inspection report n° 681
Transcription
inspection report n° 681
Page: 1/10 Industry & Facilities Division Interim Final INSPECTION REPORT N° 681 BV Job nr: IDD.TR.1699948.14.A41 PROJECT: HYDROSTATIC RELEASE UNIT Ref: IDD.TR.1699948.14.A41 BV Client: SAFETMADE DENIZ INŞ. YANGIN MALZ. MAK. P/o nr: KIMYA TEKSTIL SAN. VE TIC. LTD. ŞTI. (client to BV) Manufacturer: SAFETMADE DENİZ İNŞ. YANGIN MALZ. MAK. KİMYA TEKSTİL SAN. ve TİC. LTD. ŞTİ. P/o nr: (client to Manufacturer) Inspection requested by: SAFETMADE DENİZ İNŞ. YANGIN MALZ. MAK. KİMYA TEKSTİL SAN. ve TİC. LTD. ŞTİ. SUPPLY / SUBJECT OF INSPECTION Evaluation of Temperature Resistance Test, Resistance to oil, seawater and detergent test, Salt Spray Test and Function Test performed to membrane and Hydrostatic Release Unit according to ISO 15734. ITEM / TAG Nr QTY - - DOCUMENTS OF REFERENCE : See continuation sheet for additional documents: Yes No Title Reference n° Rev. Approved by Ships and marine technology -ISO 15734 ISO Hydrostatic release units - INSPECTIONS : Inspection place & Date or Period: 07-08-09.05.2014 (3 Day) Stage of inspection : Before manufacturing During manufacturing Final Packing Type of inspection: Pre-inspection meeting Document and QC record review Visual examination, checks Witnessing tests Manufacturing progress status Vendor assessment Final inspection Packing (for details see continuation sheet) Stamping : Results of inspection : Satisfactory Date 2001 - Unsatisfactory Non Conformities Reports (NCR): ❏ NCR’s issued during reported period : ❏ List of outstanding NCR’s : Main Conclusions & Remarks: (for details see continuation sheet) Temperature Resistance Test, Resistance to oil, seawater and detergent test, Salt Spray Test and Function Test results were evaluated according to ISO 15734 and results were found satisfactory and details are given in this report. Next visit scheduled: N/A No INSP 002 En GM SI 101 Copyright Bureau Veritas 04/2011 Page: 2/10 Industry & Facilities Division Interim Final INSPECTION REPORT N° 681 (continued) BV Job nr: IDD.TR.1699948.14.A41 Description of the inspections carried out: Introduction Evaluation of Temperature Resistance Test, Resistance to oil, seawater and detergent test, Salt Spray Test and Function Test performed to membrane and Hydrostatic Release Unit according to ISO 15734 on 07-08-09 May 2014. The findings are as follows: Attendees - Kamil DOĞAN, Inspector, Bureau Veritas Ankara Applicable Documents & Status of Approval - ISO 15734 - Ships and marine technology -- Hydrostatic release units - Test report: 0356-1 prepared by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. - Test report: 0356-2 prepared by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. - Test report: 0356-3 prepared by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. - Test report: 0356-4 prepared by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. - Test report: 0356-5 prepared by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. - Test report: 0356-6 prepared by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. Manufacturing Progress Status - N/A Details of inspection activities carried out with respect to scope of work - Temperature Resistance Test, Resistance to oil, seawater and detergent test, Salt Spray Test and Function Test were performed to membranes and Hydrostatic Release Unit by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. The test results were evaluated according to ISO 15734 and results were found satisfactory. Detailed test results are shown below. INSP 002 En GM SI 101 Copyright Bureau Veritas 04/2011 - Six membranes (each 10 cm in diameter, the orange collared the membranes) were exposure to -30 0 C temperature in the test cabinet for 45 minutes. Test result was evaluated ISO 15734 and found satisfactory. Test was performed by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. Please see picture below. Membrane Requirement No. 1 No. 2 No. 3 No. 4 No. 5 No. 6 Test Result Satisfactory After the test when the Membranes bended at angle of 1800, No cracking flaking and deterioration should been observed at the membranes. Satisfactory Satisfactory Satisfactory Satisfactory Satisfactory Picture-1-2 : -30 0CTemperature Resistance Test – Before The Test Picture-3-4 : -30 0CTemperature Resistance Test – After The Test INSP 002 En GM SI 101 Copyright Bureau Veritas 04/2011 - Six membranes (each 10 cm in diameter, the orange collared the membranes) were exposure to +65 0C temperature in the test cabinet for 11 day. Test result was evaluated ISO 15734 and found satisfactory. Test was performed by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. Please see picture below. Membrane Requirement No. 1 No. 2 No. 3 No. 4 No. 5 No. 6 Test Result Satisfactory After the test when the Membranes bended at angle of 1800, No cracking flaking and deterioration should been observed at the membranes. Satisfactory Satisfactory Satisfactory Satisfactory Satisfactory Picture-5-6 : +65 0CTemperature Resistance Test – Before The Test Picture-7-8 : +65 0CTemperature Resistance Test – After The Test INSP 002 En GM SI 101 Copyright Bureau Veritas 04/2011 - Six membranes (each 10 cm in diameter, the orange collared the membranes) were exposure to ASTM No:1 oil for 5 hours at the ambient temperature. Test result was evaluated ISO 15734 and found satisfactory. Test was performed by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. Please see picture below. Membrane Requirement No. 1 No. 2 No. 3 No. 4 No. 5 No. 6 Test Result Satisfactory After the test when the Membranes bended at angle of 1800, No cracking flaking and deterioration should been observed at the membranes. Satisfactory Satisfactory Satisfactory Satisfactory Satisfactory Picture-9-10 : Resistance to Oil Test – Before The Test Picture-11-12 : Resistance to Oil Test – After The Test INSP 002 En GM SI 101 Copyright Bureau Veritas 04/2011 - Six membranes (each 10 cm in diameter, the orange collared the membranes) were exposure to 5% salt solution in the test cabinet for 11 days at between 18 – 20 0C temperatures. Test result was evaluated ISO 15734 and found satisfactory. Test was performed by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. Please see picture below. Membrane Requirement No. 1 No. 2 No. 3 No. 4 No. 5 No. 6 Test Result Satisfactory After the test when the Membranes bended at angle of 1800, No cracking flaking and deterioration should been observed at the membranes. Satisfactory Satisfactory Satisfactory Satisfactory Satisfactory Picture-13-14 : Resistance to Salt Test – Before The Test Picture-15-16 : Resistance to Salt Test – After The Test INSP 002 En GM SI 101 Copyright Bureau Veritas 04/2011 - Six membranes (each 10 cm in diameter, the orange collared the membranes) were exposure to detergent solution for 11 days at between 18 – 20 0C temperatures. Test result was evaluated ISO 15734 and found satisfactory. Test was performed by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. Please see picture below. Membrane Requirement No. 1 No. 2 No. 3 No. 4 No. 5 No. 6 Test Result Satisfactory After the test when the Membranes bended at angle of 1800, No cracking flaking and deterioration should been observed at the membranes. Satisfactory Satisfactory Satisfactory Satisfactory Satisfactory Picture-17-18 : Resistance to Detergent Solution Test – Before The Test Picture-19-20 : Resistance to Detergent Solution Test – After The Test INSP 002 En GM SI 101 Copyright Bureau Veritas 04/2011 - 3 pieces HRU(Hydrostatic Release Unit) samples were exposure to salt spray test for 168 hours and then temperature cycling test between +65 0C and -30 0C for 720 hours (15 cycles, 1 cycles=48 hours), function of the HRU should be immediately checked at the end of the temperature cycling test. Test result was evaluated ISO 15734 and found satisfactory. Test was performed by Metaltek Teknoloji Kimyasal Ürünler LTD.ŞTİ. Test Lab. Please see picture below. Test Procedure; Step.1 : Salt spray test for 168 hours, Step.2 : Temperature cycling test for 720 hours at +65 0C for 8 hours at ambient conditions for 16 hours at -30 0C for 8 hours at ambient conditions for 16 hours 48 hours = 1 cycle Total test duration 720 hours (15 cycles) Step.3: Function of HRU should be checked after the test. Salt spray test result: HRU Requirement Test Result No. 1 After completion of the test the HRU should show no corrosion which could affect its efficient functioning. Satisfactory No. 2 No. 3 Picture-21- Before The Test INSP 002 En GM SI 101 Satisfactory Satisfactory Picture-22 : Salt spray test – After the salt spray test Copyright Bureau Veritas 04/2011 Temperature cycling test result: HRU No. 1 No. 2 No. 3 Requirement There should be no sign of loos of rigidity under high temperatures and after the tests, the unit should show no sign of damage such as shirinking, cracking, swelling, dissolution or change of mechanical qualities, and it should operate as before the test. Test Result Satisfactory Satisfactory Satisfactory Picture-23-24 : After The Test Temperature cycling test Function test result: HRU Requirement No. 1 No. 2 Test Result Satisfactory It should be operate as before the test. No. 3 Satisfactory Satisfactory Picture-25-26 : Function Test INSP 002 En GM SI 101 Copyright Bureau Veritas 04/2011 Picture-27-28 : Function Test Pictures - Attached in the report. Results of Inspection - Temperature Resistance Test, Resistance to oil, seawater and detergent test, Salt Spray Test and Function Test results were evaluated according to ISO 15734 and results were found satisfactory. Problems pending - None. ANNEXES Yes (Total number of pages: 24 pages) Inspected by: Name: Kamil DOĞAN Signature: No Checked by: Name:Serhan ZURNACI Signature: Date of issue:12.05.2014 Inspection centre: BV IZMIR Distribution: INSP 002 En GM SI 101 CLIENT MANUFACTURER Copyright Bureau Veritas 04/2011