El Foco (Venezuela), Alcaravan Gold Project
Transcription
El Foco (Venezuela), Alcaravan Gold Project
Zaruma Resources Inc. El Foco (Venezuela), Alcaravan Gold Project - Upside for the Company February 2006 1 - www.zaruma.com EL FOCO PROJECT (VENEZUELA) Alcaravan Gold Project (El Foco, Venezuela) q Heap leach gold project with considerable upside potential q Located in historical highly productive and gold prospective Chicanan-El Foco Greenstone Belt. q Dirt road access. q Existing site office and camp. q Large data base (ex Homestake property) q 13,700 hectares, 100% Zaruma owned. February 2006 2 www.zaruma.com EL FOCO CAMP q Established Local Infrastructure (ex Homestake Camp): February 2006 3 to Alcaravan: 3 km www.zaruma.com ALCARAVAN to Camp: 3 km February 2006 4 www.zaruma.com Zaruma: Alcaravan Heap Leach Pilot Gold Project q Open pit, saprolite gold resource N with 1,035,000 tonnes measured and indicated resources grading 2.8 Au g/t (100,000 oz.), NI 43-101, P&E Mining Consultants q Excellent leach results (KCA). q Stand-alone, attractive 20,000 oz pa pilot gold heap leach project Block Grades: § § § 0.65 g Au/t - 1.0 g Au/t 1.0 g Au/t - 2.0 g Au/t 50 m > 2.0 g Au/t February 2006 5 www.zaruma.com El Foco & Alcaravan: Considerable Upside Potential q Extensive untested gold anomalies. q Alcaravan: 100.000 oz in saprolite to a depth of 60 metres. q Potential for additional saprolite resources. q Untested primary gold potential, for example, Zaruma drilled below Alcaravan saprolite, high grade gold intercepts: - Al32-04: 6.0 m @ 43.0 Au g/t incl. 1.0 m @ 130.2 g/t - Al35-04:1.5 m @ 11.5 g/t February 2006 6 www.zaruma.com EL Foco Strategy q Complete the economic evaluation and Technical Report on Alcaravan, field work by Kappes, Cassiday and Associates (KCA) and P&E Mining Consultants was completed early 2005 q File an application for a mine construction permit with Venezuelan authorities, describing Alcaravan as a pilot project. q Success or encouraging signs with the permitting process supports farm-out discussions or further own work in the future, including further exploration q Alcaravan Pilot Project should satisfy new official guidelines for mining projects: -- Technology Transfer: the first modern heap leach operation in Venezuela -- Creation of jobs February2006 7 www.zaruma.com