Introduction to Melkøya plant
Transcription
Introduction to Melkøya plant
Snøhvit Introduction to Melkøya plant Øivind Nilsen Vice President Snøhvit STATOIL ASA 1- Snøhvit A dream came true …… 2 - Classification: external 150612 - A Successful Frontier LNG Project • The first LNG liquifaction plant in Norway and Europe • The first offshore development in the Barents Sea • The largest industrial development in northern Norway ever • New technology on several areas • New markets • New organisation in a new area of Norway 3 Classification: external 150612 70°39′48″N 23°40′55″E 4 Classification: external 150612 Facts: Discovered: 1981 – 84 Water depth: Distance to shore: Gas in place (GIP): Recoverable reserves : Condensate: 250 – 340 m 140 km 317 GSm3 193 GSm3 34 MSm3 Snøhvit, Albatross and Askeladd Original 2002 figures Owners: Statoil ASA (Operator) 36.79% Petoro AS 30.00% Total E&P Norge AS 18.40% GDF Suez Norge AS 12.00% RWE Dea Norge AS 2.81% 0 100 200 km G:\T&P\ANT\MBM\NKG\Mapdata\NO\Norge_Oversikt\Lisenskart\Mxd\Statoil_Hydro_let_lic_tot_20070401vle.mxd 5 Classification: external 150612 Out on the Snøhvit field we have no impressing installations to show… …. above the surface 6 Classification: external 150612 Hammerfest LNG in numbers pr. 13. March 2012 • Totally 358 persons employed by Statoil • 302 living in Hammerfest • 12 living in the rest of Finnmark • 20 living in Troms • 3 living in Nordland • 21 living in the rest of Norway • 17 % women • Average age: 35,8 7 - Classification: external 150612 The deputy Mayor of Hammerfest: - We have no other explanation than Snøhvit 9800 9600 9400 9200 9000 8800 8 - Classification: external 150612 2010 2007 2004 2001 1998 1995 1992 8600 Construction: Prefabrication a necessity • Harsh weather conditions and limited infrastructure make prefabrication a necessity • Compact layout • Method that can enable projects in other remote areas • Valuable lessons learnt: Technology/ organisation/ contracts 9 - Classification: 2011-04-11Classification: external 150612 Ekstern 2011-03-23 Harsh weather conditions Melkøya after the storm ”Narve”…. 10 - Classification: external 150612 Subsea to shore 11 - Classification: external 150612 Field developments offshore • Remotely controlled subsea development • No installations on the surface • Overtrawlable subsea templates • No toxic discharges to the sea • Re-injection of carbon dioxide (CO2) 12 - Classification: external Ekstern 150612 2011-01-26 World’s longest multiphase pipeline – 143 km • gas • condensate • water 13 - Classification: external 150612 Kuldeboks 14 - Classification: external 150612 Cold box Snøhvit Blue Marlin and process barge in Cadiz 15 - Classification: external Ekstern 150612 2011-01-26 In-docking of process barge 16 - Classification: external 150612 17 - Classification: external Internal 150612 2011-01-26 Production start: 21 August 2007 18 - Classification: external 150612 A challenging start-up 19 - Classification: external Ekstern 150612 2011-01-26 Modifications carried out since start-up •7 Seawater helix heat exchangers •Changes to the software system •Modifications Cold Box •Less CO2 emissions •Flare fatigue/ overpressure •Reduced start-up time 20 - Classification: external 150612 Meeting the performance targets • Modifications have given improved capacity, efficiency and regularity • Production capacity is well above 100% • Product qualities well within specifications • Liquefaction specific power measured at 243 kWh per ton LNG, which is better than the guaranteed value • Hammerfest LNG has confirmed its position as the world’s most energy efficient LNG plant 21 - Classification: external 150612 • The realization of the SNØHVIT project has been a door opener for unlocking gas resources in the Barents Sea • The design concepts and solutions for harsh environment have proven to be a success • The Hammerfest LNG plant at Melkøya has strengthened it’s position as the most energy efficient LNG liquefaction plant in the world Classification: external 150612 22 Thank you for your attention! Øivind Nilsen Vice President Snøhvit E-mail [email protected] www.statoil.com 23 Classification: external 150612