KATHERINE SHAW BETHEA HOSPITAL
Transcription
KATHERINE SHAW BETHEA HOSPITAL
KATHERINE SHAW BETHEA HOSPITAL DIXON, ILLINOIS Project Description CLIENT: Various LOCATION: Dixon, Illinois PROJECT COST: $3,500,000 COMPLETED: 2007 DESCRIPTION: Wendler provided structural engineering services in the planning and design stages of construction of a two level parking deck at the KSB campus. Additional work included an adjacent parking lot design and preparing a site grading and drainage plan Services Provided LAND SURVEYING STRUCTURAL ENGINEERING CIVIL ENGINEERING CONSTRUCTION LAYOUT ENGINEERS SURVEYORS SCIENTISTS