Torcon, Inc. — Site and Construction Logistics Plan - NJIT.edu

Transcription

Torcon, Inc. — Site and Construction Logistics Plan - NJIT.edu
PAD-MOUNTED
TRANSFORMERTO BE
MAINTAINED
Auxiliary
Construction
Access
TRAFIC CONTROL/
FLAGGER (AS NEEDED)
NJ Transit
Signage "Sidewalk Closed
-Cross Here -->"
Primary
Construction
Access
Warren Street/NJIT
Station Exit/Entrance
ACCESSIBLE AT ALL TIMES
om
ss fr wy/21
e
c
c
A
rH
arte
C
c
M
Access from I-280
PEDESTRIAN
CROSSING
te
re t
nc ou
Co ash
W
Torcon
Office
Trailers
Pool
Porta
Johns
STONE
TRACKING
PAD
Perimeter Fence
outbound of Existing
Curb
Rally
Point 1

CRANE PATH
Staging/
Laydown
Area

BUILDING
ACCESS
29' west of fence corner to
close edge of entrance
Footprint
#1 Building
AUXILIARY
ENTRANCE
REQUEST 2/22- 4/15
Signage "Sidewalk Closed
-Cross Here -->"
#2 Temporary
Contractors’
Sidewalk Takeover
Trailers
for Outlet Control
Structure 2/22-3/14
Porta
#3 Tie In of Main
Building Sanitary
5/1/2017-6/1/2017
Johns

PEDESTRIAN
CROSSING
6-ft. High Screened
Chain Link/Silt Fence
Pedestrian Detour
Rally
Point 2
PHASE ONE — CONSTRUCTION LOGISTICS
NEW JERSEY INSTITUTE OF TECHNOLOGY
NJIT WELLNESS AND EVENTS CENTER
NEWARK, NEW JERSEY
October 23, 2015
Phased Sidewalk
Replacement
Warren Street/NJIT
Station Exit/Entrance
BUILDING
ACCESS
ACCESSIBLE AT ALL TIMES
TRAFFIC CONTROL/FLAGGER
(AS NEEDED)
BUILDING
ACCESS


om
ss fr wy/21
e
c
c
A
rH
arte
C
c
M
Secondary
Construction
Access
Primary
Construction
Access
NJ Transit
Access from I-280
Dumpster
Concrete STONE
Washout TRACKING
Torcon
Office
Trailers
PAD
Porta
Johns
Rally
Point 1
WELLNESS & EVENTS CENTER
Phased Sidewalk
Replacement
Porta
Johns
Rally
Point 2
Phased Sidewalk
Replacement

BUILDING
ACCESS

LOADING DOCK
ACCESS
Contractors’
Trailers
PHASE TWO — CONSTRUCTION LOGISTICS
6-ft. High Screened
Chain Link/Silt Fence
NEW JERSEY INSTITUTE OF TECHNOLOGY
NJIT WELLNESS AND EVENTS CENTER
NEWARK, NEW JERSEY
October 23, 2015

Similar documents