Application for Environmental Authorization
File Reference Number:
NEAS Reference Number:
Date Received:
(For official use only)
DC/
KZN/EIA/
APPLICATION FOR ENVIRONMENTAL AUTHORIZATION
Submitted in terms of the National Environmental Management Act, 1998 (Act No. 107 of
1998)(NEMA) and regulation 6 (1) and 16 (1) of the Environmental Impact Assessment (EIA)
Regulations, 2014 (Government Notice No. R 982, 04 December 2014).
PROJECT TITLE
Proposed construction of a bulk water pipeline, Umbulwane to Lombardskop Reservoir,
Emnambithi / Ladysmith Municipality KwaZulu-Natal
DISTRICT MUNICIPALITY
uThukela District Municipality (DC23)
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 1 of 17
Application for Environmental Authorization
IMPORTANT INFORMATION
PLEASE NOTE:
1.
It is the responsibility of the applicant to confirm that the Department is the competent authority to which this
application must be submitted (refer to NEMA section 24C).
2.
The application must be typed within the spaces provided in the form. The size of the space provided is not
necessarily indicative of the amount of information required.
3.
Where required, place a cross in the box you select.
4.
Incomplete applications will be returned to the applicant for revision.
5.
The use of the phrase “not applicable” in the form must be done with circumspection. Should it be done in
respect of material information required by the competent authority for assessing the application, it may result
in the rejection of the application as provided for in the Regulations.
FEES APPLICABLE FOR APPLICATIONS FOR ENVIRONMENTAL AUTHORIZATIONS
6.
The following fees for the consideration and processing of applications for an environmental authorization will
be applicable from 01 April 2014 (refer to the Annexure in Government Notice No.141 dated 28 February
2014):
Application
Application for an environmental authorization subject to a Basic
Assessment in terms of the EIA Regulations
Application for an environmental authorization subject to a Scoping and
Environmental Impact Report in terms of the EIA Regulations
Fee
R2 000.00
R10 000.00
7.
Where an applicant is required to pay fees for an application for environmental authorization as contemplated
in section 6, this must be made by means of a bank deposit or electronic fund transfer into the bank account
of this Department (refer to section 8).
8.
Payment reference number for applications for environmental authorizations and banking details for
the Department:
Reference number (only reference number to
be used for environmental authorization
applications):
Account name:
Bank name:
Branch code:
Account number:
9.
04003903
KwaZulu-Natal Provincial Government -Economics
ABSA
630495
4072482787
Proof of payment of fees (if applicable) for an environmental authorization application must be attached as
Appendix 10 to this application form and submitted with it. Proof of payment is either a stamped deposit slip
or an electronic fund transfer payment advice.
INSTANCES WHERE FEES FOR APPLICATIONS FOR ENVIRONMENTAL AUTHORIZATIONS ARE NOT
APPLICABLE
10. Where an application is for a community based project funded by a government grant or the application is
made by an organ of state, the fees for considering and processing applications for an environmental
authorization do not apply (refer to regulation 2 in Government Notice No.141 dated 28 February 2014).
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 2 of 17
Application for Environmental Authorization
11. Where an applicant is not required to pay a fee as contemplated in section 6 of this form, a written
motivation(with proof of funding if a government grant is applicable) must be attached as Appendix 11 to
this application form and submitted with it.
12. If you have any queries regarding the EIA process or fees applicable for applications for environmental
authorizations please contact the relevant District Office of this Department. These contact details are
obtainable from Regional Offices (see below).
REGIONAL OFFICE DETAILS
13. The original application must hand delivered or posted to the appropriate Regional Offices of this Department
as provided below. No faxed or e-mailed applications will be accepted. Regional Office details are:

FOR APPLICATIONS IN NORTHERN KWAZULU-NATAL (Amajuba, Umkhanyakude, Uthungulu,
Umzinyathi and Zululand District Municipalities):
Environment: North Region
KwaZulu Natal Department of Economic Development, Tourism & Environmental Affairs
Private Bag X1048, RICHARDS BAY, 3900
Block D, 1st Floor, North Park Offices
Cnr Via Verbena and Aloe Loop Streets
(Opposite uMhlathuze Sports Complex)
Veldenvlei, RICHARDS BAY

Contact Person:
Ms Zama Mbanjwa
Telephone No:
Cellular Telephone No:
035 - 780 0314
073 875 7763
FOR APPLICATIONS IN SOUTHERN KWAZULU-NATAL (Ethekwini Metro, Ilembe, Harry Gwala, Ugu,
Umgungundlovu and Uthukela District Municipalities):
Environment: South Region
KwaZulu-Natal Department of Economic Development, Tourism & Environmental Affairs
Private Bag X9152, PIETERMARITZBURG, 3201
270 Jabu Ndlovu Street
PIETERMARITZBURG
3201
Contact Person:
Ms Mavis Padayachee
Telephone No:
Cellular Telephone No:
033 - 264 2572
073 127 8907
14. Unless protected by law, all information filled in on this application will become public information on receipt by
this Department. Any interested and affected party must be provided with the information contained in this
application on request, during any stage of the application process.
15. Please note an exemption application must be finalized before lodging an application for environmental
authorization with the Department.
16. If an Environmental Assessment Practitioner (EAP)has not been appointed at the time of the submission of
this application form, the declaration from the EAP must be included in the Basic Assessment Report.
17. Pages 2 and 3 may be deleted from the application form submitted to the Department.
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 3 of 17
Application for Environmental Authorization
CONTENTS
LIST OF APPENDICES ............................................................................................................. 4
1. PROJECT DESCRIPTION ................................................................................................. 5
2. BACKGROUND INFORMATION....................................................................................... 6
3. ACTIVITIES APPLIED FOR .............................................................................................. 8
5. ECONOMIC AND SOCIAL INFORMATION .....................................................................10
6. TYPE OF APPLICATION..................................................................................................10
7. DECLARATIONS ..............................................................................................................11
LIST OF APPENDICES
SUBMITTED
Appendix 1
Appendix 2
Appendix3
Appendix4
Appendix 5
Appendix 6
Appendix 7
Written consent from the land owner or the person in control
of the land (Regulation 39(1) (If the applicant is not the land
owner and Regulation 39(2) does not apply).
Correspondence from the Department confirming the Listing
Notice 3 activities triggered (if applicable)
Approval by the Department that a combined application in
terms of Regulation 11 of the EIA Regulations, 2014 may be
submitted (if applicable)
A locality map and a plan (Regulation 16 (1) (vii)
Proof of payment of environmental authorization fees (if
applicable). Proof of payment includes a stamped deposit
slip or an electronic fund transfer payment advice.
A written motivation explaining why the payment of
environmental authorization fees are not applicable (an
application for a community based project funded by a
government grant or an application by an organ of state).
List of Properties and SG 21 Digit Codes
N/A
N/A
N/A
YES
N/A
YES
YES
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 4 of 17
Application for Environmental Authorization
1.
PROJECT DESCRIPTION
Please provide a detailed description of the project.
The proposed development is located within Wards 9, 14 and 20 of the Emnambithi /
Ladysmith Municipality and comprises the installation of a new 500mm diameter (Ø)
dedicated bulk water pipeline from Umbulwane to Lombardskop, which will ultimately tie
into the existing bulk water system located in the area. The approximately 7.7km long
pipeline will supply water to an existing 5 mega litre (Ml) concrete reservoir at
Lombardskop, located to the east of Ladysmith town. The purpose of the development is
to address current water supply constraints experienced within the Ladysmith /
Ezakheni areas.
The proposed water pipeline will be assessed based on a corridor of disturbance, with
the corridor width varying from 50m – 350m to allow for construction deviations if these
are required during the construction phase of the project.
The following will be constructed for the Umbulwane to Lombardskop Water Supply
Project:



Lombardskop Rising Main (Dedicated bulk water feeder main to the existing 5 Ml
Lombardskop Reservoir, currently not utilized) - to be linked to the existing
550mm Ø Abattoir pipeline.
 Approximately 7.7Km, 500mm Ø steel pipeline with associated
appurtenant works;
 17 air valve chambers;
 6 scour valve chambers;
 Various crossings of minor water courses;
 Elevated 500mm Ø pipe crossing of the Klip River.
Necessary remedial work to the structure of the existing 5 Ml Lombardskop
Reservoir including water tightness testing; and
Strategic adjustments to the Lombardskop Reservoir Chamber and Distribution
mains to suit supply area demand requirements.
(a) Strategic Infrastructure Projects
Does the project form part of any of the Strategic Infrastructure Projects (SIPs) as
described in the National Development Plan, 2011?
NO
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 5 of 17
Application for Environmental Authorization
2. BACKGROUND INFORMATION
Project applicant:
Trading name (if any):
Contact person:
Physical address:
Postal address:
Postal code:
Telephone:
E-mail:
uThukela District Municipality
Mduduzi Radebe
33 Forbes Street, Ladysmith
PO Box 116, Ladysmith
3370
Cell:
036 638 2400
Fax:
[email protected]
079 511 5559
036 635 5501
Owner or person in control of the land:(if the applicant is not the owner or the person in control of the
land or Regulation 39(2) in the EIA Regulations 2014 does not apply)
Contact person:
Please note that Regulation 39(2) applies to this project as it is a linear
development.
Postal address:
Postal code:
Telephone:
E-mail:
Cell:
Fax:
DistrictMunicipality:
uThukela District Municipality
LocalMunicipality:
Ladysmith Local Municipality
In instances where the project includes more than one local or district
municipality, please provide a list.
Contact person at
M.P Khathide
LocalMunicipality:
Postal address:
PO Box 29 Ladysmith
Postal code:
3350
Cell:
082 497 8725
Telephone:
036 637 2231
Fax:
036 631 1400
E-mail:
[email protected]
In instances where there is more than one local authority involved, please include details of local
authorities with their contact details in an Appendix.
Property
description/physical
address:
A list of properties is attached in Annexure 7
(Farm name, portion etc.) Where a large number of properties are involved
(e.g. linear activities), please attach a full list in an Appendix to the
application.
Nearest town/s:
Directions to the
physical address:
Ladysmith
The corridor runs alongside the P32 and P325, Ladysmith
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 6 of 17
Application for Environmental Authorization
Current land-use
zoning:
Various Land-use Zonings including town lands, municipal and
departmental servitudes, Agriculture and residential land uses.
In instances where there is more than one current land-use zoning, please
attach a list of current land use zonings in the Appendix and also indicate
which portions are relevant to this application.
Is a change of land-use or a consent use application required?
Must a building plan be submitted to the local authority?
Locality map:
NO
NO
An A3 locality map must be attached to the back of this document, as
Appendix 9. The scale of the locality map must be relevant to the size of the
development (at least 1:50 000. For linear activities of more than 25
kilometres, a smaller scale e.g. 1:250 000 can be used. The scale must be
indicated on the map.) The map must indicate the following:
 an accurate indication of the project site position in relation to known
landmarks such as towns/villages, as well as the positions of the
alternative sites, if any;
 road access from all major roads in the area;
 road names or numbers of all major roads as well as the roads that
provide access to the site(s);
 all roads within a 1km radius of the site or alternative sites; and
 a north arrow;
 a legend; and
 locality GPS co-ordinates (Indicate the position of the activity using the
latitude and longitude of the centre point of the site for each alternative
site. The co-ordinates should be in degrees, minutes and seconds.
Site identification and linkage
Please indicate all the Surveyor-General 21 digit site (erf/farm/portion) reference numbers for all sites
(including portions of sites) that are part of the application.
Please refer to Annexure 7
(if there are more than 6, please expand the list with the rest of the numbers)
(These numbers will be used to link various different applications, authorizations, permits etc. that may
be connected to a specific site)
Please provide the geographical coordinates for the site
Start
Latitude /Longitude
Degrees
Minutes
South
28
35
East
29
49
Seconds
56.66
03.80
Middle
Latitude /Longitude
South
East
Seconds
19.65
04.08
Degrees
28
29
Minutes
34
50
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 7 of 17
Application for Environmental Authorization
End
Latitude /Longitude
South
East
Degrees
28
29
Minutes
33
51
Seconds
33.16
24.44
3. ACTIVITIES APPLIED FOR
a. For an application for authorizationthat involves more than one listed or specified
activity that, together, make up one development proposal,all the listed activities
pertaining to this application must be indicated.
Indicate the
number and date
of the relevant
notice:
GN. R 983 (Listing
Notice 1 of 2014)
GN. R 983 (Listing
Notice 1 of 2014)
GN. R 983 (Listing
Notice 1 of 2014)
Activity No (s) (in
terms of the
relevant or notice)
:
Activity 9
Activity 12
Activity 19
Describe each listed activity as per the project
description (and not as per wording of the relevant
Government Notice)1:
“The development of infrastructure exceeding 1 000
metres in length for the bulk transportation of water or
stormwater (i) with an internal diameter of 0,36 metres or
more; or (ii) with a peak throughput of 120 litres per
second or more.”
This Listed Activity is relevant as the proposed
pipeline will be longer than 1 000 metres and will
have an internal diameter of more than 0,36 metres
i.e. the pipeline will be approximately 7.7km in length
and will have an internal diameter of 0.5 metres.
“The development of (iii) bridges exceeding 100m2 in
size; (xii) infrastructure or structures with a physical
footprint of 100m2 or more where such development
occurs (a) within a watercourse; (b) in front of a
development setback; or (c) if no development setback
exists, within 32 metres of a watercourse, measured from
the edge of a watercourse; excluding (dd) where such
development occurs within an urban area; or (ee) where
such development occurs within existing roads or road
reserves.”
This Listed Activity is relevant as portions of the
proposed corridor route will require the construction
of infrastructure for the crossing of watercourses
which exceeds 100m2 within a watercourse, or 32
metres thereof, which doesn’t occur within an
existing road or road reserve, and which the majority
of it is located in a rural area.
“The infilling or depositing of any material of more than
5m3 into, or dredging, excavation, removal or moving of
soil, sand, shells, shell grit, pebbles or rock of more than
5m3 from (i) a watercourse.”
Please note that this description should not be a repetition of the listed activity as contained in the relevant
Government Notice, but should be a brief description of activities to be undertaken as per the project description,
i.e. describe the components of the desired development
1
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 8 of 17
Application for Environmental Authorization
This Listed Activity is relevant as the proposed water
pipeline construction will involve the movement of
more than 5m3 of soil from the banks of
watercourses during construction and/or the
deposition of 5m3 of material or more into
watercourses.
Please note that any authorization that may result from this application will only cover activities
specifically applied for.
4. STATE DEPARTMENTS IDENTIFIED IN TERMS OF S240
Please indicate to which State departments reports related to your application will be forwarded to
provide comments in terms of section 24 0 (2) of NEMA:
Please note: details of the relevant contact person and the address of the State department must be
provided. Add the names and other details for State departments not listed.
YES
Name of Department
Contact person
X
Ezemvelo KZN Wildlife
Andy Blackmore
X
Amafa
X
X
X
X
X
X
X
X
X
X
X
NO
Department of Water
Affairs
Department of
Agriculture and
Environmental Affairs:
Macro Planning
Directorate
Department of
Agriculture, Forestry and
Fisheries
Department of
Cooperative Governance
and Traditional Affairs
KZN Department of
Transport
Department of Human
Settlement
South African National
Roads Agency Limited
(SANRAL)
Ladysmith / Emnambithi
Local Municipality
uThukela District
Municipality
Transnet (Servitude
Management)
ESKOM
Weziwe
Tshabalala
Nompumelelo
Mdlalose
Address
PO Box 13053,
Cascades, 3202
PO Box 2685,
Pietermaritzburg, 3201
PO Box 1018, Durban,
4000
Zibusiso Dlamini
Private Bag X9059,
Pietermaritzburg, 3201
Wiseman
Rozani
Private Bag X9029,
Pietermaritzburg, 3200
Martin de Lange
Private Bag X9123,
Pietermaritzburg, 3200
Roy Ryan
Gumbi Masilela
Cas Landman
M.P. Khathide
Mduzi Radebe
M T Hadebe
Nomile Mtawali
Private Bag X9043,
Pietermaritzburg, 3201
Private Bag X9157,
Pietermaritzburg, 3200
PO Box
100410,Scottsville,
3209
PO Box 29 Ladysmith,
3370
P O Box 116,
Ladysmith, 3370
PO Box 3113, Durban,
4000
PO Box 99, Ladysmith,
3370
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 9 of 17
Application for Environmental Authorization
Please note that: The EAP must request comments from all relevant State departments and remind
such departments that failure to submit comments with 30 days will, in terms of sub-regulation 3(4) of
the EIA Regulations, 2014 be regarded as no comments..
5. ECONOMIC AND SOCIAL INFORMATION
Provide details on the anticipated socio-economic values associated with the proposed project
Anticipated CAPEX value of the project on completion
What is the expected annual turnover to be generated by or as a result of the project?
New skilled employment opportunities created in the construction phase of the project
New skilled employment opportunities created in the operational phase of the project
R670m
R91m
R18.75m
R1.5m/yr
New un-skilled employment opportunities created in the construction phase of the
R24m
project
New un-skilled employment opportunities created in the operational phase of the
R0.25m/yr
project
What is the expected value of the employment opportunities during the operational and R130m
construction phase?
6. TYPE OF APPLICATION
(a) Application for Basic Assessment
This is an application that is subject to a basic assessment (EIA Regulations 2014: YES
Chapter 4, Part 2)) and Regulation 19 in the EIA Regulations 2014 will be
complied with.
(b) Application for Scoping and Environmental Impact Assessment (EIA
This is an application that is subject to Scoping and EIA (EIA Regulations 2014:
Chapter 4: Part 3) and Regulation 21 in the EIA Regulations 2014 will be complied
with.
NO
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 10 of 17
Application for Environmental Authorization
Appendix 1 – N/A
Appendix 2 – N/A
Appendix 3 – N/A
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 13 of 17
Application for Environmental Authorization
Appendix 4 – Locality Map
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 14 of 17
Application for Environmental Authorization
Appendix 5 – N/A
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 15 of 17
Application for Environmental Authorization
Appendix 6 – Environmental Authorisation Fee Exemption Letter
17 August 2015
Our Ref: 41556/JR
Environment: South Region
KwaZulu-Natal Department of Economic Development, Tourism & Environmental
Affairs
Private Bag X9152
Pietermaritzburg
3201
PROPOSED CONSTRUCTION OF A BULK WATER PIPELINE, UMBULWANE TO
LOMBARDSKOP RESERVOIR, EMNAMBITHI / LADYSMITH MUNICIPALITY
KWAZULU-NATAL.
The attached Application for Environmental Authorisation has reference:
The Applicant for the above is the uThukela District Municipality (i.e. an Organ of
State). As the Basic Assessment Process is being funded by the District Municipality
through a Department of Water Affairs MWIG grant, the Application is exempt from
payment from Environmental Authorisation fees as per Regulation 2b of Government
Notice 141 (28 February 2014) which states:
Government Notice 141, Regulation 2: Application of Regulations
“These regulations apply to an Application but will exclude an Application b) made by
an Organ of State”
Based on this Regulation, no application fee payment will be made for this project.
Yours sincerely,
John Richardson BSc. Hons (Geography and Environmental Management)
Environmental Scientist
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 16 of 17
Application for Environmental Authorization
Appendix 7 - List of Properties and SG 21 Digit Codes
_____________________________________________________________________
“Leading the attainment of inclusive growth for job creation and economic sustenance”
Page 17 of 17
Farm Portions
Surveyor General 21 Digit Number
N0GS00000001287300002
N0GS00000001287300005
N0GS00000001287300006
N0GS00000001287300007
Portion Number
2/12873
5/12873
6/12873
7/12873
ERF's
Surveyor General 21 Digit Number
N0GS01770000000100000
N0GS01770000118000001
N0GS01770000117600010
N0GS01770001073800000
N0GS01770001073900000
N0GS01770001074000000
N0GS01770001074300000
N0GS01770001074400000
N0GS01770001074500000
N0GS01770001074600000
N0GS01770001074700000
N0GS01770001074800000
N0GS01770001074900000
N0GS01770001075000000
N0GS01770001075100000
N0GS01770001075200000
N0GS01770001075300000
N0GS01770001075400000
N0GS01770001075500000
N0GS01770001075600000
N0GS01770001075700000
N0GS01770001075800000
N0GS01770001075900000
N0GS01770001076000000
N0GS01770001076100000
N0GS01770001076200000
N0GS01770001076300000
N0GS01770001076400000
N0GS01770001076500000
N0GS01770000109700000
N0GS01770001097800000
N0GS01770001097900000
N0GS01770000117600011
N0GS01770001103000000
N0GS01770001103100000
N0GS01770001104900000
N0GS01770001105000000
N0GS01770001105100000
N0GS01770001105200000
N0GS01770001105300000
ERF Number
1
1/1180
10/1176
10738
10739
10740
10743
10744
10745
10746
10747
10748
10749
10750
10751
10752
10753
10754
10755
10756
10757
10758
10759
10760
10761
10762
10763
10764
10765
1097
10978
10979
11/1176
11030
11031
11049
11050
11051
11052
11053
Farm Name
LOMBARDS KOP SETTLEMENT 12873
LOMBARDS KOP SETTLEMENT 12874
LOMBARDS KOP SETTLEMENT 12875
LOMBARDS KOP SETTLEMENT 12876
N0GS01770001105400000
N0GS01770001105500000
N0GS01770001105600000
N0GS01770000118000000
N0GS01770000117600012
N0GS01770001216900000
N0GS01770001216900000
N0GS01770001217000000
N0GS01770001217100000
N0GS01770001217700000
N0GS01770001217800000
N0GS01770001217900000
N0GS01770001218200000
N0GS01770001220300000
N0GS01770001220400000
N0GS01770001220900000
N0GS01770001221000000
N0GS01770001221100000
N0GS01770001228400000
N0GS01770001228500000
N0GS01770001228600000
N0GS01770001228700000
N0GS01770001233100000
N0GS01770001233300000
N0GS01770001233900000
N0GS01770001234100000
N0GS01770001234200000
N0GS01770001234400000
N0GS01770001236900000
N0GS01770001237000000
N0GS01770001237100000
N0GS01770001237200000
N0GS01770001238000000
N0GS01770001238100000
N0GS01770001238200000
N0GS01770001238300000
N0GS01770001239100000
N0GS01770001239200000
N0GS01770001239300000
N0GS01770001239400000
N0GS01770001239600000
N0GS01770001239700000
N0GS01770001239800000
N0GS01770001239900000
N0GS01770001240000000
N0GS01770001240100000
N0GS01770001240200000
N0GS01770001240300000
N0GS01770001240400000
N0GS01770001240500000
11054
11055
11056
1180
12/1176
12169
12169
12170
12171
12177
12178
12179
12182
12203
12204
12209
12210
12211
12284
12285
12286
12287
12331
12333
12339
12341
12342
12344
12369
12370
12371
12372
12380
12381
12382
12383
12391
12392
12393
12394
12396
12397
12398
12399
12400
12401
12402
12403
12404
12405
N0GS01770001240600000
N0GS01770001240700000
N0GS01770001240800000
N0GS01770001240900000
N0GS01770001241000000
N0GS01770001241100000
N0GS01770001260400000
N0GS01770001260700000
N0GS01770001261000000
N0GS01770001261100000
N0GS01770001261700000
N0GS01770000117600013
N0GS01770000117600014
N0GS01770000117900014
N0GS01770000117600015
N0GS01770000117900015
N0GS01770000117900015
N0GS01770000117900019
N0GS01770000117900020
N0GS01770000117900022
N0GS01770000117900023
N0GS01770000117900025
N0GS01770000117900027
N0GS01770000117900029
N0GS01770000117600003
N0GS01770000117900031
N0GS01770000117900032
N0GS01770000117900033
N0GS01770000117900035
N0GS01770000117900041
N0GS01770000117900042
N0GS01770000117900044
N0GS01770000117900045
N0GS01770000117600006
N0GS01770000610400000
N0GS01770000633600000
N0GS01770000117600007
N0GS01770000117900007
N0GS01770000117600008
N0GS01770000889700000
N0GS01770000889800000
N0GS01770000889900000
N0GS01770000890000000
N0GS01770000117600009
N0GS01770000946200000
N0GS01770000946300000
N0GS01770000117800000
N0GS01770000117900000
N0GS01770000117900012
12406
12407
12408
12409
12410
12411
12604
12607
12610
12611
12617
13/1176
14/1176
14/1179
15/1176
15/1179
15/1179
19/1179
20/1179
22/1179
23/1179
25/1179
27/1179
29/1179
3/1176
31/1179
32/1179
33/1179
35/1179
41/1179
42/1179
44/1179
45/1179
6/1176
6104
6336
7/1176
7/1179
8/1176
8897
8898
8899
8900
9/1176
9462
9463
RE/1178
RE/1179
RE/12/1179

Similar documents