Torcon, Inc. — Site and Construction Logistics Plan - NJIT.edu
Transcription
Torcon, Inc. — Site and Construction Logistics Plan - NJIT.edu
PAD-MOUNTED TRANSFORMERTO BE MAINTAINED Auxiliary Construction Access TRAFIC CONTROL/ FLAGGER (AS NEEDED) NJ Transit Signage "Sidewalk Closed -Cross Here -->" Primary Construction Access Warren Street/NJIT Station Exit/Entrance ACCESSIBLE AT ALL TIMES om ss fr wy/21 e c c A rH arte C c M Access from I-280 PEDESTRIAN CROSSING te re t nc ou Co ash W Torcon Office Trailers Pool Porta Johns STONE TRACKING PAD Perimeter Fence outbound of Existing Curb Rally Point 1 CRANE PATH Staging/ Laydown Area BUILDING ACCESS 29' west of fence corner to close edge of entrance Footprint #1 Building AUXILIARY ENTRANCE REQUEST 2/22- 4/15 Signage "Sidewalk Closed -Cross Here -->" #2 Temporary Contractors’ Sidewalk Takeover Trailers for Outlet Control Structure 2/22-3/14 Porta #3 Tie In of Main Building Sanitary 5/1/2017-6/1/2017 Johns PEDESTRIAN CROSSING 6-ft. High Screened Chain Link/Silt Fence Pedestrian Detour Rally Point 2 PHASE ONE — CONSTRUCTION LOGISTICS NEW JERSEY INSTITUTE OF TECHNOLOGY NJIT WELLNESS AND EVENTS CENTER NEWARK, NEW JERSEY October 23, 2015 Phased Sidewalk Replacement Warren Street/NJIT Station Exit/Entrance BUILDING ACCESS ACCESSIBLE AT ALL TIMES TRAFFIC CONTROL/FLAGGER (AS NEEDED) BUILDING ACCESS om ss fr wy/21 e c c A rH arte C c M Secondary Construction Access Primary Construction Access NJ Transit Access from I-280 Dumpster Concrete STONE Washout TRACKING Torcon Office Trailers PAD Porta Johns Rally Point 1 WELLNESS & EVENTS CENTER Phased Sidewalk Replacement Porta Johns Rally Point 2 Phased Sidewalk Replacement BUILDING ACCESS LOADING DOCK ACCESS Contractors’ Trailers PHASE TWO — CONSTRUCTION LOGISTICS 6-ft. High Screened Chain Link/Silt Fence NEW JERSEY INSTITUTE OF TECHNOLOGY NJIT WELLNESS AND EVENTS CENTER NEWARK, NEW JERSEY October 23, 2015