Rough Carpentry - McCullough Construction
Transcription
Rough Carpentry - McCullough Construction
Project: Location: Bid Date: Scoped By: Trade: 1625 14th STREET NW 1625 1631 14th St NW, Washington, DC Ralph Baird / Matthew McCullough ROUGH CARPENTRY SUBCONTRACTOR PROJECT REQ DESCRIPTION BID DOCS: ALTERNATE / BREAKOUT PRICING ($$$) DESIRED SCOPE Bidding Per Plans & Specifications 6 % DC Sales Tax Included Provide Add Alternate For P&P Bond / Surety Name Parking For This Project % NO • Specifications prepared by Eric Colbert & Associates, P.C., dated May 1, 2013 • Architectural, Structural, Mechanical, Plumbing & Electrical Plans Dated May 2, 2013 CD • Civil Drawings (C.1 thru C.6) dated 04 18 12 DCL Permit Set • Geotechnical Report prepared by Hillis Carnes Engineering Associates dated May 14,, 2012 • Environmental Assessment prepared by Ibrahim Bullo (DDOE) dated January 16, 2013 Yes Yes Yes Yes Yes • Structural Drawings Dated 7/26/13 • 6 25 Architectural Revisions / 8 2 Addendum #01 / 8 9 RFI #18 Revised RCP's • 8 14 Slab Edge Drawings Yes Yes Yes ROUGH CARPENTRY Y/N 06 1000 Rough Carpentry complete without deviation YES 1 Subcontractor has reviewed the updated Drawings listed above and posted online, specifically 7/26/13 Structural Revisions MCC does not believe that any of the updated Documents have an impact on your scope of work, however, if your pricing has changed due to any of these Drawings, please breakout the value of the add / deduct and explain to the right: 2 Furnish all labor, material and equipment required to furnish and install all ROUGH CARPENTRY Work in accordance with Plans and Specifications including but not limited to the following: 3 Provide all required permits and inspections for your work YES 4 Furnish all labor, material and equipment required to furnish & install all 2 X 8 wood joist framing at 16" O.C. including 2 x 8 headers, 2 x 4 parapets, 2 x wood jambs, 3/4" plywood sheathing, plywood for fascia profile at storefront bay window roof, all blocking, nailers, etc... (Ref: A 1.02, S 1.01, 1/A 5.05, 1/A5.06). Reference 9/S 5.02 as well as Architectural Drawings for bay window framing details YES 5 Provide all temporary bracing as required for wood structure during construction YES 6 Furnish & install wood nailer at clay tile roof ( 3/A5.06) YES 7 Furnish all labor, material and equipment required to furnish & install all 2 1 3/4" x 9 1/2" LVL wood joist framing at 16" O.C. including hangers, 3/4" T & G plywood deck at 3rd and 4th Floors (A 3.10, A 3.13, S 1.03, S 1.04, Details 8 & 9/S 4.01; 7/S 4.02; 01, 02 & 14/A5.50). Reference 14 / S 4.02 for typical PT 2x ledgers at masonry walls, expansion bolts, nailers, joist hangers, etc... All floor sheathing to be screwed and glued down YES 8 Reference 13 / S 4.02 wood framing and infill at floor elevation change YES 9 Subcontractor will work in a sequential manner with the demolition and structural steel contractor in removing sections of the existing floor framing while in filling with new LVLs. Carpenter to work with Demolition contractor to insure that work is done in a safe manner and walls are not left unbraced for a long period of time. YES 10 Furnish & install 2x4 wood purlin nailers including barge board at perimeter at corrugated roof panels at Areaway enclosure ( Details 4 & 5/A5.21) all wood framing required at new areaway enclosure YES $ Project: Location: Bid Date: Scoped By: Trade: 1625 14th STREET NW 1625 1631 14th St NW, Washington, DC Ralph Baird / Matthew McCullough ROUGH CARPENTRY DESCRIPTION SUBCONTRACTOR DESIRED SCOPE ALTERNATE / BREAKOUT PRICING ($$$) 11 Furnish & install all p/t plywood blocking at roof parapets (existing masonry and new construction) coordinate details and requirements for blocking with approved roofing shop drawings YES 12 Furnish & install all wood nailers at roof ( Details 1, 2, 3, 5 & 6/A5.10) all roof curbs for MEP penetrations and skylights as required YES 13 Furnish & install wood nailers at Mechanical roof penetrations ( M 1.02) YES Furnish & install platform landing comprised of 2 x 4 stud wall knee walls with diagonal bracing including painted 14 wood stringers with clear finished wood treads at steps both levels (also include platform framing at adjacent closets) at Units 308, 309, 310, 408, 409 & 410 (A 1.04, A 1.05, Details 13, 14 & 15/A7.03) YES Provide safe handling and self storage of all framing materials. Take proper precautions to protect material from 15 other onsite activities. Subcontractor acknowledges that lay down areas will not be provided and will implement on time delivery of materials as needed. YES 16 Provide and maintain temporary ladders per OSHA standards to access floors for other trades to use as floor decks are being built within the townhomes. Provide safety railings for your work. YES 17 Floor infills at tower crane cutouts at a later date after tower crane is removed from the middle townhome (see also Alternate #07 to create the floor openings for tower crane and column #21) YES FINISH CARPENTRY 1 Furnish & install all 2x finish wood (painted), 1/4 round, door jamb at interior at storefront bay window (A 1.02, 1 & 2 / A 5.05) 2 Furnish & install 3/4 " finish wood fascia with drip edge (painted) at exterior at storefront bay window (A 1.02, 1/A 5.06) 3 Furnish & install running & standing trim at corridors on 2nd thru 6th Floors including crown, base & casing at entry Doors and casing at Interior unit doors (A9.0) 4 Furnish and install wood Jamb and wood rail for style doors in historic façade (6/A 5.07) 5 Furnish and install Wood treads including wood handrails & wall brackets at Penthouse stairs (Details 1 thru 12 & 16/A7.03) 6 Furnish and install painted 3/4" wood stool, apron, jamb extension & casing for Historic replacement wood windows (5/A 9.04a) Provide Break Out price 7 Furnish and install painted MDF Sill, 5/4X wood stool and apron for typical windows in masonry opening and in metal cladding . (10 & 11/A 9.04a ) Provide Break Out price 8 Furnish and install wood window unit including wood jamb, trim, etc. and wood blocking for the transom window of the historic façade (Details 1 thru 4/A 5.07) Provide Break Out price. 9 Furnish and install Historic replacement wood windows (Detail 5/A 9.04a, Detail 4/A 9.03). Provide break out pricing. LOBBY MILLWORK 1 Furnish & install Millwork at First Floor Lobby including crown trim, wood veneer panels "type WD3 & WD4", base board, paint grade MDF flat trim at Wall paneling "Type 2" (A6.10 & A9.8) 2 All wood blocking for your work Project: Location: Bid Date: Scoped By: Trade: 1625 14th STREET NW 1625 1631 14th St NW, Washington, DC Ralph Baird / Matthew McCullough ROUGH CARPENTRY DESCRIPTION SUBCONTRACTOR DESIRED SCOPE ALTERNATE / BREAKOUT PRICING ($$$) 3 Provide full time supervision for your work. YES 4 Subcontractor acknowledges and understands that there are no parking provisions on the jobsite. Parking and associated costs for subcontractor's personnel are the sole responsibility of the Subcontractor. YES GENERAL: 1 Provide all licenses and trade permits as required for your work. Cooperation with governing agencies during the field testing and inspection of this work. YES 2 Provide certifications as required by governing authorities and the Project Specifications. YES 3 All work procedures shall meet or exceed OSHA requirements and Local Building Codes. YES 4 Provide all maintenance of traffic, flag persons, and pedestrian control for your work. YES 5 Subcontractor has reviewed the site conditions and acknowledges the restricted work area and limited material lay down area and agrees to coordinate & inform the General Contractor of all major material deliveries a minimum of two weeks prior to their arrival and also acknowledges that weekend and/or off hour stocking of material and clean up may be required at no additional cost. YES 6 Provide multiple mobilizations and sequencing of work accordingly. Provide work force size as required to meet the below work duration in the Schedule section. YES 7 Provide cleaning of your equipment (including truck tires prior to entering street(s) adjacent the project site. YES 8 Provide as built drawings and documentation. YES 9 Subcontractor acknowledges that other trades will be working concurrently and includes coordination with other trades as required. YES 10 Provide field measurements and layout as required for your work. YES 11 Provide daily removal of trash and debris to an onsite dumpster(s) provided by others. YES 12 Provide for protection of materials and work from the elements. YES 13 Provide protection for the work of this subcontractor and the work of other trades from damage. YES 14 Provide delivery, unloading, and distribution of materials and equipment. YES Provide all rigging, scaffolding, & hoisting for your work, including. Stages, lifts, cranes, ladders & related items 15 required to complete the work safely. Provide safety protection below work areas including safety barriers, tape or personnel to prevent people from entering the work area. YES 16 Provide all shop drawings, submittals, samples, and mock ups in accordance with the Specifications. Provide a professional engineer design certification as required for connection details. YES Project: Location: Bid Date: Scoped By: Trade: 1625 14th STREET NW 1625 1631 14th St NW, Washington, DC Ralph Baird / Matthew McCullough ROUGH CARPENTRY SUBCONTRACTOR DESIRED SCOPE DESCRIPTION 17 Provide all testing and quality assurance measures in accordance with the Specifications. 18 ALTERNATE / BREAKOUT PRICING ($$$) YES Provide warranties in accordance with the Specifications (please provide note any inconsistencies between the manufacturer's warranty and warranty stated in the Specifications). YES SCHEDULE: 1 Provide required engineering, shop drawings, samples, and submittals as required for your work. # wks 2 Fabrication and delivery of materials to jobsite from date of approved submittal # wks ; 3 Installation and erection of your work, 100% complete # wks Base Bid Total (by Subcontractor): $ Alternates 1 Provide F.T. in wall wood blocking for all grab bars and all toilet & bathroom accessories (Reference Bathroom Details) include 2x blocking for shower curbs $ 2 Provide F.T. in wall wood blocking for wall hung and base kitchen cabinets $ 3 Provide F.T. wood blocking at jambs and heads of interior doors $ 4 Provide F.T wall rail blocking at metal stud stair partitions $ 5 Provide 2x window blocking at historic replacement windows $ 6 Furnish and install all labor, material, equipment and services to provide a covered walkway along 14th Street design based on the attached covered walkway plan and reference traffic control plan showing the extent of the covered walkway. Work to start on or around 8/26/13 $ 7 Provide floor openings for tower crane and Column 21 in the existing townhomes based on the intent of the attached design, including railings as shown Work to start on or around 8/26/13 $ Covered Walkway @ 14th Street Middle Townhome For Crane Opening Alternate #07 14" 14" 18' - 10" Brick divider wall Actual 2 x 10 every 16"oc. Every other joist is a double 10' Reshores 10' (2) 2 x 10 Nominal added to make header around 10 x 10 opening. 6'-2" x 6'-2" crane tower Crane foundation 16' x 24' x 5'-6" Plywood safety rail around opening on all floors