R+P The new Gut Bridge replacement consists of a bascule bridge
Transcription
R+P The new Gut Bridge replacement consists of a bascule bridge
The Gut Bridge Type: Modified Bascule Bridge Services: Conceptual Design, 3D Renderings and Animations. Cost: $3.7 Million (projected) Completion Date: N/A Contact: M aine Department of Transportation 16 State House Station Augusta, Maine 04333-0016 Steve Bodge, Project Manager Phone: 207.441.6850 email: [email protected] 10 Derne Street, MA 02114 R+P South Bristol, Maine The new Gut Bridge replacement consists of a bascule bridge with a innovative lifting mechanism that utilizes efficient and low maintenance hydraulic cylinders. The small scale of the bridge towers and hangers fits perfectly with the historic context of the South Bristol fishing coastal village and its marine environment. The new bridge provides more clearance than the existing swing bridge in both the open an close positions reducing the number of openings per year. The main span over the navigation channel is approximately 35’ with a cross section providing two traffic lanes and an ADA-compliant sidewalk. The entire steel structure will be fabricated off-site and brought to the channel via barge. The Rosales + Partners bascule bridge design will enhance views of and from the water with its elegant profile and overall slenderness. t 617 247 7499 f 617 723 6892 [email protected] www.rosalespartners.com