SB2013-045 Pinery Filing 30-A - Meeting Portal
Transcription
SB2013-045 Pinery Filing 30-A - Meeting Portal
B. Process On November 14, 2007, the Douglas County Board of County Commissioners approved a sketch plan for a total of 68 single-family residential lots on 84.67 acres for Filing 30. An extension of the sketch plan approval for Pinery Sketch Plan No. 30 was approved by the Board of County Commissioners on October 26, 2010, extending the sketch plan approval to November 14, 2013. This application includes 25 of the approved 68 lots, with 43 lots on 54.8 acres remaining to be platted within Filing 30. Following sketch plan approval, the next step in the subdivision process is the combined preliminary and final plat application which is processed pursuant to Article 5A of the Subdivision Resolution. Article 5A states the intent of the process is “to provide a combined review process for the proposed subdivision of residential and non-residential lots where a sketch plan has been approved and is still valid, unless otherwise directed by the Board of County Commissioners at the time of sketch plan approval. The combined preliminary and final plat process is designed to accomplish the intent of both the preliminary plan and final plat as stated in Article 4, Section 401, and Article 5, Section 501, of this Resolution. For purposes of recordation and vesting, the combined preliminary and final plat shall serve as a final plat.” Per Section 504A.09, “The Board of County Commissioners shall evaluate the application, staff report, referral and public comments, and Planning Commission recommendations and shall either approve, approve with conditions, table for further study, or deny the combined preliminary and final plat. The Board of County Commissioner’s decision shall be based on the evidence presented, compliance with the adopted standards, regulations, policies, and other guidelines.” C. Location The Pinery is located in the northeast portion of Douglas County, east of State Highway 83, south of Hilltop Road, and north of Bayou Gulch Road. This site is located in the eastern portion of the Pinery PD (“The Timbers”), at the northeast corner of North Pinery Parkway and Democrat Road. The maps on the following page show the general vicinity and zoning of the subject property. The aerial map shows the immediate vicinity of the property. Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 2 of 140 N N Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 3 of 140 D. Project Description Pinery Filing 30 consists of 68 single family residential lots within an overall 84.67-acre development site. This portion of Filing 30, known as Pinery Filing 30-A, consists of 25 single family residential lots within a 29.87-acre area. The remaining 54.8 acres will be platted in a future phase. This combined preliminary and final plat contains 13.19 acres of open space, drainage, maintenance, utilities, and pedestrian public access within Tracts A, B, C, D, E, and F. The tracts will be owned and maintained by the High Prairie Farms Metro District. A detention pond and regional trail extension will be located on Tract F. Majestic Oak Drive will be a public road and dedicated for ownership and maintenance to Douglas County. Zoning Gross Site Acreage Residential Lots ROW Open Space, Pedestrian Public Access, Drainage and Maintenance Tracts Gross Density Net Density Lot Size Range Project Details th Portion of Planning Area 70 as designated in the 5 Amendment, Pinery Planned Development 29.87 acres 25 single-family residential lots 3.10 acres A, B, C, D, E, and F (13.19 acres) 0.84 dwelling units per acre 2.39 dwelling units per acre 0.501 - 0.692 acres III. CONTEXT A. Background Pinery Sketch Plan 30 was included in the “Conceptual Lotting Plan” of the Pinery Planned Development 5th Amendment approved in October 1995. This area has come to be referred to as “The Timbers” for marketing purposes. Sketch Plans 30, 31, and 32 were reviewed and processed concurrently because of the planned interconnections between the filings, including roads, utilities, and drainage. The Planning Commission voted to recommend approval of the sketch plans on October 22, 2007. The Board of County Commissioners approved the sketch plans on November 14, 2007. Per the Subdivision Resolution, sketch plans are valid for a period of one year, after which a preliminary plan application must be submitted for all or a portion of the sketch plan area. Extension of the sketch plan approvals was granted twice administratively and by the Board of County Commissioners until November 14, 2013 at a public meeting held on October 26, 2010. B. Adjacent Land Uses and Zoning The parcel is bounded directly to the west by N. Pinery Parkway and Pinery Filing 27 platted for single family residential lying west across N. Pinery Parkway. The adjacent property to the north and to the east is the remaining portion of Sketch Plan 30 that is currently vacant and not yet platted. Part of a large lot residential parcel is adjacent to the southeast, with Democrat Road and Pinery Filing 26-A single family residential adjacent immediately to the south. Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 4 of 140 NORTH SOUTH ZONING Pinery PD Residential Pinery PD Residential SOUTHEAST A-1 EAST Pinery PD Residential Pinery PD Residential WEST LAND USE Vacant unplatted (balance of Sketch Plan 30) Democrat Road Single Family Residential (Pinery Filing 26-A) Large Lot Residential (A-1 parcel) Vacant unplatted (Sketch Plan 30) North Pinery Parkway Single Family Residential (Pinery Filing 27) C. Major Issues There are no outstanding issues. IV. PHYSICAL SITE CHARACTERISTICS A. Site Characteristics and Constraints The site is characterized by rolling terrain with a mix of scrub oak, ponderosa pine and native grasses. There are no major constraints to development identified as part of the geotechnical report. Significant ponderosa pines will be preserved through street and building envelope placement. Nearly half of the site is preserved in formal open space tracts. Open space buffers the west side of the one adjacent A-1 parcel, and is otherwise sited to preserve significant topography and trees. B. Access Access is taken from Majestic Oak Drive, a local road that will connect to North Pinery Parkway and extend east into the roadway system approved with Pinery Sketch Plan 29. Two cul-de-sacs extend north off of Majestic Oak Drive to provide lot access for this filing. The extension of Majestic Oak Drive to the east is not yet built. This roadway continuation will be constructed as part of adjacent future plats. C. Soils and Geology The Colorado Geological Survey reviewed the combined preliminary and final plat. Consistent with their review at sketch plan, they noted certain variable soils that warrant soils testing and engineered foundation design for individual lots. These steps are routinely required at the building permit phase of development. D. Drainage and Erosion A Phase III Drainage study was reviewed and accepted by Engineering Services. A regional detention pond will be built within Tract F that will capture drainage. The High Prairie Farms Metro District will accept all drainage improvements for ownership and maintenance with the final plat. The County will accept a blanket access and backup maintenance easement for these facilities. As required by a condition of approval on the sketch plan, a design for the detention pond has been provided to demonstrate the overall appearance of the pond to ensure that its appearance is compatible with the surrounding residential land uses. Construction best management practices and post-construction best management practices will be provided in accordance with Control Regulation No. 72 per Cherry Creek Basin Authority’s regulations. Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 5 of 140 E. Floodplain There is no mapped FEMA floodplain on the site. F. Wildlife The Colorado Division of Wildlife did not respond to our request for referral comment. They have provided previous comments for the area known as “The Timbers.” A condition of approval will require that Colorado Division of Wildlife literature be made available to both prospective homeowners and home buyers concerning the possible presence of large wildlife throughout the Pinery and shall be available at all times through the homeowners’ association. G. Wildfire Mitigation As a condition of approval for the Sketch Plan, an approved Forest Management Plan is required prior to consideration by the Planning Commission. A Wildfire Mitigation Plan has been prepared and submitted to Douglas County. It has been determined that the plan will fulfill the minimum plan requirements. H. Tree Preservation Plan A Tree Preservation Plan (TPP) has been provided in accordance with the requirements of the Pinery PD 5th Amendment. The TPP provides for inventory and preservation of trees and vegetation that may be impacted by development or housing construction. As a condition of approval at sketch plan, the TPP shall be financially secured through the Subdivision Improvements Agreement (SIA). As a result of the Wildfire Mitigation Plan, a note has been added to the TPP that states that any trees designated to be saved on the plan that are removed as a requirement of the Wildfire Mitigation Plan, are not subject to a penalty assessment. As a condition of approval on the sketch plan, a weed management plan was required to be submitted. As part of the current request, the applicant has submitted a plan which has been accepted by County staff. I. Traffic Impact Analysis A traffic study, prepared by LSC Transportation Consultants, Inc. was submitted and reviewed with the Sketch Plan in 2007. That study concluded that the traffic impacts of the proposed development can be accommodated by the adjacent roadway network. LSC Transportation Consultants, Inc. has reviewed this combined preliminary and final plat and has determined that this proposal will not increase the total lots approved with the sketch plan; therefore no additional traffic studies should be necessary. Public Works Engineering concurs with this assessment. V. PROVISION OF SERVICES A. Schools School land dedication has been satisfied through the terms of the Pinery 5th Amendment Development Guide. The Douglas County School District (DCSD) evaluated the access plan alternatives at sketch plan and commented at that time that they were in support of the full street connection provided by Filings 30, 31, and 32 as such connections provide a desired connectivity between neighborhoods for school bus routes, as well as safer alternatives for bus stop locations. A response of no objection was received from the DCSD during the referral period for the combined preliminary and final plat. Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 6 of 140 B. Fire Protection Fire protection is provided by South Metro Fire Rescue Authority. A fire hydrant has been added at the entry of North Pinery Parkway and Majestic Oak Drive that resolves the comment received from South Metro Fire Rescue Authority that a hydrant be installed. C. Sheriff Services The Douglas County Sheriff’s Office (DCSO) will provide police protection to the site. A response of no comment was received from DCSO during the referral period. D. Water The Pinery Water and Wastewater District (PWWD), also known as the Denver Southeast Suburban Water and Sanitation District, provided correspondence acknowledging water availability and its willingness and ability to serve the proposed subdivision. The land where the proposed subdivision is located is within its service area and was included within the District boundaries when the District was formed on July 12, 1965. The District indicated that its projected water requirements for the subdivision total 13.1 acre feet per year, or 0.52 acre feet per year per lot. Lytle Water Solutions, the County’s water consultant, reviewed the application and states that there is sufficient water available for this filing. The State Engineer’s Office has also reviewed the application and determined that the water supply is adequate and can be legally provided without causing injury to decreed water rights. The amount of water is adequate to annually serve the subdivision, and water is physically available based on current aquifer conditions. The State Engineer’s Office’s September 19, 2013 letter is found on the next two pages: (Staff report continues on Page9) Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 7 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 8 of 140 E. Sanitation The PWWD will provide sanitation services to this filing. The District has confirmed its willingness and ability to serve the proposed subdivision. Tri-County Health Department reviewed the application and provided a favorable recommendation regarding the proposed method of sewage disposal. F. Utilities Utility service providers are IREA (electric), CenturyLink (telephone), Black Hills Energy (natural gas), AT&T (long distance), and Comcast (cable). AT&T, CenturyLink, and Comcast all responded with “no comment” to the referral request. There was no response from Black Hills Energy In response to the comments received from IREA; 10foot wide utility easements have been added to the front of all lots, along the north and west property lines, and parallel with Majestic Oak Drive on the south. G. Dedications Roads will be public and dedicated to Douglas County for ownership and maintenance on the recorded final plat. The tracts (Tracts A through F) are for open space, pedestrian public access, drainage, and maintenance and shall be owned and maintained by the High Prairie Farms Metro District. Drainage easements are granted to Douglas County across Tracts C, E, and F for the purpose of accessing, and repairing stormwater management and water quality facilities. Utility easements will also be accepted by Douglas County on behalf of the utility providers. Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 9 of 140 H. Parks, Trails, and Open Space The site contains six tracts for a total of 17.34 acres that are designated for open space, pedestrian public access, drainage, and maintenance. The largest tract, Tract F, is 11.42 acres and creates a buffer along the southern boundary of Filing 30-A. Most significantly, this filing will extend the regional open space corridor and trail (Bayou Gulch) through the eastern portion of the Pinery. The regional trail is secured through the SIA. The other smaller tracts allow for pedestrian connections to other open space areas within the Pinery. The final pocket park as required by the Pinery Planned Development 5th Amendment will be provided with the next plat within Filing 30. VI. PUBLIC NOTICE AND INPUT Public notice of the combined preliminary and final plat meeting will be posted on the property in accordance with Section 508A of the Douglas County Subdivision Resolution. In addition, staff placed a courtesy notice of the Planning Commission and Board of County Commissioners’ public meetings on the County website, in accordance with Section 508A.04 of the Douglas County Subdivision Resolution. Adjacent landowners were also mailed courtesy notices at the beginning of the referral period. An email was received from the owners living at 5655 Majestic Oak Way. They expressed their concerns with lot size of this new filing and the water demands. A copy of the email is attached to this staff report. Referral packets were sent to the Pinery Homeowners Association, Timbers Homeowners Association and the Misty Pines Homeowners Association. The Pinery Homeowners Association responded that they do not have any concerns with the proposed changes to Filing 30 and that the realignment and relocation of units from other areas of Filing 30 is well within the terms of their agreement with the developers of the Timbers. No response was received from the Timbers Homeowners Association. Misty Pines Homeowners Association responded that they do not object to the current application. However, they regard the previous traffic plan that is being used for this request to be outdated and inadequate for the purposes of this and future build-out requests by the applicant. A meeting was held with the President of the Misty Pines Homeowners Association, Planning, and Public Works Engineering staff to discuss the concerns. Updated traffic counts were provided to them at that meeting. VII. PLANNING COMMISSION MEETING At the Planning Commission public meeting on November 18, 2013 the applicant’s representative presented the request. The Planning Commission asked staff various questions about soil tests, a comment from the State Engineer’s Office encouraging renewable water resources, and a letter from a resident regarding covenant rules and lot sizes. Staff explained that soil tests would be required when applying for a building permit, and that the proposed density is in conformance with the planning area as lot sizes exceed the minimum 15,000 square feet. The Planning Commission asked the applicant about traffic, the tree preservation plan, and plans for future parks in the area. The applicant explained that several traffic studies have been conducted since 2002 and recent reports are supportive that the previous studies are applicable. The applicant explained the intent of the tree preservation plan and plans for a future pocket park in the next stage of this filing. No members of the public spoke during the public portion of the meeting. The Commission recommended approval of the application, subject to the proposed conditions, by a vote of 8 to 0. The condition that the Subdivision Improvements Agreement Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 10 of 140 (SIA) be fully executed and approved prior to consideration of the combined preliminary and final plat by the Board of County Commissioners has been met. VIII. STAFF ANALYSIS Per Article 503A of the Subdivision Resolution, a combined preliminary and final plat application may be approved if the following standards are met: 503A.01: The combined preliminary and final plat is consistent with the goals, objectives, and policies of the Douglas County Comprehensive Master Plan. Staff Comment: The proposed subdivision is located within the Pinery Separated Urban Area (SUA) as identified in Section 2 of the Comprehensive Master Plan. Urban Land Use Objective 2-1A encourages that urban development is directed to designated SUAs. The plan preserves important site characteristics including existing vegetation, minimizes site grading, and preserves the established character of the neighborhood. The property is identified within Map 10.1 of the Comprehensive Master Plan as have low habitat value. The presence of large wildlife throughout the Pinery such as deer, is possible and as a condition of approval of the sketch plan, Colorado Division of Wildlife literature will be made available to both prospective homeowners and homebuyers and shall be available at all times. 503A.02: The combined preliminary and final plat is in conformance with the design elements established in Article 3, Section 304 of this Resolution. Staff Comment: 304.01 – The lots all exceed the 15,000 square feet minimum permitted lot size; the lot sizes and shapes will allow compliance with required setbacks for proposed residences. 304.02 – Geologic hazards and soil conditions have been determined acceptable. 304.03 - Proposed lots provide protection from noise, wind and traffic. 304.04 Street, drainage designs and flood control have been preliminarily reviewed and accepted by Douglas County Engineering. 304.05 - Natural terrain and vegetation are preserved to a significant extent. 304.06 - Multi-frontage lots are not proposed. 304.07 - Storm water and flood control have been coordinated with regional systems. 304.08 – Vehicular, pedestrian, and bicycle access is provided to abutting neighborhoods, recreation, retail, and employment areas. 304.09 - Physical and visual barriers have been minimized. Visual buffering has been addressed and pedestrian access connections provided. 503A.03: The subdivider has provided evidence that provision has been made for a water supply that is sufficient in terms of quantity, quality and dependability for the type of subdivision proposed, as determined in accordance with the standards set forth in the Water Supply-Overlay District section of the Douglas County Zoning Resolution. Staff Comment: Central water will be provided by the PWWD. The State Engineer’s Office has reviewed the will-serve letter from the District and has found that the water supply is adequate. 503A.04: The subdivider has provided evidence that provision has been made for a public sewage disposal system, and, if other methods of sewage disposal are proposed, adequate evidence that such system shall comply with State and local laws and regulations. Staff Comment: The proposed subdivision will be served by the PWWD. Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 11 of 140 503A.05: The subdivider has provided evidence to show that all areas of the proposed subdivision which may involve soil or topographical conditions presenting hazards or requiring special precautions have been identified by the subdivider and that the proposed uses of these areas are compatible with such conditions. Staff Comment: The Colorado Geological Survey found that the site was suitable for the development proposed, but noted that highly variable soils were present throughout the site. Each lot will be investigated by a qualified soils and foundation engineer in conjunction with the foundation excavation due to the potential for subsurface drainage problems at the time of building permit. 503A.06: The subdivider has adequate drainage improvements. Staff Comment: The applicant has submitted a Phase III Drainage study to Douglas County Public Works Engineering and is working with County Engineering staff to comply with all necessary construction plans for the required drainage facilities. 503A.07: Significant cultural, archaeological, natural, and historic resources, and unique landforms have been protected. Staff Comment: There is no evidence of significant cultural, archaeological, natural and historical resources and unique landforms to protect. Grading within the site will be minimized and significant ponderosa pine preserved through the Tree Preservation Plan. 503A.08: Services, including fire and police protection, recreation facilities, utility service facilities, streets, and open space, are available to serve the proposed subdivision. Staff Comment: All such services are available to the proposed subdivision. Roads will be public and maintained by Douglas County. Other services will be provided through South Metro Fire Rescue Authority, Douglas County Sheriff, PWWD, Douglas County School District, High Prairie Farms Metropolitan District, Xcel, IREA, CenturyLink and Comcast. IX. STAFF ASSESSMENT Staff has evaluated the combined preliminary and final plat request, referral agency comments, applicant responses, public input, approval standards, and all other information included within this staff report. In staff’s assessment, the application complies with the approval standards subject to the following conditions: 1. Prior to recordation of the final plat, the developer, their successors or assigns shall pay $200 per platted lot to Douglas County in accordance with Commitment #9 of the Pinery PD, to be used at the discretion of Douglas County to mitigate for local and regional impacts of the Pinery PD plan. 2. Colorado Division of Wildlife literature shall be made available to both prospective homeowners and homebuyers concerning the possible presence of large wildlife throughout the Pinery and shall be available at all times. 3. Prior to recordation of the final plat, all technical corrections shall be made to the satisfaction of Douglas County. 4. All commitments and promises made by the applicant or the applicant’s representative during the public meeting and/or agreed to in writing and included in the public record have been relied upon by the Board of County Commissioners in approving the Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 12 of 140 application; therefore, such approval is conditioned upon the applicant’s full satisfaction of all such commitments and promises. Attachments Page Douglas County Land Use Application ......................................................................................14 Project Narrative .......................................................................................................................15 Referral Agency Summary Report.............................................................................................16 Referral Response Letters ........................................................................................................24 Letter from abutting landowner ..................................................................................................64 Applicant Response Letters to Referrals ...................................................................................65 Pinery Water and Wastewater District Willingness to Serve Letter ............................................ 79 Wildfire Mitigation Plan..............................................................................................................92 Weed Management Plan...........................................................................................................99 Tree Preservation Plan ...........................................................................................................100 Detention Pond Design ...........................................................................................................101 Traffic Impact Analysis ............................................................................................................102 Final Approved Sketch Plan ....................................................................................................124 Planning Commission Minutes ................................................................................................131 Final Plat Exhibit .....................................................................................................................136 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 13 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 14 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 15 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 16 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 17 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 18 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 19 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 20 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 21 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 22 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 23 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 24 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 25 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 26 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 27 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 28 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 29 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 30 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 31 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 32 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 33 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 34 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 35 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 36 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 37 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 38 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 39 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 40 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 41 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 42 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 43 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 44 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 45 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 46 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 47 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 48 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 49 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 50 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 51 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 52 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 53 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 54 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 55 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 56 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 57 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 58 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 59 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 60 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 61 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 62 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 63 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 64 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 65 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 66 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 67 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 68 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 69 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 70 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 71 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 72 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 73 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 74 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 75 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 76 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 77 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 78 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 79 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 80 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 81 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 82 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 83 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 84 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 85 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 86 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 87 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 88 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 89 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 90 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 91 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 92 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 93 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 94 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 95 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 96 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 97 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 98 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 99 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 100 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 101 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 102 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 103 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 104 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 105 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 106 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 107 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 108 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 109 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 110 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 111 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 112 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 113 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 114 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 115 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 116 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 117 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 118 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 119 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 120 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 121 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 122 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 123 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 124 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 125 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 126 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 127 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 128 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 129 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 130 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 131 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 132 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 133 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 134 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 135 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 136 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 137 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 138 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 139 of 140 Pinery Filing 30-A Project File SB2013-045, Combined Preliminary and Final Plat Board of County Commissioners Staff Report - Page 140 of 140