TDOT Smartway Maintenance - Tennessee Section Institute of
Transcription
TDOT Smartway Maintenance - Tennessee Section Institute of
Intelligent Transportation Systems Maintenance TDOT SmartWay System: Memphis Update Presented by: Michael Rebick, PE, M.S. Project Manager Gannett Fleming 2014 TSITE Spring Meeting May 7th, 2014 Presentation Outline Tennessee Department of Transportation (TDOT) SmartWay Maintenance – General TDOT SmartWay Information – Gannett Fleming’s Consultant Role TDOT ITS Maintenance Concepts – Types of ITS Maintenance – Managing ITS Maintenance – Maintenance Challenges The Tennessee Department of Transportation (TDOT) SmartWay ITSs Nashville Knoxville Memphis Chattanooga TDOT SmartWay Transportation Management Center (TMC) Mission Statement “It is the mission of Smartway to proactively monitor the interstates to maximize traffic flow and inform area motorists of abnormal conditions. This is accomplished using field devices, software and Smartway partners to gather and disseminate real-time traveler information.” Overview of System Devices TDOT SmartWay Systems Memphis Nashville (for comparison) 83-mile coverage 169-mile coverage 42 Dynamic Message Signs 59 Dynamic Message Signs 115 CCTV Cameras 152 CCTV Cameras 359 Vehicle Detectors 461 Vehicle Detectors Highway Advisory Radio – 16 transmitters & 42 beacon signs Highway Advisory Radio – 14 transmitters & 47 beacon signs Communications – 60 fiber backbone with 4 fiber drops – Memphis to Jackson 50 GHz Wireless Link Communications – 60 & 72 fiber backbone with 4 fiber drops Gannett Fleming’s Role Prime CEI Consultant (Construction, Engineering, and Inspection) – Provide Contract and Project Management Services (Project Principle, Project Manager, Project Administration) – Provide Full-Time On Site Daily Inspection Assist with Program Management – Track Device Outages – Generate Maintenance Reports – Advise on New Technology & System Improvements TDOT ITS Maintenance Concepts ITS Maintenance Categories 18 months into a 3 year ~$2MIL contract (CNL146) Preventative/Scheduled – PM Schedule of Devices – Underground Infrastructure Locating Unscheduled – Equipment Failure – Acts of Nature • Weather Events • Natural Habitat – 3rd Party Damage • Motorist Hits • Conflicting Construction Damage ITS Maintenance Categories…continued Special Repairs/Enhancements/Innovation – Change Orders – System Improvements – Introduction of New Technology Equipment Replacement – Replenish Spare Parts Inventory – Upgrades to Existing Technology System Software and Network Support – TMC Systems and Communications Managing ITS Maintenance Rely on End User Notifications Rely on Automated System Notifications Effort Tracked using TDOT issued Response Authorization (RA) Ticket – Generated from State’s Maintenance Database Contractor Payments Based on Performance – Thresholds of Device Operability – Response Times Requirements Recent Memphis System Changes CNL007 : I-40 Expansion Canada Rd. to E/O Shelby/Fayette County Line – ~$2.5MIL – 7 CCTV’s & 3 DMS’s – Route traffic to SR385 Wireless Upgrade on MS River Bridge and in Arkansas Radar Detection Upgrade from X3 to G4 TDOT ITS Maintenance/Operations Challenges Improper Dynamic Message Sign Use Proper Dynamic Message Sign Use Inconsistency Across Regions *If possible, use same device manufacturer statewide. TDOT SmartWay TMC Operations Memphis : 5:00 AM – 11:00 PM, Daily Nashville : 24/7 • Nashville “takes” control of Memphis after hours Varying Maintenance Notification Protocols across TDOT Regions Conflicting Roadway Construction • AHTD – mitigate responsibility • TDOT – notify all stakeholders • design, construction, and maintenance TDOT Roadway Construction Projects CNJ411 : I-240 Widening (Walnut Grove to Quince Overpass) • 4 trunk fiber hits in past year – 04/05/2014 most recently, cut comm to CCTV 106 CNM305 : I-40/I-240/Sam Cooper Interchange • Maintain current ITS infrastructure • Adding additional infrastructure IS NEW TECHNOLOGY COMPATIBLE?? Past Obstacles Encountered Tornado struck the Arlington, TN towers – Both the existing and proposed tower were leveled (Pictures taken 2/5/08) Acts of Nature Weather Events Equipment Replacement Obstacles Encountered More Pictures of tornado damage at the Arlington tower site Obstacles Encountered More Pictures of tornado damage at the Arlington tower site Obstacles Encountered More Pictures of tornado damage at the Arlington tower site Multi-Agency Communications Disruption “We can not build our way out of congestion. Planning for mobility through system management & operations is the only alternative.” -Phillip Tarnoff University of Maryland Head Instructor of Senior Management Operations Academy Questions? THANK YOU [email protected] 901-546-0540 http://www.tdot.state.tn.us/tdotsmart way/ www.itstn.org