ASTALDI CONSTRUCTION CORPORATION
Transcription
ASTALDI CONSTRUCTION CORPORATION
CLIENT: STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION (DISTRICT 1) ROAD NO. 93 CHARLOTTE – SARASOTA COUNTY Financial Project ID: 413043-2-52-01 ID 413044-2-52-01,ID 413044-3-52-01 CONTRACTOR: SUBCONTRACTOR: DOCUMENT: SR 93 (I-75) CHARLOTTE/SARASOTA COUNTY LINE TO S OF TOLEDO BLADE DEWATERING PLAN #1 SUBMITTAL NO: X PAGES: 4 ASTALDI DOCUMENT NUMBER: ID. T1598 NOTE: PHASE ORIG. DOC.TYPE WBS1 WBS2 SEQ REV: C AT CP XX00 00 005 A A 20-Nov-2015 Issued for Approval Hamilton Mazzocchi Brasil REV. DATE DESCRIPT. ISSUED VERIFIED APPROVED T1598-C-AT-CP-XX-00-00-005_A SR 93 (I-75) CHARLOTTE/SARASOTA COUNTY LINE TO S OF TOLEDO BLADE DEWATERING PLAN #1 FINANCIAL ID. 413043-2-52-01 413044-2-52-01 413044-3-52-01 T1598-C-AT-CP-XX-00-00-005_A Page PAGE 2 of 4 1. Project Overview Astaldi Construction Corporation is the Contractor for the FDOT T1598 project, situated in Charlotte & Desoto/Sarasota County, Florida. The improvements under this contract consist of adding lanes and reconstruction, including bridge rehabilitation, milling and resurfacing, widening, base work, shoulder treatment, drainage improvements, curb and gutters, sidewalks, signing and pavement marking, signalization, intelligent transportation system components and lighting on State Road 93 (I-75) from south of Harborview Road northeasterly approximately 15.581 miles, to Sumter Boulevard in Charlotte and Sarasota Counties. EHC Construction Inc. is the earthwork subcontractor for Astaldi that will perform the excavation and the dewatering activities hereby described. 1. Description of the dewatering activities We are planning on starting on the Ponds 1 & 2 in Charlotte County and the Ponds 5 & 4-04 at Sumter Blvd simultaneously as soon as the clearing will allow. Excavation activities will approximately start in mid-January. We then plan on moving to the Toledo Blade ponds after the Sumter ponds are complete. We should be complete with the Charlotte ponds in about 4-5 weeks, the Sumter Ponds in about 3-4 weeks, and the Toledo Blade Ponds in 10-12 weeks. All the dewatering activities will be performed as per specific plans included in the following annexes: 1. POND #1; 2. POND #2; 3. NW Pond Sumter BLVD 4. SW Pond Sumter BLVD 5. NE & NW Ponds Toledo Blade 6. SE & SW Ponds Toledo Blade Our Construction Plan and dewatering activities are as follows. 1.1. Charlotte Pond 1 & Pond 2 We plan to start construction with installing a conveyance swale from Pond #1 to Pond #2 and excavate Pond #1 and Pond #2 down to the water table and install a perimeter berm around pond #2. After construction of conveyance swale and containment berm, we intend to install specified pump system and pump in Pond #1 with dewatering discharging into the conveyance swale flowing to Pond #2 containment area. We plan to continue pumping while completing the T1598-C-AT-CP-XX-00-00-005_A SR 93 (I-75) CHARLOTTE/SARASOTA COUNTY LINE TO S OF TOLEDO BLADE DEWATERING PLAN #1 FINANCIAL ID. 413043-2-52-01 413044-2-52-01 413044-3-52-01 T1598-C-AT-CP-XX-00-00-005_A Page PAGE 2 of 4 construction of Pond #1. Then we intend to install a pumping system in Pond #2 and discharge dewatering into the conveyance swale flowing to Pond #1 containment area. We plan continue pumping while completing construction of Pond #2. 1.2. Sumter Blvd Pond 5 & Pond 4-04 We anticipate to first install a containment berm around Pond #4-04. We plan to install specified pump system and pump in Pond #5 with dewatering discharging through piping to Pond #4-04 containment area. We would continue pumping while completing the construction of Pond #5. Then we expect to install pumping system in Pond #4-04 and discharge dewatering into Pond #5 containment area. We plan to continue pumping while completing construction of Pond #4-04. 1.3. Toledo Blade Pond 2-01 & Pond 1-02 We anticipate to first install a containment berm around Pond #2-01. We plan to install specified pump system and pump in Pond #1-02 with dewatering discharging through piping to Pond #2-01 containment area. We would continue pumping while completing the construction of Pond #102. Then we expect to install pumping system in Pond #2-01 and discharge dewatering into Pond #1-02 containment area. We plan to continue pumping while completing construction of Pond #201. 1.4. Toledo Blade Pond 2-02 & Pond 2-03 We anticipate to first install a containment berm around Pond #2-02. We plan to install specified pump system and pump in Pond #2-03 with dewatering discharging through piping to Pond #2-02 containment area. We would continue pumping while completing the construction of Pond #203. Then we expect to install pumping system in Pond #2-02 and discharge dewatering into Pond #2-03 containment area. We plan to continue pumping while completing construction of Pond #202. T1598-C-AT-CP-XX-00-00-005_A SR 93 (I-75) CHARLOTTE/SARASOTA COUNTY LINE TO S OF TOLEDO BLADE DEWATERING PLAN #1 FINANCIAL ID. 413043-2-52-01 413044-2-52-01 413044-3-52-01 T1598-C-AT-CP-XX-00-00-005_A Page PAGE 2 of 4 ANNEXES DEWATERING PLANS: 1. POND #1; 2. POND #2; 3. NW Pond Sumter BLVD 4. SW Pond Sumter BLVD 5. NE & NW Ponds Toledo Blade 6. SE & SW Ponds Toledo Blade T1598-C-AT-CP-XX-00-00-005_A