AC15_Session24_FMcNeill
Transcription
AC15_Session24_FMcNeill
Big Pipe… Deep ExcavaUon… Downtown LocaUon… Equals ExciUng Project… NEWEA 2015 Annual Conference & Exhibit Tuesday, January 27th Session 24 Frederick J. McNeill, P.E. City of Manchester, NH Richard V. Davis III, P.E. Jared T. O’Donnell, P.E. CDM Smith Manchester, NH Big Pipe – 60 inch ID, 72 inch OD Deep ExcavaUon – 26 feet Downtown LocaUon Verizon Wireless Arena Equals ExciUng Project PresentaUon Agenda • • • • • Background Manchester’s CSO Program Contract No. 1 -‐ Chestnut Street Project What’s Next? QuesUons City of Manchester, NH • Largest City North of Boston -‐ 109,000 populaUon • Sealed in 1725 • Evolved from Agricultural to Industrial: 1725 -‐ 1815 • Amoskeag Mills: Largest single mill in the world 1915 • Post Industrial Depression: 1930 – 1980’s • RevitalizaUon: 1990 to Present • RevitalizaUon = “ManchVegas” WWTP – Facts and Figures • • • • • • • 1975 – 26 mgd 1994 – Upgrade to 34 mgd 2015 – Upgrade to 42 mgd Serves four communiUes Metro pop. 172,000 2014 – 24 mgd avg. “Combined” system Sewer System Facts and Figures • • • • • • 385 Miles of sewer 11,000 SMH 10 pump staUons Over 100 miles is over 100 years old 55% combined system 5 perennial streams contribute up to 5 mgd of dry weather flow Stormwater System Facts and Figures • 180 miles of drains – 14,000 CBs – 3,000 DMHs • Not designed for today’s populaUon • Not designed for today’s impervious area • Not designed for today’s wet weather events impacted by climate change Manchester’s CSO History • • • • EPA issued naUonal CSO Policy in 1994 NegoUaUons w/ EPA mid/late 1990s Manchester’s CSO Compliance Order issued 1999 Two phase approach – Phase I: West Side – Phase II: East Side Phase I: 1999 – 2009 West Side of City • Scope of Work – 10-‐year $58 million program – Fully separated 15 basins – 8 construcUon contracts – Over 53 miles of new or rehabilitated piping up to 60” diameter AddiUonal Benefits and Upgrades • Road reconstrucUon (26 miles) • Other uUlity construcUon – Water (9 miles) – Gas (14 miles) • Surface reconstrucUon – Curbing (8 miles) – Sidewalks (6 miles) – Pedestrian Ramps (290) Phase I CSO Abatement Program– Surpasses all Goals! • Average annual CSO discharges decreases by 99% from 53.2 mgd to 0.2 mgd • Goal was three-‐month level of CSO control, program achieved two-‐ year level of CSO control • Merrimack River water quality increases • Manchester’s west side received full infrastructure upgrade; sewer, drain, water, gas, road, sidewalks, and curb • Ten year program was completed on schedule and on budget Lessons learned from Phase I -‐ Biggest bang for $$$ • Do all infrastructure work at once – How do our residents benefit? • Address sewer backups • Address street flooding – What do our residents want? • Roads, sidewalks, and curbing Manchester’s Future CSO Work • Phase II -‐ $165 million over 20 years – – – – – $20 million in WWTP improvements $3 million in system opUmizaUon $65 million for removal of Cemetery Brook $73 million in sewer separaUon $4 million in program assessment/ reporUng • Phase III -‐ $177 million over next 20 years Phase II CSO Abatement Program Contract No. 1 Chestnut Street Sewer SeparaUon Project • Design – 2012 – – – – – – – – – RouUng AlternaUves Modeling Cemetery Brook Conduit Cemetery Brook Conduit ConnecUon Road ReconstrucUon, new curb/sidewalk Special Structures Bike lanes (1st in Manchester) CoordinaUon with Stakeholders AddiUonal ConstrucUon Challenges • ConstrucUon – 2013 – 4400 LF of new drain (15” – 60”) – 1640 LF of new sewer (6” – 12”) – 2670 LF of new water main (6” – 20”) • Final Paving – 2014 • Total Project Costs -‐ $6.60 million RouUng AlternaUves Hydraulic Modeling • Used SWMM model from Phase II LTCP • Northeast Regional Climate Center (NRCC) 25-‐year storm – Factors more recent events to incorporate climate change • Comparable to 50-‐year Manchester Long Term Record Cemetery Brook Conduit • ExisUng 10-‐s x 8-‐s concrete box culvert – Built in 1926 – 18-‐s below exisUng grade ConnecUon to Cemetery Brook Conduit • New 8-‐s diameter connecUon structure on top of box culvert • Saw cut 7-‐s diameter hole in culvert roof Special Structures • Crossed over 60” brick combined sewer – New 54” DI set on concrete pillars • New Sewer passing through New DMH (exisUng uUlity congesUon) – 16” DI sleeve with 12” PVC sewer Road ReconstrucUon, new curb/sidewalk • Road reconstrucUon (12” reclaim) and final grade adjustments • Curb reveal adjustments • ADA compliant sidewalk/corners Bike Lanes • 1st bike lanes in Manchester • Groundwork for bike lane extension in future project • Coordinated with local bike support groups CoordinaUon with Stakeholders • • • • Verizon Wireless Arena Federal Building Hillsborough County Courthouse Manchester Central Fire StaUon 60-‐inch RC Pipe • 60-‐inch ID, 72-‐inch OD • 8-‐s long secUons 60-‐inch RC Pipe Moved into Place • CAT 375 Excavator InstallaUon 26 feet deep • Double stacked 10’W X 20’L trench boxes with steel plaUng Pipe Rammed Home • Come-‐Along Method • Pipe Puller Manhole SecUons • Precast 8-‐s diameter manhole riser secUon • Precast 60-‐inch RCP tee secUon being lowered Next up -‐ North Chestnut Street Sewer SeparaUon Project QuesUons?