VERMICULITE FIRE BRICK INSTALLATION SEQUENCE
Transcription
VERMICULITE FIRE BRICK INSTALLATION SEQUENCE
VERMICULITE FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5 Uniq 4: 1 – Rear Brick 2 – Right Side Brick 3 – Inner Top Baffle Brick 4 – Top Baffle Brick 5 – Left Side Brick 6 – Left Back Base Brick 7 – Right Back Base Brick 8 – Rear Base Brick 9 – Base Grate 10 – Left Front Base Brick 11 – Right Front Base Brick 12 – Log Retainer Uniq 5: 3 4 1 8 5 6 59 10 12 7 11 2 FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5 Installation procedure: Rear brick 1. Right side brick 2. Inner top baffle brick 3 positioned with angled edge at front / top. Position brick so that it rests on rear brick 1 and secondary air pre heat chamber. FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5 Push up Inner top baffle brick 3 slightly so that top baffle brick 4 can rest on rear brick 1. Inner top baffle brick 3 then rests on top baffle brick 4. Left side brick 5 fitted. Base bricks 6 & 7 fitted. Rear base brick 8 & Base grate 9 fitted. Left & right front base bricks 10 &11 fitted. FIRE BRICK INSTALLATION SEQUENCE - WESTFIRE UNIQ 4 / 5 Log retainer 12 fitted.