Sinnissippi Watershed Assessment

Transcription

Sinnissippi Watershed Assessment
Citywide Stormwater Management/Flood Control Assessment
City of Rockford
Sinnissippi Watershed
Sinnissippi Watershed Assessment
Introduction
Material presented in the following summary documents current stormwater management and
flooding issues for the Sinnissippi Watershed. Information presented is based on a review of
available information related to current conditions in the drainage basin. No comprehensive
analysis of stormwater management and flooding issues in the watershed has been performed in
the last 20 years.
Watershed Description
Description and Land Use
The Sinnissippi watershed is located in the
northern part of the City of Rockford on the east
side of the Rock River. The watershed drains
approximately 1,500 acres at its mouth. 100% of
the watershed is located within the City of
Rockford. The watershed is compact, with the
receiving stream being the Rock River to its
West.
Watershed Statistics: Sinnissippi
Total Area:
1,492 ac.
Total Area within City:
1,492 ac.
% of City within Watershed:
3.8%
Other Stakeholders:
None
No. of Detention Facilities
0
The Sinnissippi watershed is 100% developed.
No. of Outfalls
13
The Sinnissippi watershed contains the heavily
commercialized developments on the eastern side of the Rock River that characterize the
“downtown” area of Rockford. There are the large, Swedish American Hospital and UIC
Medical Center, many office buildings, and commercial storefronts in the western section of the
watershed. To the east, Sinnissippi development is dense single-family residential. There is also
a cemetery, the Sinnissippi Park Golf Course, a school, some small park and recreation facilities
and a railroad located in the watershed.
Topography and Soils
The topography of the Sinnissippi watershed that of a relatively flat and compact watershed on
the East bank of the Rock River. Ground elevations within the watershed range from about 800
feet NAVD near Green Meadow Road to about 700 feet NAVD near the ditch’s confluence with
the Rock River. The watershed slope is relatively flat and gradual.
SN-1
Citywide Stormwater Management/Flood Control Assessment
City of Rockford
Sinnissippi Watershed
Soils within the Sinnissippi watershed consist primarily of type B soils, with a thin strip of type
A soils at the River, and two large pockets of type D soils in the southwestern corner and center
of the watershed. Type B soils are soils with moderately low runoff potential when thoroughly
wet. Water can be transmitted through these soils without impediment. Type B soils typically
have less than 20 percent clay, and between 50 and 90 percent sand with a loamy sand or sandy
loam textures. These soils have moderately fine to moderately coarse textures. Type A soils have
a high infiltration rate even when very wet. They consist of well-drained sands and gravels, and
have less than 10% clay. The runoff potential is low, as water absorbs quickly into these soils.
Type D soils are characterized by properties that restrict water movement through the soil. Type
D soils typically have greater than 40 percent clay, less than 50 percent sand, and have clayey
textures. They have high runoff potential when thoroughly wet.4 The predominance of type B
soils in the Sinnissippi watershed should facilitate infiltration of rainfall in pervious areas,
thereby contributing to lower runoff volumes and rates than in basins with less pervious soil
types.
Primary Receiving Stream
The Rock River is the receiving stream for the Sinnissippi watershed. The watershed is flat and
the gentle slope to the River is the direction of runoff flow. There is a small drainage ditch in the
northern section, near UIC Medical Center.
Due to the lack of a receiving stream within the watershed itself, there are no impoundments or
gauging stations in Sinnissippi.
There is no readily available flow data for the Sinnissippi watershed as the watersheds
contribution to the Rock River can not be feasibly measured.
Given the character of the watershed, flooding within Sinnissippi is primarily caused by pooling
due to wet weather events. As shown in Figure SI-1, the floodplain along the Rock River is very
small, and along the Sinnissippi boundary, it does not enter any developed area.
Records maintained by the Federal Emergency Management Agency (FEMA), indicate that no
letters of map revision (LOMRs) have been issued for development projects in the Sinnissippi
watershed during the past 30 years.
Water Quality and NPDES Discharges
SCORE has one storm water collection site, R2, in the Sinnissippi watershed. Table Sn-1
provides metadata for this site. Figure Sn-3 shows the location.
4
Burke, Christopher and Thomas Burke. HERPICC Stormwater Drainage Manual. West Lafayette, Indiana: Purdue
Research Foundation, 1994.
SN-2
Citywide Stormwater Management/Flood Control Assessment
City of Rockford
Sinnissippi Watershed
Figure Sn-3
SAMPLING SITES
SINNISSIPPI WATERSHED, ROCKFORD, ILLINOIS
Table Sn-1
SAMPLING SITES
SINNISSIPPI WATERSHED, ROCKFORD, ILLINOIS
Station Location
R2
Station Type
Number of
Samples
(2003-2008)
16
Market Street and Storm water
North First
Parameters Measured
pH, Fecal Coliform, BOD,
COD, TSS, TDS, FOG,
Hardness, Ammonia-N, NitrateN, TKN, P, Cyanide, Cu, Cd,
Zn, Pb, phenol
For all water quality parameters; TSS, TDS, BOD, COD, ammonia nitrogen, nitrate nitrogen,
total kjeldahl nitrogen, total p, copper, zinc, lead, hardness, and coliform, R2 results show that
the concentrations are moderate when compared to the other storm water sampling sites.
Table Sn-2 provides the NPDES-permitted point sources in the watershed.
SN-3
Citywide Stormwater Management/Flood Control Assessment
City of Rockford
Sinnissippi Watershed
Table Sn-2
NPDES POINT SOURCES LOCATED WITHIN THE SINNISSIPPI WATERSHED
ROCKFORD, ILLINOIS
NPDES Permit #
IL0003697
IL0049107
IL0049344
IL0054640
IL0073059
IL0076864
Facility Name
Ingersoll Milling Machine Co.
N-D Industries, Inc.
Barnes John Corp.
Highlander Foods, Inc.
Rockford Register Star
Harkins Pool
Receiving Water
Rock River Via Storm Sewer
Not listed
Rock River
Rock River
Rock River
Not listed
Runoff from industrial sites is a potential pollutant source for receiving waters. Table Sn-3 lists
eight industrial sites in the Sinnissippi watershed.
Table Sn-3
INDUSTRIAL SITES LOCATED WITHIN THE SINNISSIPPI WATERSHED
ROCKFORD, ILLINOIS
Name
Street
Land Use
Code (LUC)
7991
YMCA
Y Blvd.
Rock Valley Culligan
Madison St.
3950
American
Lombardi Olive St.
Society
Cellusuede Products, Inc.
Madison St.
7992
DDCI
The Learning Center
State St.
1st St.
7334
7990
US Cellular
State St.
6512
Swedish American Realty Corp.
State St.
6513
2300
SN-4
LUC Description
Rcrtn. – Amsnt. Social- Rlgs.
w/S-Fac.
Miscellaneous Manufacturing
(Dry)
Clubs
&
Services
Organizations w/Food
Apparel & Other Fin. Fabric
Prods.
Printers
Rcrtn. – Amsnt. – Scl. & Flgs.
w/o S-Fac.
Office Bldg. – Shopping
Center
Medical Centers
Citywide Stormwater Management/Flood Control Assessment
City of Rockford
Sinnissippi Watershed
Existing Drainage Network
Drainage within the Sinnissippi watershed occurs through a mix of surface drainage paths and
gravity storm sewers. The northern part of the watershed, surface drainage is the primary mode
of stormwater conveyance, including the small drainage ditch noted above. The rest of the
Sinnissippi watershed is drained by networks of storm sewers as shown in Figure SN-2.
Figure SN-2 also shows the general location of identified detention basins and storm sewer
outfalls within the Sinnissippi watershed. The Sinnissippi watershed has no identified detention
facilities which is expected due to the age of the infrastructure in this watershed, along with the
density of development. The 13 identified storm sewer outfalls within the watershed are located
scattered in the center of the watershed, with the largest number concentrated along the bank of
the Rock River.
Available Data Resources
Previous Drainage Studies
“Drainage Report, UIC College of Medicine.” Arnold Lundgren & Associates, February 2005.
Historic Flow Data
No source of historic flow data has been identified for the Sinnissippi watershed.
Historic Water Quality Data
No source of historic water quality data has been identified for the Sinnissippi watershed.
(pending input from David Pott)
Other
Flood Insurance Study:
Winnebago County and Incorporated Areas, (FEMA, 2006)
Soil Characteristics:
“Soil Survey Geographic (SSURGO) database for Winnebago County, Illinois.”
Fort Worth: U.S. Department of Agriculture, Natural Resources Conservation Service, 2007.
URL:<http://SoilDataMart.nrcs.usda.gov/>
SN-5
Citywide Stormwater Management/Flood Control Assessment
City of Rockford
Sinnissippi Watershed
Drainage Issues
Table SN-1 (at the end of this section) provides a summary listing of current identified drainage
issues and projects within the Sinnissippi watershed. The general locations of these issues and
projects are shown on Figure SI-1.
The most significant stormwater management/flood control problem in the Sinnissippi
Watershed seems to be localized ponding due to inadequate drainage during wet weather events,
as well as flooding due to overtopping of clogged or undersized drainage channels. The City is
already addressing some flood complaints Parkwood Avenue by restoring the small drainage
channel as part of the Neighborhood Plan (#5). In other areas the City needs to look at ways of
addressing recurring flooding issues. This may require deepening ditches, scheduling more
regular channel maintenance, or installation of a larger, or parallel storm sewer conduit (#1) at
Chamberlain and Longwood, where the 96” sewer is backing up.
The City also receives ponding complaints from the Sinnissippi watershed in response to major
storm events and responds to the best of their ability. Further evaluation of site-specific
stormwater management/flood control improvement needs is required to provide a basis for
effective planning, budgeting, and prioritization of potential projects.
SN-6
Citywide Stormwater Management/Flood Control Assessment
City of Rockford
Sinnissippi Watershed
Table Sn-4
SUMMARY OF STORMWATER/FLOOD CONTROL ISSUES AND PROJECTS
SINNISSIPPI WATERSHED, ROCKFORD, ILLINOIS
Brief Description of Issue
1
NE of Chamberlain and Longwood Streets - Several blocks
are experiencing backyard flooding. This area is currently
drained by a 96-inch storm sewer.
2
2nd and Lover Jefferson Streets - Roadway ponding
3
Longwood and Benton Streets - Roadway ponding
4
Parkview Avenue and Spring Creek Road - Intersection is
currently experiencing flooding caused by the unnamed ditch
overtopping near the intersection of Crabapple Lane. To
reduce the frequency of flooding the City is looking to retrofit
the detention facility north of the crossing.
5
Parkwood Avenue and Rural Street - Channel restoration
between James and Parkwood Avenues. This project is part
of the Neighborhood Plan.
SN-7
Proposed Project
Future Project
Maintenance Required
Improvements Completed
Action
Water Quality Impacts
Localized/Nuisance Flooding
#
Major Surface Flooding
Over-bank Flooding
Issue Type
RO
SHADY
VIST
A
CER
Figure Sn - 1
EL RANCHO
EMERSON
REBECCA
WOOD
COOLIDGE
HEMLOCK
Y
MA
RA
FloodWay
WOODLAND
100-yr Floodplain
Issue Type
PARKSIDE
Flooding
BLENHEIM
MORNINGSIDE
Watershed Boundary
SHIRLEY
HAWTHORNE
FAIRVIEW
GLENDALE
STA
Legend
TE
JORDAN
S
GLENDALE
29TH
28TH
CHA
RLE
ALPINE
MAYFAIR
LAUREL
SKYLARK
SUNRISE
TAMARACK
HEMLOCK
CHELSE
A
WARREN
ROLAND
HILTON
AL CREST
ARDEN
GORHAM
CHELSEA
SCOTTSWOOD
STRATFORD
WINTHROP
LUTHER
PALM
HARNEY
27TH
GE
EASTRID
MORSAY
29TH
30TH
24TH
23RD
21ST
RURAL
W
KEITH VIE
20TH
22ND
IR
WREN
CRO
SBY
29TH
VALE
HUNTER
HOLLISTER
OAK KNOLLS
VALE
CALVIN PARK
JAMES
ROBERT
DAWSON
WELTY
ROCKFORD
11TH
11TH
OLD WOOD
KINGS
STRATFORD
BRADLEY
OLD ORCHARD
WESTCHESTER
GREEN MEADOW
PARKWOOD
WOODLANE
JAMES
HIGHVIEW
PARKVIEW
ROCKFORD
ROME
ROCKFORD
SAINT LOUIS
7TH
19TH
LONDON
PARIS
18TH
18TH
10TH
SHAW
WASHINGTON
CHICAGO
LONDON
9TH
Keith Creek
BE
LVO
PETER
RAM
P S
TA
TE
RA
MP
JACOBY
HIGHLAND
HIGHLAND
16TH
17TH
14TH
13TH
8TH
14TH
WO
OD
RU
FF
10TH
2ND
HUTCHINS
15TH
PROSPECT
12TH
AD
OAK GROVE
HIGHCREST
ABBOTSFORD
31ST
51
Y2
HW
ROCK
CLINTON
OXFORD
PROSPECT
SMITH
BOHM
12TH
WILLIAM REGAN
S
10TH
9TH
8TH
7TH
8TH
GARDINER
GARDINER
C
REGAN
REGAN
JOSLYN
SUMMIT
DAVIS
REVELL
ADAMS
LONGWOOD
7TH
2ND
4TH
6TH
RA
ILR
O
7TH
D
C
RI
DG
EW
OO
D
1S
T
HALL
5TH
6TH
KISHWAUKEE
3RD
GREGORY
LEWIS
CUMBERLAND
MELROSE
DOUGLAS
HANCOCK
LOGAN
TONER
LATHAM
RA
MP
RA
M
P
4T
H
2N
D
3R
D
MA
Y
3RD
4TH
8TH
POPE
HARLEM
FREMONT
LATHAM
CHURCH
COURT
GRANT
MA
DI
1S
SO
T
N
R
AR
Y
SE
MIN
ROCK
BUCHANA
N
COURT
HUFFMAN
GR
A
HASKELL
HO
VE
Y
WY
MA
N
WA
TE
MA
IN
CH
PRICE
NO
GARRISON
RT
H
NT
WINNEBAGO
T
CO
UR
UR
CH
RS
MA
N
HO
RT
BRUNER
RIDGE
CARNEY
TACOMA
HENRY
ROCKTON
EVERGREEN
PAULINE
TACOMA
GORDON
WINNEBAGO
WINNEBAGO
EDGEMONT
GRENSHAW
PEACH
SH
O
WEST
WEST
3RD
2ND
1ST
PINECREST
OW
VERBLE
2ND
DAISY
JACKSON
IEW
BROOKV
AY
W
IR
FA
Feet
3
CROSBY
GREENWOOD
OAK
BAKER
BENTON
5
ME
AD
CORBRIDGE
IN
LV
CA
GRAHA
M
CATLIN
2
1ST
VE
D
JACKSON
1
SMITH
LINCOLN
S
LA
KNOWLTON
South Main
SALTE
R LANE
2,000
COLLEGE
BREMER
ET
GREENWOOD
GUILFORD
HAWTHORNE
K
RE E
E
SID
HILL
LD
FIE
EN
E
R
HIC
G
KO
RY EDGEBROOK
BUCKINGHAM
BURRMONT
LUNDVALL
OA
KE
S
HARVARD
GC
ER
LIND
BUCKINGHAM
BARRINGTON
BRENDENWOOD
BARRINGTON
EL
B
WA
LN
UT
OA
K
4
BURRMONT
N
HI
LL
PR
AIR
IE
LA
FA
YE
TT
E
MA
RK
Spring Creek
PELHAM
Sinnissippi
KENT
MONTAGUE
O
IN
SPR
ASPEN
STARKWEATHER
P
M
RA
P
M
RA
BIRCHWOOD
ETH
OL
IV
E
EL
M
MP
RA
EM
AL
RL
HA
ION
T
NA
Y
IND
IAN
PA
RK
ELL
IS
G
LA LEN
W
N
Y
FO
R
LOOMIS
EM
RL
HA
GREENMOUNT
BLAKE
LOOMIS
N
GA
LO
ER
R
GR
O
MORGAN
LE
ON
CA
RL
T
ILL
ES
TN
UT
GR
EE
N
CE
DA
R
RD
CH
CH
ER
SO
N
MU
LB
ER
RY
SA
LE
M
A
GU
JE
FF
UR
CH
NA
PO
W
HI
TM
AN
FI
SH
ER
WOODLAWN
LOCUST
HN
CH
HORSMAN
LEE
ACORN
O
MY
ST
PO
BOILVIN
MP
OLDS
REYN
CA
KING
JO
North Main
TT
ELLIS
CAMLIN
VIEW
Forest Hills
ST
EA
VERNON
BRUCE
MAPLE
Y
YONGE
SA
LE
M
SCHOOL
MULBER
R
GRACE
AUBURN
LAPP
BLINN
Kent Creek
BURTON
UG
DO
N
TAYLOR
QUINCY
HARPER
IS
UR
KILB
ARLINE
CUSTER
A
CAMELL
KNIGHT
BROWN
RR
HA
LAWNDALE
OW
WILL
Ü
ARCADIA
LARSON Proposed Projects
City Limits
DEMPSTER
ROCKFORD
TONAWANDA
South East
Sinnissippi Watershed Flooding Issues
City of Rockford, Illinois
Autumn 2008
RO
SHADY
VIST
A
CER
EL RANCHO
WOOD
COOLIDGE
HEMLOCK
SUNRISE
TAMARACK
HEMLOCK
SKYLARK
LAUREL
EMERSON
WOODLAND
Y
MA
RA
Watershed Boundary
SubType
PARKSIDE
Pipe
BLENHEIM
MORNINGSIDE
"
) Detention
SHIRL
Outfall
!
( EY
HAWTHORNE
FAIRVIEW
GLENDALE
Legend
STA
TE
JORDAN
S
GLENDALE
29TH
28TH
CHA
RLE
ALPINE
MAYFAIR
REBECCA
ARDEN
GORHAM
CHELSEA
CHELSE
A
WARREN
ROLAND
HILTON
AL CREST
OLD WOOD
SCOTTSWOOD
STRATFORD
WINTHROP
LUTHER
PALM
HARNEY
27TH
24TH
23RD
21ST
GE
EASTRID
MORSAY
20TH
22ND
RURAL
W
KEITH VIE
29TH
VALE
HUNTER
HOLLISTER
OAK KNOLLS
VALE
CALVIN PARK
JAMES
ROBERT
DAWSON
WELTY
ROCKFORD
11TH
11TH
KINGS
STRATFORD
BRADLEY
OLD ORCHARD
WESTCHESTER
GREEN MEADOW
PARKWOOD
WOODLANE
JAMES
HIGHVIEW
PARKVIEW
ROCKFORD
ROME
ROCKFORD
SAINT LOUIS
19TH
LONDON
PARIS
18TH
18TH
10TH
SHAW
WASHINGTON
CHICAGO
LONDON
16TH
17TH
9TH
7TH
IR
WREN
CRO
SBY
PETER
RAM
P S
TA
TE
RA
MP
JACOBY
HIGHLAND
HIGHLAND
15TH
PROSPECT
14TH
8TH
14TH
8TH
WO
OD
RU
FF
10TH
2ND
HUTCHINS
13TH
AD
OAK GROVE
BE
LVO
31ST
51
Y2
HW
ROCK
CLINTON
OXFORD
PROSPECT
SMITH
BOHM
7TH
JACKSON
HIGHCREST
CORBRIDGE
GREENWOOD
2ND
4TH
12TH
10TH
12TH
WILLIAM REGAN
S
ADAMS
REVELL
9TH
8TH
7TH
GARDINER
GARDINER
C
REGAN
REGAN
JOSLYN
DAVIS
SUMMIT
LONGWOOD
5TH
1ST
HAWTHORNE
PINECREST
OW
ABBOTSFORD
29TH
30TH
LEWIS
DAISY
6TH
RA
ILR
O
7TH
D
C
RI
DG
EW
OO
D
1S
T
HALL
CROSBY
2ND
4TH
6TH
KISHWAUKEE
POPE
CUMBERLAND
MELROSE
DOUGLAS
HANCOCK
LOGAN
TONER
LATHAM
RA
MP
RA
M
P
4T
H
2N
D
3R
D
MA
Y
3RD
3RD
8TH
GREGORY
AR
Y
BAKER
HARLEM
FREMONT
LATHAM
CHURCH
COURT
GRANT
MA
DI
1S
SO
T
N
R
WA
TE
CATLIN
SE
MIN
ROCK
2ND
VE
D
BENTON
1ST
3RD
WEST
COURT
BUCHANA
N
Feet
HUFFMAN
GR
A
HASKELL
HO
VE
Y
WY
MA
N
CH
MA
IN
PRICE
NO
GARRISON
RT
H
NT
WINNEBAGO
T
CO
UR
UR
CH
RS
MA
N
HO
RT
BRUNER
RIDGE
CARNEY
TACOMA
HENRY
ROCKTON
EVERGREEN
TACOMA
GORDON
WINNEBAGO
WINNEBAGO
EDGEMONT
GRENSHAW
PAULINE
PEACH
SH
O
WEST
GRAHA
M
COLLEGE
BREMER
ET
!
(
ME
AD
VERBLE
WA
LN
UT
OA
K
JACKSON
LUNDVALL
GUILFORD
HARVARD
IEW
BROOKV
AY
W
IR
FA
!
(
MA
RK
GREENWOOD
!
(
OA
KE
S
OAK
LINCOLN
E
HI
LL
PR
AIR
IE
LA
FA
YE
TT
E
BURRMONT
IN
LV
CA
2,000LAN
!
(
N
SMITH
KNOWLTON
SALTE
R
S
LA
!
(
!
(
KENT
MONTAGUE
O
EL
K
RE E
E
SID
HILL
LD
FIE
EN
E
R
HIC
G
KO
RY EDGEBROOK
BUCKINGHAM
BARRINGTON
BRENDENWOOD
BARRINGTON
ETH
GC
ER
LIND
BUCKINGHAM
BURRMONT
Sinnissippi
!
(
!
(PELHAM
B
EL
M
STARKWEATHER
P
M
RA
P
M
RA
(
(!
!!
(
!
(
OL
IV
E
!
(
MP
RA
IN
SPR
ASPEN
BIRCHWOOD
EM
AL
RL
HA
ION
T
NA
Y
IND
IAN
PA
RK
ELL
IS
G
LA LEN
W
N
Y
FO
R
LOOMIS
EM
RL
HA
GREENMOUNT
BLAKE
LOOMIS
N
GA
LO
ER
R
GR
O
MORGAN
LE
ON
CA
RL
T
ILL
ES
TN
UT
GR
EE
N
CE
DA
R
RD
CH
CH
ER
SO
N
MU
LB
ER
RY
SA
LE
M
A
GU
JE
FF
UR
CH
NA
PO
W
HI
TM
AN
FI
SH
ER
WOODLAWN
LOCUST
HN
CH
HORSMAN
LEE
LAPP
BLINN
JO
T
OT
MY
KING
ST
PO
BOILVIN
MP
OLDS
REYN
CA
ELLIS
CAMLIN
VIEW
ST
EA
VERNON
SA
LE
M
MAPLE
Y
YONGE
AUBURN
SCHOOL
MULBER
R
GRACE
BRUCE
ACORN
BURTON
UG
DO
N
TAYLOR
QUINCY
HARPER
IS
UR
KILB
ARLINE
CUSTER
A
CAMELL
KNIGHT
BROWN
RR
HA
LAWNDALE
OW
WILL
Ü
ARCADIA
LARSON Culvert
DEMPSTER
GravityMain
OpenChannel
TONAWANDA
Sinnissippi Outfalls, Detention and Storm Sewer
Figure Sn - 2
City of Rockford, Illinois
Current Data as of Autumn 2008