DRINK ADRIA for BeCer Water Management
Transcription
DRINK ADRIA for BeCer Water Management
DRINK ADRIA for Be-er Water Management Istarski vodovod d.o.o. Buzet Nova Gorica, May, 2015 HOW IS OUR SYSTEM MANAGED • 5 Operating units • 129 DMA zones • 607 water meters covering all zones and sub-zones PILOT PROJECT -‐ INVESTMENTS IN THE DRINK ADRIA PROJECT PROCUREMENT • 344 Ultrasonic water meters • 329 Telemetry devices • 10 Pressure gauges • AMR control computer programme CONNECTING AND COMMISSIONING • System connected(SCADA i AMRcontrol). Joint layout of 344 Ultrasonic water meters from the project and 263 water meters from the SCADA system • Education and training for targeted staff Arad Octave Ultrasonic Water Meters Version 4.0 InvenGa MT – 713 HC -‐ logger Capacity: 4 MB 3 batteries (lithium) 3,6V 78 Ah Life: 10 years 3 analogue inlets 0-5 V 2 digital outputs Recording Interval min. 1 s (15 min.) - Outside antennae 5 dBi - IP67 - - - - - - Aplisens -‐ pressure meter PCE -‐ 28 - - - - Measurement span 0-16 Bars Accuracy 0,2% Analogue voltage outlet 0-2,5 Vdc IP67 Measuring post Water losses tracking -‐ before and now Before Now 129 Daily consump1on tracking Daily 152 Weekly consump1on tracking Daily 180 Fortnight consump1on tracking Daily 146 Monthly consump1on tracking Daily Key parameters for system tracking 1. Daily consumption(24 hours) 2. Consumption the day before (48 hours) 3. Comparison (over, under - realised in %) last two days 4. Minimal night consumption 5. Consumption within zones (no consumers) 6. Alarms 7. Vehicle cost for delivering the monthly reports 8. Cost of plumber for monthly readings 9. Leakage detection 10. Leakage repair 11. Feedback on leakage and/or other breakage ReorganisaGon of the leakage surveillance system • The pilot project brought to a-enLon the flaws in the system of surveillance and certain important decisions were made: • Key parameters for future surveillance were definetly • The process of system surveillance and leakage repairs was redefined • Our own overall application for informing and evidence of leakage repairs agreed and launched • Three-month report period on noted and repaired was defined Redefining of the leakage repairs surveillance process Example of financial savings -‐transfer MONTHLY READINGS OU Buje NUMBER OF READINGS HOURS NEEDED 2 16 Hours/overall Km 32 542 očitavanje mjernih mjesta OU Buzet broj očitanja 8 2 PJ Buje Buje OU Pazin OU Poreč 4 Novigra d 2 Umag 2 2 PJ Buzet OU Rovinj 2 utrošeno sati ukupno sati 7 8 4 32 2 4 4 406 118 236 63 126 90 180 30 8 16 10 PJ PazinPazin 32 5 15 Buzet kilometara 16 534 203 406 40 8 32 848 170 680 134 268 82 82 150 HOURS PJ Poreč 45,00 kn/hour Kaštelir 2 6 Poreč 1 5 29 680 3010 km 2,00 kn/km Future steps • • • • • Updating of the existing the GIS base (pipes position, types of pipes, profiles, materials…) Zoning: (129 zones) division to smaller zones according to implemented water meters Introducing the management of losses according to IWA methodology or the ILI indicator Analysis of leakage/breakages Pressure adjustments in the critical zones (according to ILI indicators) Thanks for your a-enLon!