SISD Bond Slideshow
Transcription
SISD Bond Slideshow
Slaton ISD Proposed Bond 2015 Respect. Responsiveness. Ownership • Improvements at all PreK-12 schools • Facility program focus: • upgrades to learning environments • infrastructure restoral • technology needs • safety and security • additional learning spaces Our Respect. Kids! ORur esponsiveness. Community! OOur wnership Future! Why Now? • Reactive maintenance is no longer adequate for quality operations and budget. • Legal requirement for vocational and career tech opportunities for our students. • HVAC (158) units are on average 17.5 years old. • Plumbing issues require ongoing maintenance. Respect. Responsiveness. Ownership Aging Facili1es: 60 – 87 yrs. old School Building Year Built Age of Bldg. Stephen F. Aus?n 1955 60 Cathelene Thomas 1928 87 Slaton Junior High 1938 77 Slaton High School 1955 60 Our Respect. Kids! ORur esponsiveness. Community! OOur wnership Future! Addressing Aging Facili1es Respect. Responsiveness. Ownership Addressing Aging Facili1es Respect. Responsiveness. Ownership Addressing Aging Facili1es Respect. Responsiveness. Ownership Addressing Aging Facili1es Respect. Responsiveness. Ownership Addressing Aging Facili1es Respect. Responsiveness. Ownership Roo>ops Respect. Responsiveness. Ownership Roo>ops Respect. Responsiveness. Ownership Proposed Facility Needs Slaton High School Vocational Career and Technology Center • Renovation of existing vocational shop. • Coordination of House Bill 5- College and Career Readiness. High School Condition and Training Facilities • Expansion of current weight room in response to increased enrollment in Athle1cs. Respect. Responsiveness. Ownership Bond Project Break Down Slaton High School High School Parking Lot Replacement Completion of ITV Lab for Dual Credit and Adult Learning Respect. Responsiveness. Ownership Bond Project Break Down Slaton High School Implementation of Adult Learning/GED Classes for community • Pursuit of community college satellite designation Implementation of ESL/Spanish Classes for community Respect. Responsiveness. Ownership Slaton Junior High School Existing Face Lift Renovations • Energy efficient ligh1ng and electrical. • Water efficient bathrooms and plumbing. • Replacement of flooring, lockers, ceilings, and new paint. New Multi Purpose Building • Available for Fine Arts, Physical Educa1on, and Community Use. • Community Storm Shelter. (F-‐5 Rated) • Community Wellness Center Respect. Responsiveness. Ownership Multi-purpose facility Respect. Responsiveness. Ownership Multi-purpose facility Respect. Responsiveness. Ownership Multi-purpose facility Respect. Responsiveness. Ownership Cathelene Thomas Elementary Existing Face Lift Renovations • Energy efficient lighting and electrical. • Water efficient bathrooms and plumbing. • Replacement of flooring, lockers, ceilings, and new paint. New Multi Purpose Building • Available for Fine Arts, Physical Education, and Community Use. (F-5 Rated) Respect. Responsiveness. Ownership Existing PE room at CTE Respect. Responsiveness. Ownership Proposed Multi-purpose facility Respect. Responsiveness. Ownership Cathelene Thomas Elementary Kitchen Equipment Replacement • Replace aging and inefficient kitchen equipment. Enlarge Cafeteria. Parking Lot Repairs • Repair parking lot. Add lighting to the parking lot. Respect. Responsiveness. Ownership Cathelene Thomas Elementary Cafeteria Expansion • Increase the size of cafeteria to accommodate current students. Respect. Responsiveness. Ownership Stephen F. Austin Early Learning Center Corrections to major structural issues • Extensive Electrical, Mortar, & Foundation Repairs • Energy efficient lighting and electrical • Water efficient bathrooms and plumbing • Replacement of ceilings, and general repairs. Respect. Responsiveness. Ownership District Wide Projects Plumbing Replacement • Replace deteriorated plumbing on all campuses. HVAC and Boiler Replacement • Replace dated and inefficient HVAC and Boiler Systems on all campuses. Respect. Responsiveness. Ownership District Wide Projects Instructional Technology Plan • Replace technology infrastructure • Update Instructional Technology • Establish a cycle for technology replacement Safety and Security (Monitoring System) • Upgrade camera and lighting system • Visitor ID system Respect. Responsiveness. Ownership District Wide Projects Roof Repair • Replace exis1ng roofs with newest energy efficient materials. • Reduc1on of opera1ng costs. Parking Lot Improvements • Repair parking lots. • Install parking lot ligh1ng. Respect. Responsiveness. Ownership Questions? Respect. Responsiveness. Ownership