Photo Timeline of the Wash Project – February
Transcription
Photo Timeline of the Wash Project – February
Photo Timeline of the Wash Project – February & March 2016 The last two photos show the original condition of the wash on Jan 27th before work was begun. If you left click on a photo it will open in a new browser window giving you a larger image. Wash 3/7/16 Wash 3/7/16 One bucket at a time 3/3 ~ 100’ of dirt removed From N end of wash 3/3 Mar 2nd N part of the wash looking N 450’ at N end; dirt now removed. Green Monster loads Green Hauler. N part of wash looking S 3/1 preparing wash for vehicle access. Looking S from N end of wash 3/5/16 3/2 in the N end of wash. Cut out cactus impeding Water flow at N end. Finishing rock on top Complete rip rap on final 200’ of wash wall. Finish rip rap. Dirt from top moved to bottom. Stone in place, 75’ at N end of wash. Completing rip rap on final 200’ of wall. Looking S from N end 2/26. N end of wash 2/26 Upper wall N wash 2/25 Finish rip rap. Upper wall N wash 2/25 Working on upper wall Dirt from top moved into the bottom. Completing rip rap on final 200’ of wall. Pulling last Rosemary on top of wash 2/25. Pulling last Rosemary More Rosemary removal … Tight going 2/23 … and finish grading 2/23…. Starting to look good. More Rosemary…. Working around cable boxes. A resting Bobcat 2/17. Behind Del Vate on the South end 2/17. Top side 2/17. Working on top 2/17. More rock & rip rap. Bobcat Arrival 2/16 One backyard reclaimed S end of wash 2/3. And here are two pictures showing the original condition of the Wash on January 27th, before we started work.
Similar documents
westport commons update
• Healthy Lifestyle and City-Wide Advocacy, Demonstration and Training
More information