hallwang strecke wien- salzburg, km 307, at
Transcription
hallwang strecke wien- salzburg, km 307, at
Slope Protection HALLWANG STRECKE WIENSALZBURG, KM 307, AT HALLWANG STRECKE WIEN- SALZBURG, KM 307 Slope Protection Project Place Country/Region Hallwang Strecke Wien- Salzburg, km 307 Hallwang Austria Year of installation 2004 Customer Engineering Contractor Österreichische Bundesbahnen, Salzburg Prof. Dipl.-Ing. Dr. Techn. Peter Waibel, Zivilingenieur für Bauwesen (BGG), Wien Hinteregger, Salzburg Protected object Systems Railway TECCO ® G65/3 Corrosion protection Soil problems GEOBRUGG SUPERCOATING Stabilized area 3000 m² Maxium Slope height Slope inclination 20 m 40 ° - 45 ° Subsoil Protection measure Active slope stabilization ® Bolt type Greening Erosion control mat Exposition Yes Yes North Slope Protection | Hallwang Strecke Wien- Salzburg, km 307, AT 2/4 Slope Protection | Hallwang Strecke Wien- Salzburg, km 307, AT 3/4 For questions please contact our Geobrugg specialist at your side: Alexander Bittendorfer Project Manager Bavaria Phone +41 71 466 84 29 Mobile +41 78 601 06 14 [email protected] Geobrugg AG Aachstrasse 11 | 8590 Romanshorn | Switzerland [email protected] | www.geobrugg.com A company of the BRUGG Group | Certified to ISO 9001 Slope Protection | Hallwang Strecke Wien- Salzburg, km 307, AT 4/4