Total System (MMcf/d) Total System (MDth/d) Total System (MMcf/Yr

Transcription

Total System (MMcf/d) Total System (MDth/d) Total System (MMcf/Yr
Cold (1-in-10
Likelihood) Yr
Hdd
1567
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Dth/Mcf:
1.0302
Col# for
"VlookUp"
1
Total
Total
System
System
Total System Total System
Annual
(MMcf/d) (MDth/d)
(MMcf/Yr)
(MDth/Yr)
Reserve %
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
2,642
2,722
967,005
996,208
47%
2,642
2,722
964,416
993,541
47%
2,639
2,719
963,385
992,480
47%
2,624
2,704
957,924
986,854
48%
2,630
2,710
962,636
991,708
47%
2,631
2,710
960,215
989,213
47%
2,632
2,711
960,670
989,682
47%
2,636
2,715
962,099
991,154
47%
2,640
2,720
966,409
995,595
47%
2,666
2,747
973,183
1,002,573
45%
2,662
2,743
971,775
1,001,123
46%
2,671
2,752
974,944
1,004,387
45%
2,677
2,758
979,730
1,009,318
45%
2,721
2,803
993,183
1,023,178
42%
2,786
2,870
1,016,882
1,047,592
39%
1,021,064
1,051,900
39%
2,797
2,882
2,832
2,917
1,036,385
1,067,684
37%
2,884
2,971
1,052,610
1,084,399
34%
2
3
4
5
Cold (1-in-10
Likelihood) Yr
Hdd
1534
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Dth/Mcf:
1.0175
Col# for
"VlookUp"
1
Total
Total
System
System
Total System Total System
Annual
(MMcf/d) (MDth/d)
(MMcf/Yr)
(MDth/Yr)
Reserve %
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
330
335
120,621
122,729
91%
355
362
129,702
131,969
77%
365
371
133,257
135,586
73%
336
342
122,616
124,759
88%
336
342
123,019
125,169
87%
337
343
123,089
125,240
87%
334
340
121,847
123,977
89%
332
338
121,085
123,201
90%
332
338
121,535
123,659
90%
335
340
122,142
124,277
88%
336
342
122,677
124,821
87%
338
344
123,310
125,465
86%
339
345
123,957
126,123
86%
346
352
126,359
128,568
82%
131,046
79%
353
359
128,795
360
366
131,280
133,575
75%
365
372
133,769
136,106
72%
377
384
137,583
139,988
67%
2
3
4
5
GasResourcePlan_PeakDayLoad(14Nov2007)4DMB_1-in-35CoreOnly-Rev SoCalGas coincident_1-in-35
12Mo Operating Year (Apr-Mar)
2006/7
core (Bruce)
noncore (Loan)
eor-Steam + CoGen(Sharon)
MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD
3120
3106
3083
3082
3086
3089
3085
3078
3070
3063
3057
3046
3037
3030
3030
3029
3030
3033
3038
3045
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
eg (UEG/EWG+Purpa50) (Jeff Huang)
SmCog+Ref-EG (Rose-Marie/Brenda)
sdge (Marjorie)
lb (Marjorie)
swg (Marjorie)
vernon (Marjorie)
ECO-Gas (Marjorie)
TOTAL
Noncore (Incl. Wholesale)
2007/8
0
0
388
52
74
5
0
3639
519
0
0
387
57
78
5
0
3633
527
2007/8
2008/9
0
0
385
57
67
5
0
3599
515
0
0
389
57
71
5
0
3605
523
2009/10
2010/11
0
0
391
57
74
5
0
3613
528
2010/11
2011/12
0
0
392
57
78
5
0
3621
532
2011/12
2012/13
0
0
385.5
57
82
5
0
3615
529
2012/13
2013/14
0
0
384.8
57
85
5
0
3610
532
2013/14
2014/15
0
0
384
57
89
5
0
3605
535
2014/15
2015/16
0
0
386
57
92
5
0
3604
541
2015/16
2016/17
0
0
388
57
94
5
0
3601
544
2016/17
2017/18
0
0
388
57
96
5
0
3592
546
2017/18
2018/19
0
0
390
57
98
5
0
3587
550
2018/19
2019/20
0
0
392
57
100
5
0
3584
554
2019/20
2020/21
0
0
394
57
102
5
0
3588
558
2020/21
2021/22
0
0
396
57
104
5
0
3591
562
2021/22
2022/23
0
0
399
57
106
5
0
3597
567
2022/23
2023/24
0
0
401
57
108
5
0
3604
572
2023/24
2024/25
0
0
404
57
110
5
0
3614
576
2024/25
2025/26?
0
0
420
57
112
5
0
3639
595
12Mo Operating Year (Apr-Mar)
2006/7
core
noncore c&i *
eg **
wholesale ***
TOTAL
MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD
3120
3106
3083
3082
3086
3089
3085
3078
3070
3063
3057
3046
3037
3030
3030
3029
3030
3033
3038
3045
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
519
527
515
523
528
532
529
532
535
541
544
546
550
554
558
562
567
572
576
595
3639
3633
3599
3605
3613
3621
3615
3610
3605
3604
3601
3592
3587
3584
3588
3591
3597
3604
3614
3639
* includes eor-steaming and eor-cogen
** ex cludes EOR cogeneration
*** includes international service and wholesale eg
2008/9
2009/10
2025/26?
GasResourcePlan_PeakDayLoad(14Nov2007)4DMB_1-in-35CoreOnly-Rev SDG&E coincident_1-in-35
12Mo Operating Year (Apr-Mar)
2006/7
core (Bruce)
noncore-nonEG a/ (Loan)
noncore-CoGenEG a/ (Loan)
MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD
388
387
386
390
391
392
386
385
385
387
388
389
390
392
394
397
399
402
404
421
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2008/9
2009/10
2010/11
2011/12
2012/13
2013/14
2014/15
2015/16
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26?
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
388.43
0
0
387
0
0
386
0
0
390
0
0
391
0
0
392
0
0
385.9
0
0
385.2
0
0
385
0
0
387
0
0
388
0
0
389
0
0
390
0
0
392
0
0
394
0
0
397
0
0
399
0
0
402
0
0
404
0
0
421
0
EG Power-Plant a/ (Marjorie/Jeff H.)
wholesale ***
TOTAL
Noncore
2007/8
12Mo Operating Year (Apr-Mar)
2006/7
core
noncore c&i *
eg **
wholesale ***
TOTAL
MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD
388
387
386
390
391
392
386
385
385
387
388
389
390
392
394
397
399
402
404
421
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
388
387
386
390
391
392
386
385
385
387
388
389
390
392
394
397
399
402
404
421
2007/8
2008/9
2009/10
2010/11
2011/12
2012/13
* includes CoGenEG
** Only Power-Plant Load (i.e., ex cludes cogeneration from above)
*** SDG&E does not provide wholesale gas service.
a/
Gas demand forecasts for noncore commercial & industrial (C&I)
and electric generation (EG) customer classes do not distinguish between firm and interruptible noncore service.
Thus, for the purposes of this assessment, SDG&E assumed that all future peak loads elected firm noncore service,
until SDG&E has a mechanism to identify specific customer firm service requests beyond the current two-year firm noncore service election.
2013/14
2014/15
2015/16
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26?
GasResourcePlan_PeakDayLoad(14Nov2007)4DMB_1-in-10 SoCalGas coincident_1-in-10
12Mo Operating Year (Apr-Mar)
2006/7
core (Bruce)
noncore (Loan)
eor-Steam + CoGen(Sharon)
MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD
2888
2874
2853
2852
2856
2859
2856
2849
2842
2836
2830
2820
2811
2805
2805
2804
2806
2809
2813
2820
453
438
426
421
421
421
414
415
415
416
416
415
412
411
409
408
408
407
406
406
111
101
86
39
39
39
29
29
29
29
29
29
29
29
29
29
29
29
29
29
eg (UEG/EWG+Purpa50) (Jeff Huang)
SmCog+Ref-EG (Rose-Marie/Brenda)
sdge (Marjorie)
lb (Marjorie)
swg (Marjorie)
vernon (Marjorie)
ECO-Gas (Marjorie)
TOTAL
Noncore (Incl. Wholesale)
2007/8
625
104
621
52
72
22
16
4965
2077
685
98
564
63
75
22
13
4934
2060
2007/8
2008/9
860
98
569
63
58
33
14
5060
2207
789
98
626
63
61
33
14
4996
2144
2009/10
2010/11
777
98
626
63
64
33
14
4991
2135
2010/11
2011/12
769
98
596
63
66
23
14
4949
2090
2011/12
2012/13
715
105
601
63
69
23
14
4890
2034
2012/13
2013/14
710
105
592
63
72
23
14
4873
2024
2013/14
2014/15
705
106
582
63
74
23
15
4855
2013
2014/15
2015/16
700
107
575
63
77
23
15
4841
2005
2015/16
2016/17
742
107
581
63
79
23
15
4884
2054
2016/17
2017/18
785
108
586
63
80
23
15
4922
2103
2017/18
2018/19
827
108
592
63
82
23
15
4961
2150
2018/19
2019/20
869
108
598
63
83
23
15
5003
2198
2019/20
2020/21
911
108
604
63
85
23
15
5052
2247
2020/21
2021/22
946
108
614
63
87
23
15
5098
2294
2021/22
2022/23
982
108
625
63
89
23
15
5147
2341
2022/23
2023/24
1018
109
636
63
90
23
15
5197
2389
2023/24
2024/25
1053
109
646
63
92
23
15
5250
2437
2024/25
2025/26?
1089
109
670
63
94
23
15
5317
2497
12Mo Operating Year (Apr-Mar)
2006/7
core
noncore c&i *
eg **
wholesale ***
TOTAL
MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD
2888
2874
2853
2852
2856
2859
2856
2849
2842
2836
2830
2820
2811
2805
2805
2804
2806
2809
2813
2820
563
539
512
460
460
459
443
444
444
445
445
444
441
440
438
437
437
436
435
435
730
783
958
887
875
867
820
816
811
807
850
892
934
976
1019
1054
1090
1126
1162
1198
784
737
737
797
799
763
771
764
757
753
760
767
774
782
790
802
814
827
839
864
4965
4934
5060
4996
4991
4949
4890
4873
4855
4841
4884
4922
4961
5003
5052
5098
5147
5197
5250
5317
* includes eor-steaming and eor-cogen
** ex cludes EOR cogeneration
*** includes international service and wholesale eg
2008/9
2009/10
2025/26?
GasResourcePlan_PeakDayLoad(14Nov2007)4DMB_1-in-10 SDG&E coincident_1-in-10
12Mo Operating Year (Apr-Mar)
2006/7
core (Bruce)
noncore-nonEG a/ (Loan)
noncore-CoGenEG a/ (Loan)
MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD
364
362
361
365
366
367
361
360
360
362
363
364
365
367
369
371
373
376
378
393
10
11
11
11
11
11
10
10
10
10
10
11
11
11
11
11
11
11
11
12
52
52
52
53
53
54
54
54
55
55
56
56
57
57
57
58
58
59
59
60
2008/9
2009/10
2010/11
2011/12
2012/13
2013/14
2014/15
2015/16
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26?
197
139
145
198
196
165
176
167
158
149
153
156
160
164
168
175
183
190
198
206
0
622.12
259
0
564
202
0
569
208
0
626
262
0
626
260
0
596
229
0
602
241
0
592
232
0
583
223
0
576
214
0
581
218
0
587
223
0
592
227
0
598
231
0
605
236
0
615
244
0
626
252
0
636
260
0
647
269
0
670
277
EG Power-Plant a/ (Marjorie/Jeff H.)
wholesale ***
TOTAL
Noncore
2007/8
12Mo Operating Year (Apr-Mar)
2006/7
core
noncore c&i *
eg **
wholesale ***
TOTAL
MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD
364
362
361
365
366
367
361
360
360
362
363
364
365
367
369
371
373
376
378
393
62
64
64
64
64
64
64
65
65
65
66
67
67
68
68
69
69
70
71
71
197
139
145
198
196
165
176
167
158
149
153
156
160
164
168
175
183
190
198
206
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
622
564
569
626
626
596
602
592
583
576
581
587
592
598
605
615
626
636
647
670
2007/8
2008/9
2009/10
2010/11
2011/12
2012/13
* includes CoGenEG
** Only Power-Plant Load (i.e., ex cludes cogeneration from above)
*** SDG&E does not provide wholesale gas service.
a/
Gas demand forecasts for noncore commercial & industrial (C&I)
and electric generation (EG) customer classes do not distinguish between firm and interruptible noncore service.
Thus, for the purposes of this assessment, SDG&E assumed that all future peak loads elected firm noncore service,
until SDG&E has a mechanism to identify specific customer firm service requests beyond the current two-year firm noncore service election.
2013/14
2014/15
2015/16
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26?
Rainbow Corridor forecast
2009/10
2010/11
2011/12
2012/13
2013/14
2014/15
2015/16
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
Core
MMcfd
86
90
95
100
105
110
116
122
128
135
142
149
157
165
173
EG
MMcfd
109
83
112
114
114
109
114
114
114
114
114
114
114
114
114
Total
MMcfd
195
173
207
214
219
219
230
236
242
249
256
263
271
279
287
SJV_CoreSetAsideFcst(26Jun2007)ExtendedFurtherver2(SJV-Estimates(26Jun2007))
Month/
Year
Jan-06
Jan-07
Jan-08
Jan-09
Jan-10
Jan-11
Jan-12
Jan-13
Jan-14
Jan-15
Jan-16
Jan-17
Jan-18
Jan-19
Jan-20
Jan-21
Jan-22
Jan-23
Jan-24
Jan-25
month
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
year
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
FINAL of Feb. 8th, 2007 and EXTENDED through March 2017
Total Core
ResidenG10&GEN
NGV
"Settial
Aside"
(MDth/d) (MDth/d) (MDth/d)
73.0
34.6
0.169
107.8
74.7
35.7
0.327
110.8
76.3
36.9
0.327
113.5
77.9
38.1
0.327
116.4
79.7
39.3
0.327
119.3
81.5
40.6
0.327
122.4
83.3
41.9
0.311
125.5
85.1
43.3
0.297
128.7
86.9
44.7
0.282
131.9
88.8
46.2
0.269
135.2
90.8
47.6
0.256
138.7
92.7
49.2
0.244
142.2
94.8
50.8
0.232
145.8
96.8
52.4
0.221
149.5
98.9
54.1
0.211
153.3
101.1
55.9
0.201
157.2
103.3
57.7
0.191
161.2
105.5
59.6
0.182
165.3
107.8
61.5
0.173
169.5
110.2
63.5
0.165
173.9
SJV Loading Forecast summary
Year
Core
Non-core
Total
2009
116
42
158
2010
119
42
161
2011
122
42
164
2012
125
42
167
2013
129
42
171
2014
132
42
174
2015
135
42
177
2016
139
42
181
2017
142
42
184
2018
146
42
188
2019
149
42
191
2020
153
42
195
2021
157
42
199
2022
161
42
203
2023
165
42
207
1-in-10 Full System, 6 Bcf Sendout
Loads vs Supplies
6500
-2000
6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00
AM AM AM PM PM PM PM PM PM AM AM AM AM AM AM PM PM PM PM PM PM AM AM AM AM
6400
-3000
6300
-4000
6200
6100
-6000
6000
-7000
5900
-8000
5800
-9000
5700
-10000
5600
Loads
Supplies
MMcfd
MMcfd
-5000
1-in-10 Full System, 6 Bcf Sendout
System Pack & SDG&E Pack
2800
180
2750
160
140
2700
120
2650
MMcf
MMcf
100
2600
80
2550
60
2500
40
2450
20
2400
0
6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00
AM AM AM PM PM PM PM PM PM AM AM AM AM AM AM PM PM PM PM PM PM AM AM AM AM
Syspack
SDGEPack
1-in-10 Full System, 6 Bcf Sendout
Various Packs
1000
900
800
700
MMcf
600
500
400
300
200
100
0
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
Cpack
4:00
AM
Vpack
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
Npack
Lpack
4:00
PM
Bpack
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
City Gate Flows
1200
1000
MMcfd
800
600
400
200
0
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
Yorba
4:00
AM
Westside
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
Brea
Puente
4:00
PM
Quigley
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
Storage Field Pressures
1000
900
800
700
PSIG
600
500
400
300
200
100
0
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
DelRey
Aliso
4:00
AM
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
Honor
Montebello
4:00
PM
6:00
PM
Goleta
8:00 10:00 12:00 2:00
PM
PM
AM
AM
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
Storage Field Flows
2000
1800
1600
1400
MMcfd
1200
1000
800
600
400
200
0
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
DelRey
Aliso
4:00
AM
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
Honor
Montebello
4:00
PM
6:00
PM
Goleta
8:00 10:00 12:00 2:00
PM
PM
AM
AM
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
Chino and Prado Flows and Totals
700
1000
900
600
800
500
700
600
500
300
400
300
200
200
100
100
0
0
6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00
AM AM AM PM PM PM PM PM PM AM AM AM AM AM AM PM PM PM PM PM PM AM AM AM AM
Chino
Prado
ChinoQ
PradoQ
MMcf
MMcfd
400
1-in-10 Full System, 6 Bcf Sendout
Orange County Pressures
340
320
300
280
PSIG
260
240
220
200
180
160
140
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
HUNTING
SANTA
4:00
AM
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
YOR4000U
YOR4002U
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
SDGEDANA
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
Loop Pressures
500
460
420
380
PSIG
340
300
260
220
180
140
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
L1024UEG
4:00
AM
Haynes
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
Redondo
DelRey
4:00
PM
6:00
PM
Spence
8:00 10:00 12:00 2:00
PM
PM
AM
AM
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
Line 4000 Pressures
700
650
PSIG
600
550
500
450
400
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
Cajon
4:00
AM
Fontana
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
Chino
Prado
4:00
PM
Yorba
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
Coastal Pressures
1000
900
PSIG
800
700
600
500
400
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
Gaviota
Goleta
4:00
AM
6:00
AM
Center Road
8:00 10:00 12:00 2:00
AM
AM
PM
PM
Westside 404
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
Westside 406
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
San Jaoquin Valley Pressures
850
800
PSIG
750
700
650
600
550
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
QuigleyU
4:00
AM
SaugusU
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
Honor
WheelerD
4:00
PM
6:00
PM
KernSta
8:00 10:00 12:00 2:00
PM
PM
AM
AM
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
Needles Pressures
900
850
800
PSIG
750
700
650
600
550
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
NNeedleS
4:00
AM
6:00
AM
NNeedleD
8:00 10:00 12:00 2:00
AM
AM
PM
PM
SNeedleS
4:00
PM
SNeedleD
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
Blythe Pressures
850
800
750
700
PSIG
650
600
550
500
450
400
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
BlytheS
BlytheD
4:00
AM
DesertD
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
CactusD
WhiteU
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
Mor2000U
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
San Diego Pressures
650
600
550
PSIG
500
450
400
350
300
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
LaMesa
4:00
AM
Mesa
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
SoBay
Escondido
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
4:00
AM
6:00
AM
1-in-10 Full System, 6 Bcf Sendout
Moreno and Rainbow Pressures
900
800
PSIG
700
600
500
400
300
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
4:00
PM
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
MorenoS
4:00
AM
MorenoD
6:00
AM
8:00 10:00 12:00 2:00
AM
AM
PM
PM
RainbowS
4:00
PM
RainbowD
6:00
PM
8:00 10:00 12:00 2:00
PM
PM
AM
AM
4:00
AM
6:00
AM
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
MMCF
SDG&E SYSTEM PACK
SDG&E Winter=650 MMcfd (December 2019), RDOM= 0
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd
150
140
130
120
110
100
90
80
70
60
50
BORDER PRESSURE AND FLOW
SDG&E Winter=650 MMcfd (December 2019), RDOM= 0
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd
200
500
450
175
400
150
350
100
200
75
150
50
100
25
50
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
0
7:00 AM
0
6:00 AM
PSIG
250
MMCFD
125
300
Border P
Border Q
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
PSIG
SYSTEM PRESSURES
SDG&E Winter=650 MMcfd (December 2019), RDOM= 0
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd
550
500
450
400
350
300
La Mesa
SoBay
250
200
150
100
50
0
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
PSIG
SYSTEM PRESSURES
SDG&E Winter=650 MMcfd (December 2019), RDOM= 0
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd
600
550
500
450
400
350
300
Miramar
30-inch
250
200
150
100
50
0
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
PSIG
SYSTEM PRESSURES
SDG&E Winter=650 MMcfd (December 2019), RDOM= 0
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd
700
600
500
400
Escondido
Valve 7
Rainbow
300
200
100
0
MORENO PRESSURE AND FLOW
SDG&E Winter=650 MMcfd (December 2019), RDOM= 0
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd
50
750
700
40
650
600
30
PSIG
MMCFH
550
500
20
450
400
10
350
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
0
6:00 AM
300
Discharge
Suction
Flow
MORENO HORSEPOWER
SDG&E Winter=650 MMcfd (December 2019), RDOM= 0
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd
16000
15000
14000
13000
12000
11000
+3 Clarks
Mor HP Used
+Unit 8
+Unit 9
+Unit 10
4 Solars
10000
8000
7000
6000
5000
4000
3000
2000
1000
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
0
6:00 AM
HP
9000
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
MMCF
SDG&E SYSTEM PACK
SDG&E Winter=675 MMcfd (December 2009), RDOM = 0
EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd
150
140
130
120
110
100
90
80
70
60
50
BORDER PRESSURE AND FLOW
SDG&E Winter=675 MMcfd (December 2009), RDOM = 0
EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd
200
500
450
175
400
150
350
100
200
75
150
50
100
25
50
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
0
7:00 AM
0
6:00 AM
PSIG
250
MMCFD
125
300
Border P
Border Q
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
PSIG
SYSTEM PRESSURES
SDG&E Winter=675 MMcfd (December 2009), RDOM = 0
EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd
500
450
400
350
300
250
La Mesa
SoBay
200
150
100
50
0
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
PSIG
SYSTEM PRESSURES
SDG&E Winter=675 MMcfd (December 2009), RDOM = 0
EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd
550
500
450
400
350
300
Miramar
30-inch
250
200
150
100
50
0
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
PSIG
SYSTEM PRESSURES
SDG&E Winter=675 MMcfd (December 2009), RDOM = 0
EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd
700
600
500
400
Escondido
Valve 7
Rainbow
300
200
100
0
MORENO PRESSURE AND FLOW
SDG&E Winter=675 MMcfd (December 2009), RDOM = 0
EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd
40
750
700
650
30
PSIG
550
20
500
450
10
400
350
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
0
6:00 AM
300
MMCFH
600
Discharge
Suction
Flow
MORENO HORSEPOWER
SDG&E Winter=675 MMcfd (December 2009), RDOM = 0
EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd
16000
15000
14000
13000
12000
11000
+3 Clarks
Mor HP Used
+Unit 8
+Unit 9
+Unit 10
4 Solars
10000
8000
7000
6000
5000
4000
3000
2000
1000
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
0
6:00 AM
HP
9000
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
MMCF
SDG&E SYSTEM PACK
SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd
150
140
130
120
110
100
90
80
70
60
50
BORDER PRESSURE AND FLOW
SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd
550
200
500
175
450
150
400
300
100
250
75
200
150
50
100
25
50
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
0
7:00 AM
0
MMCFD
125
6:00 AM
PSIG
350
Border P
Border Q
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
PSIG
SYSTEM PRESSURES
SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd
550
500
450
400
350
300
La Mesa
SoBay
250
200
150
100
50
0
SYSTEM PRESSURES
SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd
600
550
500
450
400
Miramar
30-inch
300
250
200
150
100
50
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
0
6:00 AM
PSIG
350
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
6:00 AM
PSIG
SYSTEM PRESSURES
SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd
700
600
500
400
Escondido
Valve 7
Rainbow
300
200
100
0
MORENO PRESSURE AND FLOW
SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd
50
750
700
40
650
600
30
PSIG
MMCFH
550
500
20
450
400
10
350
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
0
6:00 AM
300
Discharge
Suction
Flow
MORENO HORSEPOWER
SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd
EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd
16000
15000
14000
13000
12000
11000
+3 Clarks
Mor HP Used
+Unit 8
+Unit 9
+Unit 10
4 Solars
10000
8000
7000
6000
5000
4000
3000
2000
1000
TIME OF DAY
6:00 AM
5:00 AM
4:00 AM
3:00 AM
2:00 AM
1:00 AM
12:00 AM
11:00 PM
10:00 PM
9:00 PM
8:00 PM
7:00 PM
6:00 PM
5:00 PM
4:00 PM
3:00 PM
2:00 PM
1:00 PM
12:00 PM
11:00 AM
10:00 AM
9:00 AM
8:00 AM
7:00 AM
0
6:00 AM
HP
9000
SJV SYSTEM PRESSURES
Base Case
400.0
390.0
380.0
Pressure (PSIG)
370.0
360.0
350.0
340.0
330.0
320.0
310.0
300.0
6.000
8.000
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
Time (HOURS)
Left: V-85N21A PRESSURE
Left: ID1386
PRESSURE
Left: V80002A
Left: ID1101
PRESSURE
PRESSURE
Left: ID1492U
PRESSURE
28.00
30.00
SJV SYSTEM PRESSURES IN YEAR 8
400.0
390.0
380.0
Pressures (PSIG)
370.0
360.0
350.0
340.0
330.0
320.0
310.0
300.0
6.000
8.000
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
Time (HOURS)
Left: V-85N21A PRESSURE
Left: ID1386
PRESSURE
Left: V80002A
Left: ID1101
PRESSURE
PRESSURE
Left: ID1492U
PRESSURE
28.00
30.00
3200
400
3150
395
3100
390
3050
385
3000
380
2950
375
2900
370
2850
365
2800
360
2750
355
2700
350
6
8
10
12
14
16
18
20
Time (Hours)
HP
DisP
SucP
22
24
26
28
30
Pressure (Psig)
HP
SJV COMPRESSION IN YEAR 8
Avenal Compressor
SJV SYSTEM PRESSURES AT END OF PLAN PERIOD
Avenal Compressor only
400.0
390.0
380.0
Pressure (PSIG)
370.0
360.0
350.0
340.0
330.0
320.0
310.0
300.0
6.000
8.000
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
Time (HOURS)
Left: V-85N21A PRESSURE
Left: ID1386
PRESSURE
Left: V80002A
Left: ID1101
PRESSURE
PRESSURE
Left: ID1492U
PRESSURE
28.00
30.00
3000
400
2950
395
2900
390
2850
385
2800
380
2750
375
2700
370
2650
365
2600
360
2550
355
2500
350
6
8
10
12
14
16
18
20
Time (HOURS)
DisP
SucP
22
24
26
28
30
Pressure (Psig)
Hp
SJV COMPRESSION AT END OF PLAN PERIOD
Avenal Compressor Only
SJV SYSTEM PRESSURES AT END OF PLAN PERIOD
Avenal compressor and 8 mi loop
400.0
390.0
380.0
Pressure (PSIG)
370.0
360.0
350.0
340.0
330.0
320.0
310.0
300.0
6.000
8.000
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
Time (HOURS)
Left: V-85N21A PRESSURE
Left: ID1386
PRESSURE
Left: V80002A
Left: ID1101
PRESSURE
PRESSURE
Left: ID1492U
PRESSURE
28.00
30.00
3000
400
2950
395
2900
390
2850
385
2800
380
2750
375
2700
370
2650
365
2600
360
2550
355
2500
350
6
8
10
12
14
16
18
20
Time (HOURS)
HP
DisP
SucP
22
24
26
28
30
Pressure (Psig)
HP
SJV COMPRESSION AT END OF PLAN PERIOD
Avenal Compressor and 8 mi Loop

Similar documents