Total System (MMcf/d) Total System (MDth/d) Total System (MMcf/Yr
Transcription
Total System (MMcf/d) Total System (MDth/d) Total System (MMcf/Yr
Cold (1-in-10 Likelihood) Yr Hdd 1567 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Dth/Mcf: 1.0302 Col# for "VlookUp" 1 Total Total System System Total System Total System Annual (MMcf/d) (MDth/d) (MMcf/Yr) (MDth/Yr) Reserve % #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 2,642 2,722 967,005 996,208 47% 2,642 2,722 964,416 993,541 47% 2,639 2,719 963,385 992,480 47% 2,624 2,704 957,924 986,854 48% 2,630 2,710 962,636 991,708 47% 2,631 2,710 960,215 989,213 47% 2,632 2,711 960,670 989,682 47% 2,636 2,715 962,099 991,154 47% 2,640 2,720 966,409 995,595 47% 2,666 2,747 973,183 1,002,573 45% 2,662 2,743 971,775 1,001,123 46% 2,671 2,752 974,944 1,004,387 45% 2,677 2,758 979,730 1,009,318 45% 2,721 2,803 993,183 1,023,178 42% 2,786 2,870 1,016,882 1,047,592 39% 1,021,064 1,051,900 39% 2,797 2,882 2,832 2,917 1,036,385 1,067,684 37% 2,884 2,971 1,052,610 1,084,399 34% 2 3 4 5 Cold (1-in-10 Likelihood) Yr Hdd 1534 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Dth/Mcf: 1.0175 Col# for "VlookUp" 1 Total Total System System Total System Total System Annual (MMcf/d) (MDth/d) (MMcf/Yr) (MDth/Yr) Reserve % #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 330 335 120,621 122,729 91% 355 362 129,702 131,969 77% 365 371 133,257 135,586 73% 336 342 122,616 124,759 88% 336 342 123,019 125,169 87% 337 343 123,089 125,240 87% 334 340 121,847 123,977 89% 332 338 121,085 123,201 90% 332 338 121,535 123,659 90% 335 340 122,142 124,277 88% 336 342 122,677 124,821 87% 338 344 123,310 125,465 86% 339 345 123,957 126,123 86% 346 352 126,359 128,568 82% 131,046 79% 353 359 128,795 360 366 131,280 133,575 75% 365 372 133,769 136,106 72% 377 384 137,583 139,988 67% 2 3 4 5 GasResourcePlan_PeakDayLoad(14Nov2007)4DMB_1-in-35CoreOnly-Rev SoCalGas coincident_1-in-35 12Mo Operating Year (Apr-Mar) 2006/7 core (Bruce) noncore (Loan) eor-Steam + CoGen(Sharon) MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD 3120 3106 3083 3082 3086 3089 3085 3078 3070 3063 3057 3046 3037 3030 3030 3029 3030 3033 3038 3045 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 eg (UEG/EWG+Purpa50) (Jeff Huang) SmCog+Ref-EG (Rose-Marie/Brenda) sdge (Marjorie) lb (Marjorie) swg (Marjorie) vernon (Marjorie) ECO-Gas (Marjorie) TOTAL Noncore (Incl. Wholesale) 2007/8 0 0 388 52 74 5 0 3639 519 0 0 387 57 78 5 0 3633 527 2007/8 2008/9 0 0 385 57 67 5 0 3599 515 0 0 389 57 71 5 0 3605 523 2009/10 2010/11 0 0 391 57 74 5 0 3613 528 2010/11 2011/12 0 0 392 57 78 5 0 3621 532 2011/12 2012/13 0 0 385.5 57 82 5 0 3615 529 2012/13 2013/14 0 0 384.8 57 85 5 0 3610 532 2013/14 2014/15 0 0 384 57 89 5 0 3605 535 2014/15 2015/16 0 0 386 57 92 5 0 3604 541 2015/16 2016/17 0 0 388 57 94 5 0 3601 544 2016/17 2017/18 0 0 388 57 96 5 0 3592 546 2017/18 2018/19 0 0 390 57 98 5 0 3587 550 2018/19 2019/20 0 0 392 57 100 5 0 3584 554 2019/20 2020/21 0 0 394 57 102 5 0 3588 558 2020/21 2021/22 0 0 396 57 104 5 0 3591 562 2021/22 2022/23 0 0 399 57 106 5 0 3597 567 2022/23 2023/24 0 0 401 57 108 5 0 3604 572 2023/24 2024/25 0 0 404 57 110 5 0 3614 576 2024/25 2025/26? 0 0 420 57 112 5 0 3639 595 12Mo Operating Year (Apr-Mar) 2006/7 core noncore c&i * eg ** wholesale *** TOTAL MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD 3120 3106 3083 3082 3086 3089 3085 3078 3070 3063 3057 3046 3037 3030 3030 3029 3030 3033 3038 3045 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 519 527 515 523 528 532 529 532 535 541 544 546 550 554 558 562 567 572 576 595 3639 3633 3599 3605 3613 3621 3615 3610 3605 3604 3601 3592 3587 3584 3588 3591 3597 3604 3614 3639 * includes eor-steaming and eor-cogen ** ex cludes EOR cogeneration *** includes international service and wholesale eg 2008/9 2009/10 2025/26? GasResourcePlan_PeakDayLoad(14Nov2007)4DMB_1-in-35CoreOnly-Rev SDG&E coincident_1-in-35 12Mo Operating Year (Apr-Mar) 2006/7 core (Bruce) noncore-nonEG a/ (Loan) noncore-CoGenEG a/ (Loan) MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD 388 387 386 390 391 392 386 385 385 387 388 389 390 392 394 397 399 402 404 421 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2008/9 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26? 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 388.43 0 0 387 0 0 386 0 0 390 0 0 391 0 0 392 0 0 385.9 0 0 385.2 0 0 385 0 0 387 0 0 388 0 0 389 0 0 390 0 0 392 0 0 394 0 0 397 0 0 399 0 0 402 0 0 404 0 0 421 0 EG Power-Plant a/ (Marjorie/Jeff H.) wholesale *** TOTAL Noncore 2007/8 12Mo Operating Year (Apr-Mar) 2006/7 core noncore c&i * eg ** wholesale *** TOTAL MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD 388 387 386 390 391 392 386 385 385 387 388 389 390 392 394 397 399 402 404 421 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 388 387 386 390 391 392 386 385 385 387 388 389 390 392 394 397 399 402 404 421 2007/8 2008/9 2009/10 2010/11 2011/12 2012/13 * includes CoGenEG ** Only Power-Plant Load (i.e., ex cludes cogeneration from above) *** SDG&E does not provide wholesale gas service. a/ Gas demand forecasts for noncore commercial & industrial (C&I) and electric generation (EG) customer classes do not distinguish between firm and interruptible noncore service. Thus, for the purposes of this assessment, SDG&E assumed that all future peak loads elected firm noncore service, until SDG&E has a mechanism to identify specific customer firm service requests beyond the current two-year firm noncore service election. 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26? GasResourcePlan_PeakDayLoad(14Nov2007)4DMB_1-in-10 SoCalGas coincident_1-in-10 12Mo Operating Year (Apr-Mar) 2006/7 core (Bruce) noncore (Loan) eor-Steam + CoGen(Sharon) MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD 2888 2874 2853 2852 2856 2859 2856 2849 2842 2836 2830 2820 2811 2805 2805 2804 2806 2809 2813 2820 453 438 426 421 421 421 414 415 415 416 416 415 412 411 409 408 408 407 406 406 111 101 86 39 39 39 29 29 29 29 29 29 29 29 29 29 29 29 29 29 eg (UEG/EWG+Purpa50) (Jeff Huang) SmCog+Ref-EG (Rose-Marie/Brenda) sdge (Marjorie) lb (Marjorie) swg (Marjorie) vernon (Marjorie) ECO-Gas (Marjorie) TOTAL Noncore (Incl. Wholesale) 2007/8 625 104 621 52 72 22 16 4965 2077 685 98 564 63 75 22 13 4934 2060 2007/8 2008/9 860 98 569 63 58 33 14 5060 2207 789 98 626 63 61 33 14 4996 2144 2009/10 2010/11 777 98 626 63 64 33 14 4991 2135 2010/11 2011/12 769 98 596 63 66 23 14 4949 2090 2011/12 2012/13 715 105 601 63 69 23 14 4890 2034 2012/13 2013/14 710 105 592 63 72 23 14 4873 2024 2013/14 2014/15 705 106 582 63 74 23 15 4855 2013 2014/15 2015/16 700 107 575 63 77 23 15 4841 2005 2015/16 2016/17 742 107 581 63 79 23 15 4884 2054 2016/17 2017/18 785 108 586 63 80 23 15 4922 2103 2017/18 2018/19 827 108 592 63 82 23 15 4961 2150 2018/19 2019/20 869 108 598 63 83 23 15 5003 2198 2019/20 2020/21 911 108 604 63 85 23 15 5052 2247 2020/21 2021/22 946 108 614 63 87 23 15 5098 2294 2021/22 2022/23 982 108 625 63 89 23 15 5147 2341 2022/23 2023/24 1018 109 636 63 90 23 15 5197 2389 2023/24 2024/25 1053 109 646 63 92 23 15 5250 2437 2024/25 2025/26? 1089 109 670 63 94 23 15 5317 2497 12Mo Operating Year (Apr-Mar) 2006/7 core noncore c&i * eg ** wholesale *** TOTAL MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD 2888 2874 2853 2852 2856 2859 2856 2849 2842 2836 2830 2820 2811 2805 2805 2804 2806 2809 2813 2820 563 539 512 460 460 459 443 444 444 445 445 444 441 440 438 437 437 436 435 435 730 783 958 887 875 867 820 816 811 807 850 892 934 976 1019 1054 1090 1126 1162 1198 784 737 737 797 799 763 771 764 757 753 760 767 774 782 790 802 814 827 839 864 4965 4934 5060 4996 4991 4949 4890 4873 4855 4841 4884 4922 4961 5003 5052 5098 5147 5197 5250 5317 * includes eor-steaming and eor-cogen ** ex cludes EOR cogeneration *** includes international service and wholesale eg 2008/9 2009/10 2025/26? GasResourcePlan_PeakDayLoad(14Nov2007)4DMB_1-in-10 SDG&E coincident_1-in-10 12Mo Operating Year (Apr-Mar) 2006/7 core (Bruce) noncore-nonEG a/ (Loan) noncore-CoGenEG a/ (Loan) MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD 364 362 361 365 366 367 361 360 360 362 363 364 365 367 369 371 373 376 378 393 10 11 11 11 11 11 10 10 10 10 10 11 11 11 11 11 11 11 11 12 52 52 52 53 53 54 54 54 55 55 56 56 57 57 57 58 58 59 59 60 2008/9 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26? 197 139 145 198 196 165 176 167 158 149 153 156 160 164 168 175 183 190 198 206 0 622.12 259 0 564 202 0 569 208 0 626 262 0 626 260 0 596 229 0 602 241 0 592 232 0 583 223 0 576 214 0 581 218 0 587 223 0 592 227 0 598 231 0 605 236 0 615 244 0 626 252 0 636 260 0 647 269 0 670 277 EG Power-Plant a/ (Marjorie/Jeff H.) wholesale *** TOTAL Noncore 2007/8 12Mo Operating Year (Apr-Mar) 2006/7 core noncore c&i * eg ** wholesale *** TOTAL MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD MMCFD 364 362 361 365 366 367 361 360 360 362 363 364 365 367 369 371 373 376 378 393 62 64 64 64 64 64 64 65 65 65 66 67 67 68 68 69 69 70 71 71 197 139 145 198 196 165 176 167 158 149 153 156 160 164 168 175 183 190 198 206 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 622 564 569 626 626 596 602 592 583 576 581 587 592 598 605 615 626 636 647 670 2007/8 2008/9 2009/10 2010/11 2011/12 2012/13 * includes CoGenEG ** Only Power-Plant Load (i.e., ex cludes cogeneration from above) *** SDG&E does not provide wholesale gas service. a/ Gas demand forecasts for noncore commercial & industrial (C&I) and electric generation (EG) customer classes do not distinguish between firm and interruptible noncore service. Thus, for the purposes of this assessment, SDG&E assumed that all future peak loads elected firm noncore service, until SDG&E has a mechanism to identify specific customer firm service requests beyond the current two-year firm noncore service election. 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26? Rainbow Corridor forecast 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Core MMcfd 86 90 95 100 105 110 116 122 128 135 142 149 157 165 173 EG MMcfd 109 83 112 114 114 109 114 114 114 114 114 114 114 114 114 Total MMcfd 195 173 207 214 219 219 230 236 242 249 256 263 271 279 287 SJV_CoreSetAsideFcst(26Jun2007)ExtendedFurtherver2(SJV-Estimates(26Jun2007)) Month/ Year Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 Jan-24 Jan-25 month 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 FINAL of Feb. 8th, 2007 and EXTENDED through March 2017 Total Core ResidenG10&GEN NGV "Settial Aside" (MDth/d) (MDth/d) (MDth/d) 73.0 34.6 0.169 107.8 74.7 35.7 0.327 110.8 76.3 36.9 0.327 113.5 77.9 38.1 0.327 116.4 79.7 39.3 0.327 119.3 81.5 40.6 0.327 122.4 83.3 41.9 0.311 125.5 85.1 43.3 0.297 128.7 86.9 44.7 0.282 131.9 88.8 46.2 0.269 135.2 90.8 47.6 0.256 138.7 92.7 49.2 0.244 142.2 94.8 50.8 0.232 145.8 96.8 52.4 0.221 149.5 98.9 54.1 0.211 153.3 101.1 55.9 0.201 157.2 103.3 57.7 0.191 161.2 105.5 59.6 0.182 165.3 107.8 61.5 0.173 169.5 110.2 63.5 0.165 173.9 SJV Loading Forecast summary Year Core Non-core Total 2009 116 42 158 2010 119 42 161 2011 122 42 164 2012 125 42 167 2013 129 42 171 2014 132 42 174 2015 135 42 177 2016 139 42 181 2017 142 42 184 2018 146 42 188 2019 149 42 191 2020 153 42 195 2021 157 42 199 2022 161 42 203 2023 165 42 207 1-in-10 Full System, 6 Bcf Sendout Loads vs Supplies 6500 -2000 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 AM AM AM PM PM PM PM PM PM AM AM AM AM AM AM PM PM PM PM PM PM AM AM AM AM 6400 -3000 6300 -4000 6200 6100 -6000 6000 -7000 5900 -8000 5800 -9000 5700 -10000 5600 Loads Supplies MMcfd MMcfd -5000 1-in-10 Full System, 6 Bcf Sendout System Pack & SDG&E Pack 2800 180 2750 160 140 2700 120 2650 MMcf MMcf 100 2600 80 2550 60 2500 40 2450 20 2400 0 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 AM AM AM PM PM PM PM PM PM AM AM AM AM AM AM PM PM PM PM PM PM AM AM AM AM Syspack SDGEPack 1-in-10 Full System, 6 Bcf Sendout Various Packs 1000 900 800 700 MMcf 600 500 400 300 200 100 0 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM Cpack 4:00 AM Vpack 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM Npack Lpack 4:00 PM Bpack 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout City Gate Flows 1200 1000 MMcfd 800 600 400 200 0 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM Yorba 4:00 AM Westside 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM Brea Puente 4:00 PM Quigley 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout Storage Field Pressures 1000 900 800 700 PSIG 600 500 400 300 200 100 0 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM DelRey Aliso 4:00 AM 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM Honor Montebello 4:00 PM 6:00 PM Goleta 8:00 10:00 12:00 2:00 PM PM AM AM 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout Storage Field Flows 2000 1800 1600 1400 MMcfd 1200 1000 800 600 400 200 0 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM DelRey Aliso 4:00 AM 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM Honor Montebello 4:00 PM 6:00 PM Goleta 8:00 10:00 12:00 2:00 PM PM AM AM 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout Chino and Prado Flows and Totals 700 1000 900 600 800 500 700 600 500 300 400 300 200 200 100 100 0 0 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 8:00 10:00 12:00 2:00 4:00 6:00 AM AM AM PM PM PM PM PM PM AM AM AM AM AM AM PM PM PM PM PM PM AM AM AM AM Chino Prado ChinoQ PradoQ MMcf MMcfd 400 1-in-10 Full System, 6 Bcf Sendout Orange County Pressures 340 320 300 280 PSIG 260 240 220 200 180 160 140 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM HUNTING SANTA 4:00 AM 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM YOR4000U YOR4002U 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM SDGEDANA 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout Loop Pressures 500 460 420 380 PSIG 340 300 260 220 180 140 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM L1024UEG 4:00 AM Haynes 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM Redondo DelRey 4:00 PM 6:00 PM Spence 8:00 10:00 12:00 2:00 PM PM AM AM 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout Line 4000 Pressures 700 650 PSIG 600 550 500 450 400 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM Cajon 4:00 AM Fontana 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM Chino Prado 4:00 PM Yorba 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout Coastal Pressures 1000 900 PSIG 800 700 600 500 400 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM Gaviota Goleta 4:00 AM 6:00 AM Center Road 8:00 10:00 12:00 2:00 AM AM PM PM Westside 404 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM Westside 406 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout San Jaoquin Valley Pressures 850 800 PSIG 750 700 650 600 550 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM QuigleyU 4:00 AM SaugusU 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM Honor WheelerD 4:00 PM 6:00 PM KernSta 8:00 10:00 12:00 2:00 PM PM AM AM 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout Needles Pressures 900 850 800 PSIG 750 700 650 600 550 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM NNeedleS 4:00 AM 6:00 AM NNeedleD 8:00 10:00 12:00 2:00 AM AM PM PM SNeedleS 4:00 PM SNeedleD 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout Blythe Pressures 850 800 750 700 PSIG 650 600 550 500 450 400 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM BlytheS BlytheD 4:00 AM DesertD 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM CactusD WhiteU 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM Mor2000U 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout San Diego Pressures 650 600 550 PSIG 500 450 400 350 300 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM LaMesa 4:00 AM Mesa 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM SoBay Escondido 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM 4:00 AM 6:00 AM 1-in-10 Full System, 6 Bcf Sendout Moreno and Rainbow Pressures 900 800 PSIG 700 600 500 400 300 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM 4:00 PM 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM MorenoS 4:00 AM MorenoD 6:00 AM 8:00 10:00 12:00 2:00 AM AM PM PM RainbowS 4:00 PM RainbowD 6:00 PM 8:00 10:00 12:00 2:00 PM PM AM AM 4:00 AM 6:00 AM TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM MMCF SDG&E SYSTEM PACK SDG&E Winter=650 MMcfd (December 2019), RDOM= 0 EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd 150 140 130 120 110 100 90 80 70 60 50 BORDER PRESSURE AND FLOW SDG&E Winter=650 MMcfd (December 2019), RDOM= 0 EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd 200 500 450 175 400 150 350 100 200 75 150 50 100 25 50 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 0 7:00 AM 0 6:00 AM PSIG 250 MMCFD 125 300 Border P Border Q TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM PSIG SYSTEM PRESSURES SDG&E Winter=650 MMcfd (December 2019), RDOM= 0 EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd 550 500 450 400 350 300 La Mesa SoBay 250 200 150 100 50 0 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM PSIG SYSTEM PRESSURES SDG&E Winter=650 MMcfd (December 2019), RDOM= 0 EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd 600 550 500 450 400 350 300 Miramar 30-inch 250 200 150 100 50 0 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM PSIG SYSTEM PRESSURES SDG&E Winter=650 MMcfd (December 2019), RDOM= 0 EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd 700 600 500 400 Escondido Valve 7 Rainbow 300 200 100 0 MORENO PRESSURE AND FLOW SDG&E Winter=650 MMcfd (December 2019), RDOM= 0 EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd 50 750 700 40 650 600 30 PSIG MMCFH 550 500 20 450 400 10 350 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 0 6:00 AM 300 Discharge Suction Flow MORENO HORSEPOWER SDG&E Winter=650 MMcfd (December 2019), RDOM= 0 EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=256 MMcfd 16000 15000 14000 13000 12000 11000 +3 Clarks Mor HP Used +Unit 8 +Unit 9 +Unit 10 4 Solars 10000 8000 7000 6000 5000 4000 3000 2000 1000 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 0 6:00 AM HP 9000 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM MMCF SDG&E SYSTEM PACK SDG&E Winter=675 MMcfd (December 2009), RDOM = 0 EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd 150 140 130 120 110 100 90 80 70 60 50 BORDER PRESSURE AND FLOW SDG&E Winter=675 MMcfd (December 2009), RDOM = 0 EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd 200 500 450 175 400 150 350 100 200 75 150 50 100 25 50 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 0 7:00 AM 0 6:00 AM PSIG 250 MMCFD 125 300 Border P Border Q TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM PSIG SYSTEM PRESSURES SDG&E Winter=675 MMcfd (December 2009), RDOM = 0 EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd 500 450 400 350 300 250 La Mesa SoBay 200 150 100 50 0 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM PSIG SYSTEM PRESSURES SDG&E Winter=675 MMcfd (December 2009), RDOM = 0 EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd 550 500 450 400 350 300 Miramar 30-inch 250 200 150 100 50 0 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM PSIG SYSTEM PRESSURES SDG&E Winter=675 MMcfd (December 2009), RDOM = 0 EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd 700 600 500 400 Escondido Valve 7 Rainbow 300 200 100 0 MORENO PRESSURE AND FLOW SDG&E Winter=675 MMcfd (December 2009), RDOM = 0 EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd 40 750 700 650 30 PSIG 550 20 500 450 10 400 350 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 0 6:00 AM 300 MMCFH 600 Discharge Suction Flow MORENO HORSEPOWER SDG&E Winter=675 MMcfd (December 2009), RDOM = 0 EG1=58 MMcfd, EG2=73 MMcfd, EG3=37 MMcfd, RBC=195 MMcfd 16000 15000 14000 13000 12000 11000 +3 Clarks Mor HP Used +Unit 8 +Unit 9 +Unit 10 4 Solars 10000 8000 7000 6000 5000 4000 3000 2000 1000 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 0 6:00 AM HP 9000 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM MMCF SDG&E SYSTEM PACK SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd 150 140 130 120 110 100 90 80 70 60 50 BORDER PRESSURE AND FLOW SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd 550 200 500 175 450 150 400 300 100 250 75 200 150 50 100 25 50 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 0 7:00 AM 0 MMCFD 125 6:00 AM PSIG 350 Border P Border Q TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM PSIG SYSTEM PRESSURES SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd 550 500 450 400 350 300 La Mesa SoBay 250 200 150 100 50 0 SYSTEM PRESSURES SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd 600 550 500 450 400 Miramar 30-inch 300 250 200 150 100 50 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 0 6:00 AM PSIG 350 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 6:00 AM PSIG SYSTEM PRESSURES SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd 700 600 500 400 Escondido Valve 7 Rainbow 300 200 100 0 MORENO PRESSURE AND FLOW SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd 50 750 700 40 650 600 30 PSIG MMCFH 550 500 20 450 400 10 350 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 0 6:00 AM 300 Discharge Suction Flow MORENO HORSEPOWER SDG&E Winter=690 MMcfd (December 2023), RDOM=50 MMcfd EG1=68 MMcfd, EG2=65 MMcfd, EG3=50 MMcfd, RBC=287 MMcfd 16000 15000 14000 13000 12000 11000 +3 Clarks Mor HP Used +Unit 8 +Unit 9 +Unit 10 4 Solars 10000 8000 7000 6000 5000 4000 3000 2000 1000 TIME OF DAY 6:00 AM 5:00 AM 4:00 AM 3:00 AM 2:00 AM 1:00 AM 12:00 AM 11:00 PM 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6:00 PM 5:00 PM 4:00 PM 3:00 PM 2:00 PM 1:00 PM 12:00 PM 11:00 AM 10:00 AM 9:00 AM 8:00 AM 7:00 AM 0 6:00 AM HP 9000 SJV SYSTEM PRESSURES Base Case 400.0 390.0 380.0 Pressure (PSIG) 370.0 360.0 350.0 340.0 330.0 320.0 310.0 300.0 6.000 8.000 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 Time (HOURS) Left: V-85N21A PRESSURE Left: ID1386 PRESSURE Left: V80002A Left: ID1101 PRESSURE PRESSURE Left: ID1492U PRESSURE 28.00 30.00 SJV SYSTEM PRESSURES IN YEAR 8 400.0 390.0 380.0 Pressures (PSIG) 370.0 360.0 350.0 340.0 330.0 320.0 310.0 300.0 6.000 8.000 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 Time (HOURS) Left: V-85N21A PRESSURE Left: ID1386 PRESSURE Left: V80002A Left: ID1101 PRESSURE PRESSURE Left: ID1492U PRESSURE 28.00 30.00 3200 400 3150 395 3100 390 3050 385 3000 380 2950 375 2900 370 2850 365 2800 360 2750 355 2700 350 6 8 10 12 14 16 18 20 Time (Hours) HP DisP SucP 22 24 26 28 30 Pressure (Psig) HP SJV COMPRESSION IN YEAR 8 Avenal Compressor SJV SYSTEM PRESSURES AT END OF PLAN PERIOD Avenal Compressor only 400.0 390.0 380.0 Pressure (PSIG) 370.0 360.0 350.0 340.0 330.0 320.0 310.0 300.0 6.000 8.000 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 Time (HOURS) Left: V-85N21A PRESSURE Left: ID1386 PRESSURE Left: V80002A Left: ID1101 PRESSURE PRESSURE Left: ID1492U PRESSURE 28.00 30.00 3000 400 2950 395 2900 390 2850 385 2800 380 2750 375 2700 370 2650 365 2600 360 2550 355 2500 350 6 8 10 12 14 16 18 20 Time (HOURS) DisP SucP 22 24 26 28 30 Pressure (Psig) Hp SJV COMPRESSION AT END OF PLAN PERIOD Avenal Compressor Only SJV SYSTEM PRESSURES AT END OF PLAN PERIOD Avenal compressor and 8 mi loop 400.0 390.0 380.0 Pressure (PSIG) 370.0 360.0 350.0 340.0 330.0 320.0 310.0 300.0 6.000 8.000 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 Time (HOURS) Left: V-85N21A PRESSURE Left: ID1386 PRESSURE Left: V80002A Left: ID1101 PRESSURE PRESSURE Left: ID1492U PRESSURE 28.00 30.00 3000 400 2950 395 2900 390 2850 385 2800 380 2750 375 2700 370 2650 365 2600 360 2550 355 2500 350 6 8 10 12 14 16 18 20 Time (HOURS) HP DisP SucP 22 24 26 28 30 Pressure (Psig) HP SJV COMPRESSION AT END OF PLAN PERIOD Avenal Compressor and 8 mi Loop