Qawra Coast Development Brief
Transcription
Qawra Coast Development Brief
Qawra Coast Development Brief Approved Draft - May 2007 MALTA ENVIRONMENT AND PLANNING AUTHORITY P.O. Box 200 Marsa GPO 01 Malta Tel: (356) 2290 0000 Fax: (356) 2290 2295 e-mail: [email protected] website: http://www.mepa.org.mt ISBN – 978-99932-83-71-3 Contents 5 CHAPTER 1: INTRODUCTION & OBJECTIVES CHAPTER 2: LAND USE FRAMEWORK 10 CHAPTER 3: PARAMETERS FOR THE VISITOR ATTRACTION 16 CHAPTER 4: FRAMEWORK FOR PROPOSED LAND USES SUMMARY 19 CHAPTER 5: SUBMISSION REQUIREMENTS 21 APPENDIX A: RELEVANT STRUCTURE PLAN AND LOCAL PLAN POLICIES 24 APPENDIX B: FORESHORE 29 HISTORICAL FEATURES ON THE QAWRA APPENDIX C: EXTRACT FROM TREES, SHRUBS AND PLANTS FOR LANDSCAPING IN THE MALTESE ISLANDS 31 APPENDIX D: CAR PARKING STANDARDS 34 APPENDIX E: SUBMISSIONS RECEIVED CONSULTATION ON REVISED DRAFT Revised Qawra Coast Development Brief – March 2007 DURING PUBLIC 3 35 Revised Qawra Coast Development Brief – March 2007 4 development, while still retaining the possibility of having the marine aquarium concept as one component. The revised Brief will enable MEPA to favourably consider a wider range of future applications for the development of the site. Chapter 1: Introduction & Objectives 1.1 INTRODUCTION 1.1.1 The Government of Malta intends to develop the publicly owned coastal stretch of land between the New Dolmen Hotel and the area surrounding Qawra Tower (Fra Ben) at Qawra covering a total area of 3.5ha (refer to Map 1). Private sector involvement may be contemplated in the running of the facilities at a later stage. Government believes that the Bugibba area lacks a mix and variety of leisure facilities, and that this area would benefit from a visitor attraction. Moreover, rehabilitation of the area is also appropriate since dumped building material on the coastal stretch alongside the Qawra Tower portrays a derelict atmosphere, especially in view of the various historical and natural resources forming part of the coastal foreshore. 1.1.2 The original draft of this Brief, as approved in 2003, contained a marine aquarium as the main feature of the site. This proposal had been included since public sector authorities had received various enquiries from potential developers to set up an aquarium attraction on the islands. A tendering process was carried out by the Lands Department on behalf of Government, with active involvement of the Malta Tourism Authority. Even though one response was received to the tender, there was no successful conclusion to the discussions. In order to increase the possibility of successful implementation of the project, it was decided to amend the options for this site and propose mixed education and leisure related Revised Qawra Coast Development Brief – March 2007 5 1.1.3 The revised draft of the Brief was published for public consultation, according to section 27(2)(b) of the Development Planning Act 1992, on 21st March 2007, and the general public was invited to submit their comments until 2nd May 2007. Four submissions were received during this consultation period; for details refer to Appendix E. 1.2 POLICY CONTEXT 1.2.1 The key planning policy documents are the Structure Plan, which was approved by Parliament in July 1992, and the North West Local Plan, approved by Government in August 2006. The preparation of the revised Brief has therefore been guided by the relevant policies of these Plans concerning tourism, recreation, coastal zone management, settlement pattern, built environment and conservation policies, amongst others. A list of relevant policies is included for information in Appendix A. 1.2.2 The tourism objectives in the current Structure Plan seek to: • Encourage appropriate tourism while preventing the further spread of tourist buildings and associated facilities outside areas already committed to such uses • Further develop the tourism industry by channelling resources into the refurbishment and upgrading of existing facilities located in built up and developed areas. 1.2.3 The main objectives for tourism listed above tie in with the current tourism strategy of the Malta Tourism Authority to achieve diversification, reduction of seasonality and product development within the context of the principles of sustainable tourism development. Since the proposed site forms part of a coastal zone and given its footprint, the project may qualify for an Environmental Planning Statement. 1.3 DEVELOPMENT OBJECTIVES 1.3.1 The objectives of the Brief are: i. To accommodate a number of leisure and recreation facilities that would further diversify the current product offer and complement the existing urban fabric in the predominantly residential, tourism accommodation and catering quarters around Qawra and Bugibba and the coast. ii. To develop a visitor attraction such as a marine aquarium, focusing on research, presentation and education. iii. To ensure a holistic (rather than segregated) approach to planning and development of the site, based on acceptable land-uses, whilst protecting those areas scheduled for their ecological importance. iv. To provide a better and more pleasant environment along the promenade by increasing the accessible open spaces in the area, providing a continuous walkway along the coast, and incorporating high quality and appropriate landscaping throughout. v. To restore and increase public appreciation of historical features such as the entrenchment wall and the beach post. Revised Qawra Coast Development Brief – March 2007 6 vi. To promote the natural features of the coastal environment and increase their appreciation, whilst safeguarding views and view points across the coastal foreshore and the open sea. vii. To improve public access to the foreshore and rocky beach area, whilst ensuring that bathing areas are protected from unsightly development. Revised Qawra Coast Development Brief – March 2007 7 Revised Qawra Coast Development Brief – March 2007 8 Revised Qawra Coast Development Brief – March 2007 9 low-lying rock for public use and restricted bathers within a narrower stretch of coast. Chapter 2: Land Use Framework 2.1 EXISTING LAND USES IN BUGIBBA AND QAWRA 2.1.1 Bugibba and Qawra have evolved in recent years into some of Malta`s leading leisure centres, with strong concentrations of catering facilities and tourism accommodation. There is a clear distinction between land-uses at street and higher levels around most quarters. Indeed, catering and entertainment establishments coupled with tourism related retail outlets dominate the streetscape at ground level. The upper floors, on the other hand, are characterised by a large number of apartments, mainly holiday flats that have a predominantly seasonal use. 2.1.2 The area closest to Ras il-Qawra (opposite the Fra Ben Restaurant towards the Qawra Palace Hotel) houses several semi-detached villas and bungalows, which vary considerably in density when compared to the other residential blocks in Qawra. This area is however partly isolated from the bustling atmosphere along the promenade. 2.1.3 The remaining unbuilt part of the coastline in the Bugibba/ Qawra area comprises an important feature since it provides an open environment for formal and informal recreation. The quality of bathing water in this area is good and the flora and fauna relatively rich. A good part of the coastline, previously used freely by bathers in this area, has however been taken up by the private sector for the establishment of catering facilities and lidos. This has reduced the availability of smooth Revised Qawra Coast Development Brief – March 2007 10 2.1.4 The use of the Qawra/ Bugibba promenade is highly seasonal, fluctuating from a large number of summer visitors, which include families and young people (residents and daytrippers) and fewer visitors in winter, which are mainly middle aged, or senior citizens. Fluctuations are also influenced by the prevailing weather conditions. Indeed, the site is exposed to northerly winds in the winter months and this influences the type of development suitable for the area as well as the type of material used. 2.1.5 The site for which this Brief applies is a stretch of coastal area bounded by the rocky foreshore to the north-west and the Qawra promenade to the south-east. The site was levelled in the past by dumped rubble. While the westernmost section has regenerated and is now being covered by trees and other vegetation, the middle section has a derelict appearance and is mainly used for informal parking, and the eastern section (near Fra Ben restaurant) is tarmacked and used as a formal car park. 2.1.6 However, a number of historical and heritage features are present on the site itself and in its vicinity, i.e. an entrenchment wall, coastal tower and battery, beach post and cistern. Provisions regarding these features are included in this Brief, together with improved accessibility to the rocky beach through minor interventions. Additional details on the above features are provided in section 2, Map 2 and Appendix B. 2.2 ZONING – INTRODUCTION 2.2.1 The site of this Development Brief has been organised into three zones (refer to Map 3), according to their current state as well as the uses which are envisaged to be accommodated on these parts of the site. The main objectives for these zones are: Zone 1 - Priority Area for Conservation: safeguarding of natural and historical features, while use of the area for informal recreation is advocated by allowing minimal interventions. Zone 2 - Development Area: accommodating the bulk of the development, while coastal views should be safeguarded. Zone 3 - Coastal Enhancement Area: Improvement of the area through small-scale measures and without altering its open and barren character. 2.3 ZONE 1 AND CONTIGUOUS FORESHORE 2.3.1 This zone has a total footprint of 1.5ha and is located between the ecologically sensitive Level 2 coastal area just outside the western edge of the site, and the promenade. It is a Level 3 Area of Ecological Importance (refer to Map 2) and acts as a buffer zone to the Level 2 area which is currently undergoing regeneration with substantial tree cover (mainly tamarisk which is a protected species). 2.3.2 Particular attention should be paid to the scheduled property and coastal cliffs just outside Zone 1. No form of intervention will be allowed in the Level 2 Area of Ecological Importance (vide Map 2), apart from improving accessibility to the shore. Access provision should preferably be reversible and respect the environmental characteristics of the area. For Level 2 AEI`s, which include important habitats present in relatively Revised Qawra Coast Development Brief – March 2007 11 large areas and/or sites with rare species or features, human intervention should be strictly controlled. Since the entire Level 2 area is not included in this Development Brief, encroachment into this area even from the minor developments taking place in the adjacent Level 3 area should be avoided. 2.3.3 The predominant use of the area covered by Zone 1 should be a pleasant walkway which reflects the natural characteristics on the foreshore and which complements the belvederes on the promenade. In order to improve the recreational value of the area, the developer should consolidate the existing footpaths, possibly through the use of gravel, thus promoting a continuous link across Zones 2 and 3. The creation of vegetated areas for informal recreational use is also required, whilst some of the existing vegetation (such as the shrubby orache) could be trimmed in order to maintain views and improve accessibility. Excavation works in this zone will not be permitted with the possible exception being the entrenchment wall area as indicated in paragraphs 2.3.5 to 2.3.6. In other parts of Zone 1, there should be no removal of fill except for the clearance of specific incongruous heaps of rubble. All works should take place under the supervision of the competent authorities and identified beforehand as part of a management plan. 2.3.4 Overall, therefore, the area should not assume a formal garden setting although some soft and hard landscaping (financed by the developer) may be acceptable in specific areas, subject to further evaluation and detailed site identification. The provision of facilities such as picnic tables and benches should however not be tied to the commercial facilities in Zone 2; subsequently, they should be free of charge and accessible to all. Appropriate lighting may also be considered as part of the landscaping plan. Moreover, all vegetation proposals (as in other zones) are to follow MEPA guidelines indicated in Appendix C. Existing views from promenade level should always be retained whilst the waste water issue needs to be tackled by the developer as currently Zones 1 and 2 are acting as “soak away” areas due to the existing road culverts. 2.3.5 Particular attention should be given to the entrenchment wall located adjacent to the promenade (see also Map 2). The entrenchment wall is located predominantly in the Level 3 AEI site and is currently partly buried beneath building debris just off the promenade. It is a Grade 1 protected structure of outstanding architectural/historical interest; all such structures should be preserved in their entirety and any interventions allowed must be directed to their scientific restoration and rehabilitation. 2.3.6 The developer is to upgrade at his own expense the interpretation of the entrenchment wall for the general public by implementing measures such as exposing and restoring parts of the eastern section of the wall (i.e. the section closest to Fra Ben Restaurant) or incorporating the existing visible remains into the holistic interpretation strategy. Moreover, the developer is to finance the provision of interpretive facilities and suitable lighting so as to maximise the attractiveness and historical importance of such a wall. Proposals in this regard will be discussed with MEPA officials, and all works around the entrenchment wall will take place under the supervision of MEPA, Superintendence of Cultural Heritage and Works Division (Restoration Unit) personnel. 2.3.7 Furthermore, the developer will be responsible for the proper upkeep of the entrenchment. In this respect, he will be bound to finance the necessary maintenance works which will need to be carried out in the first five years after the Revised Qawra Coast Development Brief – March 2007 12 interventions have been carried out, as directed by the Restoration Unit of the Works Division. 2.3.8 Also present on the western side of Zone 1 is a rural cistern described in Appendix B. The developer will be expected to recreate the cistern head (“herza”) after consultation with the relevant authorities, thus ensuring that such a feature is conserved and integrated in the overall project. No development should occur on or around the immediate surroundings of this area. Moreover, it should also be ensured that the existing semi-circular belvederes sited adjacent to the promenade but within the boundary of Zone 1 should be retained and that any proposals by the developer should not hinder views from such recreational nodes. 2.3.9 The developer will furthermore be required to ensure that the seaward edge of Zone 1 is stabilised and vegetated for consolidation and landscaping purposes, under the supervision of the relevant authorities. Structures that would improve access from the Level 3 area to the coast below and look-out posts with interpretive panels should also be provided at specific points. A holistic interpretation strategy is indeed warranted around Zones 1, 2 and the respective buffer zones to cover the: a) historic/cultural features (such as the entrenchment wall, Qawra tower and redoubt, pillbox, cistern) b) ecological areas (to include the regeneration of maritime vegetation in Zone 1, the rocky shore and the low coastal cliff beneath the New Dolmen Hotel) c) coastal geomorphology and dynamics of the Qawra, Bugibba, St. Paul’s Bay area including St. Paul’s Islands 2.4 ZONE 2 AND CONTIGUOUS FORESHORE 2.4.1 This zone covers approximately 1.8ha, is located between Zone 1 and the Fra Ben Restaurant, and includes the area of the car park located in front of the restaurant. 2.4.2 Below ground level, this zone should accommodate a visitor attraction as the main use and ancillary uses such as catering outlets, retail outlets, administration offices, lecturing facilities, research lab, library, clinic and other compatible facilities, as well as an adequate amount of parking spaces. A coastal sports facility, such as a diving school, may also be included as part of a mixed-use complex. Given the level of tourism activity in Malta, such a project would aim to attract a high number of tourists visiting our islands as well as local residents. It would assist in extending the choice of tourism facilities which in turn may help to improve the overall tourism offer to Malta. The attraction should operate throughout the year and not be subject to seasonal restrictions. 2.4.3 This visitor attraction and all facilities related to it, including most car and coach parking spaces, should be sited below promenade level; this will help to safeguard the context of the historical Qawra Tower. Coach drop off points may need to be located at road level. No additional excavation will be permitted outside Zone 2. Since a number of car parking spaces at road level will be removed and the area converted into a park instead, it needs to be ensured that at least the equivalent number of parking spaces is provided underground. However, the depth of excavation for the whole scheme should not exceed two floors below ground level. Chapter 3 gives a detailed description of the development parameters for this visitor attraction. Revised Qawra Coast Development Brief – March 2007 13 2.4.4 At promenade level, Zone 2 should mainly be retained for public open spaces (including footpaths, soft and hard landscaped areas) but could include a variety of relatively small scale, low lying structures, attractions and recreational facilities which could possibly also be removed in the tourist low season. Facilities like limited kiosks, children’s play areas, mechanised facilities like carousels or merry-go-rounds, minigolf, amphitheatre, picnic/BBQ areas and similar low key recreational facilities will be considered as long as their provision will not compromise the environmental objectives for this area and the interventions will be visually acceptable. These facilities could improve the commercial viability of the overall project whilst providing additional facilities for locals and tourists alike frequenting the area. It is important to safeguard the views towards the sea from the adjacent residential areas; therefore all structures should be designed in a way as not to obstruct sea views. 2.4.5 A two to three metre vegetated buffer along the northwestern boundary of this zone is to be included to ensure the protection of this coastal fringe. No developments should take place inside this buffer zone, and the area should be cleaned from existing dumped material, excess fill and building waste (that is alien to the coastal system) by the developer, under the supervision of the competent authorities. Subsequently, native vegetation suitable for coastal areas (refer to Appendix C) should be planted along this strip and the semi-circular belvederes adjacent to the promenade should be retained. 2.4.6 Physical development at promenade level of this zone should be concentrated to the eastern part which lies closest to the Fra Ben Restaurant. This would ensure that the attractiveness provided by the openness around the entire foreshore is not undermined by urban development scattered around various parts of Zone 2. The whole of Zone 2 should remain in public ownership. Development should be appropriately shielded and heavily (yet sensitively) landscaped in line with Zone 1, merging with the latter zone on the west and grading into a semi-formal landscaping to the east. It is important that the transition between Zone 1 (semi-natural vegetated area) and Zone 2 (more formal landscaped area) should be gradual (refer to Map 3). Hard and soft landscaping should be financed by the developer. 2.4.7 A 20th Century beach post is also located beyond the buffer zone in an area not zoned for development. The developer is to restore this military building under the supervision of the competent authorities and provide interpretive panels as part of the overall project. There should be no accretions to the current footprint of the beach post. Moreover, the developer is required to improve rocky beach access on a stretch of land lying directly on the foreshore north of Zones 1 and 2 without resorting to the use of cement and/or concrete. Intervention details are to be submitted by the developer as part of an integral plan for the area. 2.4.8 To summarise, all development in this zone should: a) Be low lying and rather inconspicuous from road level; b) Have due regard to the setting of the Qawra Tower; c) Be predominantly public at surface level and not detract from the value of a pedestrian walkway around the Qawra coast (including the promenade, identified zones and other parts of the foreshore). The roofs of the development below promenade level should preferably be utilized as an extension of the public open space, yet views of St Paul`s Islands, l-Ahrax, Gozo and the Mediterranean sea from the existing promenade should be protected and retained; Revised Qawra Coast Development Brief – March 2007 14 d) Increase the recreational attractiveness in the Bugibba/ Qawra area, thus diversifying even further the overall entertainment offer in this tourist resort; e) Be well integrated in the overall development scenario without creating any new significant pressures on the surrounding infrastructure. Any dense urbanisation in this coastal strip needs to be discouraged so as to ensure that any proposed development is compatible with the site’s natural heritage and environmental characteristics; f) Be assessed as part of a Traffic Impact Statement; g) Allow for additional parking spaces; h) Allow for better accessibility to selected points along the rocky stretch of foreshore outside the development brief boundary. 2.4.9 It is important to re-emphasise that there should still be free public access around all zones and the foreshore, and that users are only charged (if necessary) for visiting attractions/ commercial facilities included in the resulting development. Moreover, the developer will be responsible for the maintenance of Zones 1 and 2, together with the monitoring of historical features (under the supervision of the relevant authorities), for the first five years upon completion of the project. 2.5 ZONE 3 2.5.1 Zone 3 occupies a footprint of 0.2ha and stretches along the foreshore on the northern side of the Fra Ben Restaurant into an area currently utilised as an informal car park. The site is very exposed to wave action and consequently there is little scope for landscaping. In this respect, the developer will be responsible to clean the area by removing the existing old concrete platforms and concrete boulders and the entire excess fill. Most of the area is to remain barren, whilst commercial development will not be allowed in this zone. Any landscaping carried out in this area shall respect the setting of the coastal tower and battery. To this effect, soft landscaping should be limited. 2.5.2 Given that Zone 3 lies contiguous to the Qawra Tower and Battery, and given that several incompatible accretions have taken place there over time, MEPA would encourage the possibility of exploring solutions for the improvement of this situation (including utilizing EU funding for this purpose). MEPA would also encourage proposals for the improved interpretation of this and other cultural and natural features in the area. 2.5.3 The developer should ensure that Zones 1, 2 and 3 are physically linked by a continuous walkway along the Qawra coast, below promenade level, spreading from behind the Fra Ben Restaurant to the western side of Zone 1, that is the area just short of the New Dolmen beach facilities. Zone 3 should be closed to traffic and subsequently car parking will not be allowed in the entire zone (some of the displaced parking spaces are to be provided by the developer in Zone 2). The existing road adjacent to the south-eastern side of the Fra Ben Restaurant (just outside Zone 3) should however be safeguarded since it is heavily used by enthusiasts diving in the Ras il-Qawra Beach area. Moreover, the developer will be expected to provide a pedestrian footpath linking Zone 3 to Zone 2 in order to facilitate access between the two zones. Revised Qawra Coast Development Brief – March 2007 15 either be contained within the building or be hidden within an appropriately designed structure. Chapter 3: Parameters for the Visitor Attraction 3.2.4 The new building should satisfy the construction, sanitary, fire, safety and hygiene requirements applicable for such buildings, which are contained in the relevant Maltese and EU regulations. 3.1 INTRODUCTION 3.1.1 The visitor attraction forms the nucleus of the development on this site. It is therefore important to deal with the various aspects related to its provision separately in this chapter. 3.2 DESIGN 3.2.1 The new visitor attraction complex offers the potential for an innovative design (including interior design) appropriate for such an attraction. The internal layout should permit a smooth flow of visitors through the attraction and the various facilities, to assist them in appreciating the attraction and its contents, and to enhance their knowledge of the subjects being presented to them. 3.2.2 The new building must be safe and all appropriate measures must be taken to ensure the safety of visitors. The scheme must cater for persons with special needs and for young children. As regards this aspect, reference should be made to the guidelines published by KNPD (National Commission Persons with Disability) and entitled “Access for All”. 3.2.3 The design of the building must take into consideration factors that will minimise adverse impact on the environment. These include water conservation, waste reduction, efficient use of materials, energy saving devices, etc. A high level of design quality, detailing and construction finish must be achieved. All air conditioning units, water tanks or other similar structures must Revised Qawra Coast Development Brief – March 2007 16 3.3 LANDSCAPING 3.3.1 One of the important requirements of the proposed development is the need to ensure a high quality landscaping of the area. The developer shall be responsible for the funding and execution of such a scheme. Responsibility of maintaining and irrigating the landscaped area in this zone will also be entirely in the hands of the developer. 3.3.2 Appendix C lists the various species of plants and trees that can be used. It must be ensured that any soft landscaping proposed will survive along the coast. 3.4 ACCESS AND PARKING 3.4.1 The existing access to the site is through Triq it-Trunciera or Triq il-Qawra. Both are heavily used by coaches and mini vans in view of the proliferation of hotels in the area, and as such a Traffic Impact Statement will be necessary to determine the extent of additional pressures to be imposed by the proposed development (in all zones) on the existing road infrastructure. Access through Triq it -Trunciera and Triq il-Qawra needs to be safeguarded throughout the entire construction phase. 3.4.2 The car park design should allocate specific areas for coach, mini van and car parking, and adequate space should be made available in order to enable them to manoeuvre within the site. It should be noted that the existing car park takes up to 88 cars and will be removed; therefore alternative parking needs to be provided underground. In case there is not sufficient space underground to accommodate the required number of spaces (particularly for coaches), some additional parking may be provided along the strip south of the Qawra Tower that is currently a wide pavement below the level of the main road. The developer will also be responsible for the maintenance of the car park. 3.4.3 All access and parking proposals must be to the satisfaction of MEPA and comply with the relevant guidelines and standards set out in Appendix 2 of the Structure Plan Explanatory Memorandum (1990) “Highways and Traffic Guidance” and other updates or guidelines issued by MEPA in the meantime. Although the Explanatory Memorandum does not give specific standards for car park spaces for visitor attractions, the figures given in Appendix D should provide some guidelines as to the spaces required. The exact number of parking spaces needed will be calculated upon submission of the detailed plans and the Traffic Impact Statement. In any proposals for internal circulation within the car park, adequate provision must be made for the needs of disabled visitors. 3.5 INFRASTRUCTURE AND SERVICES 3.5.1 The site is not currently connected to the drainage network since existing sewers are connected to the Qawra residences and Fra Ben Restaurant along the promenade/ inner roads and local access road (serving the boathouses) respectively. It is apparent, therefore, that the development needs to be served by various utility connections which have to be carried out at the expense of the developer. 3.5.2 No storm water is to be connected to the existing sewer and waste and sewage effluents will not be allowed to be Revised Qawra Coast Development Brief – March 2007 17 discharged untreated into the open sea. All utility proposals must be formulated and approved in consultation with the relevant utility agency. These proposals should take into account the peak visitation load to the attraction. 3.6 CONSTRUCTION 3.6.1 The developer will be required to ensure that construction causes minimum disruption and adverse impacts on adjacent land uses and users, whilst particularly ensuring the protection of the environmental/ coastal resources. In particular, the developer should ensure that all vehicular traffic is allowed to flow freely at all times alongside Triq it-Trunciera and Triq ilQawra. Adequate precautions must be taken to ensure that building activities (and any storage of materials) are contained within the allocated area for the development and must not spread into the adjacent areas. All debris and other waste materials must be removed from the site on a regular basis to a controlled and approved tipping site. 3.6.2 The developer will have to provide a Construction Management Plan giving full details of construction access points, storage areas for materials and plant, workers’ accommodation, site management office/s and construction routes. A detailed construction programme, clearly highlighting the various phases of implementation, must be submitted for approval prior to any construction commencing. This should include details of any provisional traffic/ road arrangements, in view of the possible disruption of the access only road linking the Fra Ben car park to the boathouses at Qawra. 3.7 OPERATING SYSTEM FOR A MARINE AQUARIUM 3.7.1 If the developer opts for the establishment of a marine aquarium, there are three main operational options, either an open or closed system, or a combination of both. Whichever system is selected, the developers should indicate the measures to be used to mitigate potentially adverse effects on the coastal environment and would thus be expected to dig boreholes vertically into the sea level and not go over the natural foreshore. The developer is advised to negotiate all above matters with the Environment Protection Directorate within MEPA since they will need to give their consent to all issues relating to the marine aquarium. 3.7.2 Only species that are characteristic of the local territorial waters, and have been approved by the EPD, should be kept in an open system. Any species, which are not characteristic of the local territorial waters and have been approved by the Environment Protection Department, should be kept in a closed system. Both systems should have a separate pumping room, yet water pumped in the closed system shall not be allowed to be discharged into the marine environment. 3.7.3 The size of the tanks should be commensurate with the type, size and quantity of fish species that will be placed inside each tank to ensure that species have the right conditions reflecting nearly similar conditions to their normal habitat. Apart from the size of the tanks it is to be ensured that the fish species have the appropriate ecological ambience, particularly as regards sea water temperature, aeration system and the right type of marine flora. 3.7.4 Careful thought needs to be given to the species placed in the tanks and continual maintenance is required to ensure that the species remain healthy or are replenished regularly. 3.8 EDUCATION AND RESEARCH 3.8.1 The design and concept of the development should reflect the aim of delivering an educational and conservation Revised Qawra Coast Development Brief – March 2007 18 message. Interpretive provisions should aim at meeting the requirements of the various types of audiences from school children to tourists and specialist visitors, whilst the use of the latest technology in this field to enhance interpretation is encouraged. The interpretive provisions should seek to actively involve visitors, particularly children. Adequate information either through interpretive panels or leaflets should be provided to assist visitors. The use of exhibitions can also help to inform and educate. Interactive media constitute another option to attract the attention of the children. 3.8.2 The development proposal should include facilities for research purposes, in the form of a laboratory or a similar facility. The facility/ies will be used to carry out research, whilst also ensuring a technical backup to the operations aspect of the attraction. The research facility should be appropriately equipped and staffed. Facilities may include a small conference room, a testing lab and other supporting facilities. 3.9 MANAGEMENT AND VISITOR FACILITIES 3.9.1 It is essential to have the appropriate management expertise and qualified staff to ensure the success of this venture. The project will need personnel to run the attraction, manage visitors and respond to their needs and questions to ensure that visitors are satisfied with their visit. On the other hand, the project would need to be supplemented with technical expertise to ensure that the operations are maintained to the appropriate standards. 3.9.2 The attraction should make provision for a number of ancillary visitor facilities, such as related retail outlets and catering outlets. Chapter 4: Framework for Proposed Land Uses - Summary 4.1 SUMMARY OF PLANNING PARAMETERS AND KEY LAND USES 4.1.1 The main planning parameters and key land uses per zone are: • Developer will be responsible for maintenance and irrigation, together with the monitoring of historical features, for the first five years upon completion of the project; • Any proposed development should cater for persons with special needs and young children, as highlighted in the KNPD document “Access for All”; • Unless specifically indicated, all works should be undertaken and structures rehabilitated at the developer’s expense, after a full development permit is obtained from MEPA. OVERALL REQUIREMENTS AND ANNOTATIONS • Detailed management and landscaping plan; • Construction management plan; • Holistic interpretation strategy; • Environmental Planning Statement (EPS): this requirement would depend on the project details; • Traffic Impact Statement (TIS), inclusive of parking requirements vis-à-vis the proposed commercial development in Zone 2; • Commercial development to be restricted to Zone 2; • Pleasant walkway and free public access throughout. Clear views from the promenade are to be protected; Revised Qawra Coast Development Brief – March 2007 ZONE 1 AND CONTIGUOUS FORESHORE 19 • Development should respect the Level 3 scheduling in the area; • Predominant use: consolidation of existing footpaths, stabilisation of seaward edge, trimming of existing vegetation, introduction of some soft and hard landscaping such as timber structures. No formal garden setting; • Upgrade the interpretation of the entrenchment wall and surrounding area; • Excavation works entrenchment wall; • Rocky beach access improvements that are compatible with the natural environment. not permitted except near ZONE 2 AND CONTIGUOUS FORESHORE • Development of a local visitor attraction and ancillary facilities. The attraction and related facilities, including most parking, should be sited below promenade level; • Developer will be required to provide at least the same number of car parking spaces underground as the ones removed at road level; • Development above ground: heavily landscaped, small scale, low lying structures concentrated around the eastern area of this zone; • Rocky beach access improvements that are compatible with the natural environment. ZONE 3 • Removal of excess fill, existing concrete platforms and concrete boulders; • Landscaping (earth berm and low retaining wall) in an area behind Fra Ben, provided that the setting of the tower is protected; • Parking in this zone should be physically prevented. Revised Qawra Coast Development Brief – March 2007 20 • Statement explaining proposals (detailed floorspace in respect of land uses suggested) and demonstrating compliance with the detailed requirements of this Brief. 5.1 INTRODUCTION • 5.1.1 The design process will be carried out in two stages. Other non land use requirements will also be included at a later stage, as deemed necessary by Government. Overall scheme plans (Scale 1:500) showing broad site levels, buildings, parking facilities (with capacities), landscaping and construction space requirements. • 5.1.2 Stage One entails the submission of drawings illustrating the overall concept of the design and a preliminary concept of the interpretive provision. These requirements are compulsory for all developers (or their consultants). Preliminary elevations of the whole development (Scale 1:200) demonstrating broad design concepts, showing the relationship of the proposed development to the nearby buildings and to recognisable site features. • Section through the site (north-south), illustrating the relationship of the building heights to the coast, and one section (east -west) along the length of the site. • Proposed phasing plan, including routing of utilities and the location of ancillary requirements, e.g. new pumping stations, sub stations, closed/open water system in case that a marine aquarium is being proposed, water storage facilities and telecommunication facilities. Scale 1:200. • Three photomontages taken from the promenade in the western part of Zone 1, from the rear (northern) part of the Fra Ben Restaurant and from the car park in Triq it Trunciera leading down to Dawret il-Gzejjer. • Overall plan showing retained buildings and structures and those to be removed (if any), combined with a written statement (not more than 15 pages A4) of the proposed restoration methods of all structures including use of materials and phasing along with a schedule of materials for buildings, structures, apertures, hard landscaping. Chapter 5: Submission Requirements 5.1.3 Stage Two is the preparation in detail of the concept designs from Stage One. A full development application will be required at this stage. Stage Two requirements, as highlighted below, should be carried out to the satisfaction of MEPA before a development permit is awarded. 5.1.4 Further to the submission requirements highlighted below, the developer should however also comply with all requirements as stipulated in the previous chapters. 5.2 STAGE ONE 5.2.1 Outline scheme plans shall be submitted giving the following details: • Written statement giving a clear and concise description of the development concept, and how it complies with the requirements in the Development Brief and the relevant Structure Plan and other approved policies of MEPA, together with a description of each land use/ facility of the project and a schedule of all space allocations (in square metres). Revised Qawra Coast Development Brief – March 2007 21 • General statement highlighting construction operation employment levels by category. and • Axonometric of proposals from two important viewpoints. Scale 1:500. • Plan showing the proposed layout of the various facilities inside the main attraction/s and clearly indicating visitor flow and circulation around the attraction/s from one facility to another. • Block model of proposals. Scale 1:1000. • Detailed proposals for landscaping and its maintenance, existing vegetation, new planting (with species and number), earth mounding, hard landscaping, street furniture and lighting. Scale 1:200. • Schedule of floorspace by land use (like retail, catering and offices) plus proposed use of existing structures. • Proposed restoration details for all structures, including methods to be applied and the materials involved. • Proposed phasing plan, including buildings, uses and areas within each phase, phasing order and timing of each phase. Scale 1:1000. • A brief description of the interpretation concept proposed for the whole project, indicating how this relates to the concept design being proposed. MEPA may consider waiving a number of stage 1 requirements in the eventuality that the site is developed by Government or a Government agency (rather than through a tendering process issued by government) provided that the requisite information normally required through the development control process is submitted. 5.3 STAGE TWO 5.3.1 Detailed scheme plans should be submitted giving the following information: • Existing site survey with levels. Scale 1:1000. • Proposed site layout, including any new site levels and all proposed land uses. Scale 1:1000 and 1:500. • Composite overall scheme plans showing levels, buildings, landscaping, vehicle parking facilities, utilities, servicing arrangements and the proposed phasing and construction space requirements. Scale 1: 2500. • Plans, elevations and sections of the proposed new buildings and those structures to be rehabilitated. Scale 1:200. Revised Qawra Coast Development Brief – March 2007 22 5.3.2 The following details are required as regards the operational and management aspects of the proposed attraction: • Written statement explaining proposals for the treatment of sewage, water and energy conservation. • The predicted requirements of water, electricity and sewerage systems and the likely impact on the existing network. The location of proposed site utilities layout including connection to the existing public networks (scale 1:1000), and proof of negotiations with the relevant utilities organisations. • Detailed interpretation plan explaining the overall interpretation concept whilst identifying the various themes to be interpreted (vis-à-vis the marine aquarium, coastal, historical and ecological characteristics, where relevant), the techniques and media to be used in interpreting each theme. • Details on emergency/ security arrangements both inside the attraction and in the car park. • As requested by the procedures covering Environmental Impact Assessment in Malta, it may be necessary to carry out an Environmental Planning Statement (EPS) for this project. In such cases, the relevant terms of reference for this study will be provided by MEPA. • A Traffic Impact Statement (TIS) will be required. Terms of reference for this study will be provided by MEPA. • Proposed construction management plan, including details of: 1. Information on site excavations, details of fill material, and the sites for construction and waste disposal, 2. Works required for utility provisions, 3. Temporary access roads, all construction access points and proposals for maintaining pedestrian and vehicular access, 4. Underground structures, storage areas for plant and materials, location of any cranes used in construction. 5.3.3 Furthermore, a statement explaining proposals and demonstrating compliance with the requirements of this brief should be presented. 5.3.4 The following information should also be submitted, in case the development of a marine aquarium is envisaged: • Details as regards the proposed system to be used in operating the aquarium (i.e. closed or open system) by Revised Qawra Coast Development Brief – March 2007 23 showing the equipment to be used as well as plans and specifications relating to the layout of the tanks. • Detailed description regarding the removal and replenishment of water in the tanks explaining the technical operations of the system to be used and other relevant details. • Details of equipment to be used in ensuring satisfactory and adequate ambient conditions for the species inside the tanks. • Detailed drawings of each tank to be installed, giving their dimensions and details of the species to be placed in each tank. • List the flora and fauna species to be used in the attraction and an indication on the method of species procurement. • A detailed monitoring programme (regarding the species) should be submitted which would be reviewed by the competent authorities and agreed upon by the developer. 5.3.5 The developer may be required to provide additional information, which may be sought by the relevant public sector authorities, according to the identified uses. Prospective developers should also note that between 1st July and 30th September, the operation of plant, machinery and any other equipment, which is audible at the approved development site boundaries as well as construction or engineering works or operations which involve demolition, trenching, excavation and building activity on site, shall only be permitted between 09:00 and 19:00 on Mondays to Fridays, between 09:00 and 17:00 on Saturdays and at no time on Sundays and public holidays. Policy REC 9 stresses the fact that no permanent structures will be permitted in coastal areas, and that the owners of huts and similar developments on coastlines will be required to remove these structures. In accordance with this policy, the Brief only allows smallscale structures related to recreation above ground while the more large-scale development will be located entirely underground. Appendix A: Relevant Structure Plan and Local Plan Policies STRUCTURE PLAN POLICIES Tourism SP Policies TOU 3, TOU 4 & TOU 5 relate to tourism objectives and preferred locations in which further tourism facilities should be developed. The Development Brief Area is located in one of the zones specified in policies TOU3 and TOU4. The proposals contained in this Brief aim at upgrading and improving the tourism product in this area, which is in line with the above policies. SP Policy TOU 11 is relevant because it encourages Malta’s heritage items to be made more accessible and interesting to tourists. There are historical structures on site which are proposed to be restored and if possible also reused by the Brief, thus being made more accessible. The Brief also requests the installation of interpretative signage. Recreation In SP Policy REC 3, Government is urged to prepare and implement management schemes for publicly owned open spaces and water areas, besides encouraging other agencies and landowners to implement similar schemes. According to REC 4, MEPA will seek to identify sites for district level recreation centres and co-ordinate publicly provided facilities with commercial and voluntary aided facilities. One of the proposed uses for this area is a public park, which will be established and maintained by the government with possible involvement of the private sector, thus an additional recreational facility is being provided. Revised Qawra Coast Development Brief – March 2007 24 Policy REC 13 states that MEPA and other Government bodies will seek to identify and establish a network of country parkways. The identification of heritage trails and country parkways is stressed in the Structure Plan as a means to enhance the historical and natural heritage product for recreational and tourism purposes. Besides, MEPA will also designate a series of picnic areas within the country parkway system, to include environmentally-friendly support facilities along the routes (Policy REC 14). New footpaths allowing sea views and the appreciation of historical structures, as well as new picnic areas, will be provided in this area according to the Brief. Settlement pattern Policy SET 1 encourages continued development, including rehabilitation and redevelopment, within existing built -up areas, so long as it does not go against other policies. Policy SET 7 provides a hierarchy of preferred uses, particularly for outer residential areas, the first one of which is community facilities, among them educational and recreational uses. Both of these are components of the development proposed for this site. Built environment Policy BEN 1 states that development will not be permitted if the proposal is likely to have characteristics which would constitute bad neighbourliness. Policy BEN 2 does not allow development which is incompatible with good urban design, natural heritage and environmental characteristics of existing or planned adjacent uses, and is unlikely to maintain the good visual integrity of the area in which it is located. The provisions of the Brief ensure that sea views are being safeguarded and that the proposed development will not have deleterious impacts on adjacent areas. Policy BEN 17 refers to the importance of hard and soft landscaping, and measures by which their maintenance will be undertaken. Landscaping of most of the site is part of the requirements contained in this Brief. Social and Community Facilities Policy SOC 24 relates to appropriate access, toilets and internal arrangements for the disabled, the elderly, and children in prams and pushchairs being given consideration. Therefore, the Brief contains a provision requiring all development on this site to be line with the “Access for All” Guidelines. Transport Policy TRA 2: The policy requires promoters of major developments to prepare Traffic Impact Statements (TIS). The Brief therefore includes the request for the preparation of a TIS for this site. Policy TRA 4: This policy sets out parking principles for new development. The Brief notes that development is to follow MEPA’s vehicle parking requirements as defined in Appendix D (Parking Standards Requirements). Policy RDS 9: New public footpaths through the site are being recommended, which is in line with this policy, as it requires that footways and their maintenance will be improved. Conservation Policy UCO 12 requires a continuing commitment to the enhancement of Conservation Areas, listed buildings, and structures of outstanding architectural or historical interest, by means of promoting restoration, good street furniture design, landscaping, and finding new uses for vacant and underused buildings. Furthermore, according to Policy RCO 15 there is a general presumption against developments in urban and other built-up areas which are insensitive to the continued Revised Qawra Coast Development Brief – March 2007 25 existence of identified features of scientific importance and significant elements of the country’s natural heritage present within the area. The safeguarding and rehabilitation of the historical structures located within and near the site is one of the provisions contained in the Brief. Policy RCO 20 requires positive action to be taken to rehabilitate identified areas of degraded habitat and landscape, and proposals for rehabilitation for these areas, provided that such schemes do not conflict with other policies and/or regulations, will be supported subject to scrutiny and approval by competent experts. A large percentage of the site covered by this Brief is degraded, and the proposed development will improve the area. Policy MCO 1 lists candidate sites for the status of Marine Conservation Areas, among them Qawra Point. The Brief includes provisions to prevent any deleterious effects of the proposed development on the marine ecosystem. Policy CZM 3 states that public access around the coastline immediately adjacent to the sea will be secured. This will include taking shorelands into public ownership, Government acquisition of illegal developments and encroachments, and suitable construction works. The Brief therefore requires the developer of the site to ensure that public access to the coast is being safeguarded. Public Utilities Policy PUT 3: The policy requires, as a major strategy of public utilities planning, the efficient management and conservation of resources, the recycling and reuse of waste water and waste materials, as well as the minimisation of waste. The Brief contains a provision to ensure that the development will include these requirements. A further relevant policy relating to public utilities that is being followed in this Brief is policy PUT 7 regarding water storage reservoirs which are to be placed underground. POLICIES OF THE NORTH WEST LOCAL PLAN Site-Specific Policy Policy NWSP 14 relates specifically to the Qawra Coast Development Brief and states that all development proposals for the site must be in line with the approved Brief. Proposals, which prejudice the holistic development of this site, as set out in the policy document, will not be allowed. The explanatory text furthermore emphasizes that the stretch of coast identified by this policy runs along the Residential Priority Area and thus it is important that its development is controlled to ensure that no adverse impacts on this area ensue. The enhancement of the area where dumping has occurred, is also required. Urban Settlements The policy NWUS 6 is relevant for the proposed urban park in Zone 2. It gives priority to landscaping schemes and provision of play areas and equipment. Proposals should enhance the amenity value of the sites for use by the public for recreation and be compatible with the character and environmental value of the sites and surrounding areas. Commercial uses on these sites are to be restricted to the bare minimum such as small kiosks. Excavations of the sites allocated for urban open space will not be accepted, unless MEPA is satisfied that these works and the use of the space created below ground will not adversely affect the use of the site for recreation by the general public or prejudice the implementation of an attractive, landscaped open space. The Brief allows excavations on the indicated site, but also requires well-designed open space above. Commerce and Industry Policy NWCM 3 designates Entertainment Priority Areas (EPAs), among them Bugibba. It specifies a number of acceptable land uses for these Revised Qawra Coast Development Brief – March 2007 26 areas, such as small shops, offices, food and drink outlets, nonresidential institutions including interpretation centres, small-scale educational facilities, assembly and leisure, marine leisure (diving, sailing or windsurfing school) or other marine based sports or recreation, etc. Certain conditions and restrictions also apply. All proposed uses for the site of this Brief are in line with this policy. Tourism and Recreation Paragraph 4.6.1 of the Local Plan outlines the strategy for tourism: i. To encourage new tourism accommodation projects and channel them towards the Tourism Zones and the Entertainment Priority Areas, among them St. Paul’s Bay/ Bugibba/ Qawra; ii. To facilitate the expansion of existing tourism accommodation establishments in urban areas only; iii. To encourage the upgrading of existing tourism accommodation establishments both in urban and rural areas; iv. To permit new ancillary facilities to the tourism industry which enhance the experience of the visitor and improve the quality of the tourist product such as visitor/ interpretation centres, museums, recreation/ leisure/ entertainment uses, promenades, and to direct them towards established sites for visitor attractions; v. To resist low quality, poorly designed and inappropriately located tourism related development. The proposals in the Brief follow this strategy, with points (iv) and (v) being particularly relevant. Paragraph 4.7.1 indicates the strategy for recreation as follows: i. To promote regional and national centres for formal and informal recreation which would include both land and water sports; ii. To attract recreational activities to sites where the impact on the urban and rural environment would be limited; iii. To meet demand for recreation spaces by residents in the urban areas and thus provide well-maintained open spaces within walking distance for all sectors of the public; iv. To give emphasis to the provision of facilities at a local level in the smaller settlements, and sites for sports being directed to the larger settlements; v. To encourage the better use of existing facilities and a dual use of sports facilities in schools by the public. The Brief is also in line with this strategy as it provides additional recreational space close to a residential area. Policy NWTO 3 permits the development of visitor attractions within the settlement boundaries of St. Paul’s Bay/Bugibba/Qawra and other settlements. Favourable consideration for such projects can only be given subject to the following criteria: i. The prior approval of the Malta Tourism Authority; ii. The proposed development will not cause detrimental pressures on the local community; iii. The scale of the project is consistent with the character of the site and surrounding area; iv. High design quality in terms of height, volume, bulk, materials and finishes, and landscaping, is achieved; v. The existing infrastructure is not adversely affected by the proposed project, and can meet the demands of the project without significant intervention; vi. The proposed development would not exacerbate existing problems of traffic congestion, potential street/ highway danger and vehicular and pedestrian conflict, and appropriate off street parking is provided; vii. Access to the foreshore and scenic views are not restricted or limited by the proposed development; viii. For the reuse of scheduled buildings and structures of architectural or historical interest, policies in this Plan, existing policies and guidelines related to developments in Urban Conservation Areas and on scheduled buildings also apply; ix. The proposals comply with all other policies in this Plan relating to specific areas such as Town/ Neighbourhood Centres, Tourism Zones, Entertainment Priority Areas, Residential Areas. Revised Qawra Coast Development Brief – March 2007 27 For the proposed visitor attraction, all the requirements of this policy have been included in the provisions of the Brief. Policy NWRE 6 requires that existing and proposed long distance footpaths and other access ways will be protected from any development that would adversely affect their route or character. A network of footpaths will be integrated wherever possible with the Country Parkway System (Refer to Policy NWRE 5). Emphasis will be given to the provision of circular routes and access from the urban settlements to the countryside. The Brief contains the creation of new footpaths, which will be linked with the existing Qawra promenade. Policy NWRE 7 encourages Local Councils to provide and maintain picnic areas in appropriate locations including specific designated sites. Development permission of designated and any other additional picnic areas will be subject to the following criteria: i. The design and layout shall have regard to the characteristics of the area in order to minimize adverse effects; ii. The siting has no significant adverse impact on any scheduled, designated or protected area; iii. Preference will be given to areas which are in public ownership and which currently are in a dilapidated state. Picnic areas will not be permitted within 10 metres of the coastline; iv. The site is well related to an existing highway/ access and does not cause a traffic hazard, and off-road parking is provided; v. Details of washing and toilet facilities shall be submitted and approved together with the details of drainage and sewage disposal arrangements; vi. No static or touring caravans, tents or other temporary accommodation will be permitted; and vii. A landscape scheme is submitted and approved with any permit application, which shall be implemented in its entirety within the first planting season and thereafter maintained. One of the proposals of the Brief is to locate some new picnic facilities within the urban park and/or within the vegetated area of Zone 1. These would be in line with the provisions above. Conservation NWCO 6 contains provisions for Areas of Ecological Importance (AEIs) and Sites of Scientific Importance (SSIs). General protection will apply as follows: i. No inappropriate development permitted. However, suitable maintenance of existing structures and construction of minor amenities designed to enhance the conservation or educational use of any area may be permitted. Supervised visits to sites of natural importance will be encouraged; ii. No development activities that are likely to be a fire risk to trees and wooded areas will be allowed; iii. No development where noxious emissions, effluents or waste may create adverse impacts on nearby AEIs or SSIs will be allowed. iv. The removal of intrusive elements and alien species in a manner compatible with conservation; and the inclusion of buffer zones to further the protection of AEIs and SSIs. Level 1 AEIs and SSIs (Ecological) No development will be permitted and access will be limited except to enhance the educational use of the area whilst not damaging the features being protected and for necessary rehabilitation works. Level 2 AEIs and SSIs (Ecological) Permission will only be granted for the maintenance of existing structures, covered by a permit and construction of minor amenities where permissible, designed to enhance the educational and recreational use of the area (e.g. narrow footpaths, nature trails and small scale visitor centres). Level 3 AEIs and SSIs (Ecological) No residential, industrial, commercial, tourism development, infrastructure or public utility works will be permitted. A satisfactory environmental impact assessment is to be undertaken and approved by MEPA. Level 4 AEIs and SSIs (Ecological) Permission will only be granted for small-scale development provided that no suitable alternative locations exist and features of Revised Qawra Coast Development Brief – March 2007 28 ecological and scientific interest are protected. A satisfactory environmental planning statement is to be undertaken and approved by MEPA. Paragraph 15.4.3 contains the Strategy for the Developed Coastline: To safeguard the existing legitimate coastal uses and to minimise existing and potential conflicts. The protection of open space for public use is to be safeguarded. Existing legally approved uses and development within protected areas should be allowed to continue, provided that it does not affect the value of the protected coast negatively. Transport NWTR 1 encourages proposals which will provide better facilities for pedestrians, cyclists and those with special mobility needs. The introduction of a network of cycle ways and footpaths will also be supported, particularly in the less hilly parts of the North West, such as Rabat, Dingli and St Paul’s Bay. The Brief proposes the construction of new footpaths, which need to be accessible to all. NWSP 1 relates to parking provision within St. Paul’s Bay. MEPA will encourage and support the introduction of a Controlled Parking Zone (CPZ), mainly to ensure that on-street and off-street parking is controlled and managed. Four sites around the locality are proposed for multi-storey car parks. This car-parking provision will be over and above the one required for other development proposed on sites. These CPPS car parks will form part of a comprehensive parking regime for the area. MEPA will give due consideration to other acceptable alternative sites for off-street public car parks should these become available during the lifetime of this Plan. The proposed development on the site of this Brief will result in the loss of a number of street-level parking spaces; however, an equivalent number of spaces is required to be provided underground, so that parking problems existing in the area will not be aggravated. Appendix B: Historical Features on the Qawra Foreshore Beachpost 1. The Qawra beachpost was constructed during WWII. It is one of a variety of detached defences built to resist any attempt by the enemy to land on the coasts of Malta. The beachpost formed part of a fortified system, usually consisting of consecutive "lines" of defences having varying designs according to their location and purpose within the system. 2. The first "line" of defences particularly ran along the coast, while other "lines" circumscribed the hinterland. The post is built of concrete and has a square plan. The entrance was through a small hatch secured with an armoured door. Most probably this post was also camouflaged according to the official camouflage scheme adopted specifically for the Maltese WWII defences. 3. The post is approximately 4.5m high and internally divided into two floors. The upper floor has horizontal slit windows which originally had wooden sliding shutters. A detachment of about seven men, armed with small arms such as machine guns and rifles, served within such posts. The lower floor mainly served as a rest room for the crew, but also had small embrasures in the walls for defence firing. On the roof of the post is a square observation turret, originally with a metal hatch on top. Lean vertical slits allowed the observer, availed with a pair of binoculars, to direct the defence. Evidence that these Revised Qawra Coast Development Brief – March 2007 29 defences have truly seen action is the fact that some are riddled with aerial machine gun fire and shrapnel holes. 4. The importance of WWII defences is quite significant for various reasons: a) They are examples of early 20th century fortifications; Fondazzjoni Wirt Artna describe them as the "last of impressive fortifications" built in the Maltese Islands since the earliest evidence from the Bronze Age. date the work to around 1763, when a similar pattern of defensive lines was being built along the coast south of Ricasoli under the direction of Knight De Tigne. b) They are synonymous with the defence of the Maltese Islands. Similar, though variant, examples are only found elsewhere in Britain. Therefore these British defences are unique since they are the only examples which are found outside Britain itself. 7. Little remains nowadays of the Qawra entrenchment, though most of it lies buried beneath the promenade. One particular section is still visible above road level and reveals a solid wall built of regular courses of drafted masonry with huge blocks of some 41 centimetres in height. The wall was served by a firing banquette and the bastions had cuttings in the flanks1. It is nowadays scheduled as a Grade 1 property. c) Most are still in a very good condition, although some require restoration and a more appropriate use, which may also include recreation apart from being museum pieces. d) These British 20th century defences have arguably equal historic value as most of the Knights' period fortifications. Apart from being fine examples of military architecture of the time, they were actually used in warfare, which engagements resulted in deterring the enemy from succeeding in capturing Malta. This factor is unlike several of the Knights' fortifications which were never used in combat and at times were merely built for the prestige of the Grand Master. Qawra Cistern 8. The cistern located in the Level 3 area is one of the few rural features that still exist in this heavily urbanised area of Bugibba. The cistern has no historical connotations and in fact is not scheduled; its significance is however still very valid as part of our rural heritage, with the result that such a cistern should therefore be conserved. Qawra Entrenchment Wall 9. Overall, the cistern is at least 5 metres deep and is 5. During the 18th Century, one of the most heavily characterised by semicircular ends. The cistern head is supported on small arches whilst beyond the lower edge of the shaft, the base opens up in a bell-shaped cistern. defended bays in Malta after Marsaxlokk was undoubtedly St Paul’s Bay. To its complement of six coastal batteries and two towers, the Knights later added a long defensive line at Qawra Point. Here, the shoreline was relatively exposed and easily approachable from the sea, particularly during the calm summer months. 10. In the recent past, the cistern was covered by about two courses depth of soil in which trees were also planted. 6. The exact year during which this entrenchment wall was constructed is not known. The design of the entrenchment with its three flat-faced bastions would Revised Qawra Coast Development Brief – March 2007 30 1 Spiteri Stephen C.: Fortress of The Cross, Heritage Interpretation Services, 1994 Laurus nobilis Rand Bay laurel Olea europaea Żebbuġ Olive Prunus dulcis Lewż Bitter almond Punica granatum Rummien Pomegranate Ficus carica Tin Fig Pyrus amygdaliformis Lanġas salvaġġ Wild pear Sites outside development zones and near urban fringes Quercus ilex Ballut Holm oak Only indigenous and archaeophytic species are to be used in the countryside, in sites located outside development zones and in urban peripheries; the use of alien species in such areas infringes Structure Plan policy RCO 31. The following trees, shrubs, and plants are recommended for general landscaping, normal afforestation purposes, as well as other tree planting on abandoned fields and derelict areas, subject to Structure Plan Policy RCO 30. Tamarix Africana Bruk Tamarisk Crataegus azarolus Anżalor Azarole Crataegus monogyna Żargħun Common hawthorn Darniella melitensis Xebb / Siġar ta' lirmied Maltese salt tree Appendix C: Extract from Trees, Shrubs and Plants for Landscaping in the Maltese Islands List of Species for Use Conifers Small trees Scientific name Maltese name English name Euphorbia dendroides Tengħud tas-siġra Tree spurge Pinus halepensis Żnuber Aleppo pine Myrtus communis Riħan Myrtle Tetraclinis articulata Għargħar Alerce / Sandarac gum tree Pistacia lentiscus Deru Lentisk / Mastic tree Pistacia terebinthus Skurnabekk Terebinth / Turpentine tree Punica granatum Rummien Pomegranate Pyrus amygdaliformis Lanġas salvaġġ Wild pear Rhamnus alaternus Alaternu Mediterranean buckthorn Broadleaved trees Ceratonia siliqua Ħarrub Carob Cercis siliquastrum Siġar ta' Ġuda Judas' tree Revised Qawra Coast Development Brief – March 2007 31 Rhamnus oleoides Żiju Small buckthorn Sambucus ebulus Sebbuq salvaġġ Dwarf elder Sambucus nigra Sebbuq il-kbir Common elder Palms Chaemerops humilis Ġummar Dwarf fan palm Phoenix dactylifera Palm Date palm Shrubs Darniella melitensis Xebb / Siġra ta' lirmied Maltese salt tree Dittrichia viscosa Tulliera Viscous fleabane Ephedra fragilis -- Shrubby ephedra Erica multiflora Savina / Leħjet ixxiħ / Issopu Mediterranean heath Euphorbia melitensis Tengħud taxxagħri Maltese spurge Lycium intricatum Għawseġ Southern tea-tree Ononis natrix Broxka Bush restharrow Cheirolophus crassifolius Widnet il-baħar Maltese rock centaury Paliurus spina-christi Xewk tal-kuruna Christ's thorn Periploca laevigata angustifolia Siġret il-ħarir Wolfbane Phlomis fruticosa Salvja talMadonna/ Salvjun/ habaq tal-Madonna Great Sage Rhus coriaria Xumakk tal-konz Sumack Aloe vera Sabbar Yellow aloe Anargyris foetida Ful tal-klieb Stinking bean trefoil Anthyllis hermanniae Ħatba s-sewda Shrubby kidneyvetch Antirrhirum tortuosum Papoċċi ħomor Snapdragon Capparis orientalis Kappar Caper Cistus creticus ssp. creticus -- Hoary rockrose Rosmarinus officinalis Klin Rosemary Cistus creticus eriocephlus -- Hoary rockrose Prasium majus Teħ Sqalli Mediterranean prasium Cistus monspeliensis -- White rockrose Ruscus hypophyllum Belladonna Thymus capitatus Sagħtar Mediterranean thyme Greater Butcher'sbroom Ruta chalepensis Fejġel Wall rue Maltese cliff-orache Salvia fruticosa Salvja Three-lobed Sage Cremnophyton lanfrancoi Bjanka ta' l-irdum Revised Qawra Coast Development Brief – March 2007 32 Senecio bicolor Kromb il-baħar Silver ragwort Coastal areas Spartium junceum Ġenista safra Spanish broom Teucrium flavium Borgħom Yellow germander Teucrium fruticans Żebbuġija Olive-leaved/ evergreen germander Planting along the coast is subject to Structure Plan Policies RCO 29 and RCO 30. The trees/ shrubs in this list may be used in coastal plantings and landscaping. Triadenia aegyptica (=Hypericum aegypticum) Fexfiex Egyptian St John's Wort Trees Climbers Asparagus aphyllus Spraġ xewwieki / Ġaqċieqa Mediterranean aspargus Clematis cirrhosa Kiesħa / bajda Evergreen traveller's joy Scientific name Maltese name English name Vitex agnus-castus Għadib / Siġar tal-Virgi Chaste tree Tamarix africana Bruk Tamarisk Aloe vera Sabbar Yellow aloe Shrubs Hedera helix Liedna Ivy Atriplex halimus Bjanka Lonicera implexa Qarn il-mogħża Evergreen honeysuckle Shrubby orache / Salt bush Capparis orientalis Kappar Caper Prasium majus Teħ Sqalli Mediterranean prasium Cremnophyton lanfrancoi Bjanka ta' lirdum Maltese cliff-orache Rosa gallica Ward taż-żejt Provence rose Darniella melitensis Maltese salt tree Rosa sempervirens Girlanda tal-wied Evergreen rose Xebb / Siġar ta' l-irmied Smilax aspera Zalza pajżana / pajżana Mediterranean sarsaparilla Palaeocyanus crassifolius Widnet il-baħar Maltese rock centaury Tamus comunis -- Black bryony Periploca laevigata ssp. angustifolia Siġret il-ħarir Wolfbane Revised Qawra Coast Development Brief – March 2007 33 Appendix D: Car Parking Standards Development Retail Type Car Parking Standards Mixed Use (no supermarket) 1 customer space per 50 sq. metres 0.33 spaces per employee Offices 1.5 spaces per 50 sq. metres Restaurant/Bar/Club 7.5 customer spaces per 50 sq. metres 0.5 spaces per employee Parks & Recreation Areas Depending on estimated car park usage at peak Entertainment parking (Visitor Attractions etc.) Planning Authority will give guidance on the requirements based on the estimates of visitors provided by the developer and on the outcome of the Traffic Impact Statement Any future amendments to the above standard provision will apply in their stead. Revised Qawra Coast Development Brief – March 2007 34 Appendix E: Submissions Received during Public Consultation on Revised Draft Public Consultation Period: 21st March until 2nd May 2007 Reference Respondent Date Summary of Comments received Response QCPC 001 Dr. Anthony Licari 03/04/07 • Urges MEPA not to allow further development on the Qawra coast • Suggests that if there is rubbish, to just clean up the area Site had already been committed for this type of development by the Brief approved in 2003. Area will be cleaned up and upgraded and will become a public open space with all major development taking place underground. QCPC 002 Mario Attard, MTA 27/04/07 • Para 1.1.1: Suggests amendment re. level of involvement of private sector in the project • Para 1.1.2: Suggests amendment re. details of tendering process following 2003 Brief • Para 1.2.3: Suggests insertion of clause stating that EPS requirement may be waived if PDS contains all relevant information • Chapter 5, Stage 1: Points out that requirements are for tendering process, which is currently not envisaged by Government; therefore suggests insertion of clause to cover this scenario too • Para 5.1.1 & 5.1.3: Suggests removing references to tendering process and legal agreement Amendments suggested for paragraphs 1.1.1, 1.1.2, and chapter 5 have been included in the final draft of the Brief. Re. paragraph 1.2.3, the local legislative framework will be applicable with respect to the EPS. QCPC 003 Alfred Grech obo MTA 02/05/07 • Refers to pending application PA 7794/06, proposed site of which is partly within the Brief area • States that proposed development is in line with provisions of Brief and application should therefore be processed as soon as possible Submits arguments in favour of PA 7794/06 being in line with the Brief. Assessment of a proposal submitted in a planning application is undertaken through normal Development Control procedures. Revised Qawra Coast Development Brief – March 2007 35 Reference Respondent QCPC 004 Chev. Louis Scerri Montaldo, St. Paul’s Bay Date Summary of Comments received Response 27/04/07 • States that this type of development would spoil the last stretch of land in this area still being in its pristine state; therefore suggests the following: 1. Drop aquarium proposal 2. Car park could be built instead of wide pavement 3. Remove building material 4. Prune and space existing trees so that they do not obstruct sea views 5. Convert pool that was used for target practise into proper swimming pool 6. Create small secluded sandy beaches 7. Cut paths out of the rock 8. Cut platforms into the rock with benches and greenery 9. Smooth sections of rock close to sea to improve access 10. Install ladders 11. Restore Qawra Tower and Battery, remove tanks and other additions 12. Restore and paint pill-box; make Local Council responsible for upkeep 13. Restore entrenchment 14. Upgrade and schedule cistern well (1) Aquarium proposal was already included in approved 2003 draft of Brief, and the options are being extended in the provisions of the revised brief, to the effect that now the aquarium is not a mandatory requirement. (2), (3) and (4) are already included in the provisions of the revised Brief. (5) It is not clear which pool is being referred to as the description is not detailed enough and no site plan was submitted. (6), (7), (8), (9) and (10) aim at improving access to the rocky coast, but most of them constitute unacceptable interventions to the natural environment, particularly in view of the fact that part of the foreshore is scheduled as an AEI. The improvement of access to the coast in an environmentally compatible way is already included in the Brief. (11), (12) and (13) are, to an extent, already included in the provisions of the revised Brief. (14) Upgrading is already included in provisions of the revised Brief. The Brief makes very specific reference that this feature should be conserved but does not deserve scheduling status. Revised Qawra Coast Development Brief – March 2007 36