for BSUP and ACAM of Subic Enerzone Corporation (SEZ) after finding SEZ to be in compliance with the requirements under the Business Separation Guidelines (BSG), as Amended. In addition, SEZ submitted an undertaking together with a plan to separate the business segments to ensure full compliance to the BSG, as well as a plan to comply with the Code of Conduct for Competitive Retail Market Participants. CAPITAL EXPENDITURE PROJECTS It is the ERC’s mandate to ensure the quality, reliability, security and affordability of the supply of electric power, as provided for in Republic Act No. 9136 or the Electric power Industry Reform Act (EPIRA). Consistent with its mandate, on 03 December 2012, the ERC approved the application filed by the National Grid Corporation of the Philippines (NGCP) for its Sta. Barbara 230 kV project, with a total approved cost of PhP691,794,000.00. Moreover, in order to ensure the supply of a quality and reliable electricity within their franchise areas, the ERC approved twelve (12) applications filed by various Distribution Utilities (DUs), to wit: No. 1 ERC CASE NUMBER 2010-049 RC 2 2010-050 RC 3 2010-099 RC 4 2010-101 RC 5 2010-105 RC APPLICANT Agusan Del Norte Electric Cooperative, Inc. (ANECO) Zamboanga del Norte Electric Cooperative, Inc. (ZANECO) Aurora Electric Cooperative, Inc. (AURELCO) Davao del Sur Electric Cooperative, Inc. (DASURECO) DATE OF DECISION/ PROJECT COST PARTICULARS December 19, 2011 PhP50,054,323.00 Capital projects for years 2011 to 2012 December 19, 2011 PhP529,667,270.00 Capital projects for years 2009 to 2013 December 05, 2011 PhP74,049,393.00 Capital projects for years 2010 to 2013 April 16, 2012 PhP124,432,370.00 Capital projects for years 2010 to 2012 Sorsogon I Electric December 19, 2011 PhP233,277,178.40 Cooperative, Inc. Capital projects for years 2010 (SORECO I) to 2014 13 No. 6 ERC CASE NUMBER 2010-160 RC 7 2011-001 RC 8 2011-006 RC 9 2011-022 RC 10 2011-066 RC 11 2012-044 RC 12 2012-080 RC APPLICANT Negros Oriental I Electric Cooperative, Inc. (NORECO I) Tablas Island Electric Cooperative, Inc. (TIELCO) Bohol I Electric Cooperative, Inc. (BOHECO I) Zamboanga del Norte Electric Cooperative, Inc. (ZANECO) Palawan Electric Cooperative, Inc. (PALECO) Misamis Oriental I Rural Electric Service Cooperative, Inc. (MORESCO I) DATE OF DECISION/ PROJECT COST PARTICULARS July 16, 2012 PhP150,554,777.00 Capital projects for years 2011 to 2015 April 02, 2012 PhP14,807,000.00 Capital projects for year 2010 April 23, 2012 Capital projects for years 2011 to 2015 December 19, 2011 Unplanned capital project, particularly the upgrading of the Roxas Substation May 22, 2012 Capital projects for years 2011 to 2016 October 01, 2012 Force majeure capital project for year 2012 due to Typhoon Sendong, particularly the rehabilitation of the 1 MVA Cabula Substation, 69 kV line structures and accessories, 34.5 kV line structures and accessories, 13.2 kV line structures and accessories, and distribution transformers and arresters Angeles Electric November 12, 2012 Corporation (AEC) 2012 major capital project PhP354,092,130.08 PhP17,325,269.00 PhP364,258,387.00 PhP10,024,670.00 PhP49,463,792.91 CERTIFICATE OF COMPLIANCE (COC) The ERC approved 1,146 new COCs (approximately 1,103 MW installed capacity) and 1,454 COC renewal applications (approximately 1,643 MW installed capacity) in 2012 to the following Generation Companies (GenCos) and Self-Generation Facilities (SGFs). This brings the total number of COCs issued by the ERC to 26,844 as of December 31, 2012. Below is the list of new COCs issued from January to December 2012: 14 No. 1 2 3 4 5 6 7 8 9 10 11 Name of Applicant Caltex Barotac - Norberto T. Braga Cooperative Bank of Nueva Vizcaya - Maddela Branch Laguna Sino-Filipino Educational Foundation, Inc. Landbank of the Philippines - Petit Barracks Mandaue Foam Industries, Inc. - Dela Paz Mandaue Foam Industries, Inc. - Lanang Executive Homes POS Marketing Enterprises, Inc. Times Trading, Inc. - Binondo Times Trading, Inc. - Pasig LCC Central Mall Coca-Cola Bottlers Philippines Incorporated-Misamis Oriental Date Approved January 5, 2012 January 5, 2012 January 5, 2012 January 5, 2012 January 5, 2012 January 5, 2012 January 5, 2012 January 5, 2012 January 5, 2012 January 13, 2012 January 13, 2012 12 Maynilad Water Services, Inc.- Putatan Water Treatment Plant January 13, 2012 13 14 15 Yamashin Cebu Filter Manufacturing Corp. Allied Banking Corporation - Samson Road Branch Allied Banking Corporation - E Rodriguez G. Araneta Branch January 13, 2012 January 13, 2012 January 13, 2012 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Allied Banking Corporation - Mindanao Avenue Branch Allied Banking Corporation - Parang Marikina Allied Banking Corporation - Elcano Branch Allied Banking Corporation -Reina Regente Branch Allied Banking Corporation - San Andres Branch Allied Banking Corporation - Lubao Branch Allied Banking Corporation - Mabalacat Branch Allied Banking Corporation - San Agustin Branch Allied Banking Corporation - Naga Magsaysay Branch Allied Banking Corporation - Kumintang Batangas Allied Banking Corporation - Sta Cruz Laguna Branch Allied Banking Corporation - Sta Barbara Branch Allied Banking Corporation - Malaybalay Branch Allied Banking Corporation - Nunez Extention Allied Banking Corporation - SK Pendatum Branch JJACCIS Development Corporation MLMN Foods, Inc. National Grid Corporation of the Philippines - Naga Converter Substation National Grid Corporation of the Philippines - Ormoc Converter Station National Grid Corporation of the Philippines - Head Office Brothers of Christ of Banneux, Inc. City of San Fernando Water District - PS No.10 City of San Fernando Water District - PS No.14 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 34 35 36 37 38 15 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 No. 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 Name of Applicant City of San Fernando Water District - PS No.2 City of San Fernando Water District - PS No.4 City of San Fernando Water District - PS No.9 City of San Fernando Water District Genset 1 City of San Fernando Water District Genset 2 Ember Shell Service Station Gentri Gasoline Station Hensonly Plaza Ilocos Norte Water District - Bacarra Ilocos Norte Water District - Balacad Ilocos Norte Water District - Brgy. 22 Ilocos Norte Water District - Mabusag Ilocos Norte Water District - Nagbacalan Ilocos Norte Water District - Paltit Ilocos Norte Water District - Paratong Ilocos Norte Water District - Piddig Ilocos Norte Water District - Solsona Ilocos Norte Water District - Suyo Ilocos Norte Water District - Vintar Land Bank of the Philippines - Polangui Branch Land Bank of the Philippines - Tigaon Extension Rural Bank of Sta. Ignacia, Inc. - Camiling Rural Bank of Sta. Ignacia, Inc. - Capas Rural Bank of Sta. Ignacia, Inc. - Gerona Rural Bank of Sta. Ignacia, Inc. - Ligtasan Rural Bank of Sta. Ignacia, Inc. - San Jose Rural Bank of Sta. Ignacia, Inc. - San Manuel Rural Bank of Sta. Ignacia, Inc. - Victoria Verde Foods Inc. National Grid Corporation of the Philippines - North Luzon Area Regional Office National Grid Corporation of the Philippines - North Luzon Area - Mt. Mataba RS National Grid Corporation of the Philippines - North Luzon Area Bacnotan SS National Grid Corporation of the Philippines - North Luzon Area - San Esteban SS National Grid Corporation of the Philippines - North Luzon Area Bantay SS National Grid Corporation of the Philippines - North Luzon Area Palauig RS 16 Date Approved January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 No. 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 Name of Applicant National Grid Corporation of the Philippines - North Luzon Area - La Trinidad SS National Grid Corporation of the Philippines - North Luzon Area Nagsaag SS National Grid Corporation of the Philippines - North Luzon Area - San Manuel SS National Grid Corporation of the Philippines - North Luzon Area - Bolo SS National Grid Corporation of the Philippines - North Luzon Area Labrador SS National Grid Corporation of the Philippines - North Luzon Area Bayombong SS National Grid Corporation of the Philippines - North Luzon Area Santiago SS National Grid Corporation of the Philippines - North Luzon Area - Gamu SS National Grid Corporation of the Philippines - North Luzon Area Tuguegarao SS National Grid Corporation of the Philippines - North Luzon Area - Limay SS National Grid Corporation of the Philippines - North Luzon Area Hermosa SS National Grid Corporation of the Philippines - North Luzon Area Olongapo SS National Grid Corporation of the Philippines - North Luzon Area Botolan SS National Grid Corporation of the Philippines - North Luzon Area Mexico SS National Grid Corporation of the Philippines - North Luzon Area Concepcion SS National Grid Corporation of the Philippines - North Luzon Area Cabanatuan SS National Grid Corporation of the Philippines - North Luzon Area - Cruz na Daan SS National Grid Corporation of the Philippines - North Luzon Area Araneta SS National Grid Corporation of the Philippines - North Luzon Area - Hill 399 National Grid Corporation of the Philippines - North Luzon Area Dolores SS National Grid Corporation of the Philippines - North Luzon Area Malaya SS National Grid Corporation of the Philippines - North Luzon Area - San Jose 500kV SS 17 Date Approved January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 No. 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 Name of Applicant National Grid Corporation of the Philippines - North Luzon Area - San Jose 115kV SS National Grid Corporation of the Philippines - North Luzon Area - Mt. Mataba RS National Grid Corporation of the Philippines - South Luzon Area Batangas SS National Grid Corporation of the Philippines - South Luzon Area - Dela Paz RS National Grid Corporation of the Philippines - South Luzon Area Dasmariñas SS National Grid Corporation of the Philippines - South Luzon Area Zapote SS National Grid Corporation of the Philippines - South Luzon Area Rosario SS National Grid Corporation of the Philippines - South Luzon Area - Biñan SS National Grid Corporation of the Philippines - South Luzon Area - Sucat SS National Grid Corporation of the Philippines - South Luzon Area Tayabas SS National Grid Corporation of the Philippines - South Luzon Area Gumaca SS National Grid Corporation of the Philippines - South Luzon Area Caliraya SS National Grid Corporation of the Philippines - South Luzon Area Daraga SS National Grid Corporation of the Philippines - South Luzon Area - Naga SS National Grid Corporation of the Philippines - South Luzon Area - Labo SS National Grid Corporation of the Philippines - South Luzon Area Calapan RS National Grid Corporation of the Philippines - South Luzon Area - Sta. Magdalena Cable National Grid Corporation of the Philippines - South Luzon Area Camalig RS National Grid Corporation of the Philippines - South Luzon Area Tamayo RS 1 National Grid Corporation of the Philippines - South Luzon Area Tamayo RS 2 National Grid Corporation of the Philippines - South Luzon Area Guinyangan RS National Grid Corporation of the Philippines - South Luzon Area Kalayaan RS 18 Date Approved January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 No. 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 Name of Applicant National Grid Corporation of the Philippines - South Luzon Area - Looc RS 1 National Grid Corporation of the Philippines - South Luzon Area - Looc RS 2 National Grid Corporation of the Philippines - South Luzon Area Lucban RS National Grid Corporation of the Philippines - South Luzon Area Matnog RS National Grid Corporation of the Philippines - South Luzon Area - New Bacman RS National Grid Corporation of the Philippines - South Luzon Area Maunong RS National Grid Corporation of the Philippines - South Luzon Area - Old Bacman RS National Grid Corporation of the Philippines - South Luzon Area Pasacao RS 1 National Grid Corporation of the Philippines - South Luzon Area Pasacao RS 2 National Grid Corporation of the Philippines - South Luzon AreaPinamalayan RS National Grid Corporation of the Philippines - South Luzon Area - San Aquilino RS National Grid Corporation of the Philippines - South Luzon Area Maintenance & Testing Division B-SLOM National Grid Corporation of the Philippines - Visayas Area - Talisay CTS National Grid Corporation of the Philippines - Visayas Area Compostela SS National Grid Corporation of the Philippines - Visayas Area - Quiot SS Date Approved January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 National Grid Corporation of the Philippines - Visayas Area - Mandaue January 13, 2012 GS 4 National Grid Corporation of the Philippines - Visayas Area - Mactan January 13, 2012 GS 5 National Grid Corporation of the Philippines - Visayas Area - Cebu SS 6 January 13, 2012 National Grid Corporation of the Philippines - Visayas Area - Samboan SS National Grid Corporation of the Philippines - Visayas Area - Ubay SS January 13, 2012 National Grid Corporation of the Philippines - Visayas Area - Calongcalong SS National Grid Corporation of the Philippines - Visayas Area - Colon (New Naga) SS National Grid Corporation of the Philippines - Visayas Area - Cadiz SS January 13, 2012 19 January 13, 2012 January 13, 2012 January 13, 2012 No. 141 Name of Applicant National Grid Corporation of the Philippines - Visayas Area Kabankalan SS National Grid Corporation of the Philippines - Visayas Area - Maricalum SS National Grid Corporation of the Philippines - Visayas Area - Amlan SS Date Approved January 13, 2012 January 13, 2012 147 National Grid Corporation of the Philippines - Visayas Area - Mabinay SS National Grid Corporation of the Philippines - Visayas Area - Bacolod SS National Grid Corporation of the Philippines - Visayas Area - Panit-an SS National Grid Corporation of the Philippines - Visayas Area - Dingle SS 148 National Grid Corporation of the Philippines - Visayas Area - Nabas SS January 13, 2012 149 National Grid Corporation of the Philippines - Visayas Area - Panit-an SS National Grid Corporation of the Philippines - Visayas Area National Grid Corporation of the Philippines - Visayas Area - Isabel SS January 13, 2012 National Grid Corporation of the Philippines - Visayas Area - Tabango SS (Genset 25) National Grid Corporation of the Philippines - Visayas Area - Tabango SS (Genset 26) National Grid Corporation of the Philippines - Visayas Area - Babatngon SS National Grid Corporation of the Philippines - Visayas Area - Paranas SS (Genset 28) National Grid Corporation of the Philippines - Visayas Area - Paranas SS (Genset 29) National Grid Corporation of the Philippines - Visayas Area - Masbate RS (Genset 30) National Grid Corporation of the Philippines - Visayas Area - Maasin RS (Genset 31) National Grid Corporation of the Philippines - Visayas Area Cabacungan CTS (Genset 32) National Grid Corporation of the Philippines - Visayas Area - Busay RS January 13, 2012 National Grid Corporation of the Philippines - Visayas Area - Camotes RS National Grid Corporation of the Philippines - Visayas Area - Majic RS January 13, 2012 National Grid Corporation of the Philippines - Visayas Area - Mauagao RS National Grid Corporation of the Philippines - Visayas Area Buenavista RS January 13, 2012 142 143 144 145 146 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 20 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 No. 165 Name of Applicant National Grid Corporation of the Philippines - Visayas Area - Loon RS Date Approved January 13, 2012 166 January 13, 2012 169 National Grid Corporation of the Philippines - Visayas Area - Canlandog RS National Grid Corporation of the Philippines - Visayas Area Caniapasan RS (Genset 40) National Grid Corporation of the Philippines - Visayas Area Caniapasan RS (Genset 41) National Grid Corporation of the Philippines - Visayas Area - Ivisan RS 170 National Grid Corporation of the Philippines - Visayas Area - Jawili RS January 13, 2012 171 National Grid Corporation of the Philippines - Visayas Area - Panit-an RS National Grid Corporation of the Philippines - Visayas Area - Palompon RS National Grid Corporation of the Philippines - Visayas Area - Siquijor RS National Grid Corporation of the Philippines - Visayas Area - Masbate RS National Grid Corporation of the Philippines - Mindanao Area - Aurora SS National Grid Corporation of the Philippines - Mindanao Area - Sta. Clara SS National Grid Corporation of the Philippines - Mindanao Area - Sangali SS National Grid Corporation of the Philippines - Mindanao Area - Pitogo SS National Grid Corporation of the Philippines - Mindanao Area - Overton SS National Grid Corporation of the Philippines - Mindanao Area - Lugait SS National Grid Corporation of the Philippines - Mindanao Area - Abaga SS National Grid Corporation of the Philippines - Mindanao Area - Carmen SS National Grid Corporation of the Philippines - Mindanao Area Tagoloan SS National Grid Corporation of the Philippines - Mindanao Area - Aplaya SS National Grid Corporation of the Philippines - Mindanao Area - Kibawe SS National Grid Corporation of the Philippines - Mindanao Area Maramag SS National Grid Corporation of the Philippines - Mindanao Area - Nasipit SS January 13, 2012 167 168 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 21 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 No. 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 Name of Applicant Date Approved National Grid Corporation of the Philippines - Mindanao Area January 13, 2012 Anislagan SS National Grid Corporation of the Philippines - Mindanao Area - Bislig SS January 13, 2012 National Grid Corporation of the Philippines - Mindanao Area - Butuan SS National Grid Corporation of the Philippines - Mindanao Area - San Francisco SS National Grid Corporation of the Philippines - Mindanao Area - Davao SS Gen 1 National Grid Corporation of the Philippines - Mindanao Area - Davao SS Gen 2 National Grid Corporation of the Philippines - Mindanao Area - Matanao SS National Grid Corporation of the Philippines - Mindanao Area Bunawan SS National Grid Corporation of the Philippines - Mindanao Area Nabunturan SS National Grid Corporation of the Philippines - Mindanao Area Pintatagan Switching Station National Grid Corporation of the Philippines - Mindanao Area - Maco SS National Grid Corporation of the Philippines - Mindanao Area Kidapawan SS National Grid Corporation of the Philippines - Mindanao Area - General Santos (Klinan) SS National Grid Corporation of the Philippines - Mindanao Area Tacurong SS National Grid Corporation of the Philippines - Mindanao Area - Nuling SS National Grid Corporation of the Philippines - Mindanao Area - SO Control Center National Grid Corporation of the Philippines - Mindanao Area - MRCC January 13, 2012 National Grid Corporation of the Philippines - Mindanao Area - Bucagan RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Buga RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Maligaya RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Taguite RS National Grid Corporation of the Philippines - Mindanao Area Mercedes RS National Grid Corporation of the Philippines - Mindanao Area - Ilihan January 13, 2012 22 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 No. Name of Applicant Date Approved RS 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 National Grid Corporation of the Philippines - Mindanao Area Lunzuran/Sangali RS National Grid Corporation of the Philippines - Mindanao Area - Signal Hill RS National Grid Corporation of the Philippines - Mindanao Area - Lugait Hill RS National Grid Corporation of the Philippines - Mindanao Area - Dongue Hill RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Langilanon RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Kitanglad RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Haruray RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Pangsikan RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Rojales RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Josefa RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Silop RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Magdiwata RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Libaylibay RS National Grid Corporation of the Philippines - Mindanao Area - Matina Hill National Grid Corporation of the Philippines - Mindanao Area - Mt. Pasian RS National Grid Corporation of the Philippines - Mindanao Area - Mt. Tupi RS National Grid Corporation of the Philippines - Mindanao Area Batulawan RS/Pikit National Grid Corporation of the Philippines - Mindanao Area - Mt. Malalag RS Oriental Mindoro Electric Cooperative, Inc. - Linao-Cawayan MiniHydroelectric Power Plant Bangko Sentral ng Pilipinas - Naga Branch Dinalupihan Water District - Lower Roosevelt Dinalupihan Water District - Pita Dinalupihan Water District - Sta. Isabel 23 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 13, 2012 January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 No. 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 Date Approved January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 January 24, 2012 February 1, 2012 February 1, 2012 February 1, 2012 February 1, 2012 February 1, 2012 February 1, 2012 February 6, 2012 February 6, 2012 254 255 256 257 258 259 260 261 262 263 264 265 266 267 Name of Applicant Dinalupihan Water District - Upper Roosevelt Goldenfield Milling Corporation Gromix Poultry Farm, Inc. - Duhat Gromix Poultry Farm, Inc. - Paltoc Kingswood Rubber Corporation Lapaz Petron Service Station Makoto Metal Technology, Inc. Metro Vigan Water District - Paing Metro Vigan Water District - Raois Rural Bank of Cebu - Daanbantayan San Manuel Water District - District 4 San Manuel Water District - Sandiat Centro Petron Corporation - Ariel Tan Petron Corporation - Billy Baguio Petron Corporation - Brigida Llorente Petron Corporation - G. Yabes Petron Corporation - Genalyn Cornejo Petron Corporation - Ma. Esther Te Mindanao Energy Systems, Inc. Cummins Sales and Service Philippines, Inc. - San Jose, Occidental Mindoro Petron Corporation –Cornelio Mirelles Petron Corporation - Leony De Los Reyes Petron Corporation - Caridad Garcia Petron Corporation - Vicente Licante Petron Corporation - Gina C. Yap Petron Corporation - Emil Lizares Petron Corporation - Manuel Winston Ko Petron Corporation - Susan Fortich Petron Corporation - Rodney C. Bandojo Petron Corporation - Arturo Onas Petron Corporation - Linarda Nulada Petron Corporation - Robert P. Uy Petron Corporation - Lorenzo Kilayko Petron Corporation - Emilio L. Teves 268 Cummins Sales and Service Philippines, Inc. - Roxas, Palawan February 13, 2012 269 270 271 Hastings Motor Corp. - Masbate Agubella Fuel Distributions - Bgry. E. Rodriguez Agubella Fuel Distributions - Bgry. Socorro February 13, 2012 February 13, 2012 February 13, 2012 24 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 February 7, 2012 No. 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 Name of Applicant Bacolod CJH Corp./ JP 227 Residences Baylober Trading Eagle Broadcasting Corporation - Bulacan Eagle Broadcasting Corporation - Davao City GM Bank of Luzon, Inc. - Sta. Rosa Joey's Foods Corporation - Jollibee Baliuag Bayan Landbank of the Philippines - Roxas Oriental Mindoro Landbank of the Philippines- Gumaca Branch (Quezon) Landbank of the Philippines- Sta. Cruz Branch (Laguna) Landbank of the Philippines-Bajada Branch Liponpon Elementatry School Parang Cueva Elementary School Parang Elementary School River Valley Broiler San Agapito Elementary School San Agustin Kanluran Elementary School San Agustin Silangan Elementary School SK Hardware & General Merchandise Nable St. Branch Wellington Food Products ACR Shell Service Station Buenavista Water District- Pump Station No. 3 Burauen Shell Station Fort Bonifacio Development Corporation Goldland Tower Condominium Corporation Grand Batangas Resort Development, Inc. Honeywell Shell Service Station Ivoclar Vivadent, Inc. Landbank of the Philippines - Barracks Branch Landbank of the Philippines - Camiguin Branch LGU Bayawan City MMJ 1 Shell Station MMJ 2 Shell Station New Shell Marina Shell Service Station R and L Shell Gas Station Rural Bank of Cebu South Inc. - Argao Branch Rural Bank of Cebu South Inc. - Carcar Branch Rural Bank of Cebu South Inc. - Dalaguete Branch Rural Bank of Cebu South Inc. - Sibonga Branch Subic Central Supermart The Roman Catholic Archbishop of Manila 25 Date Approved February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 13, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 February 17, 2012 No. 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 Date Approved February 17, 2012 February 23, 2012 February 23, 2012 February 23, 2012 February 23, 2012 February 23, 2012 February 23, 2012 February 23, 2012 March 7, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 20, 2012 March 26, 2012 March 26, 2012 March 26, 2012 March 26, 2012 343 Name of Applicant Treasure Island Shell Service Station Jollibee Foods Corporation-Pinnacle Northbeacon Commercial Corporation Philippine Townships, Inc. (Fairways Tower) San Miguel Yamamura Packaging Corpration Manila Glass Plant Serendra Commercial Strip/Ayala Land, Inc. SM Investments Corporation - SM Corporate Offices Yazaki-Torres Parts Lima Mfg. Inc. (YTMI Realty Corp.) China Banking Corporation - Las Pinas - Manuela Branch United Coconut Planters Bank - Aurora Blvd. Branch United Coconut Planters Bank - Banaue Branch United Coconut Planters Bank - Calbayog Branch United Coconut Planters Bank - Clarkfield Banch United Coconut Planters Bank - Dasmariñas Branch United Coconut Planters Bank - Dumaguete Branch United Coconut Planters Bank - General Santos Branch United Coconut Planters Bank - Grace Park Branch United Coconut Planters Bank - Iznart Branch United Coconut Planters Bank - Jaro Branch United Coconut Planters Bank - Kalibo Branch United Coconut Planters Bank - Lacson-Galo Branch United Coconut Planters Bank - Libertad Branch United Coconut Planters Bank - Mabini Branch United Coconut Planters Bank - North Drive Branch United Coconut Planters Bank - San Juan Branch United Coconut Planters Bank - Tanauan Branch Luuk Diesel Power Plant Tandubanak Diesel Power Plant Sacol Island Diesel Power Plant DMCI Masbate Power Corp. - Aroroy Satellite Diesel Power Plant (Additional Unit) DMCI Masbate Power Corp. - Cataingan Satellite Diesel Power Plant (Additional Unit) Cummins Sales and Services Philippines, Inc. - Sultan Kudarat 344 345 346 347 348 349 Bangko Sentral Ng Pilipinas - Bacolod Branch Banner Plasticard, Inc. Bohol Island State University Chang Chuen Cotton Paper Mfg. Co., Ltd. - Philippines, Inc. Dole Philippines, Inc. Stanfilco Division - MIS Office Davao Dole Philippines, Inc. Stanfilco Division - North Skyland, Pumping March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 342 26 March 26, 2012 March 26, 2012 No. 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 Name of Applicant Station 1 Dole Philippines, Inc. Stanfilco Division - North Skyland, Pumping Station 2 Dole Philippines, Inc. Stanfilco Division - North Skyland, Pumping Station 3 Dole Philippines, Inc. Stanfilco Division - North Skyland, Pumping Station 4 Dole Philippines, Inc. Stanfilco Division - Alejal Dole Philippines, Inc. Stanfilco Division - Panabo Zone (Dapco Hangar) Dole Philippines, Inc. Stanfilco Division - Compostela Hangar Dole Philippines, Inc. Stanfilco Division - PP 79 Dole Philippines, Inc. Stanfilco Division - Atlae (Pump Stn. 1) Dole Philippines, Inc. Stanfilco Division - Maknit (Pump Stn. 1) Dole Philippines, Inc. Stanfilco Division - Malandag Dole Philippines, Inc. Stanfilco Division - Atlae (Pump Stn. 2) Dole Philippines, Inc. Stanfilco Division - Socsargen Zone Dole Philippines, Inc. Stanfilco Division - Atlae (Pump Stn. 3) Dole Philippines, Inc. Stanfilco Division - South Hangar Dole Philippines, Inc. Stanfilco Division - Kapalong Zone, PP 54 Dole Philippines, Inc. Stanfilco Division - Lunga. Og Dole Philippines, Inc. Stanfilco Division - Kinamayan Dole Philippines, Inc. Stanfilco Division - Pag-Asa Dole Philippines, Inc. Stanfilco Division - Kapalong Zone, PP 62 Sampao Dole Philippines, Inc. Stanfilco Division - Guinhalinan Dole Philippines, Inc. Stanfilco Division - Dayo. An Hiltop Shell Station Kuting Shell Station Davao Agricultural Ventures Corporation Lloyd Laboratories, Inc. Remec Broadband Wireless, International, Inc. Winsome Development Corp - Waltermart Sucat Balatubat DPP (NPC-SPUG) Minabel DPP (NPC-SPUG) Lahuy DPP (NPC-SPUG) Haponan DPP (NPC-SPUG) Quinalasag DPP (NPC-SPUG) Ticao DPP (NPC-SPUG) Guinawayan DPP (NPC-SPUG) Gilotongan DPP (NPC-SPUG) Nabuctot DPP (NPC-SPUG) 27 Date Approved March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 March 28, 2012 April 2, 2012 April 2, 2012 April 2, 2012 April 2, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 No. 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 Name of Applicant Peña DPP (NPC-SPUG) Chico DPP (NPC-SPUG) Burias DPP (NPC-SPUG) Dangcalan DPP (NPC-SPUG) Mababangbaybay DPP (NPC-SPUG) Malaking Ilog DPP (NPC-SPUG) Osmeña DPP (NPC-SPUG) Penafrancia DPP (NPC-SPUG) Quezon DPP (NPC-SPUG) Paluan DPP (NPC-SPUG) Palimbang DPP (NPC-SPUG) Batbatan DPP (NPC-SPUG) Sibolo DPP(NPC-SPUG) Guiwanon DPP(NPC-SPUG) B. Titong MGE 1 & 2(NPC-SPUG) Cawayan Ext.(NPC-SPUG) Cawayan Ext. (Bel-at)(NPC-SPUG) Ubongan Dacu (NPC-SPUG) Bolo MGE 1(NPC-SPUG) Bolo MGE 2 & 3(NPC-SPUG) Tinago MG1(NPC-SPUG) Cabangcalan (NPC-SPUG) Pinanaan (NPC-SPUG) Lanang (NPC-SPUG) San Isidro (NPC-SPUG) Syndicate (NPC-SPUG) Sawang MG 1 & 2(NPC-SPUG) Talib MG1(NPC-SPUG) Talib MG2(NPC-SPUG) Concepcion (NPC-SPUG) Balete (NPC-SPUG) Amutag MG1(NPC-SPUG) Amutag MG2(NPC-SPUG) Calanay MG1(NPC-SPUG) Calanay MG2(NPC-SPUG) Balawing (NPC-SPUG) Cabas-an (NPC-SPUG) Dayhagan MG1(NPC-SPUG) Dayhagan MG2(NPC-SPUG) Gumahang MG1(NPC-SPUG) 28 Date Approved April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 No. 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 Name of Applicant Gumahang MG2(NPC-SPUG) Gumahang MG3(NPC-SPUG) Macabug (NPC-SPUG) Mariposa (NPC-SPUG) Mataba (NPC-SPUG) Matalangtang (NPC-SPUG) Matongog MG1(NPC-SPUG) Matongog MG2(NPC-SPUG) San Agustin MG1(NPC-SPUG) San Agustin MG2(NPC-SPUG) Tigbao MG1(NPC-SPUG) Tigbao MG2(NPC-SPUG) Tigbao MG3(NPC-SPUG) Tigbao MG4(NPC-SPUG) Tinigban MG1 & 2(NPC-SPUG) Tinigban MG3(NPC-SPUG) Tinigban MG4(NPC-SPUG) Jamorawon MG1(NPC-SPUG) Jamorawon MG2(NPC-SPUG) Jamorawon MG3(NPC-SPUG) Jamorawon MG4(NPC-SPUG) Tagbon (NPC-SPUG) Tigbao MG1 & 2(NPC-SPUG) Tigbao MG3(NPC-SPUG) Tigbao MG4(NPC-SPUG) Tigbao MG5(NPC-SPUG) Magsalangi (NPC-SPUG) Pamangpangon (NPC-SPUG) Calumpang (NPC-SPUG) Calasuche (NPC-SPUG) Docol (NPC-SPUG) Baao (NPC-SPUG) Looc, Mandaon (NPC-SPUG) Lantangan MG1(NPC-SPUG) Lantangan MG2(NPC-SPUG) Bugtong (NPC-SPUG) Tumalaytay MG1(NPC-SPUG) Tumalaytay MG2(NPC-SPUG) Tumalaytay MG3(NPC-SPUG) Cabangcalan (NPC-SPUG) 29 Date Approved April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 No. 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 Name of Applicant Calumpang (NPC-SPUG) Locsoan (NPC-SPUG) Tan-Awan (NPC-SPUG) Luna MG1(NPC-SPUG) Luna MG 2 & 3(NPC-SPUG) Mahayahay (NPC-SPUG) Nagarao (NPC-SPUG) Itombato (NPC-SPUG) Iraya, Cawayan (NPC-SPUG) Cabayugan MG1(NPC-SPUG) Cabayugan MG2(NPC-SPUG) Calumpang (NPC-SPUG) Pananawan MG1(NPC-SPUG) Pananawan MG2(NPC-SPUG) Campana (NPC-SPUG) Candelaria MG1 & 2(NPC-SPUG) Bonifacio MG1(NPC-SPUG) Bonifacio MG2(NPC-SPUG) San Jose (NPC-SPUG) Matayum MG1(NPC-SPUG) Matayum MG2(NPC-SPUG) Matayum MG3(NPC-SPUG) Pitogo MG1(NPC-SPUG) Pitogo MG2(NPC-SPUG) Madamba MG1 & 2(NPC-SPUG) Libtong(NPC-SPUG) Osmena (NPC-SPUG) Aguada (NPC-SPUG) San Rafael (NPC-SPUG) Nadawisan (NPC-SPUG) Magcaraguit MG1(NPC-SPUG) Magcaraguit MG2(NPC-SPUG) MagcaraguitMG3(NPC-SPUG) T. R. Yangco (NPC-SPUG) Jintotolo MG1(NPC-SPUG) Jintotolo MG2(NPC-SPUG) JintotoloMG3(NPC-SPUG) San Antonio MG1 & 2(NPC-SPUG) Cantil MG1(NPC-SPUG) Cantil MG2(NPC-SPUG) 30 Date Approved April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 No. 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 Name of Applicant Cantil MG3(NPC-SPUG) Cantil MG4(NPC-SPUG) Sapatos Island(NPC-SPUG) Sawmill (NPC-SPUG) Baang (NPC-SPUG) Mabuhay (NPC-SPUG) Sorosimbajan MG1(NPC-SPUG) Sorosimbajan MG2(NPC-SPUG) Costa Rica (NPC-SPUG) Matabao, Batuan(NPC-SPUG) Rizal, Batuan(NPC-SPUG) Luna (NPC-SPUG) Alta Vista (NPC-SPUG) Don Pablo Dela Rosa (NPC-SPUG) Pangle (NPC-SPUG) Bara MG1 & 2(NPC-SPUG) Bara MG3(NPC-SPUG) Guiluthangan MG1(NPC-SPUG) Guiluthangan MG2(NPC-SPUG) Sawmill MG1 & 2(NPC-SPUG) Matagbak (NPC-SPUG) San Carlos (NPC-SPUG) Buri (NPC-SPUG) Cagmasoso (NPC-SPUG) Polo Dacu (NPC-SPUG) R M Magbalon (NPC-SPUG) Cobre Is. Pena (NPC-SPUG) San Vicente (NPC-SPUG) Buracan (NPC-SPUG) Quinayangan Diotay (NPC-SPUG) Quinayangan Tonga (NPC-SPUG) San Andres (NPC-SPUG) San Roque (NPC-SPUG) Bugtong (NPC-SPUG) Sto. Nino (NPC-SPUG) Danao (NPC-SPUG) San Antonio (NPC-SPUG) Agumil Philippines, Inc. - Agusan Plantation Cabadbaran Shell Service Station Caballero Shell Service Station - Los Baños 31 Date Approved April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 10, 2012 April 24, 2012 April 24, 2012 April 24, 2012 No. 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 Name of Applicant Cagayan De Oro College - PEN (Main) Davao Central Warehouse Club, Inc. - Kidapawan Davao Central Warehouse Club, Inc. - Mati Freemont Foods Corp. - 'Jollibee DMC Drive Thru General Santos City Water District J Marketing Corporation - Ipil Branch Jolisa Agribusiness Corporation - Bajada Jolisa Agribusiness Corporation-Victoria Plaza Landbank of the Philippines - Puerto Princesa Extension Office Landbank of the Philippines - Velez Branch Sayre National Highway Landbank of the Philippines - Velez Branch Macabalan Landbank of the Philippines - Velez Branch Malaybalay Landbank of the Philippines - Velez Branch Valencia Philippine Ports Authority - PMO North Harbor (Admin. Bldg.) Philippine Ports Authority - PMO North Harbor (IPB Terminal) Philippine Ports Authority - PMO North Harbor (Pier 2 Terminal) Philippine Ports Authority - PMO North Harbor (Pier 8 Terminal) Philippine Ports Authority - PMO North Harbor (Pier 12 Terminal) Philippine Ports Authority - PMO North Harbor (Pier 16 Terminal) Philippine Ports Authority - PMO North Harbor (Pier 18 Terminal) Philippine Ports Authority - PMO North Harbor (R-2 Terminal) Rawlings Foundations, Inc. SVN Petroleum Station Hedcor, Inc. - Irisan 1 Hydroelectric Power Plant BAG Electronics, Inc. Bangko Sentral Ng Pilipinas - Legazpi Branch Bangko Sentral ng Pilipinas-Tacloban Calamba Water District - Makiling Calamba Water District - NHA Canlubang Calamba Water District - Villa De Calamba Cang's Inc. - Maria Cristina Davao Agricultural Ventures Corporation Florete Land, Inc. Glory (Philippines), Inc. - Main Glory (Philippines), Inc. - Plant 4 Green Pine Agricultural Dev't. Corporation LV Shell Filling Station Mc Colby's - Bayambang Mc Colby's - Lucao Mc Colby's - San Carlos 32 Date Approved April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 24, 2012 April 30, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 No. 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 Name of Applicant Mc Colby's - Urdaneta Mc Colby's - Alaminos Mc Colby's - Dagupan Monkayo Shell Service Station Philippine Long Distance Telephone Co. - Daet Branch Stronghold Steel Corp. Surigao Metropolitan Water District - Ceniza Reservoir Surigao Metropolitan Water District - Serna 2 Deepwell Yamaha Motor Philippines, Inc. Davao Oriental Electric Cooperative (DORECO) Integra Business Processing Solutions, Inc. Khornerstone Group Corp. (Landbank - Alicia) Pagsanjan Binan Hope Shell Gasoline Service Station Petron Corporation - Esel Ike Limkakeng Petron Corporation - Francis Llaban Petron Corporation - Jaysel Sato - Cebu City Petron Corporation - Wilfred Tan Philippine Allied Enterprises, Inc. - Laguna Philippine Allied Enterprises, Inc. - Muntinlupa Philippine Allied Enterprises, Inc. - Taguig Rizal Commercial Banking Corp. - Tacloban City The Hongkong & Shanghai Banking Corp. - Taguig City Universal Leaf Philippines (formerly Lancaster Philippines, Inc.) Isabela Wee Eng Construction, Inc. KCC Property Holdings, Inc. - Koronadal City KCC Property Holdings, Inc. - Gen. Sanots City Khi-Ali Manila, Inc. Amkor Technology Philippines SM Prime Holdings, Inc. (SM Masinag) Bridgebury Realty Corporation - Zuellig Bldg. Chevron Philippines, Inc. Maynilad Water Services, Inc. - La Mesa Pumping Station Maynilad Water Services, Inc. - Villamor Reservoir and Pumping Station ON Semiconductor Philippines, Inc. - Carmona Vicsal Development Corporation ON Semiconductor Philippines, Inc. - Carmona The Persimmon Condominium Corp. Iglesia ni Cristo ( Church Of Christ) - Barocboc, Apayao Iglesia ni Cristo ( Church Of Christ) - Bangan, Cagayan 33 Date Approved May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 2, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 7, 2012 May 9, 2012 May 9, 2012 May 9, 2012 May 9, 2012 May 9, 2012 May 16, 2012 May 16, 2012 May 16, 2012 May 16, 2012 May 16, 2012 May 16, 2012 May 16, 2012 May 16, 2012 May 30, 2012 May 30, 2012 No. 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 Name of Applicant Iglesia ni Cristo ( Church Of Christ) - Curva, Cagayan Iglesia ni Cristo ( Church Of Christ) - Libertad, Cagayan Iglesia ni Cristo ( Church Of Christ) - Sanchez Mira, Cagayan Iglesia ni Cristo ( Church Of Christ) - Zinarag, Cagayan Iglesia ni Cristo ( Church Of Christ) - Paruddon Norte, Cagayan Iglesia ni Cristo ( Church Of Christ) - Apayao, Cagayan Iglesia ni Cristo ( Church Of Christ) - Isabela, Cagayan Iglesia ni Cristo ( Church Of Christ) - Tuguegarao, Cagayan Iglesia ni Cristo ( Church Of Christ) - Baliuag, Bulacan Iglesia ni Cristo ( Church Of Christ) - Angat, Bulacan Iglesia ni Cristo ( Church Of Christ) - San Rafael, Bulacan Iglesia ni Cristo ( Church Of Christ) - San Miguel, Bulacan Iglesia ni Cristo ( Church Of Christ) - Pulilan, Bulacan Iglesia ni Cristo ( Church Of Christ) - San Isidro, Bulacan Iglesia ni Cristo ( Church Of Christ) - Francisco Homes, Bulacan Iglesia ni Cristo ( Church Of Christ) - San Jose del Monte, Bulacan Iglesia ni Cristo ( Church Of Christ) - Guiguinto, Bulacan Iglesia ni Cristo ( Church Of Christ) - Baguio City Iglesia ni Cristo ( Church Of Christ) - San Francisco, Batangas Iglesia ni Cristo ( Church Of Christ) - San Jose, Batangas Iglesia ni Cristo ( Church Of Christ) - Tambo, Batangas Iglesia ni Cristo ( Church Of Christ) - Tingloy, Batangas Iglesia ni Cristo ( Church Of Christ) - Marawoy, Batangas Iglesia ni Cristo ( Church Of Christ) - Ibaan, Batangas Iglesia ni Cristo ( Church Of Christ) - Tanauan, Batangas Iglesia ni Cristo ( Church Of Christ) - Lemery, Batangas Iglesia ni Cristo ( Church Of Christ) - Brgy. Namunga, Batangas Iglesia ni Cristo ( Church Of Christ) - Felix Manalo St., Batangas Iglesia ni Cristo ( Church Of Christ) - Bauan, Batangas 1 Iglesia ni Cristo ( Church Of Christ) - Bauan, Batangas 2 Iglesia ni Cristo ( Church Of Christ) - Pob 011, Batangas Iglesia ni Cristo ( Church Of Christ) - Ibaan, Batangas Iglesia ni Cristo ( Church Of Christ) - Matala, Batangas Iglesia ni Cristo ( Church Of Christ) - Morong, Bataan Iglesia ni Cristo ( Church Of Christ) - Balanga, Bataan Iglesia ni Cristo ( Church Of Christ) - Abucay, Bataan Iglesia ni Cristo ( Church Of Christ) - Orani, Bataan Iglesia ni Cristo ( Church Of Christ) - Dinalupihan, Bataan Iglesia ni Cristo ( Church Of Christ) - LImay, Bataan Iglesia ni Cristo ( Church Of Christ) - Mariveles, Bataan 34 Date Approved May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 No. 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 Name of Applicant Iglesia ni Cristo ( Church Of Christ) - Parang-Parang, Bataan Iglesia ni Cristo ( Church Of Christ) - Puerto Rivase, Bataan Iglesia ni Cristo ( Church Of Christ) - Samal, Bataan Iglesia ni Cristo ( Church Of Christ) - Sibol, Bataan Iglesia ni Cristo ( Church Of Christ) - Aurora Iglesia ni Cristo ( Church Of Christ) - Culasi, Antique Iglesia ni Cristo ( Church Of Christ) - San Jose, Antique Iglesia ni Cristo ( Church Of Christ) - Legazpi City, Albay Iglesia ni Cristo ( Church Of Christ) - Boracay, Albay Iglesia ni Cristo ( Church Of Christ) - Ligao City, Albay Iglesia ni Cristo ( Church Of Christ) - Pioduran, Albay Iglesia ni Cristo ( Church Of Christ) - Malay, Aklan Iglesia ni Cristo ( Church Of Christ) - Kalibo, Aklan Iglesia ni Cristo ( Church Of Christ) - J. Rosales Ave., Agusan del Norte Iglesia ni Cristo ( Church Of Christ) - Nasipit, Agusan del Norte Iglesia ni Cristo ( Church Of Christ) - Cabadbaran City, Agusan del Norte Iglesia ni Cristo ( Church Of Christ) - Tacloban City Iglesia ni Cristo ( Church Of Christ) - Tandang Sora, Quezon City Iglesia ni Cristo ( Church Of Christ) - Batasan Hills, Quezon City Iglesia ni Cristo ( Church Of Christ) - Araneta Ave., Quezon City Iglesia ni Cristo ( Church Of Christ) - Old Balara, Quezon City Iglesia ni Cristo ( Church Of Christ) - San Francisco del Monte, Quezon City Iglesia ni Cristo ( Church Of Christ) - Bago Bantay, Quezon City Iglesia ni Cristo ( Church Of Christ) - Cubao, Quezon City Iglesia ni Cristo ( Church Of Christ) - Rodriguez, Rizal Iglesia ni Cristo ( Church Of Christ) - Project 4, Quezon City Iglesia ni Cristo ( Church Of Christ) - H. Lopez Blvd., Manila Iglesia ni Cristo ( Church Of Christ) - Bo. Magsaysay, Manila Iglesia ni Cristo ( Church Of Christ) - Sampaloc, Manila Iglesia ni Cristo ( Church Of Christ) - Sta. Cruz, Manila Iglesia ni Cristo ( Church Of Christ) - Tondo, Manila Iglesia ni Cristo ( Church Of Christ) - Sta. Ana, Manila Iglesia ni Cristo ( Church Of Christ) - Tagum Iglesia ni Cristo ( Church Of Christ) - Cov. Province Iglesia ni Cristo ( Church Of Christ) - Davao del Sur Iglesia ni Cristo ( Church Of Christ) - Kabacan, Cotabato Iglesia ni Cristo ( Church Of Christ) - Kidapawan, Cotabato 1 Iglesia ni Cristo ( Church Of Christ) - Kidapawan, Cotabato 2 Iglesia ni Cristo ( Church Of Christ) - Pardo, Cebu City 35 Date Approved May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 No. 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 Name of Applicant Iglesia ni Cristo ( Church Of Christ) - Duljo-Fatima, Cebu City Iglesia ni Cristo ( Church Of Christ) - Maxilom Ave., Cebu City Iglesia ni Cristo ( Church Of Christ) - Dasmariñas, Cavite Iglesia ni Cristo ( Church Of Christ) - Trece Martires City Iglesia ni Cristo ( Church Of Christ) - Gen. Trias, Cavite Iglesia ni Cristo ( Church Of Christ) - Brgy. Slitran IV, Cavite Iglesia ni Cristo ( Church Of Christ) - Mambusao, Capiz Iglesia ni Cristo ( Church Of Christ) - Jamindan, Capiz Iglesia ni Cristo ( Church Of Christ) - Naga City Iglesia ni Cristo ( Church Of Christ) - Ragay, Camarines Sur Iglesia ni Cristo ( Church Of Christ) - Calabanga, Camarines Sur Iglesia ni Cristo ( Church Of Christ) - Calabang, Camarines Sur Iglesia ni Cristo ( Church Of Christ) - Iriga City, Camarines Sur Iglesia ni Cristo ( Church Of Christ) - Matacla Goa, Camarines Sur Iglesia ni Cristo ( Church Of Christ) - Nabua, Camarines Sur Iglesia ni Cristo ( Church Of Christ) - San Francisco Ocampo, Camarines Sur Iglesia ni Cristo ( Church Of Christ) - San Agustin, Camarines Sur Iglesia ni Cristo ( Church Of Christ) - Daet, Camarines Norte Iglesia ni Cristo ( Church Of Christ) - San Vicente, Camarines Norte Iglesia ni Cristo ( Church Of Christ) - Mercedes, Camarines Norte Iglesia ni Cristo ( Church Of Christ) - Bansud, Camarines Norte+C195 Iglesia ni Cristo ( Church Of Christ) - Calamburnay, Camarines Norte Iglesia ni Cristo ( Church Of Christ) - Basud, Camarines Norte Iglesia ni Cristo ( Church Of Christ) - Brgy. 4, Palawan Iglesia ni Cristo ( Church Of Christ) - Bo. Marcilla, Palawan Iglesia ni Cristo ( Church Of Christ) - Brgy. Turda, Palawan Iglesia ni Cristo ( Church Of Christ) - L. Aviente, Gattaran, Cagayan 1 Iglesia ni Cristo ( Church Of Christ) - Decalchao, Cagayan Iglesia ni Cristo ( Church Of Christ) - Brgy. San Jose, Cagayan Iglesia ni Cristo ( Church Of Christ) - Busuanga, Cagayan Iglesia ni Cristo ( Church Of Christ) - Cullon, Palawan Iglesia ni Cristo ( Church Of Christ) - Gonzaga, Cagayan Iglesia ni Cristo ( Church Of Christ) - Nabanggagan West, Cagayan Iglesia ni Cristo ( Church Of Christ) - Peru, Cagayan Iglesia ni Cristo ( Church Of Christ) - L. Aviente, Gattaran, Cagayan 2 Iglesia ni Cristo ( Church Of Christ) - Camalanuigan, Cagayan Iglesia ni Cristo ( Church Of Christ) - Aparri, Cagayan Iglesia ni Cristo ( Church Of Christ) - Centro 2, Cagayan Iglesia ni Cristo ( Church Of Christ) - Mercado, Marinduque 36 Date Approved May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 No. 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 Name of Applicant Iglesia ni Cristo ( Church Of Christ) - Poblacion Gasan, Marinduque Iglesia ni Cristo ( Church Of Christ) - Sta. Cruz, Marinduque Iglesia ni Cristo ( Church Of Christ) - San Antonio, Marinduque Iglesia ni Cristo ( Church Of Christ) - Mogpos, Marinduque Iglesia ni Cristo ( Church Of Christ) - Balagsan, Marinduque Iglesia ni Cristo ( Church Of Christ) - Boac, Marinduque 1 Iglesia ni Cristo ( Church Of Christ) - Boac, Marinduque 2 Iglesia ni Cristo ( Church Of Christ) - Pob. Buenavista, Marinduque Iglesia ni Cristo ( Church Of Christ) - Upi, Maguindanao Iglesia ni Cristo ( Church Of Christ) - Libungan, Cotabato Iglesia ni Cristo ( Church Of Christ) - Biliran, Leyte Iglesia ni Cristo ( Church Of Christ) - San Fernando City, La Union Iglesia ni Cristo ( Church Of Christ) - Cabaroan, La Union Iglesia ni Cristo ( Church Of Christ) - Rosario, La Union Iglesia ni Cristo ( Church Of Christ) - Bauang, La Union Iglesia ni Cristo ( Church Of Christ) - Biñan City, Laguna Iglesia ni Cristo ( Church Of Christ) - Calamba City, Laguna Iglesia ni Cristo ( Church Of Christ) - San Pablo City, Laguna Iglesia ni Cristo ( Church Of Christ) - Sta. Rosa, Laguna Iglesia ni Cristo ( Church Of Christ) - Sta. Cruz, Laguna Iglesia ni Cristo ( Church Of Christ) - Sto. Tomas, Laguna Iglesia ni Cristo ( Church Of Christ) - Bantug, Roxas Iglesia ni Cristo ( Church Of Christ) - Burgos Ramon, Isabela Iglesia ni Cristo ( Church Of Christ) - Diadi, Nueva Vizcaya Iglesia ni Cristo ( Church Of Christ) - Isabela, Isabela Iglesia ni Cristo ( Church Of Christ) - Jones, Isabela Iglesia ni Cristo ( Church Of Christ) - Cauayan City, Isabela Iglesia ni Cristo ( Church Of Christ) - Malam, Isabela Iglesia ni Cristo ( Church Of Christ) - Calamagui, Isabela Iglesia ni Cristo ( Church Of Christ) - Gamo, Isabela Iglesia ni Cristo ( Church Of Christ) - Soliven, Isabela Iglesia ni Cristo ( Church Of Christ) - Rizal St., Iloilo City 1 Iglesia ni Cristo ( Church Of Christ) - La Paz, Iloilo City Iglesia ni Cristo ( Church Of Christ) - Oton, Iloilo City Iglesia ni Cristo ( Church Of Christ) - Rizal St., Iloilo City 2 Iglesia ni Cristo ( Church Of Christ) - Jaro, Iloilo City Iglesia ni Cristo ( Church Of Christ) - Pavia, Iloilo City Iglesia ni Cristo ( Church Of Christ) - Molo, Iloilo City Iglesia ni Cristo ( Church Of Christ) - Balasan, Iloilo City Iglesia ni Cristo ( Church Of Christ) - Laoag City 37 Date Approved May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 No. 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 Name of Applicant Iglesia ni Cristo ( Church Of Christ) - San Nicolas, Ilocos Norte Iglesia ni Cristo ( Church Of Christ) - Dingras, Ilocos Norte Iglesia ni Cristo ( Church Of Christ) - Talian, Davao Oriental Iglesia ni Cristo ( Church Of Christ) - Mapawa, Davao Oriental Iglesia ni Cristo ( Church Of Christ) - Tibanban, Davao Oriental Iglesia ni Cristo ( Church Of Christ) - Pantukan, Davao Oriental Iglesia ni Cristo ( Church Of Christ) - Mati, Davao Oriental Iglesia ni Cristo ( Church Of Christ) - Agdao, Davao Iglesia ni Cristo ( Church Of Christ) - Gen. Malvar St., Davao Iglesia ni Cristo ( Church Of Christ) - Brgy. Banggot, Nueva Vizcaya Iglesia ni Cristo ( Church Of Christ) - Brgy. Barat, Nueva Vizcaya Iglesia ni Cristo ( Church Of Christ) - San Antonio, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - San Isidro, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - Cabanatuan City, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - Guimba, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - Burgos, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - Palitan Norte, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - Rizal, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - Bunga, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - Brgy. R.A. Padilla, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - San Jose City, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - Bongabon, Nueva Ecija Iglesia ni Cristo ( Church Of Christ) - Bacolod City, Negros Occidental Iglesia ni Cristo ( Church Of Christ) - Talisay City, Negros Occidental Iglesia ni Cristo ( Church Of Christ) - Valladolid, Negros Occidental Iglesia ni Cristo ( Church Of Christ) - East Candoni, Negros Occidental Iglesia ni Cristo ( Church Of Christ) - Himamaylan City, Negros Occidental Iglesia ni Cristo ( Church Of Christ) - San Carlos City, Negros Occidental Iglesia ni Cristo ( Church Of Christ) - Calatrava, Negros Occidental Iglesia ni Cristo ( Church Of Christ) - Sagay City, Negros Occidental Iglesia ni Cristo ( Church Of Christ) - Bontoc Iglesia ni Cristo ( Church Of Christ) - Misamis Occidental Iglesia ni Cristo ( Church Of Christ) - Montelago 1 Iglesia ni Cristo ( Church Of Christ) - Montelago 2 Iglesia ni Cristo ( Church Of Christ) - Pala, Oriental Mindoro Iglesia ni Cristo ( Church Of Christ) - Concepcion, Mindoro Iglesia ni Cristo ( Church Of Christ) - Mar Francisco, Oriental Mindoro Iglesia ni Cristo ( Church Of Christ) - Banilad, Oriental Mindoro Iglesia ni Cristo ( Church Of Christ) - Socorro, Oriental Mindoro 38 Date Approved May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 No. 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 Name of Applicant Iglesia ni Cristo ( Church Of Christ) - Nag Iba 1 Iglesia ni Cristo ( Church Of Christ) - Calapan City, Oriental Mindoro Iglesia ni Cristo ( Church Of Christ) - Bongabong, Oriental Mindoro Iglesia ni Cristo ( Church Of Christ) - Pinagsabangan II Iglesia ni Cristo ( Church Of Christ) - Bansud, Oriental Mindoro Iglesia ni Cristo ( Church Of Christ) - Alaminos, Pangasinan Iglesia ni Cristo ( Church Of Christ) - Rosales, Pangasinan Iglesia ni Cristo ( Church Of Christ) - Urdaneta City, Pangasinan Iglesia ni Cristo ( Church Of Christ) - Abongan, Palawan Iglesia ni Cristo ( Church Of Christ) - Brgy. Alimanguan, Palawan Iglesia ni Cristo ( Church Of Christ) - Bagong Sikat, Palawan Iglesia ni Cristo ( Church Of Christ) - El Nido, Palawan Iglesia ni Cristo ( Church Of Christ) - Brooke's Point, Palawan Iglesia ni Cristo ( Church Of Christ) - Brgy. Alakailan, Palawan Iglesia ni Cristo ( Church Of Christ) - Brgy. Maligaya, Palawan Iglesia ni Cristo ( Church Of Christ) - Rizal, Palawan Iglesia ni Cristo ( Church Of Christ) - So. Lamuro, Palawan Iglesia ni Cristo ( Church Of Christ) - Luzviminda, Palawan Iglesia ni Cristo ( Church Of Christ) - Aborlan, Palawan Iglesia ni Cristo ( Church Of Christ) - Brgy. New Capino, Palawan Iglesia ni Cristo ( Church Of Christ) - Port Barton, Palawan Iglesia ni Cristo ( Church Of Christ) - Princess Urduja, Palawan Iglesia ni Cristo ( Church Of Christ) - Pob. Quezon, Palawan Iglesia ni Cristo ( Church Of Christ) - Roxas, Palawan Iglesia ni Cristo ( Church Of Christ) - Sta. Monica, Palawan Iglesia ni Cristo ( Church Of Christ) - Bantulan, Palawan Iglesia ni Cristo ( Church Of Christ) - Swam Aberawan, Palawan Iglesia ni Cristo ( Church Of Christ) - Montevista Pob., Palawan Iglesia ni Cristo ( Church Of Christ) - TDC, Palawan Iglesia ni Cristo ( Church Of Christ) - Guinayangan, Quezon Iglesia ni Cristo ( Church Of Christ) - Gumaca, Quezon Iglesia ni Cristo ( Church Of Christ) - Plaridel, Quezon Iglesia ni Cristo ( Church Of Christ) - Brgy. Pilion, Quezon Iglesia ni Cristo ( Church Of Christ) - Patnanungan, Quezon Iglesia ni Cristo ( Church Of Christ) - Polilio, Quezon Iglesia ni Cristo ( Church Of Christ) - Mandaon, Masbate Iglesia ni Cristo ( Church Of Christ) - Makbug, Masbate Iglesia ni Cristo ( Church Of Christ) - Jamorawon Mil., Masbate Iglesia ni Cristo ( Church Of Christ) - Aroroy, Masbate Iglesia ni Cristo ( Church Of Christ) - Malinta, Masbate 39 Date Approved May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 No. 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 Name of Applicant Iglesia ni Cristo ( Church Of Christ) - Bagong Sirang, Masbate Iglesia ni Cristo ( Church Of Christ) - Cawayan, Masbate Iglesia ni Cristo ( Church Of Christ) - Uson, Masbate Iglesia ni Cristo ( Church Of Christ) - San Jose Road, Zamboanga City Iglesia ni Cristo ( Church Of Christ) - Canelar St., Zamboanga City Iglesia ni Cristo ( Church Of Christ) - Masinloc, Zambales Iglesia ni Cristo ( Church Of Christ) - Sta. Cruz, Zambales Iglesia ni Cristo ( Church Of Christ) - San Marcelino, Zambales Iglesia ni Cristo ( Church Of Christ) - Pamatawan, Zambales Iglesia ni Cristo ( Church Of Christ) - Calapacuan, Zambales Iglesia ni Cristo ( Church Of Christ) - Olongapo City, Zambales Iglesia ni Cristo ( Church Of Christ) - San Antonio, Zambales Iglesia ni Cristo ( Church Of Christ) - San Felipe, Zambales Iglesia ni Cristo ( Church Of Christ) - Masalasa, Tarlac Iglesia ni Cristo ( Church Of Christ) - Capas, Tarlac Iglesia ni Cristo ( Church Of Christ) - San Nicolas, Tarlac Iglesia ni Cristo ( Church Of Christ) - Cutcut II, Tarlac Iglesia ni Cristo ( Church Of Christ) - Bamban, Tarlac Iglesia ni Cristo ( Church Of Christ) - San Juan de Mata, Tarlac Iglesia ni Cristo ( Church Of Christ) - Maligaya, Tarlac Iglesia ni Cristo ( Church Of Christ) - Sapang Maragul, Tarlac Iglesia ni Cristo ( Church Of Christ) - San Roque, Tarlac Iglesia ni Cristo ( Church Of Christ) - San Fernando, Tarlac Iglesia ni Cristo ( Church Of Christ) - Bislig City Iglesia ni Cristo ( Church Of Christ) - Washington, Surigao Iglesia ni Cristo ( Church Of Christ) - Brgy. Lakandula, Surigao del Norte Iglesia ni Cristo ( Church Of Christ) - Brgy. Sarni-Sani, Surigao del Norte Iglesia ni Cristo ( Church Of Christ) - Dapa, Surigao del Norte Iglesia ni Cristo ( Church Of Christ) - Guinhadap, Masbate Iglesia ni Cristo ( Church Of Christ) - Pob. Monreal, Masbate Iglesia ni Cristo ( Church Of Christ) - Bulan, Sorsogon Iglesia ni Cristo ( Church Of Christ) - Bagong Nayon, Rizal Iglesia ni Cristo ( Church Of Christ) - Burgos, Quezon Iglesia ni Cristo ( Church Of Christ) - Ibabang Pole, Pagbilao, Quezon Iglesia ni Cristo ( Church Of Christ) - Candelaria, Quezon Iglesia ni Cristo ( Church Of Christ) - Sariaya, Quezon Iglesia ni Cristo ( Church Of Christ) - Granja St., Lucena City Iglesia ni Cristo ( Church Of Christ) - Mayao, Lucena Iglesia ni Cristo ( Church Of Christ) - Ilayang Pulo, Pagbilao, Quezon 40 Date Approved May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 No. 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 Name of Applicant Iglesia ni Cristo ( Church Of Christ) - Edaño St., SFQ, Quezon Iglesia ni Cristo ( Church Of Christ) - Gen. Luna, Quezon Iglesia ni Cristo ( Church Of Christ) - Tayuman, SFQ, Quezon Iglesia ni Cristo ( Church Of Christ) - Brgy. 9, Catanauan Quezon 1 Iglesia ni Cristo ( Church Of Christ) - Tagbacanllaya, Catanauan Quezon Iglesia ni Cristo ( Church Of Christ) - Brgy. 9, Catanauan Quezon 2 IM Digital Philippine, Inc. Automax Gasoline Station - Edsa Greeenhills Bangko Sentral ng Pilipinas - Roxas City Clark Water Corporation Industrial Galvanizers Corporation of the Philippines Janice Minor Export, Inc. Maynilad Water Services, Inc. - Algeciras Reservoir Maynilad Water Services, Inc. - Caloocan Reservoir Maynilad Water Services, Inc. - Commonwealth Pumping Station Maynilad Water Services, Inc. - D.Tuazon Reservoir Maynilad Water Services, Inc. - Noveleta Reservoir Monde M.Y. San Corporation Q Plaza Building 2 Rizal Avenue Tourist Development Corporation Roman Catholic Archbishop of Manila - Archdiocesan Shrine of Divine Mercy SMB Prestige Corporation Wordtext Systems, Inc. Zuellig Pharma Corporation Cummins Sales and Service Philippines, inc. - Basco 7 MG Gasoline Station A. Lim Development, Inc Bangko Sentral ng Pilipinas Butuan City Water District - Km. 5 Baan Butuan City Water District - Taguibo City Savings Bank - Iloilo Branch City Savings Bank - Kalibo Branch City Savings Bank - La Union Branch City Savings Bank - Pampanga Branch De La Salle - College of St. Benilde - Benilde Bldg. De La Salle - College of St. Benilde - Dverr Bldg. Landbank of the Philippines - Oroquieta Branch Metropolitan Bank & Trust Company - Davao City Metropolitan Bank & Trust Company - General Santos City 41 Date Approved May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 May 30, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 June 29, 2012 July 9, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 No. 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 Name of Applicant Metropolitan Bank & Trust Company - Mati City Metropolitan Bank & Trust Company - Oroquieta City Metropolitan Bank & Trust Company - Ozamis City Metropolitan Bank & Trust Company - Zamboangay Sibugay Pacific Rare Specialty Metals & Chemicals, Inc. Panay Telephone Corp. - New Washington Exchange Society of the Divine Word-Southern Province, Inc. 8 Wack Wack Road Condominium B/E Aerospace B.V. Philippine Branch Maxim Philippine Operating Corp. ON Semiconductor Philippines, Inc. - Carmona Philippine Sinter Corporation SM Prime Holdings, Inc. - SM City Olongapo Bantayan Island Power Corp. (BIPCOR) - new SN Aboitiz Power-Benguet, Inc. - Binga Hydroelectric Power Plant Date Approved July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 19, 2012 July 23, 2012 July 30, 2012 955 July 30, 2012 965 Cummins Sales and Service Philippines, Inc. - Pulang Lupa, Occidental Mindoro King Energy Generation, Inc. AboitizLand, Inc. LTS Malls, Inc./NCCC Mall MA-A Monde MY San Corporation Nestle Philippines, Inc. Oceanagold (Philippines), Inc. One Corporate Centre Condominium Unit Owners Association, Inc. SM Prime Holdings, Inc./ SM City San Fernando Cummins Sales and Service Philippines, Inc. - Calapan City, Oriental Mindoro CBK Power Company Limited - Cavinti 966 967 968 969 970 971 972 973 974 975 976 CBK Power Company Limited - Lumban CBK Power Company Limited - San Juan Japlas Injection Moulders Corporation Maynilad Water Services Inc. - La Mesa Water Treatment 2 Megaworld Corporation - Tuscany Private Estate Metro Wear, Inc. 2 MH Boss Oil Service Station Yeeloofa Development Corporation Nepo Mall Angeles Pampanga Sunnyfield E-Officer Coporation 2GO Logistics, Inc. September 3, 2012 September 3, 2012 September 3, 2012 September 3, 2012 September 3, 2012 September 3, 2012 September 3, 2012 September 3, 2012 September 7, 2012 September 7, 2012 September 18, 2012 956 957 958 959 960 961 962 963 964 42 August 6, 2012 August 13, 2012 August 13, 2012 August 13, 2012 August 13, 2012 August 13, 2012 August 13, 2012 August 13, 2012 August 28, 2012 September 3, 2012 No. 977 978 979 980 981 982 983 984 985 986 987 988 989 990 Date Approved September 18, 2012 September 18, 2012 September 18, 2012 September 18, 2012 September 18, 2012 September 18, 2012 September 18, 2012 September 18, 2012 September 18, 2012 September 18, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 1001 Name of Applicant Cebu Whitesands Resort and Spa Landbank of the Philippines - Biñan Branch Landbank of the Philippines - Concepcion, Tarlac Branch Landbank of the Philippines - Lemery Branch Marquee Place Homeowners Association, Inc. Steel Asia Manufacturing Corporation The Sapphire Residences Condominium Corporation Aboitizland, Inc. Coca-Cola Bottlers Philippines, Incorporated Petron Corporation - Refining Division CJ ToyotaTsusho Philippines, Inc. Innoland Development Corporation Covelandia, Gasoline Refilling Station Energy Development Corporation-Mindanao Geothermal Production Field (MGPF) JMS International, Inc. - Muntinlupa Branch Landbank of the Philippines - Cabuyao Laguna Branch Landbank of the Philippines - Capas Branch Landbank of the Philippines - San Carlos Pangasinan Branch N. De La Merced & Sons, Inc. National Grid Corporation of the Philippines - Head Office National Grid Corporation of the Philippines - North Luzon Area - Bolo (Kadampat EHV) Substation National Grid Corporation of the Philippines - North Luzon Area - MTDB Garrage National Grid Corporation of the Philippines - North Luzon Area Western Benguet T/L Office National Grid Corporation of the Philippines - Visayas Area - Calbayog Substation National Grid Corporation of the Philippines - Visayas Area - VNCC 1002 National Grid Corporation of the Philippines - Visayas Area - Loon RS October 9, 2012 1003 National Grid Corporation of the Philippines - Visayas Area - Murcia (Canlandog) RS National Grid Corporation of the Philippines - Visayas Area - Ivisan RS October 9, 2012 National Grid Corporation of the Philippines - Visayas Area - Tangalan (Jawili) RS National Grid Corporation of the Philippines - Visayas Area - Pio Corpuz (Masbate RS) National Grid Corporation of the Philippines - Visayas Area - MTDA Visayas O&M October 9, 2012 991 992 993 994 995 996 997 998 999 1000 1004 1005 1006 1007 43 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 October 9, 2012 No. 1008 1009 1010 1011 Name of Applicant Date Approved National Grid Corporation of the Philippines - Visayas Area - AMLAN October 9, 2012 Substation National Grid Corporation of the Philippines - Visayas Area - Pondol October 9, 2012 Cable Terminal Station National Grid Corporation of the Philippines - Mindanao Area - MRRCC October 9, 2012 October 29, 2012 1012 1013 1014 1015 1016 1017 Mindanao Energy Systems, Inc. (MINERGY) - Cabulig MiniHydroelectric Power Plant Monark Equipment Corp. - Basilan DPP Monark Equipment Corp. - Jolo DPP Monark Equipment Corp. - Bongao DPP Manila Water Company, Inc. - Bagong Nayon Manila Water Company, Inc. - STP Ayala Manila Water Company, Inc. - STP U.P. 1018 Manila Water Company, Inc. - Main Bldg. November 6, 2012 1019 Manila Water Company, Inc. - Diego Silang STP November 6, 2012 1020 Manila Water Company, Inc. - Fort Bonifacio Global City November 6, 2012 1021 Manila Water Company, Inc. - Brookside November 6, 2012 1022 Manila Water Company, Inc. - DOST November 6, 2012 1023 Manila Water Company, Inc. - Mobile (Chapagnat) November 6, 2012 1024 Manila Water Company, Inc. - JICA Mobile 1 November 6, 2012 1025 Manila Water Company, Inc. - Masinag November 6, 2012 1026 Manila Water Company, Inc. - JICA Mobile 2 November 6, 2012 1027 Manila Water Company, Inc. - Jala Treatment November 6, 2012 1028 Manila Water Company, Inc. - San Rafael November 6, 2012 1029 Manila Water Company, Inc. - Holy Family November 6, 2012 1030 Manila Water Company, Inc. - Celina 1 November 6, 2012 1031 Manila Water Company, Inc. - Celina 2 November 6, 2012 1032 Manila Water Company, Inc. - Curayao - PS, DW 1,3,4 & 5 November 6, 2012 1033 Manila Water Company, Inc. - Central Lab November 6, 2012 1034 Manila Water Company, Inc. - Manggahan November 6, 2012 1035 Manila Water Company, Inc. - Molave November 6, 2012 1036 Manila Water Company, Inc. - San Jose November 6, 2012 1037 Manila Water Company, Inc. - Aranzazu November 6, 2012 1038 Manila Water Company, Inc. - Botong November 6, 2012 1039 Manila Water Company, Inc. - San Mateo STP November 6, 2012 1040 Manila Water Company, Inc. - Modesta November 6, 2012 44 October 29, 2012 October 29, 2012 October 29, 2012 November 6, 2012 November 6, 2012 November 6, 2012 No. 1041 Date Approved November 6, 2012 1042 Name of Applicant Manila Water Company, Inc. - Truck Mntd-1 SFV 396,797, 426, 435, 766 & 739 Manila Water Company, Inc. - Amity 1043 Manila Water Company, Inc. - Baras DW-1 November 6, 2012 1044 Manila Water Company, Inc. - Jala DW-2 November 6, 2012 1045 Manila Water Company, Inc. - I.T. Data Center 1 & 2 November 6, 2012 1046 Manila Water Company, Inc. - TAY PTP November 6, 2012 1047 Manila Water Company, Inc. - La Mesa Dam November 6, 2012 1048 Manila Water Company, Inc. - FTI STP November 6, 2012 1049 Manila Water Company, Inc. - U.P. Reuse November 6, 2012 1050 Manila Water Company, Inc. - BLC November 6, 2012 1051 Manila Water Company, Inc. - Maharlika November 6, 2012 1052 Manila Water Company, Inc. - Centenial November 6, 2012 1053 Manila Water Company, Inc. - Pag - Asa November 6, 2012 1054 Manila Water Company, Inc. - Guadalupe Bliss November 6, 2012 1055 Manila Water Company, Inc. - Fortville November 6, 2012 1056 Manila Water Company, Inc. - Philam November 6, 2012 1057 Manila Water Company, Inc. - Palosapis November 6, 2012 1058 Manila Water Company, Inc. - Belarmino November 6, 2012 1059 Manila Water Company, Inc. - Karangalan 1 November 6, 2012 1060 Manila Water Company, Inc. - Karangalan 2 November 6, 2012 1061 Manila Water Company, Inc. - Karangalan 3 November 6, 2012 1062 Manila Water Company, Inc. - Karangalan 4 November 6, 2012 1063 Manila Water Company, Inc. - Karangalan 5 November 6, 2012 1064 Manila Water Company, Inc. - Karangalan 6 November 6, 2012 1065 Manila Water Company, Inc. - Karangalan 7 November 6, 2012 1066 Manila Water Company, Inc. - Karangalan 8 November 6, 2012 1067 Manila Water Company, Inc. - Karangalan 9 November 6, 2012 1068 Manila Water Company, Inc. - Makati Pabahay November 6, 2012 1069 Manila Water Company, Inc. - Fusion November 6, 2012 1070 Manila Water Company, Inc. - Balara BA November 6, 2012 1071 Manila Water Company, Inc. - Cubao BA November 6, 2012 1072 Manila Water Company, Inc. - Marikina BA November 6, 2012 1073 Manila Water Company, Inc. - Taguig BA November 6, 2012 45 November 6, 2012 No. 1074 Name of Applicant Manila Water Company, Inc. - Pasig BA Date Approved November 6, 2012 1075 Manila Water Company, Inc. - Makati BA November 6, 2012 1076 Manila Water Company, Inc. - Panorama November 6, 2012 1077 Manila Water Company, Inc. - Grandvillas November 6, 2012 1078 Manila Water Company, Inc. - BG Molina November 6, 2012 1079 Manila Water Company, Inc. - Pineda STP November 6, 2012 1080 Manila Water Company, Inc. - Road 5 November 6, 2012 1081 Manila Water Company, Inc. - Holy Family TP November 6, 2012 1082 Manila Water Company, Inc. - East Ave. November 6, 2012 1083 Manila Water Company, Inc. - Imelda November 6, 2012 1084 Manila Water Company, Inc. - Olandes November 6, 2012 1085 Manila Water Company, Inc. - Sikatuna November 6, 2012 1086 Manila Water Company, Inc. - Kalayaan November 6, 2012 1087 Manila Water Company, Inc. - Heroes Hill November 6, 2012 1088 Manila Water Company, Inc. - Lake View November 6, 2012 1089 Manila Water Company, Inc. - Fisheries November 6, 2012 1090 Manila Water Company, Inc. - A. Luna November 6, 2012 1091 Manila Water Company, Inc. - MRH November 6, 2012 1092 De La Salle College of Saint Benilde - Angelo King Int'l. Center November 6, 2012 1093 ePLDT, Inc. November 6, 2012 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 Interbev Philippines, Inc. WF Plaza Bldg. Administration Inc. / Intellectual Property Center Willin Sales Inc. - Waltermart Guiguinto, Bulacan Manila Water Company, Inc. - Balara Manila Water Company, Inc. - San Juan Manila Water Company, Inc. - Makati Manila Water Company, Inc. - Fort Bonifacio Manila Water Company, Inc. - Cubao Manila Water Company, Inc. - Pasig Manila Water Company, Inc. - Filter 1 & 2 Manila Water Company, Inc. - Lukban 1 & 2 Manila Water Company, Inc. - Kinsville 1 & 2 November 6, 2012 November 6, 2012 November 6, 2012 November 6, 2012 November 6, 2012 November 6, 2012 November 6, 2012 November 6, 2012 November 6, 2012 November 6, 2012 November 6, 2012 November 6, 2012 1106 Manila Water Company, Inc. - Siruna 1 & 2 November 6, 2012 1107 Manila Water Company, Inc. - Siruna 1 & 2 November 6, 2012 1108 Manila Water Company, Inc. - El Niño (1-22) November 6, 2012 1109 Manila Water Company, Inc. - Rodriguez - 1-3 November 6, 2012 46 No. 1110 Name of Applicant Green Future Innovations, Inc. Date Approved November 12, 2012 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 City of Koronadal Water District City Savings Bank - Borongan Branch City Savings Bank - Dagupan Branch City Savings Bank - Legazpi Branch De La Salle College of Saint Benilde LandBank of the Philippines Ombudsman Extension Office Majestic Press, Inc. - 4th Street Mariphil Orphanage Foundation Atung Pinuy Anan Lafarge Republic, Inc. PowerSource Philippines, Inc. GNPower Mariveles Coal Plant Ltd., Co. Monark Equipment Corp. - Dinagat DPP Monark Equipment Corp. - Siquijor DPP Land Bank of the Philippines – Sablayan, Occidental Mindoro SM Development Corporation Hantex Land Corporation Metrobank Data Center Aderans Philippines, Inc. November 12, 2012 November 12, 2012 November 12, 2012 November 12, 2012 November 12, 2012 November 12, 2012 November 12, 2012 November 12, 2012 November 26, 2012 November 26, 2012 December 3, 2012 December 3, 2012 December 3, 2012 December 3, 2012 December 3, 2012 December 3, 2012 December 3, 2012 December 7, 2012 1129 1130 1131 1132 Blue Sapphire Residences Condominium Corporation Bangko Sentral Ng Pilipinas-Dumaguete Branch Bangko Sentral Ng Pilipinas-Naga Branch The Beacon Tower December 7, 2012 December 7, 2012 December 7, 2012 December 7, 2012 1133 Acbel Polytech Phils., Inc. December 7, 2012 1134 Hillsford Property Corp. December 7, 2012 1135 Metrobank Data Center Building December 7, 2012 1136 Hantex Land Corporation December 7, 2012 1137 1138 Lunang Diesel Power Plant Biasong Diesel Power Plant December 10, 2012 December 10, 2012 1139 Costa Rica Diesel Power Plant December 10, 2012 1140 Cabunga-an Diesel Power Plant December 10, 2012 1141 1142 1143 1144 1145 1146 Takut Diesel Power Plant Ilijan Diesel Power Plant Monark Equipment Corp. - Roxas DPP, Palawan Amkor The Beaufort Accendo Commercial Corp. December 10, 2012 December 10, 2012 December 17, 2012 December 18, 2012 December 18, 2012 December 18, 2012 47 CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY The ERC, on 08 November 2011, approved the application filed by Cagayan Electric Power and Light Company, Inc. (CEPALCO) for the renewal of its CPCN to operate in the City of Cagayan de Oro and its suburbs, effective June 17, 2011 to August 2, 2044, to coincide with its approved Congressional franchise. CEPALCO established that it has the expertise and resources to adequately and reliably serve the present and future electrical power needs of its customers. CERTIFICATE OF REGISTRATION The ERC issued three (3) Certificates of Registration filed by the following Wholesale Aggregators (WA) in 2012: Wholesale Aggregator (WA) Date of Approval 1. Angeles Power, Inc. April 2, 2012 2. First Gen Energy Solutions, Inc. May 22, 2012 3. Manta Energy, Inc. (Formerly named iN2Power, Inc.) June 25, 2012 CONNECTION ASSETS On 20 February 2012, the ERC approved the application filed by Kepco-SPC Power Corporation (KSPC) for the construction of connection assets for its 2x100 Circulating Fluidized Bed Combustor (CFBC) Boiler Coal-Fired Power Plant, particularly the 138 kV DC-ST transmission line from KEPCO Power Plant to New Naga (Cebu) Substation. CONSUMER COMPLAINTS Section 41 of Republic Act No. 9136 or the Electric Power Industry Reform Act (EPIRA) mandated the ERC to handle consumer complaints and ensure the adequate promotion of consumer interests. In line with this, the ERC, on 16 November 2011, resolved the complaint filed by Corinthian Realty Corp. and Renato Dragon, versus Manila Electric Company (MERALCO), under ERC Case No. 2009-091 CC. The ERC ruled that there was no tampering of the meters which could have resulted to overbilling or illegal disconnection committed by MERALCO. The ERC found that the outstanding electric bills issued to Corinthian Realty Corp. from September 2006 to June 2010 were correct based on numerous tests and verification conducted by the ERC. Accordingly, Corinthian Realty Corp was directed to pay MERALCO the amount of PhP2,091,119.70 which represents its bills in arrears. 48 DISPUTE RESOLUTION The EPIRA, under Section 43(u), gave the ERC the original and exclusive jurisdiction over all cases involving disputes between and among participants or players in the energy sector. As such, the ERC, in 2012, resolved three (3) disputes filed before it, namely: 1. Angeles Electric Corporation (AEC) and Tarlac Electric, Inc. (TEI) versus Power Sector Assets and Liabilities Management Corporation (PSALM) and National Grid Corporation of the Philippines (NGCP); 2. Stronghold Steel Corporation (SSC) versus National Grid Corporation of the Philippines (NGCP); and 3. Melters Steel Corporation (MSC) versus National Grid Corporation of the Philippines (NGCP). AEC and TEI filedtheir petition with ERC to nullify the Value Added Tax (VAT) charges on Default Wholesale Supply Arrangement (DWSA). The ERC, in its Decision dated 03 December 2012 made permanent the Status Quo Order issued on 19 April 2011. AEC and TEI were able to prove that their PEZA or BOI-registered customers were granted tax incentives under Section 4, 108-5 and 108-6, Revenue Regulation No. 16-2005, therefore qualifying them under Zero Rate Sale of Services and effectively Zero Rate Sale of Services, respectively. Accordingly, PSALM was directed to refrain from collecting the 12% VAT on the electricity sales to PEZA and BOI-registered customers of AEC and TEI. On the other hand, SCC filed a petition for dispute resolution against NGCP relative to its billing determinant arrangement with the National Transmission Corporation (TRANSCO). On 26 November 2012, the ERC made permanent the Cease and Desist Order issued on 10 September 2012, upon confirming that the transmission charges for SSC should be calculated on the basis of the Coincident Peak Demand (CPD) of the Luzon System Peak Demand. As a result, NGCP was directed to (a) use SSC's actual demand coincident with the Luzon System Peak Demand as its billing determinant in the calculation of its transmission charges, subject to the approved minimum billing determinant of 17 MW; (b) refund to SSC the total amount of over-recovery in the transmission charges from the time it shifted from CPD to Non-Coincident Peak Demand (NCPD); and (c) submit its compliance within 10 days from receipt of Decision. Similar to the case above, MSC filed its petition for the adoption of the same billing methodology approved for SKK Steel Corporation (SKK) and SSC by TRANSCO. Thus, on the same date as the SSC’s petition was resolved, the ERC approved MSC's application for the adoption of the same billing methodology approved for SSC in ERC Case No. 2011-060 MC. 49 FEED-IN TARIFF (FIT) RATE Section 7 of the Republic Act No. 9513 or the Renewable Energy Act of 2008 mandated the ERC to formulate a feed-in tariff system to encourage development of renewable energy in the country. The Feed-in Tariff Rules of the ERC further provides that the National Renewable Energy Board (NREB) file its recommended FITs per technology to the ERC for its approval. On 27 July 2012, the ERC approved the NREB's application for feed-in tariff for biomass, run-of-river (ROR) hydropower, solar and wind energy. The ERC-approved FIT rates were as follows: TECHNOLOGY Wind Biomass Solar Hydro APPROVED FIT PhP8.53/kWh PhP6.63/kWh PhP9.68/kWh PhP5.90/kWh DEGRESSION RATE 0.5% after year 2 from effectivity of FIT 0.5% after year 2 from effectivity of FIT 6% after year 1 from effectivity of FIT 0.5% after year 2 from effectivity of FIT Meanwhile, the ERC deferred decision on the proposed FIT for ocean until sufficient data shall become available upon which it may base its determination. FUEL AND LUBRICANT COST RECOVERY The ERC approved Cotabato Light and Power Company, Inc.’s application for the recovery of its actual fuel and lubricant costs incurred for the period March 15, 2010 up to January 2011. Accordingly, the ERC authorized CLPC to recover the fuel and lubricant costs (on top of the existing fuel recovery charge of PhP0.0298/kWh) amounting to PhP17,275,184.43 which is equivalent to PhP0.1554/kWh, effective on the next billing cycle from receipt of the Decision until its full recovery. GENERATION RATE ADJUSTMENT MECHANISM (GRAM) On 26 March 2012, the ERC approved the application of the National Power Corporation (NPC) and Power Sector Assets and Liabilities Management Corporation (PSALM) for the recovery of its fuel and IPP costs under the 10th to 17th GRAM (under ERC Case Nos. 2008-042 RC, 2008-053 RC, 2008-063 RC, 2009-032 RC, 2009-056 RC, 2010-003 RC, 2010-068 RC, and 2010-074 RC) for test period January 2007 to April 2011. The following are the approved Deferred Accounting Adjustment (DAA), recovery rate and recovery period for Luzon, Visayas and Mindanao, effective March 26, 2012 to April 25, 2012 billing period until the end of the corresponding recovery periods or until such time that the full amount shall have been recovered, whichever comes earlier: 50 LUZON VISAYAS MINDANAO DAA (PHP) 26,281,952,768.34 7,706,055,072.95 1,908,403,425.72 RECOVERY (PHP/KWH) 0.3267 0.4847 0.0536 RECOVERY PERIOD 120 months 126 months 54 months On 24 September 2012, the ERC also approved the application of National Power Corporation - Small Power Utilities Group (NPC-SPUG) for the recovery of its fuel and IPP costs under the 13th GRAM for test period January 2005 to December 2005. The following are the approved Deferred Accounting Adjustment (DAA), recovery rate and recovery period for Luzon, Visayas and Mindanao, effective the next billing period until the end of the corresponding recovery periods or until such time that the full amount shall have been recovered, whichever comes earlier: LUZON VISAYAS MINDANAO DAA (PHP) 1,467,086,778.00 152,045,847.42 344,188,432.00 RECOVERY (PHP/KWH) 0.5585 0.8043 1.0773 RECOVERY PERIOD 64 months 57 months 12 months Meanwhile, the ERC, on 03 December 2012, approved the petitions filed by Cabanatuan Electric Corporation (CELCOR) under ERC Case Nos. 2010-022 RC and 2010-040 RCfor lower generation charges for billing months of March 2010 and April 2010 and for the recovery of the differential generation charges within a 6 month period. CELCOR was authorized to recover the amount of PhP13,161,725.58 equivalent to PhP0.0651/kWh, and was directed to refund the amount of PhP1,485,795.10 equivalent to PhP0.0073/kWh starting the next billing period from receipt of the Decision until such time that the full amount shall have been recovered/refunded. Further, CELCOR was directed to revisit and renegotiate its Power Supply Contract (PSC) with First Cabanatuan Ventures Corporation (FCVC) relative to its Minimum Energy Off-Take (MEOT). INCREMENTAL CURRENCY EXCHANGE RATE ADJUSTMENT (ICERA) The ERC approved the petitions filed by National Power Corporation (NPC) and Power Sector Assets and Liabilities Management Corporation (PSALM)for the recovery of their 15th and 16th ICERA under ERC Case Nos. 2010-067 RC and 2010-073 RC on 26 March 2012. NPC and PSALM were authorized to recover the Deferred Accounting Adjustments (DAAs) on ICERA, covering test period July 2009 to April 2010 and the remaining balance of the 14th ICERA, effective March 26, 2012 to April 25, 2012 billing period until it is fully recovered/ refunded, to wit: 51 DAA (PHP) LUZON VISAYAS MINDANAO RECOVERY / (REFUND) (PHP/KWH) 0.3637 0.1213 (0.0094) 8,193,293,149.95 918,421,045.84 (224,300,499.43) RECOVERY/ (REFUND) PERIOD 96 months 60 months 36 months The ERC also approved the application of National Power Corporation - Small Power Utilities Group (NPC-SPUG) for the recovery of its 3rd ICERA on 24 September 2012, in the amount of PhP341,418,352.54. Accordingly, NPC-SPUG was authorized to recover from SPUG consumers the amount of PhP0.3907/kWh within a period of 2 years or until such time that it is fully recovered starting the next billing system from receipt of the Decision. LEASE OF PROPERTY The ERC approved, on 28 November 2011 and 19 December 2011 the applications filed by Angeles Electric Corporation (AEC) and Cabanatuan Electric Corporation (CELCOR), respectively, for authority to lease Regulatory Asset Base (RAB) properties. The ERC’s approval of AEC's and CELCOR’s pole space rentals was subject to the R.A. 9136 and its IRR’s provision that a portion of a Distribution Utilities' net annual income from related business undertaking shall be used to reduce its Distribution Wheeling Charges provided that such shall not exceed 50% of the net income derived from such undertaking. As such, it will be beneficial to the consumers of AEC and CELCOR in terms of reduced rates. The 2010 pole rental income of AEC reached PhP3,427,673.02 relative to the Joint Pole Agreements with Angeles City Telephone System, Angeles City Cable Television Network, Inc., Dau Telephone Company, Digital Telecommunications Philippines, Inc., Innove Communications, Inc., Philippine Long Distance Telephone Company, and Angeles University Foundation. On the other hand, the summary of the pole rental income submitted by CELCOR for a 10 year contract period with Philippine Long Distance Telephone Company, Digital Telecommunications Philippines, Inc., MultiNetwork Cable Television, Inc., Bayan Telecommunications, Inc., Innove Communications, Inc., and Smart Communications, Inc. shows a total income of PhP54,032,581.08. MARKET TRANSACTION FEES The ERC, on 05 December 2011, approved the Philippine Electricity Market Corporation’s(PEMC) additional Market Transaction Fees in the amount of PhP26,380,586.00 to cover the additional budget necessary for operating the WESM in the Visayas, as well as the hiring of additional personnel as a result of its 52 reorganization. The approved amount includes the Visayas funding requirement amounting to PhP23,706,457.00, additional adjustments amounting to PhP474,129.00 and provision for external auditor amounting to PhP2,200,000.00. Accordingly, PEMC was authorized to collect the said fees from WESM participants in the Visayas Grid retroactive from the billing month of January 2011, and was directed to submit a mechanism for the collection of the fees within 10 days from receipt of the Decision. Moreover, the ERC granted PEMC's request for authority to allocate the amount of PhP26,518,272.00 from the unutilized market transaction fees for calendar year 2010 for its proposed Market Dispatch Optimization Model (MDOM) Software Modification Project. OVER / UNDER RECOVERIES IN THE IMPLEMENTATION OF THE AUTOMATIC ADJUSTMENTS Pursuant to ERC Resolution No. 16, Series of 2009 and Resolution No. 21, Series of 2010, the ERC approved twelve (12) applications for verification and confirmation of the over/under recoveries incurred by the Distribution Utilities in their implementation of the various automatic cost adjustments and true-up mechanisms authorized by the ERC. No. ERC Case Applicant Date of Decision/ Details No. (Date of Decision) 1 2011-006 Sorsogon I Electric SORECO I was directed to refund starting the next billing CF Cooperative, Inc. cycle from receipt of Decision until its full refund, the total (SORECO I) amount of PhP943,873.73 equivalent to PhP0.0040/kWh generation cost over-recoveries; the total amount of (November 2, PhP17,023,168.44 equivalent to PhP0.0935/kWh for 2011) residential, PhP0.0476/kWh for commercial, PhP0.0178/kWh for public building, PhP0.0092/kWh for industrial low voltage, PhP14.8583/kW for industrial high voltage and PhP0.0546/kWh for streetlight representing transmission cost over-recoveries; the total amount of PhP21,337,522.15 equivalent to PhP0.0906/kWh representing system loss overrecoveries; and the total amount of PhP1,166,914.16 equivalent to PhP0.0552/kWh representing inter-class cross subsidy over recoveries. On the other hand, SORECO I was directed to collect starting the next billing cycle from receipt of Decision until its full recovery the total amount of PhP310,643.10 equivalent to PhP0.0014/kWh representing lifeline subsidy under-recoveries to be recovered only from non-lifeline customer. 2 2011-011 Cagayan I Electric CAGELCO I was directed to refund starting the next billing CF Cooperative, Inc. cycle from receipt of Decision until its full refund, the total (CAGELCO I) amount of PhP551,663.34 equivalent to PhP0.0005/kWh representing generation cost over-recoveries. On the other (October 1, 2011) hand, CAGELCO I was directed to collect starting the next 53 No. ERC Case Applicant No. (Date of Decision) 3 2011-015 CF Tarlac Electric Incorporated (TEI) (June 4, 2012) 4 2011-028 CF Nueva Ecija II Electric Cooperative, Inc. Area 2 (NEECO IIAREA 2) Date of Decision/ Details billing cycle from receipt of Decision until its full recovery the total amount of PhP1,507,944.39 equivalent to PhP0.0013/kWh for residential, PhP0.0013 for Low Voltage and PhP0.3120/kW for Higher Voltage representing transmission cost under-recoveries; the total amount of PhP28,666,496.20 equivalent to PhP0.0243/kWh representing system loss under recoveries; the total amount of PhP1,498,710.53 equivalent to PhP0.0013/kWh representing lifeline subsidy under-recoveries; the total amount of PhP2,773,376.71 equivalent to PhP0.0103/kWh representing inter-class cross subsidies under-recoveries; and the total amount of PhP110,764.29 equivalent to PhP0.0006/kWh for residential and Low voltage and PhP0.1912/kW for higher voltage representing reinstated prompt payment discount under-recoveries. TEI was directed to refund starting the next billing cycle from receipt of Decision until its full refund, the total amount of PhP20,010,583.84 equivalent to PhP0.0155/kWh for residential/small commercial, PhP5.4450/kW for secondary, PhP6.1141/kW for primary, PhP6.1361/kW for 69kV and PhP0.0203/kWh for flat/streetlights representing transmission cost over-recoveries; the total amount of PhP12,323,597.27 equivalent to PhP0.0534/kWh representing inter-class cross subsidy over-recoveries; and the total amount of PhP1,490,327.22 equivalent to PhP0.0059/kWh for residential, PhP2.0614/kW for secondary, PhP2.3148/kW for primary, PhP2.3231/kW for 69 kV and PhP0.0077/kWh for flat/streetlights, representing reinstated prompt payment discount over-recoveries. On the other hand, TEI was directed to collect starting the next billing cycle from receipt of Decision until its full recovery the total amount of PhP4,307,133.04 equivalent to PhP0.0034/kWh representing generation cost under-recoveries; the total amount of PhP1,064,084.98 equivalent to PhP0.0008/kWh for residential/small commercial/69 kV, PhP0.0009/kWh for secondary/primary and PhP0.0011/kWh for flat/streetlights, representing system loss under-recoveries; and the total amount of PhP211,440.44 equivalent to PhP0.0002/kWhfor lifeline subsidy under-recoveries. NEECO II-AREA 2 was directed to refund starting the next billing cycle from receipt of Decision until its full refund, the total amount of PhP62,407,443.81 equivalent to PhP0.0709/kWh for streetlights, PhP0.0829/kWh for residential, PhP0.1328/kWh for sale for resale, 54 No. ERC Case Applicant No. (Date of Decision) (December 2012) 5 2011-037 CF Zambales II Electric Cooperative, Inc. (ZAMECO II) (December 2011) 6 2011-040 CF 12, 12, Masbate Electric Cooperative, Inc. (MASELCO) (October 10, 2011) Date of Decision/ Details PhP0.0882/kWh for small commercial, PhP0.1206/kWh for special lights, PhP0.0709/kWh for public building, PhP6.5801/kW for large commercial and PhP15.4330/kW for industrial, representing transmission cost over-recoveries; the total amount of PhP18,299,515.46equivalent to PhP0.0236/kWh representing lifeline subsidy over-recoveries; and the total amount of PhP5,933,560.90 equivalent to PhP0.0389/kWh representing inter-class cross subsidy over recoveries. On the other hand, NEECO II-AREA 2 was directed to collect starting the next billing cycle from receipt of Decision until its full recovery the total amount of PhP13,517,114.82 equivalent to PhP0.0175/kWh representing generation cost under-recoveries; and the total amount of PhP15,414,730.17 equivalent to PhP0.0199/kWh representing system loss under-recoveries. ZAMECO II was directed to refund starting the next billing cycle from receipt of Decision until its full refund, the total amount of PhP31,194,688.48 equivalent to PhP0.1314/kWh for residential, PhP0.1120/kWh for Low Voltage and PhP46.58/kW for High Voltage representing transmission cost over-recoveries; the total amount of PhP1,629,225.20 equivalent to PhP0.0064/kWh representing system loss overrecoveries; and the total amount of PhP57,215.67 equivalent to PhP0.0002/kWh representing lifeline cost over recoveries. On the other hand, ZAMECO II was directed to collect starting the next billing cycle from receipt of Decision until its full recovery the total amount of PhP9,710,425.29 equivalent to PhP0.0383/kWh representing generation cost underrecoveries, and the total amount of PhP1,241,461.60 equivalent to PhP0.0006/kWh representing inter-class cross subsidies under-recoveries. MASELCO was directed to refund starting the next billing cycle from receipt of Decision until its full refund, the total amount of PhP3,083,669.28 equivalent to PhP0.0093/kWh representing generation cost over-recoveries, and the total amount of PhP1,878,912.73 equivalent to PhP0.0538/kWh representing inter-class cross subsidies over-recoveries. On the other hand, MASELCO was directed to collect starting the next billing cycle from receipt of Decision until its full recovery the total amount of PhP98,862.75 equivalent to PhP0.0003/kWh representing system loss rate underrecoveries, and the total amount of PhP14,217,295.07 equivalent to PhP0.0694/kWh representing lifeline subsidy under-recoveries. 55 No. ERC Case Applicant No. (Date of Decision) 7 2011-041 First Laguna CF Electric Cooperative, Inc. (FLECO) (December 2011) 8 2011-044 CF 12, Central Pangasinan Electric Cooperative, Inc. (CENPELCO) (October 1, 2012) 9 2011-051 CF Ibaan Electric and Engineering Corporation (IEEC) (October 10, 2011) Date of Decision/ Details FLECO was directed to refund starting the next billing cycle from receipt of Decision until its full refund, the total amount of PhP321,133.22 equivalent to PhP0.0006/kWh representing generation cost over-recoveries; the total amount of PhP79,704,343.22 equivalent to PhP0.1431/kWh for residential, PhP0.1409/kWh for low voltage and PhP55.6462/kW for higher voltage representing transmission cost over-recoveries; the total amount of PhP9,564,124.75 equivalent to PhP0.0172/kWh representing lifeline subsidy over-recoveries; and the total amount of PhP5,801,281.15 equivalent to PhP0.0717/kWh representing inter-class cross subsidy over-recoveries. On the other hand, FLECO was directed to collect starting the next billing cycle from receipt of Decision until its full recovery the total amount of PhP16,314,074.75 equivalent to PhP0.0293/kWh representing system loss under-recoveries. CENPELCO was directed to refund starting the next billing cycle from receipt of Decision until its full refund, the total amount of PhP145,542,661.95 equivalent to PhP0.1502/kWh for residential, PhP0.1478/kWh for low voltage and PhP138.04/kW for higher voltage representing transmission cost over-recoveries; the total amount of PhP24,330,398.06 equivalent to PhP0.0268/kWh representing lifeline subsidy over-recoveries; the total amount of PhP53,109,337.67 equivalent to PhP0.1698/kWh representing inter-class cross subsidy over-recoveries; and the total amount of PhP1,613,302.12 equivalent to PhP0.0075/kWh for residential and PhP1.8607/kW for low/higher voltage, representing reinstated prompt payment discount over-recoveries. On the other hand, CENPELCO was directed to collect starting the next billing cycle from receipt of Decision until its full recovery the total amount of PhP21,436,972.93 equivalent to PhP0.0231/kWh representing generation cost underrecoveries; and the total amount of PhP44,837,279.12 equivalent to PhP0.0484/kWh representing system loss under-recoveries. IEEC was directed to refund starting the next billing cycle from receipt of Decision until its full refund, the total amount of PhP10,831,137.90 equivalent to PhP0.0783/kWh for residential, PhP0.0791/kWh for Commercial, PhP15.4078/kW for Industrial and PhP0.0789/kWh for streetlights representing transmission cost over-recoveries; and the total amount of PhP581,062.67 equivalent to PhP0.0042/kWh representing lifeline cost over recoveries. On the other hand, IEEC was 56 No. ERC Case Applicant No. (Date of Decision) 10 2011-053 CF Zambales I Electric Cooperative, Inc. (ZAMECO I) (October 1, 2012) 11 2011-055 CF Cagayan II Electric Cooperative, Inc. (CAGELCO II) (July 9, 2012) Date of Decision/ Details directed to collectstarting the next billing cycle from receipt of Decision until its full recovery the total amount of PhP673,190.19 equivalent to PhP0.0049/kWh representing generation cost under-recoveries; the total amount of PhP2,315,176.59 equivalent to PhP0.0168/kWh representing system loss under recoveries; and the total amount of PhP1,679,902.33 equivalent to PhP0.0278/kWh representing inter-class cross subsidies under-recoveries. ZAMECO I was directed to refund starting the next billing cycle from receipt of Decision until its full refund, the total amount of PhP59,245,711.99 equivalent to PhP0.2316/kWh for residential, PhP0.3414/kWh for low voltage and PhP65.7421/kW for higher voltage representing transmission cost over-recoveries; the total amount of PhP3,995,420.15 equivalent to PhP0.0175/kWh representing lifeline subsidy over-recoveries; the total amount of PhP1,275,052.34 equivalent to PhP0.0411/kWh representing inter-class cross subsidy over-recoveries; and the total amount of PhP3,421,301.76 equivalent to PhP0.0739/kWh representing reinstated prompt payment discount over-recoveries. On the other hand, ZAMECO I was directed to collect starting the next billing cycle from receipt of Decision until its full recovery the total amount of PhP8,033,453.24 equivalent to PhP0.0347/kWh representing generation cost underrecoveries; and the total amount of PhP7,631,949.09 equivalent to PhP0.0329/kWh representing system loss under-recoveries. CAGELCO II was directed to refund starting the next billing cycle from receipt of Decision until its full refund, the total amount of PhP19,977,018.72 equivalent to PhP0.0309/kWh for residential, PhP0.0309/kWh for low voltage and PhP10.9952/kW for high voltage representing transmission cost over-recoveries; the total amount of PhP5,799,631.54 equivalent to PhP0.0092/kWh representing lifeline subsidy over-recoveries; the total amount of PhP1,416,223.56 equivalent to PhP0.0307/kWh representing inter-class cross subsidy over recoveries; and the total amount of PhP581,790.09 equivalent to PhP0.0648/kWh for residential and low voltage, and PhP1.0024/kW for high voltage, representing reinstated prompt payment discount overrecoveries. On the other hand, CAGELCO II was directed to collect starting the next billing cycle from receipt of Decision until its full recovery the total amount of PhP17,522,511.13 equivalent to PhP0.0271/kWh representing generation cost 57 No. ERC Case Applicant No. (Date of Decision) 12 2011-063 CF Date of Decision/ Details under-recoveries; and the total amount of PhP5,204,393.38 equivalent to PhP0.0080/kWh representing system loss under-recoveries. Camiguin Electric CAMELCO was directed to collect starting the next billing Cooperative, Inc. cycle from receipt of Decision until its full recovery the (CAMELCO) Franchise Tax for the Province of Camiguin amounting to PhP191,982.24 at the rate of PhP0.0134/kWh for a period of (July 3, 2012) one year, and the Business Tax for the Municipality of Mambajao amounting to PhP339,984.18 at a rate of PhP0.0187/kWh for a period of two years. PERFORMANCE-BASED REGULATION The ERC, on 24 September 2012, approved the application filed by the National Grid Corporation of the Philippines (NGCP) for the Maximum Allowable Revenue (MAR) for the Calendar Year 2012 and Performance Incentive Scheme (PIS) Compliance in accordance with the Alternative Form of Rate Setting Methodology under the Rules for Setting Transmission Wheeling Rates (RTWR). The approved MAR amounted to PhP42,903.05 million while the approved PIS amounted to PhP503.12 million. Further, NGCP was directed to submit in subsequent application for approval of CY 2013 MAR an ancillary services availability register for each ancillary service for each grid. On 29 October 2012, the ERC approved the application of the following Distribution Utilities (DUs) for theRecalculated MAP for Regulatory Year 2013 and its translation into distribution rates of different customer classes for the 3 rd Regulatory Year of the ERCARR: ERC Case Distribution Utility MAP 2013 S FACTOR OVERNo. RECOVERY 2012-048 La Union Electric PhP1.5438/kWh PhP0.0039/kWh PhP0.0648/kWh RC Company (LUELCO) 2012-049 Cabanatuan Electric PhP1.6488/kWh PhP0.0263/kWh PhP0.0912/kWh RC Corporation (CELCOR) 2012-050 Tarlac Electric, PhP1.7305/kWh PhP0.0113/kWh PhP0.0434/kWh RC Incorporated (TEI) The ERC directed LUELCO, CELCOR and TEI to implement the detailed table (as provided in the Decision) of the approved distribution, supply and metering charges effective its next billing period. Similarly, on 19 December 2011 and 01 October 2012, the ERC decided on the application filed by Cagayan Electric Power and Light Company, Incorporated (CEPALCO) for its Maximum Average Price (MAP) and its translation into distribution, supply and metering charges for the different customer classes for 2012 and 2013, respectively. The ERC made permanent the provisional approval granted to CEPALCO 58 on August 22, 2011 on its application for MAP 2012 and its translation into rates. The overall reduction in CEPALCO's existing rate of PhP1.5705/kWh vis-a-vis its MAP2012 of PhP1.3467/kWh is Php0.2238/kWh. Meanwhile, the ERC approved CEPALCO's MAP2013 and its translation into distribution charges, with a total average rate of PhP1.2849/kWh. The ERC directed CEPALCO to implement the detailed table of approved rates effective its next billing period from receipt of the Decision. Likewise, on 23 April 2012, the ERC approved the application of Bohol Light Company, Incorporated (BLCI) and Clark Electric Distribution Corporation (CEDC) for the translation into distribution rates for the First Regulatory Year of the ERC-Approved Annual Revenue Requirement (ARR) for the Regulatory Period 2012-2015 and October 1, 2011 - September 30, 2015, respectively. The ERC directed BLCI and CEDC to implement the detailed table of the approved charges effective its next billing period from receipt of the Decision, with a total average rate of PhP1.0181/kWh for BLCI and PhP0.8527/kWh for CEDC. BLCI was also directed to implement a revised lifeline discount of 100% for 20kWh and below, 50% for 21-35kWh, 40% for 36-55kWh, 30% for 56-66kWh, and 20% for 66-75kWh; and a subsidy rate to non-lifeline customers at PhP0.0661/kWh. Eleven (11) other cases decided by the ERC in 2012 on the approval of the MAP and its translation into distribution rates for various regulatory years/ periods are detailed in a table below: No ERC Case No. Date of Decision November 14, 2011 1 2011-106 RC 2 2011-122 RC February 27, 2012 3 2011-124 RC 4 2011-173 RC December 19, 2011 March19, 2012 5 2011-176 RC June 11, 2012 6 2011-180 RC April 2, 2012 7 2012-051 RC October 29, 2013 Distribution Utility Dagupan Electric Corporation’s (DECORP) San Fernando Electric Light and Power Company, Incorporated (SFELAPCO) Angeles Electric Corporation (AEC) Cotabato Light and Power Company, Inc. (CLPC) Iligan Light and Power, Inc. (ILPI) Mactan Electric Company (MECO) Visayan Electric Company, Incorporated’s (VECO) 59 Regulatory Year First Regulatory Period 2011-2015 First 2012-2015 First 2012-2015 Fourth 2009-2013 Fourth 2010-2013 Fourth 2009-2013 Third 2011-2014 No ERC Case No. 8 2012-052 RC 9 2012-055 RC 10 2012-088 RC 11 2012-089 RC Date of Decision October 29, 2013 October 29, 2013 December 3, 2012 December 10, 2012 Distribution Utility Davao Light and Power Company, Incorporated (DLPC) Ibaan Electric and Engineering Corporation (IEEC) Bohol Light Company, Inc. (BLCI) Angeles Electric Corporation (AEC) Regulatory Year Third Regulatory Period July 1, 2010 June 30, 2014 Third 2010-2014 Second 2012-2015 Second 2012-2015 The ERC directed the Distribution Utilities listed above to implement the detailed table (included in the Decision) of the approved distribution, supply and metering charges effective the next billing period from receipt of the ERC Decision on their respective applications. RATE ADJUSTMENT On 19 December 2011, the ERC approved Romblon Electric Cooperative, Inc.’s (ROMELCO) petition for rate adjustment, granting ROMELCO a Total Revenue Requirement (TRR) amounting to PhP20,406,667.00 and an Overall Average Tariff Adjustment (OATA) amounting to PhP0.4663/kWh on its total distribution, supply and metering charges. Rate schedule per customer class as detailed in the Decision shall be effective on the next billing cycle from receipt of the Decision. Moreover, the ERC directed ROMELCO to implement a 25% lifeline discount to customers consuming 15 kWh and below, and 20% lifeline discount to customers consuming 16-20 kWh. Further, the Reinvestment Fund of PhP0.4431/kWh shall be part of the contribution from the member-consumers. RETAIL ELECTRICITY SUPPLIERS (RES) LICENSE The ERC issued a total of eleven (11) Retail Electricity Suppliers (RES) License in 2012 to the following entities: RES 1. 2. 3. 4. 5. 6. 7. Kratos RES, Inc. Team (Philippines) Energy Corp. Ecozone Power Management, Inc. DirectPower Services, Inc. PRISM Energy, Inc. GN Power Ltd. Adventenergy, Inc. 60 Date of Approval January 9, 2012 January 24, 2012 March 19, 2012 March 26, 2012 May 22, 2012 May 28, 2012 June 18, 2012 RES 8. Subic Enerzone Corporation (Local RES) 9. Bohol Light Company, Inc. (Local RES) 10. Aboitiz Energy Solutions, Inc. 11. Trans-Asia Oil and Energy Development Corporation RETIREMENT AND WITHDRAWAL FROM MACHINERIES AND OTHER PROPERTIES SERVICE Date of Approval July 24, 2012 October 5, 2012 October 29, 2012 November 19, 2012 OF EQUIPMENT, The ERC grantedManila Electric Company’s (MERALCO) petition to retire the Cavite, Lucena II, Pagbilao, Forbes Park and Tondo Substations and the withdrawal from the service of the equipment and machineries installed therein. The total cost of the retired assets amounting to PhP24,798,169.00 shall be subject to adjustment and optimization during reset process for the 4th Regulatory Period in accordance with the Rules for Setting Distribution Wheeling Rates (RDWR) and other pertinent issuances of the ERC. RULES FOR SETTING ELECTRIC COOPERATIVES’ WHEELING RATES (RSECWR) The ERC, in 2012, decided on two (2) applications for approval of an adjustment in rates under the RSEC-WR. On 17 October 2011, The ERC approved Cotabato Electric Cooperative, Inc.’s (COTELCO) proposed rate adjustment with a detailed Final Transition Rates Schedule for the following periods, effective its January 2011 to December 2013 billing period: (1) Start of transition from January 2011 to December 2011; (2) End of Year 1 from January 2012 to December 2012; and (3) End of transition from January 2013 to December 2013. On 12 March 2012, the ERC approved Pampanga III Electric Cooperative, Inc.’s (PELCO III) proposed rate adjustment and provided a detailed Final Transition Rates Schedule for the following periods, effective its January 2012 to December 2014 billing period: (1) Start of transition from January 2012 to December 2012; (2) End of Year 1 from January 2013 to December 2013; and (3) End of transition from January 2014 onwards. SALE OF SUBTRANSMISSION LINES/ ASSETS The ERC approved three (3) applications of the National Transmission Corporation (TRANSCO) for the sale of the following subtransmission assets: ERC Case No. 2009-174 Franchise Area Date of Decision Manila Electric March 6, 2012 Subtransmission Lines/ Assets 1. Makban-Los Baños 69kV Line 61 Agreed Purchase Price (in PhP) 84.945.335.09 ERC Case No. Franchise Area Date of Decision RC Company (MERALCO) 2009-036 MC Lima Utilities March 12, 2012 Corporation (LUC) Visayan March 12, 2012 Electric Company (VECO) 2010-159 RC Subtransmission Lines/ Assets Agreed Purchase Price (in PhP) 2. Makban-Calamba 69kV Line (structures 122 to 250) 3. Calamba-CSE 13.8kV Line 4. Los-Baños-Boy Scout of the Philippines 13.8kV Line 5. Los Baños-IRRI, ERDB, FPRDI 13.8kV Line 6. Calamba Substation Equipment 7. Los Baños Substation Equipment 8. Makban-Substation Termination Equipment Batangas-Lima Land 69kV Line 54,453,096.77 1. 100 MVA 138/69/13.8 kV, 3 125,775,969.00 Phase Transformer 2. Power Circuit Breakers 3. Potential Transformers 4. Switchbay 69kV Single CB Bay with 1 Breaker, Feeder 5. Switchbay 69kV Single CB Bay with 1 Breaker, Feeder Protection 6. Switchbay 69kV Single CB Bay with 1 Breaker, Transformer 7. Switchbay 69kV Single CB Bay with 1 Breaker, Transformer Protection 8. Switchbay 69kV Single CB Bay with 1 Breaker, b Coupler 9. Switchbay 69kV Single CB Bay with 1 Breaker, b Coupler Protection 10. Type 4 - 69kV Site Development SECURING LOANS Pangasinan I Electric Cooperative, Inc.’s (PANELCO I) application to secure a loan amounting to PhP13 million from the Bank of the Philippine Islands was approved by the ERC on 19 December 2011. This is to finance the implementation of its power 62 distribution expansion and rehabilitation projects, namely: (1) installation of a 10MVA substation in Dasol, Pangasinan; (2) rehabilitation of its Bolinao and Tara substations; and (3) construction and acquisition of transmission lines in its franchise area. The loan, as certified by BPI, shall be for a maximum term of 7 years with 1 year grace period on principal payments. PANELCO I shall repay the loan in equal quarterly installments of PhP2,825,000.00 commencing at the end of the 4th quarter from the initial drawdown. SUPPLY AGREEMENTS The ERC resolved, on 26 September 2011 and 03 October 2011, theapplication for approval of the Electric Power Purchase Agreement (EPPA) of Cebu Energy Development Corporation (CEDC) with Mactan Electric Company, Incorporated (MECO) and Bohol I Electric Cooperative, Incorporated (BOHECO I), respectively. Upon Commercial Operation Date (at 80% load factor), the rate shall be PhP5.9176/kWh with the following breakdown: Capital Recovery Fee Peso O&M Fee Dollar O&M Fee Fuel Cost MECO (in PhP/kWh) BOHECO 1 (in PhP/kWh) 2.7853 2.2282 0.3871 0.3434 0.4810 0.3688 2.2642 2.2642 For additional electric power in excess of 1,545,264,000/kWh per year, on the other hand, the approved O&M variable fee shall be PhP0.1685/kWh and fuel cost shall be computed based on a consumption rate of 0.70kg/kWh or actual, whichever is lower. On 22 August 2011, the ERC resolved the application for approval of the Contract for the Sale of Electricity (CSE) entered into by Masinloc Power Partners Company, Limited (MPPCL) with Dagupan Electric Corporation (DECORP) under ERC Case No. 2010-005 RC and the Supplemental Agreement to the CSEE under ERC Case No. 2010-092 RC. The ERC approved an average time of use generation rate of PhP2.5494/kWh, with the following components: PhP0.6619/kWh Capacity Recovery Charge; PhP0.4057/kWh Fixed O&M Charge; PhP0.0120/kWh Variable O&M Charge; and PhP1.4698/kWh Fuel Cost. The ERC allowed the indexation of Fuel to Fuel Cost Index and exchange rate provided that the actual cost is reflected, and also the Allowable Contract Reimbursable (ACR) and TRANSCO Service Charge (TSC) and Generation Service Charge (GSC). On the other hand, the ERC disallowed the use of coefficient factors, the step increases in the SoLO TOU, as well as the condition in the FXRo, particularly, when FXRn/FXRo, 1 shall be deemed to be 1.0000, to reflect the actual value of FXRo. Also, ERC clarified that the re-declaration of Bilateral Contract Quantities (BCQ) should have been until January 17, 2011 only, in congruence to DOE's directive to PEMC. Finally, the ERC directed MPPCL to refrain from entering into any contract for the 51.97 MW allocated for its in-house consumption as the same was not considered in the computation of its base rate. 63 On 26 December 2011, the ERC resolved the application for approval of CSEE filed by Batangas II Electric Cooperative, Inc. (BATELEC II) and Trans-Asia Oil and Energy Development Corporation (TA-OIL), and authorized TA-OIL to charge BATELEC II the approved National Power Corporation (NPC) Time-of-Use (TOU) rates for Luzon from the time it started supplying electricity to BATELEC. On 02 July 2012, the ERC resolved the application for approval of Electricity Supply Agreement (ESA) filed by Catanduanes Power Generation, Inc. (CPGI) and First Catanduanes Electric Cooperative, Inc. (FICELCO). The applicable base tariff that was approved consists of a non-fuel charge component, fuel oil charge and lube oil charge. The PhP2.0018/kWh non-fuel charge includes a capacity fee of PhP0.5471/kWh, Fixed Operations and Maintenance (O&M) of PhP0.8647/kWh subject to Philippine CPI adjustment at base index date of July 2003, and Variable O&M of PhP0.5900/kWh subject to adjustments in US CPI at base index of July 2003 and Philippine Peso-US Dollar foreign exchange adjustment at base date of July 2003. On the other hand, both the fuel oil and lube oil charges are pass through cost but limited to a fuel efficiency cap, to wit: (1) for load of up to 50%, a hear rate of 0.2680 li/kWh or actual, whichever is lower; and (2) for load of above 50%, a heat rate of 0.2604 or actual, whichever is lower. The above cap may be adjusted depending on the result of a capacity/fuel consumption test run to be conducted by an independent third party or the National Power Corporation- Small Power Utilities Group (NPC-SPUG). On 01 October 2012, the ERC resolved the application for approval of the ESA between Therma Marine, Inc. (TMI) and Zamboanga del Norte Electric Cooperative, Inc. (ZANECO). The ERC approved the following capacity fees (in PhP/kW/month) which shall not be subject to indexation but to true-up mechanism at the beginning of the following year: 379 for 2011; 360 for 2012; 342 for 2013; 323 for 2014; and 305 for 2015. Moreover, a Fixed O&M Fee and Energy Fee were approved in the amount of PhP239/kW/month and PhP0.1486/kWh, respectively, both subject to their respective indexation factor. On the other hand, the Fuel and Lube Oil Rate is a pass thru cost based on fuel consumption rates of 0.2358 liter/kWh or actual, whichever is lower for Heavy Fuel Oil and 0.0024 liter/kWh or actual, whichever is lower, for Lube Oil. The ERC approvedPalawan Power Generation, Inc.’s (PPGI)Amended Electricity Supply Agreement (ESA) with Palawan Electric Cooperative, Inc. (PALECO) on 01 October 2012 under ERC Case Nos. 2011-099 RC and 2011-102 RC. The amended ESA covers the change in the indexation of foreign Operations and Maintenance (O&M) Fee of Engines 1 and 2 imported from France from US Dollar to Euro and of Engines 3 and 4 imported from Japan from US Dollar to Japan Commodity Index and Philippine Peso-Yen Exchange Rate. The amendments also cover the removal of the associated Lube Oil Cost from the O&M Fee, which shall be charged as a separate item subject to an efficiency cap of 0.00291li/kWh or actual, whichever is lower for Engines 1 and 2, and 0.003165li/kWh or actual, whichever is lower for Engines 3 and 4.The amendments of the ESA have no direct impact on the generation rates 64 imposed on PALECO customers considering Palawan is within the area served by the NPC-SPUC and thus, they shall continue to be charged the approved Socialized Average Generation Rate (SAGR) of PhP5.6404/kWh plus the prevailing GRAM and ICERA charges and the difference between the True Cost Generation Rate (TCGR) of PPGI and the SAGR shall be collected from the UC-ME. On 16 July 2012, the ERC made permanent the provisional authority granted to Guimaras Electric Cooperative, Incorporated (GUIMELCO) and Trans-Asia Oil and Energy Development Corporation (TA-OIL) on the application for approval of the Amended ESA, subject to the conditions that in the event of any increase in fuel consumption due to fuel quality, deterioration of equipment or for any reasons, TA-OIL shall bear the cost while any savings on fuel consumption shall be passed on to GUIMELCO's member-consumers. Meanwhile, the ERC approved the application filed by Ilocos Norte Electric Cooperative, Inc. (INEC) and Northwind Power Development Corporation (NORTHWIND) for the approval of the Memorandum of Agreement (MOA) on the termination of the ESA and interconnection of the Burgos Substation of INEC. The termination of the ESA shall not be deemed a waiver or forfeiture of INEC and NORTHWIND's respective claims or rights which arose prior to the termination, and shall be without prejudice to the resolution of the motion for reconsideration filed by INEC on November 18, 2010. Moreover, no additional obligations shall be incurred except as provided in the said MOA. As a result of such termination, effective February 25, 2011, all NORTHWIND generation shall be deemed delivered to the grid. However, during the transition period from March 26, 2010 to February 25, 2011, the NPC Effective Rates shall be replaced by the rates of SMEC in the computation of the rates for Burgos Generation. Additionally, INEC is entitled to a Prompt Payment Discount (PPD) of 3% should it pay the bill in full within 10 days from receipt thereof. On the interconnection of INEC's Burgos Substation, the ERC directed INEC to construct the distribution line as soon as possible and the Interconnection Agreement shall terminate on the date INEC notifies NORTHWIND that such distribution line is commissioned into operation. The ERC decided the followingapplications relating to thePower Supply Agreements (PSAs) entered into by Manila Electric Company (MERALCO) with various generation companies, to wit: ERC Case No. ERC Case No. 2011-098 RC South Premiere Power Corporation (SPPC) Details A basic generation rate of PhP3.9429/kWh was approved, which was considered as an interim rate and applicable only until December 25, 2011. In case of extension beyond December 25, 2011, MERALCO shall file a separate application for approval and detailed cost evaluation by the Commission. Decision dated: December 12, 2011 ERC Case No. 2012-036 RC Approved Rates: 1. Annual Capacity Fee of US$276.39/kW/Yr Masinloc Power Partners Co., Ltd. 2. Annual Fixed O&M Fee of US$55.30/kW/Yr 65 ERC Case No. (MPPCL) Details 3. Annual Fixed O&M Fee of PhP1,285.63/kW/Yr 4. Variable O&M Fee of US$0.0002/kWh Decision dated: December 17, 2012 5. Variable O&M Fee of PhP0.05382/kWh 6. Pass through fuel cost 7. Guaranteed Net Plant Heat Rate of 10,300 Btu/kWh ERC Case No. 2012-087 RC Approved Capacity Fee in US$/kW-Month: 1. Year 1 - 7.663829 San Miguel Energy Corporation 2. Year 2 - 8.198146 (SMEC) 3. Year 3 - 9.74211 4. Year 4 - 10.128603 Decision dated: December 17, 2012 5. Year 5 - 10.357072 6. Year 6 - 10.594849 7. Year 7 - 10.842314 Approved Capacity Fee in PhP/kW-Month arethe following: 1. Year 1 - 658.478714 2. Year 2 - 697.650329 3. Year 3 - 821.344268 4. Year 4 - 837.802607 5. Year 5 - 855.032095 6. Year 6 - 872.198398 7. Year 7 - 890.474465 Annual Fixed O&M is set at PhP955.81/kW-Year while Variable O&M Fee (US$) is set at US$0.0015/kWh and US$0.0012/kWh from June 26, 2012 to December 25, 2009, and December 26, 2009 to October 25, 2024, respectively. Variable O&M Fee (PhP) is set at PhP0.0083/kWh from June 26, 2012 to October 25, 2024. ERC Case No. 2012-037 RC The approved fees are the following: 1. Annual Capacity Fee - PhP9,684.02/kW/Yr Sem-Calaca Power Corporation 2. Annual Fixed O&M Fee - PhP4,785.12/kW/Yr (SCPC) 3. Variable O&M Fee (US$) - PhP0.0162/kWh 4. Variable O&M Fee - PhP0.05382/kWh Decision dated: December 17, 2012 5. Pass through fuel cost 6. Guaranteed Net Plant Heat Rate of 10,500 Btu/kWh. ERC Case No. 2012-034 RC The approved Capacity Fees in US$ and PhP are detailed in the Decision from December 26, 2012 up to July 22, 2022. Annual South Premiere Power Corporation Fixed O&M Fee is set at PhP258.3875/kW/Yr while (SPPC) Administration Fee escalating is set at PhP84.745576271/kW/Yr. Further, energy payments (inclusive Decision dated: December 17, 2012 of start-up cost) based on energy declared at BCQ to the WESM and the applicable plant heat rate actually paid by PSALM to the IPP are pass through. 66 ERC Case No. ERC Case No. 2012-035 RC Therma Luzon, Inc. (TLI) Decision dated: December 17, 2012 Details The Capacity Fees in US$ and PhP are detailed in the Decision from December 26, 2011 up to December 26 2018 or until end of the contract. Annual Fixed O&M Fee is set at PhP444.47/kW/Yr. Meanwhile, Variable O&M (US$) for the first 75% utilization of the contract capacity is set at US$0.0020/kWh and US$0.0019/kWh in excess of the 75% utilization of contract capacity. Variable O&M Fee (PhP) is set at PhP0.0107. Other PSAs approved by the ERC in 2012 are the following: ERC Case No. 2009-140 RC 2010-140 RC 2011-138 RC Parties Sorsogon I Electric Cooperative, Inc. (SORECO I) and AP Renewables Incorporated (APRI) Ifugao Electric Cooperative, Inc. (IFELCO) and Provincial Government of Ifugao (PGI) South Cotabato II Electric Cooperative, Inc. (SOCOTECO II), and Sarangani Energy Corporation (SEC) Date of Decision December 19, 2011 July 30, 2012 July 30, 2012 67 Details of the Decision Time of Use (TOU) rates for the 1st year shall be 1% lower than the National Power Corporation (NPC) rates and 30% PhP-US$ escalation adjustment shall be adopted. TOU rates for the 2nd year shall be adjusted using the actual Philippine Consumer Price Index (CPI). The ERC approved a Total Generation Rate of PhP3.62/kWh effective the next billing period from receipt of the Decision, with the following components: Capital Recovery Fee (CRF) at PhP1.25/kWh; O&M Fee at PhP2.36/kWh; and Share to Host Communities (ER1-94) at PhP0.01/kWh. CRF proceeds shall be used for the major refurbishment and replacement of the Ambangal Mini-Hydro Power Plant (AMPP) while the unutilized portion of the CRF shall be allocated to the community. Upon commercial operation, Foreign Component of the CRF (in USD/kW/month) shall be 20.32 in Year 1, 23.33 in Year 2, and 28.69 in Years 3 & 4 and onwards. Local Component of the CRF (in PhP/kW/month) shall be 427.32 for Year 1, 490.56 for Years 2 & 3, and 603.37 for Year 4 and onwards. Fixed O&M Fee and Variable O&M Fee approved are333.23/kW/month and 0.3170/kWh, respectively, subject to adjustment based on economic indices provided in the PSA. Interconnection CRF isset at USD1.25/kW/month for the foreign component and PhP43.68/kW/month for the local ERC Case No. Parties Date of Decision Details of the Decision component. Fuel cost is a pass through cost subject to efficiency cap of 0.70kg/kWh plus 0.5% degradation factor or the actual fuel consumed, whichever is lower. Start-up cost per event shall be charged as follows: cold start-up at PhP4,208,906.51; warm-up start-up at PhP2,872,221.20; and hot start-up at PhP1,227,515.30. Commissioning Output Charge is computed at PhP0.3170/kWh variable O&M fee and the actual cost of fuel to be a pass through cost. Likewise, the ERC decided the application for approval of the Commissioning Power Sales Contract between Kepco SPC Power Corporation (KSPC) and the following distribution utilities, and approved a testing and commissioning rate of PhP2.3300/kWh, pre-commercial rate of PhP2.8729/kWh, and an adjustment formula which shall be (Kadj=1x(CFn/CFo): ERC Case No. 2010-085 RC 2010-125 RC 2010-130 RC 2010-141 RC 2011-012 RC 2011-020 RC 2011-024 RC Distribution Utility (DU) Negros Occidental Electric Cooperative, Inc. (NOCECO) Negros Oriental I Electric Cooperative, Inc. (NORECO I) VMC Rural Electric Service Cooperative, Inc. (VRESCO) Negros Oriental II Electric Cooperative, Inc. (NORECO II) Central Negros Electric Cooperative, Inc. (CENECO) Cebu II Electric Cooperative, Inc. (CEBECO II) Cebu I Electric Cooperative, Inc. (CEBECO I) Date of Decision September 05, 2011 October 10, 2011 October 03, 2011 October 10, 2011 August 22, 2011 September 26, 2011 September 26, 2011 The ERC, on 06 March 2012, approved the Memorandum of Agreement (MOA) for the Sale of Generated Power during Commissioning between Smith Bell Mini-Hydro Corporation (SBMHC) and Nueva Vizcaya Electric Cooperative, Inc. (NUVELCO). As such, SBMHC shall charge NUVELCO at the rate of PhP1.52/kWh from October 26, 2010 to December 26, 2010. From December 27, 2010 until the time it will qualify for the feed-in tariff (FIT), the interim rate to be applied by SBMHC for the sale of its generated power shall be PhP4.24/kWh, of which PhP2.72/kWh is for the Capital Recovery Rate and PhP1.52/kWh is for the Operational and Maintenance Rate. The variable component of the O&M shall be escalated or de-escalated annually by the Philippine Consumer Price Index (CPI). On the other hand, the PhP2 million annual payment of SBMHC for the utilization of the distribution lines of NUVELCO cannot be passed upon in the instant application, but should be subject of a separate application to be filed by SBMHC and NUVELCO. On 14 November 2011, the ERC made permanent the provisional authority issued on May 9, 2011, approving the Power Sector Assets and Liabilities Management Corporation’s (PSALM) Contracts to Supply Electric Energy (CSEE) and Letters of 68 Agreement (LOA) Entered Into with Distribution Utilities (DUs) Located in the Visayas Grid under ERC Case No. 2011-039 RC and 2011-021 RC. The ERC approved the CSEEs and LOAs with ANTECO, CEBECO I, CEBECO II, ILECO II, ILECO III, LEYECO III, LEYECO IV, LEYECO V, NOCECO, NORECO I, SAMELCO II and VRESCO, in varying amounts of average contracted energy as specified in the Decision for the contract duration from December 26, 2010 up to December 25, 2011. Likewise, the ERC approved the CSEEs and LOAs with BILECO, NORSAMELCO, SAMELCO I, VECO, CENECO, LEYECO I/DORELCO and LEYECO II, in varying amounts of average contracted energy as specified in the Decision for the contract duration from December 26, 2010 up to December 25, 2011, with only LEYECO II having a contract duration from November 26, 2010 up to December 25, 2011. The ERC also made permanent, on 24 January 2012, the provisional authority issued on May 9, 2011 to Power Sector Assets and Liabilities Management Corporation (PSALM), approving the CSEEs and LOAs with LASURECO and ZAMCELCO, in varying amounts of average contracted energy as specified in the Decision. TAX RECOVERY The ERC granted, on 27 February 2012,Manila Electric Company’s (MERALCO)application for recovery of Local Franchise Tax (LFT) for the 5 provinces and 14 cities under its franchise area, specifically the areas of Bulacan Province, Batangas Province, Cavite Province, Laguna Province, Rizal Province, San Jose Del Monte City, Batangas City, San Pablo City, Tagaytay City, Lucena City, Mandaluyong City, Marikina City, Quezon City, Caloocan City, Pasay City, Las Piñas City, City of Manila, Pasig City, and Calamba City. MERALCO was authorized to recover the LFT and impose the Tax Recovery Adjustment Charges (TRAC) as detailed in the Decision, and to reflect the Tax Recovery Adjustment Charges (TRAC) in customers' bills as a separate item. UNIVERSAL CHARGE (UC) The ERC, on 16 July 2012, approved the application of National Power Corporation (NPC) for the availment of the Environmental Charge/Share from the Universal Charge for the Rehabilitation and Management of Watershed Areas. The Power Sector Assets and Liabilities Management Corp. (PSALM) was authorized to release the amount of PhP58,829,083.10 to fund NPC's Watershed Management Program for 2007, and PhP100,554,854.56 for 2008. Disbursement and utilization, as directed by the ERC, shall be in accordance with the Rules and Procedures Governing the Utilization and Disbursement of the UC-EC. Meanwhile, on 30 July 2012, the ERC approved the petition of the National Power Corporation - Small Power Utilities Group (NPC-SPUG) for the recovery from the UC of the shortfalls in the Missionary Electrification (ME) Subsidy for CY 2003 to CY 2009under the True-Up Mechanism Pursuant to ERC Resolution No. 11, Series of 2005 69 and the corresponding adjustment of the UCME. As a result, PSALM was authorized to release the amount of PhP6,326,090,190.46 to NPC-SPUG and all distribution utilities and the National Grid Corporation of the Philippines (NGCP) were directed to collect from the consumers the UC-ME charge in the amount of PhP0.0709/kWh, on top of the existing UC-ME rate of PhP0.0454/kWh for a period of 17 months or until such time that the full amount shall have been collected, whichever comes earlier. This will start on the August 2012 billing period and shall be remitted to PSALM on or before the 15th day of the succeeding month. VIOLATION OF ERC RULES, REGULATIONS AND POLICIES The ERC, in line with its mandate under Section 43(i) of Republic Act No. 9136, decided thirty-three (33) violation cases filed against entities for violating the EPIRA and its IRR, and the rules and regulations promulgated by ERC, specifically, for: 1. Failure to renew their Certificates of Compliance (COCs) within the prescribed period and operating a generation facility without a valid COC; 2. Inclusion of Power Supply Contract Cost (PSC) in the Retail Rates Without Prior Approval from the Commission 3. Failure to Comply with ERC Resolution No. 16, Series of 2009, As Amended by ERC Resolution No. 21, Series of 2010; 4. Implementation of Unapproved Additional Rate; 5. Implementing Capital Projects Without Prior Approval from the Commission; 6. Failure to Submit Annual Report; 7. Violation of Chapter 3, Sections 3.2.3.3 and 3.2.3.4 of the Philippine Distribution Code (PDC) and Section 1.7.6 of the Distribution Services and Open Access Rules (DSOAR); 8. Failure to Implement the Inter-Class Cross-Subsidy Removal; 9. Failure to Furnish the Commission a Copy of the Written Notices dated November 4, 2009 and September 1, 2010 Denying Team (Philippines) Energy Corporation's (TPEC) Application as a WESM Member. Twenty-eight (28) out of the thirty-three (33) or 85% pertain to violations on COC renewal, PSC cost inclusions in the retail rates, non-compliance to Resolution No. 16, series of 2009, and non-submission of Annual Report. The following are the details of the violation cases decided per nature of violation: Failure to renew their COCs within the prescribed period and operating a generation facility without a valid COC No. 1 ERC Case No. 2011-013 MC Entity Date of Decision Action National Power Corporation Small Power Utilities Group (NPC-SPUG) and Catanduanes February 24, 2012 Approved Settlement 70 No. ERC Case No. 2 2011-037 MC 3 2011-047 MC 4 2011-054 MC 5 2011-055 MC 6 2011-056 MC 7 2011-057 MC 8 2011-058 MC 9 2011-061 MC 10 2011-081 MC 11 2012-014 MC 12 2012-016 MC Entity Power Generation, Inc. (CPGI) Panasia Energy Holdings, Inc. (Panasia) SPC Island Power Corporation (SIPC) SPC Power Corporation (SPC) Power Sector Assets and Liabilities Management Corporation (PSALM) Lubang Electric Cooperative, Inc. (LUBELCO) Oriental Mindoro Electric Cooperative, Inc. (ORMECO) Samar I Electric Cooperative, Inc. (SAMELCO I) SPC Island Power Corporation (SIPC) Southern Leyte Electric Cooperative, Inc. (SOLECO) Hastings Motor Corporation (HASTINGS) Monark Equipment Corporation (MONARK) Date of Decision Action March 21, 2012 Approved Settlement April 30, 2012 Closed and Terminated Closed and Terminated Approved Settlement April 2, 2012 February 8, 2012 January 24, 2012 January 24, 2012 April 2, 2012 December 20, 2011 March 21, 2012 Closed and Terminated Closed and Terminated Closed and Terminated Approved settlement December 11, 2012 Closed and Terminated Approved settlement July 19, 2012 Approved settlement Inclusion of PSC in the Retail Rates Without Prior Approval from the Commission No. 1 ERC Case No. 2011-042 MC 2 2012-004 MC 3 2012-005 MC 4 2012-022 MC 5 2012-023 MC 6 2012-029 MC 7 2012-031 MC Entity Date of Decision Central Negros Electric November 27, 2012 Cooperative, Inc. (CENECO) Sorsogon II Electric Cooperative, November 27, 2012 Inc. (SORECO II) Iloilo III Electric Cooperative, Inc. June 6, 2012 (ILECO III) Capiz Electric Cooperative, Inc. September 24, 2012 (CAPELCO) Batangas I Electric Cooperative, November 5, 2012 Inc. (BATELEC I) Pangasinan III Electric November 20, 2012 Cooperative, Inc. (PANELCO III) Nueva Ecija II Area-I Electric October 24, 2012 Cooperative, Inc. (NEECO II AREA I) 71 Action Approved settlement Approved settlement Approved settlement Approved settlement Approved settlement Approved settlement Approved settlement No. 8 ERC Case No. 2012-061 MC Entity Ilocos Sur Electric Cooperative, Inc. (ISECO) Date of Decision Action December 7, 2012 Approved settlement Failure to Comply with ERC Resolution No. 16, Series of 2009, As Amended by ERC Resolution No. 21, Series of 2010 No. ERC Case Entity No. 1 2012-041 MC Leyte II Electric Cooperative, Inc. (LEYECO II) 2 2011-072 MC San Jose City Electric Cooperative, Inc. (SAJELCO) 3 2011-077 MC Isabela II Electric Cooperative, Inc. (ISELCO II) Date of Decision Action October 24, 2012 Approved settlement October 2, 2012 Approved settlement March 5, 2012 Approved Settlement Implementation of Unapproved Additional Rate No. 1 ERC Case No. 2012-020 MC Entity Date of Decision Pangasinan I Electric September 10, 2012 Cooperative, Inc. (PANELCO I) Action Approved settlement Implementing Capital Projects Without Prior Approval from the Commission No. 1 ERC Case No. 2011-010 MC Entity Date of Decision San Fernando Electric Light and January 24, 2012 Power Company, Inc. (SFELAPCO) Action Closed and Terminated Failure to Submit Annual Report No. 1 2 3 4 5 ERC Case No. 2011-014 MC Entity Date of Decision Action Ticao Island Electric Cooperative, Inc. (TISELCO) Maguindanao Electric Cooperative, Inc. (MAGELCO) South Cotabato II Electric Cooperative, Inc. (SOCOTECO II) Misamis Oriental I Electric Cooperative, Inc. (MORESCO I) Romblon Electric Cooperative, July 9, 2012 July 10, 2012 Closed and Terminated Reprimanded July 20, 2012 Reprimanded November 15, 2012 Exonerated November 5, 2012 Reprimanded 72 Inc. (ROMELCO) Violation of Chapter 3, Sections 3.2.3.3 and 3.2.3.4 of the Philippine Distribution Code (PDC) and Section 1.7.6 of the Distribution Services and Open Access Rules (DSOAR) No. 1 ERC Case No. 2012-009 MC Entity Date of Decision Action La Union Electric Cooperative, Inc. (LUELCO) October 1, 2012 Exonerated Failure to Implement the Inter-Class Cross-Subsidy Removal No. 1 ERC Case No. 2007-474 MC Entity Date of Decision Action Quezon II Electric Cooperative, Inc. (QUEZELCO II) July 10, 2012 Reprimanded Failure to Furnish the Commission a Copy of the Written Notices dated November 4, 2009 and September 1, 2010 Denying Team (Philippines) Energy Corporation's (TPEC) Application as a WESM Member No. 1 ERC Case No. 2011-015 MC Entity Philippine Electricity Market Corporation (PEMC) Date of Decision Action September 19, 2011 Reprimanded PEMC was directed to amend the WESM Rules so that in all circumstances, ERC shall be furnished a copy of the denial of an application for membership in the WESM. Further, the ERC enjoined PEMC and TPEC to resolve TPEC's application within a period of 6 months from receipt of the Decision. CONSUMER AFFAIRS The ERC received a total of 510 letter-complaints from electricity consumers directed against various DUs. As part of its mandate to promote and protect the electricity consumers’ interests, the ERC acted on these complaints and mediated between these 73 complainants and the DUs they were complaining against. Through this mediation process, a huge number of these letter-complaints, including those filed in the previous years were resolved and/or amicably settled to the satisfaction of the complainants. Throughout this process, the ERC issued 3,855 Letters, 2,121 Orders, and conducted 1,802 conferences in 2012. For some of those unresolved complaints, the complainants invoked the ERC’s jurisdiction by filing their formal complaints. Several of these complaints were also eventually amicably settled, while some of those that were not were resolved by the ERC based on the evidences submitted by the parties. Below is the Summary of the Filed and Resolved Consumers Complaints for Mediation and Arbitration. Old (Prior to 2012) January February March April May June July August September October November December Subtotal for 2012 TOTAL Filed 8,379 Resolved 6,036 Letters Orders 64 58 39 27 44 28 63 41 21 52 45 28 90 97 115 55 106 68 63 41 21 68 51 26 435 393 501 418 385 302 341 183 280 315 172 130 236 202 226 141 210 172 189 188 162 152 132 111 510 8,889 801 6,837 3,855 3,855 2,121 2,121 CHALLENGES AHEAD ERC’S STRATEGIC PLANS FOR 2013 The ERC formulated its strategic plans for 2013.These strategic plans are translated into specific and measureable targets. The systems and procedures needed in 2013 are likewise drawn up. Among the major targets lined up for 2013are the Finalization of the 74 FIT-All Payment and Collection Guidelines/Renewable Energy Payment Agreement (REPA) Template, Regulatory Support for the Interim Market for Energy in Mindanao, and the Issuance of Rules to address other transition issues in the implementation of Retail Competition and Open Access. PRIORITY AREAS ENHANCED REGULATION ENHANCED MARKET COMPETITION EFFECTIVE MONITORING PROMOTION OF CONSUMER INTEREST BUILD TECHNICALLY COMPETENT PEOPLE SYSTEMS &PROCEDURES 2013 Review and enhance Rules on Consumer Service Policy Improve Procedure in Handling Consumer Complaints Review and revise the RSEC-WR & RDWR-RT Finalize FIT-All Payment & Collection Guidelines/ REPA Template Finalize Net Metering Interconnection Guidelines Draft and finalize Rulesfor the Review &Evaluation of Power Supply Agreement Provide Regulatory Support for Interim Market for Energy in Mindanao Draft and finalize Rules to address other transition issues in the implementation of Retail Competition & Open Access Accomplish deliverables/pre-conditions for Retail Competition & Open Access Draw up roadmap for more Effective Market Monitoring Enhance Monitoring Tools & Manuals Intensify Contestable Consumer Awareness Campaign Inform and Educate the Public through the Use of TriMedia Draw up and propose a New Organizational Structure Develop Compensation & Benefits Scheme Refine and implement the PBB Scheme Conduct a comprehensive Training Needs Assessment and develop a Training Plan Improve Process Flow on Disposition of Cases Conduct an Agency-wide Inventory of all Records Develop the Records Disposition Systemand Executive Information System (Electricity Rates) The strategic plans listed above are supported by second level plans. These plans detail all the tasks to be carried out by each Service/Division/Unit. The implementation 75 of these plans shall be strictly monitored using a Monitoring and Evaluation System approved by the ERC. COMPETITIVE RETAIL ELECTRICITY MARKET (CREM) In the preparation for the implementation of the Open Access and Retail Competition Regime (OARC) in the islands of Luzon and the Visayas, the ERC needs to ensure the smooth transition of the entire electric power industry to a more competitive environment as well as to promote the interests of all the stakeholders in the said industry. A six (6) month transition period starting December 26, 2012 until June 25, 2013 will be implemented to give retail electricity market participants a sufficient amount of time to evaluate, plan and contract for supply of electricity. During this period, distribution utilities (DUs) shall continue to provide supply of electricity to contestable customers operating in their franchise areas. The ERC anticipates that several implementation issues may be encountered once retail competition is implemented. The ERC is preparing to address all these issues by coming out with regulations to ensure the smooth transition to this new environment and the protection of the interests of both the Captive and Contestable Customers. INTERIM MINDANAO ELECTRICITY MARKET (IMEM) The Interim Mindanao Electricity Market was mandated under the DOE Circular No. 2013-01-0001 to address the power situation in the Mindanao region. The IMEM is a venue forthe transparent and efficient utilization of all available capacities in Mindanao grid to meet the supply deficiency in the region. It aims to encourage all embedded generators in the grid to participate in the market and also to draw out voluntary load customers who are willing to curtail their load to lower the demand in the system. The Energy Regulatory Commission (ERC) is cognizant of its critical role in ensuring the establishment of the IMEM and the realization of its objectives. It is committed to effectively discharge this role by expediting its evaluation and action on all the necessary regulatory filings to be made as precondition to the establishment and operation of the IMEM. RENEWABLE ENERGY (RE) Net Metering for RE is an incentive mechanism that encourages end-users to participate in renewable electricity generation. All end-userscan put up and invest in RE systems and sell excess electricity to the grid. The ERC, in consultation with the National Renewable Regulatory Board (NREB), is tasked to put up rules and pricing methodology for the program. 76 The ERC’s work as regards the FIT System is not yet complete. Although the ERC approved in 2012 the initial Feed-In Tariff (FIT) rates for wind, biomass, solar and hydro renewable energy resources, it has yet to set the FIT rate for ocean generated electricity. This will depend on the availability of sufficient data to be used as basis for its initial FIT rate. To finally implement the FIT System, the ERC will have to already finalize the remaining rules and guidelines that will complement the FIT Rules it earlier issued and work on setting the FIT Allowance. The ERC is optimistic that this will be accomplished soon. FINANCIAL HIGHLIGHTS Balance Sheet December 31, 2012 Source: 2012 ERC Unaudited Financial Statements (Pending COA’s ERC Annual Audit Report) ASSETS Current Assets Cash Cash on Hand Cash in Banks Receivables Accounts Receivables Inter-Agency Receivables Other Receivables Inventories Office Supplies Inventory Accountable Forms Inventory Spare Parts Inventory Prepayments Prepaid Rent Prepaid Insurance Other Prepaid Expenses Other Current Assets Total Current Assets 220,308.00 325,429.04 545,737.04 96,021.50 1,710,605.38 100,571.94 1,907,198.82 1,881,282.08 166,201.78 9,630.00 2,057,113.86 1,000.00 385,691.47 106,490.28 493,181.75 37,620.00 5,040,851.47 Property, Plant and Equipment Leasehold Improvements, Buildings Office Equipment Furniture and Fixtures IT Equipment and Software Library Books Communication Equipment Medical, Dental and Laboratory Equipment 5,094,692.50 1,784,232.08 13,777,977.41 60,338,852.69 92,964.21 3,394,681.02 28,900.00 77 Technical and Scientific Equipment Transportation Equipment Other Property, Plant and Equipment Total Property, Plant and Equipment Less: Accumulated Depreciation Property, Plant and Equipment (Net) 44,984,658.18 14,274,016.05 13,685,779.74 157,456,753.88 76,497,316.60 80,959,437.28 Other Assets 446,877.35 TOTAL ASSETS 86,447,166.10 LIABILITIES Current Liabilities Accounts Payable Due to Officers and Employees Due to BIR Due to GSIS Due to PAG-IBIG Due to PHILHEALTH Performance/Bidders/Bail Bonds Payable Other Payables 5,214,452.64 493,573.79 408,631.65 29,368.71 4,525.37 750.00 529,090.00 436,637.89 TOTAL LIABILITIES 7,117,030.05 EQUITY Government Equity 79,330,136.05 TOTAL EQUITY 79,330,136.05 TOTAL LIABILITIES AND EQUITY 86,447,166.10 78 2012 ERC REVENUE RESOURCES The ERC’s revenue collection for 2012 amounted to PhP1.042 billion. This was 112% higher than the projected 2012 income of PhP492.855 million. The details are as follows: 1. 2. 3. 4. 5. Total NATURE OF INCOME Permits and Licenses Meter Testing Fees and Meter Type Approval Supervision Fees Fines and Penalties Other Income COLLECTION (PhP) 284,553,413.46 42,211,708.09 710,871,935.47 4,069,347.89 897,421.95 1,042,603,826.86 The bulk of the 2012 collection came from the supervision fees, in the amount of PhP710,871,935.47 or 68.18% of the total income, while the permits and licenses accounted for 27.29% of the total 2012 income. The remaining income generated by the ERC came from meter testing fees and meter type approval (4.05%), fines and penalties (0.39%) and other general income (0.09%). See pie chart below for comparison: BREAKDOWN OF 2012 ERC INCOME 79 Supervision Fees PhP710,871,935.47 (68.18%) Fines and Penalties PhP4,069,347.89 (0.39%) Permits and Licenses PhP284,553,413.46 (27.29%) Meter Testing Fees & Meter Type Approval PhP42,211,708.09 (4.05%) Other Income PhP897,421.95 (0.09%) 2012 BUDGET APPROPRIATIONS The 2012 ERC approved budget was PhP213.717 million. PhP143.026 million or 66.92% of which was for Personnel Services (PS), PhP70.191 million or 32.84% was for Maintenance & Other Operating Expenses (MOOE) and the remaining PhP.5 million or .23% was for Capital Outlay (CO). CO 0.23% MOOE 32.84% PS 66.92% 2012 REVENUE VS. BUDGET 80 The 2012 approved budget was only 20% of the total revenue collection of ERC. The graph below shows the difference between ERC’s 2012 budget and revenue: 1,200,000.00 1,000,000.00 800,000.00 600,000.00 400,000.00 200,000.00 Budget Revenue 2011 AND 2012 COMPARISON OF BUDGETS AND REVENUES ERC’s 2012 budget of PhP213.717 million is only 3.7% higher than the 2011 budget of PhP206.170 million and the ERC’s 2011 and 2012 budget are only 20% of ERC’s actual revenues for both years. This clearly indicates that the ERC generates revenue for the government. 1,200,000.00 1,000,000.00 800,000.00 Budget 600,000.00 Revenue 400,000.00 200,000.00 2011 2012 81 82 83 Annex 1 STATUS OF 393 CASES FILED IN 2012 No. Case No. Case Title 1 2012-001 CC 2 2012-002 CC 3 2012-003 CC 4 2012-004 CC 5 2012-005 CC 6 2012-006 CC 7 2012-007 CC 8 2012-008 CC 9 2012-009 CC 10 2012-010-CC 11 2012-011-CC 12 2012-012-CC 13 2012-013-CC 14 2012-014-CC 15 2012-015-CC Atty. Bernardo Q. Cuaresma vs. Manila Electric Company (MERALCO) Antardhana Holdings Corporation / Jade Vincent R. Yupangco vs. Manila Electric Company (MERALCO) Oddball A. Paulino vs. Manila Electric Company (MERALCO) Darryl Briones Ong vs. Manila Electric Company (MERALCO) Darryl Briones Ong vs. Manila Electric Company (MERALCO) Spouses Jerry S. Batang & Mildred T. Batang vs. Manila Electric Company (MERALCO) Amalia C. Cailian vs. Manila Electric Company (MERALCO) Sps. Alfredo M. Manalili and Gloria A. Manalili vs. Pampanga III Electric Cooperative, Inc. (PELCO III) Jay S. Gutierrez vs. Manila Electric Company (MERALCO) Homer Flores vs. Manila Electric Company (MERALCO) Elmer A. Mendoza vs. Manila Electric Company (MERALCO) Conrado G. Fernandez / Maria Angela J. Fernandez vs. Manila Electric Company (MERALCO) Gloria Dela Cruz vs. Manila Electric Company (MERALCO) Consuelo M. Inocencio vs. Manila Electric Company (MERALCO) Beatriz D. Ignacio represented by Adelaida G. Ignacio vs. Manila Electric Company (MERALCO) 84 Applicant/ Complainant/ Respondent/ Petitioner Atty. Bernardo Q. Cuaresma Antardhana Holdings Corporation / Jade Vincent R. Yupangco Oddball A. Paulino Status On-going On-going On-going Darryl Briones Ong On-going Darryl Briones Ong On-going Spouses Jerry S. Batang & Mildred T. Batang Amalia C. Cailian On-going Sps. Alfredo M. Manalili and Gloria A. Manalili Jay S. Gutierrez On-going Homer Flores On-going Elmer A. Mendoza On-going Conrado G. Fernandez / Maria Angela J. Fernandez Gloria Dela Cruz On-going Consuelo M. Inocencio On-going Beatriz D. Ignacio represented by Adelaida G. Ignacio On-going On-going On-going On-going No. Case No. 16 2012-016-CC 17 2012-017-CC 18 2012-018-CC 19 2012-019-CC 20 2012-020-CC 21 2012-021-CC 22 2012-022-CC 23 2012-023-CC 24 2012-024-CC 25 2012-025-CC 26 2012-026-CC 27 2012-027-CC 28 2012-028-CC 29 2012-029-CC 30 2012-030-CC 31 2012-031-CC 32 2012-032-CC Applicant/ Complainant/ Case Title Respondent/ Petitioner Atty. Rodolfo U. Jimenez vs. Manila Atty. Rodolfo U. Electric Company (MERALCO) Jimenez Jesus Trajano Loreto vs. Manila Jesus Trajano Loreto Electric Company (MERALCO) Juanito Lopez vs. Manila Electric Juanito Lopez Company (MERALCO) Larry Ang vs. Manila Electric Larry Ang Company (MERALCO) Mega Asia Bottling Corporation vs. Mega Asia Bottling San Fernando Electric Light and Corporation Power Company, Inc. (SFELAPCO), Fe Varona and Jose T. Lazatin Vilma P. Austero vs. Manila Electric Vilma P. Austero Company (MERALCO) Inocencia Villanueva vs. Manila Inocencia Villanueva Electric Company (MERALCO) Ma. Angelica Aquino-Kabasakalli vs. Ma. Angelica AquinoPioneer Highlands South Kabasakalli Condominium Corp. and Manila Electric Company (MERALCO) Delfin Sulit, Jr. vs. Manila Electric Delfin Sulit, Jr. Company (MERALCO) Romulo O. Pabilonia vs. Manila Romulo O. Pabilonia Electric Company (MERALCO) Emiliano M. Quiday, Jr. vs. Manila Emiliano M. Quiday, Electric Company (MERALCO) Jr. LBC Properties, Inc. / Josie S. LBC Properties, Inc. / Maceren vs. Manila Electric Company Josie S. Maceren (MERALCO) Estrella B. Mejarito vs. Manila Electric Estrella B. Mejarito Company (MERALCO) Teresita C. Buluran daugther of Teresita C. Buluran Prudencia B. Caluag (deceased) vs. daugther of Prudencia Manila Electric Company (MERALCO) B. Caluag (deceased) Teresita C. Buluran vs. Manila Electric Teresita C. Buluran Company (MERALCO) Lucia R. Valdez vs. Manila Electric Lucia R. Valdez Company (MERALCO) Spouses Michael S. Santiago and Spouses Michael S. Jennifer B. Santiago vs. Manila Santiago and Jennifer Electric Company (MERALCO) B. Santiago 85 Status On-going On-going On-going On-going On-going On-going On-going On-going On-going On-going On-going On-going On-going On-going On-going On-going On-going No. Case No. Case Title 33 2012-033-CC 34 2012-034-CC 35 2012-035-CC 36 2012-036-CC 37 2012-037-CC 38 2012-038-CC 39 2012-039-CC 40 2012-040-CC 41 2012-041-CC 42 2012-042-CC 43 2012-043-CC 44 2012-044-CC 45 2012-045-CC 46 2012-046-CC 47 2012-047-CC 48 2012-048-CC 49 2012-049-CC Emerencia S. Ocampo vs. Manila Electric Company (MERALCO) Bernardo S. De Vera vs. Manila Electric Company (MERALCO) Carmie Yeung and Emilia T. Chua vs. Manila Electric Company (MERALCO) Lolida O. Manuel vs. Manila Electric Company (MERALCO) Joezer B. Bolalin vs. Manila Electric Company (MERALCO) James Francis Anthony S. Garcia vs. VMC Rural Electric Services Cooperative, Inc. (VRESCO) Jane Tiamson vs. Manila Electric Company (MERALCO) Intercon Garments, Inc. vs. Manila Electric Company (MERALCO) Adoracion Fernandez vs. Manila Electric Company (MERALCO) Jose Ong represented by Carlos Acuesta vs. Manila Electric Company (MERALCO) Danilo G. Pulongbarit vs. Manila Electric Company (MERALCO) represented by Cecilio C. Javier, Squad Leader, Valenzuela NMS Edita B. Cabaña vs. Manila Electric Company (MERALCO) Jose Y. Encarnacion, Jr. vs. Manila Electric Company (MERALCO) Harold B. Silva vs. Manila Electric Company (MERALCO) Illumina Learning Institution, Inc. vs. Manila Electric Company (MERALCO) Noel Florento vs. Manila Electric Company (MERALCO) Gencars Legaspi, Inc. vs. Albay Electric Cooperative, Inc. (ALECO) 86 Applicant/ Complainant/ Respondent/ Petitioner Emerencia S. Ocampo On-going Bernardo S. De Vera On-going Carmie Yeung and Emilia T. Chua Lolida O. Manuel On-going Joezer B. Bolalin On-going James Francis Anthony S. Garcia On-going Jane Tiamson On-going Intercon Garments, Inc. Adoracion Fernandez On-going Jose Ong represented by Carlos Acuesta On-going Danilo G. Pulongbarit On-going Edita B. Cabaña On-going Jose Y. Encarnacion, Jr. Harold B. Silva On-going Illumina Learning Institution, Inc. Noel Florento On-going Gencars Legaspi, Inc. On-going Status On-going On-going On-going On-going No. Case No. Case Title 50 2012-050-CC Alpha Grandview Condominium Corporation represented by Roberto Abad vs. Manila Electric Company (MERALCO) 51 2012-051-CC 52 2012-052-CC 53 2012-053-CC 54 2012-054-CC 55 2012-055-CC 56 2012-056-CC 57 2012-057-CC 58 2012-058-CC 59 2012-059-CC 60 2012-060-CC Amando Tetangco vs. Meralco Electric Company (MERALCO) - Tutuban Business Center Wilfredo H. Calma vs. Manila Electric Company (MERALCO) Gloria D. Gutierrez vs. Manila Electric Company (MERALCO) Regner Santos Neri vs. Manila Electric Company (MERALCO) Roger T. Manaog vs. Manila Electric Company (MERALCO) Edilberto A. Camillo vs. Manila Electric Company (MERALCO) Edita R. Villafuerte vs. Meralco Electric Company (MERALCO) and Lea Sta. Maria and Carmen Magnial Ricardo G. Zaldua vs. Manila Electric Company (MERALCO) Manuel V. De Veyra/Juanito T. De Veyra vs. Manila Electric Company (MERALCO) Manuel A. Alejandro vs. "John Doe" Dalupang Branch Manager, Isabela II Electric Cooperative, Inc. (ISELCO II), Gami Branch, "Richard Doe", Institution Manager, ISELCO II, "Peter DOE, Siquian, ISELCO II, Atty. Arlan A. Castañeda, ISELCO II legal Counsel and/or Ms. Joan Macaro 61 2012-061-CC 62 2012-062-CC Applicant/ Complainant/ Respondent/ Petitioner Alpha Grandview Condominium Corporation represented by Roberto Abad Amando Tetangco On-going On-going Wilfredo H. Calma On-going Gloria D. Gutierrez On-going Regner Santos Neri On-going Roger T. Manaog On-going Edilberto A. Camillo On-going Edita R. Villafuerte On-going Ricardo G. Zaldua On-going Manuel V. De Veyra/Juanito T. De Veyra Manuel A. Alejandro On-going Myrla P. Nicandro vs. Manila Electric Myrla P. Nicandro Company (MERALCO) Victor V. Bonus vs. Manila Electric Victor V. Bonus Company (MERALCO) 87 Status On-going On-going On-going No. Case No. Case Title 63 2012-063-CC LSD Construction Corporation / Crescenciano M. Pitogo vs. Visayan Electric Company, Inc. (VECO) 64 2012-064-CC 65 2012-065-CC 66 2012-066-CC 67 2012-067-CC 68 2012-068-CC 69 2012-069-CC 70 2012-070-CC 71 2012-071-CC Ramon S. Mercurio/Margareth B. Mercurio vs. Manila Electric Company (MERALCO) Araceli Cabangis vs. Manila Electric Company (MERALCO) Marlon L. Castañeda vs. Manila Electric Company (MERALCO) Romulo M. Abancio, Jr. vs. VMC Rural Electric Services Cooperative, Inc. (VRESCO) Gary Cooper D. Cunanan vs. Manila Electric Company (MERALCO) Noel V. Binuya vs. Manila Electric Company (MERALCO) Elenita M. Mamporte vs. Manila Electric Company (MERALCO) Heirs of Pablito V. Mendoza, Sr. represented by their AIF Gertrudes C. Lopez vs. Manila Electric Company (MERALCO) 72 2012-072-CC 73 2012-073-CC 74 2012-074-CC 75 2012-075-CC 76 2012-076-CC 77 2012-077-CC Applicant/ Complainant/ Respondent/ Petitioner LSD Construction Corporation / Crescenciano M. Pitogo Ramon S. Mercurio/Margareth B. Mercurio Araceli Cabangis On-going On-going On-going Marlon L. Castañeda On-going Romulo M. Abancio, Jr. On-going Gary Cooper D. Cunanan Noel V. Binuya On-going Elenita M. Mamporte On-going Heirs of Pablito V. Mendoza, Sr. represented by their AIF Gertrudes C. Lopez Ma. Victoria Frialde vs. Manila Electric Ma. Victoria Frialde Company (MERALCO) Luciano Sarne, Jr. vs. Manila Electric Luciano Sarne, Jr. Company (MERALCO) Ricky Co Ongchan vs. Manila Electric Ricky Co Ongchan Company (MERALCO) Concordio D. Ponce/Alberto C. Ponce Concordio D. vs. Manila Electric Company Ponce/Alberto C. (MERALCO) Ponce Anatolia J. Madronero vs. Manila Anatolia J. Madronero Electric Company (MERALCO) Raul R. Balagot / Mario H. Balagot vs. Raul R. Balagot / Manila Electric Company (MERALCO) Mario H. Balagot 88 Status On-going On-going On-going On-going On-going On-going On-going On-going No. Case No. Case Title 78 2012-078-CC Sr. Sto. Niño De Cebu Resources and Development Corporation represented by its President Guillermo C. Uy, Jr. vs. Manila Electric Company (MERALCO) 79 2012-079-CC 80 2012-080-CC 81 2012-081-CC 82 2012-082-CC 83 2012-083-CC Richie Trinidad F. De Guia vs. Manila Electric Company (MERALCO) Luz Ignacio vs. Manila Electric Company (MERALCO) Emilia U. Calaunan vs. Manila Electric Company (MERALCO) Amelia J. Capili vs. Manila Electric Company (MERALCO) Arthur S. Remigio herein represented by his Attorney-In-Fact Añonuevo S. Remigio, Anna Lyn T. Remigio, Aileen Jade T. Remigio and Aimee Lou T. Remigio vs. Manila Electric Company (MERALCO), Mr. Manolo M. Torres Head, Kamuning Business Center 84 2012-084-CC 85 2012-085-CC 86 2012-086-CC 87 2012-087-CC 88 2012-088-CC 89 2012-089-CC 90 2012-090-CC 91 2012-091-CC Stella Dela Cruz vs. Manila Electric Company (MERALCO) Meynardo U. Palma vs. Manila Electric Company (MERALCO) Anastacio G. Mañago, Jr. vs. Manila Electric Company (MERALCO) Araceli V. Tolentino vs. Manila Electric Company (MERALCO) Vicente H. Reyes vs. Manila Electric Company (MERALCO) Manuel R. Padilla vs. Manila Electric Company (MERALCO) Placido Policarpio vs. Manila Electric Company (MERALCO) Magdalena D. Melendres vs. Manila Electric Company (MERALCO) 89 Applicant/ Complainant/ Respondent/ Petitioner Sr. Sto. Niño De Cebu Resources and Development Corporation represented by its President Guillermo C. Uy, Jr. Richie Trinidad F. De Guia Luz Ignacio Status On-going On-going On-going Emilia U. Calaunan On-going Amelia J. Capili On-going Arthur S. Remigio herein represented by his Attorney-In-Fact Añonuevo S. Remigio, Anna Lyn T. Remigio, Aileen Jade T. Remigio and Aimee Lou T. Remigio On-going Stella Dela Cruz On-going Meynardo U. Palma On-going Anastacio G. Mañago, Jr. Araceli V. Tolentino On-going Vicente H. Reyes On-going Manuel R. Padilla On-going Placido Policarpio On-going Magdalena D. Melendres On-going On-going No. Case No. Case Title 92 2012-092-CC Barangay Subic (Baliuag, Bulacan) Rep. By its Barangay Chairman, Enrico Buenaventura vs. Manila Electric Company (MERALCO) 93 2012-093-CC 94 2012-094-CC 95 2012-095-CC 96 2012-096-CC 97 2012-097-CC 98 2012-098-CC 99 2012-099-CC 100 2012-100-CC 101 2012-101-CC 102 2012-102-CC 103 2012-103-CC 104 2012-104-CC 105 2012-105-CC 106 2012-106-CC Rolando V. San Miguel vs. Manila Electric Company (MERALCO) Elizabeth C. Polintan vs. Manila Electric Company (MERALCO) Pepito B. Santiago vs. Manila Electric Company (MERALCO) Rizaldy T. Villanueva vs. Manila Electric Company (MERALCO) Dr. Omar T. Cortes vs. Manila Electric Company (MERALCO) Carlito V. Lacuayan vs. Manila Electric Company (MERALCO) Dolores D. Carpio vs. Manila Electric Company (MERALCO) Antonio Atendido Tan vs. Ilocos Norte Electric Cooperative, Inc. (INEC) employees named as: Renato Balintec - General Manager, Rosita Bumanlag Finance Manager, Manuel Flore - Rate Specialist and Assct. RCO and Lindbergh Castillo - Regulatory Compliance Officer (RCO) Eugene C. Tan vs. Manila Electric Company (MERALCO) Felicitas B. Tenia vs. Manila Electric Company (MERALCO) Cristina B. Viloria vs. Manila Electric Company (MERALCO) Victor James C. Bayan vs. Manila Electric Company (MERALCO) Ramynah B. Felonia vs. Manila Electric Company (MERALCO) Nicanor C. Arugay vs. Manila Electric Company (MERALCO) 90 Applicant/ Complainant/ Respondent/ Petitioner Barangay Subic (Baliuag, Bulacan) Rep. By its Barangay Chairman, Enrico Buenaventura Rolando V. San Miguel Elizabeth C. Polintan Status On-going On-going On-going Pepito B. Santiago On-going Rizaldy T. Villanueva On-going Dr. Omar T. Cortes On-going Carlito V. Lacuayan On-going Dolores D. Carpio On-going Antonio Atendido Tan On-going Eugene C. Tan On-going Felicitas B. Tenia On-going Cristina B. Viloria On-going Victor James C. Bayan On-going Ramynah B. Felonia On-going Nicanor C. Arugay On-going No. Case No. 107 2012-107-CC 108 2012-108-CC 109 2012-109-CC 110 2012-110-CC 111 2012-111-CC 112 2012-112-CC 113 2012-113-CC 114 2012-114-CC 115 2012-001 CF 116 2012-002 CF 117 2012-003 CF Applicant/ Complainant/ Case Title Respondent/ Petitioner Emma Bautista Tabian, as Attorney- Emma Bautista In-Fact of Indalecia C. Dimaano vs. Tabian, as Attorney-InManila Electric Company (MERALCO) Fact of Indalecia C. Dimaano Amir Lamani vs. Manila Electric Amir Lamani Company (MERALCO) Jennie M. Sebastian vs. Manila Jennie M. Sebastian Electric Company (MERALCO) Ma. Cleofe A. Imperial vs. Manila Ma. Cleofe A. Imperial Electric Company (MERALCO) Virgilio M. Ibarra by Rosalia M. Ibarra Virgilio M. Ibarra by vs. Manila Electric Company Rosalia M. Ibarra (MERALCO) Emma M. Ibarra by Rosalia M. Ibarra Emma M. Ibarra by vs. Manila Electric Company Rosalia M. Ibarra (MERALCO) Arlene P. Ferrer vs. Manila Electric Arlene P. Ferrer Company (MERALCO) Hershey Co vs. Manila Electric Hershey Co Company (MERALCO) In the Matter of the Application for Nueva Vizcaya Electric Confirmation of Over and Under Cooperative, Inc. Recoveries From Automatic Cost (NUVELCO) Adjustments Pursuant to ERC Resolution No. 16, Series of 2009 and Resolution No. 21, Series of 2010 In the Matter of the Application for Isabela II Electric Approval of Over/Under Recoveries in Cooperative, Inc. the Implementation of Automatic Cost (ISELCO II ) Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Central Negros Electric Approval of Over/Under Recoveries in Cooperative, Inc. the Implementation of Automatic Cost (CENECO) Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to 91 Status On-going On-going On-going On-going On-going On-going On-going On-going On-going On-going On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010 118 2012-004 CF 119 2012-005 CF 120 2012-006 CF 121 2012-007 CF In the Matter of the Application for Approval of Over/Under Recoveries in the Implementation of Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Approval of Over/Under Recoveries in the Implementation of Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Approval of Over/Under Recoveries in the Implementation of Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Approval of Over/Under Recoveries in the Implementation of Automatic Cost Adjustments and True-Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 92 Guimaras Electric Cooperative, Inc. (GUIMELCO) On-going Aklan Electric Cooperative, Inc. (AKELCO) On-going Biliran Electric Cooperative, Inc. (BILECO) On-going Cebu III Electric Cooperative, Inc. (CEBECO III) On-going No. Case No. 122 2012-008 CF 123 2012-009 CF 124 2012-010 CF 125 2012-011 CF Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Antique Electric Approval of the Over/Under Cooperative, Inc. Recoveries Based on the Formula on (ANTECO) the Various Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 and Resolution No. 21, Series of 2010 In the Matter of the Application for Bohol Light and Approval of the Over/Under Company, Inc. (BLCI) Recoveries Based on the Formula on the Various Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 and Resolution No. 21, Series of 2010 In the Matter of the Application for Capiz Electric Approval of Over/Under Recoveries Cooperative, Inc. Based in the Implementation of (CAPELCO) Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Leyte V Electric Approval of Over/Under Recoveries Cooperative, Inc. Based in the Implementation of (LEYECO V) Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 93 Status On-going On-going On-going On-going No. Case No. 126 2012-012 CF 127 2012-013 CF 128 2012-014 CF 129 2012-015 CF 130 2012-016 CF Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Iloilo III Electric Approval of Over/Under Recoveries Cooperative, Inc. Based in the Implementation of (ILECO III) Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Visayan Electric Approval of the Over/Under Company, Inc. (VECO) Recoveries Based on the Formula on the Various Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 and Resolution No. 21, Series of 2010 In the Matter of the Application for Leyte IV Electric Approval of Over/Under Recoveries Cooperative, Inc. in the Implementation of Automatic (LEYECO IV) Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Cagayan I Electric Authority to Include in Customer's Bill Cooperative, Inc. a Tax Recovery Adjustment Clause (CAGELCO I) (TRAC) for Business Tax Paid in the Province of Cagayan for the Years 1997 - 2006 In the Matter of the Application for Cagayan I Electric Authority to Include in Customer's Bill Cooperative, Inc. a Tax Recovery Adjustment Clause (CAGELCO I) (TRAC) for Business Tax Paid in the City of Tuguegarao for the Years 1997 - 2006 94 Status On-going On-going On-going On-going On-going No. Case No. 131 2012-017 CF 132 2012-018 CF 133 2012-019 CF 134 2012-020 CF 135 2012-021 CF Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Southern Leyte Approval of Over/Under Recoveries in Electric Cooperative, the Implementation of Automatic Cost Inc. (SOLECO) Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Negros Oriental II Approval of Over/Under Recoveries in Electric Cooperative, the Implementation of Automatic Cost Inc. (NORECO II) Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for VMC Rural Electric Approval of Over/Under Recoveries in Service Cooperative, the Implementation of Automatic Cost Inc. (VRESCO) Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Cebu I Electric Approval of Over/Under Recoveries Cooperative, Inc. Based on the Formula on the Various (CEBECO I) Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 and Resolution No. 21, Series of 2010 In the Matter of the Application for Cebu II Electric Approval of Over/Under Recoveries Cooperative, Inc. Based on the Formula on the Various (CEBECO II) Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to 95 Status On-going On-going On-going On-going On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status ERC Resolution No. 16, Series of 2009 and Resolution No. 21, Series of 2010 136 2012-022 CF 137 2012-023 CF 138 2012-024 CF 139 2012-025 CF 140 2012-026 CF In the Matter of the Application for Approval of Over/Under Recoveries in the Implementation of Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 and Resolution No. 21, Series of 2010 In the Matter of the Application for Approval to Recover Payments of Franchise Tax to the Govenrment of Surigao City In the Matter of the Application for Approval of Over/Under Recoveries in the Implementation of Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 and Resolution No. 21, Series of 2010 In the Matter of the Application for Confirmation of Calculations of Over and Under Recoveries in the Implementation of the Automatic Cost Adjustments for the Billing Months from June 2004 to December 2011 In the Matter of the Application for Approval of Over/Under Recoveries in the Implementation of Automatic Cost Adjustments and True-Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 96 Negros Occidental Electric Cooperative, Inc. (NOCECO) On-going Surigao del Norte Electric Cooperative, Inc. (SURNECO) On-going Iloilo II Electric Cooperative, Inc. (ILECO II) On-going Bohol II Electric Cooperative, Inc. (BOHECO II) On-going Samar II Electric Cooperative, Inc. (SAMELCO II) On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status 21, Series of 2010 141 2012-027 CF 142 2012-028 CF 143 2012-029 CF 144 2012-030 CF In the Matter of the Application for Approval of Over/Under Recoveries in the Implementation of Automatic Cost Adjustments and True-Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Approval of the Over/Under Recoveries Based on the Formula for the Various Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Approval of Over/Under Recoveries in the Implementation of Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution no. 21, Series of 2010 In the Matter of the Application for Approval of the Over/Under Recoveries Based on the Formula for the Various Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 97 Negros Oriental I Electric Cooperative, Inc. (NORECO I) On-going Bohol I Electric Cooperative, Inc. (BOHECO I) On-going Bantayan Island Electric Cooperative, Inc. (BANELCO) On-going Camotes Electric Cooperative, Inc. (CELCO) On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status 2009, as Amended by Resolution No. 21, Series of 2010 145 2012-031 CF 146 2012-032 CF 147 2012-033 CF In the Matter of the Application for Approval of the Over/Under Recoveries Based on the Formula for the Various Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Approval of the Over/Under Recoveries In the Implementation of Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for the Approval of the Calculations for the Automatic Cost Adjustment and TrueUp Mechanisms for the a) Generation Rate; b) Transmission Rate; c) System Loss Rate; d) Lifeline Subsidy Rate; e) Interclass Cross Subsidy Rate; and f) Local Franchise Tax, Under ERC Resolution No. 16, Series of 2009, as Amended 98 Province of Siquijor Electric Cooperative, Inc. (PROSIELCO) On-going Don Orestes Romualdez Electric Cooperative, Inc. (DORELCO) On-going Panay Electric Company, Inc. (PECO) On-going No. Case No. 148 2012-034 CF 149 2012-035 CF 150 2012-036 CF 151 2012-037 CF 152 2012-038 CF Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for the Mactan Electric Approval of the Calculations for the Company (MECO) Automatic Cost Adjustment and TrueUp Mechanisms for the a) Generation Rate; b) Transmission Rate; c) System Loss Rate; d) Lifeline Subsidy Rate; and e) Interclass Cross Subsidy Rate, Under ERC Resolution No. 16, Series of 2009, as Amended In the Matter of the Application for Iloilo I Electric Approval of Over/Under Recoveries in Cooperative, Inc. the Implementation of Automatic Cost (ILECO I) Adjustments and True Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Samar I Electric Approval of Over/Under Recoveries in Cooperative, Inc. the Implementation of Automatic Cost (SAMELCO I) Adjustments and True Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Pampanga III Electric Approval of Over/Under Recoveries in Cooperative, Inc. the Implementation of Automatic Cost (PELCO III) Adjustments and True Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Leyte III Electric Approval of Over/Under Recoveries in Cooperative, Inc. the Implementation of Automatic Cost (LEYECO III) Adjustments and True Up Mechanisms During the Period 20042011 Pursuant to ERC Resolution No. 99 Status On-going On-going On-going On-going On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 153 2012-039 CF 154 2012-040 CF 155 2012-041 CF 156 2012-042 CF In the Matter of the Application to Confirm the Generation Rate Over/Under Recovery (GOUR)l Transmission Rate Over/Under Recovery (TOUR), System Loss Rate Over/Under Recovery (SLOUR); and Lifeline Subsidy Over/Under Recovery (LSOUR) Covering the Period January 2011 to December 2011 and for Authority to Refund/Recover Confirmed Over/Under Recoveries, with Prayer for Provisional Authority (PA) In the Matter of the Application for Authority to Include in Customer's Bill a Tax Recovery Adjustment Clause (TRAC) for Business Tax Paid in the 11 Municipalities of Pangasinan In the Matter of the Application for Approval of the Over/Under Recoveries in the Implementation of Automatic Cost Adjustments and True Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, as Amended by Resolution No. 21, Series of 2010 In the Matter of the Application for Approval of the Over/Under Recoveries Based on the Formula for the Various Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009, and Resolution No. 21, Series of 100 Manila Electric Company (MERALCO) On-going Central Pangasinan Electric Cooperative, Inc. (CENPELCO) On-going Leyte II Electric Cooperative, Inc. (LEYECO II) On-going Northern Samar Electric Cooperative, Inc. (NORSAMELCO) On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status 2010 157 2012-043 CF 158 2012-001 MC 159 2012-002 MC 160 2012-003 MC 161 2012-004 MC In the Matter of the Application for Approval of the Over/Under Recoveries Based on the Formula on the Various Automatic Cost Adjustments and True - Up Mechanisms and Corresponding Confirmation Process Pursuant to ERC Resolution No. 16, Series of 2009 as Amended by Resolution No. 21, Series of 2010 In the Matter of the Petition or the Issuance of a Cease and Desist Order (Default Wholesale Supplier Charges from September 2009 to April 2010 in the Amount of PhP 141,996,576.85 Contract for the Supply of Electric Energy (CSEE) expired September 2009 and No Longer Renewed) Camarines Sur III Electric Cooperative, Inc. (CASURECO III) On-going Sorsogon II Electric Cooperative, Inc. (SORECO II) and Power Sector Assets and Liabilities Management Corporation (PSALM) Hon. Emmanuel L. Ledesma and Ms. Lourdes S. Alzona On-going In the Matter of the Application for the Franchising of a Consortium to Own and Operate Sub-transmission Assets and Issuance of Certificate of Public Convenience and Necessity (CPCN) In the Matter of the Violation of ERC Orders, Rules and Regulations (Noncompliance / Late Filing of Emergency CAPEX Application) In the Matter of the Violation of ERC Orders, Rules and Regulations (Inclusion of Power Supply Contract Cost in the Retail Rates Without Approval from the Commission) Cagayan Subtransmission Company, Inc. On-going Sorsogon II Electric Cooperative, Inc. (SORECO II) On-going Sorsogon II Electric Cooperative, Inc. (SORECO II) On-going 101 No. Case No. 162 2012-005 MC 163 2012-006 MC 164 2012-007 MC 165 2012-008 MC 166 2012-009 MC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Violation of ERC Iloilo III Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (ILECO III) Cost in the Retail Rates Without Approval from the Commission) In the Matter of the Violation of ERC Ilocos Norte Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (INEC) Cost in the Retail Rates Without Approval from the Commission) In the Matter of the Violation of ERC Negros Oriental I Orders, Rules and Regulations Electric Cooperative, (Inclusion of Power Supply Contract Inc. (NORECO I) Cost in the Retail Rates Without Approval from the Commission) In the Matter of the Violation of ERC Bukidnon Second Orders, Rules and Regulations Electric Cooperative, (Imposition of Other Charges Without Inc. (BUSECO) Prior Approval from the Commission) In the Matter of the Violation of ERC La Union Electric Orders, Rules and Regulations (Non- Cooperative, Inc. compliance with the Philippine (LUELCO) Distribution Code (PDC) and Distribution Services and Open Access Rules [DSOAR]) 102 Status On-going On-going On-going On-going On-going No. Case No. Case Title 167 2012-010 MC For: Refund of Philippine Electric Market Corporation's (PEMC) Consumer Education Fund Availed and Collected by National Association of Electricity Consumers for Reforms (NASECORE) in Years 2004 to 2007 168 2012-011 MC 169 2012-012 MC Petition for the Issuance by the Commission of a Resolution Adopting and Approving a Proposed Power Supply Agreement (PSA) Template In re: Petition for Dispute Resolution Involving Refund of Transmission Charges Payments During Typhoon Ondoy 170 2012-013 MC Applicant/ Complainant/ Respondent/ Petitioner Region - 8 National Association of General Managers of Electric Cooperatives (ECs) Represented by its President, Atty. Jerry Gwen L. Conde and National Association of Electricity Consumers for Reforms (NASECORE) Represented by its President, Pete L. Ilagan and Philippine Electricity Market Corporation (PEMC) Represented by its President, Melinda L. Ocampo On-going National Power Corporation (NPC) On-going Cathay Pacific Steel Corporation (CAPASCO), Manila Electric Company (MERALCO), and National Grid Corporation of the Philippines (NGCP) On-going In the Matter of the Application for Manila Electric Approval of Authority to Lease Company (MERALCO) Regulatory Asset Base (RAB) Properties Classified as: a) Pole Attachment; and b) Lease of Lots/Space/Other Equipment, Together with the Attached Pro-Forma Agreements, with Prayer for Provisional Authority (PA) 103 Status On-going No. Case No. 171 2012-014 MC 172 2012-015 MC 173 2012-016 MC 174 2012-017 MC 175 2012-018 MC 176 2012-019 MC 177 2012-020 MC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Violation of ERC Hasting Motor Orders, Rules and Regulations Corporation (Hastings) (Operating Without Certificate of Compliance [COC]) In the Matter of the Violation of ERC Cummins Sales and Orders, Rules and Regulations Services Philippines, (Operating Without Certificate of Inc. (CSSPI) Compliance [COC]) In the Matter of the Violation of ERC Monark Equipment Orders, Rules and Regulations Corporation (Operating Without Certificate of (MONARK) Compliance [COC]) In the Matter of the Petition for Direct Real Steel Corporation Connection with the National (RSC), National Grid Transmission Corporation Corporation of the (TRANSCO) in Accordance with ERC Philippines (NGCP), Resolution No. 48, Series of 2006 and and Pampanga III Resolution No. 27, Series of 2010, Electric Cooperative, with Prayer for Provisional Authority Inc. (PELCO III) (PA) In the Matter of the Violation of ERC Pampanga II Electric Order, Rules and Regulations Cooperative, Inc. (Philippine Grid Code [PGC]) (PELCO II) and National Grid Corporation of the Philippines (NGCP) In the Matter of the Petition for Direct Victoria Park Realty Connection with the National Grid and Development Corporation of the Philippines (NGCP) Corporation (VPRDC), in Accordance with ERC Resolution National Grid No. 48, Series of 2006 and Resolution Corporation of the No. 27, Series of 2010, with Prayer for Philippines (NGCP) Provisional Authority (PA) and Capiz Electric Cooperative, Inc. (CAPELCO) In the Matter of the Violation of ERC Pangasinan I Electric Orders, Rules and Regulations Cooperative, Inc. (Implementation of Unapproved (PANELCO I ) Additional Rate Re: Cyclone Emong) 104 Status On-going On-going On-going On-going On-going On-going On-going No. Case No. 178 2012-021 MC 179 2012-022 MC 180 2012-023 MC 181 2012-024 MC 182 2012-025 MC 183 2012-026 MC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Violation of ERC Manila Electric Orders, Rules and Regulations Company (MERALCO) (Inclusion of Power Supply Contract Cost in the Retail Rates Without Approval from the Commission [2012037 RC with SEM CALACA]) In the Matter of the Violation of ERC Capiz Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (CAPELCO) Cost in the Retail Rates Without Approval from the Commission [No Application with SPC]) In the Matter of the Violation of ERC Batangas I Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (BATELEC I) Cost in the Retail Rates Without Approval from the Commission [2011132 RC with SEM CALACA]) In the Matter of the Violation of ERC Ilocos Norte Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (INEC) Cost in the Retail Rates Without Approval from the Commission [2012079 RC with San Miguel Energy Corporation {SMEC}]) In the Matter of the Violation of ERC Pampanga III Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (PELCO III) Cost in the Retail Rates Without Approval from the Commission [2012101 RC with San Miguel Energy Corporation {SMEC}]) In the Matter of the Violation of ERC Pampanga II Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (PELCO II) Cost in the Retail Rates Without Approval from the Commission [No Application with San Miguel Energy Corporation {SMEC}]) 105 Status On-going On-going On-going On-going On-going On-going No. Case No. 184 2012-027 MC 185 2012-028 MC 186 2012-029 MC 187 2012-030 MC 188 2012-031 MC 189 2012-032 MC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Violation of ERC First Laguna Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (FLECO) Cost in the Retail Rates Without Approval from the Commission [2012019 RC with San Miguel Energy Corporation {SMEC}]) In the Matter of the Violation of ERC Leyte V Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (LEYECO V) Cost in the Retail Rates Without Approval from the Commission [2011082 RC with Green Core Geothermal, Inc. {GCGI}]) In the Matter of the Violation of ERC Pangasinan III Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (PANELCO III) Cost in the Retail Rates Without Approval from the Commission [2010143 RC with SMEC]) In the Matter of the Violation of ERC Peninsula Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (PENELCO) Cost in the Retail Rates Without Approval from the Commission [No Application with Bataan 2020) In the Matter of the Violation of ERC Nueva Ecija II - Area I Orders, Rules and Regulations Electric Cooperative, (Inclusion of Power Supply Contract Inc. (NEECO II-Area 1) Cost in the Retail Rates Without Approval from the Commission [2012028 RC with San Miguel Energy Corporation {SMEC}]) In the Matter of the Violation of ERC Eastern Samar Electric Orders, Rules and Regulations (For Cooperative, Inc. Failure to Comply with ERC (ESAMELCO) Resolution No. 16, Series of 2009, as Amended by ERC Resolution No. 21, Series of 2010) 106 Status On-going On-going On-going On-going On-going On-going No. Case No. 190 2012-033 MC 191 2012-034 MC 192 2012-035 MC 193 2012-036 MC 194 2012-037 MC 195 2012-038 MC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Iloilo I Electric Approval of Business Separation and Cooperative, Inc. Unbundling Plan (BSUP) Pursuant to (ILECO I) Section 36 of Republic Act No. 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Application for Allied Power Industries Issuance of a Certificate of Public of Mindanao Inc. (AConvenience & Necessity (CPCN), Power) with Prayer for Provisional Authority (PA) In the Matter of the Application for Cagayan Electric Authority to Assign Distribution Assets Power & Light & Facilities Within PIE-MO Area to A- Company, Inc. Power, With Prayer for Provisional (CEPALCO) Authority (PA) In the Matter of the Application for Cebu III Electric Approval of Applicant's (1) Business Cooperative, Inc. Separation and Unbundling Plan (CEBECO III) (BSUP); and (2) Accounting and Cost Allocation Manual (ACAM) in Accordance with Section 36 of R.A. 9136 and Rule 10 of the Implementing Rules and Regulations (IRR) In the Matter of the Application for Cebu I Electric Approval of Applicant's (1) Business Cooperative, Inc. Separation and Unbundling Plan (CEBECO I) (BSUP); and (2) Accounting and Cost Allocation Manual (ACAM) in Accordance with Section 36 of R.A. 913 and Rule 10 of the Implementing Rules and Regulations (IRR) In the Matter of the Application for Cebu II Electric Approval of Applicant's (1) Business Cooperative, Inc. Separation and Unbundling Plan (CEBECO II) (BSUP); and (2) Accounting and Cost Allocation Manual (ACAM) in Accordance with Section 36 of R.A. 913 and Rule 10 of the Implementing Rules and Regulations (IRR) 107 Status On-going On-going On-going On-going On-going On-going No. Case No. 196 2012-039 MC 197 2012-040 MC 198 2012-041 MC 199 2012-042 MC 200 2012-043 MC 201 2012-044 MC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Violation of ERC Northern Samar Orders, Rules and Regulations (For Electric Cooperative, Failure to Comply with ERC Inc. (NORSAMELCO) Resolution No. 16, Series of 2009, as Amended by ERC Resolution No. 21, Series of 2010) In the Matter of the Violation of ERC Leyte III Electric Orders, Rules and Regulations (For Cooperative, Inc. Failure to Comply with ERC (LEYECO III) Resolution No. 16, Series of 2009, as Amended by ERC Resolution No. 21, Series of 2010) In the Matter of the Violation of ERC Leyte II Electric Orders, Rules and Regulations (For Cooperative, Inc. Failure to Comply with ERC (LEYECO II) Resolution No. 16, Series of 2009, as Amended by ERC Resolution No. 21, Series of 2010) In the Matter of the Application for Therma Mobile, Inc. Authority to Develop, Own and (TMO) Operate Dedicated Point - to - Point Limited Facilities to Connect the Distribution System of Manila Electric Company (MERALCO), with Prayer for Provisional Authority (PA) In the Matter of the Application for Manila Electric Approval of Authority to Dispose of Company (MERALCO) and/or Sell a Parcel of Land, (1,956.10 Sq.m) Including the Improvements Therein, Located at San Marcelino Street, Ermita District, City of Manila, with Prayer for Provisional Authority (PA) In the Matter of the Application for Central Negros Electric Approval of Business Separation and Cooperative, Inc. Unbundling Plan (BSUP) Pursuant to (CENECO) Section 36 of Republic Act No. 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) 108 Status On-going On-going On-going On-going On-going On-going No. Case No. 202 2012-045 MC 203 2012-046 MC 204 2012-047 MC 205 2012-048 MC 206 2012-049 MC 207 2012-050 MC 208 2012-051 MC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for La Union Electric Approval of Business Separation and Cooperative, Inc. Unbundling Plan (BSUP) Pursuant to (LUELCO) Section 36 of Republic Act No. 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Application for Peninsula Electric Approval of Business Separation and Cooperative, Inc. Unbundling Plan (BSUP) Pursuant to (PENELCO) Section 36 of Republic Act No. 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Application for Ilocos Norte Electric Approval of Business Separation and Cooperative, Inc. Unbundling Plan (BSUP) Pursuant to (INEC) Section 36 of Republic Act No. 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Application for Aklan Electric Approval of Business Separation and Cooperative, Inc. Unbundling Plan (BSUP) Pursuant to (AKELCO) Section 36 of Republic Act No. 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Application for Leyte II Electric Approval of Business Separation and Cooperative, Inc. Unbundling Plan (BSUP) Pursuant to (LEYECO II) Section 36 of Republic Act No. 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Petition for Tarlac II Electric Approval/Review of the Business Cooperative, Inc. Separation and Unbundling Plans (TARELCO II) (BSUP), Pursuant to the Provisions of Section 36 of R. A. 9136, and Rule 10 of the Implementing Rules and Regulations (IRR) In the Matter of the Application for Batangas I Electric Approval of Business Separation and Cooperative, Inc. Unbundling Plan (BSUP) Pursuant to (BATELEC I) Section 36 of Republic Act 9136 and Rule 10 of its Implementing Rules and 109 Status On-going On-going On-going On-going On-going On-going On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status Regulations (IRR) 209 2012-052 MC 210 2012-053 MC 211 2012-054 MC 212 2012-055 MC 213 2012-056 MC 214 2012-057 MC In the Matter of the Application for the Approval of the Business Separation and Unbundling Plan (BSUP) Pursuant to Section 36 of Republic Act 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Application for the Approval of the Business Separation and Unbundling Plan (BSUP) Pursuant to Section 36 of Republic Act 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Application for Approval of Business Separation and Unbundling Plan (BSUP) Pursuant to Section 36 of Republic Act 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Application for Direct Connection with the National Power Corporation (NPC) and the National Transmission Corporation (TRANSCO), with Prayer for the Provisional Authority (PA) and Issuance of a Temporary Mandatory Order and/or Writ of Preliminary Injunction Camarines Sur II Electric Cooperative, Inc. (CASURECO II) On-going Batangas II Electric Cooperative, Inc. (BATELEC II) On-going Quezon I Electric Cooperative, Inc. (QUEZELCO I) On-going XRC Mall Developer, Inc. and National Power Corporation (NPC), National Grid Corporation of the Philippines (NGCP) and Isabela I Electric Cooperative, Inc. (ISELCO I) On-going In the Matter of the Violation of ERC Orders, Rules and Regulations (For Failure to Comply with ERC Resolution No. 16, Series of 2009, as Amended by ERC Resolution No. 21, Series of 2010) In the Matter of the Application for Authority to Secure Loan from the National Electrification Administration (NEA) and Other Financial Institutions Camarines Sur III Electric Cooperative, Inc. (CASURECO III) On-going Surigao del Norte Electric Cooperative, Inc. (SURNECO) On-going 110 No. Case No. 215 2012-058 MC 216 2012-059 MC 217 2012-060 MC 218 2012-061 MC 219 2012-062 MC 220 2012-063 MC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Violation of ERC Negros Occidental Orders, Rules and Regulations (Re: Electric Cooperative, Implementing a Recovery Scheme Inc. (NOCECO) Without the Commission's Prior Approval) In the Matter of the Application for the Manila Electric Approval of Authority to Dispose of Company (MERALCO) and/or Sell Non-Regulatory Asset Base (Non-RAB) Properties, with Prayer for Provisional Authority (PA) In the Matter of the Application for Therma South, Inc. Authority to Develop, Own and (TSI) Operate a 138 KV Dedicated Point-toPoint Line and Associated Assets from the Coal - Fired Power Plant of Therma South, Inc. (TSI) in Davao City and Davao Del Sur to the New Toril Substation of the National Grid Corporation of the Philippines (NGCP), with Prayer for Provisional Authority (PA) In the Matter of the Violation of ERC Ilocos Sur Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (ISECO) Cost in the Retail Rates Without Approval from the Commission [2011113 RC]) In the Matter of the Violation of ERC Camarines Sur I Orders, Rules and Regulations Electric Cooperative, (Inclusion of Power Supply Contract Inc. (CASURECO I) Cost in the Retail Rates Without Approval from the Commission [2012011 RC]) In the Matter of the Violation of ERC Peninsula Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (PENELCO) Cost in the Retail Rates Without Approval from the Commission [2011141 RC]) 111 Status On-going On-going On-going On-going On-going On-going No. Case No. 221 2012-064 MC 222 2012-065 MC 223 2012-066 MC 224 2012-067 MC 225 2012-068 MC 226 2012-069 MC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Violation of ERC Isabela I Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (ISELCO I) Cost in the Retail Rates Without Approval from the Commission [2011096 RC]) In the Matter of the Violation of ERC Nueva Vizcaya Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (NUVELCO) Cost in the Retail Rates Without Approval from the Commission [2011175 RC]) In the Matter of the Violation of ERC Pangasinan III Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (PANELCO III) Cost in the Retail Rates Without Approval from the Commission [2012042 RC]) In the Matter of the Violation of ERC Tarlac II Electric Orders, Rules and Regulations Cooperative, Inc. (Inclusion of Power Supply Contract (TARELCO II) Cost in the Retail Rates Without Approval from the Commission [2010086 RC with SMEC]) In the Matter of the Application for Benguet Electric Approval of Business Separation and Cooperative, Inc. Unbundling Plan (BSUP) Pursuant to (BENECO) Section 36 of Republic Act 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Petition for Altima Empire Steel Direction Connection with the National Corporation (AESC), Grid Corporation of the Philippines National Grid (NGCP) in Accordance with ERC Corporation of the Resolution No. 48, Series of 2006 and Philippines (NGCP) Resolution No. 27, Series of 2010, and Pampanga III with Prayer for Provisional Authority Electric Cooperative, (PA) Inc. (PELCO III) 112 Status On-going On-going On-going On-going On-going On-going No. Case No. Case Title 227 2012-070 MC 228 2012-071 MC 229 2012-072 MC 230 2012-073 MC 231 2012-074 MC 232 2012-075 MC 233 2012-076 MC In the Matter of the Petition for Direction Connection with the National Grid Corporation of the Philippines (NGCP) in Accordance with ERC Resolution No. 48, Series of 2006 and Resolution No. 27, Series of 2010, with Prayer for Provisional Authority (PA) and Issuance of a Temporary Mandatory Order and/or a Writ of Preliminary Injunction In the Matter of the Application for Approval of Business Separation and Unbundling Plan (BSUP) Pursuant to Section 36 of Republic Act 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Violation of ERC Orders, Rules and Regulations (Failure to Implement the Decision Under ERC Case No. 2011-037 CF) In the Matter of the Violation of ERC Orders, Rules and Regulations (Failure to Implement the Order Under ERC Case No. 2001-932 [Order dated February 7, 2011]) In the Matter of the Violation of ERC Orders, Rules and Regulations (Improper Utilization of the 5% Reinvestment Fund in 2005 and 2006) In the Matter of the Violation of ERC Orders, Rules and Regulations (Inclusion of Power Supply Contract Cost in the Retail Rates Without Approval from the Commission [2011142 RC]) In the Matter of the Application for Authority to Secure Loan from the National Electrification Administration (NEA) to Finance Approved Capital Expenditure Projects, with Prayer for Provisional Authority (PA) 113 Applicant/ Complainant/ Respondent/ Petitioner Flo Water Resources Iloilo, Inc. (FWRII), National Grid Corporation of the Philippines (NGCP) and Iloilo II Electric Cooperative, Inc. (ILECO II) Status On-going Nueva Ecija I Electric Cooperative, Inc. (NEECO I) On-going Zambales II Electric Cooperative, Inc. (ZAMECO II) On-going Leyte II Electric Cooperative, Inc. (LEYECO II) On-going Leyte II Electric Cooperative, Inc. (LEYECO II) On-going Mountain Province Electric Cooperative, Inc. (MOPRECO) On-going Davao Oriental Electric Cooperative, Inc. (DORECO) On-going Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Petition for Dispute Taiheyo Cement Resolution to Determine the Philippines, Inc. and Appropriate Sub-transmission Visayan Electric Wheeling Charge Company, Inc. (VECO) No. Case No. 234 2012-077 MC 235 2012-078 MC In the Matter of the Petition for the Approval of the Direct Connection with the National Power Corporation (NPC), National Grid Corporation of the Philippines (NGCP) and Team (Philippines) Energy Corporation NPC Alliance Corporation, National Power Corporation (NPC), National Grid Corporation of the Philippines (NGCP), Team (Philippines) Energy Corporation (TPEC) and Peninsula Electric Cooperative, Inc. (PENELCO) On-going 236 2012-079 MC Kalinga Apayao Electric Cooperative, Inc. (KAELCO) On-going 237 2012-080 MC Camarines Norte Electric Cooperative, Inc. (CANORECO) On-going 238 2012-081 MC PowerSource Philippines, Incorporated (PSP) On-going 239 2012-082 MC In the Matter of the Application for the Approval of the Business Separation and Unbundling Plan (BSUP) Pursuant to Section 36 of Republic Act 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Application for the Approval of the Business Separation and Unbundling Plan (BSUP) Pursuant to Section 36 of Republic Act 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Violation of ERC Orders, Rules and Regulations (For: Operating Generation Facilities Without Certificates of Compliance (COC) 1.05 MW DPP of PowerSource Philippines, Incorporated (PSP) Commenced Operation on December 10, 2009) In the Matter of the Application for Approval of Business Separation and Unbundling Plan (BSUP) Pursuant to Section 36 of Republic Act No. 9136 and Rule 10 of its Implementing Rules Pampanga I Electric Cooperative, Inc. (PELCO I) On-going 114 Status On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status and Regulations (IRR) 240 2012-083 MC 241 2012-084 MC 242 2012-085 MC In the Matter of the Application for the Approval of Business Separation and Unbundling Plan (BSUP) Pursuant to Section 36 of Republic Act No. 9136 and Rule 10 of its Implementing Rules and Regulations (IRR) In the Matter of the Application for the Approval of the Consortium Agreement among Batangas II Electric Cooperative, Inc. (BATELEC II), First Bay Power Corporation (FBPC) and Manila Electric Company (MERALCO) and the Issuance of a Franchise and a Certificate of Public Convenience and Necessity (CPCN) to Own, Operate and Maintain Sub-transmission Assets in Favor of the Consortium of BATELEC II, FBPC and MERALCO, with Prayer for Provisional Authority (PA) In the Matter of the Application for the Approval of the Consortium Agreement Between Batangas II Electric Cooperative, Inc. (BATELEC II) and Manila Electric Company (MERALCO) and the Issuance of a Franchise and a Certificate of Public Convenience and Necessity (CPCN) to Own, Operate and Maintain Subtransmission Assets in Favor of the Consortium of BATELEC II and MERALCO, with Prayer for Provisional Authority (PA) 115 Pangasinan I Electric Cooperative, Inc. (PANELCO I) On-going Batangas II Electric Cooperative, Inc. (BATELEC II), First Bay Power Corporation (FBPC) and Manila Electric Company (MERALCO) On-going Batangas II Electric Cooperative, Inc. (BATELEC II) and Manila Electric Company (MERALCO) On-going No. Case No. Case Title 243 2012-086 MC 244 2012-001 RC 245 2012-002 RC 246 2012-003 RC 247 2012-004 RC In the Matter of the Application for the Approval of the Consortium Agreement Between First Bay Power Corporation (FBPC) and Manila Electric Company (MERALCO) and the Issuance of a Franchise and a Certificate of Public Convenience and Necessity (CPCN) to Own, Operate and Maintain Sub-transmission Assets in Favor of the Consortium of FBPC and MERALCO, with Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of Proposed Electric Capital Projects for the Year 2011 to 2015, with Prayer for Provisional Authority (PA) In the Matter of the Application for the Approval of the Renewable Power Supply Agreement (RPSA) Between Dagupan Electric Corporation (DECORP) and SN Aboitiz Power Benguet, Inc., with Prayer for Issuance of Provisional Authority (PA) Joint Application for the Approval of the Power Purchase and Sale Agreement (PPSA) Entered Into By and Between First Laguna Electric Cooperative, Inc. (FLECO) and GNPower Mariveles Coal Plant Ltd. Co. (GMCP) In the Matter of the Application for Approval of Capital Projects for the Year 2011 to 2015 and Authority to Secure Loan from the National Electrification Administration (NEA) in Accordance with the Provisions of R. A. No. 9136 and the Rules for the Approval of Regulated Entities' Capital Expenditure Projects 116 Applicant/ Complainant/ Respondent/ Petitioner First Bay Power Corporation (FBPC) and Manila Electric Company (MERALCO) Status On-going Camotes Island Electric Cooperative, Inc. (CELCO) On-going Dagupan Electric Corporation (DECORP) On-going First Laguna Electric Cooperative, Inc. (FLECO) and GNPower Mariveles Coal Plant Ltd. Co. (GMCP) On-going Surigao del Sur II Electric Cooperative, Inc. (SURSECO II) On-going No. Case No. Case Title 248 2012-005 RC 249 2012-006 RC 250 2012-007 RC 251 2012-008 RC 252 2012-009 RC 253 2012-010 RC In Re: Petition for Approval of the Power Supply Agreement (PSA) and Amendatory Agreement and NPPTrue Cost Generation Rate (NPPTCGR), with Prayer for Provisional Authority (PA) In the Matter of the Application for Authority to Implement 2012 Major Electrical Capital Projects (ECPs) and Non-Electrical Capital Projects (NONECPs), with Prayer for Provisional Authority (PA) In the Matter of the Application for the Approval of the Contracts for the Supply of Electric Energy (CSEEs) Entered Into with Distribution Utilities (DUs) Located in the Mindanao Grid, with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for the Approval of the Contracts for the Supply of Electric Energy (CSEEs) Entered Into with Distribution Utilities (DUs) Located in the Visayas Grid, with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application or the Approval of Power Supply Agreement (PSA) Executed on December 10, 2011 Between the Green Core Geothermal, Inc. (GCGI) and Leyte III Electric Cooperative, Inc. (LEYECO III), with Motion for the Issuance of Provisional Authority (PA) In the Matter of the Application for Approval of (A) Amended Power Supply Agreement Between Bantayan Island Power Corporation (BIPCOR) and Bantayan Island Electric Cooperative, Inc. (BANELCO), (B) Increase in Load Generation , and (C) Energy Tariff Adjustment, with Prayer 117 Applicant/ Complainant/ Respondent/ Petitioner Busuanga Island Electric Cooperative, Inc. (BISELCO) and Calamian Islands Power Corp. (CIPC) Status On-going Tarlac Electric Incorporated (TEI) On-going Power Sector Assets and Liabilities Management Corporation (PSALM) On-going Power Sector Assets and Liabilities Management Corporation (PSALM) On-going Leyte III Electric Cooperative, Inc. (LEYECO III) On-going Bantayan Island Power Corporation (BIPCOR) On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status for Provisional Authority 254 2012-011 RC 255 2012-012 RC 256 2012-013 RC 257 2012-014 RC In the Matter of the Application for Approval of the Energy Supply Contract (ESC) Between Camarines Sur I Electric Cooperative, Inc. (CASURECO I) and San Miguel Energy Corporation (SMEC), with Prayer for Provisional Authority (PA) In the Matter of the Application for the Approval of Force Majeure Event Capital Expenditure Project, re: Repair and Restoration of Damage Distribution System Due to Typhoons Pedring and Quiel, with Prayer for Authority to Secure Loan from the National Electrification Administration (NEA) In the Matter of the Application for Approval of Emergency Capital Expenditure Projects, re: Installation of a New 10MVA Substation at San Rafael, Roxas and Construction of 5.63 KMS of 69KV Transmission Line from San Jose to San Rafael, Roxas and Relocation of the 10MVA Substation from Munoz, Roxas to San Manuel and Construction of 10.53 KMS of 69KV Transmission Line from San Rafael, Roxas to San Manuel In the Matter of the Application for Approval of Proposed Capital Expenditure Projects for the Years 2011 to 2015 (Regular Projects) 118 Camarines Sur I Electric Cooperative, Inc. (CASURECO I) and San Miguel Energy Corporation (SMEC) On-going Isabela I Electric Cooperative, Inc. (ISELCO I) On-going Isabela II Electric Cooperative, Inc. (ISELCO II) On-going Isabela II Electric Cooperative, Inc. (ISELCO II) On-going No. Case No. 258 2012-015 RC 259 2012-016 RC 260 2012-017 RC 261 2012-018 RC 262 2012-019 RC 263 2012-020 RC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Central Negros Electric Approval of the Power Supply Cooperative, Inc. Agreement (PSA) Between Central (CENECO) Negros Electric Cooperative, Inc. (CENECO) and Green Core Geothermal, Inc. (GCGI), with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for Iloilo II Electric Approval of Capital Expenditure Cooperative, Inc. Program for the Years 2012 to 2013, (ILECO II) with Prayers for Authority to Secure Loan and Provisional Authority (PA) In the Matter of the Application for Visayan Electric Approval of the Power Supply Company, Inc. (VECO) Agreement (PSA) Between Visayan Electric Company, Inc. (VECO) and Green Core Geothermal, Inc. (GCGI), with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application fro Province of Siquijor Approval of the Power Supply Electric Cooperative, Agreement (PSA) as Revised, Inc. (PROSIELCO) Between Province of Siquijor Electric and S. I. Power Cooperative, Inc. (PROSIELCO) and Corporation (SIPCOR) S. I. Power Corporation (SIPCOR) In the Matter of the Application for First Laguna Electric Approval of the Energy Supply Cooperative, Inc. Contract (ESC) Between First Laguna (FLECO) and San Electric Cooperative, Inc. (FLECO) Miguel Energy and San Miguel Energy Corporation Corporation (SMEC) (SMEC), with Prayer for Provisional Authority (PA) In the Matter of the Application for the National Transmission Approval of the Sale of Various Sub- Corporation Transmission Lines/Assets of the (TRANSCO) and National Transmission Corporation Cagayan Sub(TRANSCO) to the Cagayan Sub- Transmission Transmission Company, Inc. As Company, Inc. Covered by a Lease Purchase Agreement (LPA) 119 Status On-going On-going On-going On-going On-going On-going No. Case No. Case Title 264 2012-021 RC 265 2012-022 RC 266 2012-023 RC 267 2012-024 RC 268 2012-025 RC In the Matter of the Application for the Approval of the Sale of Various SubTransmission Lines/Assets of the National Transmission Corporation (TRANSCO) to Dagupan Electric Corporation (DECORP) As Covered by a Contract to Sell In the Matter of the Application for the Approval of the Sale of Various SubTransmission Lines/Assets of the National Transmission Corporation (TRANSCO) to Don Orestes Romualdez Electric Cooperative, Inc. (DORELCO) as Covered by a Lease Purchase Agreement (LPA) In the Matter of the Application for Approval of the Contract for the Sale of Electricity (CSE) Between TransAsia Oil and Energy Development Corporation (TA-OIL) (as Wholesale Aggregator) and Sorsogon I Electric Cooperative, Inc. (SORECO I), with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for Approval of the Contract for the Sale of Electricity (CSE) Between TransAsia Oil and Energy Development Corporation (TA-OIL) (as Wholesale Aggregator) and Quezon II Electric Cooperative, Inc. (QUEZELCO II), with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for the Approval of the Proposed Five (5) Year Interim Capital Expenditure Projects 120 Applicant/ Complainant/ Respondent/ Petitioner National Transmission Corporation (TRANSCO) and Dagupan Electric Corporation (DECORP) Status On-going National Transmission Corporation (TRANSCO) and Don Orestes Romualdez Electric Cooperative, Inc. (DORELCO) On-going Sorsogon I Electric Cooperative, Inc. (SORECO I) On-going Quezon II Electric Cooperative, Inc. (QUEZELCO II) On-going Cotabato Electric Cooperative, Inc. (COTELCO) On-going No. Case No. 269 2012-026 RC 270 2012-027 RC 271 2012-028 RC 272 2012-029 RC 273 2012-030 RC 274 2012-031 RC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for City of Olongapo Approval of Emergency Capital Projects, Namely: 1) Construction of 13.8 KV Tie-Line Between CMBU and Mercurio Substations; 2) Rehabilitation of Mercurio Substation; 3) Development of Customer Information Management System & Bill On - Site System; and 4) Rehabilitation of 69 KV Line, for Olongapo City's Electric Distribution System In the Matter of the Application for the First Bukidnon Electric Approval of the Contract for the Cooperative, Inc. Supply of Electric Energy (CSEE) (FIBECO) Between First Bukidnon Electric Cooperative, Inc. (FIBECO) and King Energy Generation, Inc. (KEGI) In the Matter of the Application for Nueva Ecija II Area 1 Approval of the Energy Supply Electric Cooperative, Contract (ESC) Between Nueva Ecija Inc. (NEECO II - Area II Area 1 Electric Cooperative, Inc. I) and San Miguel (NEECO II - Area I) and San Miguel Energy Corporation Energy Corporation (SMEC), with (SMEC) Prayer for Provisional Authority (PA) In the Matter of the Application for Central Pangasinan Approval of Capital Expenditure Electric Cooperative, Program for the Years 2011 to 2014, Inc. (CENPELCO) with Prayer for Provisional Authority (PA) In the Matter of the Application for the SPC Island Power Approval of the Power Sales Contract Corporation (SIPC) (PSC) Between SPC Island Power and Iloilo I Electric Corporation (SIPC) and Iloilo I Electric Cooperative, Inc. Cooperative, Inc. (ILECO I), with (ILECO I) Motion for the Issuance of Provisional Authority (PA) In the Matter of the Application for the SPC Island Power Approval of the Power Sales Contract Corporation (SIPC) (PSC) Between SPC Island Power and Iloilo II Electric Corporation (SIPC) and Iloilo II Electric Cooperative, Inc. Cooperative, Inc. (ILECO II), with (ILECO II) Motion for the Issuance of Provisional 121 Status On-going On-going On-going On-going On-going On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status Authority (PA) 275 2012-032 RC 276 2012-033 RC 277 2012-034 RC 278 2012-035 RC 279 2012-036 RC 280 2012-037 RC In the Matter of the Application for Approval of Capital Expenditure Program for Years 2011 to 2013, with Prayer for Provisional Authority (PA) In the Matter of the Application for Authority to Substitute Various Approved Third Regulatory Period Capital Expenditure Projects with the Implementation Services of Prepaid Electric Management System (ISPEMS) Project, with Urgent Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of the Power Supply Agreement (PSA) Between Manila Electric Company (MERALCO) and South Premiere Power Corporation (SPPC) In the Matter of the Application for Approval of the Power Supply Agreement (PSA) Between Manila Electric Company (MERALCO) and Therma Luzon, Inc. (TLI) In the Matter of the Application for Approval of the Power Supply Agreement (PSA) Between Manila Electric Company (MERALCO) and Masinloc Power Partners, Co., Ltd. (MPPLC) In the Matter of the Application for Approval of the Power Supply Agreement (PSA) Between Manila Electric Company (MERALCO) and Sem-Calaca Power Corporation (SCPC), with Prayer for Provisional Authority (PA) 122 Don Orestes Romualdez Electric Cooperative, Inc. (DORELCO) Manila Electric Company (MERALCO) On-going Manila Electric Company (MERALCO) On-going Manila Electric Company (MERALCO) On-going Manila Electric Company (MERALCO) On-going Manila Electric Company (MERALCO) On-going On-going No. Case No. 281 2012-038 RC 282 2012-039 RC 283 2012-040 RC 284 2012-041 RC 285 2012-042 RC 286 2012-043 RC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Batangas II Electric Approval of the Power Supply Cooperative, Inc. Agreement (PSA) Between Batangas (BATELEC II) II Electric Cooperative, Inc. (BATELEC II) and Bac-Man Geothermal Inc. (for Load Following / Mid-Merit Power Requirements), with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for Zamboanga City Approval of the Energy Supply Electric Cooperative, Agreement (ESA) Between Inc. (ZAMCELCO) Zamboanga City Electric Cooperative, Inc. (ZAMCELCO) and Therma Marine, Inc. (TMI), with Prayer for Provisional Authority (PA) In the Matter of the Petition for the National Power Availment of the Environmental Corporation (NPC) Charge (EC) / Share from the Universal Charge (UC) for the Rehabilitation and Management of Watershed Areas (Plan 9), with Prayer for Provisional Authority (PA) Joint Application for the Approval of Sorsogon I Electric the Power Purchase and Sale Cooperative, Inc. Agreement (PPSA) Entered Into By (SORECO I) and and Between Sorsogon I Electric GNPower Mariveles Cooperative, Inc. (SORECO I) and Coal Plant Ltd., Co. GNPower Mariveles Coal Plant Ltd., (GMCP) Co. (GMCP) In the Matter of the Application for Pangasinan III Electric Approval of the Energy Supply Cooperative, Inc. Contract (ESC) Between Pangasinan (PANELCO III) and III Electric Cooperative, Inc. San Miguel Energy (PANELCO III) and San Miguel Corporation (SMEC) Energy Corporation (SMEC), with Prayer for Provisional Authority (PA) In the Matter of the Application for Nueva Vizcaya Electric Approval of Proposed Capital Cooperative, Inc. Expenditure Projects for the Years (NUVELCO) 2011-2014 123 Status On-going On-going On-going On-going On-going On-going No. Case No. Case Title 287 2012-044 RC 288 2012-045 RC 289 2012-046 RC 290 2012-047 RC In the Matter of the Application for the Approval of the Force Majeure Capital Projects of Misamis Oriental Rural Electric Service Cooperative - 1 (MORESCO-1) for 2012 Arising from the Damage to its Distribution Assets Due to Typhoon "Sendong", with Authority to Secure Loan from the National Electrification Administration (NEA) and with Prayers for the Issuance of Provisional Authority (PA) In the Matter of the Application for the Energy Supply Agreement (ESA) Between Misamis Occidental I Electric Cooperative, Inc. (MOELCI I) and Therma Marine, Inc. (TMI), with Prayer for Provisional Authority (PA) In the Matter of the Petition for the Approval of the Recovery from the Universal Charge (UC) of the Shortfalls in the Missionary Electrification Subsidy for CY 2010 Under the True Up Mechanism Pursuant to ERC Resolution No. 11, Series of 2005 and the Corresponding Adjustment of the Universal Charge (UC) for Missionary Electrification (UCME), with Prayer for the Issuance of a Provisional Authority (PA) In the Matter of the Application for Approval of the Maximum Average Price (MAP) for the 2nd Regulatory Year of the 3rd Regulatory Period (MAP2013) and its Corresponding Translation into Distribution Charges for Each Rate Schedule Applicable for the Regulatory Year 2013 124 Applicant/ Complainant/ Respondent/ Petitioner Misamis Oriental Rural Electric Service Cooperative - 1 (MORESCO 1) Status On-going Misamis Occidental I Electric Cooperative, Inc. (MOELCI I) On-going National Power Corporation - Small Power Utilities Group (NPC-SPUG) On-going Cagayan Electric Power and Light Company, Inc. (CEPALCO) Decicion dated October 1, 2012. No. Case No. 291 2012-048 RC 292 2012-049 RC 293 2012-050 RC 294 2012-051 RC Applicant/ Complainant/ Case Title Status Respondent/ Petitioner In the Matter of the Application for La Union Electric On-going Approval of the Translation Into Company, Inc. Distribution Rates of Different (LUECO) Customer Classes for the Third Regulatory Year of the ERC-Approved Annual Revenue Requirement (ARR) for La Union Electric Company, Inc. (LUECO) under the Performance Based Regulation (PBR) for the Regulatory Period 2011-2014 In the Matter of the Application for Cabanatuan Electric Decision dated Approval of the Translation Into Corporation (CELCOR) October 29, Distribution Rates of Different 2012. Customer Classes for the Third Regulatory Year of the ERC-Approved Annual Revenue Requirement for Cabanatuan Electric Corporation (CELCOR) under the Performance Based Regulation (PBR) for the Regulatory Period 2011-2014 In the Matter of the Application for Tarlac Electric, On-going Approval of the Translation Into Incorporated (TEI) Distribution Rates of Different Customer Classes for the Third Regulatory Year of the ERC-Approved Annual Revenue Requirement (ARR) for Tarlac Electric, Incorporated (TEI) under the Performance Based Regulation (PBR) for the Regulatory Period 2011-2014 In the Matter of the Application for Visayan Electric On-going Approval of: (a) Recalculated Company, Inc. (VECO) Maximum Average Price (MAP) for Regulatory Year 2013; and (b) The Translation Into Distribution - Related Rates of Different Customer Classes for the Third Regulatory Year of the ERC-Approved Annual Revenue Requirement (ARR) for Visayan Electric Company, Inc. (VECO) Under the Performance Based Regulation (PBR) for the Regulatory Period 2011125 No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status 2014 295 2012-052 RC 296 2012-053 RC 297 2012-054 RC In the Matter of the Application for Approval of the Recalculated Maximum Average Price (MAP) for Regulatory Year 2013 and the Translation Into Distribution Related Rates of Different Customer Classes for the Third Regulatory Year of the ERC- Approved Annual Revenue Requirement (ARR) for Davao Light and Power Company, Inc. (DLPC) Under the Performance Based Regulation (PBR) for the Regulatory Period July 1, 2010 - June 30, 2014 In the Matter of the Application for Approval of the Translation Into Distribution Rates of Different Customer Classes for the Second Regulatory Year of the ERC-Approved Annual Revenue Requirement (ARR) for Dagupan Electric Corporation (DECORP) Under the Performance Based Regulation (PBR) for the Regulatory Period Year 2011-2015 In the Matter of the Application for Approval of: (a) Maximum Average Price (MAP) for the RY2013; and (b) Translation of the Maximum Average Price (MAP) for RY2013 Into Distribution Rates for its Various Customer Classes, with Prayer for the Issuance of a Provisional Authority (PA) 126 Davao Light and Power Company, Inc. (DLPC) On-going Dagupan Electric Corporation (DECORP) On-going Manila Electric Company (MERALCO) On-going No. Case No. 298 2012-055 RC 299 2012-056 RC 300 2012-057 RC 301 2012-058 RC 302 2012-059 RC 303 2012-060 RC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Ibaan Electric and Approval of: (a) Maximum Average EngineerinG Price (MAP) for the RY2013; and (b) Corporation (IEEC) Translation of the Maximum Average Price (MAP) for RY2013 Into Distribution Rates for its Various Customer Classes, with Prayer for the Issuance of a Provisional Authority (PA) In the Matter of the Application for the Surigao del Norte Approval of the Proposed Interim Electric Cooperative, Capital Expenditure Projects Inc. (SURNECO) In the Matter of the Application for Bukidnon Second Approval of the Energy Supply Electric Cooperative, Agreement (ESA) Between Bukidnon Inc. (BUSECO) Second Electric Cooperative, Inc. (BUSECO) and Therma Marine, Inc. (TMI), with Prayer for Provisional Authority (PA) In the Matter of the Application for Cotabato Electric Approval of the Energy Supply Cooperative, Inc. Agreement (ESA) Between Cotabato (COTELCO) Electric Cooperative, Inc. (COTELCO) and Therma Marine, Inc. (TMI), with Prayer for Provisional Authority (PA) In the Matter of the Application for Dinagat Island Electric Approval of Capital Projects for the Cooperative, Inc. Years 2012 to 2016 and Authority to (DIELCO) Secure Loan from the National Electrification Administration (NEA) in Accordance with the Provisions of R. A. No. 9136 and the Rules for the Approval of Regulated Entities' Capital Expenditure Projects, with Prayer for Issuance of Provisional Authority (PA) In the Matter of the Application for Camiguin Electric Approval of the Energy Supply Cooperative, Inc. Agreement (ESA) Between Camiguin (CAMELCO) Electric Cooperative, Inc. (CAMELCO) and Therma Marine, Inc. (TMI), with Prayer for Provisional Authority (PA) 127 Status On-going On-going On-going On-going On-going On-going No. Case No. 304 2012-061 RC 305 2012-062 RC 306 2012-063 RC 307 2012-064 RC 308 2012-065 RC 309 2012-066 RC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for the Davao del Norte Approval of Emergency Capital Electric Cooperative, Expenditure Project, Re: Replacement Inc. (DANECO) of Damaged Power Transformer in MACO Substation, with Prayer for Authority to Secure Loan from the National Electrification Administration (NEA) In the Matter of the Application for the National Transmission Approval of the Sale of Various Corporation Subtransmission Lines/ Assets of the (TRANSCO) and National Transmission Corporation Manila Electric (TRANSCO) to Manila Electric Company (MERALCO) Company (MERALCO) as covered by the Contract to Sell, with Prayer for Provisional Authority (PA) In the Matter of the Application for Misamis Occidental II Approval of the Energy Supply Electric Cooperative, Agreement (ESA) Between Misamis Inc. (MOELCI II) Occidental II Electric Cooperative, Inc. represented by Jemilo (MOELCI II) and Therma Marine Inc. L. Pelimer (TMI), with Prayer for Provisional Authority (PA) In the Matter of the Application for Tarlac I Electric Approval of the Energy Supply Cooperative, Inc. Contract (ESC) Between Tarlac I (TARELCO I) and San Electric Cooperative, Inc. (TARELCO) Miguel Energy and San Miguel Energy Corporation Corporation (SMEC) (SMEC), with Prayer for Provisional Authority (PA) In the Matter of the Application for Cebu II Electric Approval of the Power Supply Cooperative, Inc. Agreement (PSA) Between Cebu II (CEBECO II) and Electric Cooperative, Inc. (CEBECO II) Desco, Inc. and Desco, Inc., with Prayer for Provisional Approval (PA) In the Matter of the Application for the National Grid Approval of the Opol Substation Corporation of the Project, with Prayer for the Issuance of Philippines (NGCP) a Provisional Authority (PA) 128 Status On-going On-going On-going On-going On-going On-going No. Case No. Case Title 310 2012-067 RC 311 2012-068 RC 312 2012-069 RC 313 2012-070 RC In the Matter of the 2nd Application for the True Up Adjustments of Fuel and Purchased Power Costs (TAFPPC), and Foreign Exchange - Related Costs (TAFxA) under the Rules for the Automatic Recovery of Monthly Fuel and Purchased Power Costs and Foreign Exchange - Related Costs by the National Power Corporation (NPC), as Amended, with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for Amendment of the Rate Approved in ERC Case No. 2010-066 RC In re: Approval of the Electric Power Purchase Agreement (EPPA) Between Antique Electric Cooperative, Inc. (ANTECO) and Panay Energy Development Corporation (PEDC) In the Matter of the Application to Approve the Purchase and Installation of One 83 MVA Power Transformer Used in the Diliman Substation and for Authority to Maintain at All Times, and Install During Emergency, A Spare Power Transformer In the Matter of the Application of the National Grid Corporation of the Philippines (NGCP) for the Approval of Force Majeure (FM) Event Regulated FM Pass Through for Flooding in Mindanao, Typhoon Bebeng, Landslide in Mindanao and Typhoon Juaning in Accordance with the Rule for Setting Transmission Wheeling Rates, with Prayer for Provisional Authority (PA) 129 Applicant/ Complainant/ Respondent/ Petitioner Power Sector Assets and Liabilities Management Corporation (PSALM) Status On-going Antique Electric Cooperative, Inc. (ANTECO) and Panay Energy Development Corporation (PEDC) On-going Manila Electric Company (MERALCO) On-going National Grid Corporation of the Philippines (NGCP) On-going No. Case No. Case Title 314 2012-071 RC In the Matter of the Petition for Approval of the Adoption of Special Hydro-Electric Energy Rate and Revision of Transmission and Ancillary Service Charges for the Lanao Del Sur Electric Cooperative, Inc. (LASURECO), with Prayer for Provisional Authority (PA) 315 2012-072 RC 316 2012-073 RC 317 2012-074 RC 318 2012-075 RC In the Mater of the Application for the Approval of the Renewable Energy Supply Agreement (RESA) Between Davao del Sur Electric Cooperative, Inc. (DASURECO) and Municipality of Malita, Davao Del Sur In the Matter of the Application for Authority to Implement Proposed Additional Capital Project for Years 2013-2014, with Prayer for Provisional Authority (PA) In the Matter of the Application for Authority to Implement Proposed Additional Capital Project for Years 2012-2014, with Prayer for Provisional Authority (PA) In the Matter of the Application for the Approval of the Sale of Various Subtransmission Lines/ Assets of the National Transmission Corporation (TRANSCO) to Iligan Light and Power, Inc. (ILPI) as covered by the Contract to Sell 130 Applicant/ Complainant/ Respondent/ Petitioner Lanao Del Sur Electric Cooperative, Inc. (LASURECO) represented by General Manager (GM) Sultan Ashary P. Maongco, National Power Corporation (NPC)/Power Sector Assets and Liabilities Management Corporation (PSALM), National Transmission Corporation (TRANSCO), and National Grid Corporation of the Philippines (NGCP) Status On-going Davao del Sur Electric Cooperative, Inc. (DASURECO) and Municipality of Malita, Davao Del Sur On-going Visayan Electric Company, Inc. (VECO) On-going Visayan Electric Company, Inc. (VECO) On-going National Transmission Corporation (TRANSCO) and Iligan Light and Power, Inc. (ILPI) On-going No. Case No. 319 2012-076 RC 320 2012-077 RC 321 2012-078 RC 322 2012-079 RC 323 2012-080 RC 324 2012-081 RC 325 2012-082 RC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for the Negros Oriental I Approval of Force Majeure (FM) Event Electric Cooperative, Capital Expenditure Project, Re: Inc. (NORECO I) Repair and Restoration of Distribution System Destroyed by the February 6, 2012 Earthquake In the Matter of the Application for Southern Leyte Approval of Capital Expenditure for the Electric Cooperative, Years 2012 to 2015, with Prayer for Inc. (SOLECO) Provisional Authority (PA) In the Matter of the Application for the Manila Electric Approval of the Contract for the Company (MERALCO) Supply of Electric Energy (CSEE) Between Pangea Green Energy, Philippines, Inc. (Pangea) and Manila Electric Company (MERALCO), with Prayer for Provisional Authority (PA) In the Matter of the Application for Ilocos Norte Electric Approval of the Energy Supply Cooperative, Inc. Contract (ESC) Between Ilocos Norte (INEC) and San Miguel Electric Cooperative, Inc. (INEC) and Energy Corporation San Miguel Energy Corporation (SMEC) (SMEC), with Prayer for Provisional Authority (PA) In the Matter of the Application for Angeles Electric Authority to Implement 2012 Major Corporation (AEC) Electrical Capital Projects, with Prayer for the Immediate Issuance of a Provisional Authority (PA) In the Matter of the Application for Negros Oriental II Approval of Force Majeure (FM) Event Electric Cooperative, Capital Expenditure Project, Re: Inc. (NORECO II) Repair and Restoration of Distribution Lines and Facilities and Replacement of KWH Meters Damaged by Typhoon Sendong In the Matter of the Application for Cagayan I Electric Approval of the Interim Power Supply Cooperative, Inc. Agreement (PSA) with San Miguel (CAGELCO I) Energy Corporation (SMEC), with Prayer for Provisional Authority (PA) 131 Status On-going On-going On-going On-going On-going On-going On-going No. Case No. 326 2012-083 RC 327 2012-084 RC 328 2012-085 RC 329 2012-086 RC 330 2012-087 RC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Cagayan II Electric Approval of the Interim Power Supply Cooperative, Inc. Agreement with San Miguel Energy (CAGELCO II) Corporation (SMEC) with Prayer for Provisional Authority In the Matter of the Application for the Philippine Electricity Approval of the Level of Market Market Corporation Transaction Fees for the Calendar (PEMC) Year 2013 for the Philippines Wholesale Electricity Spot Market (WESM) In the Matter of the Petition for the National Power Approval of the Following Pursuant to Corporation (NPC) ERC Resolution No. 21, Series of 2011: (a) Availments from the Universal Charge of the Share for Missionary Electrification (UCME) Subsidy for the Years 2012 to 2016; and (b) Recovery from the Universal Charge (UC) of the Shortfall in Missionary Electrification (ME) Subsidy for CY2011 and the Corresponding Adjustment of the UCME, with Prayer for Provisional Authority (PA) In the Matter of the Application for Negros Oriental II Approval of Emergency Capital Electric Cooperative, Expenditure Project, Re: Procurement Inc. (NORECO II) of Brand New 10 MVA Power Transformer for Bayawan Substation In the Matter of the Application for Manila Electric Approval of the Power Supply Company (MERALCO) Agreement (PSA) Between Manila Electric Company (MERALCO) and San Miguel Energy Corporation (SMEC) 132 Status On-going On-going On-going On-going On-going No. Case No. 331 2012-088 RC 332 2012-089 RC 333 2012-090 RC 334 2012-091 RC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Bohol Light Company, Approval of the Maximum Average Inc. (BLCI) Price (MAP RY 2013) and its Translation Into Distribution Rates of Different Customer Classes for the Second Regulatory Year of the ERCApproved Annual Revenue Requirement (ARR) for Bohol Light Company, Inc. (BLCI) Under the Performance- Based Regulation (PBR) for the Regulatory Period 20122015 In the Matter of the Application for Angeles Electric Approval of the Translation Into Corporation (AEC) Distribution Rates of Different Customer Classes for the Second Regulatory Year of the ERC-Approved Annual Revenue Requirement (ARR) for Angeles Electric Corporation (AEC) Under the Performance Based Regulation (PBR) for the Regulatory Period 2012-2015 In the Matter of the Application for Davao del Norte Approval of the Power Supply Electric Cooperative, Agreement (PSA) Between Davao del Inc. (DANECO) Norte Electric Cooperative, Inc (DANECO) and EEI Power Corporation, with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for Busuanga Island Approval of Proposed Electric Capital Electric Cooperative, Projects for the CY 2012-2016 and the Inc. (BISELCO) Authority to Secure Loans from National Electrification Administration (NEA), with Prayer for Provisional Authority (PA) 133 Status On-going On-going On-going On-going No. Case No. Case Title 335 2012-092 RC 336 2012-093 RC 337 2012-094 RC 338 2012-095 RC In the Matter of the Application for Approval of: a) Recalculated Maximum Average Price (MAP) for Regulatory Year 2013; and b) The Translation Into Distribution - Related Rates of Different Customer Classed for the Second Regulatory Year of the ERCApproved Annual Revenue Requirement (ARR) for San Fernando Electric Light and Power Company, Inc. (SFELAPCO) Under the Performance Based Regulation (PBR) for the Regulatory Period 2012-2015 In the Matter of the Application for Approval of Capital Expenditure Program for the Years 2011 to 2015, with Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of Unplanned Capital Expenditure Project for Year 2012, Re: Installation of New 10 MVA Substation in Laoag City and Construction of 69KV Sub-transmission Line Due to Unexpected Significant New Load, with Prayer for Provisional Authority (PA) In the Matter of the Application for the Proposed Interim Capital Expenditure Projects for the Years 2011-2013 and Authority to Secure Loan from the National Electrification Administration (NEA) and Development Bank of the Philippines (DBP) 134 Applicant/ Complainant/ Respondent/ Petitioner San Fernando Electric Light and Power Company, Inc. (SFELAPCO) Status On-going Quirino Electric Cooperative, Inc. (QUIRELCO) On-going Ilocos Norte Electric Cooperative, Inc. (INEC) On-going Agusan Del Sur Electric Cooperative, Inc. (ASELCO) On-going No. Case No. 339 2012-096 RC 340 2012-097 RC 341 2012-098 RC 342 2012-099 RC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Subic Enerzone Approval of: a) the Recalculated Corporation (SEZ) Maximum Average Price (MAP) for Regulatory Year 2013; and b) the Translation Into Distribution Rates of Different Customer Regulatory Year of the ERC-Approved Annual Revenue Requirement (ARR) for Subic Enerzone Corporation (SEZ) Under the Performance - based Regulation (PBR) for the Regulatory Period October 1, 2011 - September 30, 2015 In the Matter of the Application for the Philippine Electricity Approval of the Level of Market Market Corporation Transaction Fees for the Repayment (PEMC) of the Market Management System (MMS) Loan for the Philippine Wholesale Electricity Spot Market (WESM) In the Matter of the Application for Camarines Sur III Approval of the Energy Supply Electric Cooperative, Contract (ESC) Between Camarines Inc. (CASURECO III) Sur III Electric Cooperative, Inc. and San Miguel (CASURECO III) and San Miguel Energy Corporation Energy Corporation (SMEC), with (SMEC) Prayer for Provisional Authority (PA) In the Matter of the Application for Clark Electric Approval of the Translation Into Distribution Distribution Rates of Different Corporation (CEDC) Customer Classes for the Second Regulatory Year of the ERC-Approved Annual Revenue Requirement (ARR) for the Clark Electric Distribution Corporation (CEDC) Under the Performance Based Regulation (PBR) for the Regulatory Period October 1, 2011 - September 30, 2015 135 Status On-going On-going On-going On-going No. Case No. 343 2012-100 RC 344 2012-101 RC 345 2012-102 RC 346 2012-103 RC 347 2012-104 RC Applicant/ Complainant/ Case Title Respondent/ Petitioner In the Matter of the Application for Panay Electric Approval of the Translation Into Company, Inc. (PECO) Distribution Rates of Different Customer Classes for the Second Regulatory Year of the ERC-Approved Annual Revenue Requirement for the Panay Electric Company, Inc. (PECO) Under the Performance Based Regulation (PBR) for the Regulatory Period October 1, 2011 - September 30, 2015 In the Matter of the Application for Pampanga III Electric Approval of the Energy Supply Cooperative, Inc. Contract (ESC) Between Pampanga III (PELCO III) and San Electric Cooperative, Inc. (PELCO III) Miguel Energy and San Miguel Energy Corporation Corporation (SMEC) (SMEC), with Prayer for Provisional Authority) (PA) In the Matter of the Application for Visayan Electric Approval of the Supplement to the Company, Inc. (VECO) Power Supply Agreement (PSA) Between Visayan Electric Company, Inc. (VECO) and Cebu Private Power Corporation (CPPC), with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for Kalinga - Apayao Approval of the Power Supply Electric Cooperative, Agreement (PSA) Between the Inc. (KAELCO) Kalinga-Apayao Electric Cooperative, Inc. (KAELCO) and AP Renewables, Inc. (APRI), with Prayer for Provisional Authority (PA) In the Matter of the Application for Bukidnon SubApproval of the Capital Expenditure Transmission Projects Corporation (BSTC) 136 Status On-going On-going On-going On-going On-going No. Case No. Case Title 348 2012-105 RC 349 2012-106 RC 350 2012-107 RC 351 2012-108 RC 352 2012-109 RC In the Matter of the Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO to Cagayan Electric Power and Light Company, Inc. (CEPALCO) as Covered by an Amended Contract to Sell dated 27 February 2012 In the Matter of the Application of the National Grid Corporation of the Philippines (NGCP) for the Approval of Force Majeure (FM) Event Regulated FM Pass Through for Typhoons Quiel and Sendong in Accordance with the Rules for Setting Transmission Wheeling Rates, with Prayer for Provisional Authority (PA) In the Matter of the 8th Application for the Recovery of the Incremental Costs on Foreign Currency Exchange Rate Fluctuations Under the Incremental Currency Exchange Rate Adjustment (ICERA), with Prayer for Provisional Authority (PA) In the Matter of Application for the Approval of the 8th Generation Rate Adjustment Mechanism (8th GRAM), with Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of the Maximum Allowable Revenue (MAR) for the Calendar Year 2013 and the Performance Incentive Scheme (PIS) Under the Rules for Setting the Transmission Wheeling Rates, with Prayer for Provisional Authority (PA) 137 Applicant/ Complainant/ Respondent/ Petitioner National Transmission Corporation (TRANSCO) and Cagayan Electric Power and Light Company, Inc. (CEPALCO) Status On-going National Grid Corporation of the Philippines (NGCP) On-going National Power Corporation - Small Power Utilities Group (NPC-SPUG) On-going National Power Corporation - Small Power Utilities Group (NPC-SPUG) On-going National Grid Corporation of the Philippines (NGCP) On-going No. Case No. Case Title 353 2012-110 RC 354 2012-111 RC 355 2012-112 RC 356 2012-113 RC 357 2012-114 RC 358 2012-115 RC 359 2012-116 RC 360 2012-117 RC In the Matter of the Application for Approval of the Memorandum of Agreement (MOA) Between DMCI Power Corporation (DPC) and Palawan Electric Cooperative, Inc. (PALECO), with Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of Capital Expenditure Program for the Years 2011 to 2013, with Prayer for Provisional Authority (PA) In the Matter of the Application for the Approval of the Power Purchase Agreement (PSA) Between Agusan Power Corporation (APC) and Agusan del Norte Electric Cooperative, Inc. (ANECO), with Motion for the Issuance of Provisional Authority (PA) In the Matter of the Application for Approval of the Emergency Installation of One (1) 83 MVA Power Transformer in the New Teresa Substation In the Matter of the Application for the Construction of a Substation, with Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of Capital Expenditure Program for the Years 2012 to 2013, with Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of Force Majeure (FM) Pass Through Amount Resulting from Damage to Facilities Due to Typhoon "Sendong" a Force Majeure (FM) Event, in Accordance with the Rules for Setting Distribution Wheeling Rates (RDWR) In the Matter of the Application for Approval of Revised Time-Of-Use (TOU) Retail Rates to End-Users, with 138 Applicant/ Complainant/ Respondent/ Petitioner Palawan Electric Cooperative, Inc. (PALECO) and DMCI Power Corporation (DPC) Status On-going Peninsula Electric Cooperative, Inc. (PENELCO) On-going Agusan Power Corporation (APC) and Agusan del Norte Electric Cooperative, Inc. (ANECO) On-going Manila Electric Company (MERALCO) On-going Batangas II Electric Cooperative, Inc. (BATELEC II) Zamboanga City Electric Cooperative, Inc. (ZAMCELCO) On-going Cagayan Electric Power and Light Company, Inc. (CEPALCO) On-going Manila Electric Company (MERALCO) On-going On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status Prayer for Provisional Authority (PA) 361 2012-118 RC 362 2012-119 RC 363 2012-120 RC 364 2012-121 RC 365 2012-122 RC 366 2012-123 RC In the Matter of the Application for the Approval of the Power Supply Agreement (PSA) Between Quirino Electric Cooperative, Inc. (QUIRELCO) and SN Aboitiz PowerMagat, Inc. (SNAP), with Prayer for Issuance of a Provisional Authority (PA) In the Matter of the Application for the Approval of the Power Supply Agreement (PSA) Between Ifugao Electric Cooperative, Inc. (IFELCO) and SN Aboitiz Power-Magat, Inc. (SNAP), with Prayer for Issuance of a Provisional Authority (PA) In the Matter of the Application for the Approval of the Power Supply Agreement (PSA) Between Isabela II Electric Cooperative, Inc. (ISELCO II) and SN Aboitiz Power-Magat, Inc., with Prayer for Issuance of a Provisional Authority (PA) In the Matter of the Application for Approval of an Emergency Capital Expenditure Project to Replace the 5 MVA Power Transformer at the Alicia Substation, with Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of the Power Supply Agreement (PSA) Between the Nueva Ecija I Electric Cooperative, Inc. (NEECO I) and AP Renewables, Inc. (APRI), with Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of an Adjustment in Rates Under the Rules of Setting Electric Cooperatives' Wheeling Rates (RSEC139 Quirino Electric Cooperative, Inc. (QUIRELCO) On-going Ifugao Electric Cooperative, Inc. (IFELCO) On-going Isabela II Electric Cooperative, Inc. (ISELCO II) On-going Bohol II Electric Cooperative, Inc. (BOHECO II) On-going Nueva Ecija I Electric Cooperative, Inc. (NEECO I) On-going Maguindanao Electric Cooperative, Inc. (MAGELCO) On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Status WR), with Prayer for Provisional Authority (PA) 367 2012-124 RC 368 2012-125-RC 369 2012-126-RC 370 2012-127-RC 371 2012-128-RC In the Matter of the Application for Approval of the Overall Rate Adjustment, with Urgent Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for Approval of the Energy Supply Contract (ESC) Between Quezon I Electric Cooperative, Inc. (QUEZELCO I) and San Miguel Energy Corporation (SMEC), with Prayer for provisional Authority (PA) In the Matter of the Joint Application for the Approval of the Power Purchase and Sale Agreement (PPSA) entered into by and between Biliran Electric Cooperative Inc. (BILECO) and GNPOWER Mariveles Coal Plant Ltd., Co. (GMCP) In the Matter of the Application for the Approval of the Power Supply Agreement (PSA) Between the Mountain Province Electric Cooperative, Inc. (MOPRECO) and AP Renewables, Inc. (APRI), with Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of Unplanned Capital Expenditure (CAPEX) Re: 1) Proposed 2 - 35/43.75 MVA Substation; 2) Proposed Installation of 2 units 69 kV Sectionalizing Circuit Breaker; and 3) South Cotabato II Electric Cooperative, Inc. (SOCOTECO II) Proposed New Headquarters 140 Negros Oriental I Electric Cooperative, Inc. (NORECO I) On-going Quezon I Electric Cooperative, Inc. (QUEZELCO I) and San Miguel Energy Corporation (SMEC) On-going Biliran Electric Cooperative Inc. (BILECO), and (GNPOWER Mariveles Coal Plant Ltd., Co. (GMCP) On-going Mountain Province Electric Cooperative, Inc. (MOPRECO) On-going South Cotabato II Electric Cooperative, Inc. (SOCOTECO II) On-going No. Case No. Case Title 372 2012-129-RC In the Matter of the Joint Application for the Approval of the Power Purchase and Sale Agreement (PPSA) Entered Into by and Between I) Each of Don Orestes Romualdez Electric Cooperative, Inc. (DORELCO); Leyte IV Electric Cooperative, Inc. (LEYECO IV); and Samar II Electric Cooperative, Inc. (SAMELCO II); and II) GNPOWER Mariveles Coal Plant Ltd. Co. (GMCP) 373 2012-130-RC 374 2012-131-RC 375 2012-132-RC 376 2012-133-RC In the Matter of the Application for Approval of the Settlement Agreement Between Central Negros Electric Cooperative, Inc. (CENECO) and Panay Energy Development Corporation (PEDC) In the Matter of the Application for Approval of the Generation Rate Recovery for the Oriental Mindoro Electric Cooperative, Inc.'s (ORMECO) 2.1 MW Linao-Cawayan Mini-Hydro Power Plant - Lower Cascade, with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for Approval of the Sale for Resale Agreement by and Between First Bukidnon Electric Cooperative, Inc. (FIBECO) and Bukidnon Second Electric Cooperative, Inc. (BUSECO), with Prayer for Provisional Authority (PA) In the Matter of the Application for Approval of Capital Expenditure Program for the Years 2012 to 2014, with Prayer for Provisional Authority (PA) 141 Applicant/ Complainant/ Respondent/ Petitioner Don Orestes Romualdez Electric Cooperative, Inc. (DORELCO); Leyte IV Electric Cooperative, Inc. (LEYECO IV); Samar II Electric Cooperative, Inc. (SAMELCO II); and GNPOWER Mariveles Coal Plant Ltd. Co. (GMCP) Status On-going Central Negros Electric Cooperative, Inc. (CENECO) and Panay Energy Development Corporation (PEDC) On-going Oriental Mindoro Electric Cooperative, Inc. (ORMECO) On-going First Bukidnon Electric Cooperative, Inc. (FIBECO) and Bukidnon Second Electric Cooperative, Inc. (BUSECO) On-going Sorsogon II Electric Cooperative, Inc. (SORECO II) On-going No. Case No. Case Title 377 2012-134-RC 378 2012-135-RC 379 2012-136-RC 380 2012-137-RC In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement (ASPA) Between the National Grid Corporation of the Philippines (NGCP) and Panasia Energy, Inc., with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement (ASPA) Between the National Grid Corporation of the Philippines (NGCP) and TransAsia Power Generation Corporation, with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for Approval of the Ancillary Services Procurement Agreement (ASPA) Between the National Grid Corporation of the Philippines (NGCP) and TransAsia Oil and Energy Development Corporation (TA-OIL), with Prayer for the Issuance of Provisional Authority (PA) In the Matter of the Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO) to the Consortium of Manila Electric Company (MERALCO) and First Bay Power Corporation (FBPC), as Covered by a Contract to Sell, as Amended, with Prayer for Provisional Authority (PA) 142 Applicant/ Complainant/ Respondent/ Petitioner National Grid Corporation of the Philippines (NGCP) and Panasia Energy, Inc. Status On-going National Grid Corporation of the Philippines (NGCP) and Trans-Asia Power Generation Corporation On-going National Grid Corporation of the Philippines (NGCP) and Trans-Asia Oil and Energy Development Corporation (TA-OIL) On-going National Transmission Corporation (TRANSCO), Manila Electric Company (MERALCO) and First Bay Power Corporation (FBPC) On-going No. Case No. Case Title 381 2012-138-RC 382 2012-139-RC 383 2012-140-RC 384 2012-001 RM 385 2012-002 RM 386 2012-003 RM In the Matter of the Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO) to the Consortium of Manila Electric Company (MERALCO), Batangas II Electric Cooperative, Inc. (BATELEC II) and First Bay Power Corporation (FBPC), as Covered by a Contract to Sell, as Amended, with Prayer for Provisional Authority (PA) (Batangas-MabiniCuenca 69kV Line and Batangas S/S 69kV Termination ) In the Matter of the Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO) to the Consortium of Manila Electric Company (MERALCO) and Batangas II Electric Cooperative, Inc. (BATELEC II), as Covered by a Contract to Sell, as Amended, with Prayer for Provisional Authority (PA) (Circuit 59BS, 59BS12, Circuit 56MB and 56MB4) In the Matter of the Application for Approval of Proposed Unplanned and Contingency Capital Expenditures In the Matter of the Petition to Initiate Rule Making to Amend Resolution No. 16, Series of 2010, Otherwise Known as the "Feed In Tariff Rules" In the Matter of Amendments of Resolution No. 15, Series of 2009 Prepaid Retail Electricity Service Using Prepaid Metering System In the Matter of the Draft Guidelines for Transmission Planning 143 Applicant/ Complainant/ Respondent/ Petitioner National Transmission Corporation (TRANSCO), Manila Electric Company (MERALCO), Batangas II Electric Cooperative, Inc. (BATELEC II) and First Bay Power Corporation (FBPC) Status On-going National Transmission Corporation (TRANSCO), Manila Electric Company (MERALCO) and Batangas II Electric Cooperative, Inc. (BATELEC II) On-going Ibaan Electric and Engineering Corporation (IEEC) Visayan Electric Company, Inc. (VECO) On-going Rey I. Prolles On-going Energy Regulatory Commission (ERC) On-going On-going No. Case No. 387 388 2012-004 RM 389 2012-005 RM 390 2012-006 RM 391 2012-007 RM 392 2012-008 RM 393 2012-009 RM Applicant/ Complainant/ Case Title Respondent/ Petitioner A Resolution Enjoining Compliance Energy Regulatory with the Department of Energy (DOE) Commission (ERC) Circular no. DC2012-03-0004, Entitled "Directing Compliance with the Electric Power Industry Report Act of 2011 (EPIRA) to Address the Power Supply Situation Including the Rationalization of the Available Capacities in the Mindanao Grid" and Providing for Fines and Penalties for Violations Therefor A Resolution Setting Aside and Energy Regulatory Rendering Ineffective for Purposed of Commission (ERC) Expediency, Several Open Access and Retail Competition Rules to Allow the Completion of the Retail Market Framework Within the Timeline Issued by the Department of Energy (DOE) In the Matter of the Petition for the Association of Adoption of Rules for the Demand Mindanao Rural Aggregation and Joint Power Supply Electric Cooperatives Contracting of Electric Cooperatives (AMRECO) (ECs) In the Matter of the Petition for the Philippine Independent Amendment of ERC Resolution No. 16 Power Producers or the "Resolution Adopting Amended Association, Inc. Rules on the Definition and (PIPPA) Boundaries of Connection Assets for Customers or Transmission Providers In the Matter of the Approval of the National Renewable Rule Enabling the Net-Metering Energy Board (NREB) Program for Renewable Energy (RE) In the Matter of the Approval of the National Renewable Feed-In Tariff Allowance - Payment Energy Board (NREB) and Collection Guidelines In the Matter of the Petition to Amend Visayan Electric Resolution No. 11, Series of 2009, Company, Inc. (VECO) Otherwise Known as the "Rules to Govern the Installation and Relocation of Residential Electric Meters by Distribution Utilities (DUs) to Elevated Metering Centers or Individual 144 Status On-going On-going On-going On-going On-going On-going On-going No. Case No. Applicant/ Complainant/ Respondent/ Petitioner Case Title Residential Electric Meter to Other Elevated Service" 145 Status
Similar documents
Siquijor 2009
There is one diesel-generated power supply on the island owned and operated by the National Power Corporation (NPC). The electric power is purchased by the Province of Siquijor Electric Cooperative...
More information