SISD Bond Slideshow

Transcription

SISD Bond Slideshow
Slaton ISD Proposed Bond 2015 Respect. Responsiveness. Ownership •  Improvements at all PreK-12 schools
•  Facility program focus:
•  upgrades to learning environments
•  infrastructure restoral
•  technology needs
•  safety and security
•  additional learning spaces
Our Respect. Kids! ORur esponsiveness. Community! OOur wnership Future! Why Now?
•  Reactive maintenance is no longer
adequate for quality operations and
budget.
•  Legal requirement for vocational and
career tech opportunities for our students.
•  HVAC (158) units are on average 17.5
years old.
•  Plumbing issues require ongoing
maintenance.
Respect. Responsiveness. Ownership Aging Facili1es: 60 – 87 yrs. old School Building Year Built Age of Bldg. Stephen F. Aus?n 1955 60 Cathelene Thomas 1928 87 Slaton Junior High 1938 77 Slaton High School 1955 60 Our Respect. Kids! ORur esponsiveness. Community! OOur wnership Future! Addressing Aging Facili1es Respect. Responsiveness. Ownership Addressing Aging Facili1es Respect. Responsiveness. Ownership Addressing Aging Facili1es Respect. Responsiveness. Ownership Addressing Aging Facili1es Respect. Responsiveness. Ownership Addressing Aging Facili1es
Respect. Responsiveness. Ownership Roo>ops
Respect. Responsiveness. Ownership Roo>ops
Respect. Responsiveness. Ownership Proposed Facility Needs Slaton High School
Vocational Career and Technology Center
•  Renovation of existing vocational shop.
•  Coordination of House Bill 5- College and Career Readiness.
High School Condition and Training Facilities
•  Expansion of current weight room in response to increased enrollment in Athle1cs. Respect. Responsiveness. Ownership Bond Project Break Down
Slaton High School
High School Parking Lot Replacement
Completion of ITV Lab for Dual Credit
and Adult Learning
Respect. Responsiveness. Ownership Bond Project Break Down
Slaton High School
Implementation of Adult Learning/GED
Classes for community
•  Pursuit of community college satellite designation
Implementation of ESL/Spanish
Classes for community
Respect. Responsiveness. Ownership Slaton Junior High School
Existing Face Lift Renovations
• Energy efficient ligh1ng and electrical. • Water efficient bathrooms and plumbing. • Replacement of flooring, lockers, ceilings, and new paint. New Multi Purpose Building
• Available for Fine Arts, Physical Educa1on, and Community Use. • Community Storm Shelter. (F-­‐5 Rated) • Community Wellness Center Respect. Responsiveness. Ownership Multi-purpose facility
Respect. Responsiveness. Ownership Multi-purpose facility
Respect. Responsiveness. Ownership Multi-purpose facility
Respect. Responsiveness. Ownership Cathelene Thomas Elementary
Existing Face Lift Renovations
•  Energy efficient lighting and electrical.
•  Water efficient bathrooms and plumbing.
•  Replacement of flooring, lockers, ceilings, and
new paint.
New Multi Purpose Building
•  Available for Fine Arts, Physical Education, and
Community Use. (F-5 Rated)
Respect. Responsiveness. Ownership Existing PE room at CTE
Respect. Responsiveness. Ownership Proposed Multi-purpose facility
Respect. Responsiveness. Ownership Cathelene Thomas Elementary
Kitchen Equipment Replacement
•  Replace aging and inefficient kitchen
equipment. Enlarge Cafeteria.
Parking Lot Repairs
•  Repair parking lot. Add lighting to the
parking lot. Respect. Responsiveness. Ownership Cathelene Thomas Elementary
Cafeteria Expansion • Increase the size of cafeteria to accommodate current students. Respect. Responsiveness. Ownership Stephen F. Austin Early Learning Center
Corrections to major structural issues
•  Extensive Electrical, Mortar, &
Foundation Repairs
•  Energy efficient lighting and electrical
•  Water efficient bathrooms and plumbing
•  Replacement of ceilings, and general
repairs.
Respect. Responsiveness. Ownership District Wide Projects
Plumbing Replacement
•  Replace deteriorated plumbing on all
campuses.
HVAC and Boiler Replacement
•  Replace dated and inefficient HVAC and
Boiler Systems on all campuses.
Respect. Responsiveness. Ownership District Wide Projects
Instructional Technology Plan
•  Replace technology infrastructure
•  Update Instructional Technology
•  Establish a cycle for technology replacement
Safety and Security (Monitoring System)
•  Upgrade camera and lighting system
•  Visitor ID system
Respect. Responsiveness. Ownership District Wide Projects
Roof Repair
•  Replace exis1ng roofs with newest energy efficient materials. •  Reduc1on of opera1ng costs. Parking Lot Improvements
•  Repair parking lots. •  Install parking lot ligh1ng. Respect. Responsiveness. Ownership Questions?
Respect. Responsiveness. Ownership