VERMICULITE FIRE BRICK INSTALLATION SEQUENCE

Transcription

VERMICULITE FIRE BRICK INSTALLATION SEQUENCE
VERMICULITE FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE
UNIQ 4 / 5
Uniq 4:
1 – Rear Brick
2 – Right Side Brick
3 – Inner Top Baffle Brick
4 – Top Baffle Brick
5 – Left Side Brick
6 – Left Back Base Brick
7 – Right Back Base Brick
8 – Rear Base Brick
9 – Base Grate
10 – Left Front Base Brick
11 – Right Front Base Brick
12 – Log Retainer
Uniq 5:
3
4
1
8
5
6 59
10
12
7
11
2
FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5
Installation procedure:
Rear brick 1.
Right side brick 2.
Inner top baffle brick 3 positioned with angled
edge at front / top. Position brick so that it rests
on rear brick 1 and secondary air pre heat
chamber.
FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5
Push up Inner top baffle brick 3 slightly so that
top baffle brick 4 can rest on rear brick 1. Inner
top baffle brick 3 then rests on top baffle brick 4.
Left side brick 5 fitted.
Base bricks 6 & 7 fitted.
Rear base brick 8 & Base grate 9 fitted.
Left & right front base bricks 10 &11 fitted.
FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5
Log retainer 12 fitted.

Similar documents