LSP Parkland Stage 27 (8.5x11) 15JAN09 Part 2.cdr

Transcription

LSP Parkland Stage 27 (8.5x11) 15JAN09 Part 2.cdr
Stage 27
G
Hodgins Road
24
G G
84
20
90
Lan e
La n e
30
30
30
30
30
28
69
28
70
26
71
30
26
28
74
73
72
G
G
46
G
G
G G
ay
Hemingw
63
30
62
30
61
30
59
60
26
26
58
28
32
BLK. 44
Walkway
47
ue
58 Aven
G G
G
G
57
26
56
26
55
28
54
26
52
53
28
26
51
26
28
Wa
lkw
ay
48
G G
G G
G G
G
30
20
99
G
G
G G
G
64
BLK. 44
45
G
O
32
42
G
G G
G G
G G
65
20
40
39
44
43
41
75
G
66
30
98
50
26
49
28
28
Wa
lkw
ay
30
BLK. 44
Road
22
101
*
30
28
30
32
34
32
G G
G
67
22
100
28
32
32
G
22
97
22
Road
Hodgins
24
102
24
103
22
105
Storm
Water
Management
Facility
La ne
22
104
20
106
20
107
108
eet
208 Str
22
22
109
110
Trees and Shrubs
(locations must be confirmed)
Wood Fencing
30
30
G
24
96
Starter
30
24
95
*
30
68
22
94
G
O
78
30
93
1
79
22
92
Suggested House Width
in Feet at Frontage Shown
Lot Requires Special
Design Consideration
Lot Frontage
Garage Location
Optional Garage Location
Bollards
Transit Zone
Transformer
Fire Hydrant
Communication Cabinet
Street Light
Proposed Mailbox
Street Light/Communication
Cabinet(s)
Move-Up
80
20
91
34
81
28
28
Legend
82
22
89
76
77
83
34
34
32
ad
Ro
85
34
36
37
38
sement
BLK. 44
22
88
B
35
eet
208 Str
87
G G
G G
G G
24
G
G
ins
dg
Ho
86
G G
G G
Special Ea
*
LK. 44
111
24
Play Ground
Area
TZ
24
ue
57 Aven
TZ
Revised January 2009
This plan is for marketing purposes only, and is subject to errors and omissions. Street furniture are in approximate locations and are subject to change.
All green spaces, trees and the storm water facility is conceptual only. Water level will fluctuate from year to year.
Dimensions are in feet and decimals. Refer to registered subdivision plan to confirm all lot information. The water level and plant material may very from year to year.

Similar documents