1625 14th STREET NW
1625 1631 14th St NW, Washington, DC
Ralph Baird / Matthew McCullough
ROUGH CARPENTRY
SUBCONTRACTOR
PROJECT
REQ
DESCRIPTION
BID DOCS:
ALTERNATE /
BREAKOUT
PRICING
($$$)
DESIRED
SCOPE
Bidding Per Plans & Specifications
6 % DC Sales Tax Included
Provide Add Alternate For P&P Bond / Surety Name
Parking For This Project
%
NO
• Specifications prepared by Eric Colbert & Associates, P.C., dated May 1, 2013
• Architectural, Structural, Mechanical, Plumbing & Electrical Plans Dated May 2, 2013 CD
• Civil Drawings (C.1 thru C.6) dated 04 18 12 DCL Permit Set
• Geotechnical Report prepared by Hillis Carnes Engineering Associates dated May 14,, 2012
• Environmental Assessment prepared by Ibrahim Bullo (DDOE) dated January 16, 2013
Yes
Yes
Yes
Yes
Yes
• Structural Drawings Dated 7/26/13
• 6 25 Architectural Revisions / 8 2 Addendum #01 / 8 9 RFI #18 Revised RCP's
• 8 14 Slab Edge Drawings
Yes
Yes
Yes
ROUGH CARPENTRY
Y/N
06 1000 Rough Carpentry complete without deviation
YES
1
Subcontractor has reviewed the updated Drawings listed above and posted online, specifically 7/26/13 Structural
Revisions MCC does not believe that any of the updated Documents have an impact on your scope of work,
however, if your pricing has changed due to any of these Drawings, please breakout the value of the add / deduct
and explain to the right:
2
Furnish all labor, material and equipment required to furnish and install all ROUGH CARPENTRY Work in
accordance with Plans and Specifications including but not limited to the following:
3
Provide all required permits and inspections for your work
YES
4
Furnish all labor, material and equipment required to furnish & install all 2 X 8 wood joist framing at 16" O.C.
including 2 x 8 headers, 2 x 4 parapets, 2 x wood jambs, 3/4" plywood sheathing, plywood for fascia profile at
storefront bay window roof, all blocking, nailers, etc... (Ref: A 1.02, S 1.01, 1/A 5.05, 1/A5.06). Reference 9/S 5.02
as well as Architectural Drawings for bay window framing details
YES
5
Provide all temporary bracing as required for wood structure during construction
YES
6
Furnish & install wood nailer at clay tile roof ( 3/A5.06)
YES
7
Furnish all labor, material and equipment required to furnish & install all 2 1 3/4" x 9 1/2" LVL wood joist framing at
16" O.C. including hangers, 3/4" T & G plywood deck at 3rd and 4th Floors (A 3.10, A 3.13, S 1.03, S 1.04,
Details 8 & 9/S 4.01; 7/S 4.02; 01, 02 & 14/A5.50). Reference 14 / S 4.02 for typical PT 2x ledgers at masonry
walls, expansion bolts, nailers, joist hangers, etc... All floor sheathing to be screwed and glued down
YES
8
Reference 13 / S 4.02 wood framing and infill at floor elevation change
YES
9
Subcontractor will work in a sequential manner with the demolition and structural steel contractor in removing
sections of the existing floor framing while in filling with new LVLs. Carpenter to work with Demolition contractor to
insure that work is done in a safe manner and walls are not left unbraced for a long period of time.
YES
10
Furnish & install 2x4 wood purlin nailers including barge board at perimeter at corrugated roof panels at Areaway
enclosure ( Details 4 & 5/A5.21) all wood framing required at new areaway enclosure
YES
$
Project:
Location:
Bid Date:
Scoped By:
Trade:
1625 14th STREET NW
1625 1631 14th St NW, Washington, DC
Ralph Baird / Matthew McCullough
ROUGH CARPENTRY
DESCRIPTION
SUBCONTRACTOR
DESIRED
SCOPE
ALTERNATE /
BREAKOUT
PRICING
($$$)
11
Furnish & install all p/t plywood blocking at roof parapets (existing masonry and new construction) coordinate
details and requirements for blocking with approved roofing shop drawings
YES
12
Furnish & install all wood nailers at roof ( Details 1, 2, 3, 5 & 6/A5.10) all roof curbs for MEP penetrations and
skylights as required
YES
13 Furnish & install wood nailers at Mechanical roof penetrations ( M 1.02)
YES
Furnish & install platform landing comprised of 2 x 4 stud wall knee walls with diagonal bracing including painted
14 wood stringers with clear finished wood treads at steps both levels (also include platform framing at adjacent
closets) at Units 308, 309, 310, 408, 409 & 410 (A 1.04, A 1.05, Details 13, 14 & 15/A7.03)
YES
Provide safe handling and self storage of all framing materials. Take proper precautions to protect material from
15 other onsite activities. Subcontractor acknowledges that lay down areas will not be provided and will implement on
time delivery of materials as needed.
YES
16
Provide and maintain temporary ladders per OSHA standards to access floors for other trades to use as floor decks
are being built within the townhomes. Provide safety railings for your work.
YES
17
Floor infills at tower crane cutouts at a later date after tower crane is removed from the middle townhome (see also
Alternate #07 to create the floor openings for tower crane and column #21)
YES
FINISH CARPENTRY
1
Furnish & install all 2x finish wood (painted), 1/4 round, door jamb at interior at storefront bay window (A 1.02, 1 &
2 / A 5.05)
2
Furnish & install 3/4 " finish wood fascia with drip edge (painted) at exterior at storefront bay window (A 1.02, 1/A
5.06)
3
Furnish & install running & standing trim at corridors on 2nd thru 6th Floors including crown, base & casing at entry
Doors and casing at Interior unit doors (A9.0)
4
Furnish and install wood Jamb and wood rail for style doors in historic façade (6/A 5.07)
5
Furnish and install Wood treads including wood handrails & wall brackets at Penthouse stairs (Details 1 thru 12 &
16/A7.03)
6
Furnish and install painted 3/4" wood stool, apron, jamb extension & casing for Historic replacement wood
windows (5/A 9.04a) Provide Break Out price
7
Furnish and install painted MDF Sill, 5/4X wood stool and apron for typical windows in masonry opening and in
metal cladding . (10 & 11/A 9.04a ) Provide Break Out price
8
Furnish and install wood window unit including wood jamb, trim, etc. and wood blocking for the transom window of
the historic façade (Details 1 thru 4/A 5.07) Provide Break Out price.
9
Furnish and install Historic replacement wood windows (Detail 5/A 9.04a, Detail 4/A 9.03). Provide break out
pricing.
LOBBY MILLWORK
1
Furnish & install Millwork at First Floor Lobby including crown trim, wood veneer panels "type WD3 & WD4", base
board, paint grade MDF flat trim at Wall paneling "Type 2" (A6.10 & A9.8)
2
All wood blocking for your work
Project:
Location:
Bid Date:
Scoped By:
Trade:
1625 14th STREET NW
1625 1631 14th St NW, Washington, DC
Ralph Baird / Matthew McCullough
ROUGH CARPENTRY
DESCRIPTION
SUBCONTRACTOR
DESIRED
SCOPE
ALTERNATE /
BREAKOUT
PRICING
($$$)
3
Provide full time supervision for your work.
YES
4
Subcontractor acknowledges and understands that there are no parking provisions on the jobsite. Parking and
associated costs for subcontractor's personnel are the sole responsibility of the Subcontractor.
YES
GENERAL:
1
Provide all licenses and trade permits as required for your work. Cooperation with governing agencies during the
field testing and inspection of this work.
YES
2
Provide certifications as required by governing authorities and the Project Specifications.
YES
3
All work procedures shall meet or exceed OSHA requirements and Local Building Codes.
YES
4
Provide all maintenance of traffic, flag persons, and pedestrian control for your work.
YES
5
Subcontractor has reviewed the site conditions and acknowledges the restricted work area and limited material lay
down area and agrees to coordinate & inform the General Contractor of all major material deliveries a minimum of
two weeks prior to their arrival and also acknowledges that weekend and/or off hour stocking of material and clean
up may be required at no additional cost.
YES
6
Provide multiple mobilizations and sequencing of work accordingly. Provide work force size as required to meet
the below work duration in the Schedule section.
YES
7
Provide cleaning of your equipment (including truck tires prior to entering street(s) adjacent the project site.
YES
8
Provide as built drawings and documentation.
YES
9
Subcontractor acknowledges that other trades will be working concurrently and includes coordination with other
trades as required.
YES
10 Provide field measurements and layout as required for your work.
YES
11 Provide daily removal of trash and debris to an onsite dumpster(s) provided by others.
YES
12 Provide for protection of materials and work from the elements.
YES
13 Provide protection for the work of this subcontractor and the work of other trades from damage.
YES
14 Provide delivery, unloading, and distribution of materials and equipment.
YES
Provide all rigging, scaffolding, & hoisting for your work, including. Stages, lifts, cranes, ladders & related items
15 required to complete the work safely. Provide safety protection below work areas including safety barriers, tape or
personnel to prevent people from entering the work area.
YES
16
Provide all shop drawings, submittals, samples, and mock ups in accordance with the Specifications. Provide a
professional engineer design certification as required for connection details.
YES
Project:
Location:
Bid Date:
Scoped By:
Trade:
1625 14th STREET NW
1625 1631 14th St NW, Washington, DC
Ralph Baird / Matthew McCullough
ROUGH CARPENTRY
SUBCONTRACTOR
DESIRED
SCOPE
DESCRIPTION
17 Provide all testing and quality assurance measures in accordance with the Specifications.
18
ALTERNATE /
BREAKOUT
PRICING
($$$)
YES
Provide warranties in accordance with the Specifications (please provide note any inconsistencies between the
manufacturer's warranty and warranty stated in the Specifications).
YES
SCHEDULE:
1
Provide required engineering, shop drawings, samples, and submittals as required for your work.
# wks
2
Fabrication and delivery of materials to jobsite from date of approved submittal
# wks ;
3
Installation and erection of your work, 100% complete
# wks
Base Bid Total (by Subcontractor): $
Alternates
1
Provide F.T. in wall wood blocking for all grab bars and all toilet & bathroom accessories (Reference Bathroom
Details) include 2x blocking for shower curbs
$
2
Provide F.T. in wall wood blocking for wall hung and base kitchen cabinets
$
3
Provide F.T. wood blocking at jambs and heads of interior doors
$
4
Provide F.T wall rail blocking at metal stud stair partitions
$
5
Provide 2x window blocking at historic replacement windows
$
6
Furnish and install all labor, material, equipment and services to provide a covered walkway along 14th Street
design based on the attached covered walkway plan and reference traffic control plan showing the extent of the
covered walkway. Work to start on or around 8/26/13
$
7
Provide floor openings for tower crane and Column 21 in the existing townhomes based on the intent of the
attached design, including railings as shown Work to start on or around 8/26/13
$
Covered Walkway
@ 14th Street
Middle Townhome For Crane Opening
Alternate #07
14"
14"
18' - 10"
Brick
divider
wall
Actual 2 x 10 every
16"oc. Every other
joist is a double
10'
Reshores
10'
(2) 2 x 10 Nominal
added to make header
around 10 x 10
opening.
6'-2" x 6'-2"
crane tower
Crane foundation
16' x 24' x 5'-6"
Plywood safety rail
around opening on
all floors