Montoursville Area Montoursville Area School District
Transcription
Montoursville Area Montoursville Area School District
Montoursville Area School District High School Project Update September 9, 2014 Crabtree, Rohrbaugh & Associates, Architects Additions and Renovations Montoursville Area High School Renovation ‐ Demolition Option 5: Additions and Renovations Montoursville Area High School 3 Option 5: Additions and Renovations Montoursville Area High School 1993 CONSTRUCTION Existing and New Option 5: Additions and Renovations Montoursville Area High School 1st Floor Plan Option 5: Additions and Renovations Montoursville Area High School 2nd Floor Plan 3rd Floor Plan Option 5: Additions and Renovations Montoursville Area High School 1st Floor Plan ‐ Update Option 5: Additions and Renovations Montoursville Area High School 2nd & 3rd Floor Plan ‐ Update Option 5: Additions and Renovations Montoursville Area High School 9 Schedule 2014 2015 2016 2017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S I PRE-DESIGN II SCHEMATIC DESIGN III DESIGN DEVELOPMENT IV CONSTRUCTION DOC'S V BIDDING VI CONST. ADMIN. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PHASE I : 3 Story Wing PHASE II: Reno Gym y PHASE III: Aud. Wing PHASE IV: DAO, A. Gym PHASE V: Sitework Additions and Renovations Montoursville Area High School Construction Phasing Additions and Renovations Montoursville Area High School Construction Phasing Option Characteristics Option Characteristics High School Option 5 1. Uses existing site 2. Retains the 1993 portion of the existing building 3. Parking for 300 Vehicles 4. Parking adjacent to stadium and new main entrance to High School 5. Retains DAO and district maintenance building on site 6. Retains stadium in it’s current location w/ new synthetic turf field 7. Minimal disruption to students during construction 8. Variance for 3 story building height will be required 9. Variance for Lot Coverage will be required 13 Pre-Design Tasks - Completed Finalize Educational Program Obtain Civil Engineering Proposals Preliminary Discussions with Borough P li i Di i ith B h (zoning, impervious surface approval requirements, etc.) Addressed various Project Goals (Tech Ed Phasing, Future Expansion) Pre-Design Pre Design Tasks - Ongoing Educational Specifications Site Requirements (Parking, Circulation, Athletics, etc.) Document District Building Standards (Materials, Systems, Technology, etc.) g ( y gy ) Building & Site Design Building & Site Design Scope and Budget Scope and Budget Pre-Design Tasks - Upcoming Zoning Variance Process: (Building Height, Parking, Impervious Lot Coverage) Obtain Additional RFP’s (Mechanical/Electrical Engineering, Structural Engineering, Food Service, Geotechnical, etc.) / Develop Aesthetic Preferences Finalize Scope and Budget Existing Site & Building Surveys Initiate PDE PlanCON Process