Rydens Enterprise School and Sixth Form College, Hersham Road
Transcription
Rydens Enterprise School and Sixth Form College, Hersham Road
Report To North Area Planning Sub-Committee – List A – Applications For Decision Application No: 2015/2627 Application Type: Case Officer: Edward Chetwynd-Stapylton Ward: Expiry Date: 25/03/2016 Rydens Enterprise School and Sixth Form College Hersham Road Hersham Waltonon-Thames KT12 5PY Reserved Matters application (housing development) for Appearance, Landscaping, Layout and Scale pursuant to application 2013/5035 (296 residential units for means of access) Bewley Homes Mr Kris Mitra Genesis Town Planning Ltd 26 Chapel Street Chichester West Sussex PO19 1DL Location: Proposal: Applicant: Agent: Decision Level: Recommendation: RM Hersham North If Permit – Planning Committee If Refuse – Sub Committee Permit (approve reserved matters) Representations 115 Objections received to the plans as originally submitted, concerned with the following issues: • • • • • • • • • • • • • • • • • • • Traffic impact Scale / density Highway Safety Strain on infrastructure Alternative Sites available Proposed school not required Use of Felcott Rd by contractors Financial gain Parking Overlooking / loss of privacy Loss of light / overshadowing Layout Flooding Loss of playing Field Antisocial behaviour Loss of Trees Overdevelopment Ecology Lack of Open Space within development A further 12 letters have been received in connection with the amended plans consultation reiterating the above concerns. *** This application qualifies for public speaking *** Report Description 1 The application site comprises the existing Rydens Enterprise School (RES) and associated playing field to the north. The site is located north and west of Hersham Road and is currently served by two vehicular accesses, one off Felcott Road and the main access off Hersham Road. The site is bounded to the west by residential development on Millers Close, Felcott Close and Felcott Road, to the north by the London to Portsmouth railway line and to the east and south the proposed school site and playing fields and Bell Farm Junior School. Constraints 2 The following constraints apply: • • • Hersham Settlement Area Queensway, Robinsway and Green Lane Environs character area Open Space Policy 3 In addition to the National Planning Policy Framework and the National Planning Practice Guidance, the following local policies and guidance are relevant to the determination of this application: Core Strategy 2011 CS5 – Hersham CS17 – Local Character, Density and Design CS19 – Housing Type and Size CS25 – Travel and Accessibility CS27 – Sustainable Buildings Development Management Plan 2015 DM1 – Presumption in Favour of Sustainable Development DM2 – Design and Amenity DM6 – Landscape and Trees DM7 – Access and Parking Design & Character SPD 2012 Relevant Planning History 4 There is an extensive planning history associated with this site. Of direct relevance to the determination of this application are the following applications (most recent first): Reference 2016/0214 Description Confirmation of Compliance with Conditions: 6 (Drainage Strategy- Residential Development), 8 (Secure by Design - Residential Development), 11 (Bat Survey), 12 (Additional Tree Information and Pre-Commencement Inspection - Residential Development), 14 (Landscaping - Full Survey (Outline)), 15 (Landscaping - Implementation), 19 (Parking Area Management Plan - School Development), 23 (Protection of Highway from Mud Etc - School Development), 25 (Travel Plan), 26 (Archaeology - Scheme of Working (Large Surface Area) - School Development and 28 (Archaeology Scheme of Working (Large Surface Area) Residential Development) of planning permission 2013/5035 Decision Under consideration 2015/4383 2015/4382 2015/4055 2015/4046 2015/3890 2015/0640 2013/5035 Confirmation of Compliance with Conditions 4 (Archaeology) and 9 & 10 (Protection of School Playing Field) of Reserved Matters application 2015/0640 Confirmation of Compliance with Conditions: 13 (additional tree information), 22 (method of construction statement), 24 (protection of highway from mud) & 27 (archaeology - scheme of working) of planning permission 2013/5035 Variation of Condition of 1 (Approved Plans) of reserved matters approval 2015/0640 for amendments to the external appearance and scale of the school building Reserved Matters application (school development) for Landscaping pursuant to outline planning permission 2013/5035 Confirmation of Compliance with Condition: 5 (Drainage Strategy), 7 (Implementation of Flood Risk Assessment), 10 (Additional Tree Information and Pre-Commencement Inspection) and 12 (Landscaping) of planning permission 2013/5035 Reserved Matters application (school development) for Appearance, Layout & Scale pursuant to outline planning permission 2013/5035 Outline planning application (means of access only to be determined at this time) for development comprising 296 residential units, replacement secondary school and sixth form college along with associated modified access, landscaping and parking following demolition of the existing school and sixth form college Compliance confirmed Compliance confirmed Granted Approved Under consideration Approved Granted Proposal 5 The quantum of development has previously been established by virtue of the grant of outline planning permission and this application does not seek to alter that. In addition the percentage of affordable housing has also been established and no variation is sought. As such approval of reserved matters is now being sought for the appearance, landscaping, layout and scale for a scheme of 296 dwellings pursuant to application 2013/5035 (296 residential units for means of access). 6 The schedule of accommodation below shows the composition of the 296 dwellings proposed, achieving 43% affordable housing with 128 of the 296 units being affordable. Affordable (Rented) 1 bed flat Dwellings 26 Parking Provision 1 space 2 bed flat 31 1 space + 0.5 visitor space 2 bed house 2 3 bed house 4 bed house Total Affordable (Shared Ownership) 1 bed flat 2 bed flat 24 7 90 Dwellings 1 space + 0.5 visitor space 2 spaces 2 spaces – Parking provision 20 18 1 space 1 space + 0.5 visitor Parking Spaces 27 (1 extra visitor space provided) 49 (46.5 rounded to 47 + 2 extra visitor spaces) 3 48 14 141 Parking spaces 20 27 Total Market (Private) 1 bed flat 2 bed flat 7 Housing space – Parking provision 38 Dwellings 13 53 2 bed house 4 3 bed house 4 bed house Total SITE TOTALS 43 55 168 296 1 space 1 space + 0.5 visitor space 1 space + 0.5 visitor space 2 spaces 2 spaces – – 47 Parking spaces 13 79.5 (rounded to 80) 6 86 110 295 530 The affordable housing mix follows the percentages agreed within the S106, set out below. 1 bed flat 2 bed flat 2 bed house 3 bed house 4 bed house Affordable rented 17% 24% Shared Ownership 16% 14% 5% _ 19% _ 5% _ Minimum gross internal area (sqm) 50 70 (for affordable rent and 61 (for shared ownership/0) 83 (two storey house) 87 (4 bed spaces) and 96 (5 bed spaces) – for two storeys 100 (5 bed spaces) & 107 (6 bed spaces) – for two storeys 106 (5 bed spaces) and 113 (6 bed spaces) – for three storeys 8 As set out in the accommodation schedule plot by plot, plots 1 – 127 and 213 – 278 are ‘market’ housing with plots 42 – 57 and 111 – 167 being ‘affordable’ and plots 168 – 212 and plots 279 – 296 being ‘shared ownership’. 9 Of these, the market housing is to be provided in the form of flats, terraced, semi-detached and detached housing. • Plots 213 – 278 are ‘market flats’ 7 of which are 1-bed with the remainder (27) being 2bed units. • Plots 1 – 4, 13 – 22, 31 – 33, 58 – 63, 76 – 81, 93 – 98 and 120 – 127 are terrace or end of terrace units • Plots 40, 41, 64 – 75, 82 – 89, 91, 92, 99 – 110 are semi-detached • Plot 90 is link detached. 10 The breakdown of dwelling type for the affordable and shared ownership housing is as follows: • Affordable flats: Plots 46 – 48 and 139 – 167 • Shared ownership flats: Plots 168 – 212 and 279 – 296 • Affordable terraced housing: Plots 42 – 57 and 111 – 138 • No shared ownership or affordable terraced, semi-detached or detached housing is being provided. Appearance, Landscaping, Layout and Scale 11 As set out in the Design and Access Statement submitted with the application, and as shown on the proposed layout plan (Drawing No 30739 A-02-001 Rev P3), the site offers the opportunity to create a scheme with varied character. The centre of the site is focused around the School Square with the scale of the buildings increasing towards the contemporary proposed school. The School Square connects to the apron of the new school, providing an amenity space framed between the school entrance and the apartment buildings. The square terminates with the school being the highest built form at 18.3m. 12 The development will have a clear road hierarchy with the main route through the site as a wide avenue with a clear and legible entrance to the scheme off Hersham Road. Focal buildings punctuate the main route through the site highlighting gateways and key junctions. Secondary routes are interspersed with key green spaces and will have a contrasting surface. A secondary access is proposed to Felcott Road to the northwest boundary (albeit that the quantum of development to be served by this access has been reduced – see the summary of amendments below). In terms of appearance the proposed dwellings will follow the character, detailing and materials of many of the surrounding local buildings. 13 As shown in the concept diagram above, the proposed site layout allows for five distinct character ‘zones’ to be created namely the ‘Gateway’, the ‘Avenue’, ‘School Square’, ‘Town Square’ and ‘Pocket Park’. As set out in the Design and Access Statement this offers the opportunity to create a scheme with varied character, centred on the School Square with a clear road hierarchy. 14 The site is to be built out in two phases with Phase 1 being the units accessed off Felcott Road and Phase 2 being those located on the existing school site. 15 In terms of scale, the scheme has been designed so that the highest buildings will be located around the School Square and the flatted blocks backing onto the railway line with scale decreasing towards the site boundaries. 16 In terms of storey heights, the breakdown by plot no. is as follows: • 2 storey: Plots 17 – 22, 70 – 75, 90- 100 and 128, 129 • 2 ½ storey: Plots 1 – 6, 11 – 16, 42 – 60, 64 – 69, 82 – 89, 101 – 119 and 130 – 138 • 3 storey: Plots 7 – 10, 23 – 41, 61 – 63, 76 – 81 and 120 – 127 • 3+ storey: Plots 139 – 296 17 Since the submission of the application in August 2015, a number of adjustments have been made (all as shown on the amended plans received on 12 January 2016) and these comprise, inter alia: • • • • • • • • • • • 18 Reducing the height of the apartment blocks adjacent to the railway line from five to four storeys The apartment blocks have been reduced in massing and split into smaller groupings A new road connecting the main square and Felcott Road, with parking around square adjusted as necessary The stopping up of Felcott Road at plot 112 (once the school opens and the new access off Hersham Road provided), crossing point indicated and turning head introduced next to Block A1 – emergency only route through between Felcott Road and the main development The redesign of Plots 46-49 so that they now consist of one 4-bed affordable house, two 2-bed affordable flats and one 1-bed affordable flat. This now places the large tree in a communal garden which will be less of an overshadowing issue to residents The rotation of Plots 70-75 through 90 degrees so that a 15m distance is maintained from properties on Felcott Close The redesign of Plots 111-119 into three plot terraces to allow space for the new road The redesign of Plots 120-127 in two rows of four plot terraces The redesign of Plots 128-132 to introduce three additional 3-bed units in place of three 2bed units Adjustments made to the internal roads to ensure that all technical standards are met Additional work carried out with Thames Water and SCC to agree mitigation strategy for surface and foul water In terms of landscaping, the proposed details, as shown on the general arrangement plan (drawing no 1197_GA_100 Rev D) and planting plan (Drawing No 1197-PP300 and 301) will comprise hard surfacing, boundary treatments, grassed areas and tree and shrub planting in accordance with the details shown on those plans. 19 Typical materials will comprise a variety of sustainable, quality materials comprising: • • • • • Brickwork and render walls. Clay and slate effect tiled roofs. Tile hanging to emphasise details at gables to key buildings located at the end of vistas. Reconstituted stone to brickwork façades and brick arch details to rendered façades are introduced to emphasise window and door cills and head details in certain areas. Protruding / recessed bands are proposed as features at key levels to particular buildings Details of the actual materials to be used will be secured by way of pre-commencement condition. Consultations 20 Asset Management: No views received 21 SCC Spatial Planning: No views received 22 SCC SUDS: No objection subject to conditions 23 SCC Archaeology: No objection, subject to a condition requiring a Written Scheme of Investigation. 24 SCC Highways & Transportation: The County Highway Authority has undertaken an assessment in terms of the likely net additional traffic generation, access arrangements and parking provision and are satisfied that the application would not have a material impact on the safety and operation of the adjoining public highway. The County Highway Authority therefore has no highway requirements. 25 Surrey Police (Secure by Design): No objection subject to a condition requiring the development to achieve ‘Secured by Design’. 26 Planning – Conservation: No objection 27 Planning – Landscaping: No objection 28 Planning – Trees: No objection subject to a condition requiring details of tree planting and aftercare. 29 Head of Environmental Care: No objection subject to the scheme complying with the Council’s standards for refuse collection 30 Head of Environmental Health & Licensing: No objection subject to noise mitigation measures as contained within the submitted noise impact assessment being implemented in full. 31 Natural England : No objection 32 Environment Agency SE: No objection 33 Surrey Bat Group: No views received 34 Surrey Playing Fields Association: No views received 35 Surrey Wildlife Trust: No objection subject to the applicant undertaking the recommended actions as set out in Section 5 of the Biodiversity Report submitted with the application 36 Thames Water: No objection 37 Network Rail: No objection, subject to stringent requirements regarding Future maintenance, Drainage, Plant & materials, Scaffolding, Fencing, Lighting, Noise & vibration, Landscaping 38 Sport England: No objection 39 Whilst a number of adjoining and adjacent local authorities were consulted at the outline application stage where wider strategic views were considered important in establishing the principle of the development, their input into the detailed design and layout issues now under consideration is not considered to be of overriding importance. Positive and Proactive Engagement 40 In assessing this application, officers have worked with the applicant in a positive and proactive manner consistent with the requirements of 186-187 of the NPPF by making available pre-application advice to seek to resolve problems before the application was submitted and through the setting up of a member liaison group composed of local ward councillors to foster the delivery of sustainable development. Planning Considerations 41 The principle of the re-development of the existing school site for a development of 296 units has previously been accepted by virtue of the grant of outline planning permission with the issues of principle being set out in full within the officer report to that application. Therefore there is no further requirement for the applicant to demonstrate the acceptability of the site for the proposed housing or its proposed access arrangements. Indeed, as cautioned within Planning Practice Guidance (Paragraph 049), a planning authority may be considered to have acted unreasonably, and therefore be liable for costs, if it refuses to approve reserved matters when the objections relate to issues that have been considered at the outline stage (officer emphasis). Notwithstanding this the main planning considerations in the determination of this reserved matters application are: • The acceptability of the appearance, layout and scale of the proposed development • The acceptability of the proposed landscaping • Other matters, comprising, inter alia, affordable housing and traffic and parking issues 42 In this case whilst ‘access’ was the only matter for detailed consideration at the outline stage, consideration was given to matters of appearance, layout, landscaping and scale which are subject to further detailed examination below. 43 The National Planning Policy Framework (NPPF) provides the overarching planning policies in relation to development. It maintains a presumption in favour of sustainable development and encourages the effective re-use of previously developed land. Further, it seeks to secure high quality design and a good standard of amenity for all existing and future occupants of land and buildings. The NPPF retains the primacy of design making to be made by the Local Plan. 44 As set out in Paragraph 3 above, the following Core Strategy and Development Management Plan policies are material to the consideration of this application: CS5 (Hersham), CS17 (Local Character, Density and Design), CS19 (Housing Type and Size), CS21 (Affordable Housing), CS27 (Sustainable Buildings) and CS28 (Implementation and Delivery). CS5 acknowledges that Hersham’s primary role is as a residential area and that all new development will be focused on previously developed land, to be well designed and to integrate with and enhance local character. CS17 maintains that development must respect the local character of the area, must provide efficient use of land through development density, promote sustainable design provide an inclusive development. CS19 requires a range of housing types and sizes to be secured in order to create inclusive and sustainable communities. CS21 provides the Council’s targets on delivering affordable housing, both on site and by contribution. CS27 seeks to provide sustainable buildings and recycling/waste facilities. CS28 seeks to ensure that local communities are supported by the provision of high quality infrastructure that is commensurate with the scale of development and the needs of the Borough. In addition Development Management Plan Policies DM2 (Design and Amenity), DM6 (Landscape & trees) and DM7 (Access and Parking) are also relevant as is the council’s Design and Character SPD. 45 As defined in Article 2 of the Town and Country Planning (Development Management Procedure) (England) Order 2015: • Appearance is defined as those aspects of a building or place which affect the way it looks, including the exterior of the development • Landscaping is defined as how the development would improve or protect the amenities of the site and the area and the surrounding area, this could include planting trees or hedges as a screen • Layout is defined as the way in which buildings, routes and open spaces within the development are provided, situated and orientated in relation to each other and to buildings and spaces outside the development. • Scale is defined as the height, width and length of each building proposed within the development in relation to its surroundings. Appearance, Layout and Scale, 46 In terms of appearance, layout and scale, it is considered that the redevelopment of the existing Rydens School site with the housing proposed represents a unique opportunity for the council to meet its housing target on a site in the urban area thereby taking pressure off having to look at sites not in the urban area (i.e. green belt). Whilst it is recognised that proposed density is higher than that prevailing in the area, the Core Strategy does state in paragraph 7.16, that, ‘much of the borough is characterised by low density developments which are sought after by residents and which make a major contribution to the character and identity of many sought after residential areas. However replicating such development as new across the Borough would not only mean that housing targets could not be met within the urban area but would also result in people having to travel further distances to access facilities and services.’ 47 With respect to the proposed mix, Core Strategy Policy CS19 seeks to ensure that there is a range of housing types and sizes on development across the Borough in order to create inclusive and sustainable communities. In this regard the Core Strategy identifies that there is a need for 90% of all new housing development to deliver 1, 2 and 3 bedroom dwellings in equal proportions in the private market housing sector. Whereas the indicative market housing mix at the outline application comprised 27% 1-bed flats, 50% 2-bed flats and houses, 3% 3-bed houses and 20% 4-bed houses this has been revised as follows: • • • • 1-bed flats (13) = 8% 2-bed flats (53) and 2-bed houses (4) = 34% 3-bed houses (43) = 25% 4-bed houses (55) = 33% 48 With regard to the proposed 128 units of ‘affordable’ housing (90 units of affordable rented and 38 units of shared ownership), the percentage mix is as follows: • 36% 1-bed flats (46) • 40% 2-bed flats and houses (51) • 19% 3-bed houses (24) • 5% 4-bed houses (7) 49 Overall therefore the mix is as follows: • 1-bed flats – 20% • 2-bed houses and flats – 36% • 3-bed houses – 23% • 4 bed houses – 21% 50 This revised mix is considered to accord broadly with the requirements of Policy CS19. 51 In terms of internal space standards, all the units within the scheme satisfy or exceed the 1 nationally prescribed space standards published in March 2015 . 52 With regard to matters of appearance, layout and scale, having regard to the NPPF, pursuing sustainable development involves seeking positive improvements in the quality of the built, natural and historic environment, as well as in people’s quality of life, including, inter alia, replacing poor design with better design and improving the conditions in which people live, work, travel and take leisure. It is also a core planning principle that high quality design and a good standard of amenity should be sought for all existing and future occupants of land and buildings. As set out in the NPPF, paragraphs 56 - 66, the Government attaches great importance to the design of the built environment stating that good design is a key aspect of sustainable development, is indivisible from good planning, and should contribute positively to making places better for people. 53 Policy within paragraphs 60, 61, 63, 65 and 66 of the NPPF is also material as it emphasises that great weight should be given to outstanding or innovative designs which help raise the standard of design in an area regardless of compatibility with the existing townscape. In particular, paragraphs 60 and 61 require that planning policies and decisions should not attempt to impose architectural styles or particular tastes and they should not stifle innovation, originality or initiative through unsubstantiated requirements to conform to certain development forms or styles and that although visual appearance and the architecture of individual buildings are very important factors, securing high quality and inclusive design goes beyond aesthetic considerations. 54 This approach is advocated within the Core Strategy which seeks to support and promote exemplary and appropriately landscaped designed schemes (Policy CS17) and also within the Development Management Plan (Policy DM2). Policy CS17 states that new development will be required to deliver high quality and inclusive sustainable design which maximises the efficient use of urban land whilst responding to the positive features of individual locations, integrating with the locally distinctive townscape and protecting the amenities of those within the area. 55 The proposed site layout is depicted on the site plan attached to this report. Whilst perhaps not that readily visible on the plan the applicant has sought to create a number of character areas within the site to ensure that there is variety across the site in terms of building size and type. This is expanded on in more detail within the design and access statement. 56 The proposed layout proposes a gateway entrance leading onto The Avenue which in turn leads onto ‘School Square provides a main focal point of the development and is the location of the majority of the flats within Blocks C, D, E, F, G and J (Plot No’s 213 – 296 inclusive). The building form around ‘School Square’ is of 3 – 4 storey blocks which results in a vertical scale similar to the proposed, approved, school building. The remainder of the development is typically domestic in scale being either two storey or two storey with rooms in the roof. An exception to this is the blocks of flats proposed adjacent to the railway line (Blocks A1, A2, and B1 – B3) (Plots 139 – 212 inclusive) which will be single aspect and due to their mass and height provide a barrier to the railway line. 57 The remainder of the development is comprised of terraces of between 4 and 6 units, pairs of semi-detached houses and also link detached house arranged around the secondary access roads. The layout shows all the houses with private rear gardens, either 11 or 15 metres in depth depending on storey height. In addition the minimum required 22 metre back to back separation to prevent loss of privacy due to overlooking is provided across the site. A further feature of the layout is that the dwellings proposed adjacent to the perimeter of the site. i.e. those adjacent to Millers Close, Felcott Close and Felcott Road all respect the pre-existing street layout. 1 https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/421515/150324__Nationally_Described_Space_Standard____Final_Web_version.pdf 58 In terms of living conditions for future occupiers, as noted above, all required separation distances in order to prevent loss of privacy and / or to provide adequate private amenity spaces have been provided and the flats adjacent to the railway line are to be single aspect so that all habitable rooms will face away from the railway line. In addition dedicated open spaces in the form of a LEAP and a LAP have been provided notwithstanding the site’s location close to public open space at the Coronation Recreation Ground. It should be noted that the principle and size of the public open space within the site was considered acceptable under the outline application and will be safe and inclusive by virtue of surveillance from the adjacent dwellings. 59 In terms of car-parking, a total of 530 spaces will be provided across the site broken down as follows: Affordable (Rented) 1 bed flat Dwellings 26 Parking Spaces 27 Council Standard 1 space per unit 2 bed flat 31 49 1.5 spaces per unit 2 bed house 3 bed house 4 bed house Total Affordable (Shared Ownership) 1 bed flat 2 bed flat Total Market Housing (Private) 1 bed flat 2 bed flat 2 bed house 3 bed house 4 bed house Total SITE TOTALS 2 24 7 90 Dwellings 3 48 14 141 Parking spaces 1.5 spaces per unit 2 spaces per unit 2 spaces per unit 20 18 38 Dwellings 13 53 4 43 55 168 296 20 27 47 Parking spaces 13 80 6 86 110 295 530 1 space per unit 1.5 spaces per unit 1 space per unit 1.5 spaces per unit 1.5 spaces per unit 2 spaces per unit 2 spaces per unit 60 This level of provision accords with the Council’s standards as set out above. In addition, cycle parking in accordance with Council standards is proposed within the back gardens of each house and within dedicated stores at ground floor level for each of the apartment blocks. As such the level of car / cycle parking is considered appropriate for a scheme of this size. In addition, there is also a requirement that electric vehicle (EV) charging points be provided in new development at the ratio of one trickle charging point per dwelling and one trickle charging point per every 5 spaces for flats be provided. This will be secured by way of a suitably worded planning condition. 61 In terms of scale, the scale parameters have been dictated by the approved new school buildings and existing development surrounding the site, as shown on the building storey heights plan within the submitted Design and Access statement. This shows the highest buildings to be located around the ‘School Square adjacent to the new school with building heights generally decreasing towards the site boundaries. An exception to this is the proposed flats adjacent to the railway line at the northern end of the site which at 4-storeys will provide a useful noise barrier and focal point for the development. 62 With regard to appearance, the scheme reflects the character of the area. The design and access statement confirms that bespoke houses have been designed for this site, will be detailed in a traditional vernacular style and be finished in traditional materials, i.e. facing brickwork, render, clay tile and slate roofs, tile hanging and reconstituted stone to emphasise window and door cills. This overall design approach and proposal for character materials is considered to be entirely appropriate for such a residential development in this location. 63 Following the submission of amended plans in January this year which will result in the changes outlined in paragraph 17 above, it is considered that the appearance, layout and scale of the development is policy compliant, will deliver housing within the urban area in accordance with the stated aims of the core strategy and will result in a development appropriate to the character of the area. Landscaping 64 With regard to landscaping, the details as submitted have been assessed by the Council’s Landscape and Heritage Manager and Tree Officer against the requirements of Policy DM6, Landscape and Trees. 65 Relevant information submitted with the application includes the Landscape Management Plan (Ref 1197/MP/600 rev A), General arrangement Plan (Ref. 1197/GA/1 00 ref 0) and Planting Plans (Refs. 1197/PP/300, /301 and /302 rev A). The majority of the hard surface is tarmac with block paving to the car parks, plus 1.8m timber close boarded fencing to external and internal rear garden boundaries and timber car port details in some areas. Existing boundary vegetation has been retained where possible and the Council’s Tree Officer has commented on the importance of using forest sized tree species to provide scale. Larger trees include a central avenue of fastigiate Norway Maple with Hornbeam, Beech, Lime, London Plane and Tulip trees planted at generous sizes in key locations. Ornamental trees including Birch spp, Field Maple, Wild Cherry, Pear and Honey Loqust are also proposed and together these will provide variety and interest throughout the year and in the longer term. A total of 99 new trees are proposed and although it would have been desirable to also provide tree planting along the railway line the comments from Network Rail are noted. The shrub and other plant lists and layout will also provide variety, interest and amenity for future residents. One item that was not clear however is the proposal to plant 37 pleached Field Maple around the access square to the new school as these are shown on the key but not on the most recent landscape plans. The Landscape Management Plan is a generic report covering the all soft landscape maintenance aspects for the initial 5 years to ensure establishment. 66 In conclusion it is considered that the applicant has addressed and satisfied all the landscaping requirements pursuant to the original outline permission. Other Matters Affordable Housing 67 The quantum of affordable housing (43.2%) has been agreed under the Outline Planning Permission and accords with the requirements of Core Strategy policy CS21 and the S106 Agreement submitted pursuant to the Outline Application dated 13 February 2015. The applicant has submitted a Schedule of Accommodation as part of the application submission. This confirms that 128 units will be affordable of which 90 units (70%) will be affordable rented and 38 units (30%) will be shared ownership. The Head of Housing Services supports the application on this basis. New Homes Bonus 68 Section 70 subsection 2 of the Town and Country Planning Act 1990 (as amended) states that any local financial considerations are a matter to which local planning authorities must have regard to in determining planning applications; as far as they are material for the application. The weight to be attached to these considerations is a matter for the Council. 69 The New Homes Bonus is a grant paid by central government to local councils for increasing the number of homes and their use. The New Homes Bonus is paid each year for 6 years. It is based on the amount of extra Council Tax revenue raised for new-build homes, conversions and long-term empty homes brought back into use. There is also an extra payment for providing affordable homes. Community Infrastructure Levy (CIL) 70 The development comprises development which is liable for CIL. As agreed at the outline application stage, the CIL liability is £1,668,805.24 and a liability notice has been issued to secure this. Sustainability 71 The applicant has confirmed that the development will meet the development will meet the standards for Code for Sustainable Homes Level 3. This will include water saving measures to meet building regulations and will have design elements that promote a secure by design ethos. The site during the construction phases will be registered with the considerate contractors scheme and all timber used on site will be FSC approved material. During construction a 90% target for recycling of waste will be set. 72 It should be noted however, that following the announcement of a new approach to the setting of technical housing standards that from 1 October 2015, the Government has withdrawn the Code for Sustainable Homes. 73 Issues regarding Archaeology, Ecology and Surface Water Flooding have all been considered under the Outline Planning application and are covered by pre-commencement conditions. As such, these issues do not require any further analysis under this application. Traffic and Parking 74 Whilst access was the one reserved matter ‘fixed’ approved at the outline stage thereby confirming compliance with part (a) access of Policy DM7, this application has been assessed by the County Highway Authority (Surrey County Council) in respect of parking and layout. As a result of this the Highway Authority have not raised any objection, subject to the conditions placed on the outline application (Ref 2013/5035) being maintained. 75 In this regard the County Highway Authority has undertaken detailed negotiations with the applicant addressing various issues as summarised below: 76 i. General visibility requirements along the central spine road did not meet the requirements for a 30mph road. Subsequently, the developer has agreed the inclusion of traffic calming in the form of junction tables which will reduce prevailing traffic speed to a level which results in the proposed levels of junction visibility being acceptable. ii. The County expressed concerns relating to the width of the carriageway within the return loop road on the western side of the development, due to the potential for onstreet parking on the first corner restricting access for larger vehicles. Subsequently, the developer has agreed a localised widening on this corner to reduce the potential risk of such obstructions. iii. The County expressed concern in relation to the available visibility at the tight right hand bend in the northern section of the scheme, in that it was unlikely that two vehicles could pass each other in opposing directions while negotiating a 90 degree bend with a carriageway width of 4.8m. Subsequently, the developer has agreed to widen the carriageway to 5.5m in the mid-section of the bend. iv. The County expressed concern in relation to the operation of the central square as a potential area of public highway, as it would be difficult in operational / management / maintenance terms to have such a relatively complex mix of highway and private parking in the form proposed. As a result, it has been agreed that the edge of the central square will mark the limit of highway adoption within the proposed scheme. With regard to parking, as set out in paragraphs 59 and 60 above, the proposed level of provision accords with the Council’s standards. In addition, cycle parking in accordance with Council standards is proposed within the back gardens of each house and within dedicated stores at ground floor level for each of the apartment blocks. It should be noted however that there is also a requirement that electric vehicle (EV) charging points be provided in new development at the ratio of one trickle charging point per dwelling and one trickle charging point per every 5 spaces for flats be provided. This will be secured by way of a suitably worded planning condition. Matters raised in Representations 77 The concerns raised as summarised above are either covered in the above report or relate to matters of principle which have been dealt with during the determination of the outline application. Conclusion 77 This proposal is considered to create a residential development with an appropriate layout, scale, appearance and landscaping that is not considered to have a materially adverse impact on the amenity of neighbouring properties or the character of the surrounding area. It creates a satisfactory environment for future residents. The application has been considered against Core Strategy 2011 policies CS5, CS17, CS19, CS21, CS25, CS27 and Development Management Plan 2015 policies DM1, DM2, DM6, DM7, the Council’s Design & Character SPD and the National Planning Policy Framework. Case Officer Checklist Neighbour Notifications Consultations Drawings Site Visit Notes ECS – 25/08/15 12/01/16 ECS – 25/08/15 12/01/16 ECS – 24/02/16 ECS – 24/02/16 & & Recommendation: Approve Reserved Matters & Conditions Conditions/Reasons 1 OUTLINE (DURATION) The development hereby permitted shall be begun before the expiration of two years from the date of approval of the last of the Reserved Matters to be approved. Reason: To comply with Section 51 of Part 4 of the Planning and Compulsory Purchase Act 2004. 2 LIST OF APPROVED PLANS The development hereby permitted shall be carried out in strict accordance with the list of approved plans as set out in the Drawing Registers (Broadway Malyan Rydens School Hersham (Job No. 30739) and MJA Consulting Drawing Register (Job No. 5114)) received on 25 February 2016. Reason: To ensure that the development is carried out in a satisfactory manner. 3 GARAGES - NO CONVERSION That part of the buildings indicated for use as a garage shall be kept permanently for that purpose, and shall not be converted to living accommodation or other use. Reason: To comply with the Borough Council's approved standards for the parking and garaging of vehicles in accordance with Policy DM7 of the Elmbridge Development Management Plan 2015. 4 PD LIMITATION Notwithstanding the provisions of the Town & Country Planning General Permitted Development Order 2015 (or any Order revoking or re-enacting that Order) no development falling within Part 1 Classes D and E of Schedule 2 to the said Order shall be carried out within the curtilage of any dwellinghouse, unless planning permission is first granted by the Borough Council. Reason: To safeguard the character and amenities of the premises and adjoining properties and to comply with Policy DM2 of the Elmbridge Development Management Plan 2015. 5 MATERIALS SAMPLES NO DEVELOPMENT SHALL TAKE PLACE UNTIL SAMPLES OF THE MATERIALS TO BE USED ON THE EXTERNAL FACES AND ROOF OF THE BUILDINGS HAVE BEEN SUBMITTED TO AND APPROVED IN WRITING BY THE BOROUGH COUNCIL. DEVELOPMENT SHALL BE CARRIED OUT IN ACCORDANCE WITH THE APPROVED DETAILS. Reason: To ensure that a satisfactory external appearance is achieved of the development in accordance with Policy DM2 of the Elmbridge Development Management Plan 2015. It is considered necessary for this to be a pre-commencement condition because the use of satisfactory external materials goes to the heart of the planning permission. 6 SURFACE MATERIALS DETAILS OF THE SURFACE MATERIALS FOR THE ROADS, CAR PARKING AREAS DRIVEWAYS SHALL BE SUBMITTED TO, AND APPROVED IN WRITING, BY BOROUGH COUNCIL PRIOR TO THE COMMENCEMENT OF DEVELOPMENT. APPROVED MATERIALS SHALL BE USED IN THE CONSTRUCTION OF DEVELOPMENT HEREBY PERMITTED. AND THE ALL THE Reason: To safeguard the visual amenities of the locality in accordance with Policies DM2 and DM7 of the Elmbridge Development Management Plan 2015. 7 ADDITIONAL WINDOWS The development hereby permitted shall have no windows or other openings (other than those shown on the approved plans) inserted into any elevation unless planning permission has first been granted by the Borough Council. Reason: To preserve the reasonable privacy of neighbouring residents in accordance with Policy DM2 of the Elmbridge Development Management Plan 2015 and the Elmbridge Design and Character SPD 2012. 8 LANDSCAPING - TREE PLANTING AND AFTERCARE NO WORKS OR DEVELOPMENT SHALL TAKE PLACE UNTIL FULL DETAILS OF ALL PROPOSED TREE PLANTING, THE PROPOSED TIMES OF PLANTING, AND ARRANGEMENTS FOR AFTERCARE OVER A PERIOD OF 5 YEARS HAVE BEEN APPROVED IN WRITING BY THE BOROUGH COUNCIL. ALL TREE PLANTING AND AFTERCARE SHALL BE CARRIED OUT IN ACCORDANCE WITH THOSE DETAILS AND AT THOSE TIMES. IF WITHIN A PERIOD OF FIVE YEARS FROM THE DATE OF THE PLANTING OF ANY TREE, THAT TREE, OR ANY PLANTED IN REPLACEMENT FOR IT, IS REMOVED, UPROOTED OR DESTROYED OR DIES, ANOTHER TREE OF THE SAME SPECIES AND SIZE AS THAT ORIGINALLY PLANTED SHALL BE PLANTED IN THE SAME PLACE, UNLESS THE BOROUGH COUNCIL GIVES ITS WRITTEN CONSENT TO ANY VARIATION. Reason: To preserve and enhance the visual amenities of the locality in accordance with Policy DM6 of the Elmbridge Development Management Plan 2015. 9 LANDSCAPING - IMPLEMENTATION ALL HARD AND SOFT LANDSCAPING WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH THE APPROVED DETAILS. ARBORICULTURAL WORK TO EXISTING TREES SHALL BE CARRIED OUT PRIOR TO THE COMMENCEMENT OF ANY OTHER DEVELOPMENT, OTHERWISE ALL REMAINING LANDSCAPING WORK AND NEW PLANTING SHALL BE CARRIED OUT PRIOR TO THE OCCUPATION OF ANY PART OF THE DEVELOPMENT OR IN ACCORDANCE TO THE TIMETABLE AGREED WITH THE BOROUGH COUNCIL. ANY TREES OR PLANTS, WHICH WITHIN A PERIOD OF FIVE YEARS OF THE COMMENCEMENT OF ANY WORKS IN PURSUANCE OF THE DEVELOPMENT DIE, ARE REMOVED, OR BECOME SERIOUSLY DAMAGED OR DISEASED, SHALL BE REPLACED AS SOON AS PRACTICABLE WITH OTHERS OF SIMILAR SIZE AND SPECIES, FOLLOWING CONSULTATION WITH THE BOROUGH COUNCIL, UNLESS THE BOROUGH COUNCIL GIVES WRITTEN CONSENT TO ANY VARIATION. Reason: To preserve and enhance the visual amenities of the locality in accordance with Policy DM6 of the Elmbridge Development Management Plan 2015. 10 ARCHAEOLOGY - SCHEME OF WORKING (LARGE SURFACE AREA) A WRITTEN SCHEME OF ARCHAEOLOGICAL INVESTIGATION FOR THIS LARGE SITE SHALL BE SUBMITTED TO AND AGREED IN WRITING WITH THE BOROUGH COUNCIL BEFORE THE COMMENCEMENT OF THE DEVELOPMENT HEREBY APPROVED. NO DEVELOPMENT SHALL TAKE PLACE UNTIL THE APPLICANT HAS SECURED THE IMPLEMENTATION OF A PROGRAMME OF ARCHAEOLOGICAL WORK AND RECORDING IN ACCORDANCE WITH THE FINDINGS OF THAT INVESTIGATION. Reason: The development proposed covers a large surface area and it is therefore considered likely that it will affect currently unknown archaeological information. It is important that the site is surveyed and work is carried out as necessary in order to preserve as a record any such information before it is destroyed by the development, in accordance with Policy DM12 of the Elmbridge Development Management Plan 2015. 11 PERMISSION TO DISCHARGE Prior to commencement of development, evidence of permission to connect into the surface water sewer/main river and agreement of the discharge rate must be submitted to and approved by the local planning authority. Reason: To ensure that the proposed discharge method is agreed by the appropriate authority in accordance with Elmbridge Core Strategy Policy CS26 12 CONSTRUCTION PHASING BEFORE THE COMMENCEMENT OF THE CONSTRUCTION OF THE DEVELOPMENT HEREBY APPROVED, DETAILS OF HOW THE SITE RUNOFF WILL BE DEALT WITH AND HOW THE SUSTAINABLE DRAINAGE SYSTEM WILL BE PROTECTED AND MAINTAINED DURING THE CONSTRUCTION OF THE DEVELOPMENT SHALL BE SUBMITTED TO AND APPROVED BY THE LOCAL PLANNING AUTHORITY. Reason: To ensure the drainage system is maintained throughout its life time to an acceptable standard in accordance with Elmbridge Core Strategy Policy CS26 13 SUDS MANAGEMENT AND MAINTENANCE PRIOR TO CONSTRUCTION OF THE DEVELOPMENT HEREBY APPROVED, DETAILS OF THE PROPOSED MAINTENANCE REGIMES FOR EACH OF THE SUDS ELEMENTS MUST BE SUBMITTED TO AND APPROVED BY THE LOCAL PLANNING AUTHORITY. DEVELOPMENT SHALL THEN BE CARRIED OUT IN ACCORDANCE WITH THE APPROVED DETAILS. Reason: To ensure the Sustainable Drainage System has been constructed as agreed in accordance with Elmbridge Core Strategy Policy CS26 14 VERIFICATION Prior to the occupation of the development hereby permitted, a verification report carried out by a qualified drainage engineer must be submitted to and approved by the Local Planning Authority to demonstrate that the Sustainable Drainage System has been constructed as per the agreed scheme. Reason: To ensure the Sustainable Drainage System has been constructed as agreed in accordance with Elmbridge Core Strategy Policy CS26 15 a) (i) (ii) (iii) CONTAMINATED LAND - Potential Land Contamination To ensure the potential for contamination has been investigated and the necessary action taken to make the development site suitable for its proposed use, the following steps must be completed to the satisfaction of the Council. Site Investigation, Method Statement and Remediation A written site specific investigation plan using the information obtained from the 'GeoEnvironmental Desk Study and Preliminary Risk Assessment' (ARUP, 05/12/2013) must be prepared and submitted to the Council for written approval. It must provide details of the investigation for soil, gas and controlled waters where appropriate. The site investigation shall be undertaken in accordance with the scheme agreed by the Borough Council. The results of the site investigation, a refined conceptual model and a risk assessment of any contamination found shall be submitted in writing to, and approved by, the Council. A written Method Statement detailing any remediation requirements shall be submitted to, and approved by, the Council. b) Development in accordance with the Method Statement The development of the site shall be carried out in accordance with the approved Method Statement, and any addenda submitted by the developer, and agreed in writing by the Borough Council. Any post remediation monitoring identified in the Method statement, shall be installed by the developer within the timescales identified in the Method Statement and maintained and operated for as long as identified by the Method Statement. c) Unsuspected Contamination If, during development, contamination not previously identified, is found to be present at the site then no further development shall be carried out until the developer has submitted, and had approved by the Council, a written addendum to the Method Statement detailing how the unsuspected contamination shall be dealt with. d) Imported material Clean, uncontaminated rock, soil, brick rubble, crushed concrete or ceramic only shall be permitted as infill material. The developer shall not import any material until a sampling program has been submitted in writing, and approved by, the Council. e) Completion of Remediation Upon completion of the remediation detailed in the Method Statement, and before occupation of any part of the site by any end user, a written report shall be submitted to, and agreed by, the Council that provides verification that the required works regarding decontamination and installation of post remediation monitoring, have been carried out in accordance with the agreed Method Statement and any addenda thereto. The verification report shall be signed by an appropriate person, stating that remediation was carried out in accordance with the approved remediation scheme and that the site is suitable for the permitted end use. Reason: To avoid adverse effects from pollution on health, the natural environment or general amenity, in accordance with the National Planning Policy Framework. 16 DETAILS OF ELECTRICAL VEHICLE CHARGING POINTS PRIOR TO THE COMMENCEMENT OF THE DEVELOPMENT HEREBY APPROVED, A SCHEME PROVIDING DETAILS OF THE PROVISION ELECTRICAL VEHICLE (EV) CHARGING POINTS IN ACCORDANCE WITH THE GUIDANCE PROVIDED IN APPENDIX 1, ELMBRIDGE PARKING STANDARDS IS TO BE SUBMITTED FOR APPROVAL BY THE LOCAL PLANNING AUTHORITY. THE SCHEME AS APPROVED IS TO BE IMPLEMENTED IN ACCORDANCE WITH THE APPROVED DETAILS. Reason: To ensure that adequate and satisfactory provision is made for Electric Vehicle (EV) charging points in accordance with Policy DM7 of the Elmbridge Development Management Plan 2015. Informatives 1 SECTION 38 AGREEMENT The Highway Authority has no objection to the proposed development, subject to the conditions placed on the original application (2015/5035) If it is the applicant's intention to offer any of the roadworks included in the application for adoption as maintainable highways, permission under the Town and Country Planning Act should not be construed as approval to the highway engineering details necessary for inclusion in an Agreement under Section 38 of the Highways Act 1980. Further details about the post-planning adoption of roads may be obtained from the Transportation Development Planning Division of Surrey County Council. The potential limit of any adoption would be restricted to those areas indicated on MJA Consulting Drawing Number 5114:500 Rev B (dated 23.02.16). 2 ENVIRONMENTAL HEALTH CONSULTATION Before carrying out any site investigation or remediation of a site the developer is strongly recommended to contact the Environmental Health Division for guidance on the requirements for such investigations or remediation. Investigations, in particular, which do not adequately fulfil these recommendations, may result in additional work having to be carried out. 3 ASBESTOS Please be aware that buildings constructed before 2000 may contain asbestos and we would recommend a suitable asbestos survey is undertaken before any redevelopment commences. Advice is available in The Health and Safety Executive's Asbestos Survey Guide HSG264. 4 NETWORK RAIL REQUIREMENTS The applicant's attention is drawn to the requirements of Network Rail as set out in their consultation response dated 27 January 2016. Bewley Homes Layout Original Layout by Bewley Homes Proposed Amendments to Layout 3 Residential Development at Rydens School for Bewley Homes Hersham, Walton on Thames Design & Access Statement: Revision D – 18.12.2015 Use and Amount The schedule of accommodation shows the composition of the The affordable housing mix follows the percentages agreed 296 dwellings proposed, achieving 43% of affordable housing within the S106, set out below. with 128 of the 296 units being affordable. Affordable (Rented) Dwellings Parking Provision Parking Spaces 1 bed flat 26 1 space 27 (1 extra visitor space provided) 2 bed flat 31 1 space + 0.5 visitor space 49 (46.5 rounded to 47 + 2 extra visitor spaces) 2 bed house 2 1 space + 0.5 visitor space 3 3 bed house 24 2 spaces 48 4 bed house 7 2 spaces 14 Total 90 Affordable (Shared Ownership) Dwellings Parking provision Parking spaces 1 bed flat 20 1 space 20 2 bed flat 18 1 space + 0.5 visitor space 27 Total 38 – 47 Private Dwellings 1 bed flat – 141 Affordable Shared rented Ownership Minimum gross internal area (sqm) 1 bed flat 17% 16% 50 2 bed flat 24% 14% 70 (for affordable rent and 61 (for shared ownership/0) 2 bed house 5% _ 83 (two storey house) 3 bed house 19% _ 87 (4 bed spaces) and 96 (5 bed spaces) – for two storeys 4 bed house 5% _ 100 (5 bed spaces) & 107 (6 bed spaces) – for two storeys 106 (5 bed spaces) and 113 (6 bed spaces) – for three storeys The proposed density is 56.4 dwellings per hectare. The diagram below shows the locations of the types of units proposed. Parking provision Parking spaces 13 1 space 13 2 bed flat 53 1 space + 0.5 visitor space 79.5 (rounded to 80) 2 bed house 4 1 space + 0.5 visitor space 6 3 bed house 43 2 spaces 86 4 BED HOUSES 4 bed house 55 2 spaces 110 1+2 BED FLATS Total 168 – 295 AFFORDABLE: RENTED SITE TOTALS 296 – 530 2 BED HOUSES 3 BED HOUSES AFFORDABLE: SHARED OWNERSHIP AFFORDABLE: SHARED OWNERSHIP TO GROUND FLOOR Dwelling distribution plan © Broadway Malyan 15 NOTE: This drawing is the copyright of UBU Design LLP, all rights reserved. Do not scale from this drawing, except for planning purposes only. All dimensions/levels to be checked. UBU Design LLP accept no liability for any expense loss or damage of whatsoever nature and however arising from any variation made to this drawing or in the execution of the work to which it relates which has not been referred to them and their prior approval obtained. B3 / p139 B3 141 p141 p B3 p139 B3 p140 B3 / p142 B3 145 p142 p B3 p145 B3 p143 B3 p144 LEGEND Rotary washing line B3 p148 B3 / p146 B3 149 p149 p B3 p146 6x4ft timber garden shed B3 p151 B3 p150 B3 p147 B3 p1 52 Proposed pedestrian macadam surface Ref dwg 1197-DE-200-1 B2 p165 B2 p162 B2 p167 B3 p153 Proposed vehicular macadam surface Ref dwg 1197-DE-200-2 B2 p164 38 B2 p163 B2 / p161 B2 164 p161 p B2 p166 p1 Tarmac Ulticolour colour Light Grey Supplied by Lafargetarmac Ref dwg 1197-DE-200-3 36 p1 p1 35 p1 35 p1 34 p1 34 p1 33 B p1 2 58 Block paving Tegula Bracken Ref dwg 1197-DE-200-4 p1 32 B p1 2 81 p1 32 B p1 1 80 B1 p178 A2 p196 B1 p175 / p178 A2 p197 B1 p175 B p1 2 59 LAP 100mm upstand saxon kerb Ref dwg 1197-DE-200-8 p1 33 A2 p197 / B1 B1 p168 p168 B p1 2 57 B1 p169 Plot 198 - 212 B2 p155 B1 p173 B p1 2 p1 57/ 60 B1 p170 B1 p172 Tarmac Ulticolour colour Dark Grey Supplied by Lafargetarmac Ref dwg 1197-DE-200-3 B2 p154 B2 / p154 B2 156 p156 p B p1 2 60 B1 p170 / P171 B1 p171 Plot 182 - 197 p1 3 0 p1 30 p1 31 B p1 1 77 B p1 1 79 Block paving Tegula Slate Grey Ref dwg 1197-DE-200-5 Patio 450x450mm buff slabs Ref dwg 1197-DE-200-6 Patio 450x450mm natural slabs Ref dwg 1197-DE-200-7 p111 p111 1.8m brick wall to Architects specification p112 p112 p110 p108 p1 25 1.8m timber close board fence Ref dwg 1197-DE-200-9 p109 p1 p107 D p235 C 24 p2 C p2 17 C p2 14 C p2 15 Plot 228 - 239 E p246 Plot 95 C p2 1 p2 7/ 18 C p2 18 C 19 p2 C p2 16 E p244 / p246 Plot 94 E p257 E p251 E p245 Plot 93 Plot 101 E p244 Plot 92 Plot 102 Plot 127 C p213 / p215 P C 213 Plot 103 Plot 126 C p2 20 D p228 E / p257 p258 Plot 104 E p258 E p250 E p255 E / p255 E 259 p259 p E 0/ p25 2 p25 Plot 105 E p254 E / p253 E 254 p253 p E p252 D p230 / p228 Plot 106 D p232 D p229 Plot 108 Plot 107 Timber car port to Architect specification Plot 125 C p2 1 p2 9/ 21 C p2 21 D / p234 D 236 p236 p Plot 109 p101 D p234 D p231 D p233 Plot 110 p103 p102 D / p231 p233 p105 p104 27 Plot 124 D p230 p106 p94 p93 Plot 91 p90 p92 Plot 213 - 227 p94 p92 p93 p95 p91 p91 E p247 / p248 Plot 90 p95 E p247 D p237 Plot 240 - 259 p89 Plot 89 D p237 / p239 D p239 p99 9 spaces p98 p99 p96 p98 Plot 88 p88 p96 Plot 98 p100 p100 Plot 99 Plot 100 50-60cm girth Plot 97 Plot 96 50-60cm girth F p274 p87 Plot 87 F p272 / p274 50-60cm girth 0 Plot 260 - 278 5 10 15 20 25m F p273 p27 F p267 F p271 F p264 / p267 F p278 F p264 8 spaces 6 spaces F p269 F p260 / p269 F p260 p86 F p270 / p271 F p270 F p276 / p277 F p277 p85 Plot 76 G p286 Plot 77 Plot 85 G p287 Plot 78 J p295 Plot 79 J p296 Plot 80 G p279 J p288 Plot 81 G p285 Plot 86 p27 F p272 SCALE F p276 F p275 p80 F p275 / p81 F p268 Plot 84 p84 G p284 p79 J p288 J p289 p51 p52 p52 p53 p53 p83 p62 J p291 J p290 p50 p50 Plot 82 p51 G p282 G p281 p63 G p280 p76 G p279 p77 Plot 83 Plot 279 - 287 G p283 p78 J p292 Plot 63 Plot 75 p82 Plot 61 p75 p60 J p294 Plot 49 15 20 25m p74 Plot 53 p73 Plot 60 p72 Plot 54 Plot 46-48 p54 Plot 68 p44 p55 Plot 57 p42 p6 4 Plot 66 Plot 44 p43 p57 p43 p57 p56 p6 5 Plot 67 Plot 45 p44 p6 6 Plot 69 p56 p70 Plot 56 p45 p73 p55 p45 p75 p69 p74 p54 Plot 55 7 p71 Plot 58 p6 8 p71 p82 p72 Plot 59 p6 Plot 43 p42 p3 0 Plot 64 Plot 29 Plot 28 Plot 21 Plot 25 p1 Plot 38 p2 6 p2 0 p37 p1 9 p27 p1 9 Plot 39 p37 p27 Plot 26 p1 8 p38 p28 Plot 22 p1 p1 7/ 8 Plot 40 p38 p28 Plot 27 p39 p29 Plot 20 p39 p29 Plot 19 p36 p2 0 p2 p2 5 Plot 24 p2 2 p2 p3 p3 Plot 36 p4 p2 4 p2 p3 5 5 Plot 23 Plot 37 p3 5 p2 p2 1/ 2 p36 p2 6 p2 1 Plot 1 Plot 41 p40 Plot 18 p2 4 4 p3 Plot 2 p2 p3 3 3 p3 4 Plot 3 Plot 35 3 Plot 4 p2 Plot 5 p3 3 p3 2 Plot 34 p3 2 Plot 7 Plot 8 p5 Plot 33 Plot 32 Plot 31 p6 Plot 9 p7 p8 Plot 10 D C B A 05/01/16 16/11/15 12/11/15 28/04/15 REV DATE General update General update Change in status to planning Pergolas added to parking bays p1 6 p1 3 p1 4 p1 5 p1 5 Plot 12 p9 p1 0 DRN CHK Plot 13 p1 1 Plot 14 Plot 15 p1 2 MJ MJ MJ MJ UBU Design LTD Alligator Business Centre 20 Moorside Road Winchester, Hants, SO23 7RX +44 (0) 1962 856 008 [email protected] www.ubu-design.co.uk p3 1 Plot 11 RG RG RG RG COMMENTS p3 1 p1 6 p4 Plot 6 p1 3 p1 7 Plot 42 p41 Plot 30 Plot 65 Plot 17 p1 p70 10 p58 Plot 70 5 p59 Plot 71 0 SCALE p58 Plot 72 Plot 52 p1 4 Plot 73 p 49 p48 p47 p59 p48 p46 Plot 51 p49 p46 Plot 62 Plot 74 p47 p61 p60 J p293 Plot 50 LEAP 20-25cm girth PROJECT: RYDENS RESIDENTIAL Plot 16 TITLE: GENERAL ARRANGEMENT PLAN CLIENT: BROADWAY MALYAN DATE: SCALE: 17/04/2015 1:500@A0 0 5 10 20 30 40 50m JOB NO: DWG NO: 1197_GA_100 1197 SCALE STATUS: PLANNING REV: D APP Elevation 3 8 Elevation 4 9 9 W.I.P. 8 3 7 7 4 Client 4 Bewley Homes 6 Project Development of Rydens School 5 6 Description 2 Streetscene elevations 1 of 4 5 1 Status Preliminary for comment 2 3 1 Scale DrawnDate Not to scale CJ May15 Job number Drawing number Date revision 30739 A-05-SS-101 – Original size 100mm @ A1 Copyright Broadway Malyan Limited Elevation 3 (continued) 8 Elevation 4 (continued) 9 9 W.I.P. 8 3 7 7 4 Client 4 Bewley Homes 6 Project Development of Rydens School 5 6 Description 2 Streetscene elevations 2 of 4 5 1 Status Preliminary for comment 2 3 1 Scale DrawnDate Not to scale CJ May15 Job number Drawing number Date revision 30739 A-05-SS-102 – Original size 100mm @ A1 Copyright Broadway Malyan Limited Elevation 7 – Felcott Road 8 Elevation 1 – Hersham Road 9 9 W.I.P. 8 3 7 7 4 Client 4 Bewley Homes 6 Project Development of Rydens School 5 6 Description 2 Streetscene elevations 3 of 4 5 1 Status Preliminary for comment 2 3 1 Scale DrawnDate Not to scale CJ May15 Job number Drawing number Date revision 30739 A-05-SS-103 – Original size 100mm @ A1 Copyright Broadway Malyan Limited Elevation 7 – Felcott Road (continued) Elevation 8 – Plots 128-138 8 Elevation 6 – Plots 76-82 Elevation 9 – Block A1-A2 9 9 W.I.P. 7 8 3 Elevation 5 – Plots 64-75 7 4 Client 4 Bewley Homes 6 Project Development of Rydens School 5 6 Description 2 Streetscene elevations 4 of 4 5 1 Status Preliminary for comment 2 Elevation 2 – Plots 17-23 and Plot 31 3 1 Scale DrawnDate Not to scale CJ May15 Job number Drawing number Date revision 30739 A-05-SS-104 – Original size 100mm @ A1 Copyright Broadway Malyan Limited