SE Oklahoma Woodford History and Present Day Completion
Transcription
SE Oklahoma Woodford History and Present Day Completion
SE Oklahoma Woodford History and Present Day Completion Activity Bill Grieser Sr. Technical Specialist 5/23/07 2 OGS 3 Tulsa County Payne County 4 Dewey County Wagoner County Kingfisher County Logan County Blaine County 799 Creek County 8698 6191 9864 Lincoln County Okmulgee County Custer County Muskogee Coun Oklahoma County Canadian County 8582 8493 8754 8836 Okfuskee County 7805 Washita County 3008 3149 McIntosh County 3721 3865 3805 3308 10296 Pottawatomie County Cleveland County 4231 4038 Caddo County Seminole County 4085 4801 4808 4847 4854 4872 7573 5151 4959 8167 5552 6525 5691 4020 5840 6745 4069 6284 6994 7374 7267 8198 8217 2137 6792 2933 6298 6392 7667 8012 8481 8212 8202 8705 8277 8002 6328 8798 6756 8735 8545 8393 8337 8448 8307 8206 8290 8388 6883 8049 8410 8476 8479 7184 7438 8095 8694 8793 10032 7639 7937 8504 9534 8014 8227 4478 8567 7641 7866 8687 5892 8 599 7452 5444 5252 7555 7407 7222 7648 873211096 Hughes County 5543 5571 5110 4247 4276 2045 666 Kiowa County Grady County McClain County Pittsburg County 11002 9603 8288 14923 7844 2497 Pontotoc County Garvin County Comanche County Latim Coal County Stephens County 6599 2709 7153 Murray County Pushmataha Cou 4411 5976 7389 6849 6954 Tillman County Cotton County Carter County Jefferson County Atoka County 6284 6159 6540 5930 6049 6457 7088 3740 3446 3738 5245 3766 5176 7098 3721 8670 7697 7800 9140 8922 9809 Wichita County Love County 601 4892 Johnston County 974 4094 4397 3668 4483 4501 5121 10264 4778 4627 4973 3350 Marshall County Choctaw County Bryan County 5 WOODFORD HISTORICAL PRODUCTION 1979-2007 Woodford shale production 150 Woodford wells with one perforated interval 1979-1998 PetroData Source Bryan 2 Average daily production Caddo 9 OIL BPD Gas Mcf/d Canadian 6 max 14.8 1547 Carter 37 min 0.03 0.13 Garvin 25 average 2.29 123 Grady 21 median 1.5 68 Hughes 1 Average yearly production Love 1 McClain 7 bbl/yr. MCF/Yr Marshall 28 max 68,895 1,090,088 Mayes 2 min 6 33 Murray 1 average 6,129 117,957 Pittsburg 1 median 3,142 48,512 Pontotoc Seminole Stephens 1 1 7 150 Cumulative production from 150 Woodford wells oil 3,069,542 bbl gas 111,007,972 mcf 6 7 Caney Shale & Woodford Shale by month average rig counts (Southeastern Oklahoma) 35.0 8 ATOKA COAL HUGHES MARSHALL MCINTOSH PITTSBURG 30.0 6.0 25.0 6.5 20.0 4.2 0.0 5.0 0.0 0.0 1.0 0.0 2.0 6.8 5.3 0.0 15.0 2.4 1.2 1.0 2.3 0.0 0.0 7.2 1.0 0.0 3.0 0.0 4.0 1.3 1.0 10.0 2.5 0.0 15.8 1.8 0.0 5.0 7.0 6.0 0.0 5.8 1.5 1.5 10.3 0.0 1.0 2.5 11.0 9.6 1.3 6.3 6.6 3.0 3.0 5.5 0.0 2.2 0.0 0.0 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 1.0 1.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 Feb-05 Mar-05 Apr-05 May-05 Jun-05 Jul-05 1.0 4.0 1.8 1.0 2.6 1.0 1.0 0.0 0.0 0.0 2.8 2.0 1.8 3.4 3.3 3.6 3.0 3.0 2.0 Jan-07 0.0 1.0 1.0 0.0 1.0 Dec-06 0.0 0.0 Nov-06 0.0 1.0 0.0 Oct-06 0.0 0.0 1.0 Sep-06 0.0 0.0 0.0 Aug-06 0.0 1.0 2.0 Jul-06 0.0 1.0 0.0 1.5 0.0 Jun-06 1.0 1.0 3.3 May-06 1.0 1.8 0.0 3.0 Apr-06 1.0 0.0 1.0 Mar-06 1.0 1.0 1.0 Feb-06 1.0 1.0 1.0 Jan-06 1.0 Jul-04 1.0 1.0 0.0 Dec-05 0.0 1.5 1.0 1.0 0.0 Nov-05 0.0 0.0 0.0 Oct-05 0.0 Jun-04 0.0 1.0 0.0 May-04 1.0 0.0 1.0 Apr-04 0.0 Jan-05 0.0 1.5 1.0 Sep-05 1.0 0.0 0.0 Aug-05 0.0 Mar-04 Rig Count Average 6.5 SE 35.4 OKLAHOMA WOODFORD 9 43 RIGS 35.2 35 HUGHES PITTSBURG 34.8 COAL 34.6 34.4 ATOKA -96.4 -96.3 -96.2 -96.1 Longitude -96 -95.9 -95.8 -95.7 Woodford Peak Gas Production 10 35.2 35.1 35 Hughes 34.9 Pittsburg 34.8 34.7 = 4-5 mmcf/d =2-3 mmcf/d 34.6 =1-2 mmcf/d Coal 34.5 =0.75-1 mmcf/d =0.3-0.5 mmcf/d 34.4 Atoka -96.3 -96.2 -96.1 LONGITUDE -96 -95.9 -95.8 11 Cardott www.ogs.ou.edu/oilgas.php Brittle Shale 170 ft. Brittle Shale High TOC Brittle Shale 13 WOODFORD HORIZONTAL 13 3/8" 9 5/8" to 600-4500 ft. 9 7/8" or 8.75-8.5" hole to TD 7" Intermediate if needed KOP @ 7800 ft. 8-12/100ft. 5.5" 4.5" 11000 ft. MD 8500 ft. TVD Lateral Length 2000-4000 ft. 14 15 Completion Method most commonly used in the Woodford are: 1)Cased cemented multi stage with pump down PKR and guns 2) Mechanical/ BHA assemblies multi stage CEMENTED MULTI STAGE WITH PUMP DOWN GUN AND FRAC PLUG Injection at high rate Cemented TCP Perforated first stage Staged with Composite Frac Plug and select fire gun 18 MECHANICAL DEVICES Open or Cased Hole BHA Packer. OD Packer ID Sleeve Size Sleeve OD Sleeve ID Hole Size 3.75” 1.94” 2 3/8” 3.61” 1.877” 3.875” 4.63” 1.94” 2 7/8” 4.21” 2.315” 4.75” 5.875” 2.94” 3 _” 4.93” 2.752” 6.25” 6.0” 3.75” 4 _” 5.75” 3.75” 6.5” 8.39” 4.67” 5 _” 7.75” 4.67” 8.75” Multiple Stage With Sleeves and Swell Packers ONE DAY COMPLETIONS Swell Packers & Frac Sleeves Swell Packers Frac Sleeves 19 20 SIMUL-FRAC Simultaneous Hydraulic Fracture Stimulation Less complex region Longer extension Well A High complex region Well B Less complex region Longer extension 21 SPACING/LENGTH DEFINITION Distance between clusters Spacing (SP) = (SL) – ΣCL (NC-1) Overall Stimulation Length (SL) Number of Clusters (NC) Sum of Cluster Lengths (ΣCL) Stage Span (SS) = stage bottom perf – stage top perf SL CL SP SS WOODFORD STIMULATION AVERAGES number of stages Horizontal length Ft. TVD Ft. Stage Span Ft. TD MD Number of holes/stage Net Pay Ft. Gal/ft. lbs/ft. acid per stage gal. gal. per stage lbs/stage average ppg average rate BPM/Hole Average WHTP Average frac gradient 3-8 2500-3500 7900-9100 400-600 10000-12000 80-100 350-400 1000-2000 300-550 5000-11000 500,000-850,000 150,000-200,000 0.2-0.3 70-90 0.7-1.0 5000-6000 0.7-0.75 22 23 FIRST12_GAS VS Peak mcf/d OK WOODFORD 1400000 12 month cum = 101.76(mcf/d) 2 R = 0.6648 1200000 12 month cum mcf 1000000 800000 600000 400000 200000 0 0 2000 4000 6000 peak mcf/d 8000 10000 12000 24 FIRST12 BBL VS Peak BOPD OK WOODFORD 70000 12 month BBL = 86.883(BOPD) 2 R = 0.6593 60000 12 month cum BBL 50000 40000 30000 20000 10000 0 0 100 200 300 400 Peak BOPD 500 600 700 800 25 N TX BARNETT SE OK WOODFORD Production Comparison Barnett Woodford Average Peak Gas 2000 1823 1800 1600 1711 BARNETT Qh/Qv = 2.3 Peak Gas MCF/D 1400 1200 Woodford Qh/Qv = 3.9 Woodfrod Barnett 1000 754 800 600 1026 459 3784 400 200 69 30 0 Vert Vertical Gas Yield per ft. Horz Barnett 1.88 scf/d per ft Woodford 3.0 scf/d per ft. QUESTIONS? Bill Grieser Sr. Technical Specialist 5/23/07