Duong Quoc Hung, VARANS Vu Thanh Trung, IBST
Transcription
Duong Quoc Hung, VARANS Vu Thanh Trung, IBST
Presentation for 2nd workshop on the Practical Experiences for Construction phase on NPP Duong Quoc Hung, VARANS Vu Thanh Trung, IBST Beijing 23 Oct. 2013 CONTENT I. Overview on the on-going NPP program II. Site approval phase III. Construction phase 2/26 CONTENT I. Overview on the on-going NPP program II. VARANS’ preparation for site approval phase III. Conclusions 3/26 Overview on NPP development in Vietnam State commitment • June 3, 2008, National Assembly (Parliament) approved the Law on Atomic Energy (the comprehensive law on nuclear) • November 25, 2009: NA approved the project to invest for the first NPP in Ninh Thuan Province • May 4, 2010, Prime-Minister issued decision No 580/QD-TTg to establish the State Steering Committee on NPP Ninh Thuan in the head of a Vice-PM (NEPIO) 4/26 Overview on NPP development in Vietnam Strategy on National Energy Development up to 2020 with the vision to 2050: – Operation first unit (1,000MW) in 2020 – In 2050, Nuclear Power will provide 15-20% of consumption Master Plan for National Power Development during the period 2011-2020 with the vision to 2030 (MP VII) – Operation of the first two units (2x1,000MW) in 2020 • In 2025: 6,000 MW (6.2%) • In 2030: 10,700 MW (7.8%) – 8 sites for NPP planned (in central provinces: Ninh Thuan, Binh Dinh, Phu Yen, Ha Tinh and Quang Ngai) 5/26 Overview on the on-going NPP project in Vietnam Sites for 2 first NPPs Vinh Hai Phuoc Dinh Investor: Vietnam Electricity (EVN) Capacity: 2 x 1000 MW Counterpart: Japan Construction start: 2015 Technology: ABWR, PWR, AP1000, ATMEA1 Capacity: 2 x 1000 MW Construction start: 2014 Counterpart: ROSATOM (Russia) Technology: VVER-1000, VVER-1200 6/26 Overview on the on-going NPP project in Vietnam Forth-coming plan: Component tasks According to the National power development plan (Master Plan VII), Ninh Thuan 1 and 2 NPPs are scheduled to be put into operation by 2020, the time schedule of component projects (previously proposed by EVN): Task Ninh Thuan 1 Ninh Thuan 2 Completion of making Site and FS Application Dossier Jun 2013 Mar 2013 Approval of FS and Site Application Dossier Dec 2013 Sep 2013 Signing EPC Contract Nov 2014 Oct 2014 Start of Basement Clearance Dec 2014 Dec 2014 Construction Permit Dec 2015 Dec 2015 First concrete Dec 2015 Dec 2015 Start Operation Unit 1 Dec 2020 Dec 2020 7/26 Overview on the on-going NPP project in Vietnam Updated situation Russia and Japan have already finished site investigation and evaluation on field. • Ninh Thuan 1 (Russia): The application for Site and FS approval is going to be officially submitted by Dec. 2013 • Ninh Thuan 2 (Japan): The application for Site and FS approval is going to be officially submitted by Jul. 2013 (the unofficial reports are now available) VARANS is preparing for the Technical Specifications (Term Of Reference) of the bid’s document for international consultant to support the Vietnam Regulatory Body for evaluation of SAR (both Site and FS approval phases) 8/26 Overview on the on-going NPP project in Vietnam 9/26 Overview on the on-going NPP project in Vietnam 10/26 Overview on the on-going NPP project in Vietnam Updated situation 11/26 CONTENT I. Overview on the on-going NPP program II. Site approval phase III. Conclusions 12/26 Legal documents for the Site approval phase Safety Guides • • • • • Nuclear Safety Standards 6941 :2013 – External Human Induced Events in Site Evaluation for Nuclear Power Plants (based on NS-G-3.1). Nuclear Safety Standards 6942 :2013 - Dispersion of Radioactive Material in Air and Water and Consideration of Population Distribution in Site Evaluation Nuclear Safety (based on NS-G-3.2) Nuclear Safety Standards 6943 :2013 – Meteorological and Hydrological Hazards in Site Evaluation for Nuclear Power Plants Nuclear Safety (based on NS-G-3.4) Nuclear Safety Standards 6944 :2013 – Seismic hazards in site evaluation for nuclear installations (based on SSG -9) Nuclear Safety Standards 6945 :2013 – Geotechnical aspects of site evaluation and foundations for nuclear power plants (based on NS-G-3.6) 13/26 Legal documents for the Site approval phase Regulations • Decree No. 70/2010/ND-CP dated by The Government on detailing and guiding a number of articles of the Law on Atomic Energy regarding nuclear power plants; • Circular No. 13/2009/TT-BKHCN dated 20th May, 2009 by Minister of Science and Technology guiding on preliminary nuclear safety assessment for site selection for nuclear power plants in the investment decision stage (Pre-FS stage); Circular No. 28/2011/TT-BKHCN dated 28th November, 2012 on nuclear requirements for nuclear power plants site Circular No. 29/2012/QĐ-BKHCN dated 28th December, 2012 on format and content of SAR for NPP site approval. • • 14/26 Legal documents for the Site approval phase Regulations • Circular No. 20/2013/TT-BKHCN dated 06 Sept., 2013 by Minister of Science and Technology guiding on Procedures of Regulatory Inspections for NPP site investigation activities and evaluation. 15/26 Requirements for documents in Site approval phase • Site is approved by the Prime Minister; • Documents to be submitted to the Prime Minister for site approval shall include: - Application for approval of the proposed site; - Overview report on the site selection; - Preliminary design of the nuclear power plant; - Report on assessment of environment impacts; - Results from verification of the report on assessment of environment impacts - Preliminary safety analysis report; - Safety assessment report; - Plan for environmental monitoring; - Other relevant documents. 16/26 Current competence of the Vietnam Regulatory Body (VARANS) Division of Administration & Personnel MOST Division of Licensing VARANS Inspectorate Division of International Cooperation 63 DOSTs VARANS Division of Legislation and Information Division of Nuclear Safety Division of Nuclear Safeguards Division of Training Current - 90 Staff: 9 Ph. D Degrees, 14 Master Degree, 65 Bachelor and Engineering Degrees TSC for Radiation Protection andEmergency Response 17/26 Current competence of the Vietnam Regulatory Body Current technical expertise at VARANS for Safety Assessment and other Regulatory Activities Number of Staff VARANS Inspectorate 12 Division of Nuclear Safety 18 Division of Licensing 6 Technical Support Center for Radiation Protection and Emergency Response 14 Total 50 18/26 CONTENT I. Overview on the on-going NPP program II. VARANS’ preparation for site approval phase III. Construction phase 19/26 REGULATIONS PLANED To be issued • CIRCULAR: • Contents and Procedures of review and approvals of construction design for NPPs (MOIT – 2013). • Contents of Application documents and procedures for commissioning licensing for NPPs (MOIT – 2017). • Contents of Application documents and procedures for commercial operation licensing for NPPs (MOIT – 2019). 20/26 REGULATIONS PLANNED To be issued (2) • CIRCULAR: • Promulgating or accepting technical provisions on • construction of NPP units. (MOC – 2013). • Criteria on capability of entities involved in NPP construction (MOC – 2013). • Guidance for quality management for construction of NPPs (MOC – 2013). 21/26 REGULATIONS PLANNED To be issued (3) • CIRCULAR: • Procedures for inspection for design and manufacture of NPP components (MOST – 2013). • Procedures for regulatory inspection in installation and construction stage of a NPP. (MOST – 2014) • Procedures for NPP commissioning inspections. (MOST – 2017/ 2016). • Procedures for Inspection in the stage of NPP operation. (MOST – 2018/ 2019) 22/26 REGULATIONS PLANNED To be issued (4) • CIRCULAR: • Guidance for establishment of protection zone for NPPs(MOPS – 2013). • Schedule may be changed!!! 23/26 PREPARATIONS FOR THE CONSTRUCTION BY OTHER BODY Vietnam Ministry of Construction carried out some works: •Launch some circulars, technical documents relating to construction works of NPP in Vietnam. •Launch list of construction standards applying construction works of NPP in Vietnam. •Launch minimal requirements for construction works of NPP in Vietnam (loadings, materials, planning, environment, construction methods, quality management, design, design review) •Send 2,000 workers and engineers to Russia and Japan for training with a focus on nuclear power construction, starting from 2015 24/26 PREPARATIONS FOR THE CONSTRUCTION BY OTHER BODY • Research and create heavyweight concrete material from local material 25/26 Thank you for your attention!