EDAMS Conceptual Design Slides
Transcription
EDAMS Conceptual Design Slides
Association for Water Technology and Sanitary Engineering Institutional Strengthening of Water Utilities through AM programmes Presenter: Dr P. Kolovopoulos (Hydro-Comp Enterprises) Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Institutional Strengthening for Effective Utility Management Agenda Understanding the problem Methodology Example Implementation - BVK Results Achieved Summary & Benefits Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Institutional Strengthening for Effective Utility Management Agenda Understanding the problem Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Utility Management & AM Programmes (1) Holistic Approach Planning Strategy Effective Utility Management Consulting Works Hydro-Comp Enterprises People & Processes Information Technology © Copyright Hydro-Comp Enterprises 2013 Performance Improvement (2) Results Driven Step 1 Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Performance Assessment Current Condition Hydro-Comp Enterprises Step 3 Step 2 Desired Condition Roadmap Management Assistance © Copyright Hydro-Comp Enterprises 2013 Performance Improvement (2) Results Driven Step 1 Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Performance Assessment Current Condition Desired Condition Roadmap Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 (3) Cost efficient Approach Manage & Control Demand Model Management Systems Net saving € Consulting € Consulting Network Hydro-Comp Enterprises IT IT Fix & Maintain Data Rehabilitation Leakage Detection Leakage Detection Rehabilitation Detect NonVisible Leaks Fix Leaks Leakage Detection Approach © Copyright Hydro-Comp Enterprises 2013 Institutional Strengthening in BVK for Effective Utility Management Agenda Understanding the problem Methodology Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Roadmap to Efficiency Deliverables Commercial Improvement Program 2 Effect on Utility Performance €4,000,000 1 3 Yearly Revenues/Costs 4 35.0% 30.0% €3,500,000 25.0% €3,000,000 20.0% €2,500,000 15.0% €2,000,000 10.0% €1,500,000 5.0% Profitability Institutional Framework 0.0% €1,000,000 -5.0% €500,000 -10.0% €0 -15.0% 0 4 8 12 16 20 24 28 32 36 Months Revenue Operating Cost Profit % Commercial Rehabilitation Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Roadmap to Efficiency Deliverables Commercial Improvement Program 2 Effect on Utility Performance €4,000,000 1 3 Network Improvement Program Yearly Revenues/Costs 4 35.0% 30.0% €3,500,000 25.0% €3,000,000 20.0% €2,500,000 15.0% €2,000,000 10.0% €1,500,000 5.0% Profitability Institutional Framework 0.0% €1,000,000 -5.0% €500,000 -10.0% €0 -15.0% 0 4 8 12 16 20 24 28 32 36 Months Revenue Operating Cost Profit % Commercial Rehabilitation Network Rehabilitation Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Commercial Management Commercial Data Analysis & Rehabilitation Authorised Consumption IWA Classification Extended EDAMS Classification Paying Billed metered consumption Billed Authorised Consumption Billed unmetered consumption Unbilled metered consumption Unbilled Authorised Consumption Unbilled unmetered consumption Unauthorised consumption Apparent Losses Water Losses Customer metering inaccuracies Leakage on pipes Real Losses Hydro-Comp Enterprises Leakage/overflows at tanks Leakage on service connections Consumption; large consumers Consumption; wastage; internal Non-paying large consumers Consumption; wastage; internal Paying large consumers Consumption; wastage; internal Non-paying large consumers Goverment, public taps, etc Goverment, public taps, etc Fire fighting & testing Illegal connect Consumption; wastage; internal Unregistered connect Consumption; wastage; internal Meter inaccuracies Meter Broken meters problems Slow meters Oversized Meters Incorrect readings Meter reading Incomplete reading problems Unidentified connections Bad zoning & high pressures Badly corroded pipes Visible bursts Major non-visible leaks Minor leaks leakage; leakage; leakage; leakage leakage © Copyright Hydro-Comp Enterprises 2013 Network Management Life Cycle Management of Assets Objective: The effective operation and maintenance of Utility’s network assets Asset Management Strategy Asset Renewal Strategy Asset Condition Monitoring Life Cycle Asset Management System Management of Assets Asset Valuation Asset Validation Hydro-Comp Enterprises Asset Maintenance System Asset Acquisition & Evaluation © Copyright Hydro-Comp Enterprises 2013 Roadmap to Efficiency Deliverables 2 Demand Management Program Effect on Utility Performance €4,000,000 4 3 Yearly Revenues/Costs 1 35.0% 30.0% €3,500,000 Network Improvement Program 25.0% €3,000,000 20.0% €2,500,000 15.0% €2,000,000 10.0% €1,500,000 5.0% Profitability Commercial Improvement Program Institutional Framework 0.0% €1,000,000 -5.0% €500,000 -10.0% €0 -15.0% 0 4 8 12 16 20 24 28 32 36 Months Revenue Operating Cost Profit % Commercial Rehabilitation Network Rehabilitation Network Optimisation Hydro-Comp Enterprises Leakage Management © Copyright Hydro-Comp Enterprises 2013 Institutional Strengthening for Effective Utility Management Agenda Understanding the problem Methodology Example Implementation > BVK Commercial Data Analysis & Rehabilitation Network Asset Management Strengthening Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Commercial Data Analysis & Rehabilitation Methodology Belgrade Billing system Commercial Data Hydro-Comp Enterprises Commercial Data Analysis Billing Data Evaluation © Copyright Hydro-Comp Enterprises 2013 Commercial Data Analysis & Rehabilitation High Consumers Analysis Number of High Consumers Billing Group: Households billed by BVK (DDN) 120 0.5% 0.5% 0.5% 98 60 40 20 1 0.0% 0 > 100 kl/day 0.3% 200 75-99 kl/day 193 0.2% 25 150 0.1% 8 119 74 71 40-49 kl/day 30-39 kl/day 1.4% 0.1% Hydro-Comp Enterprises 8.0% 6.0% 4.0% 20-29 kl/day 10-19 kl/day 2.0% 1.7% 1.0% 1.4% 2 0 75-99 kl/day 10.0% 0.0% 0.8% > 100 kl/day 12.0% 0.1% 5 0.0% 100 50-75 kl/day50 0.2% 0.1% 122 0.1% 8 7 245 0.3% 0.3% 11.7% 250 Number of Consumers Number of Consumers 0.4% 80 14.0% 50-75 kl/day 40-49 kl/day % contribution to consumption 0.4% 300 % contribution to consumption Number of High Consumers -Billing Group: Industry (SPP) 100 30-39 kl/day 20-29 kl/day 0.0% 0.0% 10-19 kl/day © Copyright Hydro-Comp Enterprises 2013 Commercial Data Analysis & Rehabilitation Meter Analysis Meter Age distribution 35,000 30,000 25,000 4,500.0 18000 4,090.2 0 14,000 12,000 10,000 8,000 14000 15,666 12000 3,000.0 2,490 2,000 8000 6000 4018 0 0 171 5 368 200 150 11 2,500.0 2,000.0 1,500.0 1,000.0 1,000 500.0 712 732 699 724 643 681 736 106.8 73.0 34.6 25.7 12.0 49.4 7.2 3.4 0.10.0 523 500 12 >12 11 10 9 8 7 6 5 614 4 3 2 1 141 5,566 327.4 782 2,817 100 1,500 1,373 4000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 152820 16 951.3 17 18 6,278 1937 620.1 6,000 Age 2000 723 865 2,000 2,500 10000 4,000 3,500.0 3,000 no of oversized meters Number of Stuck Meters 18,000 16,000 5,000 4,000.0 16000 Oversized Meters Analysis 15,000 10,000 16170 Avg Consumption of stuck meters 20,000 Metered Consumption (m3/day) Number of meters Stuck Meters (Readings with zero consumption) ption Num ber of readings w ith zero consum 0 80 50 40 30 Meter size Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Commercial Data Analysis & Rehabilitation Commercial Losses - Recommendations Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Institutional Strengthening for Effective Utility Management Agenda Understanding the problem Methodology Example Implementation >BVK Commercial Data Analysis & Rehabilitation Network Asset Management Strengthening Institutional Framework 1 Hydro-Comp Enterprises Commercial Improvement Program 2 4 3 Network Improvement Program © Copyright Hydro-Comp Enterprises 2013 Network Asset Management Strengthening Main Objectives Sustainability of a reliable network asset register Provision of both operational and management reports Output to be used in: conservation planning (with main objective of reducing unaccounted for water infrastructure planning (by performing network optimisation & rehabilitation planning) Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management Strengthening Implementation of Integrated Information systems GIS Network Asset Management Network Data Demand Management Hydro-Comp Enterprises Operations & Maintenance Commercial Data © Copyright Hydro-Comp Enterprises 2013 Network Asset Management Strengthening Methodology Import Belgrade Asset Register Link to SCADA Import Meter Rdgs Implement EDAMS Network Asset Management Import Financial Data Network Asset Management Link to Call Centre Import Maintenance data Implement EDAMS Operations & Maintenance Implement EDAMS Demand Management Operations & Maintenance Import Commercial db (conn, meters) Demand Management Integrated Life Cycle Management of Assets & Demand Management Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Institutional Strengthening for Effective Utility Management Agenda Understanding the problem Methodology Example Implementation Results Achieved Building of the Network Asset Registries Business Processes Redefinition Computerisation of Maintenance function Data Integration Hydro-Comp Enterprises Zoning / Demand Management © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Building of the Network Asset Registry Belgrade - Data Collection -Progress 120 100 % Completed 80 60 40 20 Hydro-Comp Enterprises Data Organisation 07 20 07 30 /1 1/ 20 07 16 /1 1/ 20 07 02 /1 1/ 20 07 19 05 /1 0/ 20 07 Data Validation /1 0/ 20 07 21 /0 9/ 20 07 /0 9/ 20 07 /0 8/ 17 03 /0 8/ 20 07 7 00 7 20 /7 /2 00 7 29 /6 /2 00 07 /6 /2 20 Field Survey 15 07 31 /0 5/ 20 07 05 /0 8/ 20 07 /0 4/ 20 13 /0 3/ 16 16 /0 2/ 20 07 0 Data Capture © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Building of the Network Asset Registry Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Business Processes Strengthening of Assets/GIS Departments Re-organisation of the GIS Department in terms of business processes, job descriptions, roles and procedures Data sharing and data services rendered to departments Hydro-Comp Enterprises Item 1 2 3 4 5 6 7 8 description Data Quality Assurance Standards Data Quality Assurance Methodology GIS Data Capture guidelines for networks Network Data Evaluation & Validation Methodology Support Methodology, Procedures and forms Management reporting Procedures Lifecycle management of Utility Assets Methodology Network Asset Management procedures © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Business Processes Updating of the Assets Register The newly established Updating Unit in BVK has assumed responsibility and updates regularly the networks Personnel was assigned and trained. The Unit is actively capturing the backlog of as build drawings Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Business Processes Updating of the Assets Register Procedures were developed for updating of the networks. Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Business Processes Publishing of the Asset Registry Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Computerisation of Maintenance Sector Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Computerisation of Maintenance Sector Critical business processes were reviewed. Job Card Procedure Call Center operator Command Center Section (on line) Section (off line) Receives complaint from Command Center by fax or call. ? No Record call (In existing system) Evaluate and assign to appropriate Section/District. Is District online? 1 Yes Dispatcher assigns problem to the District Is Compl.no > 250,000? No Yes Yes No Is Section on line? Technical Services Dispatcher assigns problem to the Districts, prints Job Card and fax it to the off-line Districts for execution. Districts execute field work Dispatcher assigns problem to the Districts, completes manually Job Card form and fax it to the Districts for execution. District Head updates system on line TS reviews from EDAMS O&M all completed job cards. Where needed, request handwriting copy from section and correct any details District execute field work Process problem as before for ALL Sections District execute field work District Head or any assigned person in each District visits Section main building and updates system once a week BVK System is automatically updated with intermediate stages of problem Change Status to 6 Hydro-Comp Enterprises District Head or any assigned person in each District visits Section main building and updates system once a week Call Command Center to change status of problem to 6. Details of problem will be updated when EDAMS will be updated Call Command Center to change status of problem to 6. Details of problem will be updated when EDAMS will be updated © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Computerisation of Maintenance Sector New job cards, forms and reports were designed. The Sector was reorganised to provide inhouse 1st level support Extensive Classroom and hands on training was delivered. Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program-Results Achieved Computerisation of Maintenance Sector Management Reporting Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Data Integration On-line interface between Call Center and EDAMS O&M. Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Data Integration Automatic Links to telemetry SCADA Integration to Metering Department Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Zoning – Head Zoning Hydro-Comp Enterprises Network Asset Management program Results Achieved Head Zoning – Static Head Analysis Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Results Achieved Zoning – DMA Zones Hydro-Comp Enterprises Demand Management DMA Auditing Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 BVK Management Reporting Key Performance Areas Non-Revenue Water (Belgrade) NRW (%) 45.0% 40.0% 35.0% 30.0% 25.0% 20.0% 15.0% 10.0% 5.0% 0.0% Non-Revenue Water breakdown 42.2% Performance Indicators 34.2% Main Indicators Number of billed private connections Total number of connections: 30.8% System Input (Production) Billed Volume of water Un-accounted for Water Average Daily Real Losses Debt recovery Non-Revenue Water (% of System Input): Un-accounted for Water (% of System Input): Infrastructure Leakage Index (ILI): Real Losses Average Daily Real Losses when system is pressurised 2005 2006 2007 Technical Indicator for Real Losses (TIRL) - (when pressurised) Density of Connections (billed private connections) Real Losses as % of System Input Real Losses per length of main Calculation of (UARL)- (per connection when system pressurised) Unavoidable Annual Real Losses (UARL) - On Mains 2.0% Unavoidable Annual Real Losses (UARL) - On Connection pipes 8.9% Unavoidable Annual Real Losses (UARL) - On Connections Unavoidable Annual Real Losses (UARL) - Total 20.9% Real Losses (leakage) unit Current no no. 182,284 464,671 Ml/year Ml/year Ml/year Ml/year % % % 201,139 141,081 60,058 42,067 97.1% 31.9% 29.9% 7.3 Ml/day l/day/conn conn/km % kl/day/km 115.25 248.03 65.05 20.9% 41.13 l/day/conn l/day/conn l/day/conn l/day/conn Ml/year 6.92 6.88 20.00 33.79 2,248 >=1 30 - 200 factor 18 25 0.8 Apparent Losses (commercial losses) Hydro-Comp Enterprises Payment Losses (Non-payment) © Copyright Hydro-Comp Enterprises 2013 Institutional Strengthening for Effective Utility Management Agenda Understanding the problem Methodology BVK – Project Implementation Results Achieved Summary & Benefits Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Summary The transformation of the Technical Services included : Hydro-Comp Enterprises – IT solutions: The implementation of IT systems ( Network Asset Management, Maintenance Management). – Building up of a network asset management model, essential for establishing an accurate network database and managing investment programs – Data Quality: The improvement of data quality for both commercial and network data. – Institutional Strengthening activities with emphasis on Problem Analysis, Priorities for Change, Business Processes, Training and Action Plans formulation & implementation. It builds up capacity in the Technical department. © Copyright Hydro-Comp Enterprises 2013 Network Asset Management program Benefits An institutional strengthening project that empowers the Technical Departments has considerable impact in increasing Utility revenues, reducing operational expenditure and reducing capital expenditure for future expansion Enforces “best-practice” business practices Provides a platform for Managing and Operating the Technical department Provides a platform for proper Lifecycle Management of Utility Assets Provides proper Management Reporting Hydro-Comp Enterprises Assists in improving Data Quality through evaluation and help in the validation of both commercial and network data. © Copyright Hydro-Comp Enterprises 2013 Questions & Discussion Hydro-Comp Enterprises © Copyright Hydro-Comp Enterprises 2013