PROSES PRODUKSI PT KRAKATAU STEEL (Dalam JUTA Ton)
Transcription
PROSES PRODUKSI PT KRAKATAU STEEL (Dalam JUTA Ton)
COMPANY PROFILE PT KHI Pipe Industries (KRAKATAU STEEL GROUP) HEAD OFFICE Krakatau Steel Building, 7th Floor, Jl. Gatot Subroto kav.54 Jakarta - Indonesia Ph. (62-21) 5254140, 5212761, Fax. (62-21) 5204002 www.khipipe.com FACTORY Jl. Amerika I, Kawasan PT. Krakatau Steel, Cigading 42435 Cilegon - Banten- Indonesia Ph. (62-254) 392438, 391020, 391971, Fax. (62-254) 392083 2 Overview Founded in 1972, as a part of PT. Krakatau Steel Group First production of spiral welded pipe since January 1973 First Production line of High Frequency Resistance 2006. Welding ( HFRW ) since January 2nd Production line of large diameter High Frequency Resistance Welding (HFRW) since 2014. First Production of New Coating Technology Application ( FBE, 3 Layer Polyethylene / Polypropylene, Internal Coating ) since January 2007. 2nd production line for Coating application Polypropylene) started January 2014. of FBE, 3 Layer Polyethylene / Expansion of concrete weight coating and Asphalt Enamel facilities since October 2012. API monogrammed since 12 October 1977 with Certificate No: 5L 0203.1. ISO 9002 Certified since 23 November 1993 and has been upgraded to ISO 9001: 2000 Since October 2002 and ISO 9001: 2008 Since October 2010 certified by ABS . OHSAS 18001:2007 certified since July 2013 by SGS. Plant Location : Krakatau Industrial Estate Cigading – Cilegon, Banten Indonesia 3 International Quality and Safety Certifications ISO 9001 , For Quality Management System API Monogram For Product API 5L ( Specification For Line Pipe ) OHSAS 18001 Monogram For Health & Safety Management System TKDN Certificate (ERW) 5 TKDN Certificate (Spiral) 6 SKUP MIGAS 7 SKUP MIGAS 8 Pipe and Coating Facilities Location Map of Indonesian Integrated Gas Pipe Line Project Pipe supplied by KHI KHI Pipe Industries Pipe Mill & Coating Plant, Cilegon Facilities Competitive Advantages • Long Experience as Line Pipe Manufacturer and Coating Applicator. • Complete Production and Inspection Facilities. • Integrated Pipe Mill ( Helical SAW line for medium up to larger diameter and HFRW line for smaller diameter ) and Coating Applicator such as FBE, 3LPE/PP, Coal tar Enamel, CWC, and Internal Coating ( Flow Coat and anti corrosion ). • As Subsidiary Company of PT.Krakatau Steel (the biggest steel manufacturer at South East Asia Countries ) . • The position of Mill integrated with Steel producer ( KS ) , private and Public Port Facilities (PT.KBS and Cigading Port). 10 Market Segment of Products Oil and Gas Industries Key players of oil and gas operators in Indonesia such as Exxon Mobil, Total E&P, Pertamina, BP, State Gas Company (PGN), ConocoPhillips and Chevron Pacific Indonesia already used spiral and/or ERW welded steel line pipe since many years mostly using API 5L specification, DNV, BS, AS and other customer specification for the following services: Oil Transmission and Distribution Pipe Line Gas Transmission and Distribution Pipe Line Steam Pipe Line Construction and Structural Industries All of key players (Domestic & International) in this sector used of spiral welded for structural pipe and pilling pipe refer to ASTM, BS EN, JIS, AS and other customer specification. PT. KHI Pipe Industries already exported ± 150,000 ton of pipe to the 14 countries in the world mostly for the structural / pipe piles Water Pipes Industries All of key players in Indonesia using spiral welded pipe for water transportation refer to AWWA Standard. 11 Product and Services Pipe Manufacturing Corrosion Protection External Coating Additional Coating Internal Coating 3LPE/3LPP Spiral Welded Pipe Epoxy FBE Asphalt/Coaltar Concrete Weight Coating - Impingement - Compression Cement Lining ERW Pipe Epoxy 12 Production Capacities Plant and storage area : 46 Ha. Spiral Welded Steel Pipe Total Design Capacity Diameter Wall Thickness Material : 150,000 tons : up to 80” : 3.2 mm – 25 mm : Up to API 5 L X-80 1st Line of High Frequency Resistance Welding ( HFRW ) Total Design Capacity Range Of Diameter Range Of Wall Thickness : 70.000 Ton : 4 “ up to 12 “ : 3.2 mm up to 12.7 mm 2nd Line of High Frequency Resistance Welding ( HFRW ) Total Design Capacity Range Of Diameter Range Of Wall Thickness Material : 150.000 Ton : 10 “ up to 20 “ : 4.78 mm up to 16 mm : Up to API 5 L X-80 Corrosion Protection External 3 LPE/PP FBE : 800.000 SQM/year : 800.000 SQM/year Asphalt Enamel : 800.000 SQM/year Internal Flow Coat Epoxy : 800.000 SQM/year Cement Lining : 600.000 SQM /year Concrete Weight Coating (CWC) Total Design Capacity Pipe Diameter CWC Thickness CWC Density : 300.000 sqm/year : up to 48 “ : up to 120 mm : up to 190 pcf 13 14 SPIRAL WELDED SAW LINE PIPE PRODUCTION PROCESS HRC Outside Welding Auxiliary-Leveling Inside Welding Skelp End Cutting Forming Skelp End Joint Edge Preparation Edge Prebending Preliminary Visual and Dimensional Inspection Automatic UT for spiral weld 8 probes Heat Treatment as alternative for sour service Oscilating UT for Pipe body 2 probes Radiography Inspection if Necessary Manual UT Levelling Radiography Inspection Traveling cut off Off Line UT Hydrostatic Test Weighing & Measuring End Facing & Beveling Final Visual & Dimensional Inspection Customer Inspection Marking Shipping 15 HFRW PRODUCTION PROCESS Strip End Welding Edge slitting (optional) Leveling Uncoiling Accumulator Inside & Outside Flash Trimming Conductive & Inductive HFRW Method Roll Forming Strip Auto U/T Lamination Sizing & Straightner Flying Cut off Post Annealing End Facing Customer Inspection Marking, Weighing & Measuring Shipping Visual & Dimensional Inspection Automatic Ultrasonic Offline Hydrotest 16 Pipe Manufacture and Coating Plant Facilities Spiral Pipe Line ERW Line Internal & External Coating Line New Line Production of Large Diameter High Frequency Resistance (ERW) Welded Facility 18 Non Destructive Examination Facilities for HFRW Strip Auto U/T Lamination Hydrostatic Tester Automatic UT off-line UT Manual on Pipe end 19 Non Destructive Examination Facilities Online Automatic UT Offline Automatic UT Hydrostatic Test H X a n y d Hand Held UT Fluoroscopy X-Ray / Radiography 20 Laboratory Test Facilities Tensile & Bend Test Hardness Test Flattening Test Charpy Impact Test Guided Bend Test Chemical Composition Test Micro Structure Examination Macro Section Helical SAW Pipe Macro Section ERW Pipe 21 PE/PP Adhesive HDPE Grafted adhesive Anti-corrosion/FBE Epoxy 22 Fusion Bonded Epoxy Coating Flow Process External Blast Clean Blaster In-Coming Rack (Hold Point) Pre-Heat Reject / Hold Reject (Re-blast)/ Hold Inspection Rack (Hold Point) * Transfer pipe identification * Check for surface contamination * Check surface condition (i.e. damage free .. etc.) Cut-Back Tapping Conditioned pipe * Check * Check * Check * Check for steel defects (i.e. slivers, lamination) for salt contamination pipe surface temperature pipe wall thickness (if excessive grinding) Reject (Re-process)/ Quarantine Inspection Rack (Hold Point) * Check surface cleanliness * Check blasting profile • Monitor elapsed time between blasting and coating (Weather Control: %RH) Cutback Holiday Testing Brushing Water Quenching FBE Topcoat (Rough coat) FBE Base Coat Application To CWC Plant To FBE stockpile area * Check coating thickness * Check coating visual appearance * Check for holiday • Pipe marking / colour coding • Check cut-back dimension and taper •I nstall rope separator (3-off per joint) In-house QC Lab (Hold Point) Temperature Control Induction Heat 3 Layer Polyethylene/Polypropylene Coating Flow Process External Blast Clean Blaster In-Coming Rack (Hold Point) Pre-Heat Reject / Hold Reject (Re-blast)/ Hold Inspection Rack (Hold Point) * Transfer pipe identification * Check for surface contamination * Check surface condition (i.e. damage free .. etc.) Cut-Back Tapping Conditioned pipe * Check * Check * Check * Check for steel defects (i.e. slivers, lamination) for salt contamination pipe surface temperature pipe wall thickness (if excessive grinding) Reject (Re-process)/ Quarantine Inspection Rack (Hold Point) * Check surface cleanliness * Check blasting profile • Monitor elapsed time between blasting and coating (Weather Control: %RH) Cutback Brushing Holiday Testing Water Quenching Extrusion of Adhesive and Top Coat FBE Base Coat Application To Concrete Coating Plant To FBE stockpile area * Check coating thickness * Check coating visual appearance * Check for holiday • Pipe marking / colour coding • Check cut-back dimension and taper In-house QC Lab (Hold Point) Temperature Control Induction Heat Laboratory Of Coating Plant Facilities Cathodic Disbondment Test Tensile Test/Test Peel Constant Rate Bending Test Differential Scanning Calorimeter (DSC) Analysis Adhesion Test Impact Test 25 Requirements of 3LPE Coating In Service Performance : Peel Test Peel Test Hanging Weight Method Peel Test Constant Rate Method Internal Flow Coating Flow Process PE/PP Coating Line (Endo Conveyor) Internal Mechanical Blast Line Inspection Rack (Hold Point) Inspection Rack (Hold Point) Paint Spray Line PE/PP Storage Area Internal Cut-Back Taping Fume Extraction (Air blower & Suction Fan) Internal Coating Inspection Enclosed curing area complete with air blower (Hold Point) PE/PP Coated Pipe Stockpile In-house QC Lab (Hold Point) Reject (Reprocess)/ Quarantine To Concrete Coating Plant To PE/PP Coated Pipe Stockpile * Check wet and dry film thickness * Check coating visual appearanceglossiness and roughness * Check for pinholes (glass slides) * Check for adhesion, cureness, flexibility and hot water immersion (steel panel) * Check cut-back dimension * Re-stencil pipe marking and colour coding PE/PP Coated complete with Internal Flowcoat Pipe Stockpile Internal Coating Testing Internal Bending Test Pin Hole Test Adhesion Test Measurement of Roughness Stripping Test Concrete Weight Coating (CWC) Impingement Process Incoming Feed Rack of Concrete Plants (Hold Point) Holiday Testing Damage/ Hold for Repair * Batch Plant Calibration • Plant parameter adjustment • Wire mesh machine adjustment * Rubber drum throwing unit djustment * Check holding and feed hoppers Concrete Mixing (Iron ore, cement, water) FBE Coated Pipe Stockpile Concrete Application (Impingement) * Clean concrete cutback • Check girth measurement (OD) • Check concrete weight * Check concrete finishing • Calculate NB and Concrete Density • Draw cube samples for Concrete Strength Wire Mesh Concrete Gap for Anode at Mid-center of Pipe (As required) Reject / Hold / Repair Weighbridge Concrete Cutback Preparation Concrete Weight Control (Hold Point) Pipe transfer to curing bay DELIVERY Concrete Coated Pipe Curing Bay / Storage * Concrete repairs (if any Spalling) In-house QC Lab (Hold Point) CWC Machine Facilities Batching Plant CWC Application Machine Facilities CWC Pipe 30 Laboratory Of CWC Plant Facilities Compressive Strength Drying Oven Shear Strength Test Electric Resistant Check Sieve Analysis Specific Gravity Analysis 31 32 Application of Spiral Welded Pipe for Piling Structure 33 Pilling Pipe for International Cruise Terminal Project – Singapore 34 Application Heavy Wall Spiral Welded Pipe For Onshore Oil & Gas Transmission Pipeline Coated Line pipe of LTRO Project, South of Sumatera Dia. 8 inchx9.53 mm WT API 5 L X-46 (Sour Service) – Conoco Phillips (Grissik Ltd), 2010 Stringing Pipe Line activity of Gas Transmission & Distribution for PGN, API 5L X-65, 2005 Coated Linepipe for Gas Distribution Pipeline of Bojonegara-Serpong Project, PT PGN, Tbk, Dia. 24”x12.7 mm WT API 5 L X-65 35 Major Experience of PT. KHI Pipe Industries, Line Pipe in Oil & Gas Industries Customer Year Ton Size Spec Project ARCO 1994 7000 24” x14.27 mm WT API 5 L X-65 Qadipur Gas Pipeline Pakistan 1994 3300 26”, 30”x8.74 mm WT API 5 L X-65 Exxon Mobil Indonesia 1995 8000 30”x9.52mmWT API 5 L X-60 Sour Gas Pipeline Total Fina Elf 1995 14288 12”, 14”,32” API 5 L X-65 Tunu North -114 State Gas Company (PGN) 1997 85600 28”x8.74 ,10.31, 12.7 mm WT API 5 L X-65 Bontang Train H, East Kalimantan Indonesia 1997 11591 42”x14.27 mm WT API 5 L X-65 TOTAL Elf 1998 12075 20”, 36”x12.7 mm &15.88mm WT API 5 L X-65 Pertamina Proyek Pengembangan Gas Sumatera Selatan 2005 32254 28”, 32” & 11.9 mm & 14.27mm & 15.88 mm, 19.05 mm & 20.06mm WT API 5 L X-52 State Gas Company (PGN) 2006 28000 32”x14.3, 17.5, 20.6 mm WT API 5 L X-65 State Gas Company (PGN) 2009 12000 24”x12.7mm WT API 5 L X-65 Exxon Mobil (MCL 2009 10000 20”x9.52mm WT Total E&P Indonesie 2012 500 14”x9.52 mm WT API 5 L X-60 M PT pertagas 2013 3602 24”x12.7 mm WT API 5 L X-52 Arun Belawan Project State Gas Company (PGN) 2013 6124 24”x14.27 mm WT API 5 L X-65 Bitung – Cimanggis Project 36 ARII Submarine Gas Pipeline Tunu Phase 07 PT. KHI Pipe Industries Experiences for Supplying HFRW Pipe Customer Year Length Size Project Location Perusahaan Gas Negara ( PGN ) 2007-2009 60 KM 4 – 12.75 Inch Gas Distribution For Banten Area , Batam and Surabaya East Java, Riau, & East Java Indonesia Chevron Pacific Indonesia 2007-2009 260 KM 4 – 12,75 Inch North Duri Development Project Riau Indonesia 2007- 2009 42 KM 6 Inch East Kalimantan Gas Distribution System Balikpapan East Kalimantan Indonesia Medco Indonesia 2008 30 KM 6 – 8 Inch Crude Oil Pipeline System South Sumatera Indonesia EMP kangean 2008 12 KM 6 Inch East Java Gas Pipeline East Java Indonesia PERTAMINA 2007- 2009 60 KM 4 – 12 Inch Crude Oil Pipeline System Sumatera and Java Indonesia Pertamina 2010 75 Km 10 Inch Oil Transmission West Java Indonesia ConocoPhillips 2012 54 Km 12.75 Inch Gas Distribution South Sumatera VICO Indonesia 37 PT. KHI Pipe Industries Experiences for Supplying HFRW Pipe (Continued) Customer Year Length Size Project Location PT Pertamina Hulu Energi ONWJ 2014 28.67 KM 10,752 Inch Proyek FPRO – ECOM North West Java PT Wijaya Karya (Persero) Tbk 2014 17.59 KM 4.5 – 20 inch - 31.42 KM 4.5 – 20 inch - Proyek Upgrading Fasilitas Penimbunan Gasoline di Tanjung Uban Tanjung Uban Proyek Pengembangan TBBM Pertamina Pulau Sambu Pulau Sambu 38 Major Experiences of FBE and 3LPE/PP Coating Customer Year Length Size Project Location Pertamina 2007 6 KM (3lPE) 32 Inch Relocation of East Java Gas Pipeline Project East Java Indonesia Pertamina 2008 120 KM (3LPE) 16 Inch Cikampek Balongan Oil Pipeline Project West Java Indonesia Perusahaan Gas Negara ( PGN ) 2008 40 KM (3LPE) 6 – 12 Inch West Java Gas Distribution System West Java Indonesia PLN – Power Plant 2008 24 KM (3LPE) 24 Inch Gas Pipeline System For Power Plant EMP kangean 2008 12 KM (3LPE) 6 Inch East Java Gas Pipeline East Java Indonesia Perusahaan Gas Negara 2009 74 KM (3LPE) 24 Inch Bojonegara – Serpong Gas Pipeline System Banten Indonesia Pertamina 2010 75 KM (3LPE) 10 Inch Ujung Berung - Tasikmalaya West Java Indonesia ConocoPhillips 2012 54 KM (3LPE) 12 Inch Letang Tengah Rawa Optimization South Sumatera ConocoPhillips 2012 14.4 KM (3LPP) 6 Inch Letang Tengah Rawa Optimization South Sumatera Muara Karang Jakarta Indonesia Major Experiences of FBE and 3LPE/PP Coating Customer Year Length Size Project Location PT PGN, Tbk 2013 57 KM (3lPE) 32 Inch PGN CP 10 (BitungCimanggis) Bitung – Cimanggis PT PGN SBU Pusat 2014 23 KM (3LPE) 12 & 16 Inch PGN SBU I Jabodetabek and West Java 40 Major Experiences For Offshore Application Client / Project IAPCO / MAXUS OD (INCH) WT (INCH) Grade Length (M) 20 0.375 X - 52 5500 Remarks Line pipe included CWC Line pipe included CWC ARCO / ARII 24 0.562 X - 65 31000 Line pipe included CWC TOTAL TUNU Ph. 7 20 - 36 0.5 - 0.622 X - 65 10000 TOTAL E&P INDONESIE 14 0.374 X-60 6000 Line pipe included CWC KPM Oil & Gas/PHE ONWJ 36 20000 CWC PT RPE/CNOOC 10 1104 CWC 8.5 X-52 41 Major Export Market ( Spiral SAW ) to 14 Countries Pipe Size No Customer Project / Location 1 PT. Prima Comexindo Sudan Water Supply 2 Mitsubishi Corp. Qardipur Gas Line 3 Mitsubishi Heavy Ind. 4 Country Spec Qty (Ton) Sudan 28” AWWA C200 2,602 Pakistan 26” & 30” API 5L X65 3,303 Takasago Power Plant Japan 26” API 5L X65 2,945 Oil Serv IOCL Project India 24” API 5L X52 132 5 Pipeco United Kingdom Project England 28” & 42” Comm. Grade 5,225 6 Trade Arbed Changi East Phase 2 Singapore 28” & 32” BS 6323 3,086 7 Coutinho Caro Iran Pipeline Project Iran 63” API 5L X42 137 8 Shark Bay Project Australian Project Australia 47” BS 4363 Gr 55 C 2000 9 Foster Piling – USA Panama Bridge Project Panama 20” Comm. Grade 160 10 Borneo Raya Holland Project Holland Various ASTM A252 1,302 11 Performance Pipe Kuala Baram Bridge Malaysia 60” BS 6323 4,557 12 Mitsubishi Corp. Kenya Steam Pipeline Kenya 16” & 28” API 5L Gr. B 1,576 13 McConnell Dowell Loyang Project Singapore 28 “& 30” BS EN 10219 200 14 Daiho Corporation PNG LNG Project Papua Nuguinie 24” & 16 ASTM A252 2000 42 www.khipipe.com Steel Pipe Manufacturer and Coating Applicator 43